TECHNICAL RIDER (2015)

TECHNICAL RIDER (2015) 1 - GENERAL INFORMATION oqpo_oooo is an audiovisual and formal performance (30 to 45 minutes). Sound part is a standard stere...
Author: Milton Weaver
29 downloads 0 Views 390KB Size
TECHNICAL RIDER (2015)

1 - GENERAL INFORMATION oqpo_oooo is an audiovisual and formal performance (30 to 45 minutes). Sound part is a standard stereo diffusion. Visual part is a videoprojection with video mapping on 3 faces of a cube. Installation and equipment requirements are detailed below. The information described below correspond to an optimum installation and can be readapted. For any questions contact [email protected]

2 - CUBE / INSTALLATION

-

Mounting: 15-20 min Structure transported and assembled by the artist Aluminum frame, 3 sided in white tulle « Gobelin », 2 sides in black brushed cotton During the performance, the cube is in the center of the stage and occupies 3.12 m deep, 2.56 m transverse axis and less than 3.12 m in height (1.80 m side)

3 - CUBE / INSIDE

- X-Stand + table (80 x 60 cm minimum) for the artist equipment are required - AC power on stage for the equipment is required (3 x 110V or 220V European plug)

4 - VIDEO

- Video-check : 10-15 min (if the VP is already ready, fixed, with right lens…) - Projection needs to be of high quality, carefully aligned, and adjusted - A single channel of VGA, DVI or HDMI video will be provided from a laptop located on stage

- The resolution of the video signal will be in fullHD - High quality Video Projector, DLP technology, capable of accepting a VGA, DVI or -

HDMI signal at fullHD, 10000 lumens recommended (6000 lumens minimum) with a lens appropriately to cover the projection surface All cables necessary to route a DVI, VGA or HDMI signal from a laptop on stage to the video projector are required Video projector is 10 meters from the front extremity of the cube

Background must be black

Fixed from the ceil for the best stability (mapping +++)

Background must be black

5 - VIDEO MAPPING

- Video mapping : 1 hour - BUT : after the previous step, I get some « mapping marks » on the cube (10 min) and from this marks, I adapt the mapping project for the new installation : this step is the longest (1 hour) but I work only on my laptop. So, the stage is free for another things : soundcheck for others artists…

6 - SOUND

- Soundcheck : 15-20 min - Standard Stereo configuration. Mixer is not required on stage. Audio signals come

-

from a RME Fireface 400 soundcard and are line level analog audio on balanced 1/4” TRS jacks. The signals from the soundcard is routed directly to the house mixing board via DI boxes. The venue should provide 2 x 1/4” TRS cables to connect the soundcard to the PA system. Sound system needs to be able to deliver undistorted signal at 105db(A) over the whole frequency range from 30Hz - 20kHz. This implies we need a lot of energy in the low and very low end. Provide enough appropriate subwoofers. 2 stage monitors are required.

7 - LIGHT

- No light during the show other than that coming from the video projector - The venue should be as dark as possible - No smoke or fog effects used during the show 8 - VARIOUS

- Setup and full sound / video check has to be done before the event starts or doors -

open. After soundcheck, the equipments should not be moved prior to their performance. After the show the removal of the artist equipment takes < 10 minutes. Stage must be secured against people sitting on it, pouring drinks over equipment…

9 - CONTACT / LINKS [email protected] www.alexaugier.com

PROVIDED BY THE VENUE

- X-stand + Table (80x60 mm minimum) + AC power (3 x 110V or 220V European plug) - Video projector + All cables necessary to route a DVI, VGA or HDMI signal from a -

laptop PA System + 2 x Stage monitoring DI box (1 x stereo or 2 x mono) + 2 x 1/4” TRS cables PROVIDED BY THE ARTIST

- Cube - Laptop, soundcard, controler, audio processor and all cables necessary - VGA, DVI adaptator

IN PRATICE

- I set-up the cube on the stage : 15-20 min - we set-up the video-projector (best cover, right position…) : 10-15 min (if the VP is already ready, fixed…)

- I take some « mapping » marks : 10-15 min (I need to be in front of the cube, not inside)

- I install myself inside the cube and we check the sound : 15-20 min - From the « mapping » marks, I adapt the mapping project at the new installation. This step is the longest (1 hour) but I work only on my laptop. I don’t need to use the cube. The stage is free for another things : soundcheck of others artists…

- Then, last video and sound check : 5 min

IMPORTANT

- The cube and the video-projector mustn’t move after theirs installation +++. So, for the moment, I always played first.