NATIONAL ROAD, TRANSPORT, TOURISM AND POST STRATEGY OF MONGOLIA. State Secretary Ministry of Road, Transport and Tourism, Mongolia

NATIONAL ROAD, TRANSPORT, TOURISM AND POST STRATEGY OF MONGOLIA Presented by Ts.Bat-Enkh, State Secretary Ministry of Road, Transport and Tourism, M...
Author: Leona Shepherd
56 downloads 2 Views 2MB Size
NATIONAL ROAD, TRANSPORT, TOURISM AND POST STRATEGY OF MONGOLIA

Presented by

Ts.Bat-Enkh, State Secretary Ministry of Road, Transport and Tourism, Mongolia

Transport types

PRESENT ROAD AND TRANSPORT NETWORK OF MONGOLIA Õàíõ

Õàíäãàéò

Óëààíáàéøèíò

Àðö ñóóðü

ªËÃÈÉ Äàâàí

49,308 1,815 46,5 0,5 98,123

50,25 1,85 47,39 0,51 100,00

Ýðýýíöàâ

Àëòàíáóëàã

Áàãà-¯åíõ

%

KHUVSGUL

ÓËÀÀÍÃÎÌ

̪ЪÍ

UVS

BAYAN ULGII

Road Railway Civil Aviation Maritime Total

Length /thous.km/

ÄÀÐÕÀÍ

SELENGE ÕÎÂÄ

ÁÓËÃÀÍ

ZAVKHAN Óëèàñòàé

ARKHANGAI

Õàâèðãà

ÝÐÄÝÍÝÒ

BULGAN

ULAANBAATAR KHENTII

×ÎÉÁÀËÑÀÍ

DORNOD ÇÓÓÍÌÎÄ

KHOVD

TUV

ÖÝÖÝÐËÝÃ

ªÍĪÐÕÀÀÍ

ÀËÒÀÉ

ßðàíò

ÃÎÂÜѯÌÂÝÐ

¯åí÷ ÁÀßÍÕÎÍÃÎÐ

ÀÐÂÀÉÕÝÝÐ

ÁÀÐÓÓÍ-ÓÐÒ

SUKHBAATAR

×ÎÉÐ

Áè÷èãò ÌÀÍÄÀËÃÎÂÜ

GOBI-ALTAI UVURKHANGAI Áóðãàñòàé

DUNDGOBI

ÑÀÉÍØÀÍÄ

BAYANKHONGOR DORNODGOBI Çàìûí-¯¿ä ÄÀËÀÍÇÀÄÃÀÄ

UMNOGOBI

Airports with paved runway

Õàíáîãä

Ãàøóóíñóõàéò

Airports with gravel runway

Railway Network

Paved road Gravel road

Airports with earth runway

Total length of road network - State road - Paved road - Improved and Gravel road

11219km 1219km 1503km 1439km

Earth road

Policy Documents of Road, Transport and Tourism Sectors Road Master Plan of Mongolia Master Plan and National Tourism Policy and Strategy National Tourism Master Plan 2000-2015 Millennium Road project Regional Development Concept General Plan For Railway Development of Mongolia until 2021 Master Plan For Development of Postal Services Civil Aviation Master Plan Civil Aviation Policy Document Master Plan for Transport sector development until 2015 National Transport Strategy of Mongolia National Infrastructure Strategy of Mongolia National Development Strategy of Mongolia

1994 1998 1999 2001 2001 2002 2002 2003 2004 2005 2006 2006 2006

ONGOING PROJECTS IN ROAD SECTOR Building 30 km paved road in direction to Ulgii Tsagaan funded by domestic investment

-Building 58km paved road in direction to Ulaangom –Khandgait -Teeliin gol in 75 long m. -Nari gol in in200long m -Building concrete bitum bridge in 180,55long m in Buyantiin gol

Planned to build gravel road of 46 km in direction to Khar Khorin-Tsetserleg funded by World Bank and build paved road in some certain gravel road sections

Building road 146 km in direction to Erdenet-Bulgan –Unt funded by Kuwait Fund and be completed by 2007.

