Company Profile
March 2015 DRILLING SERVICES INTERNATIONAL, INC. Zip. 150749 #1133, Manhattan Bldg., 33, Gukjegeumyung-ro 6-gil, Yeongdeungpo-gu, Seoul, Korea / Tel. 82-2-785-5485 Fax. 82-2-785-5487 http://drill4future.com
1. Greetings Mining investments of Korea has been limited to simple financial investment or purchasing mining products. Recently, with the strong support of Korean government for securing energy resources, financial investors as well as strategic investors in Korea begin to aggressively seek potential development projects and participate in international big mining projects. Accordingly, as the resource development’s vitamin, mining services business in Korea including evaluation, exploration and drilling, field operation are now in desperate need for investors and in the process of going international. In response to this business climate, Drilling Services International Corp.(DSI) was established in September 2011 as the nation’s first drilling services company in mining and geothermal area. DSI is invested by Hanjin D&B(HDB) with the expectation of the business bringing in a financial gain for all backers. Hanjin D&B(HDB) is a world famous innovative drill rig manufacturer in Korea. Based on the 25 yrs’ experience and knowledge, HDB is world’s third-ranked company in sales of drilling rig by exporting hundreds of drilling rigs and equipments per year over the world. Particularly, HDB is the world best company in the area of water hammer and RC drilling machine. HDB performed 35,000 m drilling of uranium mine in Mongolia(under the order of COGE GOBI, AREVA, France) in 2007. In 2009, HDB carried out directional drilling with total length of 1,400m for Korea Hydro & Nuclear Power Co., Ltd. HDB has received many patents for global drilling equipment manufacturing related technologies, such as Water hammer drilling, Large-diameter(10 inch) core drilling, directional drilling, and Sonic drilling, etc. Although DSI is a small start-up now, we promise that we provide competitive services in a near future with the core advantages created by combining manufacturing capability of HDB and services experience and investors connection of EHG.
Starting from the exploration drilling services for Rapu-Rapu copper mining operated by LG Corp. in Philippines, DSI provide gold mine drilling service for PT T.M.E in Bengkulu, Indonesia(2013). Also, we are drilling CBM(CoalBed Methane) exploration, operation drilling service in Kapuas, Indonesia(2013). DSI will provide various services for domestic investors with the highest quality and technology. In the future, throughout continuous acquisition, equity investment and joint venture with small and medium sized local drilling companies in global resources rich countries including Australia, Canada, South America and Asia, DSI will try to its best to become world’s third big mining service company within a few years to come. DSI will also do its best to secure nation’s resources through enhancing international competitiveness in the area of mining drilling services in Korea. Sincerely March 2015
Salesio (Suk-Ho) Ryu
2. Company Overview Company name : Drilling Service International Co., Ltd. President : Salesio (Suk-Ho) Ryu Established : July, 2011 (Business start : March, 2006) Business Scope -
