May 2013
BIG FESTIVE SALE 2013 2013 July
Ramadan
10 July – 7 Aug
Aug
Sept
Oct
Nov
Hari Raya
Malaysia Day
Hari Raya Haji
Deepavali & School Holiday Begins
8 & 9 Aug
16 Sept
15 Oct
2 Nov & 16 Nov onwards
The campaign period starts from Ramadan 2013 stretching all the way to Deepavali 2013 – covering all major festivities & holidays
FESTIVE TRAFFIC AT NORTH-SOUTH EXPRESSWAY
NORTH-SOUTH EXPRESSWAY 1040 Savings RM 100,781 1.4 x ROI
Value-Add Package 1040 x 5 sites
Freeway Coverage Northern – 13 sites Southern – 7 sites Media
No. of Sites
Rental (RM)
6% GST (RM)
Production (RM)
137,850
8,271
60,000
46,000
2,760
20,000
TOTAL (RM)
183,850
11,031
2013 FESTIVE RATE (RM)
125,000
7,500
Display Size
Duration (mths)
Lighting (RM)
Total (RM)
N/A
274,881
80,000
N/A
274,881
41,600
N/A
174,100
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
North-South Expressway
15
10ft x 40ft
Value-Add 10ft x 40ft Billboards
5
10ft x 40ft
5 months
TOTAL SAVINGS (RM)
100,781
NORTH SOUTH EXPRESSWAY 1040 State
Site No
Location Add
Size
Available
NORTH
PS1000
KM125.25 (nb-offside) Ladang Bertam I/C - Sg. Petani Selatan I/C
10x40
01/07/2013
NORTH
PS0794
KM344.20 (nb) Sungkai I/C-Bidor I/C
10x40
03/08/2013
NORTH
PS1025
KM338.95 (nb) Bidor I/C - Tapah I/C
10x40
01/07/2013
NORTH
PS0565
KM384.10 (nb) Behrang - Slim River
10x40
01/07/2013
NORTH
PS1041
KM404.0 (nb-offside) Lembah Beringin I/C - Tanjung Malim I/C
10x40
01/07/2013
NORTH
PS1051
KM420.55 (nb-offside) Lembah Beringin I/C - Bukit Beruntung I/C
10x40
01/07/2013
NORTH
PS1140
KM438.5 (sb-offside) Bukit Beruntung I/C - Rawang I/C
10x40
01/07/2013
NORTH
PS1028
KM402.60 (sb) Slim River I/C – Behrang I/C
10x40
01/07/2013
NORTH
NSH-061
KM224.50 (sb-offside) Perspg Changkat Jering menuju ke Perspg Kuala Kangsar
10x40
01/07/2013
NORTH
PS1017
KM209.7 (sb) Taiping I/C - Changkat Jering I/C
10x40
01/07/2013
NORTH
PS0798
KM128.70 (sb) Ladang Bertam I/C - Sg. Dua I/C
10x40
01/07/2013
NORTH
PS0265
KM128.70 (sb) Ladang Bertam I/C - Sg. Dua I/C
10x40
01/07/2013
NORTH
PS0980
KM76.60 (sb) Pendang-Gurun
10x40
01/07/2013
SOUTH
PS0349
KM137.80 (nb) Yong Peng Utara I/C-Pagoh I/C
10x40
01/07/2013
SOUTH
PS0607
KM38.20 (nb) Kulai I/C to Sedenak I/C
10x40
01/07/2013
SOUTH
PS0614
KM17.30 (sb) Senai I/C - Skudai I/C
10x40
01/07/2013
SOUTH
PS0963
KM132.06 (sb) Pagoh - Yong Peng Utara
10x40
01/07/2013
SOUTH
PS0577
KM113.80 (sb) Pagoh - Yong Peng Utara
10x40
02/08/2013
SOUTH
LK0052
KM24.55 (sb) Linkedua - Tuas
10x40
01/07/2013
SOUTH
LK0056
KM26.9 (nb) Gelang Patah - Senai
10x40
01/07/2013
# all sites listing are subject to changes
NORTH-SOUTH EXPRESSWAY 2060
Savings RM 96,373 1.3 x ROI
Freeway Coverage Northern – 3 sites Central – 3 sites Southern – 3 sites East – 1 site Media
No. of Sites
Duration (months)
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
Total (RM)
5 months
167,333
10,040
120,000
12,000 ( 2 sites)
309,373
TOTAL
167,333
10,040
120,000
12,000
309,373
2013 FESTIVE RATE (RM)
132,500
7,950
62,550
10,000
213,000
Display Size
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