-Building 50km paved road in direction to BaganuurUndurkhaan -Started to build 58.5km road by grand aid of Japanese government

In frame of “Transport Infrastructure Development” project, building 96 km gravel road in direction to Zavkhan, Darkhan and Selenge provinces funded by German government

Building 46km paved road in direction to KharkhorinKhoshootsaidam,funded by Turkey

With purpose to improve Mongolian tourism roads, started building over 120 km roads in Arkhangai, Khuvsgul and Ovurkhangai aimags

Building 431.7 km paved road in direction to Choir- Zamiin Uud,funded by ADB and Korea

CURRENT FINANCE SITUATION OF ROAD SECTOR À. INVESTMENT IN ROAD SECTOR

15.9

1999

2000

2001

2002

2003

2004

2005

Domestic

4.1

4.3

5.9

6.5

7.9

10.7

14.7

19.8

17.4

21.9

Foreign

11.8

12.6

19.8

12.4

9.8

6.2

15.9

21.8

14.2

7.5

7.5

6.2 10.7

17.4

9.8

1998

14.2

12.4

1997

0.0

21.8

19.8

1996

10.0

7.9

12.6 4.3

20.0

6.5

5.9

14.7

30.0

21.9

19.8

40.0

11.8 4.1

US$ mln / bln tugrugs

50.0

PLAN UNTIL 2020 Ханх Хандгайт

Улаанбайшинт

Хатгал

УЛААНГОМ Ногоон нуур

ÓÂÑ

Наранбулаг

Öýíãýë ӨЛГИЙ Даян

Бага-Илэнх Цагааннуур

ХӨВСГӨЛ

Òýñ Цагаан-Уул

МӨРӨН Сэлэнгэ

Өлгий

ДАРХАН

Түдэвтэй

ЗАВХАН ХОВД

УЛИАСТАЙ

Мандах

БУЛГАН

АРХАНГАЙ Цахир

ЭРДЭНЭТ

Ярант

ЦЭЦЭРЛЭГ Хархорин

Buutsagaan

ГОВЬ-АЛТАЙ

Бургастай

Нөмрөг ЧОЙБАЛСАН

СҮХБААТАР

АРВАЙХЭЭР МАНДАЛГОВЬ

Нарийн тээл

ӨВӨРХАНГАЙ

ДУНДГОВЬ

САЙНШАНД

БАЯНХОНГОР Цогт Овоо

ДОРНОГОВЬ Замын-Үүд

ДАЛАНЗАДГАД

ӨМНӨГОВЬ

Ханбогд

Шивээ хүрэн Гашуун Сухайт

Paved road – 6472 км Improved and gravel road – 3866 км

Òàìñàãáóëàã

ÄÎÐÍÎÄ Матад

БАРУУН-УРТ

ЧОЙР ÃÎÂÜѯÌÁÝÐ

Үенч BAYANHONGOR

ХЭНТИЙ

Батноров УЛААНБААТАР Гачуурт Багануур Лүн Налайх ЗУУН МОД Мөнххаан ӨНДӨРХААН ТӨВ

Батцэнгэл

АЛТАЙ

Хавирга

Сүмбэр

Жаргалант

БУЛГАН

Дарви

ÕÎÂÄ

Баян-Уул

СЭЛЭНГЭ

Хутаг-Өндөр

БАЯН-ӨЛГИЙ

Эрээнцав

Алтанбулаг

Эрдэнэцагаан

Бичигт

0 Year 2 02 1

2 01 9

2 01 7

2 01 5

2 01 3

2 01 1

2 00 9

2 00 7

2 00 5

30.3

25.8

27.4

35.25

36.28

37.69

40.85

37.22

22.9

36.26

37.69

38.86

35.69

35.25

30.3

25.8

27.5

23.72

US$ mln

INVESTMENT UNTIL 2020

100

INVESTMENT REQUIREMENTS IN ROAD SECTOR Projects, programs

Description

Budget, US$ mln/km òotal

year 2006-2011

2011-2016

2016-2021

1

New road construction

327.7 /2253.7êì/

377.4 /2209 êì/

343.8 /2516.1êì/

1048.9

6978.8êì road will built in 44 directions.

2

Repair and maintenance in road network

74.1

114.5

96.0

284.6

To maintain the condition of new roads and elongate utilization period daily maintenance and repair work will be carried out.

3

Modernize road inspection, management activities

12.1

14.7

13.2

40

To improve on-sight and stage supervision during new road construction and maintenance works, maintain research on equipment utilization methods and provide updated management

Total

1373.5

Road transport

Transit transport will be expanded

T

T T T T

T AH4

T

T

T

AH32

T

T AH3

T

T

Terminal

- Establishing

integrated terminal for international and intercity transport.

- Introducing Intelligent Transport System

32-ын тойрог

100 айл

New public transportation system will be introduced in Ulaanbaatar and passenger terminals will be built.