Shale Gas, CBM, Oil&Gas, Mining, Deep Geothermal Drilling Services Oil&Gas Field Operation Services Mining & Processing Services Technical, Operational Training Services Professional & Technical Training Services (Shale Gas, CBM, Mining, Oil&Gas, Industry) Energy Resource R&D Service
Contact - Address : # 1133, Manhattan Bldg., 33, Gukjegeumyung-ro 6-gil, Yeongdeungpo-gu, Seoul, Korea - Fax : 82-2-785-5487 - Tel. : 82-2-785-5485 - E-mail :
[email protected] - Address : Ariobimo Sentral 4th Floor Suite #416 Jl. H.R. Rasuna Said Block X-2 Kav.5 Jakarta 12950 Indonesia - Tel. : (62-21) 527-0717 - Fax : (62-21) 252-5760 - E-mail :
[email protected]
3. Business Scope
Engineering Business Consulting Business Training Business
R&D
• Shale Gas, CBM, Oil&Gas, Mining, Deep Geothermal Drilling Services • Oil&Gas Field Operation Services • Mining & Processing Services
• Technical, Operational Training Services
• Professional & Technical Training Services (Shale Gas, CBM, Mining, Oil&Gas, Industry)
• Energy Resource R&D Service
4. History
2011
July : Established Drilling Services International
July~March, 2012 : Drilling Investigation of Rapu-Rapu Mine, Philippines July~Current : PT. SUGICO, Indonesia (CoalBed Methane Drilling Technology Joint Study on Site)
2012
April : 1st CBM Education & Training April~July : Diamond Core Drilling of Gubong & Ongam Gold Mine, Korea April~Sep, 2013 : Deep Geothermal Drilling by Water Hammer, Korea (Depth 3,500m) June : 2nd CBM Education & Training June~Current : R&D Project (CBM Production Technology Optimization and On-site Empirical Research) July~Current : Geothermal Research Drilling by Water Hammer, Seoul National University, Korea
4. History
2012
August~July 2013 : R&D project (Research on the Valuation Modeling and the Establishment of Application Standards for CBM Development Projects) August~December : Zirconium Mine Drilling Services, Indonesia November~Current : R&D project (Development of CO2 Geological Storage Technologies through 1,000 ton CO2-EOR Pilot Test)
2013
January~July : Bengkulu Tambang Sawah Gold Mine Project, Indonesia May~March, 2014 : Bengkulu Lebong Tambang Gold Mine Project, Indonesia May~November : KAPUAS CBM Drilling, Indonesia(1st End) September~December : Lampung Semangka Geotechnical Drilling, Indonesia December~November : R&D project (Pilot Test Research for Directional Drilling System)
4. History
2014
February~June : KAPUAS CBM Drilling, Indonesia(2nd) June~September : Magalau CBM Production Well Drilling, Indonesia(3rd)
August~November : Belimau Gold Mine Drilling, Indonesia
October~November : Pangkalan Bun Titanium Mine Drilling, Indonesia December~Current : On-site verification to cable free land seismic exploration for oil and gas reservoir, Myanmar
2015
January~Current : Peru Olmos Undergroundwater Project, Peru
5. Headquarter
• Mr. Allan Bray (AMT, Australia)
Advisory Group President/ Salesio (Suk-ho) Ryu Drilling Services Division • Team manager
R&D Center • Director of Research
Mr. Dong-keun Shin • Manager Mr. Jae-woong Moon Mr. Gi-hyeon Kim Mr. Jae-kyoung Yoon • Driller Mr. Sang-su Kim Mr. Duk-geun Jeon Mr. Jong-pil Kim Mr. Hak-jun Lee
Administration
Team manager Dr. Won-beom Kim
• Mr. Roger Lord • Dr. Suk-whan Park(KIGAM)
Overseas Operation
• Team manager
Dr. In-hang Yoo •
• Mr. Tom (PSI, Indonesia)
Mrs. Ji-na Kim •
Indonesia
Manager Miss. Ji-hye Lee
Philippines
• Manager Mr. Young-sik Lim
Mongolia
Mr. Hyung-seok Yu
Australia
6. Key Members(Headquarter)
