Mayo Performing Arts Center Technical Specifications

Tec chnical Speciffication ns Updated: 9/2 2014   Mayo Performing Arts Center Technical Specifications   Contents General Information ................
Author: Barrie Riley
1 downloads 0 Views 903KB Size
Tec chnical Speciffication ns Updated: 9/2 2014  

Mayo Performing Arts Center Technical Specifications  

Contents General Information ..................................................................................................................................... 3  Staff Contacts ............................................................................................................................................ 4  Vital Dimensions ....................................................................................................................................... 4  Stage Construction .................................................................................................................................... 5  Loading Dock ............................................................................................................................................. 5  Dressing Rooms ......................................................................................................................................... 5  Merchandise Sales .................................................................................................................................... 5  Orchestral Inventory ..................................................................................................................................... 6  Pianos ........................................................................................................................................................ 6  Chairs ........................................................................................................................................................ 6  Stools ......................................................................................................................................................... 6  Music Stands ............................................................................................................................................. 6  Orchestra Clouds ....................................................................................................................................... 6  Conductor’s Podium.................................................................................................................................. 6  Stage Thrust and Extensions ..................................................................................................................... 6  Audio ............................................................................................................................................................. 7  Power ........................................................................................................................................................ 7  Front of House Audio Console .................................................................................................................. 7  Available I/O Cards .................................................................................................................................... 7  Speakers .................................................................................................................................................... 7  Microphones ............................................................................................................................................. 8  Wireless ..................................................................................................................................................... 8  Drive Rack ................................................................................................................................................. 8  Source Rack ............................................................................................................................................... 9  Monitors .................................................................................................................................................... 9  Communications ....................................................................................................................................... 9  Cabling....................................................................................................................................................... 9  Page 1 of 16   

Mayo Performing Arts Center Technical Specifications   Lighting ........................................................................................................................................................ 10  Power ...................................................................................................................................................... 10  Control .................................................................................................................................................... 10  Dimmers .................................................................................................................................................. 10  Box Truss ................................................................................................................................................. 10  Front Of House Lighting .......................................................................................................................... 11  Upstage Truss .......................................................................................................................................... 11  Moving Lights .......................................................................................................................................... 11  Spotlights ................................................................................................................................................ 11  Dance Booms .......................................................................................................................................... 11  Atmospheric Effects ................................................................................................................................ 11  Additional Stock ...................................................................................................................................... 11  12” Truss ................................................................................................................................................. 12  House Lights ............................................................................................................................................ 12  Additional Equipment ................................................................................................................................. 13  Risers ....................................................................................................................................................... 13  Legs ......................................................................................................................................................... 13  Rolling Legs ............................................................................................................................................. 13  Dance Marley .......................................................................................................................................... 13  Projection ................................................................................................................................................ 13  Pipe and Drape ........................................................................................................................................ 14  Softgoods ................................................................................................................................................ 14  Counterweight Rigging ............................................................................................................................ 14  Lineset Schedule ..................................................................................................................................... 15   

Page 2 of 16   

Ma ayo Perfform ming g Artts Cente er Tec T chnic cal Spec S cificcatio ons  

Ge eneral Inform mation n

Main n Entrance Lo oading Doc ck 100 South S Streett 9 Pine St. Morristow wn, NJ 079 960 Morrisstown, NJ 07960 (973)) 539.0345 Tracto or Trailers should s approach from Morris Ave e for the be est access tto the loadin ng dock.