Троллейбус компани Гурвалжин

Офицеруудын ордон

Сонгинохайрхан автовокзал Тээврийн товчоо

Нарантуул зах

Баянзүрх автовокзал

INVESTMENT REQUIREMENTS IN ROAD TRANSPORT SECTOR Projects, programs

Description

Budget, US$ mln total

year 200620062011

20112011-2016

201620162021

1.

Introduce new transport system in Ulaanbaatar (Monorail),

150.0

400.0

400.0

950.0

Build fly-over monorail public transport system separate from city road traffic and set up passenger terminals.

2.

Build freight transport terminals

2.5

3.5

2.0

8.0

freight transport terminals will be built in regional centers and free trade and economic zones

3.

Introduce Intelligent Transport system

50.0

100.0

100.0

250.0

New up-to-date information technology based intelligent transport system will be giving information to drivers and passengers about international, regional and intercity traffic and infrastructure network.

Total

1208.0

Railway Transport Problems: Mongolian Railway has one major line which limits passenger and freight transport abilities and necessitates great attention to safety.

Actions being carried out: Increase number of stations and crossing points, Increase capacity and length of crossings, Renovate locomotive and carriage fleet.

Planned work: Electrification of railway, Research possibilities of building second railway line.

RAILWAY TRANSPORT

Planning Feasibility study for new railway construction in Gobi region of Mongolia (Zuunbayan -332км-Oyu tolgoi -150км-Tsagaan suvrag

RAILWAY TRANSPORT

Planning a Feasibility study for new Railway construction in Eastern region of Mongolia (Dornodgobi, Dornod,Sukhbaabar)

INVESTMENT REQUIREMENTS IN RAILWAY TRANSPORT Projects, programs

Description

Budget, US$ mln total

year 20062006-2011

20112011-2016

20162016-2021

1.

Build railway network in Gobi region

130.0

140.0

115.0

385.0

Feasibility studies on building new railway network to major mining sites Oyu tolgoi, Tavan tolgoi, Tsagaan suvarga in Gobi region will be done and with future implementation.

2.

Build railway network in Eastern region

190.0

200.0

160.0

550.0

Building new railway line to Chinese border station Rashaant through Sainshand-Baruun-UrtChoibalsan.

3.

Railway fleet renovation

318.0

122.0

110.0

550.0

Need to take measure to have new technique, railway fleet renovation relating to the passenger and carriage vagons.

4.

Constructing second railway line

180.0

240.0

240.0

660.0

Construct new railway line along the major line of Mongolian Railway.

5.

Electrification of railway transport

400.0

500.0

300.0

1200.0

power network will be built along the railway line.

CIVIL AVIATION EXPANDING AIR NAVIGATION SERVICES AND IMPROVE FLIGHT SAFETY OPERATIONS Ensure full coverage of air navigation radars at the major air traffic routes Continue renovation of air navigation service equipments and introduce new technologies Create auxiliary satellite communication system Update organization of air routes NIDOR NOPUS

DARNO

LETBI

SULOK

SERNA

MURUN

UlAANBAATAR TEBUS

KHARKHORIN

POLHO

Ñàéíøàíä INTIK

MORIT

Improvement of Airport Services and Flight Safety Operations Start to build new International Airport Build paved runways at airports in Umnugobi, Bayan-Ulgii and Zavkhan aimags Óëààíãîì

ªëãèé

KHUVSGUL

ÓÂÑ

̺ðºí

BAYAN UILGII Õîâä

ZAVKHANÒîñîíöýíãýë

KHOVD

SELENGE Áóëãàí Äàäàë

BULGAN ULAANBAATAR ARKHANGAI KHENTII

Óëèàñòàé Öýöýðëýã Áóëãàí

Àëòàé

ÒªÂ

KHARAHORUM

DORNOD Áàðóóí-Óðò

ªíäºðõààí

SUKHBAATAR

Àðâàéõýýð Áàÿíõîíãîð

GOBI-ALTAI

Ìàíäàëãîâü

ªÂªÐÕÀÍÃÀÉ DUNDGOBI

Ñàéíøàíä

BAYANKHONGOR Airports with paved runway Planned airports with paved runway

Planned International Airports

×îéáàëñàí

Äàëàíçàäãàä

UMNUGOBI

DORNOGOBI

International Air Transport • • •

Increase aircraft fleet for International flights. Expand international flight market. Develop international air freight transport.