President Salesio (Suk Ho) Ryu • Hanjin D&B Co. Ltd., Director of Oversea business division • Hanyang University, MBA course • Inha University, BSc. in Resources Engineering
Director of R&D Center In Hang Yoo • Chonnam National University, adjunct professor • Hanyang University, Ph.D. in Petroleum Engineering • P.E.(Energy Mineral Resources Management) • GeoScan, Director of Research(past)
6. Key Members(Headquarter)
Advisor Suk Whan Park • 2012~Current, Korea Institute of Geoscience and Mineral Resources, Honorary Researcher • September 2011~July 2012, GeoScan, Advisor • May 2011, Korea Institute of Geoscience and Mineral Resources, Senior Researcher • Seoul National University, Ph.D. in Resources Engineering
Advisor Roger Lord • Consultant for South West Pinnacle Drilling, overseeing coal seam gas project and other major drilling project in India. • Overseeing a major exploration project for Rio Tinto as consultant for South West Pinnacle in India. • Consultant for DrillCorp in control of design and implementation of BOP for geothermal exploration sites in the volcanic regions of the northern Philippines • One year as Country Manager of India for Mitchell Drilling Pty Ltd.(past) • Water Bore Consultant(Past)
6. Key Members(Headquarter)
Team Manager of Drilling Services Division Dong Keun Shin • Chonbuk National University, BSc. in Resources Engineering • Geo Meca Engineering co. Ltd., Manager(past) • DIKE E&C(past) • Major : Mining & Mineral Engineering, Geophysical Survey
Manager of Drilling Services Division Jae Woong Moon • Hangyang University, BSc. In Resources Engineering • License : Engineer Mining Safety Craftsman Boring • Major : Drilling & Geophysical Survey
6. Key Members(Headquarter)
Manager of Drilling Services Division Gi Hyeon Kim • Chonnam National University, BSc. in Resources Engineering • ITB Exchange Student • KOGAS Intern Worker • Major : Drilling & Geophysical Survey
Manager of Drilling Services Division Jae Kyoung Yoon • Dong-a University, BSc. In Resources Engineering • EMRD Mining Internship Program(Mongolia) • Major : Drilling & Geophysical Survey
6. Key Members(Headquarter)
Team Manager of R&D Center Won Beom Kim • Chonnam National University, Adjunct Instructor(past) • Chonnam National University, Ph.D. in Resources Engineering • Major : Rock Fracture & EDZ(Excavation Damaged Zone), Numerical Analysis
Manager of R&D Center Hyung Seok Yu • Inha University, M.S. In Petroleum Engineering • Inha University, BSc. In Mechanical Engineering • Major : Research & Development Management
6. Key Members(Headquarter)
Manager of R&D Center Young Sik Lim • Seoul National University of Science and Technology, BSc. In Electric Information Engineering • Korea institute of Energy Tech. Evaluation and Planning(past) • Major : Research & Development Management
7. Indonesia Branch DSI (Korea Headquarter) Indonesia Branch Mr. Richard Chai Goo Lee (President of Branch)
Drilling Services Division
• Supervisor Mr. Batara Bonatua
Mining
• Geologist 1 • Driller 5 • Ass. Driller 10 • Supervisor Mr. Novianti
CBM
• Geologist 1 • Driller 3 • Ass. Driller 6
Workshop (Warehouse) • Manager Mr. Rint Jap • Office worker 3 • Worker 7
Administration
• Manager Mr. Suhatril Ucok • Office worker 4
8. Key Members(Indonesia Branch)
President of Indonesia Branch Richard Chai Goo Lee • Hanyang University, MSc. in Resources Engineering • Korea Ocean Research & Development Institute, Research Scientist(past) • Oil & Gas Consulting Company(past)
