Architectural Inspection Standard Interior Partitions

Architectural Inspection – Standard Interior Partitions  0611 Fixed Partitions – All components of the interior wall assembly excluding finish.  Descr...
Author: Brook Davidson
12 downloads 0 Views 2MB Size
Architectural Inspection – Standard Interior Partitions  0611 Fixed Partitions – All components of the interior wall assembly excluding finish.  Description:  The building is framed with 2 x 6 wood studs along the corridors and  between classrooms.  Miscellaneous small framed areas use 2 x 4 studs.  Wall framing is  sheathed with 5/8” gypsum wallboard.  Original drawings show interior insulation for  sound­proofing was installed only at limited areas where bathrooms abutted classrooms.  Condition:  No signs of distress in basic wall framing was apparent.  Remaining Life Expectancy:  In general, partitions have 20 years remaining.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 62 of 178 

Architectural Inspection – Standard Interior Partitions  Deficiency 

0611­1  Typical Corridor Partition  Existing corridor partitions are sound, though finish materials are dated and in need of  replacement.  Over­all building structural concerns will require major reconstruction. Per  the structural analysis, corridor walls will need strengthening to satisfy lateral load  requirements.  Deficiency category:  C (2003 IBC lateral requirements)  Remedy  Structural engineering recommendations require the addition of ½” structural plywood  sheathing to both sides of the corridor wall extending to roof deck above.  Demolish  existing corridor finishes and ceiling system to expose studs to deck above.  Add ½”  plywood as identified by structural engineer extending to deck.  Add 5/8” gypsum wall  board, new wall finishes, and new ceiling system.  Estimated construction cost:  Demolition $4/sq.ft., assuming ACM materials.  Install  plywood and gypsum wall board at $6/sq.ft.  $5/sq.ft. contingency.  Costs for interior  wall finishes and new ceiling are identified separately in those sections, though obligated  by this work.  Total cost = $15/sq.ft. x 1,500 lineal ft. x 8’ = $180,000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 63 of 178 

Architectural Inspection – Special Interior Partitions  0621 Operable Partitions – Folding partitions, accordion partitions, etc.  Description:  The school includes a number of light­weight accordion partitions.  Typically these occur in each classroom to separate and conceal a storage and kid coat  area from the general classroom, and in two cases, provide openings between classrooms  in the South wing.  The partitions are 10’ in length, 6’8” height.  Condition:  Accordion Partitions dating from the original construction are starting to  break down and need replacement.  The hinge mechanism is a vinyl joint, and over time,  they have aged and are cracking.   The finishes are marred and feel dated.  Remaining life expectancy:  Need Replacement

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 64 of 178 

Architectural Inspection – Special Interior Partitions  Deficiency 

0621­1  Typical Accordion Partition  Accordian partitions are 42 years old and have exceeded their service life.  They are worn  and they require increasing maintenance to function properly.  Deficiency category:  RR  Remedy  Replace operable partitions in each classroom.  Estimated construction cost:  $1,800 x 24 =  $43,000

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 65 of 178 

Architectural Inspection – Interior Doors  0631 Personnel Doors – Door leafs, frames, finish, and hardware  Description:  Primary Classroom Doors:  Doors to the classrooms were replaced in 1993.  Doors include magnetic hold­opens, metal frames, laminate­faced doors, and quality  lockset hardware with ADA lever.  Condition:  Doors and hardware are generally in good to excellent condition, with the  exception of problems noted with locksets jamming, or cores rotating.  The biggest  difficulty is that all dimensional tolerances at the classroom entry doors fail to comply  with ADA.  This condition is noted thoroughly in the ADA condition report of 1999.  Remaining life expectancy:  Need Replacement, or reconstruction

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 66 of 178 

Architectural Inspection – Interior Doors  Deficiency 

0631­1  Clearances at Classroom Doors  As noted in ADA reports, the main classroom doors do not meet minimum dimensional  standards, and need full reconstruction of the entry framing and door installation.  Deficiency category:  C.  Doors do not comply with minimum ADA accessibility  requirements.  Remedy  Each classroom entry door and surrounding construction will need to be demolished and  reconstructed to meet ADA clearance standards.  It is proposed that the door vestibule be  widened by approximately 24” and that the area is captured by shifting the hinge side of

