Shared Use Nonmotorized (SUN) Trail Program Adopted Work Program Detailed Map and Table Set
Regional Trail Systems and Individual Trail Projects
FY 2016/2017
Courtney Campbell Causeway Trail
Adopted Work Program
Statewide Tier
FM#
C2C
4361873
District County Name Trail Name 5
Brevard
C2C
4358931
5
Lake
C2C
4364331
5
C2C
4364341
Segment
COST
PHASE
Space Coast Trail: Titusville
East end of Max Brewer Bridge to Merritt Island Refuge
$300,000
PE
South Lake Trail Phase 4
Van Fleet State Trail to Villa City Rd. (CR 565)
$700,000
PE
Orange
Orange Co. Gap Segment 2
N Hiawassee Rd. to N of SR 414 on SR 441/Clarcona-Ocoee Connector/Pine Hills Ph. 3
$2,000,000
PE
5
Volusia
Spring to Spring Trail: US 17/92 Bridge
Wayside Park to Lake Monroe Park (Seminole/Volusia Co.)
$1,800,000
CON
C2C
4357201
7
Hernando
Good Neighbor Trail Connector: Alternate Alignment
West Suncoast Parkway to SR 50/Cortez Boulevard, Brooksville
SJR2C
2102868
2
St. Johns
Palatka to St. Augustine State Trail aka SR 207 Rail Trail
Main Street (Hastings) to SR 207/Spuds
$3,288,834
$475,358
CON
SJR2C
4357961
2
St. Johns
Palatka to St. Augustine State Trail aka SR 207 Rail Trail
Putnam County Line to Hastings
$2,217,575
CON
SJR2C
4399321
2
St. Johns
SR 207/A1A
SR 207/A1A from end of trail to Flagler County Line
$750,000
FS
SJR2C
4398731
5
Flagler
SR A1A
SR A1A or Alternate Route from S. 26th Street to N. 9th Street
$600,000
FS, PDE
SJR2C
4398711
5
Volusia
Daytona Beach Gap 1: North Beach Street
N Beach Street/Sickler Drive from 350' south of 2nd Street to 2nd Street (N. city limits)
$20,000
PE
SJR2C
4398701
5
Volusia
Daytona Beach Gap 2: Ballough Road Bridge
Ballough Road approximately 0.01 miles north of Anita Avenue
$20,000
PE
SJR2C
4398691
5
Volusia
Daytona Beach Gap 3: South Beach Street
South Beach Street from Marina Point Drive to Orange Avenue
$100,000
PE
SJR2C
4398681
5
Volusia
Daytona Beach Gap 4: South Beach Street
South Beach Street from Bellevue Avenue to Marina Point Drive
$65,000
PE
SJR2C
4398671
5
Volusia
Daytona Beach Gap 5: Donnelly Place
Donnelly Place from Shady Place to Bellevue Avenue
$510,000
CON
SJR2C
4398661
5
Volusia
Daytona Beach Gap 6: South Beach Street
South Beach Street from Wilder Boulevard to Shady Place
$100,000
SJR2C
4398631
5
Volusia
Edgewater Gap
Dale Avenue to 10th Street
$1,100,000
CON
SJR2C
4398651
5
Volusia
New Smyrna to Port Orange Gap: US 1
US 1 from Canal Street to Beville Road
$1,500,000
PDE
SJR2C
4398621
5
Volusia
Oak Hill to Edgewater
US 1 at Kennedy Parkway to Dale Avenue
$800,000
PDE
SJR2C
4398721
5
Volusia
Ormond Beach Gap: SR 40 - Cassen Park
SR 40 from Cassen Park to SR A1A
$300,000
FS
SJR2C
4398771
5
Volusia
Pierson Gap: SR 15 (US 17)
SR 15 (US 17) from Washington Avenue to Palmetto Avenue
$300,000
PE
SJR2C
4398751
5
Volusia
Spring to Spring Gap: Deleon Springs
Grand Avenue/Baxter Street to SR 15 (US 17)
$750,000
PE
SJR2C
4398741
5
Volusia
Spring to Spring: Deland
Lake Beresford Park to Grand Avenue
$750,000
PDE
IND
4298202
1
Charlotte
SWCC: Harborwalk Phase 1B Southern Boardwalk
SR 45 Gap, Charlotte Harbor
$1,114,800
CON
IND
4402341
1
Charlotte
SWCC: North Alligator Creek Pedestrian Bridge
US 41 and North Fork Alligator Creek, Punta Gorda
IND
4402361
1
Lee
SWCC: Van Buren/El Dorado/Kismet Trail
Cape Coral Gap: Del Prado Blvd. to Burnt Store Road at Van Buren Parkway
IND
4402351
1
Polk
Van Fleet State Trail: Pedestrian Bridge Replacement
Polk City
$251,000
IND
4399341
2
Alachua
SR 24/Archer Road Multiuse Trail
SW 76th Terrace to SW 41st Boulevard, Gainesville
$450,000
PE
IND
4399331
2
Alachua
Tower Road Multiuse Trail
SW 26th Place to SW 8th Avenue, Gainesville
$950,000
CON
IND
4282023
2
Putnam
Palatka to Lake Butler State Trail aka SR 100 Rail Trail
Roberts Lane to St. Johns River Water Management District
$6,261,419
CON
IND
4399281
3
Bay
Lynn Haven Rails to Trails
SR 75 (US 231) to East 10th Street
IND
4389082
3
Escambia
Perdido Key Multiuse Trail (SR 292)
Alabama State Line to State Park Entrance/Gongora Drive
IND
4399262
3
Wakulla
CC2S: Coastal Trail East: SR 30 (US 98)
West of SR 363 Woodville Highway/St. Marks Trail to Lighthouse Road
IND
4399261
3
Wakulla
CC2S: Coastal Trail West: SR 30 (US 98) Coastal Highway
CR 372/Surf Road to SR 61 (US 98), Panacea
$800,000
PE
IND
4400321
4
St. Lucie
ECG-SE: FEC Overpass
Savannas Recreation Area to S. of Savannah Rd./Heathecote Gardens, Fort Pierce
$275,000
PDE
IND
4400331
4
St. Lucie
ECG-SE: Historic Downtown Ft. Pierce Retrofit
Georgia Avenue to A1A/N Causeway Drive, Fort Pierce