Manager of Indonesia Branch Suhatril Ucok • PT Barata Nusatama Prima(past) • ITB, MSc. In Petroleum Engineering • Student Regiment • Major : Hydraulic Fracturing
9. Branch Office
DSI DSI (Indonesia) DSI (Philippines) DSI (Mongolia) DSI (Australia)
9. Branch Office(Indonesia)
Office Job Site
Job Site
Warehous e
Job Site
Job Site Office
Address : Ariobimo Sentral 4th Floor Suite #416 Jl. H.R. Rasuna Said Block X-2 Kav.5 Jakarta 12950 Indonesia Tel. : (62-21) 527-0717 Fax : (62-21) 252-5760 E-mail :
[email protected]
10. Drilling Team 1 Equipment(D&B 45CBM) 1) D&B 45CBM Drilling Rig : 1 set Rig : Pull-back Capacity(45 ton)
2) Rod Carrier : 1 set 3) Platform Carrier : 1 set 4) Drill Pipe : 2,000 m 5) Other Accessories : 1 set
CBM Drilling Rig Drilling
Casing
10. Drilling Team 1 Equipment(D&B 45CBM) Technical Data D&B-45W
D&B-45D
D&B-45CBM
DIMENSIONS & WEIGHT OA length-transport
m
13.9
14
14
OA width
m
3
2.8
2.8
OA height-transport
m
3.6
3.5
3.5
OA height-mast up
m
27.5
28
29
Model(Diesel engine)
DoosanPU126TI
DoosanPU126TI
DoosanPU126TI
Cylinder
6cylinder diesel
6cylinder diesel
6cylinder diesel
HP/rpm
400/2100
400/2100
400/2100
Liter
600
600
600
Water cooling
Water cooling
Water cooling
Spur gear-3.52to 1
Spur gear-4 to 1
Spur gear-4 to 1
Two motor(Std)
Three motor(Std)
Three motor(Std)
1st900~1100/2nd650~800
1st900~1100/2nd650~800/
/3rd120~250/4th0~130
3rd120~250/4th0~130
1st190~250/2nd270~350/ 3rd650~800/4th900~1500
1st190~250/2nd270~350/ 3rd650~800/4th900~1500
ENGINE
Rated power Fuel tank capacity Cooling system TOP HEAD ROTATION
The gearhead is mounted outside the mast rails to ease drill pipe and casing handling. Reduction Performance Max. RPM
Rpm
1st0~120/2nd0~60
Max. Torque
kg·m
1st1000/2nd2000
10. Drilling Team 1 Equipment(D&B 45CBM) Technical Data D&B-45W
D&B-45D
D&B-45CBM
mm
200ⅹ150ⅹ5000
200ⅹ150ⅹ5000
200ⅹ150ⅹ5000
Head travel
m
1st 10
1st 10
1st 10
Mast travel
m
Up:1.2, Down:0.8
Up:0.5, Down:1.5
Up:0.5, Down:1.5
Pull-up capacity
ton
40
45
45
Pull-down capacity
ton
24
24
24
m/mm
38 of 14 cable
25 of 12 cable
25 of 12 cable
ton
10
10
10
5pump open loop system
3pump open loop system
3pump open loop system
Liter
350
310
310
Micron
10
10
10
FEED SYSTEM Top head driven by hydraulic cylinders through heavy duty chain. Traverse cylinder
WINCH Planetary with spring applied hydraulic release break, with cable. Spool capacity Line pull HYDRAULIC SYSTEM General Tank capacity Filtration Pump model
H3V180ⅹ2+H3V63ⅹ2+10(HP constant)
Cooling system Operating pressure
bar
Air cooling
Air cooling
Air cooling
280
280
280
10. Drilling Team 2 Equipment(D&B 35Multi) 1) D&B 35Multi Drilling Rig : 2 set Rig : Pull-back Capacity(30 ton) Capacity : N size hole to 2,000m
2) Rod Carrier : 1 set 3) Drill Pipe : 2,000 m 4) Other Accessories : 2 set
10. Drilling Team 2 Equipment(D&B 35Multi) Technical Data D&B-35Multi/A
D&B-35Multi/P
D&B-35RAB
DIMENSIONS & WEIGHT OA length-transport
m
12.1
12.3
11.8
OA width
m
2.6
2.6
2.54
OA height-transport
m
3.2
3.2
3.2
OA height-mast up
m
12
12
11.7
ton
17
19
21
DoosanDL08/086Ti
HYUNDAI D6HA
HYUNDAI D6CC
6cylinder diesel
6cylinder diesel
6cylinder diesel
285/280
380
540
550
550
1000
Water cooling
Water cooling
Water cooling
Spur gear-4.35to 1
Spur gear-4.35to 1
Spur gear-4.35to 1
Weight-less drill pipe ENGINE Model(Diesel engine) Cylinder Rated power