Paage 3 of 16   

Mayo Performing Arts Center Technical Specifications  

Staff Contacts Jed DeFilippis

Brian Isaacs

Lee Kaloidis

Production Director

Production Manager

[email protected] 973.753.0354 702.592.0160 (c)

[email protected] 973.753.0366

Production Assistant Transportation, Hospitality, Hotels [email protected] 973.753.0350

Chris Ball Lighting Designer [email protected] 973.539.0345 Ext. 6555

Stephan Wojtecki Audio Engineer [email protected] 973.539.0345 Ext. 6555

Vital Dimensions Proscenium Opening Plaster Line to Back Wall Downstage Lip to Back Wall Wall To Wall Width Grid Height High Steel

36’-0” wide x 25’-0” high 40’-0” 44’-0” 72’-0” 61’-0” 68’6”

Page 4 of 16   

Mayo Performing Arts Center Technical Specifications  

Stage Construction Fully sprung basket weave stage deck with natural wood finish. Drilling or lagging into the deck is prohibited

Loading Dock (2) Roll Up bay doors – 48” from ground. Doors measure 8’x8’ No idling or running generators is permitted while in the loading dock. Shore power is available for three vehicles – 60A each. Dock accommodates two vehicles (trucks or buses) side by side 65’ push to freight elevator Elevator Door Dimensions 6’ Wide x 8’ High Air duct in hallway at 7’-6” Interior Elevator Dimension 9’-6” Wide x 11’-0” Deep x 9’-0” High

Dressing Rooms (2) (2) (2) (3)

“Star” dressing rooms – stage level including private bathrooms with showers Chorus dressing rooms located on dock level Additional rooms dock level – can be used as production offices or additional dressing rooms Additional showers available on dock level

Merchandise Sales Located in lower lobby Equipped with Wall mount T-shirt racks, telephone, internet connections, counter storage and room for three sellers Merchandise Sales Contact: Erin Pach 973.539.0345 x6509

Page 5 of 16   

Mayo Performing Arts Center Technical Specifications  

Orchestral Inventory Pianos Steinway (D)9’ Concert Grand Steinway (O) 6’1” Baby Grand *tunings must be approved by Production Manager

Chairs (80)

Black Wenger Pro Orchestra Chairs

Stools (8)

30” Black Stools

Music Stands (80)

Manhassat Music Stands

(40)

Manhassat Music Stand Lights

(40)

Battery Operated Music Stand Lights

Orchestra Clouds Wenger Custom Built Orchestra cloud system

Conductor’s Podium (1) 4’x4‘x12”

Stage Thrust and Extensions Thrust covers first 2 rows of seating; extensions add an additional 8’ to front of stage.

Page 6 of 16   

Mayo Performing Arts Center Technical Specifications  

Audio Power 200 Amp Camlock (located Stage Right, Ground and Neutral reversed) (6) 20A Edison Quad Boxes (audio stage power)

Front of House Audio Console (1) Yamaha PM5D-RH v2.0 Digital Mixing Console

Available I/O Cards MY8AT (8 Channel ADAT) MY8ADDA96 (8 Channel AD/DA @96K) MY8AES96S (8 Channel AES with SRC)

Speakers Meyer M1D Line Array Meyer CQ-2 Meyer UPA-1P Meyer M1D Line Array Meyer M1D Line Array Meyer UPA-2P Meyer UPM-2P Meyer 650-P Subwoofer

15 Flown Per Side Flown Center Balcony Fill Flown Center Down Fill Ground Front Fill (4 total) Ground Out Fill (2 total) Ground In Fill (2 total) Under Balcony Fill (6 total) 2 per side

Page 7 of 16   

Mayo Performing Arts Center Technical Specifications  

Microphones 1 AMT 5 Sennheiser

M40

4 Sennheiser 1 Sennheiser

MD421

5 Neumann 1 DPA

KMS 105

2 AKG 2 AKG

414 ULS

1 EV 1 Earthworks

RE-20

2 Earthworks 4 Crown

M30

2 Shure 1 Shure

Beta 52

5 Shure

e 604

2 Shure 6 Countryman

SM 89 E6i

6 Countryman 2 AKG

B3

1 RODE 2 Shure

NT-5

5 Shure 5 Shure

Beta 58

5 Shure 5 Shure

Beta 57

4 Shure 1 Shure

SM 81 Beta 56

Beta 91

1 Shure 2 Shure

Beta 98

4 Shure

MX 202

E845/S 4099-B 451 B/ST PM40 PCC 160

C-747 V11 KSM 109 SM 58 SM 57 VP 88 KSM 27

Wireless 6 4 2 4 4

Shure UHF-R Wireless Receiver Shure SM-58 Handheld Shure Beta 58 Handheld Sennheiser 845 Wireless Beltpacks Sennheiser MKE-2 Lavalier

