John F. Kennedy International Airport Runway 4L-22R – RSA Compliance/Runway Reconstruction Stakeholder Input Workshop – Program Update January 19, 2012
JFK Aviation Community - Communication Plan Stakeholder Input Workshops: Functional Planning g
April p 27,, 2011
Construction Staging
May 19, 2011
Life Cycle Cost Analysis
July 21, 2011
Program Update
January 19, 2012
Construction Staging
February 17, 17 2012
Location of Work – 4L-22R Runway 4L-22R Length = 11,351 feet Runway 4l 4l-22R 22R Width = 150 feet Landings and take-offs per year = 397,843
RUNWAY 4L-22R
BAY RUNWAY
Objectives - Mandatory Compliance of Runway Safety Area – Congressional Mandate 1,000’ overshoot required Existing 4L overshoot 885’ Exiting 22R overshoot 141’ 600’ undershoot required Existing 4L undershoot 141’ Existing 22R undershoot meets standards at over 600’ Widen runway to 200’ to comply with Group VI aircraft standards
Objectives – State of Good Repair 2011 Runway Surface = Fair Condition will degrade with continued usage and d exposure to t weather th Need to rehabilitate anticipated being coincident with RSA construction
Objectives – System Enhancement Delay Reduction Initiatives High g Speed p Taxiways y Access Improvements
Scope of Work Provide congressionally mandated Runway Safety Areas Widen Runway to 200 feet required for Group VI Aircraft Improve Taxiway Fillets required for Group VI Aircraft Relocate North Boundary Road Rehabilitate Runway 4L-22R Construct High Speed Taxiways Construct Access Taxiways
Schedule Planning Authorization
June 2011
Preliminary y Design g
July y 2011 – March 2012
Project Authorization
March 2012
Final Design
April 2012 – June 2013
Contract Award
June 2013
Project Completion
December 2015
Existing Conditions
Construction Staging Concepts Maintain a minimum of three runways available at all times Utilize runways on shortened shortened-length length configurations Utilize “landside construction zones” Maintain two off three taxiways, E, YA, F, available at all times Minimize construction duration for Taxiways YA and E. Access the R/W 4L center section via east side of Bay Runway
Construction Phasing – Stage 1 Runway Open Construction Zone Available Taxiway Crossing
E FB
C YA FA F Y B
F A G Z H
J
K (Contractor access from Guard Post 106) Construct access taxiways and Rehab R/W 4L-22R north of R/W 13L-31R. Depart Runway 22R from Taxiway YA. 22R Displaced Threshold remains.
H
Construction Phasing – Stage 2 Runway Open Construction Zone Completed Runway Construction Available Taxiway Crossing
E FB
C YA
FA
F Y B F A G Z H
J
K (Contractor access from Guard Post 106) Rehab intersection of Runways 4L-22R & 13L-31R 22R Departures from F – 8,930’
H
Construction Phasing – Stage 3 Runway Open Construction Zone Completed Runway Construction Available Taxiway Crossing
Closure of Taxiway ‘E’ shall be minimized.
E FB
C YA
FA
F Y B F A G Z
Upon completion of construction work on Taxiway ‘H’, work on Taxiway ‘J’ will commence. Closure of Taxiway ‘J’ shall be minimized.
H J
K
(Contractor access from Guard Post Uniform) Rehab Runway 4L-22R center and sector.
H
Construction Phasing – Stage 3A Runway Open Construction Zone Completed Runway Construction Available Taxiway Crossing Construction in Progress
E FB
C YA
FA
F Y B F A G Z H
J
K
(Contractor access from Guard Post Uniform) Rehab 4L-22R between 13R-31L’s RSA
H
Preliminary JFK RAM (Runway Availability Matrix) 4L/22R 4L Take‐Off
13R/31L 22R
Landing
Take‐Off
4R/22L
13L/31R
Landing
13R
31L
Take‐Off
Landing
Take‐Off
Landing
S Stage 1 1
10 130 10,130
10 130 10,130
10 130 10,130
8 655 8,655
Existing
Existing
Existing
Existing
Existing
Stage 2
8,930
8,930
8,930
8,655
Closed
Existing
Existing
Existing
Existing
11,882
9,790
11,882
11,250
11,345
9,260
11,345
11,250
Stage 3
Closed
Closed
Closed
Closed
Stage 3A
Closed
Closed
Closed
Closed
Final
11,219
11,219
11,219
11,111
E i ti Existing Existing
Existing
Existing
Existing
Existing
Next Steps Stakeholder Input Workshops: Functional Planning g
April p 27,, 2011
Construction Staging
May 19, 2011
Life Cycle Cost Analysis
July 21, 2011
Program Update
January 19, 2012
Construction Staging
February 17, 17 2012