• • • •
NSE –Northern x 3 NSE -Southern x 3 Central x 3 East Coast x 1
10
20ft x 60ft
TOTAL SAVINGS (RM)
96,373
NORTH-SOUTH EXPRESSWAY 2060 State
Site No
Size
Lighting
Available
NORTH
PS0484
KM414.80 (nb) Rawang I/C - Tanjung Malim I/C
20x60
No
Immediate
NORTH
PS0426
KM1.10 (sb) Bukit Kayu Hitam-Jitra Utara
20x60
No
Immediate
NORTH
PS0440
KM102.60 (sb) Sg. Petani Utara I/C - Sg. Petani Selatan I/C
20x60
No
Immediate
CENTRAL
GT0015
KM18.8 (nb) Guthrie Highway
20x60
No
Immediate
CENTRAL
EL0144
KM25.30 (sb) Dari persimpangan Putrajaya menuju ke persimpangan KLIA
20x60
Yes
Immediate
CENTRAL
PS0722
KM15.35 (sb-offside) Dari Persimpangan DamansaraPersimpangan Subang
20x60
No
Immediate
SOUTH
SEL-165
KM296 (sb) 'Kg. Teras Jernang/KL-Seremban H`way/Bangi
20x60
Yes
Immediate
SOUTH
PS0360
KM148.10 (sb) Tangkak I/C - Pagoh I/C
20x60
No
Immediate
SOUTH
BGT-073
Kampung Teras Jernang/KL-Seremban Highway
20x60
No
Immediate
EAST
BT0380
KM97.50 (eb) Lebuhraya Pantai Timur
20x60
No
Immediate
Location Add
NORTH-SOUTH EXPRESSWAY OHB
Media
No. of Sites
Savings RM 108,273 1.4 x ROI
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
Total (RM)
167,333
10,040
98,400
22,500 (3 sites)
298,273
TOTAL (RM)
167,333
10,040
98,400
22,500
298,273
2013 FESTIVE RATE (RM)
106,000
6,360
58,890
18,750
190,000
Display Size
Duration (mths)
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
• Kepala Batas (JKR0033) • Sg Petani Selatan (JKR0442) • Bukit Tagar (PS0913) • Ayer Keroh (BT0438) • Yong Peng Selatan (PS0364)
5
Various
5 months
TOTAL SAVINGS (RM)
108,273
NORTH-SOUTH EXPRESSWAY OHB State
Site No
NORTH
JRK0033
NORTH
Location Add
Display Size
Lighting
Available
KM39.45 Di Jejambat dari persimpangan Kepala Batas menuju ke persimpangan Alor Setar Utara
7x120x2p
No
15/05/2013
JKR0442
KM112.40 Sg. Petani Selatan I/C - Ladang Bertam I/C
7x120x2p
Yes
Immediate
NORTH
PS0913
KM419.55 Bukit Tagar I/C
10x120x2p
No
15/05/2013
SOUTH
BT0438
KM184.80 Ayer Keroh I/C - Jasin I/C
10x120x2p
Yes
01/07/2013
SOUTH
PS0364
KM94.50 Yong Peng Selatan I/C
7x120x2p
Yes
01/07/2013
KLANG VALLEY METRO OHB
Media
No. of Sites
Savings RM 83,770 1.4 x ROI
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
Total (RM)
5 months
157,000
9,420
42,850
22,500 (4 sites)
231,770
TOTAL (RM)
157,000
9,420
42,850
22,500
231,770
2013 FESTIVE RATE (RM)
94,000
5,640
26,560
21,800
148,000
Size
Duration (mths)
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
• Jln Damansara/ SPRINT (SP/OHB/13-2) • East West Link/ Mid Valley (BT0479) • Salak Selatan (BT0473) • Jln Pudu/ Jln Tun Perak (ST0544/45) • Ampang Point (PL0013)
5
Various
TOTAL SAVINGS (RM)
83,770
KLANG VALLEY METRO OHB Site No SP/OHB/13-2 #BT0479 BT0473 # ST0544/45 PL0013
Location Add
Display Size
Lighting
Available
10x125x1p
Yes
Immediate
East West Link/ Tmn Desa menuju ke Mid Valley Megamall
7x45x1p
No
Immediate
Besraya Highway, Salak Selatan menuju ke KL
6x100x2p
Yes
Immediate
Jalan Pudu/ Jln Tun Perak
6x80x2p
Yes
Immediate
Jalan Ampang menuju ke Ampang Point
7x80x1p
Yes
Immediate
