Company Presentation
1
NARADA HOLDING
6 Billion USD assets
2
COMPANY
1994 founded, since 2010 listed
€550 Million turnover in 2014, more than €150 Million export
More than 5.000 employees
Number six among the biggest producers world wide
Biggest Chinese exporter of industrial batteries Market Shares World-Wide Industrial Standby Batteries
Others EnerSys Exide SAFT C&D Yuasa Narada HBL Hoppecke Fiamm Eastpenn
3
RUNNING 6 FACTORIES – BIGGEST ASIAN PRODUCER OF INDUSTRIAL BATTERIES Lin An Plant
Established Y2006
Capacity: 3.5M KVAH VRLA Area: 115K m2
Lin Ping Plant Ⅰ
Established Y1997
Capacity:120MWh Lithium Area: 60K m2
Lin Ping Plant Ⅱ
Established Y2013
Capacity: 1200MWh Lithium 3M KVAH VRLA Area: 170K m2
An Hui Plant
Acquisition Y2011
Cheng Du Plant
Wuhan Plant
Acquisition Y2011
Established Y2016
Capacity: 14.4 million sets plates + VRLA 700K KVAH Area: 110K m2 Capacity: 2.5M KVAH VRLA battery + 320MWh Lithium Area: 110K m2 Capacity: 10M KVAH VRLA Area: 411K m2 4
History
5
GLOBAL NETWORK
6
CUSTOMER STRUCTURE
7
R&D Ability Chief
Scientist of Narada—Mr. Herbert K. Giess
Chairman of IEC TC21 Secondary cells and batteries;
Working group leader for the establishment of the IEC standard for VRLA Batteries IEC 60896-21 and 22/2003
Batteries International 20 04 Silver Award for Most Outstanding Contributor across the entire Industry
Hightech R&D center
2000
Province level R&D center
2006
CNAS National Approval Lab.
2010
Postdoctoral Province advanced Research R&D center Workstation
2011
2012
National R&D center
Academician Expert Workstation
2013
2014
R&D Ability Cooperated with world level institutions
CUSTOMER STRUCTURE
10
FUTURE OF ENERGY STORAGE MARKET
11
GENERAL INFORMATION
Since any years energy storage providers are looking for new technologies – overall for industrial applications
The hope for many has been Lithium-Ion Batteries, fuel cells … But so far none of these technologies could capture a big part of the market
The simple reason is: manufacturing costs, reliability, safety and recycling
Lead-carbon combinations are not completely new, in different variations they have been tested an manufactured since decades
Lead-Carbon energy storage has been used and proven in various applications , but in small quanity so far
Just the ALABC (Advanced Lead Acid Battery Consortium) re-discovered the real potential of this technology – more under www.alabc.org
% Based on the ALABC inititiative “low cost, life 30 changing, lead carbon” leaded to break-through results in optimization of manufacturing processes for products for different applications
ALAB
ALABC has chosen NARADA to get the lead-carbon technology fit for the industrial market.
12
OVERVIEW LEAD CARBON CONFIGURATIONS/ ALABC - PROJECTS
Negative plate is replaced by high energy carbon surface
Good cycling
High energy density
Used by Axion Power
Negative Platte is partially replaced by high energy carbon surface
Extremely good cycling
High energy density
Used by CSIRO, Furukawa & East Penn
Negative Platte is partially replaced by 3D carbon structure
Good cycling
High energy density
Used by Warschauer Universität, Firefly Energy & CEA-INES
30 %
No change on product – just carbon additives to the active material
Reasonable investment
Extremely good cycling in partial state of charge
Latest ALABC – project together with Narada
NARADA Patent
13
LEAD CARBON DEVELOPMENT OVERVIEW
Lead Acid Battery
Pb-C Partial Plate
Pb-C Additives
NARADA-Patent Product and production process stay unchanged
30 %
14
WAS MACHEN CARBONADDITIVE IN DER NEGATIVEN PLATTE?
During charge lead sulfate is created
It covers the surface of the negative plate and isolate it from electrolyte
In order to charge much more energy is needed
Chargeability gets worse and charging factory decreases – available capacity drops down
Lead sulfate can only be partially removed by special charge/ discharge procedure
Effect of sulfatation is higher at continues charge/ discharge applications, ie the battery is not fully discharge and charged
Over certain period of time the sulfatation can not be removed which leads to capacity loss and dead of the battery
Standard Lead Acid
With Carbon Additives
30 % Carbon addtives prevent creation of lead sulfate
They improve chargebility/ available capacity
They increase lifetime of the battery
They limit capacity loss over lifetime
Negative plate covered
Lead sulfate is drastically
by lead sulfate
reduced
15
LEAD-CARBON VS GEL
Capacity loss lead-carbon vs gel technology in partial state of charge conditions
30 %
16
PRODUCT ROADMAP ENERGY STORAGE
Energy & Power
Energy & Power
High Power
Consumption
MESS HESS
12REXC
30 % ICSC
REXC
OPzV
Li HESS
MESS
17
APPLICATION ROADMAP EES (ENERGY STORAGE SYSTEM)
30 %
18
SAMPLE REFERENCES LEAD-CARBON
2011-DongFuShan Island Renewable Energy Storage Micro Grid Project
2013-Tulufan Energy Storage System for Smart Grid Project-1st MW level
30 %
2014-State Grid Luxi Island 4MW Energy Storage Project
2013-Jiangsu Dafeng seawater desalination 1.8MWH ESS project
19
SAMPLE REFERENCES ENERGY STORAGE Pb-C battery application project
Energy storage scale
Lin'an optical storage integration enterprise class grid Battery energy 0.5MW/2MWH storage system National class wind & optical storage and delivery demonstration 1MW/6MWH base project State Grid Wenzhou Luxi island ongrid demonstration project Jiangsu Dafeng seawater desalination system smart grid project South Grid Zhuhai Wanshan island new energy grid demonstration project Guangcheng energy storage grid project Tulufan new energy city power grid demonstration project South Grid optical storage integration project Beijing container energy storage system
Energy storage technology Pb-C battery/Lithium battery
Function
Power smoothing, load shifting
Pb-C battery/Gel battery
Power smoothing, load shifting, ramp control
2MW/4MWH
Pb-C battery
Island new energy on-grid electric power generation, power smoothing
1.5MW/1.8MWH
Pb-C battery
New energy join up on grid, power smoothing
2.5MW/8.4MWH
Pb-C battery
30 %
Island new energy off-grid elelctric power generation, power smoothing New energy join up on grid, power smoothing, load shifting Energy centralized management, power smoothing, load shifting
1.5MW/1.5MWH
Pb-C battery
1MW/2MWH
Pb-C battery
500KW/2.1MWH
Pb-C battery and lithium battery
Power smoothing, load shifting
150KW/275KWH
Pb-C battery
Energy centralized management, power smoothing, load shifting 20
Vielen Dank!
Europe Headquarter Narada Europe (UK) Limited Spectrum House, Dunstable Road, Redbourn, St.Albans, Herts AL3 7PR Tel: 0845 371 7095 *NEW* Fax: 0845 612 2031 *NEW* Email:
[email protected] Web: www.naradabattery.com Germany Office Klosterstr. 1 08056 Zwickau / GERMANY Tel: +49 375 273996 0 Fax: +49 375 273996 20 Email:
[email protected]
21