Drive Rack (1) (1) (1) (1)

Meyer Galileo 616 Processor Meyer SIM 3 Apogee Big Ben Word Clock Apple iMac (Compass, iTunes, Smaart Live 7) IBM Computer (Meyer RMS)

Page 8 of 16   

Mayo Performing Arts Center Technical Specifications  

Source Rack (1) (1) (1) (1) (1)

Tascam 901SL CD Recorder Denon DN4000 Dual CD Player Sony PCM R500 DAT Sony MDS-E12 MiniDisk Digidesign 002 Rack

Monitors (1) (2) (2) (2) (1) (8)

Avid Profile Digital Mixing Console* Meyer UM-1P Stage Monitors Meyer UPA-2P - flown downstage Meyer UPA-1P - flown upstage Carvin 18” Powered Drum Subwoofer* DAS SML-12 Stage Monitors*

Communications ClearCom Available SL, SR, Rail, Production Pit, Spot Booth (8) HME Wireless Headsets Sennheiser Tourguide 2020-D Assisted Listening System

Cabling *SNAKE IS PERMANENTLY LOCATED STAGE RIGHT

Whirlwind 48 Channel 8 Return W-4 Iso-Split (5) Whirlwind 8 Channel Subsnakes (2) Whirlwind 12 Channel Subsnakes

*Available as needed as a rental Page 9 of 16   

Mayo Performing Arts Center Technical Specifications  

Lighting Power 400 Amp Camlock (located Stage Right, Ground and Neutral reversed)

Control Both consoles reside in the production pit. The ETC may be operated from the spot booth, production pit or touring production area

Avolites Pearl Expert Pro ETC 48/96

Dimmers 288 Channels at 2.4K

(192) (96)

ETC Sensor Dimmers for overhead electrics and throughout the theatre. NSI TourRack for downstage ‘box’ truss.

Box Truss 35‘x15’ Box (made of 20.5” Truss) Trims at 29’

The Box Truss is permanently rigged (instruments included). No adding, striking, or relocating of instruments is allowed. No additional rigging to the box truss is allowed. Neither the valence or heat shield curtain on the box truss are to be removed.

DownStage (60) ETC Source Four PAR MFL (15) ETC Source Four 26

Upstage (5) ETC Source Four 36

Stage Left Side (6) ETC Source Four 36

Stage Right Side (6) ETC Source Four 36

Page 10 of 16   

Mayo Performing Arts Center Technical Specifications  

Front Of House Lighting 75’ Throw to Center Lip of Stage Apron

Balcony Boom House Right (6) ETC Source Four 19

Balcony Boom House Left (6) ETC Source Four 19

Upstage Truss Permanently rigged to linesets 26&27

(60) (5) (2)

ETC Source Four Par NARROW ACL Bars 9 Light MoleFay Audience Blinders

Moving Lights (8) (12) (32)

Robe 1200E AT Spot Permanently rigged to lineset 21 Elation Design Spot 250 Floor units Martin Mac 101 LED

Spotlights 110’ - Throw from booth to downstage-center lip of the apron

(4)

Phoebus iMarc 850

Dance Booms Booms are permanently wired

(8)

10’ booms 6 ETC Source Four 36

Atmospheric Effects (1) (1) (1)

High End Systems DF50 Hazer LeMaitre Hazer Base Hazer

Additional Stock (12) (9) (12) (12)

ETC Source Four 14 degree ETC Source Four 26 degree ETC Source Four 36 degree ETC Source Four 50 degree Page 11 of 16 

 

1.5” pipe & 50Lb base

Mayo Performing Arts Center Technical Specifications  

(16 (16) (4) (6)

