Draft Campus Master Plan
May 2006
Rowan University Master Plan
Draft Master Plan May 15, 2006
Agenda • • • •
Master Plan Schedule Goals Summary Activities Update Draft Master Plan: – – –
Strategic Plan Revised Space Analysis and Program Draft Master Plan
• Master Plan Studies: – – –
Route 322 Study North Dorms Landscape Study Signage and Wayfinding
• Next Steps Rowan University
May_2006_Board_Mtg_Draft_CMP
1
Draft Campus Master Plan
May 2006
Agenda • Master Plan Schedule • Goals Summary • Activities Update • Draft Master Plan: – Strategic Plan – Revised Space Analysis and Program – Draft Master Plan
• Next Steps
Rowan University
Schedule • Phase 1: Analysis • Phase 2: Alternatives and Additional Studies • Phase 3: Final Plan Documentation O ct-0 5
N ov-0 5 Dec-0 5
Ja n-0 6
Feb-0 6
M a r-0 6 Apr-0 6
M a y-0 6
Jun-0 6
Strategic Academic Planning Space Inventory Space Programming Study Route 322 Study N orth Dorms Landscape Study W ayfinding Study Preferred Alternative Plan Documentation X
W ork Session Board Presentation
X
X X
Rowan University
May_2006_Board_Mtg_Draft_CMP
2
Draft Campus Master Plan
May 2006
Summary of Master Plan Goals • Determine strategies to accommodate growth • Support economic growth of Glassboro • Develop and integrate the West Campus with the Main Campus • Develop a cohesive campus vision • Improve the quality of the physical environment • Evaluate the use of existing facilities and potential long-term options • Plan for continued transition to a residential campus Rowan University
Activities Since Last Meeting • Plan for the West Campus completed • Draft final strategic plan completed • Space needs analysis revised • Program prepared • Draft final master plan prepared
• Draft final Route 322 Study completed • Draft final Signage and Wayfinding study completed • North Dorms Landscape in design development • Continued coordination on Rowan Boulevard
Rowan University
May_2006_Board_Mtg_Draft_CMP
3
Draft Campus Master Plan
May 2006
Strategic Plan
Strategic Academic Planning Summary Goals: • Develop mid-term and long-term strategies for accommodating growth to 15,000 students • Assess campus capacity • Determine full operating and capital costs of accommodating growth • Develop alternative strategies for growth based on funding availability • Plan for appropriate use of the Main Campus • Plan the long-term use of the West Campus • Explore options for accommodating growth Rowan University
May_2006_Board_Mtg_Draft_CMP
4
Draft Campus Master Plan
May 2006
Strategic Academic Planning Summary Academic Planning Components: • Growth options and trade-offs: – Admissions yield – Market penetration – Capacity of existing facilities
• Recommended growth approach: – Existing program growth – New programs – New initiatives/colleges (long-term)
• Financial model: – Financial implication of different growth strategies Rowan University
Strategic Academic Planning Summary Status: • Assessment of campus capacity complete • Analysis of enrollment and staffing projections complete • Final academic plans and space needs projections integrated with campus planning: – Space needs projections revised to reflect research objectives – Master plan program developed to support academic vision – Space inventory put into SpacePlan software to test scenarios
• Financial analysis completed and alternative funding scenarios developed
Rowan University
May_2006_Board_Mtg_Draft_CMP
5
Draft Campus Master Plan
May 2006
Space Analysis and Program
Purpose and Methodology • Space needs assessed to establish current and future space needs and to determine master plan program • Analysis compares existing space to estimated space needs for different levels of enrollment • Comprehensive space inventory completed by University staff • CEFPI standards (national space planning standards) applied • Standards adjusted to reflect unique Rowan pedagogy • Analysis does not assess quality and functionality of space • Demolition and replacement included Rowan University
May_2006_Board_Mtg_Draft_CMP
6
Draft Campus Master Plan
May 2006
Inventory Assumptions • Space inventory includes all buildings on Glassboro campus • Alvin Shpeen Hall excluded • New buildings and potential building demolitions accounted for: – Education – Bosshart Hall – Robinson Hall
