EMBASSY OF THE REPUBLIC OF INDONESIA IN ANKARA, TURKEY

Indonesia News EMBASSY OF THE REPUBLIC OF INDONESIA IN ANKARA, TURKEY Volume XXII – May 2009 FOOD INGREDIENTS INDONESIA 2009 The International Exhibi...
Author: Berenice Wade
3 downloads 1 Views 3MB Size
Indonesia News EMBASSY OF THE REPUBLIC OF INDONESIA IN ANKARA, TURKEY Volume XXII – May 2009

FOOD INGREDIENTS INDONESIA 2009 The International Exhibition on : Food Additives, Food Chemicals, Food Ingredients, Food Materials

Incorporated with :

HERBAL & HEALTH FOOD INDONESIA 2009 The International Exhibition on Herbal & Health Food and Food Supplements.

BAKERY INDONESIA 2009 The International Exhibition on Bakery & Confectionery, Machinery, Equipments, Supplies, Ingredients.

For further info and participation, please contact the Organizer below

FOOD & HOSPITALITY INDONESIA 2009

The International Exhibition on Wine & Spirits, Equipments, Supplies, Storage, Services & Related Technology for Hotel, Catering, Restaurant, Cafe, Supermarket

INVESTMENT OPPORTUNITY

Public – Private Partnerships (PPP) INFRASTRUCTURE PROJECTS IN INDONESIA (Cont. from previous volume)

Project Title: Bandar Lampung Municipal Water Supply Contracting Agency : Mayor of Bandar Lampung Address: Jl. AH Nasution No. 3, Lampung, INDONESIA Phone: +62 – 725 – 41475 Fax: +62 – 725 – 49500 Contact Person: Mr. Drs. Gustimigo, MM Position: President Director of PDAM Way Rilau Address: Jln. Pangeran Emir M Noor No. 11 A, Bandar Lampung, Lampung, INDONESIA Phone: +62-721-484611 Project Feasibility Indicator : Supply and Demand Analysis Current Supply : 600 lps Current Demand : 900 lps Forecast Demand : 1100 lps Project Scope :  Water Treatment Plant Development (500 lps)  Development of water supply pipeline transmission  Development of main distribution PPP Modality : Concession for 25 years Type of Project Proposal : Solicited

Project Location : Bandar Lampung, Lampung Province Estimated Investment Cost (Constant Price 2007): US$ 52 Million Government Support : Government support can be made available Financial Overview : Construction (including fee services, interest, etc.) : US$ 52 Million Financial Feasibility: FIRR (20%) Payback Period: 11 years Capital Structure : Equity: US$ 17 Million (33%) Loan: US$ 35 Million (67%)

Project Description : Bandar Lampung Municipal will be more progressive with its role as the capital city of Lampung Province. Demand of infrastructure services, especially drinking water will increase, both for commercial and domestic consumers. Drinking water services in the Bandar Lampung is served by PDAM Way Rilau. The level of drinking water services in 2007 was 24% of total population (815,700 citizens). Future development plans will serve Way Sekampung and Way Sabu regions with each of capacity are 300 lps and 200 lps. Raw water should be conveyed to Water Treatment Plant in PDAM. Distance from raw water resources to Water Treatment Plant is about 35 km distance. This transmission will be provided by Government, meanwhile local government will provide funds for land acquisition. Expected Time of Project Development :  Project Preparation : 2009  Selection of Private Partner : 2010  Contract Negotiation : 2011  Construction : 2012 – 2013  Operation : 2013

Project Title: DKI Jakarta – Bekasi – Karawang Water Supply Contracting Agency : Ministry of Public Work Address: Address: Jl. Pattimura No. 20, Kebayoran Baru, Jakarta 12110, INDONESIA Phone: +62–21–7395588 Contact Person I : Mr. Iwan Nursirwan Position: Director General of Water Resources, Ministry of Public Work Phone: +62–21–7222804 Contact Person II : Mr. Drs. Haryadi Priyohutomo Position: President Director of PAM Jaya, DKI Jakarta Address : Jln. Penjernihan II, Pejompongan, Jakarta Pusat, INDONESIA Phone: +62–21–5704250 Fax: +62–21–5711796 Contact Person III : Mr. H. Dadang Hidayat, SE, MSi Position: President Director of PDAM Tirta Patriot Bekasi Address : Jln. Perjuangan No. 99, Bekasi, Jawa Barat, INDONESIA Phone: +62–21–88966161 Fax: +62–21–88961608 Contact Person IV : Mr. Open Supriyadi Position: President Director of PDAM Karawang Address : Jln. Suroto Kunto Km 4,5 Karawang, Jawa Barat, INDONESIA Phone: +62–267–402861 Fax: +62–267–402862 PPP Modality : Build – Operate – Transfer (BOT) for 30 years Type of Project Proposal : Solicited Expected Time of Project Development :  Project Preparation : 2010  Selection of Private Partner : 2011  Contract Negotiation : 2012  Construction : 2012 – 2016  Operation : 2014 Government Support : Government support can be made available Estimated Investment Cost : US$ 377 Million Capital Structure : Equity: US$ 113 Million (30%) Loan: US$ 265 Million (70%)