HP/rpm
Fuel tank capacity Cooling system TOP HEAD ROTATION Model : Gearbox 900 Reduction Performance
Two motor(Std)
Three motor(Std)
Three motor(Std)
1st1100~700/2nd636~450/
1st1100~700/2nd636~450/
Max. RPM
Rpm
1st1100~700/2nd636~450/ 3rd470~327/4th120~0
3rd470~327/4th120~0
3rd470~327/4th120~0
Max. Torque
kg·m
1st95~178/2nd150~280/ 3rd205~390/4th600~1100
1st95~178/2nd150~280/ 3rd205~390/4th600~1100
1st95~178/2nd150~280/ 3rd205~390/4th600~1100
10. Drilling Team 2 Equipment(D&B 35Multi) Technical Data D&B-35Multi/A
D&B-35Multi/P
D&B-35RAB
mm
160ⅹ100ⅹ3500
160ⅹ100ⅹ3500
160ⅹ100ⅹ3500
Head travel
m
1st 7
1st 7
1st 7
Mast travel
m
Up:0.5, Down:1.5
Up:0.5, Down:1.5
Up:0.5, Down:1.5
Pull-up capacity
ton
30
30
30
Pull-down capacity
ton
18
18
18
inch
10
10
10
inch
10
10
10
FEED SYSTEM Top head driven by hydraulic cylinders through heavy duty chain. Traverse cylinder
WORKING TABLE Max. casing diameter HYDRAULIC CLAMP Single/Double Clamp
10. Drilling Team 2 Equipment(D&B 35Multi) Technical Data D&B-35Multi/A
D&B-35Multi/P
D&B-35RAB
Solar 75
Solar 130
Solar 130
CRAWLER BASE Undercarrige Travelling speed
Km/h
2.5
2.5
2.5
Ground pressure
N/cm2
5, 0.5
6, 0.6
6, 0.6
Ground clearance
mm
450
500
500
3-web track shoes
3-web track shoes
3-web track shoes
Track shoes Traction force
kN
70,000
70,000
70,000
Length of crawler units
mm
7,290
9,170
9,170
Climbing capacity Max.
drgree
25
25
25
mm
2,450
2,450
2,450
Loading capacity
Max.kgs
150-520
150-520
150-520
turn
degree
80
80
80
mm
1,444
1,444
JIB CRANE Extension
SELF LOADING(Hydraulic 4 Jacks) Ground clearance HYDRAULIC OUTEIGGER JACKS
Four hydraulic outriggers are fitted to the outer corners of the rig for easy and accurate leveling of the rig.
10. Drilling Team 3 Equipment(D&B 16D) 1) D&B 16D Drilling Rig : 1 set Rig : Pull-back Capacity(16 ton) Capacity : N size hole to 1,000m
2) Rod Carrier : 1 set 3) Drill Pipe : 500 m 4) Other Accessories : 1 set
10. Drilling Team 3 Equipment(D&B 16D) Technical Data D&B-16D
D&B-16Multi
DIMENSIONS & WEIGHT OA length-transport
m
11.4
11.4
OA width
m
2.2
2.2
OA height-transport
m
2.9
2.9
OA height-mast up
m
12
12
ton
11
11
Model(Diesel engine)
HYUNDAI D6BT
HYUNDAI D6BT
Cylinder
6cylinder diesel
6cylinder diesel
HP
180
180
Liter
310
310
Water cooling
Water cooling
Weight-less drill pipe ENGINE
Rated power Fuel tank capacity Cooling system
10. Drilling Team 3 Equipment(D&B 16D) Technical Data D&B-16D
D&B-16Multi
Spur gear-4.35to 1
Spur gear-4.35to 1
TOP HEAD ROTATION Model : Gearbox 800 Reduction Performance
two motor(Std)
two motor(Std) 1st1100~700/2nd636~450/3rd470~327
Max. RPM
Rpm
1st1100~700/2nd700~450/3rd0~100
Max. Torque
kg·m
1st70~50/2nd93~140/3rd0~420
1st95~178/2nd150~280/3rd205~390
mm
120ⅹ90ⅹ3500
120ⅹ90ⅹ3500
Head travel
m
1st 7
1st 7
Mast travel
m
Up:0.5, Down:1.5
Up:0.5, Down:1.5
Pull-up capacity
ton
16
16
Pull-down capacity
ton
8
8
FEED SYSTEM Top head driven by hydraulic cylinders through heavy duty chain. Traverse cylinder
10. Drilling Team 3 Equipment(D&B 16D) Technical Data D&B-16D
D&B-16Multi
inch
10
10
inch
10/6
10/6
Solar 55
Solar 55
WORKING TABLE Max. casing diameter HYDRAULIC CLAMP Single/Double Clamp CRAWLER BASE Undercarrige Travelling speed
Km/h
4
4
Ground pressure
N/cm2
5, 0.5
5, 0.5
Ground clearance
mm
400
400
3-web track shoes
3-web track shoes
Track shoes Traction force
kN
3,970
3,970
Length of crawler units
mm
6,480
6,480
Climbing capacity Max.