KM2.6, Jln Damansara/ TTDI Bypass (KL to PJ view)
# protrusions not permissible
KLANG VALLEY 1040
Savings RM 93,700 1.4 x ROI
Media
No. of Sites
Display Size
Duration (mths)
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
120,000
7,200
32,000
7,500 (4 sites)
Total (RM)
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
KLANG VALLEY Value-Add • 10ft x 40ft Billboards • Lightbox @ KLCAT
8
10ft x 40ft 5 months
2 4
10ft x 40ft 6ft x 4ft
241,700 60,000
3,600
11,400
N/A
TOTAL (RM)
180,000
10,800
43,400
7,500
241,700
2013 FESTIVE RATE (RM)
110,000
6,600
24,150
7,250
148,000
TOTAL SAVINGS (RM)
93,700
KLANG VALLEY 1040
State
Site No
KEPONG
11-1014-6-96s
DAMANSARA
SP/96s/11-3
SETAPAK
Location Add
Size
Lighting
Available
On Sides of OHB at Jln Sg. Buloh/Jln Kepong,near Kompleks Desa-Site 6
10x40
Yes
15/05/2013
At the OHB, KM0.55, Kayu Ara Intersection (Damansara Jaya), Sprint
10x40
Yes
Immediate
UP0133
Jalan Usahawan/ Jalan Usahawan 5, Setapak
10x40
No
15/05/2013
KUCHAI LAMA
BT0490
Di laluan alternatif Jln Kuchai Lama ke Jln Kelang Lama
10x40
No
Immediate
SHAH ALAM
UP0044
Jalan Subang / Jalan Kerjaya, Shah Alam
10x40
No
15/05/2013
KUALA LUMPUR
WGT-124
Jln Maharajalela/Jln Syed Sulaiman, Kuala Lumpur
10x40
Yes
15/05/2013
MRR2
UP0131
Jalan Genting klang / Lebuhraya Lingkaran Tengah II
10x40
No
15/05/2013
PUCHONG
BT0492
Jalan Puchong/ Jalan Kinrara, Puchong
10x40
No
15/05/2013
WANGSA MAJU
UP0564
Jalan 34/26 / Jalan 42/26 berhampiran Rampai Court, Wangsa Maju
10x40
No
Immediate
KLANG
BT0466
Prsn Jln Pekan Baru / Jln Kawasari 6 berhampiran SK(1) Jln Batu Tiga Klang
10x40
Yes
01/06/2013
REGIONAL 1040
Main Market Centres Northern – 4 sites Central – 6 sites Southern – 2 sites East – 2 sites
Savings RM 211,030 1.5 x ROI
Other Towns Northern –2 sites Southern –2 sites East –2 sites
Media
No. of Sites
Display Size
Duration (mths)
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
Total (RM)
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
Main Market Centres
14
10ft x 40ft
5 months
210,000
12,600
56,000
18,750 (10 sites)
297,350
Other Towns
6
10ft x 40ft
5 months
55,500
3,330
24,000
N/A
82,830
Value-Add • Digital @ KKIA • Digital @ KIA
6 6
Various
5 months
60,000
3,600
8,000
N/A
71,600
TOTAL (RM)
325,500
19,530
88,000
18,750
451,780
2013 FESTIVE RATE (RM)
171,676
10,301
40,023
18,750
240,750
TOTAL SAVINGS (RM)
211,030
REGIONAL 1040 State
Site No
Location Add
Lighting
Size
Available
Yes
10ft x 40ft
Immediate
No
10ft x 40ft
Immediate
Jln Air Itam/Before Han Chiang School/Right
No
10ft x 40ft
Immediate
Pasir Puteh/Jln Leong Boon Swee, Perak
Yes
10ft x 40ft
15/05/2013
Jln Sg Buloh/Junction to Bandar Utama, Kuala Lumpur
No
10ft x 40ft
15/05/2013
MAIN MARKET CENTRES Simpang Jalan Tuanku Abd Rahman Putra & Jalan Pekan Melayu, Alor Setar Di Jalan Masjid dekat stesen kecil TNB dan Kompleks Cayman City Point, Sg Petani
KDH
UP0204
KDH
UP0217
PEN
PP-067
PRK
PRK-034
WP
KL-099
WP
WGT-124
Jln Maharajalela/Jln Syed Sulaiman, Kuala Lumpur
Yes
10ft x 40ft
01/07/2013
SGR
KUR0077
On Sides of OHB at Jln Sg. Buloh/Jln Kepong,near Kompleks Desa-Site 3