ETC Source Four PAR Source Four Par Barndoors Drop In Irises for Source Four Floor Plates

12” Truss (2) (2) (2) (6) (6) (4)

Silver 2’6” Silver 5’ Silver 8’ Black 10’ 2’ x 2’ Truss Floor Plates 3’ x 3’ Truss Floor Plates

House Lights House light control is located in the Production Pit, Spot Booth, and Lower Lobby. No DMX control of houselights is available

Page 12 of 16   

Mayo Performing Arts Center Technical Specifications  

Additional Equipment Risers (16) (4) (4)

4’ x 8’ Decks 4’ x 6’ Decks 4’ x 4’ Decks

Legs 8 16 8 32 24 24 6

6” 8” 12” 18” 24” 30” 48”

Rolling Legs Can accommodate up to (2) 8’x8’ rolling risers

(4) (6)

4” rolling deck legs for 4’x4’ decks 22” double wheels for 8’x8’ deck

Dance Marley (6)

40’ panels Harlequin dance floor

Projection (1) (1) (1) (1)

Eiki EIP-HDT20 Digital Video Projector Analog Way SVU-300 Switcher Da-Lite 16’ x 9’ Fast Fold Frame Da-Lite 16’ x 9’ Dual Vision Screen (front and rear projection

Page 13 of 16   

Mayo Performing Arts Center Technical Specifications  

Pipe and Drape Enough bases and uprights for all drapes 

(27) (25)

Black 8’-0” Black 3’-0”

Softgoods (1) (5) (5) (1) (1) (1) (2)

Main Curtain Black Legs (pairs) Black Borders 50% fullness Black Sharkstooth Scrim Seamless White Cyclorama Stardrop/Blackout Curtain Chameleon RGB Show LED Traveler/Blackout 50% fullness

Travels or Flies 30’x8’ 5’x40’ 30’x44’ 30’x40’ 30’x40’ 30’x24’

Counterweight Rigging (38) Single purchase counter weight line sets. Battens are 1.5” Schedule 40 pipe. 44’ long. Locking rail located stage left. Additional operating rail located on gallery SL (25’ above deck level 700 Lb maximum point load each lineset

Page 14 of 16   

Mayo Performing Arts Center Technical Specifications  

Lineset Schedule House

Trim Height

Line#

Distance

SHOW

PL

0'0"

Proscenium

Proscenium

FC 1 2 3 3A 4 5 6 6B 7 8 9

1'4" 1'10" 2'4" 3'4" 3'10" 4'4" 4'10" 5'10" 6'10" 7'4" 8'4" 9'4"

Fire Curtain Main Drape I Valance Projector Screen Border & Legs 1

Fire Curtain Main Drape l Valance

Electric 1 Orchestra Cloud 1

House 1E Orchestra Cloud 1

Moving Lights

Moving Lights 1200

10

10'4"

Border & Legs 2

11 12 13 14 15 16 17 18 19 20 21 22 23 24

11'4" 12'4" 13'4" 14'4" 15'4" 16'4" 17'4" 19'4" 20'4" 21'4" 22'4" 23'4" 23'10" 24'10"

24B

25'10"

25 26 27 28 29 30 31 32 33 33A 34

26'4" 27'4" 28'4" 29'4" 30'4" 31'4" 32'4" 33'4" 34'4" 34'10" 35'4" 36'2"

29' 30'

30'

120lbs

40' 44' 44' 44' 44' 44' 44' 44' 44' 44' 44' 44' 44'

Orchestra Cloud Blackout Drop

44'

House 2E

Midstage Traveler Orchestra Cloud 2

Midstage Traveler Orchestra Cloud

Border & Legs 3

30'

Electric 3

House 3E

Moving Lights Border & Legs 4 Video Projector Orchestra Cloud 3 Blackout Drop (fullness)

Moving Lights 1200

20.5” Rock Truss 20.5” Rock Truss Electric 4 Border & Legs 5 Black Scrim Electric 5 (Cyc Lights)