$275,000
PDE
IND
4400341
4
St. Lucie
ECG-SE: Historic Highwayman Trail Gap
Indian Hills Drive to Georgia Avenue, Fort Pierce
$100,000
PDE
IND
4399971
4
St. Lucie
ECG-SE: Indian Hills Recreation Area Trail Retrofit
South of Savannah Road to Indian Hills Drive, Fort Pierce
$80,000
PE
IND
4399991
4
St. Lucie
ECG-SE: Savannas Preserve State Park Gap
Walton Road to Savannas Recreation Area, Port St. Lucie
$500,000
PDE
IND
4398781
5
Osceola
Shingle Creek Trail South Phase 1B
Palmetto Ave. to southern limit of future Shingle Creek Phase 2B, Kissimmee
$2,230,000
CON
IND
4398981
6
Miami-Dade
Biscayne Trail Segment D, Phase 2
SW 117th Avenue to SW 137th Avenue, Homestead
$122,825
PE
IND
4398991
6
Miami-Dade
ECG-SE: Biscayne Everglades Greenway
East Mowry Drive to SW 137th Avenue, Homestead
$206,000
PE
IND
4355012
6
Miami-Dade
ECG-SE: The Underline Segment A
SW 13th Street to SW 19th Avenue, Miami
$1,445,000
PE
IND
4373491
7
Citrus
HOFL: Withlacoochee-Dunnellon Trail Connector
North end of the Withlacoochee State Trail to south end of the Dunnellon Trail
IND
4400931
7
Pinellas
SWCC: Pinellas Trail Loop Phase 2
John Chestnut Park to Enterprise Road, Palm Harbor
IND
4374981
7
Pinellas
SWCC: SR 60/Courtney Campbell Cswy Ped. Overpass
Courtney Campbell to Bayshore Trail segment/Ream Wilson Clearwater Trail
$215,000 $1,778,100
Adopted Work Program
FY 2016/2017
Notes Phase FS = Feasibility Study; Phase Group - 1 and Phase Type all but 9; PD&E=Project Development & Environmental; Phase Group - 2 and Phase Type - all but 9; PE=Preliminary Engineering; Phase Group - 3; Phase Type - all but 9; ENV=EnvironmentalMitigation: Phase Group - C; Phase Type - all but 9; ROW=Right-of-Way CON=Construction and Support
(1) Tiers : C2C - Coast to Coast; SJR2C - St. Johns River to Sea Loop; IND - Individual (2) Project costs are subject to change; (3) An allocation to one project phase is not a guarentee of commitment to allocations for future phases.
PE
PE PE PE, CON
$268,000
PE
$1,123,144
PE
$200,000
PE
$280,000
PE
$5,700,000
PE, CON
$1,362,488
PE
Total $44,434,543
Legend
PE
A L A B A M A Escambia 29 £ ¤
Santa Rosa
Okaloosa
§ ¦ ¨ 110
87 S T
Holmes
4399331 Tower Road SW 26th Place SW 8th Avenue
85 T S
Walton 331 £ ¤
98 £ ¤
2102868 SR 207 Rail Trail Main St. (Hastings) SR 207/Spuds
GEORGIA
Washington 77 T S
Bay
231 £ ¤
Gadsden
Calhoun
Gulf
4399281 Lynn Haven Rails to Trail SR 75 (US 231) East 10th Street
4357961 SR 207 Rail Trail Putnam County Line Hastings
4399261 CC2S: Coastal Trail West CR 372/Surf Road SR 61 (US 98), Panacea
319 £ ¤
Jefferson
Leon
4399262 CC2S: Coastal Trail East W of SR 363 Woodville Hig Lighthouse Road
£ ¤
§ ¦ ¨ 75
10
Duval
4398701 Daytona Beach Gap 2: Ball Ballough Road approximately 0.01 miles
§ ¦ ¨ 295
301 £ ¤
Columbia Union
Lafayette
19 £ ¤
§ ¦ ¨
£ ¤
Baker
Suwannee
Taylor
Nassau
301
Bradford
Clay
Alachua
Gilchrist
17
£ ¤
Putnam
§ ¦ ¨ 95
301 £ ¤
27A £ ¤
4398771 SR 15 (US 17) Washington Avenue Palmetto Avenue
4398691 Daytona Beach Gap 3: Sout Marina Point Drive Orange Avenue
St. Johns
Dixie Levy
Flagler
T S
75
§ ¦ ¨ 4
Volusia
Lake
44 S T
Hernando
4398671 Daytona Beach Gap 5: Donn Shady Place Bellevue Avenue
40
Citrus
4373491 Withlacoochee-Dunnellon T North end of the Withlaco South end of the Dunnello
4398681 Daytona Beach Gap 4: Sout Bellevue Avenue Marina Point Drive
100 T S
Marion
§ ¨ ¦ Sumter
4398661 Daytona Beach Gap 6: Sout Wilder Blvd. Shady Place
Seminole
4398651 New Smyrna to Port Orange Canal Street Beville Road
417 Orange S T
4398751 Spring to Spring Gap: Del Grand Avenue/Baxter Stree SR 15 (US 17), Deleon Spr
19 £ ¤
54 T S
4398741 Deland: Spring to Spring Lake Beresford Park Grand Avenue
§ ¦ ¨ 75
Pasco
60 T S
4357201 Good Neighbor Trail Conne West Suncoast Parkway SR 50/Cortez Blvd., Brook
§ ¦ ¨ 275
4364341 Spring to Spring Trail Wayside Park Lake Monroe Park
Sarasota
70 S T
§ ¦ ¨
Indian River
Okeechobee 27 £ ¤
17 £ ¤
De Soto 17 £ ¤
441 £ ¤
Highlands
£ ¤
Glades
4361873 Coast to Coast/Space Coas East end of Max Brewer Br Merritt Island Refuge
St. Lucie 70 S T
§ ¦ ¨ 95
70 T S 27
Charlotte
4398621 Oak Hill to Edgewater US 1 at Kennedy Parkway Dale Avenue
60 S T
64 S T
Hardee
4398631 Edgewater Gap Dale Avenue 10th Street
Brevard
60 S T
17 £ ¤
75
4358931 South Lake Trail Phase 4 Van Fleet State Trail Villa City Rd. (CR 565)
95
0 1
Polk
Hillsborough Manatee
§ ¦ ¨
Osceola 27 £ ¤
Pinellas
4398721 Ormond Beach Gap: SR 40 Cassen Park SR A1A 4398711 Daytona Beach Gap 1: Nort N Beach Street/Sickler Dr 2nd Street (northern city
