PROJECT SECURITY PROCESS

ORANGE COUNTY 33RD. STREET CORRECTIONS CENTER HORIZON FLOORING RENOVATION

1. CARRY A VALID ID AT ALL TIMES 2. ONLY AUTHORIZED EMPLOYEES FROM A COMPANY ARE ALLOWED TO WORK AT A JOB SITE. WORK RELEASE INMATES ARE NOT AUTHORIZED TO WORK ON ANY JAIL PROJECT. 3. WEAR YOUR CONTRACTOR ISSUED ID ON THE COLLAR OF YOUR SHIRT AT ALL TIMES WHILE ON THE JAIL COMPOUND. THIS WILL BE ISSUED TO EACH EMPLOYEE AT THE NORTH PERIMETER BUILDING AND WILL ONLY BE GIVEN UPON SURRENDERING A VALID ID 4. IF THE CONTRACTOR ID IS LOST, REPORT IT IMMEDIATELY TO YOUR POINT OF CONTACT.

BID/PERMIT DOCUMENTS APRIL 15, 2015

5. IN AN EMERGENCY, REPORT IT TO THE NEAREST CORRECTIONS STAFF MEMBER. THEY CAN CONTACT 911 FOR YOU. 6. FOLLOW DIRECTION OF CORRECTIONS STAFF AT ALL TIMES. 7. NO TOBACCO OR TOBACCO PRODUCTS ARE ALLOWED INSIDE ANY JAIL, NO SMOKING IS ALLOWED ON TOP OF ANY ROOF. 8. NO HATS OR SUNGLASSES ARE ALLOWED INSIDE ANY JAIL. 9. ONLY ONE (1) CONTRACTOR CELL PHONE IS ALLOWED INSIDE THE FACILITY UNLESS AUTHORIZED BY CORRECTIONS. 10. VEHICLES ARE TO BE PARKED IN AUTHORIZED AREAS ONLY, HAVE ALL WINDOWS ROLLED UP, ALL DOORS LOCKED, AND THE PROVIDED “CLUB” INSTALLED ON THE STEERING WHEEL AT ALL TIMES. 11. DURING BREAKS, IF YOU LEAVE AN AREA, ALL TOOLS INCLUDING LADDERS MUST BE REMOVED. 12. ALL CONTENTS WITHIN ANY AUTHORIZED COMPANY VEHICLES ENTERING OR EXITING THE JAIL COMPOUND MUST BE INVENTORIED AND SEARCHED, BRING IN ONLY WHAT YOU MUST TO EXPEDITE THIS PROCESS. 13. IF UTILITY SERVICES ARE GOING TO BE IMPACTED ENSURE IT IS SCHEDULED. 14. IF UNPLANNED UTILITY SERVICES ARE IMPACTED, REPORT IT IMMEDIATELY TO YOUR POINT OF CONTACT. 15. INSIDE A JAIL, IF IT BECOMES NECESSARY TO CUT INTO WALLS, CEILINGS, FLOORS, OR DUCTS, ENSURE YOUR POINT OF CONTACT KNOWS PRIOR TO THIS TAKING PLACE. IF AN OPENING MUST REMAIN BEYOND THE WORK DAY, SECURE ANY TEMPORARY PENETRATIONS MADE IN ANY WALLS, CEILINGS, FLOORS OR DUCTS WITH, AT A MINIMUM, ¾” PLYWOOD OR STEEL, USING SECURITY FASTENERS THAT CANNOT BE EASILY REMOVED.

BUILDING SITE SECURITY 1. 2.

3.

16. AT THE END OF THE WORKDAY, ENSURE YOU HAVE COLLECTED ALL TOOLS AND DEBRIS. CONDUCT AN INSPECTION OF ALL AREAS YOU HAVE WORKED ENSURING YOU HAVE ALL TOOLS ACCOUNTED FOR.