Yes
10ft x 40ft
Immediate
SGR
KUR0079
On Sides of OHB at Jln Sg. Buloh/Jln Kepong,near Kompleks Desa-Site 5
Yes
10ft x 40ft
15/05/2013
SGR
KUR0087
Jln Utara (near FINAS & Sek. Rendah Sri Petaling) Site 1
Yes
10ft x 40ft
Immediate
SGR
KUR0101
Yes
10ft x 40ft
Immediate
JHR
UP0274
Yes
10ft x 40ft
15/05/2013
JHR
UP0272
Yes
10ft x 40ft
15/05/2013
PHG
CGT-052
Persimpangan Jln Sultan Abu Bakar ke Kuantan/Kanan
No
10ft x 40ft
15/05/2013
PHG
UP0320
Di Persimpangan Jalan Mahkota/ Jalan Merdeka, Kuantan
Yes
10ft x 40ft
15/05/2013
Jln Kerjaya near Orchid Farm & slip road towards Jln Subang (Glenmarie) Tepi Jln Yahya Awal Berhampiran Taman Rekreasi Hutan Bandar, Johor Bahru Persimpangan Jln Abad/Jln Kebun Teh Lama berdekatan RISDA, Johor Bahru
# all sites listing are subject to changes
REGIONAL 1040
State
Site No
Location Add
Lighting
Size
Available
No
10ft x 40ft
Immediate
No
10ft x 40ft
15/05/2013
OTHER TOWNS Per Jln Siakap berhpr Kompleks Sukan Sony Seberang Jaya menuju ke Pusat Bdr Butterworth Jalan Slim River- Tg Malim Berhampiran Kawasan Rawat Dan Rehat, Slim River
PEN
PP-084
PRK
UP0196
JHR
UP0287
KM9, Jalan Besar Batu Pahat ke Muar/ Kg. Bagan, Batu Pahat
No
10ft x 40ft
15/05/2013
JHR
UP0297
Jalan Besar Sp. Renggam- Johor Bahru berhampiran AW Pottery, Simpang Renggam
No
10ft x 40ft
15/05/2013
PHG
UP0333
Berhampiran SHELL, jalan besar Karak ke Kuantan, Mentakab
No
10ft x 40ft
15/05/2013
PHG
UP0360
Simpang Empat, Jalan Besar Kampung Raja, Besut
No
10ft x 40ft
Immediate
No
Various
Immediate
Value Add KK KUCHING
-
• •
Digital @ KKIA Digital @ KIA
# all sites listing are subject to changes
SPECTACULAR
Media
Savings RM 299,551 1.4 x ROI
No. of Sites
Display Size
Duration (mths)
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
Total (RM)
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
• Ipoh (AGT-146) • KLIA (EL0171) • JB (PS0922)
3
60ft x 40ft
5 months
412,501
24,750
128,000
45,000
610,251
Value-Add – KJ LINE • BULKHEAD @ KL Sentral • ADTRACK @ KLCC, M.Jamek
1 2
12ft x18ft 5ft x10ft
5 months
75,000
4,500
11,600
N/A
91,100
TOTAL(RM)
487,501
29,250
139,600
45,000
701,351
2013 FESTIVE RATE (RM)
264,000
15,840
81,960
40,000
401,800
TOTAL SAVINGS (RM)
299,551
SPECTACULAR Site No
Display Size
Lighting
Available
NSE/ Ipoh – Tambun Farm, Perak
20xx80x2p
Yes
Immediate
EL0171
KM A4.55(nb) Lebuhraya ELITE
60x40x2p
Yes
Immediate
PS0922
KM4.8 (sb) Plaza Tol Kempas – Skudai I/C, Johor Bahru
60x40x2p
Yes
01/07/2013
12ft x18ft 5ft x10ft
N/A
Immediate
AGT-146
Location Add
Value-Add -
• •
BULKHEAD @ KL Sentral ADTRACK @ KLCC, M.Jamek
GO DYNAMIC
Festive season – targeting the ‘Balik Kampung’ crowds, travelers, shoppers & commuters
High Penetration, prompting purchases and creating buzz
East Malaysia Airport – more than 10mil ‘Balik Kampung’ travelers during the festive period
Digital Network– innovative and creative messages enable to grab full attention from the public across all platform Klang Valley– Increase brand awareness during the busiest period around town during this festive month