Project Description : Rapid population growth in the DKI Jakarta – Bekasi – Karawang is not supported by the availability of drinking water. The provision of a drinking water system in the region is needed to meet current and future demand. Development of industrial areas from Jakarta to the eastward, Bekasi Regency, Bekasi City, and Karawang requires a huge drinking water infrastructure. Currently, DKI Jakarta is estimated to be in need of around 6000 lps, meanwhile Bekasi City and Bekasi Regency totally will need around 2000 lps. This amount will increase rapidly in the future. Water supply services to these areas need raw water support from water resources in surrounding area, therefore government support can be made to support thisproject. Potential Support for Contracting Agency : (a) Approval from Ministry of Mineral and Energy Resources for electricity price; (b) Government support is preferable related to PSO. Project Feasibility Indicator : Supply and Demand Analysis Current Demand : 8000 lps Forecast Demand : 15000 lps Project Scope :  Water Treatment Plant Development (15000 lps)  Transmission Development  Tapping Point (3 locations) Financial Overview : Construction : US$ 367 Million Design and Financial Fee : US$ 10 Million Financial Feasibility: FIRR (17,2%) FNPV : US$ 154 Million Payback Period: 12 years Initial Tariff : IDR 4.300 (DKI)

IDR 2,900 (Bekasi)

Project Title: West Cikarang & Cibitung Bekasi Regency Water Supply Contracting Agency : Regent of Bekasi Regency Address: Desa Sukamahi, Kecamatan Cikarang Pusat, Bekasi, Jawa Barat, INDONESIA Phone: +62 – 21 – 89970375 Fax: +62 – 21 – 89970375 Contact Person: Mr. Drs. Dhana SW, MM Position: President Director of PDAM Bekasi Address: Jln. Raya Kalimalang Kav. I/I, Bekasi, Jawa Barat, INDONESIA Phone: +62–21–8840708 Fax: +62–21–8855003 Project Location : West Cikarang and Cibitung, Bekasi Regency, West Java Province Project Feasibility Indicator : Supply and Demand Analysis Current Supply : 1400 lps Current Demand : 1850 lps Forecast Demand : 2300 lps Project Scope :  Intake Development  Water Treatment Plant Development  Transmission Development  Reservoir Development  Distribution Network and Connection of 68.000 units Type of Project Proposal : Solicited

Project Description : Drinking water service in Bekasi Regency is served by PDAM of Bekasi. This PDAM has 6 branches that serve several districts from the two administrative regions of different government, which are Bekasi Municipal and Regency. Number of PDAM’s customers in Bekasi Regency until the end of 2005 is 110,275 connections. Scope of project between local government of Bekasi with private sector includes development of a new drinking water system that cover Cibitung and West Cikarang Regency. This includes the intake system, the installation of drinking water, reservoir and pipeline distribution network. Financial Overview : Construction (including fee services, interest, etc.) : US$ 28 Million Financial Feasibility : FIRR (20%) Payback Period: 14 years Initial Tariff : IDR 2,900 Capital Structure : Equity: US$ 9 Million (30%) Loan: US$ 19 Million (70%) Expected Time of Project Development :  Project Preparation : 2010  Selection of Private Partner : 2010  Contract Negotiation : 2011  Construction : 2012 – 2014  Operation : 2013 PPP Modality : Concession for 25 years