20.5” Rock Truss 20.5” Rock Truss House 4E

30'

30' House 5E

WhiteCyc Black/ LED Star Drop

Page 15 of 16   

350 120lbs

Batten Length

44' 44' 44' 44' 44' 44' 44' 44' 44' 44' 44' 44' 44' 44'

Electric 2

Black I LED StarDrop Back Wall

Weight

120lbs

120lbs 60lbs

120lbs 60lbs

44' 44' 44' 44' 44' 44' 44' 44' 44' 44' 44'

Notes 25'2" H x 36' W Grid 60' 11" PERMANENT PERMANENT

PERMANENT PERMANENT

PERMANENT Bottom of Border at 25' PERMANENT PERMANENT PERMANENT

PERMANENT PERMANENT

PERMANENT

PERMANENT PERMANENT PERMANENT

PERMANENT

PERMANENT Back Wall

CONCERT HOUSE LIGHTING PLOT RIGGING SYSTEM

85 86 87 88 89 90 97 98 99 100 101 102 109110111 112113 114 115 116117 118119 120 121 122 123 124 125126 30 nsp

29 nsp

28 nsp

27 nsp

26 nsp

24 nsp

25 nsp

23 nsp

22 nsp

21 nsp

20 nsp

18 nsp

19 nsp

17 nsp

16 nsp

15 nsp

14 nsp

13 nsp

12 nsp

11 nsp

9 nsp

10 nsp

8 nsp

7 nsp

6 nsp

5 nsp

4 nsp

3 nsp

2 nsp

1 nsp

127 128 129130131 132 133 134 135 136 137 138139 140141 142143 144 145 146 147 148149 150 151 152153 154155156 30 nsp