GO DYNAMIC
DIGITAL @ TRANSIT
DIGITAL @ KLCC & THE CURVE
DIGITAL @ KKIA & KIA
GO DYNAMIC – INVESTMENT SUMMARY Media
No. of Sites
Duration (mths)
Size
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
Total (RM)
24,540
(Digital Content & System Mngt)
N/A
445,540
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) Kelana Jaya & Ampang Line
9
various
165,000 12,000
Suria KLCC Escalator Lobbies (14 units) & The Curve Retail Floor (10 units @ 5 standee)
24
various
KKIA & KIA Baggage Halls (16 units)
16
63”
5 mths
144,000
100,000
TOTAL (RM)
409,000
24,540
12,000
N/A
445,540
2013 FESTIVE RATE (RM)
200,000
12,000
0
N/A
212,000
SAVINGS (RM)
233,540
* Production does not include Content Development (RM4,000 per content/RM8,000 for Cubig)
GO DYNAMIC (SHOPPING DEAL) CUBIG DIGITAL SERIES
KLCC & THE CURVE Located within the landmark Twin Towers, it is easily accessible through the LRT and main roads like Jln Tun Razak and Jln Ampang Approximately 3,500,000 traffic
count per month
Located in the affluent residential and commercial development within Mutiara Damansara . Walk-in traffic approx. 2.2 million a month
GO DYNAMIC (SHOPPING DEAL) – INVESTMENT SUMMARY Media
No. of Sites
Duration (mths)
Size
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
Total (RM)
23,640
(Digital Content & System Mngt)
N/A
429,640
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) Cubig Digital Series @ Bukit Bintang Suria KLCC Escalator Lobbies (14 units) & The Curve Retail Floor (10 units @ 5 standee)
3
various 5 mths
24
12,000
250,000
various
144,000
TOTAL (RM)
394,000
23,640
12,000
N/A
429,640
2013 FESTIVE RATE (RM)
245,000
14,700
8,300
N/A
268,000
SAVINGS (RM)
161,640
* Production does not include Content Development (RM4,000 per content/RM8,000 for Cubig)
TRANSIT & SHOPPING MALL
KELANA JAYA LINE
AMPANG LINE
SURIA KLCC
KELANA JAYA LINE & AMPANG LINE - Targeting more than 9.98 million commuters per month, high recall rate advertising SURIA KLCC - Approximately 3.5 million traffic count per month, Shoppers are affluent professionals with an average income of RM 7,00 Media
No. of Sites
Size
Duration (mths)
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
Total (RM)
24,300
43,850
2,000
475,150
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months) Transit Kelana Jaya & KL Sentral VLB
25 units
5ft x 3ft
Transit Ampang Line Horizontal Panels
25 units
5ft x 10ft
Shopping Malls KLCC, The Curve, The Spring, Alamanda
4 units (1 mall x 1 unit)
5ft x 3ft
187,500
5 mths
187,500
30,000 TOTAL (RM)
405,000
24,300
43,850
2,000
475,150
2013 FESTIVE RATE (RM)
200,000
12,000
38,000
FOC
250,000
SAVINGS (RM)
225,150
KLANG VALLEY PACKAGE ( JLN BANGSAR & AKLEH) Value-Add Package Lightbox @ AKLEH
Jalan Bangsar is well-known for its affluent residential suburb surrounded by commercial buildings, F&B outlets, shopping malls with a private hospital nearby as well . Traffic count: 1.4 million. AKLEH links the affluent highdensity population of Ampang to Jalan Sultan Ismail, the heart of the golden triangle in downtown KL. Traffic count: 1.8 million Media