• Baseline enrollment, faculty and staff data from Academic Plan • Student contact hours generated from course schedule
Rowan University
Analysis Revisions • Some adjustments to space inventory to reflect actual use of space • Baseline enrollment, faculty and staff data updated to reflect Academic Plan projections • Analysis of research space revised to reflect project-based learning and higher level of faculty research
Rowan University
May_2006_Board_Mtg_Draft_CMP
7
Draft Campus Master Plan
May 2006
Space Needs Analysis Summary Academic Space: • Current shortage of teaching labs in various academic areas • Current shortage of study space • Classrooms and offices needed for growth • Liberal Arts labs needed to replace labs in Bosshart and Robinson • Engineering, Computer Science, Math and Fine Arts needed for growth
Rowan University
Research Labs: • Current need for Engineering and LAS labs to support project-based learning (clinics) • Lab space also required to support faculty research goals
Space Needs Analysis Summary Student Life Space: • Current need for athletics and recreation space • Current need for more student union space • Additional dining space needed with growth Other: • Renovation or replacement of other poor quality buildings and spaces should be considered
Rowan University
May_2006_Board_Mtg_Draft_CMP
8
Draft Campus Master Plan
May 2006
Teaching Labs Phase
Floor Area (asf)
Surplus/ (Deficit) (asf)
Existing
138,494
Current Needs
124,920
13,574
12,500 Needs
202,207
(63,713)
15,000 Needs
243,093
(104,599)
• Current need for labs in various disciplines • Additional labs needed to replace Liberal Arts space in Bossart and Robinson • Surplus of Education labs with space in new building • Existing inventory includes +/14,500 asf of computer and unassigned labs • All labs needed for growth
Rowan University
Teaching Labs Detail Current Existing Available Business
@12,500
@15,000
Need
Surplus/ (Deficit)
Need
Surplus/ (Deficit)
Need
Surplus/ (Deficit)
1,654
440
1,214
561
1,094
640
1,014
7,205
13,025
(5,820)
17,423
(10,218)
20,865
(13,660)
Education
11,735
9,155
2,580
11,881
(146)
13,762
(2,027)
Engineering
22,651
18,813
3,838
24,438
(1,787)
38,006
(15,355)
Fine & Perf. Arts
34,157
29,925
4,232
47,529
(13,372)
56,206
(22,049)
690
8,555
(,7865)
11,712
(11,022)
13,437
(12,747)
45,855
45,056
849
88,663
(42,808)
100,179
(54,324)
14,547
0
14,547
0
14,547
0
14,547
138,494
124,920
13,574
202,207
(63,713)
243,093
(104,599)
Communication
Liberal Arts Sciences Unassigned TOTAL
Rowan University
May_2006_Board_Mtg_Draft_CMP
9
Draft Campus Master Plan
May 2006
Research Labs – CEFPI Model Program
Need at 15,000 Beyond Existing (asf)
Need at 15,000 Beyond Existing (gsf)
5,169
7,952
Liberal Arts Science
8,474
13,037
Engineering
28,155
43,315
Total
41,798
64,305
• Research labs needed to support practice-based learning and faculty research objectives • Formula multiplies faculty and students doing research by average station size • Analysis assumes students share labs • Principal need occurs in Education, Engineering, Arts and Science
Rowan University
Research Labs – Faculty Research Goal Program
Additional Need at 15,000 (asf)
Additional Need at 15,000 (gsf)
Liberal Arts
82,402
126,772
Science
59,831
92,047
Engineering
129,945
199,915
Total
272,178
418,735
• Assumes all FTE faculty following departments involved in research: – Biological science – Chemistry – Biochemistry – Computer Science – Geography/Anthropology – Physics and Astronomy – Psychology – Engineering
• Also assumes dedicated research space for Engineering and Science students • Model requires up to 400,000 gsf additional research space Rowan University
May_2006_Board_Mtg_Draft_CMP
10
Draft Campus Master Plan
May 2006
Near- and Long-Term Building Replacements Facilities Assessment: • Physical condition: • • • •
- Facility Condition Index (FCI) - Cost to renovate
Efficiency of site use Program accommodation Adaptability Historic or cultural value or legacy Short-Term Replacements
GSF
Long-Term Replacements
GSF
Bossart
48,303
Bole
19,535
Robinson
86,030
Bole Annex
10,880
Winans
26,701
Memorial
42,388
Bozorth
33,103 12,839
Total Academic
161,034
Mimosa (340beds)
44,453
Hawthorn
Mansion Park (260 beds)
59,400
Linden
Total Housing (600 beds)
35,340
Total
103,853
154,085
Rowan University
Master Plan Program: Near Term Space Type
LAS Phase I
Comm.
