Global Precipitation Measurement (GPM) mission Precipitation Processing System (PPS)

GPM Data Products and PPS Erich Franz Stocker NASA/GSFC Code 610.2 [email protected] Erich Franz Stocker - Page 1

GV International Workshop-Seoul Korea

May 12, 2015

Topics

• Standard GPM mission products available • Obtaining GPM mission products

• Current version numbers for production • Reprocessing plans

Erich Franz Stocker - Page 2

GV International Workshop-Seoul Korea

May 12, 2015

Obtaining All GPM Mission products • Must be a registered PPS user – Register at URL: http://registration.pps.eosdis.nasa.gov – Required information • Valid, reachable email • Affiliation • GPM product interest – Will receive an email to the registered address and must then validate

• Registered email address is used as username AND password for both the query and search interface – STORM: http://storm.pps.eosdis.nasa.gov – ftp location: arthurhou.pps.eosdis.nasa.gov

• All products including gridded text products are online and available through STORM or FTP • FTP access is really a special anonymous ftp implementation. – For Linux and Mac it is possible to make a .netrc entry – A .netrc entry will facilitate downloading data via scripts without requiring manual entry of username and password. Erich Franz Stocker - Page 3

GV International Workshop-Seoul Korea

May 12, 2015

GPM Production Swath Products Toolkit ID

Granule

Description

1AGMI

Gorbit

GMI unpacked packet data

1BGMI

Gorbit

GMI Brightness Temperatures

1CGMI

Gorbit

GPM Common Calibrated Brightness Temperature

GMIBASE

Gorbit

GMI Antenna Temperatures

1BKa

Gorbit

Ka Power

1BKu

Gorbit

Ku Power

2AGPROFGMI

Gorbit

Radiometer Precipitation/profiling

2BCMB

Gorbit

L-2 Combined DPR and GMI

2ADPR

Gorbit

DPR precipitation

2AKa

Gorbit

Ka precipitation

2AKu

Gorbit

Ku precipitation

Gorbit- Southernmost point of orbit to southernmost Erich Franz Stocker - Page 4

GV International Workshop-Seoul Korea

May 12, 2015

GPM Mission Gridded Products

Toolkit ID

Granule

Description

3AGMIGPROF

Daily & Monthly

GMI GPROF precip .25 deg x .25 deg

3APartnerGPROF

Daily & Monthly

Partner Constellation GPROF precip .25 deg x .25 deg

3ADPR

Daily & Monthly

Radiometer Precipitation/profiling Ku/Ka/DPR

3ADPR

Daily

3ACMB

Daily & Monthly

Subset of the full product in row above L-2 Combined DPR and GMI

3IMERG-HH*

Half-hour

.1 deg x .1 deg merged radiometer/IR Precip

3IMERG-Mo

Monthly

.1 deg x .1 deg merged radiometer/IR Precip

Gridded Text Product (ASCII)

Hourly in daily files

.25 deg x .25 deg radiometer,Ku,Ku/Ka matched, GMI/Ku/Ka matched

* Full product in HDF5 a GIS_friendly format subset in TIFF+WorldFile Erich Franz Stocker - Page 5

GV International Workshop-Seoul Korea

May 12, 2015

GPM Near-realtime (NRT) Products Toolkit ID

Description

1CGMI

GPM Common Calibrated Brightness Temperature (5min)

2AGPROFGMI

Radiometer Precipitation/profiling (5min)

2AKu

Ku 3-D profile of precipitation (30min)

2AKa

Ka 3-D profile of precipitation (30min)

2ADPR

Dual-Frequency 3-D profile of precipitation (30min)

2BCMB

Level-2 DPR and GMI Combined (30min

3IMERGH*

I-MERG 30-minute (.1 x .1 grid) (early and Late)



1C for each contributing radiometer (size depending upon instrument)

• *

GPROF for each contributing radiometer (size depending upon instrument) A subset is also available as TIFF+WorldFile

Erich Franz Stocker - Page 6

GV International Workshop-Seoul Korea

May 12, 2015

Current Production Data Product Versions For Swath Products •

GMI – – – –

1A-V03B 1B/Base-V03C 1C-V03C GPROF-V03D



Partner radiometers – 1C MHS –V02B – 1C SSMIS-V02C (F16-F18) – 1C SSMIS –V03A (F19) – 1C AMSR2-V03C – 1C SAPHIR-V02B – GPROF MHS-V03C – GPROF SSMIS –V03C – GPROF AMSR2-V03D – GPROF SAPHIR-V03A



Radar – Ku - V03B – Ka - V03B – DPR – V03B

• Combined: V03D after Dec 2014 and V03C before Dec 2014 Erich Franz Stocker - Page 7

GV International Workshop-Seoul Korea

May 12, 2015

Level 3 Gridded Product Version

• All Level 3 at V03D Except – SAPHIR GPROF at V03A – Ku/Ka/DPR at V03C – Gridded Text product at V03A

Erich Franz Stocker - Page 8

GV International Workshop-Seoul Korea

May 12, 2015

Reprocessing Plans for GPM •

Currently the first “fully GPM” reprocessing of all mission data scheduled for September 28, 2015.



V04A will be the data product version for reprocessed data – Should see fewer letter version changes – JPST needs to approve whether a “changed” algorithm allowed to be inserted (this one of the ways letters change) – JPST determines whether a change is big enough to require reprocessing of the entire mission data stream back to March 2014



Algorithm development teams currently working on V04



JAXA has provided 1 year of changed 1B Ku/Ka which adjusts the calibration of Ku and Ka



L2 Radar development team working with this data



End of May stable L2 radar data to combined team



End of June stable combined data to radiometer team to build the databases



August GPM intercalibrated tables for partner 1C products (X-cal team)



August V04 data available for analysis and validation



Once GPROF algorithms validated for GPM period will go back and reprocess partner radiometer data to January 1998 using GPM algorithms



IMERG reprocessing starts 3 months AFTER the GPM mission era reprocessing starts

Erich Franz Stocker - Page 9

GV International Workshop-Seoul Korea

May 12, 2015