THE BUILDING SHALL BE SECURED FROM UNWARRANTED ENTRY AT THE END OF EACH WORKDAY. REQUIREMENTS FOR AUTHORIZATION TO ACCESS CORRECTIONS COMPOUND CAN BE FOUND IN SPECIFICATION 01010 - SUMMARY OF WORK, SECTION 1.6B. REQUIREMENTS FOR RULES ON THE CORRECTIONS COMPOUND CAN BE FOUND IN SPECIFICATION 01010 - SUMMARY OF WORK, SECTION 1.6C.

SUMMARY OF WORK

SHEET INDEX

1.

ARCHITECTURAL A001 COVER SHEET A002 PROJECT DEMOLITION NOTES A003 PROJECT NEW WORK NOTES D101 1ST FLOOR DEMOLITION D201 2ND FLOOR DEMOLITION D301 3RD FLOOR DEMOLITION D401 4TH FLOOR DEMOLITION D501 5TH FLOOR DEMOLITION D601 6TH FLOOR DEMOLITION D701 7TH FLOOR DEMOLITION A101 1ST FLOOR NEW A246 2ND, 4TH 6TH FLOORS NEW A357 3RD, 5TH 7TH FLOORS NEW

2. 3.

4.

5. 17. NO ILLEGAL DRUGS OR DRUG PARAPHERNALIA ARE ALLOWED ON THE COMPOUND. 6. 18. NO ALCOHOL IS ALLOWED ON THE JAIL COMPOUND NOR ARE CONTRACTORS ALLOWED TO WORK ON THE COMPOUND IF THEY HAVE CONSUMED ANY ALCOHOL.

WORK SCHEDULE NOTES

19. NO WEAPONS, GUNS OR AMMUNITION, ARE ALLOWED ON THE COMPOUND.

1.

20. NO INMATE INTERACTION IS PERMITTED. THIS INCLUDES TALKING TO OR GIVING OR RECEIVING ANYTHING, INCLUDING CIGARETTES.

2.

21. ONLY USE STORAGE AREAS APPROVED AT THE BEGINNING OF THE JOB UNLESS OTHERWISE PERMITTED BY CORRECTIONS. 22. DO NOT LEAVE CLOTHING UNATTENDED, INCLUDING JACKETS, HATS AND SUNGLASSES. 23. AT NO TIME ARE CONTRACTORS ALLOWED TO LEAVE KEYS IN UNATTENDED EQUIPMENT SUCH AS LIFTS OR LULLS. 24. NO CORRECTIONS EMPLOYEE CAN CHANGE THE SCOPE OF YOUR WORK.

3.

ALL WORK SCHEDULES WILL BE COORDINATED WITH THE CORRECTIONS REPRESENTATIVE. THE SEVENTH AND SIXTH FLOORS WILL BE UNOCCUPIED TO START THIS PROJECT. UPON COMPLETITION OF THESE FLOORS, THE FIFTH AND FOURTH FLOORS WILL BE AVAILABLE. THE SAME WILL FOLLOW FOR THE THIRD AND SECOND FLOOR. THIS WILL ALLOW CONSTRUCTION DURING THE BUSINESS HOURS. THE FIRST FLOOR WILL BE THE LAST FLOOR FOR THIS PROJECT. WORK ON THIS FLOOR WILL BE AFTER BUSINESS HOURS AND THEREFORE TBD IN COORDINATION WITH THE CORRECTIONS REPRESENTATIVE.

7.