95
Hamilton
§ ¦ ¨
Wakulla
Franklin
Madison
1
4398731 Flagler Beach Gap: SR A1A S. 26th Street N. 9th Street
4399321 SJR2C: SR 207/A1A end of trail Flagler County Line
79 T S
Liberty
4398082 Perdido Key Multiuse Trai Alabama State Line State Park Entrance/Gongo
4282023 SR 100 Rail Trail Roberts Lane SJRWMD Office
Jackson
10
§ ¦ ¨
4399341 SR24 Archer Road SW 75th Terrace SW 41st Blvd.
710
T S
710 S T
Hendry
Palm Beach 27 £ ¤
29 T S
§ ¨ ¦ 75
Collier
4364331 Orange County Gap Segment N Hiawassee Rd N of SR 414 on SR 441
4400331 ECG-SE: Historic Downtown Georgia Avenue A1A/N Causeway Drive, For
0 1 869 T S
Broward
§ ¦ ¨ 95
4400341 Historic Highwayman Trail Indian Hills Drive Georgia Avenue, Fort Pier 4399971 Indian Hills Recreation A S of Savannah Road Indian Hills Drive, Fort
821 S T 997 T S
Miami-Dade
4402351 Van Fleet State Trail: Pe Polk City
4400321 FEC Overpass Savannas Recreation Area South Savannas Rd.
Monroe 1 £ ¤
4398781 Shingle Creek Trail South Palmetto Avenue. Estancia Development.
4298202 Harborwalk Ph1B Southern SR 45 Gap, Charlotte Harb
4402341 North Alligator Creek Pedestrian Bridge Mandalay Road
4402361 Van Buren/El Dorado/Kisme Del Prado Blvd Burnt Store Road at Van B
(FY 2016/2017 ) as of October, 2016 Projects color coded by year of highest phase
LEGEND Project Phase
Feasibility Study Feasibility Study, Project Development & Environment Project Development & Environment Preliminary Engineering Right of Way Construction Two miles Buffer of Coast To Coast Two miles Buffer of St. Johns River - to - Sea Loop
Work P rogram Itemseg No.
Location/Route number
Lee
4374981 SR 60/Campbell Pedestrian CCampbell Causeway Trail the Bayshore Traill
Adopted Work Program
Work Program Itemseg No.
T S 82 T S
Prioritized by Districts
Limits
80
4400931 Pinellas Trail Loop Phase Enterprise Road John Chestnut Park
Statewide
Location/Route number
Martin
29 S T
Shared-Use Nonmotorized (SUN) Trail Program
4398991 Biscayne-Everglades Green East Mowry Drive SW 137th Avenue
4399991 Savannas Preserve State Park Gap Walton Rd. Savannas Recreation Area 4398981 Biscayne Trail Segment D, SW 117th Avenue SW 137th Avenue
4355012 ECG-SE: The Underline Seg SW 13th Street SW 19th Avenue
Limits
Work Program Itemseg No. Location/Route number Limits
4364341
Tag for Regional Coast to Coast (C2C) Project
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
4364341
Tag for Regional St. Johns River - to - Sea Loop Project
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
4364341
SPRING TO SPRING TRAIL
Tag for Individual Project
US 17/92 SEMINOLE US 17/92 VOLUSIA
NOTES An allocation to one project phase is not a guarantee of commitment to allocations for future project phases. Source: Florida Department of Transportation -Systems Planning Office
Existing Conditions SUNTrail Network
Highways
Water
FDOT District Boundaries
®
0
20
!
!
!
!
40
Planned SIS roads 80
Miles
Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\SunTrails\GIS\Mapping\WorkProgram\SUNTrail _WorkProgram2016.mxd
Adopted Work Program
District 1 Tier
FM#
IND IND IND IND
4298202 4402341 4402361 4402351
District County Name Trail Name 1 1 1 1
Charlotte Charlotte Lee Polk
SWCC: Harborwalk Phase 1B Southern Boardwalk SWCC: North Alligator Creek Pedestrian Bridge SWCC: Van Buren/El Dorado/Kismet Trail Van Fleet State Trail: Pedestrian Bridge Replacement
Legend Adopted Work Program
FY 2016/2017
Segment SR 45 Gap, Charlotte Harbor US 41 and North Fork Alligator Creek, Punta Gorda Cape Coral Gap: Del Prado Blvd. to Burnt Store Road at Van Buren Parkway Polk City
Notes Phase FS = Feasibility Study; Phase Group - 1 and Phase Type all but 9; PD&E=Project Development & Environmental; Phase Group - 2 and Phase Type - all but 9; PE=Preliminary Engineering; Phase Group - 3; Phase Type - all but 9; ENV=EnvironmentalMitigation: Phase Group - C; Phase Type - all but 9; ROW=Right-of-Way CON=Construction and Support
(1) Tiers : C2C - Coast to Coast; SJR2C - St. Johns River to Sea Loop; IND - Individual (2) Project costs are subject to change; (3) An allocation to one project phase is not a guarentee of commitment to allocations for future phases.