Business
LAS Phase II
Engineering Research
Classrooms
11,900
7,200
4,800
4,500
0
Teaching Labs
11,700
42,900
1,700
55,600
15,400
Research Labs
4,400
0
1,500
0
28,200
Offices
30,100
22,000
15,300
6,300
9,300
Study Space
16,600
9,100
4,500
7,300
0
Media Space
0
16,300
0
0
0
Student Life
19,500
0
2,200
0
0
Total ASF
94,200
97,500
27,800
73,700
52,900
144,900
150,000
42,800
113,400
81,400
Total GSF@ 0.65 efficiency
Rowan University
May_2006_Board_Mtg_Draft_CMP
11
Draft Campus Master Plan
May 2006
Master Plan Program: Long-Term NEW BUILDING
Includes
Total Need (ASF)
Total Need (GSF)
Student Center Addition
• Future student union need • Winans (bookstore) replacement • Theater and Dance space from Memorial Hall (create a Black Box?)
42,200
64,800
Bunce Addition
• Phase 1 (12,500) non-academic or student union office need • Replace admin. space in Bozorth (Registrar, Public Relations etc) • Administration and Finance offices from Linden Hall
16,800
25,900
Bunce Renovation
• Re-use of space vacated by Business
5,000
7,700
New Admin Building
• Phase 2 (15,000) non-academic or student union office need • Replacement for Bole & Bole Annex • IT and other administrative offices from Hawthorn
64,100
68.700
New Facilities Bldg
• Replacement for Cassady and Facilities space in Linden • Future support space needs
55,000
84,700
Research Building
• Phase 2 Liberal Arts all Science research lab needs • All future Science office needs • All future animal/greenhouse space need
25,800
39,700
Future Student Life
• Some Phase 1 and all Phase 2 student union need + Phase 2 general student life need
58,100
84,400
Future Academic
• • • •
39,300
60,400
50% of Phase 2 (15,000) classroom need All future Education teaching and research labs All future demonstration space need Replacement space for Hawthorn (Graduate School, Government Grants, Faculty Center for Excellence in Teaching)
Rowan University
Master Plan Program: Housing Projected Population On Campus Residential
Current Need 50%
12,500 @44%
15,000 @50%
@44%
@50%
Fall 2004 Existing Beds
2,904
2,904
2,904
2,904
2,904
Total Need
3,356
4,330
5,004
5,196
6,004
New Beds
452
1,426
2,100
2,292
3,100
Replacement: Mansion Park Over Crowding
260 280
260 280
260 280
260 280
260 280
Total New Beds Needed
992
1,966
2,640
2,832
3,640
Rowan University
May_2006_Board_Mtg_Draft_CMP
12
Draft Campus Master Plan
May 2006
Master Plan Context
Master Plan Framework: Context
Rowan University
May_2006_Board_Mtg_Draft_CMP
13
Draft Campus Master Plan
May 2006
Master Plan Framework: Research Park and West Campus
Rowan University
Master Plan Framework: West Campus 1
Soccer Stadium (20,000 seats)
2
Arena (7,500 seats)
3
Fieldhouse (2,500 seats)
4
Natatorium
5
Football Stadium (5,000 seats)
6
Track & Field Complex (2,500 seats)
7
Lacrosse & Field Hockey Stadium (2.000 seats)
8
Baseball Stadium (1,200 seats)
9
Softball Stadium (1,200 seats)
10
University Practice Fields (8 fields)
11
Community Practice Fields (10 fields)
12
University Building
13
Residential Village (3,000 beds)
14
Mixed-use/Retail
15
Surface Parking
16
Structured Parking
17
Wetland/Greenway
Rowan University