drgree
25
25
mm
1,790
1,790
Loading capacity
Max.kgs
150-520
150-520
turn
degree
80
80
mm
1,523
1,523
JIB CRANE Extension
SELF LOADING(Hydraulic 4 Jacks) Ground clearance HYDRAULIC OUTEIGGER JACKS
Four hydraulic outriggers are fitted to the outer corners of the rig for easy and accurate leveling of the rig.
8.Drilling DrillingTeam Rig List(D&B 12D) 10D) 10. 4 Equipment(D&B 1) D&B 10D Drilling Rig : 3 set Rig : Pull-back Capacity(12 ton) Capacity : N size hole to 500m
2) Rod Carrier : 3 set 3) RC Pipe & Accessories : 3 set 4) Drill Pipe : 1,500 m 5) Other Accessories : 3 set
10. Drilling Team 4 Equipment(D&B 10D) Technical Data D&B-10D
D&B-12D
DIMENSIONS & WEIGHT OA length-transport
m
5.5
7.9
OA width
m
2
2
OA height-transport
m
2.3
2.5
OA height-mast up
m
5.8
8.1
ton
7.9
7.9
Model(Diesel engine)
HYUNDAI D4DA
HYUNDAI D4DD
Cylinder
4cylinder diesel
4cylinder diesel
HP
110
145
Liter
200
200
Water cooling
Water cooling
Weight-less drill pipe ENGINE
Rated power Fuel tank capacity Cooling system
10. Drilling Team 4 Equipment(D&B 10D) Technical Data D&B-10D
D&B-12D
Spur gear-4.35to 1
Spur gear-4.35to 1
two motor(Std)
two motor(Std)
TOP HEAD ROTATION Model : Gearbox 800 Reduction Performance Max. RPM
Rpm
1st1100~700/2nd700~450/3rd0~100
1st1100~700/2nd700~450/3rd0~100
Max. Torque
kg·m
1st70~50/2nd93~140/3rd0~420
1st70~50/2nd93~140/3rd0~420
mm
100ⅹ60ⅹ1900
100ⅹ60ⅹ1900
Head travel
m
1st 0.5
1st 0.5
Mast travel
m
Up:0.5, Down:1
Up:0.5, Down:1
Pull-up capacity
ton
12
12
Pull-down capacity
ton
6
6
FEED SYSTEM Top head driven by hydraulic cylinders through heavy duty chain. Traverse cylinder
10. Drilling Team 4 Equipment(D&B 10D) Technical Data D&B-10D
D&B-12D
3
4.5
4pump open loop
4pump open loop
Liter
170
170
micron
10
10
H3V63ⅹ2+H3V63+Pilot
H3V112ⅹ2+H3V63+Pilot
Air cooling
Air cooling
bar
280
280
mm
350
350
Loading capacity
Max.kgs
150
150
turn
degree
80
80
mm
1,192
1,192
DRILL PIPE & CASING Max. casing diameter
m
HYDRAULIC SYSTEM System Hydraulic oil tank capacity Filtration Pump model Cooling system Operating pressure JIB CRANE Extension
SELF LOADING(Hydraulic 4 Jacks) Ground clearance CONTROL PANEL
All controls gauges are grouped at the operator’s station within sight of the borehole.