State of Florida Department of Transportation
COST $1,114,800 $215,000 $1,778,100 $251,000 Total $3,358,900
PHASE CON PE PE PE, CON
§ ¦ ¨ 4
4402351 Van Fleet State Trail: Pe Polk City
Shared-Use Nonmotorized (SUN) Trail Program
DAVENPORT
AUBURNDALE
LAKELAND
HAINES CITY LAKE HAMILTON
DUNDEE
WINTER HAVEN EAGLE LAKE
V U 60
BARTOW
MULBERRY
District 1
LAKE WALES
HIGHLAND PARK
£ ¤ 27
FORT MEADE
Prioritized by Districts
Adopted Work Program
HILLCREST HEIGHTS FROSTPROOF
(FY 2016/2017 ) as of October, 2016 Projects color coded by year of highest phase
BOWLING GREEN
¦ ¨ § ¦ § ¨ 75
275
ANNA MARIA
V U
V U
62
62
PALMETTO
HOLMES BEACH
£ ¤ 17
V U
£ ¤ 441
70
75
V U 700
LAKE PLACID
V U
V U
ARCADIA
17
25
Project Development & Environment
Construction
V U 78
V U 29
MOORE HAVEN
V U 25
LA BELLE
V U 80
CLEWISTON
§ ¦ U ¨ V 75
Work Program Itemseg No. Location/Route number
V U
Limits
29
FORT MYERS CAPE CORAL
£ ¤ 27
§ ¦ ¨ 75
4402361 Van Buren/El Dorado/Kisme Del Prado Blvd Burnt Store Road at Van B
Feasibility Study, Project Development & Environment
Right of Way
V U
NORTH PORT
4402341 North Alligator Creek Pedestrian Bridge Mandalay Road
Project Phase
Preliminary Engineering
70
70
£ ¤
VENICE
4298202 Harborwalk Ph1B Southern SR 45 Gap, Charlotte Harb
LEGEND Feasibility Study
V U
§ ¦ ¨
SEBRING
66
LONGBOAT KEY
SARASOTA
AVON PARK
64
ZOLFO SPRINGS
BRADENTON
BRADENTON BEACH
V U
WAUCHULA
4364341
SPRING TO SPRING TRAIL
Tag for Individual Project
US 17/92 SEMINOLE US 17/92 VOLUSIA
82
NOTES
FORT MYERS BEACH SANIBEL
An allocation to one project phase is not a guarantee of commitment to allocations for future project phases. Source: Florida Department of Transportation -Systems Planning Office
V U 29
Existing Conditions
§ ¦ ¨
NAPLES
75
V U 951
£ ¤ 41
SUNTrail Network
Water
Highways
Railroads
Planned SIS roads
County Boundaries
®
10
5
0
10
Miles
Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\SunTrails\GIS\Mapping\WorkProgram\SUNTrailWPA_d1.mxd
Adopted Work Program
District 2 Tier
FM#
SJR2C SJR2C SJR2C IND IND IND
2102868 4357961 4399321 4399341 4399331 4282023
District County Name Trail Name 2 2 2 2 2 2
St. Johns St. Johns St. Johns Alachua Alachua Putnam
Palatka to St. Augustine State Trail aka SR 207 Rail Trail Palatka to St. Augustine State Trail aka SR 207 Rail Trail SR 207/A1A SR 24/Archer Road Multiuse Trail Tower Road Multiuse Trail Palatka to Lake Butler State Trail aka SR 100 Rail Trail
Legend Adopted Work Program
FY 2016/2017
Segment Main Street (Hastings) to SR 207/Spuds Putnam County Line to Hastings SR 207/A1A from end of trail to Flagler County Line SW 76th Terrace to SW 41st Boulevard, Gainesville SW 26th Place to SW 8th Avenue, Gainesville Roberts Lane to St. Johns River Water Management District
Notes Phase FS = Feasibility Study; Phase Group - 1 and Phase Type all but 9; PD&E=Project Development & Environmental; Phase Group - 2 and Phase Type - all but 9; PE=Preliminary Engineering; Phase Group - 3; Phase Type - all but 9; ENV=EnvironmentalMitigation: Phase Group - C; Phase Type - all but 9; ROW=Right-of-Way CON=Construction and Support
(1) Tiers : C2C - Coast to Coast; SJR2C - St. Johns River to Sea Loop; IND - Individual (2) Project costs are subject to change; (3) An allocation to one project phase is not a guarentee of commitment to allocations for future phases.
State of Florida Department of Transportation
COST $3,288,834 $2,217,575 $750,000 $450,000 $950,000 $6,261,419 Total $13,917,828
PHASE CON CON FS PE CON CON
Shared-Use Nonmotorized (SUN) Trail Program GEORGIA
VU U V 53
145
§ ¦ ¨ 75
V U
6
Adopted Work Program
§ ¦ ¨ 95
2
V U
(FY 2016/2017 ) as of October, 2016 Projects color coded by year of highest phase
115
47
V U 51
§ ¦ ¨
V U
Prioritized by Districts
V U
10
55
1
V U
6
V U
District 2
£ ¤
§ ¦ ¨ 295
LEGEND
§ ¦ ¨ 10
V U 51
V U
301
V U 121
V U 247
V U
20
£ ¤
249
247
51
202
§ ¦ ¨
4399321 SJR2C: SR 207/A1A end of trail Flagler County Line
V U 21
V U 100
V U U V 121
V U 100
V U
V U
V U
295
V U 47
16
13
Feasibility Study, Project Development & Environment Project Development & Environment Right of Way
V U 5
16
19
Feasibility Study
Preliminary Engineering
V U V U
£ ¤
Project Phase
Construction
V U 230
V U 18
V U 349
V U 235
V U U V 49
V U 121
Two miles Buffer of St. Johns River - to - Sea Loop
£ ¤ 17
V U 24
75
! (
24
4399331 Tower Road SW 26th Place SW 8th Avenue
V U 24
£ ¤
V U 45
V U 121
4399341 SR24 Archer Road SW 75th Terrace SW 41st Blvd.
Limits
Limits
£ ¤ 17
19
4282023 SR 100 Rail Trail Roberts Lane SJRWMD Office
Location/Route num ber
Location/Route num ber
20
V U
121
Work Program Itemseg No.