May_2006_Board_Mtg_Draft_CMP
14
Draft Campus Master Plan
May 2006
Master Plan Framework: Rowan Boulevard
B
A1
D
C2 C6
C4
C3
F
A1
Mixed-use Residential Over Retail
A2
Mixed-use Residential Over Retail
A3
Mixed-use Residential Over Retail
B
Hotel Conference Center
C1
Mixed-use Student Housing Over Retail
C2
Student Housing
C3
Student Housing
C4
Mixed-use Student Housing Over Retail
C5
Student Housing
C6
Optional Student Housing
D
Parking Garage
E
Retail/Commercial Plaza
F
Townhomes
C5 A2
A3
E
Rowan University
Draft Master Plan
May_2006_Board_Mtg_Draft_CMP
15
Draft Campus Master Plan
May 2006
Master Plan Principles • Encourage academic collaboration and integration of research • Accommodate growth through compact development • Support a pedestrian-oriented campus with a strong residential community • Enhance connections with the adjacent community • Design and develop the campus in a sustainable manner
Rowan University
Planning Sustainability Principles Parking: • Minimize surface parking and replace with parking structures where possible • Reduce the need for parking through transportation demand management Stormwater: • Introduce green roofs for stormwater management • Develop a comprehensive stormwater management plan • Buffer the creek through landscape design • Improve natural retention by reducing impermeable surfaces or permeable pavement
Rowan University
May_2006_Board_Mtg_Draft_CMP
16
Draft Campus Master Plan
May 2006
Master Plan Framework for Main Campus: 15,000 Headcount
Rowan University
Master Plan Framework: Campus Districts
5-min
Rowan University
May_2006_Board_Mtg_Draft_CMP
17
Draft Campus Master Plan
May 2006
Master Plan Framework: Campus Districts Buildings in Core
Existing (GSF)
Bozorth Site Bunce + Addition
91,200 66,049
Business Campbell Library
42,800
150,000
Education Hall
125,448
Esby/Rec Center
124,564
Lot A West Site
76,500
Hawthorn Site
91,200
LAS 1
144,900
LAS 2 (Robinson Site)
113,400
Memorial Site
91,200
Mimosa Site
60,400
Rowan Hall + Addition
87,459
Savitz
54,244
Science Hall
136,730
Student Center + Addition
120,738
Westby Wilson
Rowan University
25,900
129,118
Communications (New)
5-min
Proposed (GSF)
Total
81,400
64,800
51,993 90,995 987,338
1,033,700
Master Plan Framework: FAR Comparison Existing GSF in Core Core Area
Future +24.6
60.3
60.3
Core FAR
Total Campus GSF Total Campus Area
+67.83 196.8
199.2
Campus FAR
5-min
Rowan University
May_2006_Board_Mtg_Draft_CMP
18
Draft Campus Master Plan
May 2006
Master Plan Framework: Landscape
Preservation and Enhancement: • Stream Corridors and Wetlands • College Greens Rowan University
Master Plan Framework: Landscape
Quads and Greens • Quads • Recreation Rowan University
May_2006_Board_Mtg_Draft_CMP
19
Draft Campus Master Plan
May 2006
Master Plan Framework: Landscape
Esplanades: • 322 Corridor • North/South Connectors
Rowan • NorthUniversity Walk
Master Plan Framework: Pedestrian Circulation
Rowan University
May_2006_Board_Mtg_Draft_CMP
20
Draft Campus Master Plan
May 2006
North Residence Halls Landscape Plan
Rowan University
North Residence Halls Circulation Hierarchy
Bu ildin
30 0B uild ing