29 nsp

28 nsp

27 nsp

26 nsp

24 nsp

25 nsp

23 nsp

22 nsp

21 nsp

20 nsp

19 nsp

18 nsp

17 nsp

16 nsp

15 nsp

14 nsp

13 nsp

12 nsp

9 nsp

10 nsp

11 nsp

8 nsp

7 nsp

6 nsp

AUD. BLINDER 11

11

11

11

ACL

ACL

ACL

ACL

73 ROBE COLORSPOT 1200AT MODE 2, UNIVERSE 3

4 nsp

3 nsp

2 nsp

1 nsp

AUD. BLINDER

8,9,10 2

616263 33

1

5 nsp

2,3,4 2

7

7

7

7

6

6

6

6

5

5

5

5

ACL

ACL

ACL

ACL

ACL

ACL

ACL

ACL

ACL

ACL

ACL

ACL

74

65

75

97

161 76

129

646566 193

1

1

1

1

ACL

ACL

ACL

ACL

225 77

84

84

WORK LIGHT 35

79

145

80

157

145

34

28

22

205

193

13

MAC 101 RGB

16

26°

WORK LIGHT

83

193

181

19 17

MAC 101 RGB

26°

82

181

169

25

MAC 101 RGB

26°

81

169

157

31

MAC 101 RGB

205

7

MAC 101 RGB

10

26°

4

26°

68

68

WORK LIGHT 35

67

73

69

85

73

34

28

22

133

121

13

MAC 101 RGB

16

26°

WORK LIGHT

72

121

109

19 17

MAC 101 RGB

26°

71

109

97

25

MAC 101 RGB

26°

70

97

85

31

MAC 101 RGB

133

7

MAC 101 RGB

10

26°

3

MAC 101 RGB

4

26°

60

60

WORK LIGHT 35

3

MAC 101 RGB

55

1

56

13

1

34

28

22

61

49

13

MAC 101 RGB

16

26°

WORK LIGHT

59

49

37

19 17

MAC 101 RGB

26°

58

37

25

25

MAC 101 RGB

26°

57

25

13

31

MAC 101 RGB

61

7

MAC 101 RGB

10

26°

3

MAC 101 RGB

4

26°

273

3

36°

4

36°

36°

274

282

6

5

281

36°

36°

5

4

280

36°

6

275

3

279

1

2

1133

1144

H AS W AL

14°

19

269

wfl 30

DEDICATED CURTAIN WARMERS

26°

18

26°

17

26°

16

26°

15

26°

14

26°

13

26°

26°

11

12

26°

10

26°

9

26°

8

26°

7

26°

6

26°

5

26°

4

26°

mfl 30

mfl 29

mfl 28

mfl 27

mfl 26

mfl 25

mfl 24

mfl 23

mfl 22

mfl 21

mfl 20

mfl 19

mfl 18

mfl 17

mfl 16

mfl 15

mfl 14

mfl 13

mfl 12

mfl 11

mfl 10

mfl 9

mfl 8

3

mfl 7

mfl 6

2

mfl 5

mfl 3

mfl 2

223224225226227228229230231232233234235236237238239240241242243244245246247248249250251252 mfl 30

mfl 29

mfl 28

mfl 27

mfl 26

mfl 25

mfl

SOURCE FOUR PAR MFL

nsp

SOURCE FOUR PAR NSP

SOURCE FOUR 14 DEGREE LEKO

SOURCE FOUR 26 DEGREE LEKO

36°

SOURCE FOUR 36 DEGREE LEKO

5

1188

115

4 14°

mfl 24

mfl 23

mfl 22

mfl 21

mfl 20

mfl 19

mfl 18

mfl 17

mfl 16

mfl 15

mfl 14

mfl 13

mfl 12

mfl 11

mfl 10

mfl 9

mfl 8

mfl 7

mfl 6

mfl 5

mfl 4

mfl 3

mfl 2

mfl 1

wfl 1

269 DEDICATED CURTAIN WARMERS

BALCONY BOOM POSITIONS

HOUSE LIGHT PLOT

KEY SOURCE FOUR 19 DEGREE LEKO

14°

1

mfl 4

193194195196197198199200201202203204205206207208209210211212213214215216217218219220221222

26°

277

26°

253 254 255 283 256 258 259 284 260 261 262 285 263 264 265 286 266 267 268 mfl 31

BALCONY BOOM POSITIONS

19°

1

14°

6

6

26°

3

5

14°

1177

36°

1

14°

26°

14°

36°

1

278

36°

36°

271

2

1122

111

2

5

4

3

14°

272

1166

IT C H AR

0

110

99 14°

14°

H AS

LW

EC TU R

14°

RA TU EC

2 14°

88

1

77

14°

IT CH

AR

276

36°

UP

36°

H

PR

AS

.W

O SC

SC

.W

O

AS

PR

H

MAC 101 RGB (12 CH) UNIVERSE 2

ACL BAR (250W EA.) ACL

ACL

AUD. BLINDER 2

ACL

120K CONCERT PLOT ROBE COLORSPOT 1200 AT

ACL

9 LITE MOLE FAY

MAC 101 RGB

COLOR FORCE 72 LED COLOR FORCE 48 LED 500W HALOGEN WORKLIGHT

MARTIN MAC 101 RGB

HOUSE LD: CHRIS BALL [email protected]