Work Program Itemseg No.
! (
V U
19
95
V U
19
27A
£ ¤
§ ¦ ¨
20
V U 320
V U
21
26
V U 206
207
V U
! (
V U
5
V U
§ ¦ ¨
47
V U
100
4357961 SR 207 Rail Trail Putnam County Line Hastings
4364341
Tag for Regional St. Johns River - to - Sea Loop Project
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
4364341
Tag for Individual Project
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
NOTES
2102868 SR 207 Rail Trail Main St. (Hastings) SR 207/Spuds
An allocation to one project phase is not a guarantee of commitment to allocations for future project phases. Source: Florida Department of Transportation -Systems Planning Office
Existing Conditions SUNTrail Network
Water
Highways
Railroads
County Boundaries
Planned SIS roads
®
0
5
10
20
Miles
Document Path: \\COdata\shares\CO\ISD \OTPP\Planning\SIS\ProjRecurring\SunTrails\GIS\Mapping\WorkProgram\SUNTrailWPA_d2.mxd
Adopted Work Program
District 3 Tier
FM#
IND IND IND IND
4399281 4389082 4399262 4399261
District County Name Trail Name 3 3 3 3
Bay Escambia Wakulla Wakulla
Lynn Haven Rails to Trails Perdido Key Multiuse Trail (SR 292) CC2S: Coastal Trail East: SR 30 (US 98) CC2S: Coastal Trail West: SR 30 (US 98) Coastal Highway
Legend Adopted Work Program
FY 2016/2017
Segment SR 75 (US 231) to East 10th Street Alabama State Line to State Park Entrance/Gongora Drive West of SR 363 Woodville Highway/St. Marks Trail to Lighthouse Road CR 372/Surf Road to SR 61 (US 98), Panacea
Notes Phase FS = Feasibility Study; Phase Group - 1 and Phase Type all but 9; PD&E=Project Development & Environmental; Phase Group - 2 and Phase Type - all but 9; PE=Preliminary Engineering; Phase Group - 3; Phase Type - all but 9; ENV=EnvironmentalMitigation: Phase Group - C; Phase Type - all but 9; ROW=Right-of-Way CON=Construction and Support
(1) Tiers : C2C - Coast to Coast; SJR2C - St. Johns River to Sea Loop; IND - Individual (2) Project costs are subject to change; (3) An allocation to one project phase is not a guarentee of commitment to allocations for future phases.
State of Florida Department of Transportation
COST $268,000 $1,123,144 $200,000 $800,000 Total $2,391,144
PHASE PE PE PE PE
Shared-Use Nonmotorized (SUN) Trail Program District 3
A L A B A M A
£ ¤ 29
V U 97
V U
4
89
V U
189
V U
V U
85
P O 83
V U 2
£ ¤
81
P O 87
§ ¦ ¨ 10
Adopted Work Program
231
V U
P O 69
( ! 85
GEORGIA
V U 90
§ ¦ ¨ 110
P O
£ ¤ 231
87
£ ¤ 331
£ ¤ 98
P O 73
U V V U 12
20
P O 77
71
319
27
§ ¦ ¨ 10
U V V U 20
£ ¤ 19
£ ¤
Feasibility Study Feasibility Study, Project Development & Environment
V U 363
P O
£ ¤ 319
P O
Right of Way
P O 4399262 CC2S: Coastal Trail East W of SR 363 Woodville Hig Lighthouse Road
£ ¤ 98
Project Development & Environment Preliminary Engineering
71
4399281 Lynn Haven Rails to Trail SR 75 (US 231) East 10th Street
LEGEND Project Phase
27
59
65
4398082 Perdido Key Multiuse Trai Alabama State Line State Park Entrance/Gongo
£ ¤
£ ¤
267
P O
(FY 2016/2017 ) as of October, 2016 Projects color coded by year of highest phase
4399261 CC2S: Coastal Trail West CR 372/Surf Road SR 61 (US 98), Panacea
Construction
Work Program Itemseg No. Location/Route num ber Limits
4364341
Tag for Individual Project
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
NOTES An allocation to one project phase is not a guarantee of commitment to allocations for future project phases. Source: Florida Department of Transportation -Systems Planning Office
Existing Conditions SUNTrail Network
Water
Highways
Railroads
County Boundaries
Planned SIS roads
®
10
5
0
10
Miles
Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\SunTrails\GIS\Mapping\WorkProgram\SUNTrailWPA_d3.mxd
Adopted Work Program
District 4 Tier
FM#
IND IND IND IND IND
4400321 4400331 4400341 4399971 4399991
District County Name Trail Name 4 4 4 4 4
St. Lucie St. Lucie St. Lucie St. Lucie St. Lucie
ECG-SE: FEC Overpass ECG-SE: Historic Downtown Ft. Pierce Retrofit ECG-SE: Historic Highwayman Trail Gap ECG-SE: Indian Hills Recreation Area Trail Retrofit ECG-SE: Savannas Preserve State Park Gap
Legend Adopted Work Program
FY 2016/2017
Segment Savannas Recreation Area to S. of Savannah Rd./Heathecote Gardens, Fort Pierce Georgia Avenue to A1A/N Causeway Drive, Fort Pierce Indian Hills Drive to Georgia Avenue, Fort Pierce South of Savannah Road to Indian Hills Drive, Fort Pierce Walton Road to Savannas Recreation Area, Port St. Lucie
Notes Phase FS = Feasibility Study; Phase Group - 1 and Phase Type all but 9; PD&E=Project Development & Environmental; Phase Group - 2 and Phase Type - all but 9; PE=Preliminary Engineering; Phase Group - 3; Phase Type - all but 9; ENV=EnvironmentalMitigation: Phase Group - C; Phase Type - all but 9; ROW=Right-of-Way CON=Construction and Support
(1) Tiers : C2C - Coast to Coast; SJR2C - St. Johns River to Sea Loop; IND - Individual (2) Project costs are subject to change; (3) An allocation to one project phase is not a guarentee of commitment to allocations for future phases.