400
50 0B uild ing
g
20 0
Bu ildin g
Chestnut
Magnolia
Willow
Rowan University
May_2006_Board_Mtg_Draft_CMP
21
Draft Campus Master Plan
May 2006
Master Plan Framework for Main Campus: 15,000 Headcount
Rowan University
Route 322 Study Overall Master Plan Vision Bookstore expansion Residential infill
Structured Garage Development infill
Residential infill
Reconfigured Green
Signalized Cross Walk
Development infil
1000'
Triad Zone
Lot A / Townhouse Zone
Central Campus Zone
East Campus Zone
Rowan University
May_2006_Board_Mtg_Draft_CMP
22
Draft Campus Master Plan
May 2006
Route 322 Study Preferred Option
Rowan University
Parking Analysis: Incremental Need/Displacements User Group
Increment Over Existing*
Parking Ratio
Incremental Need*
Parking Displaced
Commuter Students
2,004
0.43
862
Lot
On-campus Residential Students
1,653
0.35
578
A + A-1
Off-campus Residential
351
0.43
151
B (½ of lot)
Faculty
370
0.62
229
D (½ of lot)
83
Staff
306
0.62
190
E (½ of lot)
40.5
Total *At 15,000 HC
2,010
Spaces 570 + 111 284
G
31
H
111
J M + ½ of M-1
181 70 + 123
P
170
R
50
U
73
Y
72
W
29
Z-1
58
Edgewood (½ of lot)
113
Mansion Park
186
Triad
101
Total
2,457
Rowan University
May_2006_Board_Mtg_Draft_CMP
23
Draft Campus Master Plan
May 2006
Parking Analysis: New Parking Provided Type
New Parking
Levels
Spaces
1
Garage
5
760
2
Garage
5
1,169
3
Garage
4
688
4
Garage
4
532
1
5
One Level under New Research
A
Surface Lot
157
B
Surface Lot
45
C
Surface Lot
112
D
Surface Lot
187
E
Surface Lot
176
80
Total New Parking Provided
3,906
Less Parking Displaced
2,457
Net New Parking Provided
1,449
New Parking Needed
2,010
Rowan University
Master Plan Framework: Parking & Circulation Parking
Existing
Parking Provided
Surface
3,951
2,094
Garage
565
565+ 3,306
4,516
5,965
Sub-total
Rowan University
May_2006_Board_Mtg_Draft_CMP
24
Draft Campus Master Plan
May 2006
Master Plan Framework: Parking & Circulation
Rowan University
Master Plan Framework: Parking & Circulation
Rowan University
May_2006_Board_Mtg_Draft_CMP
25
Draft Campus Master Plan
May 2006
Program Accommodation – LAS Phase 1 Space Type
LAS Phase I
Classrooms
11,900
Teaching Labs
11,700
Research Labs
4,400
Offices
30,100
Study Space
16,600
Student Life
19,500
Total ASF Total GSF@ 0.65 efficiency
• 50% of total Phase 1 (12,500 students) classroom need • Liberal Arts teaching & research labs • Liberal Arts offices • 55% of total Phase 1 study space need • 90% of Phase 1 general student life space
94,200 144,900
Rowan University
Program Accommodation – Business Space Type
Business
Classrooms
4,800
Teaching Labs
1,700
Research Labs Offices Study Space Student Life
1,500 15,300 4,500 2,200
Total ASF
27,800
Total GSF@ 0.65 efficiency
42,800
• 20% of total Phase 1 (12,500 students) classroom need • Existing Business teaching lab needs • Future Business research lab needs • Existing and future Business office needs • 15% of total Phase 1 study space need • 10% of total Phase 1 general student life need
Rowan University
May_2006_Board_Mtg_Draft_CMP
26
Draft Campus Master Plan
May 2006
Program Accommodation – Communications & Fine Arts Space Type
Comm.