THE ORANGE COUNTY CORRECTIONS HORIZON BUILDING FLOORING WILL BE RENOVATED TO INCLUDE THE FOLLOWING: DEMOLITION. FLOORS 1-7 . EXISTING FLOORING WILL BE REMOVED AS INDICATED ON THE CONSTRUCTION DOCUMENTS. NEW WORK. FLOORS 1-7 . EXISTING CONCRETE SLABS WILL BE POLISHED TO EITHER A 1,500 OR 3,000 GRIT AS INDICATED ON THE CONSTRUCTION DOCUMENTS. OTHER AREAS WILL HAVE LUXURY VINYL TILE (LVT) INSTALLED AS INDICATED ON THE CONSTRUCTION DOCUMENTS AND IN SPECIFICATION 09900 POLISHED CONCRETE FLOORING SYSTEM. DUST CONTROL. DUST DURING DEMOLITION AND CONSTRUCTION NEEDS TO BE CONTAINED THROUGHOUT THIS PROJECT. THE GENERAL CONTRACTOR WILL NEED TO PROVIDE A DUST CONTROL PLAN AT THE PRE-CONSTRUCTION MEETING THAT IS APPROVED BY CORRECTIONS. REMOVAL OF CONSTRUCTION WASTE. DURING DEMOLITION AND NEW WORK, THE GENERAL CONTRACTOR WILL REMOVE ALL WASTE THROUGH DESIGNATED ELEVATORS AT TIMES AGREED UPON WITH CORRECTIONS. AVAILABLE POWER. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE POWER NEEDED FOR HIS EQUIPMENT ON ALL FLOORS. THE HORIZON BUILDING IS 108V/270V, THREE PHASE, HOWEVER THE 270V COMES FROM THE FIRST FLOOR ELECTRICAL ROOM. ONLY MINIMUM USE OF THE BUILDING'S POWER CAN BE USED BY THE CONTRACTOR. POWER SOURCES, SUCH AS GENERATORS, CAN BE LOCATED IN THE COVERED OUTDOOR RECREATION YARDS ON THE SECOND, FOURTH AND SIXTH FLOORS. ALL POWER TYPES, USE AND DISTRIBUTION FOR THE WORK MUST BE APPROVED BY CORRECTIONS. EXISTING FURNISHINGS. CORRECTIONS STAFF WILL BE RESPONSIBLE FOR MOVING, STORING AND REPLACING ALL FURNISHINGS ON ALL FLOORS WITH THE EXCEPTION OF THE TRAINING AREA ON THE FIRST FLOOR. THE PRE-BID MEETING, CORRECTIONS STAFF WILL PROVIDE A MOVER'S QUOTE FOR THE TRAINING AREA, WHICH THE BIDDERS CAN INCLUDE ION THEIR BIDS OR ELECT TO GET THEIR OWN QUOTES.

COVER SHEET

BID/PERMIT SUBMITTAL

A001

AS-BUILT DRAWINGS - FOR REFERENCE ONLY R-A1 FIRST FLOOR R-A2 SECOND FLOOR, FOURTH AND SIXTH FLOORS SIMILAR R-A3 THIRD FLOOR, FIFTH AND SIXTH FLOORS SIMILAR NOTE: R-A1, R-A2 AND R-A3 ARE AVAILABLE FROM THE COUNTY AS PDFS AND CAN BE PRINTED TO FULL SIZE AS 30"X48" PRINTS.

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

DEMOLITION GENERAL NOTES 1.

2. 3. 4. 5. 6.

7. 8. 9. 10. 11.