No. of Sites
Rental (RM)
6% GST (RM)
Production (RM)
Lighting (RM)
Total (RM)
112,500
5,280
32,000
N/A
125,280
16,800
432
6,000
N/A
23,808
TOTAL (RM)
129,300
7,758
38,000
N/A
149,088
2013 FESTIVE RATE (RM)
82,200
4,932
37,088
N/A
111,500
Duration (mths)
Size
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
Pillar Wrap – Jln Bangsar (SectionA) Value-Add Lightbox – AKLEH (PL0049 – PL0060)
5
Various 5 mths
12
6ft x 4ft
SAVINGS (RM)
37,588
GO KUCHING
•
•
•
Spectacular OHP: Creating a stand separating you from the clutter. Good for branding exercise, creating the image of an industry leader. Double-sided OHP welcomes all that arrives and bid farewell to those that are leaving Kuching. An iconic landmark once you arrive in Kuching. Digital Screens: after Immigration Halls (Arrival) Media
No. of Sites
Rental (RM)
6% GST (RM)
Production (RM)
Lighting/C M (RM)
Total (RM)
210,000
12,600
26,000
7,500
256,100
50,000
3,000
4,000
4,240
61,240
TOTAL (RM)
260,000
15,600
30,000
11,740
317,340
2013 FESTIVE RATE (RM)
146,000
8,760
25,740
7,500
188,000
Duration (mths)
Size
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
Spectacular OHP / Arch– Jln Lapangan Terbang Digital Screens – After Immigration Hall (Arrival)
1 OHP
6 screens
10’ x 100’ (2sided)
5 mths
50” vertical
SAVINGS (RM)
129,340
GO KOTA KINABALU
• •
External Pillar Wraps: Your ad welcomes all while queuing up for taxi and/or pick up point (Arrivals). Visible from the new wing retail shops. Average waiting time of 15 minutes (depending on traffic). Digital Screens: in waiting halls and also free-duty shopping area (Departures). Media
No. of Sites
Rental (RM)
6% GST (RM)
Production (RM)
Lighting/CM (RM)
Total (RM)
50,000
3,000
17,500
N/A
70,500
50,000
3,000
4,000
4,240
61,240
TOTAL (RM)
100,000
6,000
21,500
4,240
131,740
2013 FESTIVE RATE (RM)
60,000
3,600
17,500
4,240
85,340
Duration (mths)
Size
COMMENCEMENT: 1 July 2013 to 30 November 2013 (5 months)
External Pillar Wrap – Public Concourse, Arrival
5 pillars
Digital Screens – In Waiting Halls, Departure
10 screens
15’ x 12’ 5 mths 50” vertical
SAVINGS (RM)
46,400
NOTES TO ADVERTISER: • “Big Festive Sale 2013” is valid for incharge date not later than 15 July 2013. • Availability of sites/packages are based on first come first serve basis and subject to confirmation at the time of booking. • Big Tree reserves the right to offer alternative media as value-add in the event of non-approval from the authorities or non-availability of media at time of booking. • Package rate is not applicable for renewal/extension. Renewal will be based on new rate. • Production cost is based on inkjetprint and does not include special effects/protrusions. Additional cost shall apply for such design. Inkjetprint materials can last for period of 8-10 months. Payment Terms • Rental & Lighting – Two (2) equal payments in advance. • Production – 1st 50% prior to commencement of production, balance payable upon installation. • Big Tree reserves the right to vary terms and conditions.