Classrooms
7,200
Teaching Labs
42,900
Offices
22,000
Study Space
9,100
Media Space
16,300
Total ASF
97,500
Total GSF@ 0.65 efficiency
• • • • • •
All existing and future Communications space Future Fine Arts spaces 30% of Phase 1 (12,500) classroom need Future Communications and Fine Arts offices 30% of Phase 1 study space need Total future media space need
150,000
Rowan University
Program Accommodation – LAS Phase 2 Space Type
LAS Phase II
Classrooms Teaching Labs Offices Study Space Total ASF Total GSF@ 0.65 efficiency
4,500 55,600 6,300 7,300
• 50% of future (15,000) classroom need • Phase 2 Liberal Arts and Sciences teaching labs • Phase 2 Liberal Arts & Sciences office need • All Phase 2 study space need
73,700 113,400
Rowan University
May_2006_Board_Mtg_Draft_CMP
27
Draft Campus Master Plan
May 2006
Program Accommodation – Engineering Space Type
Eng. Research
Teaching Labs
15,400
Research Labs
28,200
Offices
9,300
Total ASF
52,900
Total GSF@ 0.65 efficiency
81,400
• Classrooms to be shared with existing Engineering and new Liberal Arts building • Includes all future Engineering teaching and research lab needs (according to CEFPI model) • Includes all future Engineering office needs
Rowan University
Program Siting Criteria • • • • •
Academic adjacencies and ten-minute walk circle Availability of site and potential displacements Urban design and placemaking Public accessibility Pedestrian flow and campus vitality
Rowan University
May_2006_Board_Mtg_Draft_CMP
28
Draft Campus Master Plan
May 2006
Site Suitability Analysis North Rec Site
Lot A Site
Memorial Parking Site
Robinson Hall Site
Adjacencies
Proximity to Eng., Education, Perf. Arts
Proximity to existing Fine Arts
Minimal interdisciplinary opportunities
Central location to most undergraduate programs
Site
Available – move field Suitable for large building
Available – replace ±300 parking spaces Suitable for large building
Available – replace ±100 parking spaces Suitable for small building
Requires demolition of Robinson Hall
Placemaking
Links Engineering back to campus and defines the north quadrant
Development here will define campus gateway along 322; Screens Westby
Removes parking from prominent location
Potential to define academic core and embrace stream corridor
Public Access/ Visibility
Good public access because of new entry and drop-off, weak public visibility
Excellent public access and high visibility from 322
Good public access and high visibility from 322
Low public access and low visibility
Pedestrian Flow and Vitality
High-traffic building on this site will enhance campus vitality
Allows pedestrian bridge to Townhouses and enhances vitality at campus gateway
Small building will not influence traffic flow on campus
Good site for hightraffic building
Rowan University
Program Accommodation – Other Elements Building
GSF
Student Center Addition
64,800
Bunce Addition
25,900
Bunce Renovation
7,700
Admin Building
68,700
Facilities Building
84,700
Research Building
39,700
Future Student Life
84,400
Future Arts
60,400
Rowan University
May_2006_Board_Mtg_Draft_CMP
29
Draft Campus Master Plan
May 2006
Program Accommodation – Fine and Performing Arts • Academic: –Renovate Wilson Hall –Renovate Westby
• Public: Rowan Boulevard • Other on-campus: sites with good access and proximate parking
Rowan University
Program Accommodation : Housing Summary Total Need Total On-campus Rowan Boulevard West Campus
4 8
2 3
6
3,640
1. Build on cleared land around Mansion Park then demolish existing 500 to1,300 2. Build north of Linden Hall 1,500 to 3,000 3. Build when baseball moves to West Campus 4. Build when street is realigned for garage 5. Build when Bole Annex is replaced 6. Build when Bole Hall is 7 replaced 7. Build after property acquisition 8. Build after property 1 acquisition 1,650
5
Rowan University
May_2006_Board_Mtg_Draft_CMP
30