State of Florida Department of Transportation
COST $275,000 $275,000 $100,000 $80,000 $500,000 Total $1,230,000
PHASE PDE PDE PDE PE PDE
§ ¦ ¨ 95
Vero Beach
! ( 60
Ft. Pierce
4400331 ECG-SE: Historic Downtown Georgia Avenue A1A/N Causeway Drive, For
Shared-Use Nonmotorized (SUN) Trail Program
4400341 Historic Highwayman Trail Indian Hills Drive Georgia Avenue, Fort Pier
District 4
4400321 FEC Overpass Savannas Recreation Area South Savannas Rd.
Adopted Work Program
4399971 Indian Hills Recreation A S of Savannah Road Indian Hills Drive, Fort
! ( 70
Port St. Lucie
4399991 Savannas Preserve State Park Gap Walton Rd. Savannas Recreation Area
(FY 2016/2017 ) as of October, 2016 Projects color coded by year of highest phase
LEGEND Project Phase Feasibility Study Feasibility Study, Project Development & Environment
710
T S
Project Development & Environment
! ( 76
Preliminary Engineering Right of Way Construction
700
T S
West Palm Beach
£ ¤ 441
Work Program Itemseg No. Location/Route num ber Limits
£ ¤ 27
§ ¦ ¨ 95
4364341
Tag for Individual Project
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
NOTES An allocation to one project phase is not a guarantee of commitment to allocations for future project phases. Source: Florida Department of Transportation -Systems Planning Office
Existing Conditions
§ ¦ ¨ 75
Ft. Lauderdale
§ ¦ ¨ 595
SUNTrail Network
Water
Highways
Railroads
County Boundaries
Planned SIS roads
®
9
4.5
0
9
Miles
Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\SunTrails\GIS\Mapping\WorkProgram\SUNTrailWPA_d4.mxd
Adopted Work Program
District 5 Tier
FM#
District County Name Trail Name
C2C C2C C2C C2C SJR2C SJR2C SJR2C SJR2C SJR2C SJR2C SJR2C SJR2C SJR2C SJR2C SJR2C SJR2C SJR2C SJR2C IND
4361873 4358931 4364331 4364341 4398731 4398711 4398701 4398691 4398681 4398671 4398661 4398631 4398651 4398621 4398721 4398771 4398751 4398741 4398781
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Brevard Lake Orange Volusia Flagler Volusia Volusia Volusia Volusia Volusia Volusia Volusia Volusia Volusia Volusia Volusia Volusia Volusia Osceola
Space Coast Trail: Titusville South Lake Trail Phase 4 Orange Co. Gap Segment 2 Spring to Spring Trail: US 17/92 Bridge SR A1A Daytona Beach Gap 1: North Beach Street Daytona Beach Gap 2: Ballough Road Bridge Daytona Beach Gap 3: South Beach Street Daytona Beach Gap 4: South Beach Street Daytona Beach Gap 5: Donnelly Place Daytona Beach Gap 6: South Beach Street Edgewater Gap New Smyrna to Port Orange Gap: US 1 Oak Hill to Edgewater Ormond Beach Gap: SR 40 - Cassen Park Pierson Gap: SR 15 (US 17) Spring to Spring Gap: Deleon Springs Spring to Spring: Deland Shingle Creek Trail South Phase 1B
Legend Adopted Work Program
FY 2016/2017
Segment East end of Max Brewer Bridge to Merritt Island Refuge Van Fleet State Trail to Villa City Rd. (CR 565) N Hiawassee Rd. to N of SR 414 on SR 441/Clarcona-Ocoee Connector/Pine Hills Ph. 3 Wayside Park to Lake Monroe Park (Seminole/Volusia Co.) SR A1A or Alternate Route from S. 26th Street to N. 9th Street N Beach Street/Sickler Drive from 350' south of 2nd Street to 2nd Street (N. city limits) Ballough Road approximately 0.01 miles north of Anita Avenue South Beach Street from Marina Point Drive to Orange Avenue South Beach Street from Bellevue Avenue to Marina Point Drive Donnelly Place from Shady Place to Bellevue Avenue South Beach Street from Wilder Boulevard to Shady Place Dale Avenue to 10th Street US 1 from Canal Street to Beville Road US 1 at Kennedy Parkway to Dale Avenue SR 40 from Cassen Park to SR A1A SR 15 (US 17) from Washington Avenue to Palmetto Avenue Grand Avenue/Baxter Street to SR 15 (US 17) Lake Beresford Park to Grand Avenue Palmetto Ave. to southern limit of future Shingle Creek Phase 2B, Kissimmee
Notes Phase FS = Feasibility Study; Phase Group - 1 and Phase Type all but 9; PD&E=Project Development & Environmental; Phase Group - 2 and Phase Type - all but 9; PE=Preliminary Engineering; Phase Group - 3; Phase Type - all but 9; ENV=EnvironmentalMitigation: Phase Group - C; Phase Type - all but 9; ROW=Right-of-Way CON=Construction and Support
(1) Tiers : C2C - Coast to Coast; SJR2C - St. Johns River to Sea Loop; IND - Individual (2) Project costs are subject to change; (3) An allocation to one project phase is not a guarentee of commitment to allocations for future phases.