11. Core Business (Mine Exploration) Mine Exploration Drilling Service
Competence • The technicians who have drilling equipment & application • Use equipment sufficient for international safe & environmental standard
Deep
Mining
Capability • Procurability & Equipment manufacturing proper for exploration environment Max. 35years experienced technicians Alliance with global players (Roxex Ltd. / HK)
• Special diamond core drilling technique • Reverse Circulation Drilling technique
Drilling Core
Business
CBM Drilling Techniques
Geothermal
Exploration
Education & R&D
11. Core Business (Mine Exploration) Drilling Service Project Rapu-Rapu Copper Mine Site, Philippines
Period : July, 2011 ~ March, 2012 Diamond(H size) : Total 4,000m
11. Core Business (Mine Exploration) Drilling Service Project Gubong Gold Mine Site, Korea
Period : April, 2012 ~ May, 2012 Diamond(H size) : Total 835m
11. Core Business (Mine Exploration) Drilling Service Project Ongam Gold Mine Site, Korea
Period : May, 2012 ~ June, 2012 Diamond(H size) : Total 922m
11. Core Business (Mine Exploration) Drilling Service Project Zirconium Mine Drilling Services, Indonesia
Period : August, 2012 ~ December, 2012 RC Drilling : Total 2,170m
11. Core Business (Mine Exploration) Drilling Service Project Bengkulu Tambang Sawah Gold Mine Site, Indonesia
Period : January, 2013 ~ July, 2013 Diamond Core Drilling(H size) : Total 6,000m
11. Core Business (Mine Exploration) Drilling Service Project Bengkulu Lebong Tambang Gold Mine Site, Indonesia
Period : May, 2013 ~ March, 2014 Diamond Core Drilling(H size) : Total 2,450m
11. Core Business (Mine Exploration) Drilling Service Project Lampung Semangka Geotechnical Drilling, Indonesia
Period : September, 2013 ~ December, 2013 Diamond Core Drilling : Total 620m
11. Core Business (Mine Exploration) Drilling Service Project Belimau Gold Mine Drilling, Indonesia
Period : August 2014 ~ Diamond Core Drilling : Total 1,000m
11. Core Business (Mine Exploration) Drilling Service Project Pangkalan Bun Titanium Drilling, Indonesia
Period : October, 2014 ~ RC Drilling : Total 1,500m
9.Core CoreBusiness Business (CBM) 12. (CBM) CBM Drilling Service
Competence • The ability to seek service human resource who focus on domestic circumstance (Indonesia) • The ability to seek special equipment considering CBM characteristic (Safety standard, Environment regulation, drilling ability)
Deep
Mining
Capability • Technical Alliance with Asian CBM specialist company
Geothermal
Exploration
Drilling Core
Business
• Cooperation with a mine lot & mining development group (SUGICO PT.)