BERLIN IRKUTSK MOSCOW

ULAANBAATAR

KHUHHOT

BEIJING SEOUL TOKYO/OSAKA

Domestic flight operation -

Encourage foreign and domestic private investment Implement civil aviation fleet renovation

Ulaangom

Ulgii

KHUVSGUL

UVS

Ìurun

BAYAN-ULGII Khovd

ZAVKHANÒîsontsengel

KHOVD

SELENGE Bulgan Dadal

BULGAN ULAANBAATAR ARKHANGAI KHENTII

Uliastai Tsetserleg

Bulgan

TUV

Àltai

DORNOD Baruun-Urt

Undurkhaan

SUKHBAATAR

Arvaikheer Bayankhongor

GOVI-ALTAI

Mandalgovi

UVURKHANGAI DUNDGOVI BAYANKHONGOR Dalanzadgad

ÌIÀÒ AEROMONGOLIA

Choibalsan

UMNUGOVI

Sainshand

DORNOGOVI

INVESTMENT REQUIREMENTS IN CIVIL AVIATION SECTOR Projects, programs

Description

Budget, US$ mln total

year 200620062011

201120112016

201620162021

1.

Improve air traffic control equipment

15.0

15.0

15.0

45.0

Increase provision of air traffic control equipment.

2.

Introduce real-time monitoring system in air navigation services

10.0

10.0

-

20.0

Improve supervision on aviation safety operations and increase capacity and number fly-overs.

3.

Delelop local airports

28.0

7.0

-

35.0

New paved runways will be built in Uvs, Bayan-Ulgii, Zavkhan, GoviAltai and Kharkhorin airports.

4.

Construction of new International airport

-

150.0

-

150.0

New international airport with passenger and freight transport capabilities will be constructed near Ulaanabaatar.

Total

250.0

Maritime Transport There is one ferry and three barges at the Khuvsgul lake to operate between Khakh-Khatgal. But due to lack of cargo they are not used. „

„ „

Joint Mongolian-Singaporean “Mongolian Ship Registry” company was established in 2003. Of the total of 1000 ships registered over 200 ships are operational under constant supervision and coordination. Revenue from this operation to state budget was US$750.000. Ship registry will be expanded in the future. Mongolian sea vessels will utilized.

INVESTMENT REQUIREMENTS IN MARITIME AND WATER TRANSPORT Projects, programs

Description

Budget, US$ mln total

year 200620062011

201120112016

201620162021

1.

To establish water transport infrastructure

0.4

0.5

0.5

1.4

To build and introduce water transport navigation network, route signs, signaling equipment and terminal facilities.

2.

Expand Mongolian Ship Registry operation

0.8

0.8

-

1.6

Mongolia will be doing its ship registry independently and increase inspection and control in ship safety conditions.

3.

To acquire Mongolian own sea vessels

3.0

5.0

2.0

10.0

Mongolia will lease or own sea vessels on all possible terms and conditions, hire ship crew and train its own sea personnel.

4.

Train Mongolian ship crew and sea personnel.

0.6

0.8

0.6

2.0

Total

15.0

Tourism sector ¾ By the end of 2005 Mongolia received 338715 tourists and it shows 12,7 percent increase from same period of 2004. By August 2006 number of tourists reached 269945 which is 14.9 percent more than compared to same period of last year. ¾ About 80 percent of the total number of incoming tourists visit during summer season. In the last few years, due to intensified and constant foreign marketing and advertisement, eased visa procedure and increased frequency of flights, number of tourist is steadily increasing by 12-15 percent each year.

Develop tourism in connection with transport strategy

¾

To increase number of trains traveling between Ulaanbaatar and Beijing and ensure summer time train schedule regularity. To develop winter and domestic tourism through lowering cost of international flights, hotel and tourist camp rates. To increase use of tourist related road signs in major tourist destination areas, renovate and rehabilitate historical and cultural heritage sights and artifacts in connection with other sector development policies.

POSTAL DELIVERY NETWORK

INTERCITY POSTAL DELIVERY IS DONE BY PLANE TO 9 AIMAGS, BY TRAIN TO 5 AIMAGS, BY ROAD VEHICLES TO 4 AIMAGS AND BY MIXED MEANS OF TRANSPORT TO 2-5 TIMES PER WEEK.

INTEGRATED POSTAL REFORM AND DEVELOPMENT PLAN STRUCTURE (2007-2010)

Postal policy and universal services

Favorable legal environment

Better regulatory framework

Required amount of investment to implement these projects is US$ 2 mln

Increased capacity of Postal companies

Thank you for your attention

Suggest Documents