State of Florida Department of Transportation
COST $300,000 $700,000 $2,000,000 $1,800,000 $600,000 $20,000 $20,000 $100,000 $65,000 $510,000 $100,000 $1,100,000 $1,500,000 $800,000 $300,000 $300,000 $750,000 $750,000 $2,230,000 Total $13,945,000
PHASE PE PE PE CON FS, PDE PE PE PE PE CON PE CON PDE PDE FS PE PE PDE CON
4398731 Flagler Beach Gap: SR A1A S. 26th Street N. 9th Street
4398721 Ormond Beach Gap: SR 40 Cassen Park SR A1A
5
P O
4398701 Daytona Beach Gap 2: Ball Ballough Road approximately 0.01 miles
20
P O P O
4398691 Daytona Beach Gap 3: Sout Marina Point Drive Orange Avenue
40
4398681 Daytona Beach Gap 4: Sout Bellevue Avenue Marina Point Drive
5
11
P O £ ¤ 27
4398771 SR 15 (US 17) Washington Avenue Palmetto Avenue 4398751 Spring to Spring Gap: Del Grand Avenue/Baxter Stree SR 15 (US 17), Deleon Spr 4398741 Deland: Spring to Spring Lake Beresford Park Grand Avenue
P O 40
P O
40
P O 200
T S
§ ¦ ¨ 75
44
P O
§ ¦ ¨ 95
£ ¤ 17
19
P O
4398671 Daytona Beach Gap 5: Donn Shady Place Bellevue Avenue 4398661 Daytona Beach Gap 6: Sout Wilder Blvd. Shady Place
£ ¤ 27
V U 415
44
P O
£ ¤ 301
4398651 New Smyrna to Port Orange Canal Street Beville Road
44
P O
§ ¦ ¨ 4
£ ¤ 33
4398631 Edgewater Gap Dale Avenue 10th Street
46
P O V V U U 408
27
P O
50
U V V U
50
527
U V V U V U 407
V U
482
528
V U 91
4361873 Coast to Coast/Space Coas East end of Max Brewer Br Merritt Island Refuge
528
V U
4364331 Orange County Gap Segment N Hiawassee Rd N of SR 414 on SR 441
4398621 Oak Hill to Edgewater US 1 at Kennedy Parkway Dale Avenue
V U
417
4358931 South Lake Trail Phase 4 Van Fleet State Trail Villa City Rd. (CR 565)
4398711 Daytona Beach Gap 1: Nort N Beach Street/Sickler Dr 2nd Street (northern city
520
4364341 Spring to Spring Trail Wayside Park Lake Monroe Park
£ ¤ 192
500
T S
4398781 Shingle Creek Trail South Palmetto Avenue. Estancia Development.
£ ¤ 441
§ ¦ ¨ 95
£ ¤ 192
Shared-Use Nonmotorized (SUN) Trail Program District 5 Prioritized by Districts
Adopted Work Program
(FY 2016/2017 ) as of October, 2016 Projects color coded by year of highest phase
LEGEND
Project Phase
Feasibility Study Feasibility Study, Project Development & Environment Project Development & Environment Preliminary Engineering Right of Way Construction Two miles Buffer of Coast To Coast Two miles Buffer of St. Johns River - to - Sea Loop
Work P rogram Itemseg No. Location/Route number Limits
Work Program Itemseg No. Location/Route number Limits
Work Program Itemseg No. Location/Route number Limits
Tag for Regional Coast to Coast (C2C) Project
4364341
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
4364341
Tag for Regional St. Johns River - to - Sea Loop Project
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
4364341
SPRING TO SPRING TRAIL
Tag for Individual Project
US 17/92 SEMINOLE US 17/92 VOLUSIA
NOTES An allocation to one project phase is not a guarantee of commitment to allocations for future project phases. Source: Florida Department of Transportation -Systems Planning Office
Existing Conditions
V U 91
60
P O
SUNTrail Network
Water
Highways
Railroads
County Boundaries
Planned SIS roads
®
10
5
0
10
Miles
Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\SunTrails\GIS\Mapping\WorkProgram\SUNTrailWPA_d5.mxd
Adopted Work Program
District 6 Tier
FM#
District County Name Trail Name
IND 4398981 IND 4398991 IND 4355012
6 6 6
Miami-Dade Biscayne Trail Segment D, Phase 2 Miami-Dade ECG-SE: Biscayne Everglades Greenway Miami-Dade ECG-SE: The Underline Segment A
Legend Adopted Work Program
FY 2016/2017
Segment SW 117th Avenue to SW 137th Avenue, Homestead East Mowry Drive to SW 137th Avenue, Homestead SW 13th Street to SW 19th Avenue, Miami
Notes Phase FS = Feasibility Study; Phase Group - 1 and Phase Type all but 9; PD&E=Project Development & Environmental; Phase Group - 2 and Phase Type - all but 9; PE=Preliminary Engineering; Phase Group - 3; Phase Type - all but 9; ENV=EnvironmentalMitigation: Phase Group - C; Phase Type - all but 9; ROW=Right-of-Way CON=Construction and Support
(1) Tiers : C2C - Coast to Coast; SJR2C - St. Johns River to Sea Loop; IND - Individual (2) Project costs are subject to change; (3) An allocation to one project phase is not a guarentee of commitment to allocations for future phases.
State of Florida Department of Transportation
COST $122,825 $206,000 $1,445,000 Total $1,773,825
PHASE PE PE PE
V U
V U
7
847
V U 860
£ ¤ 27
924
V U
856
95
826
823
93
441
V U
U V V VU U
V U
V U
V£ U ¤§ ¦ ¨ 91
V U
U V V U
915
916
A1A
922
Shared-Use Nonmotorized (SUN) Trail Program
997
U V V U U V
826
V U 948
£ ¤ 41
41
V U 90
U U V V V U V U 976
821
94
§ ¦ ¨ 195
£ ¤ 41
973
985
V U
112
836
836
£ ¤
953
V U
V U
District 6
934
V U
V U 874
4355012 ECG-SE: The Underline Seg SW 13th Street SW 19th Avenue
Prioritized by Districts
Adopted Work Program
(FY 2016/2017 ) as of October, 2016 Projects color coded by year of highest phase
LEGEND Project Phase
Feasibility Study Feasibility Study, Project Development & Environment Project Development & Environment Preliminary Engineering Right of Way Construction
Work Program Itemseg No.