CBM Drilling Techniques • Special Diamond Core Drilling • Reverse Circulation Drilling
Education & R&D
12. Core Business (CBM) CBM Drilling Service KAPUAS K3-C1 Site, Indonesia
Period : May, 2013 ~ November, 2013(1st) Diamond Core Drilling : Total 750m
12. Core Business (CBM) CBM Drilling Service KAPUAS K3-C2 Site, Indonesia
Period : April, 2014 ~ May, 2014(2nd) Diamond Core Drilling(H size) : Total 751m
12. Core Business (CBM) CBM Drilling Service MAGALAU KB-7 Site, Indonesia
Period : August, 2014 ~ September, 2014(3rd) Diamond Core Drilling(H size) : Total 540m
13. Core Business (Deep Geothermal) Deep Geothermal Drilling Service
Competence • Geothermal drilling service management skill (know-how) • Use equipment sufficient for international safe & environmental standard
Deep
Mining
Capability • Procurability & Equipment manufacture proper for construction environment
Geothermal
Exploration
Drilling Core
Business
• More than 5years experienced Skilled technicians in Geothermal
CBM Drilling Techniques • Water Hammer Drilling • Air Hammer and Roller Cone Bit Drilling
Education & R&D
9.Core CoreBusiness Business (Deep Geothermal) 13. (Deep Geothermal) Deep Geothermal Drilling Service Gwangju Deep Geothermal Drilling Site, Korea
Period : April, 2012 ~ September, 2013 Water Hammer(8 inch) : 1well 3,500m
13. Core Business (Deep Geothermal) Gwangju Deep Geothermal Drilling History June, 2012 : Site Selection(753-1, Chipyung-dong, Gwang-ju, Korea) Site Clearance July, 2012 : Achieved Depth – 1,000m August, 2012 : Achieved Depth – 1,500m November, 2012 : Achieved Depth – 2,500m December, 2012 : Well Logging(Thermal, Conductivity, Gamma Ray) September, 2013 : Total Depth – 3,500m
14. Core Business (Education, R&D) Education, R&D Drilling Service
Competence • Retains worldwide 70 countries mining exploration network
Deep
Mining
Geothermal
Exploration Capability • Managing the program which is able to theory education & site actual training
Drilling Core
Business
• R&D study related with theory study, site actual proof
CBM Drilling Techniques • Education service for those majored in energy resource (Students, Normal) • Research for CBM drilling & manufacturing, management
Education & R&D
14. Core Business (Education, R&D) CBM Development Technology Training Center
14. Core Business (Education, R&D) Education Contents Coal Depositional Environment
CBM Reservoir Simulation
CBM Exploration and Geological Character of Coal
14. Core Business (Education, R&D) A Basic Researches on The Service-Technology in The Resource Developments
Artificial Neural Networks Module
Applicable Tec.
Guideline
User-Friendly
Development
Development
Interface
Reserve
Asset Value
Evaluation
Algorism
14. Core Business (Education, R&D) Development of CO2 Geological Storage Technologies Through 1,000 ton CO2-EOR Pilot Test
First-year Procure Corrosion
Operating Equipment
Resistant
• • •
CO2 EOR
• • •
Second-year
Empirical
Review well completion system Consideration of geological characters on site Installation of injection tool and a trial run
Test
Analysis of tech-mechanism A study on the local legislation and licensing Application of other performance date to well Third-year
• •
Formation of the core technology Emergency preparedness plan
14. Core Business (Education, R&D) Pilot Test Research for Directional Drilling System Ø Drilling Performance and Stability Evaluation of Directional Drilling System - Utilization a Variety of Geological Environments to Simulation Geo-Block
Ø On Site Empirical Study to Directional Control Drilling of Pilot Scale - Pilot Test Laboratory and on Site → Improve Equipment Problems and Procure Operating Technology
Ø Development Directional Drilling Equipment Operating Technology - Procure Directional Control Drilling Process for Field Operating Know-How
11. Core Business (Education, R&D) Pilot Test Research for Directional Drilling System Ø Drilling Performance and Stability Evaluation of Directional Drilling System - Utilization a Variety of Geological Environments to Simulation Geo-Block
Ø On Site Empirical Study to Directional Control Drilling of Pilot Scale - Pilot Test Laboratory and on Site → Improve Equipment Problems and Procure Operating Technology
Ø Development Directional Drilling Equipment Operating Technology - Procure Directional Control Drilling Process for Field Operating Know-How
DRILLING SERVICES INTERNATIONAL, INC. Zip. 150885 #801, Baeksang Bldg. Youido-dong 35-2, Yongdeungpo-gu, Seoul, Korea / Tel. 82-2-785-5485 Fax. 82-2-785-5487 http://drill4future.com