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 67 of 178 

Architectural Inspection – Interior Doors  the door into the space previously occupied by the file cabinet storage area.  This should  allow utilization of the existing framed wall that terminates the base cabinets.  When the entry and door are rebuilt, the magnetic hold­open should be removed, since no  longer required per new code requirements, given the comprehensive building sprinkler  system.  Rebuild work would include adding a new metal frame and laminate­faced door.  Door  would include narrow vision lite similar to existing.  Door would include new quality  lockset.  Construction will include some misc. relocation of electrical wiring and  switches, since the location of switches on the right or left of the door is somewhat  inconsistent.  It will include new drywall and new finish work on both the corridor and  classroom face.  It is anticipated that demolition and drywall work will likely require  some degree of abatement due to trace ACM materials in the drywall mud.  This will  significantly raise the price of framing and drywall changes.  Estimated construction cost:  New Door and Frame at $800.  New hardware at $500.  Demolition and potential ACM removal protocols $1,200 per opening.  New framing  $1,000.  New finishes and coordination $600.  Misc. electrical changes $400.  Contingency for unknows $500.  Total per door $5,000.  28 doors x  $5,000 =  $140,000  (Note that this estimated cost presumes that new carpet, wall finishes, and ceiling  replacement are added to the corridors per separate recommended work items.  If they are  not, door costs will rise accordingly.)  .

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 68 of 178 

Architectural Inspection – Interior Finishes  0641 Wall Finishes – Paint, wall coverings, tile, acoustic treatment, etc.  Description:  Primary interior finishes include painted gypsum wall board, fabric  wainscot in the hallways, tackboard surfaces in the corridors and classrooms, whiteboards  and chalkboards in the classrooms, and marlite wall panel areas, typically used in  classrooms below the whiteboards.  Condition:  General building finishes, particularly in the corridors and classrooms, are  degraded from age and hard use encountered in a school.  Many finishes in the corridor  will likely be upgraded as a consequence of structural upgrades, and need upgrading in  any case due to age and fatigue.  Whiteboards and tackboards in the classrooms should be  upgraded due to age and wear.  Remaining life expectancy:  Finishes typically need replacement.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 69 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0641­1  Worn Corridor Finishes  New wall finishes will be required at all rebuilt corridor walls.  Deficiency category: C (2003 IBC lateral requirements)  Remedy  Corridor walls will be reconstructed, at least as far as new gypsum wallboard, as a  consequence of needed structural upgrades to the lateral building strength.  (See previous  deficiencies, including interior partition work at corridor.)  It is recommended that new  wall finishes and features be included with the reconstruction.equalling or enhancing the  type of corridor systems previously in place, including tack surface and protective  wainscot.  It is recommended that new corridor finishes include a wood base, textile wainscot to  42”, running trim rail, neoprene cork wall finish to 7’, and a cap trim matching door  vestibule height.  Painted gypsum wall board above to ceiling at 8’.  Estimated Construction Cost:  Cost for finish work is estimated at $5 lineal foot for wood  base, $15 per lineal foot for wainscot fabric, $15 per lineal foot for neoprene cork tack  surface, $5 lineal foot for wood cap trims, and $6 per lineal foot for painting and misc.  Allow $5 per lineal foot as contingency.  1,500 lineal feet of corridor construction, including vestibules x $51/LF = $ 76,500.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 70 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0641­2  Damaged Whiteboards  Existing whiteboards and chalkboards generally appear to date from original  construction.  Some rooms have newer whiteboards added directly over older products.  All are significantly degraded, showing damage to the surface. Most do not allow  cleaning, or easy visibility by students.  Most are a paint finish over hardboard.  This is a  much softer finish that porcelain metal whiteboards, and it has eroded away in many  places, exposing the substrate material.  Deficiency category: RR  Remedy  Replace whiteboards in every classroom.  Assume 4’ x 16’ length.  Assume additional 4’  of tackboard is added to either side of whiteboard.  Assume new chalk tray and hanging  strip hardware frame on upper edge.  Estimated Construction Cost:  Assume $3,000 materials, $1,000 for installation and  patching.  $4,000 x 25 = $100,000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 71 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0641­3  Classroom wall with unsightly surface electrical raceways.  General painting is recommended for the classrooms and support spaces.  Classrooms  include marlite wall surface below tackboards and whiteboards.  This surface has been  used for surface­mounted electrical services, with mis­matched colors.  Some of these  surface systems will be removed with electrical system upgrades, further damaging walls  with evidence of removal, screw holes, etc.  Walls above whiteboards have been marred  by removal of brackets, and various damage.  Classroom paint finish ranges from poor to fairly good.  It appears that selective  repainting has occured in various rooms over time.  In general, a major ungrade project is  benefited by a comprehensive repainting so that miscellaneous repairs, damage,  inconsistencies, etc. are brought to a fresh starting point.  For instance, each classroom  will likely include patching where the exterior door has been removed, and where the  main entrance door has been reframed.  Deficiency category: RR