°

36

°

36

1

1

°

36

°

36 ° 36

°

3

3

36

36

46

40 36

°

°

36

°

1

36

36

° 1

45

4

°

° 4

°

BOOM 4 BOOM 4

36

39 36

5

°

5

169

2

36

° 6

°

36

170 °

42

48

3

36

BOOM 3 BOOM 3

° 4

36

° 36

° 36

°

°

° 36

° 36

BOOM 2 BOOM 2 36

° 36

°

° 36

°

° 36

191

36

° 36 2

167

6

6

2

° 36

158

168

192

157

°

° 36

1 5

5

3

°

166

190

176

165

4

36

4

36

189 1

3

°

3

164

174

186

° 36

188

173

6

6

36

185

163

2

36

° 36

2

175

1

5

5

° 36

187

°

172

184

1

171

4

36

183

36

°

3

47

6

36

41

182

°

36

2

° 36

STAGE RIGHT

36

38

181

43

44

STAGE LEFT

37

2

2

3

36

°

° 36

177

4

4

BOOM 1 BOOM 1

178

36

°

° 36 5

180

36

6

°

5

° 36

179

159

160

6

161

162

KEY 14°

mfl

SOURCE FOUR PAR MFL

nsp

SOURCE FOUR PAR NSP

SOURCE FOUR 14 DEGREE LEKO

19°

SOURCE FOUR 19 DEGREE LEKO

26°

SOURCE FOUR 26 DEGREE LEKO

ACL BAR (250W EA.) ACL

ACL

AUD. BLINDER 2

ACL

SOURCE FOUR 36 DEGREE LEKO

HOUSE LIGHT PLOT THEATRE & DANCE BOOMS

ACL

9 LITE MOLE FAY

MAC 101 RGB

COLOR FORCE 72 LED 36°

ROBE COLORSPOT 1200 AT

COLOR FORCE 48 LED 500W HALOGEN WORKLIGHT

MARTIN MAC 101 RGB

HOUSE LD: CHRIS BALL [email protected]

92

31

34

84

93

147148 241149150

28

94

241

24 wfl

25

23 wfl

21 wfl

MAC 101 RGB

20 wfl

22

26°

95

151152 253153154 253

18 wfl

19

17 wfl

15 wfl

MAC 101 RGB

12 wfl

13

16

26°

155156 265153154 11 wfl

9 wfl

MAC 101 RGB

8 wfl

65

97

129

161

193

7

6

5

4

3

2

33 wfl

135136 157133134

80

157

31

32 wfl

34

30 wfl

29 wfl

27 wfl

MAC 101 RGB

26 wfl

81

139140 181141142

169

25

28

26°

135136169 137138 24 wfl

23 wfl

21 wfl

MAC 101 RGB

20 wfl

19 17

22

26°

82

17 wfl

15 wfl

MAC 101 RGB

14 wfl

13

16

26°

11 wfl

MAC 101 RGB

8 wfl

143144 205 205

6 wfl

5 wfl

35

36°

36°

74 36

26°

85

33 wfl

32 wfl

31

30 wfl

29 wfl

97

27 wfl

MAC 101 RGB

26 wfl

24 wfl

25

28

26°

23 wfl

109

21 wfl

MAC 101 RGB

20 wfl

22

26°

18 wfl

19 17

17 wfl

121

15 wfl

MAC 101 RGB

14 wfl

16

26°

12 wfl

13

11 wfl

133

9 wfl

MAC 101 RGB

8 wfl

10

26°

6 wfl

7

5 wfl

35

36°

36°

36

WORK LIGHT

76

75

3

MAC 101 RGB

2

1

4

26°

60

WORK LIGHT

62

1

68 73

MAC 101 RGB

60 61

2

4

67 123124 69 123124 70 127128 71 131132 72 131132 73 121122 109129130 121 129130 133 85 121122 97 125126 34