Project Title: Integrated Solid Waste Final Disposal and Treatment Facility for Greater Bandung Area – West Java Project Scope : 2 final disposal sites : Leuwigajah (40 ha) and Legok Nangka (30 ha)  Transmission Development  Tapping Point (3 locations) Financial Overview : Estimated Investment Cost : US$ 80 Million Land Acquisition : by Government Construction (including fee services, interest, etc.) : US$ 68 Million Financial Feasibility: FIRR (18%) EIRR (22%) Capital Structure : Equity: US$ 20 Million (30%) Loan: US$ 48 Million (70%) Type of Project Proposal : Solicited Contracting Agency : Settllement and Housing Agency – West Java Province Address: Jln. Kawaluyaan Indah No. 4, Bandung 40286, Jawa Barat, INDONESIA Contact Person I : Mr. Drs. Rahmat Kusnadi Position: Secretary of Settlement and Housing Agency, West Java Province Phone: +62–22–7319782 Fax : +62–22–7313675 Email : [email protected] PPP Modality : Constructionof access road to the site gate by government. All other construction, site preparation, fencing, environmental facilities, leachate treatment waste handling equipment, weighbridge, workshop, etc are constructed and provided by the private party. The private party will receive gate fees for the disposal of waste. Secondary income from the recycling and reuse of waste will be to the private party. Carbon credits earned from any methane collection and flaring or secondary income from electricity generation will be to the private party. The concession period would be granted for 20 years. At the end of the concession period, full site closure and remediation will be carried out. Type of Government Support : Government support can be made available.

Expected Time of Project Development :  Under tender Preparation  Land Acquisition : Done  The design and build period will take 1 year Project Description : To operate two sanitary landfill sites which will facilitate the environmentally efficient disposal of household, and commercial waste from the greater Bandung metropolitan area in environmentally sound final disposal sites. The final disposal sites should incorporate waste sorting, recycling and or composting facilities, and may also incorporate methane capture for flaring or secondary power generation. Project Feasibility Indicator : Supply and Demand Analysis Forecast Demand : 2500 tonnes / day of waste in 2011 Technical Specification :  Waste disposal loading 2,500 ton / day by 2011  Annual increase estimated at 2.2%  Sanitary landfill specification  Leachate capture and treatment  Insect vector and odour control  18 hours / day operation 7 days / week

Project Title: Integrated Solid Waste Final Disposal and Treatment Facility for Bogor and Depok Area – West Java (Nambo) Project Scope : 1 final disposal site : Nambo (100 ha) Financial Overview : Estimated Investment Cost : US$ 40 Million Land Acquisition : by Government Construction (including fee services, interest, etc.) : US$ 32 Million Financial Feasibility: FIRR (17%) EIRR (22%) Capital Structure : Equity: US$ 10 Million (30%) Loan: US$ 22 Million (70%) Type of Project Proposal : Solicited Expected Time of Project Development :  Under tender Preparation  Land Acquisition : Done  The design and build period will take 1 year

Contracting Agency : Settllement and Housing Agency – West Java Province Address: Jln. Kawaluyaan Indah No. 4, Bandung 40286, Jawa Barat, INDONESIA Contact Person I : Mr. Drs. Rahmat Kusnadi Position: Secretary of Settlement and Housing Agency, West Java Province Phone: +62–22–7319782 Fax : +62–22–7313675 Email : [email protected] PPP Modality : Constructionof access road to the site gate by government. All other construction, site preparation, fencing, environmental facilities, leachate treatment waste handling equipment, weighbridge, workshop, etc are constructed and provided by the private party. The private party will receive gate fees for the disposal of waste. Secondary income from the recycling and reuse of waste will be to the private party. Carbon credits earned from any methane collection and flaring or secondary income from electricity generation will be to the private party. The concession period would be granted for 20 years. At the end of the concession period, full site closure and remediation will be carried out.

Project Description : To operate a sanitary landfill site which will facilitate the environmentally efficient disposal of household, and commercial waste from the District of Bogor and the cities of Depok in environmentally sound final disposal site. The final disposal site should incorporate waste sorting, recycling and or composting facilities, and may also incorporate methane capture for flaring or secondary power generation. Project Feasibility Indicator : Supply and Demand Analysis Forecast Demand : 1200 tonnes / day of waste in 2011 Technical Specification :  Waste disposal loading 1,200 ton / day by 2011  Annual increase estimated at 1.9%  Sanitary landfill specification  Leachate capture and treatment  Insect vector and odour control  18 hours / day operation 7 days / week Type of Government Support : Government support can be made available. Expected Time of Project Development :  Under Tender Preparation  Land acquisition is done for 40 ha (year 2008)  The design and build period will take 1 year