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 72 of 178 

Architectural Inspection – Interior Finishes  Remedy  Repaint all four wall surfaces, particularly marlite installed below tackboards, windows,  and whiteboards.  Protect tackboards to remain.  Paint all surface­mounted power and  data raceways to remain.  Estimated Construction Cost:Assume paint at $1.50 per sq.ft. x 700 sq.ft. per room =  $1.050.  Allow $500 additional for prep.  $1,550 x 25 = $39,000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 73 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0641­4  Worn Gymnasium Wainscot  The gymnasium includes fabric­covered wainscot on three primary surfaces, and portions  of the fourth (excluding bleachers).  The material is worn and puckered.  The base is  damaged and missing in some areas.  The unused stage area is damaged wood face and  unslightly.  Deficiency category: RR, C  Remedy  New wall finishes are recommended at three gymnasium side walls, extending up to 8’.  Work would include removal of fabric wall covering and base, and installation of new  stronger fabric wainscot, using either wool or sisal product designed for impact, and a  new hardwood base.  Work should also include upgrade of stage wall, probably including  removal of stage due to ADA and other problems, and rebuilding of wood­faced chair  storage underneath.  Provide new storage closet in lieu of stage portions.  Estimated Construction Cost:  Cost for finish work is estimated at $5 lineal foot for wood  base, $30 per lineal foot for wainscot fabric, and $7 per lineal foot for demolition, stage  infill, painting and misc.  350 lineal feet of wall refinishing, including vestibules x $42/LF = $ 14,700. June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 74 of 178 

Architectural Inspection – Interior Finishes  0642 Floor Finishes – Carpet, tile, resilient flooring, etc.  Description:  The majority of public and teaching spaces in Glacier Valley are carpeted,  with the age of carpeting estimated at between 15 and 20 years.  Carpet replacement has  been on the School District major maintenance list, but not completed.  The gym has a  resilient floor finish installed in 1991.  Restrooms include porcelain mosaic tile.  Some  incidental support areas still retain original VAT tile.  Condition:  The carpet is in fair to poor condition.  Wear and discoloration is somewhat  more noticeable in the corridor than the classrooms.  Some classrooms have significant  damage while others are wearing fairly well.  In all cases, the carpet is dated and dark­  looking, detracting significantly from the school’s general atmosphere.  Remaining life expectancy:  0 ­ 5 years

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 75 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0642­1  Worn Corridor Carpet  Corridor carpet, excluding vestibules, measures 6,300 sq.ft..  Classroom carpet measures  21,250 sq.ft.  Library and administrative spaces total an additional 5,400 sq.ft.  In  addition to the age and damage to the carpet, possible concerns with carpet­borne mold  exists, particularly at areas which may have suffered condensation along the perimeter..  Deficiency category:  RR  Remedy  Replace carpet throughout the facility.  Provide 32 oz. solution­dyed nylon, direct glue­  down installation.  Estimated Construction Cost:  3,700 sq.yds of new carpet.  Assume $5/yd for removal  and dump.  Assume $40/yd new installation.  However, portions of VAT tile may still  remain and old adhesives may create concern with more sensitve ACM standards since  removal work was accomplished.  Recommend contingency of $10/yd to cover possible  ACM demo work.  So cost would equal  3,700 yd. X $55/yd = $200,000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 76 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0642­2  Exterior metal grate  Exterior entries include metal grates with a pit below for snow.  Interior vestibules also  have metal grates and walk­off matts placed on top of grates.  The metal grates are not  ADA compliant.  Deficiency category:  RR  Remedy  Replace exterior grates with ADA­compliant product.  See more information in ADA  survey.  Remove interior old grate portions, and install new specialty walk­off matt  product from wall to wall.  Estimated construction cost:  Assume $4,000 per entry, or $20,000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 77 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0642­3  Ceramic tile cove base  Tile bathroom floors include integral tile cove base.  The base is badly damaged in many  areas, probably due to insufficient substrate rigidity.  Deficiency category:  RR  Remedy  Replace tile base in two primary bathrooms in East wing.  Remove damaged tile, expose  framing, add new cement backer board, and reinstall new porcelain tile, 4” x 4”.  See  related upgrade of Marlite wall finish.  Estimated Construction Cost:  Assume $100 lineal feet per each bathroom. Assume  $10/ft material and $20/ft. labor.  200’ x  $30 = $6,000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 78 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0642­4  Aging Gymnasium resilient flooring  The gymnasium floor was replaced with a resilient multi­use floor product in 1991.  It is  one of the older resilient floors in the District – perhaps the oldest.  While still  serviceable, it appears to be getting somewhat brittle, and the line markings are showing  wear.  The floor had been previously contemplated for replacement by the District.  Remaining life expectancy:  5 years.  Deficiency category:  RR  Remedy  If budget allows, consider replacing with new resilient flooring, preferably poured  urethane with concrete sealer for best performance.  Estimated construction cost:  Assume $12/sq.ft. product and installation cost, and $5  markup, or $17/sq.ft. x 6,200 sq.ft. = $106,000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 79 of 178 