37

88

87

3

MAC 101 RGB

68 WORK LIGHT

73 37

1

WORK LIGHT

83 7

10

26°

100

2

84

1

9 wfl

99

3

MAC 101 RGB

4

193

12 wfl

5 wfl

225

143144193 141142

181

18 wfl

277

6 wfl

26°

33

79

155156 277

7

10

26°

8

145

WORK LIGHT

96

265

14 wfl

1

145 133134 MAC 101 RGB

26 wfl

36°

36

27 wfl

MAC 101 RGB

36°

35

36°

36°

37

86

29 wfl

26°

WORK LIGHT

85

30 wfl

1 109110

55

1

33 wfl

MAC 101 RGB

32 wfl

111112 13 109110

34

56

13

31

30 wfl

29 wfl

27 wfl

MAC 101 RGB

26 wfl

28

26°

111112 25 113114

57

25

24 wfl

25

23 wfl

21 wfl

MAC 101 RGB

20 wfl

22

26°

115116 37 117118

58

37

18 wfl

19 17

17 wfl

15 wfl

MAC 101 RGB

14 wfl

16

26°

119120 49 117118

59

49

12 wfl

13

11 wfl

9 wfl

MAC 101 RGB

8 wfl

10

26°

WORK LIGHT

119120 61 61

6 wfl

7

5 wfl

64

63

3

MAC 101 RGB

36°

ROBE COLORSPOT 1200AT MODE 2, UNIVERSE 3

147148 229145146 229

32 wfl

36°

33 wfl

36°

91

217

MAC 101 RGB

36°

217 145146

36°

36°

36°

35

36°

WORK LIGHT

98 36

RIGGING SYSTEM

92 97 37

2

1

4

26°

273

3

36°

4

36°

36°

274

282

6

5

281

36°

36°

5

4

280

36°

6

275

3

279

1

2

1133

1144

H AS W AL

14°

19

wfl 30

DEDICATED CURTAIN WARMERS

26°

18

26°

17

26°

16

26°

15

26°

14

26°

13

26°

26°

11

12

26°

10

26°

9

26°

8

26°

7

26°

6

26°

5

26°

4

26°

mfl 30

mfl 29

mfl 28

mfl 27

mfl 26

mfl 25

mfl 24

mfl 23

mfl 22

mfl 21

mfl 20

mfl 19

mfl 18

mfl 17

mfl 16

mfl 15

mfl 14

mfl 13

mfl 12

mfl 11

mfl 10

mfl 9

mfl 8

3

mfl 7

mfl 6

2

mfl 5

mfl 3

mfl 2

223224225226227228229230231232233234235236237238239240241242243244245246247248249250251252 mfl 30

mfl 29

mfl 28

mfl 27

mfl 26

mfl 25

mfl

SOURCE FOUR PAR MFL

nsp

SOURCE FOUR PAR NSP

SOURCE FOUR 14 DEGREE LEKO

SOURCE FOUR 19 DEGREE LEKO

ACL BAR (250W EA.) ACL

SOURCE FOUR 36 DEGREE LEKO

4

1188

3

5

14°

mfl 24

mfl 23

mfl 22

mfl 21

mfl 20

mfl 19

mfl 18

mfl 17

mfl 16

mfl 15

mfl 14

mfl 13

mfl 12

mfl 11

mfl 10

mfl 9

mfl 8

mfl 7

mfl 6

mfl 5

mfl 4

mfl 3

mfl 2

mfl 1

wfl 1

269 DEDICATED CURTAIN WARMERS

BALCONY BOOM POSITIONS

HOUSE LIGHT PLOT

KEY

36°

14°

1

mfl 4

193194195196197198199200201202203204205206207208209210211212213214215216217218219220221222

SOURCE FOUR 26 DEGREE LEKO

277

26°

253 254 255 283 256 258 259 284 260 261 262 285 263 264 265 286 266 267 268 mfl 31

BALCONY BOOM POSITIONS

26°

1

6

6

26°

14°

5

5

14°

1177

36°

1

14°

269

19°

36°

1

278

36°

36°

271

2

1122

111

2

26°

14°

115

4

3

14°

272

1166

IT C H AR

0

110

99 14°

14°

H AS

LW

EC TU R

14°

RA TU EC

2 14°

88

1

77

14°

IT CH

AR

276

36°

UP

36°

H

PR

AS

.W

O SC

SC

.W

O

AS

PR

H

MAC 101 RGB (12 CH) UNIVERSE 2

ACL

AUD. BLINDER 2

ACL

THEATRE & DANCE PLOT ROBE COLORSPOT 1200 AT

ACL

9 LITE MOLE FAY

MAC 101 RGB

COLOR FORCE 72 LED COLOR FORCE 48 LED 500W HALOGEN WORKLIGHT

MARTIN MAC 101 RGB

HOUSE LD: CHRIS BALL [email protected]

Mayo Performing Arts Center Technical Specifications      

Page 16 of 16