PT ANTAM Tbk Looks For Partner To Develop W. Papua Nickel Project IDX-listed State mining firm PT.Aneka Tambang Tbk is looking for new partner to develop its nickel reserves in gag Island, West Papua after Anglo-Australian resources giant BHP Billiton pulled out of the project. Antam CEO Alwinsyah, however, said partner was hard to find in current condition of low nickel price. “So far, we haven’t been able to attract potential partner for the project. But we hope situation to change next year, when nickel price will be improving,” he said. Antam now holds 100 percent shares in Gag Island nickel concession after BHP Billiton transferred its 75 percent shares in the project to Antam in 2008. BHP transferred its shares in PT. Gag Nikel to Antam following decision in November 2008 to end a study into integrated nickel development in Eastern Indonesia. The study has not been able to identify a business case which would support an investment in the project, BHP Billiton said in 2008. Earlier reports said that Gag Island has a nickel resource of 216 million tons. PT ANTAM Tbk Head Office: Gedung Aneka Tambang Address: Jln. Letjen TB Simatupang No. 1 Lingkar Selatan, Tanjung Barat , Jakarta 12530, INDONESIA Tel. : (62-21) 789 1234, 781 2635 Fax. : (62-21) 789 1224 website: www.antam.com

Nickel is a chemical element, with the chemical symbol Ni and atomic number 28. It is a silvery-white lustrous metal with a slight golden tinge. It is one of the four ferromagnetic elements at about room temperature. Its use has been traced as far back as 3500 BC, but it was first isolated and classified as a chemical element in 1751 by Axel Fredrik Cronstedt, who initially mistook its ore for a copper mineral. Its most important ore minerals are laterites, including limonite and garnierite, and pentlandite. The metal is corrosion-resistant, finding many uses in alloys, as a plating, in the manufacture of coins, magnets and common household utensils, as a catalyst for hydrogenation, and in a variety of other applications. Enzymes of certain life-forms contain nickel as an active center making the metal essential for them.

Company Exposition

MCM (Mabarroh Cahaya Megah) Jalan Cibaduyut in the South of Bandung city is to shoes what Cihampelas is to jeans. The statue of two bronze shoes at the beginning of the street conveys it all: shoes of all sorts and sizes make up the bulk of what this street sells. If you are keen on shoes and like a bargain, Jalan Cibaduyut will both satisfy your feet as your wallet. To get there, either take a taxi or hop on one of the angkots that states Cibaduyut, and get off past the shoe statue. Most of the branded shoes might not be the real thing even though, many still are of good quality and it is hard to tell if it concerns the real thing or not. Other than that most shoes are Indonesian brands, again of good enough quality and economically priced. One of the best quality shoe makers in Cibaduyut is Mabarroh Cahaya Megah. The company produces high quality shoes under the Gareu and Garucci brands and for bags under Garsel. Below are some of the company’s products.

The company has 6 outlets under the name of “Toko Sepatu Garsel” (Garsel shoe shop) that can be contacted :

Jln. Cibaduyut Raya No. 30, Bandung, Jawa Barat, INDONESIA. Phone: +62-22-5417973, 5420157 Fax: +62-22-5415198

Jln. Cibaduyut Raya No. 130, Bandung, Jawa Barat, INDONESIA Phone: +62-22-5426851

Jln. Cibaduyut Raya No. 38, Bandung, Jawa Barat, INDONESIA Phone: +62-22-5415919

Jln. Cibaduyut Raya No. 55, Bandung, Jawa Barat, INDONESIA Phone: +62-22-5425350

Jln. Cibaduyut Raya No. 37 B, Bandung, Jawa Barat, INDONESIA Phone: +62-22-5420450

Jln. Ahmad Yani No. 876, Terminal Cicaheum, Bandung, Jawa Barat, INDONESIA Phone: +62-22-7272042

The company may also be contacted by txt (+62 – 81322440797, 81321577499) or email : [email protected]