Architectural Inspection – Interior Finishes  0643 Ceiling Finishes – Painted GWB, ACT, acoustical panels, etc.  Description:  The school includes a combination of ceiling systems.  The corridors,  administrative space, library, and some refurbished classrooms utilize 2 x 4 lay­in panel  ceilings at 8’0”.  Typical classroom spaces and the gymnasium utilize glue­on 12” x 24”  acoustic tile set tight to the wood roof decking.  8’0” painted gypsum ceilings are used in  bathrooms and other support spaces.  .  Condition:  Condition of the ceiling grid and tile in the corridors is poor, and should be  replaced.  It will likely be removed in any case to satisfy the recommended structural  lateral upgrades.  Other lay­in panel ceilings in the library and administrative spaces are  in fair condition and can be retained.  Many areas of glue­on 12” x 24” acoustic tile are in  poor condition, with surface fastners, stains,and sagging portions.Generally, 8’ painted  gypsum wall board ceilings are in good shape with long life expectancy.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 80 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0643­1  Damaged Corridor Lay­in Panel Ceiling  Corridor lay­in panel ceilings measure 6,300 sq.ft., excluding vestibules.  At present,  many tile are stained and warped from previous moisture problems.  Tile is dirty, and the  grid in many cases has been damaged and mis­aligned.  Ceiling will likely be demolished  to allow structural upgrades to corridor walls.  See other sections.  Deficiency category:  RR and C  Remedy  Demolish tile as part of corridor structural upgrade.  Reinstall new 2 x 4 lay­in panel  ceiling.  Assume Armstrong Cirus tile in 1” grid.  Estimated construction cost:  $4.50/sqft. X 6,300 sq.ft. = $28,000

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 81 of 178 

Architectural Inspection – Interior Finishes  Deficiency 

0643­2  Typical glue­on 12” x 24” ceiling tile in classrooms  Glue­on 12 x 24 tile in the gymnasium and classrooms is in fair to poor condition.  In  every room, the tile have been re­secured to the wood roof deck with exposed washer  fastners.  Many tile show significant staining, and in some cases are drooping due to  previous moisture damage.  Water damage does not appear to be a current problem.  Deficiency category:  RR  Remedy, Option 1  At a minimum, it is recommended that the ceiling tile in all spaces be repaired and  painted to conceal stains, repairs, and surface fastners.  Estimated Construction Cost:  The ceiling area totals 850 sq.ft. per classroom (1,430 in  kindergarten), totaling 22,400 sq.ft..  The gymnasium totals 6,000 sq.ft.  For painting,  assume $1.50/sq.ft. x 28,400 = $43,000 .  Remedy, Option 2  A difficult strategic question arises over recommended structural upgrades to the roof  deck, which will require sheathing the roof deck in plywood togain the necessary lateral  strength.  It is possible to either add the replacement plywood to the deck top, via a total  roof replacement, or it is possible to add it from below if finishes are removed and the  plywood is attached directly to the decking from below.  Some coordination issues would  also be encountered with sprinkler hangers and lighting pendants.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 82 of 178 

Architectural Inspection – Interior Finishes  If the interior structural upgrade is selected, it would be appropriate to install new glue­on  acoustic tile over the plywood.  At that point, it is also possible to switch to a lay­in  ceilng option (as retro­fitted in two classrooms previously).  Given the relative longevity still expected from the EPDM roof, and the level of  disruption already anticipated in the classrooms, it is recommended that structural  plywood upgrades be considered for the interior ceilng plane, which will also serve to  replace the deteriorated ceilng tiles.  Estimated Construction Cost:  The ceiling area totals 850 sq.ft. per classroom (1,430 in  kindergarten), totaling 22,400 sq.ft..  The gymnasium totals 6,000 sq.ft.  For new acoustic  tile, assume $4/sq.ft. x 28,400 = $114,000 .