V U 9336
Location/Route num ber Limits
4398991 Biscayne-Everglades Green East Mowry Drive SW 137th Avenue
£ ¤ 1
4398981 Biscayne Trail Segment D, SW 117th Avenue SW 137th Avenue
4364341
Tag for Individual Project
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
NOTES An allocation to one project phase is not a guarantee of commitment to allocations for future project phases. Source: Florida Department of Transportation -Systems Planning Office
Existing Conditions SUNTrail Network
Water
Highways
V U 5
Railroads
County Boundaries
Planned SIS roads
®
4
2
0
4
Miles
Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\SunTrails\GIS\Mapping\WorkProgram\SUNTrailWPA_d6.mxd
Adopted Work Program
District 7 Tier
FM#
C2C IND IND IND
4357201 4373491 4400931 4374981
District County Name Trail Name 7 7 7 7
Hernando Citrus Pinellas Pinellas
Good Neighbor Trail Connector: Alternate Alignment HOFL: Withlacoochee-Dunnellon Trail Connector SWCC: Pinellas Trail Loop Phase 2 SWCC: SR 60/Courtney Campbell Cswy Ped. Overpass
Legend Adopted Work Program
FY 2016/2017
Segment West Suncoast Parkway to SR 50/Cortez Boulevard, Brooksville North end of the Withlacoochee State Trail to south end of the Dunnellon Trail John Chestnut Park to Enterprise Road, Palm Harbor Courtney Campbell to Bayshore Trail segment/Ream Wilson Clearwater Trail
Notes Phase FS = Feasibility Study; Phase Group - 1 and Phase Type all but 9; PD&E=Project Development & Environmental; Phase Group - 2 and Phase Type - all but 9; PE=Preliminary Engineering; Phase Group - 3; Phase Type - all but 9; ENV=EnvironmentalMitigation: Phase Group - C; Phase Type - all but 9; ROW=Right-of-Way CON=Construction and Support
(1) Tiers : C2C - Coast to Coast; SJR2C - St. Johns River to Sea Loop; IND - Individual (2) Project costs are subject to change; (3) An allocation to one project phase is not a guarentee of commitment to allocations for future phases.
State of Florida Department of Transportation
COST $475,358 $280,000 $5,700,000 $1,362,488 Total $7,817,846
PHASE PE PE PE, CON PE
£ ¤ 19
4373491 Withlacoochee-Dunnellon T North end of the Withlaco South end of the Dunnello
! ( 44
4357201 Good Neighbor Trail Conne West Suncoast Parkway SR 50/Cortez Blvd., Brook
Shared-Use Nonmotorized (SUN) Trail Program District 7 Prioritized by Districts
Adopted Work Program
(FY 2016/2017 ) as of October, 2016 Projects color coded by year of highest phase
LEGEND
! ( 50
Project Phase
Feasibility Study Feasibility Study, Project Development & Environment
V U 35
75
§ ¦ ¨
Project Development & Environment Preliminary Engineering
V U 52
V U 52
35
£ ¤ 19
4400931 Pinellas Trail Loop Phase Enterprise Road John Chestnut Park
54
54
£ ¤ 301
V U 597
V U
39
Work Program Itemseg No. Location/Route num ber
Work Program Itemseg No.
580
4
§ ¦ ¨
V U 60
§ ¦ ¨
V U
Limits
V U
580
Construction Two miles Buffer of Coast To Coast
V U
V U
4374981 SR 60/Campbell Pedestrian CCampbell Causeway Trail the Bayshore Traill
Right of Way
V U
! ( 60
275
V U 600
Location/Route num ber Limits
Tag for Regional Coast to Coast (C2C) Project
4364341
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA 4364341
Tag for Individual Project
SPRING TO SPRING TRAIL US 17/92 SEMINOLE US 17/92 VOLUSIA
NOTES An allocation to one project phase is not a guarantee of commitment to allocations for future project phases. Source: Florida Department of Transportation -Systems Planning Office
§ ¦ ¨
Existing Conditions
75
§ ¦ ¨ 275
£ ¤ 301
V U 674
SUNTrail Network
Water
Highways
Railroads
County Boundaries
Planned SIS roads
®
7
3.5
0
7
Miles
Document Path: \\COdata\shares\CO\ISD\OTPP\Planning\SIS\ProjRecurring\SunTrails\GIS\Mapping\WorkProgram\SUNTrailWPA_d7.mxd
Adopted Work Program By Tier Tier
2017 Cost
Coast To Coast Connector $5,275,358 St. Johns River - to - Sea Loop $13,171,409 Individual $25,987,776 Total $44,434,543
District
County
1 1 1 2 2 2 3 3 3 4 5 5 5 5 5 5 5 6 7 7 7
Charlotte Lee Polk Alachua Putnam St. Johns Bay Escambia Wakulla St. Lucie Brevard Flagler Lake Orange Osceola Seminole Volusia Miami-Dade Citrus Hernando Pinellas
Total %
12% 30% 58% 100%
2017 Cost
$1,329,800 $1,778,100 $251,000 $1,400,000 $6,261,419 $6,256,409 $268,000 $1,123,144 $1,000,000 $1,230,000 $300,000 $600,000 $700,000 $2,000,000 $2,230,000 $1,800,000 $6,315,000 $1,773,825 $280,000 $475,358 $7,062,488 Total $44,434,543
2017 Funding
Adopted Work Program (FY 2016/2017) as of October, 2016 Statewide
Phase FS (Feasibility Study) FS, PDE (Feasibility Study, Project Development & Environment) PDE (Project Development & Environment ) PE (Preliminary Engineering) PE, CON (Preliminary Engineering, Construction) CON (Construction)
2017 Cost
$1,050,000 $600,000 $4,200,000 $13,160,915 $5,951,000 $19,472,628 Total $44,434,543
District District 1 District 2 District 3 District 4 District 5 District 6 District 7 Total
2017 Cost $3,358,900 $13,917,828 $2,391,144 $1,230,000 $13,945,000 $1,773,825 $7,817,846 $44,434,543
Total % 2% 1% 10% 30%
13% 44% 100%