For a considerably affordable resort or villa for a holiday or honeymoon in Bali, Rama Beach Resort & Villas is perfect. It is located in Tuban - Kuta, and only a few steps away from the famous miles long sandy beach of Kuta. You have the choice between SUPERIOR & DELUXE rooms, private GARDEN & POOL villas and DELUXE cottages surrounded by a spacious tropical garden. The elegant pool area with its contemporary smooth style... you will be under its charm and enjoy the flowing down cascades. Just imagine this will be a never-ending day .. More interested in sport activities? Enjoy your tennis match on its court! Spoil yourself and make the experience in our new SPA how easy your mental balance and material wellbeing will be recovered. Its shuttle bus plies between hotel and the popular shopping centres at Kuta square Garden Villa The villa is comfortably located in a spacious tropical garden - arranged with sensitivity & unique taste for the beauties of nature - and you have direct access from your terrace to the private garden. Your privacy will not be disturbed. The villa with its individual controlled AC is equipped with a special security system, IDD telephone, hair dryer, TV & movie channel, DVD player and internet access (on additional cost). Beside the well-stocked mini-bar you have coffee & tea maker, daily complimentary mineral water is taken for granted. The interior furnishing is elegant and comes up to the most pretentious expectations. The bathroom is spacious and you will be amazed at its stylishness. Maybe you prefer to take a foam bath and chill out in the bath tub or you decide for a cool & refreshing shower. King-size bed or double beds guarantee beauty sleep and wonderful dreams. Service : tropical cocktail welcome drink, daily fruit basket, afternoon tea served with special snack, 24-hour service, traditional massage (30 min) at Giriloka Spa. Pool Villa The Northern Wing of the resort ... the comfortable and spacious rooms are located in this two-storey building. All rooms are furnished & designed in contemporary Balinese style, special see-through design for the bathroom and have large-sized private terraces or balconies with a great panoramic view over the tropical garden. All rooms with individual controlled AC are equipped with special security system, IDD telephone, TV & movie channel, coffee & tea maker, well-stocked mini bar and daily complimentary mineral. Family Villa This villa is also located amidst our spacious tropical garden. You have direct access from piazza to the private garden and its plunge pool. This villa with its individual controlled AC is also equipped with Special security system, IDD telephone, hair dryer, TV & movie channels, DVD player. Our guests are thrilled by the elegant & spacious bathroom and they can choose between taking an oil bath to relax their muscles or Service : tropical cocktail welcome just hop into the cooling shower. The furnishings of living and drink, daily fruit basket, afternoon tea sleeping area are elegant and correspond to the served with special snack, 24-hour contemporary Balinese style. You will spend your nights in a service, traditional massage (30 min) comfortable king-size bed or 2 separate beds as requested. at Giriloka Spa, internet access, well-stocked mini-bar, coffee & tea maker, daily complimentary mineral water.

Suite Villa Before you come into the private area of this villa you will pass through an authentic wooden Balinese portal. All Suite Villas have a private terrace and beyond the plunge pool they have a secluded spot designed like a piazza where you can relax on comfortable sofas. The sleeping area with its king-size bed or 2 separate beds is luxuriously styled and speciallydesigned for 2 persons. Worth mentioning is the spacious wardrobe. The bathroom is designed by pink of elegance and well-provided with everything like ergonomic designed bathtub, stylish shower, illuminated vanity mirror etc. The villa with its individual controlled AC is equipped with a special security system, IDD telephone, hair dryer, TV & movie channel, DVD player and internet access (on additional cost). Beside the well-stocked mini-bar you have coffee & tea maker, daily complimentary mineral water is taken for granted. Service : tropical cocktail welcome drink, daily fruit basket, afternoon tea served with special snack, 24- hour service, traditional massage for two adults (30 min) at Giriloka Spa. Resorts The resorts have 3 different choices of size they are Superior Room, Deluxe Room, and Deluxe Cottage. All of them are equipped with modern facilities like in the Villas.

Rama Beach Resort & Villas Jl. Jenggala, Tuban-Kuta, Bali - Indonesia Phone: +62 (361) 751557 Fax: +62 (361) 751768 Get special price from online reservation http://www.ramabeachhotel.com/reservation.html Activities Saturday Night Buffet with Live Balinese Dance Show. All you can eat Barbeque Buffet with free entertainment of Traditional Balinese Dance. A perfect dinner experience for you and family with most value for money experience.

Cooking Class Lesson. Apart from exotic sight and sounds, Bali offers the pleasure of taste with a medley of food that is simply astonishing in variety. Characterized by a strong flavor, the cuisine is usually very spicy, quite salty and / or sweet with creative preparations and multifarious cooking style.

INDONESIA NEWS IS COMPILED, PRINTED AND PUBLISHED BY THE EMBASSY OF THE REPUBLIC OF INDONESIA IN ANKARA, TURKEY Abdullah Cevdet Sokak No. 10 (P.O. Box 42) Cankaya 06680, Ankara, Turkey Phone: (90-312) 4382190 Fax: (90-312) 4382193 www.indo-ank.org

Suggest Documents