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 83 of 178 

Architectural Inspection – Interior Fixed Furnishings  0651 Specialties – Toilet partitions, bath accessories, marker boards, signage, etc.  Description:  The primary focus of this section is bathroom accessories and bathroom  partitions, with markerboards, corridor tackboards, etc. covered elsewhere.  Virtually all  bathroom specialties date from the original school construction.  Condition:  Most of the accessories have have been adequately maintained and are still  serviceable.  Over 40 years of use have lent a dated, somewhat dilapidated feel to the  bathroom accessories.   Many do not meet current ADA heights and functions as  separately defined in the ADA analysis.  Remaining life expectancy:  0 ­ 5 years

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 84 of 178 

Architectural Inspection – Interior Fixed Furnishings  Deficiency 

0651­1  Toilet Partitions  Toilet partitions date from the original construction, and have exceeded their design life.  Some portions of hardware are broken.  In many cases, dimensions do not comply with  ADA standards.  Deficiency category:  RR and C  Remedy  Demolish and remove partitions.  Coordinate installation of new porcelain steel or solid  phenolic plastic partitions with other room changes, including new toilet fixtures, new  toilet accessories, Marlite replacement, and tile base upgrade.  Estimated Construction Cost:  20 partitions @ $2,000 ea. = $40,000

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 85 of 178 

Architectural Inspection – Interior Fixed Furnishings  Deficiency 

0651­2  Toilet Accessories  Toilet accessories date from the original construction, and have exceeded their design  life.  Some portions of hardware are broken.  In most cases, dimensions do not comply  with ADA standards. Appearances are dirty and dated.  Deficiency category:  RR and C  Remedy  Demolish and remove all toilet accessories in two principal rest rooms.  Coordinate  installation of new accessories with other room changes, including new porcelain  fixtures, new toilet partitions, Marlite wall replacement, and tile base upgrade.  Estimated Construction Cost:  Lump sum for mirrors, towel dispensers, soap dispensers,  grab bars, etc.. = $25,000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 86 of 178 

Architectural Inspection – Interior Fixed Furnishings  0652 Casework/Millwork – Cabinets, countertops, cubbies, display cases, trim, etc.  Description:  Cabinetry in the building all dates from the original construction.  The  classroom casework includes a primary 7’ section of base and upper cabinets.  Construction for the most part is painted wood, with a laminate­faced countertop.  Condition:  Condition of casework ranges from fair to poor.  Many of the countertops are  significiantly damaged with burns, stains, breaks, or other blemishes.  The painted wood,  while still serviceable for most of the units, has been nicked and marred.  In some cases,  particularly the kindergarten cabinetry, the sliding door fronts are broken and no longer  functioning as intended.  Remaining life expectancy:  0 – 5 years.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 87 of 178 

Architectural Inspection – Interior Fixed Furnishings  Deficiency 

0652­1  Damaged classroom base cabinets  Classroom cabinets date from the original construction.  While they appear to be  functioning adequately in many spaces, the general finish and feel of the cabinets is very  dated.  Many have active damage like the burn and stains illustrated.  Sinks in the  existing cabinets in the South wing are not ADA compliant for knee space.  Deficiency category:  RR  Remedy  Demolish and remove all fixed cabinets in the typical classrooms.  Coordinate installation  of new cabinets with other room changes, including new sink fixtures.  Coordinate new  cabinetry design to meet ADA dimensions at sink (note separate mechanical  recommendation to add sinks to all East wing classrooms).  Estimated Construction Cost:  25 classrooms will have base and upper cabinets 7’ in  length, plus two kindergarten rooms with 30 of cabinetry.  235’ x $500/ft = $118,0000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 88 of 178 

Architectural Inspection – Interior Fixed Furnishings  0654 Window Coverings – Drapes, blinds, black­out shades, etc.  Description:  Drapes are provided in most classrooms.  They are replacements from the  original construction, though the date is uncertain.  They provide good quality darkening.  Condition:  Some minor damage and wear noted, but in general the blind system is OK.  Remaining life expectancy:  5 – 10 years.  Deficiency 

0654­1  View up at typical window blind installation  Sliding blinds are located in most windows.  Minor damage was noted in several rooms,  and one room is missing a blind system entirely.  Deficiency category:  RR  Remedy  Check operation of blinds, and perform individual repairs as required.  If window  replacement is undertaken, blinds will need to be removed, cleaned, and reinstalled.  Estimated Construction Cost:  For repair, cleaning, repair – allow $2,000.  For complete  removal and reinstallation, allow additional $3,000.  Total allowance $5,000.

June 2005 

Glacier Valley Elementary School Condition Survey Report 

Page 89 of 178