NSRWTP Design Package #5 Pre-Proposal Meeting Denver Water Board Room Denver CO, Jul...
DENVER WATER NORTH SYSTEM RENEWAL WATER TREATMENT PLANT (NSRWTP)
NSRWTP Design Package #5 Pre-Proposal Meeting Denver Water Board Room Denver CO, July 28, 2016
Agenda • • • •
Introduction Design Package (DP) Overview Next Steps Questions
7/28/2016
2
NSRWTP Project Objectives – Sustainability: Achieve the highest level of sustainability certification possible in a cost-effective and feasible manner – Modularity: Parallel operation/outages while plant is in service – Ease of Access and Maintenance: Safe, efficient, flow of traffic, equipment access and future build-out – Safety: Personnel safety during construction and long-term operations – Personnel: Streamlined operations and control – Schedule: Operational by 2023 – Budget: Accomplish project objectives within budget
7/28/2016
3
North System Renewal Water Treatment Plant Site
N N
Proposed Jefferson Parkway Ralston Reservoir Ralston Outlet Works
Conduit No. 16 Ralston SOS Facilities
NSRWTP Site 7/28/2016
4
Site Layout N
Initial Process Design Future Process
NSRWTP – Table of Organization
7/28/2016
6
Design Packages • • • • • •
DP#1 – Site and Civil Improvements DP#2 – Treatment Process Systems and Structures DP#3 – Electrical, Instrumentation & Control Systems DP#4 – Ancillary Treatment Process Systems and Structures DP#5 – Architectural and Building Systems DP#6 – Post-tensioned Water Storage Tanks
7/28/2016
7
DP#5 – Architectural & Building Systems MWBE Goal: 8-12% • Design Guidance Documents – HVAC, Plumbing, and Fire Suppression design standards, specifications, and details
• Architectural Schematic Design – Water Treatment Plant – Administrative Building – Operations Facilities (warehouse/shop, Collection System warehouse and maintenance facilities, guard shack)
• Architectural Facades – Finishes and fenestrations
• Sustainability Review – LEED Scorecard – Sustainability Report (Comprehensive of all DPs)
7/28/2016
8
DP#5 – Consultant Qualifications • Prime Consultant on 2 similar multi-building campus facilities – Demonstrate familiarity with JeffCo standards
• Design with a minimum construction cost of $20 M • Firm experience with sustainability and LEED certification • Comprehensive Health & Safety Plan • Robust QA/QC program
7/28/2016
9
DP#5 – Personnel Qualifications • • • • • •
Project Manager Lead Architect Lead Structural Engineer Lead Mechanical Engineer Startup and Commissioning Coordinator Specifications Coordinator – Administrative, Document Control, Document Formatting
• AutoCAD Lead Coordinator – Only staff able to touch external reference files
7/28/2016
10
NSRWTP – MWBE Design Outreach Opportunities
7/28/2016
11
Proposal Requirements • Cover Letter (1-2 pages) • Proposal (20 page limit) – Firm’s Qualifications Summary (1-5 pages) – Statement regarding eligibility to work w/out conflict of interest – Project Approach • Consultant assumptions • Additional work items for DW consideration
– – – –
7/28/2016
Detailed Schedule DP Table of Organization Project Team W/WWTP design and construction biographies (1-3 pages)
Firm’s Minimum Qualifications Proposed Approach (40%) Project Personnel and Experience (40%) Cost and Work Hours (20%)
• Interviews/Workshops • Final Negotiation
7/28/2016
14
Next Steps • DP#5 RFP – – – –
Questions via email: August 8, 2016 Proposal Due: 11:00 a.m. August 17, 2016 Interviews: August 30 – September 1, 2016 Board Approval: October 12, 2016
Project Schedule
7/28/2016
16
Questions ?
7/28/2016
17
Visit Denverwater.org – “Doing Business With Us” for all project info http://www.denverwater.org/DoingBusinesswithUs/business-opportunities/ 7/28/2016