CONTRACTOR TO PROTECT EXISTING WALLS AND FIRE RATED, SEPARATION WALLS TO REMAIN PRIOR TO START OF DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL REMAIN RESPONSIBLE FOR REPAIR AND REPLACEMENT OF ANY DAMAGES AS JUDGED SOLELY BY CORRECTIONS' REPRESENTATIVES. COORDINATE THE SHUTDOWN OF ANY/ALL UTILITIES WITH CORRECTIONS' REPRESENTATIVE PRIOR TO SHUTDOWN. COORDINATE STAGING AREA WITH CORRECTIONS' REPRESENTATIVE PRIOR TO THE START OF CONSTRUCTION. PROTECT ALL ADJACENT EXISTING SURFACES, EQUIPMENT AND STRUCTURAL SUPPORTS TO REMAIN. PROVIDE TEMPORARY CONSTRUCTION BARRIERS. TYPE AND LOCATIONS TO BE COORDINATED WITH CORRECTIONS' REPRESENTATIVE AND AS DIRECTED BY CODE. FIELD VERIFY ALL EXISTING CONDITIONS, EQUIPMENT, STRUCTURAL SUPPORTS, PENETRATIONS AND DIMENSIONS PRIOR TO THE BEGINNING OF WORK AND COORDINATE THESE ITEMS AND SITUATIONS WITH NEW DETAILS, MATERIALS AND FINISHES. DO NOT SCALE DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR REPLACING, IN KIND, ALL EXISITNG THRESHOLDS THAT ARE DAMAGED DURING CONSTRUCTION AS APPROVED BY THE CORRECTIONS REPRESENTATIVE. TEMPORARILY REMOVE ALL CONTROL COVERS THAT ARE TO REMAIN, CLEAN AND REINSTALL AFTER NEW FINISHES HAVE BEEN APPLIED OR AS DIRECTED BY CORRECTIONS' REPRESENTATIVE. CLEAN AND PREPARE EXISTING WALLS FOR NEW FINISHES AS SPECIFIED. REPAIR ALL DENTS, NICKS OR BLEMISHES ON WALLS AND FLOORS PRIOR TO THE APPLICATION OF NEW FINISHES. MAINTAIN LIFE SAFETY AND EMERGENCY EGRESS EXITS.

SCOPE OF WORK - DEMOLITION NOTES 1. PAINTED CONCRETE FLOORS START WITH 50 TO 80 GRIT METAL TO REMOVE ALL EXISTING COATINGS. HAND GRIND EDGES TO EXPOSE BARE CONCRETE BEFORE STARTING THE POLISHING PROCESS. ONCE ALL COATINGS ARE REMOVED PROCEED WITH THE POLISHING PROCESS. 2. VCT FLOORS USE RIDE ON OR HYDRAULIC SCRAPERS TO REMOVE ALL VCT AND AS MUCH GLUE RESIDUE AS POSSIBLE. PROCEED WITH 50 TO 80 GRIT METAL TO REMOVE REMAINING GLUE TO EXPOSE BARE CONCRETE. 3. CARPETED FLOORS USE RIDE ON OR HYDRAULIC SCRAPERS TO REMOVE ALL CARPET AND AS MUCH GLUE RESIDUE AS POSSIBLE. PROCEED WITH 50 GRIT TO 80 GRIT METAL TO REMOVE REMAINING GLUE TO EXPOSE BARE CONCRETE. 4. PATCHING FLOOR TO REPAIR CONCRETE AND FIX FLOOR AROUND DRAINS HAND GRIND AREAS TO CLEAN FLOOR TO PREPARE FOR PATCHING. POLISH FLOOR TO 100 GRIT RESIN. MIX H&C QUICK PATCH, OR APPROVED EQUAL, AND REPAIR AND FILL AREA THAT NEED TO BE PATCHED. ALLOW TO DRY 4 HOURS BEFORE POLISHING AT 400 STEP. METZER MACGUIRE RS88, OR APPROVED EQUAL, CAN BE USED AS A JOINT FILLER AND RANDOM CRACK REPAIR, 5. EXISITNG WALL BASE REMOVE EXISITNG WALL BASE IN ALL AREAS WHERE CONCRETE FLOORING WILL BE POLISHED AND NEW LVT WILL BE INSTALLED. PREP THESE AREAS FOR NO WALL BASE AND PAINT TOUCH-UP (TO MATCH EXISITNG, ADJACENT) WITH POLISHED CONCRETE FLOORING AND NEW WALL BASE FOR LVT INSTALLATION. 5. METAL TRANSITION AREAS AT ELEVATOR DOORS AND OTHER DOORWAYS, SUCH AS TRANSITION AREAS WHERE METAL TRANSITION IS NECESSARY, HAND GRIND TO LEVEL FLOOR AND CREATE NECESSARY PROFILE TO FIT DIAMOND PLATE ("DP" ON NEW FLOOR PLANS), WHERE IDENTIFIED BEFORE CONSTRUCTION, FLUSH WITH THE EXISTING/NEW FLOORING. 6. DEMOLITION LIMITS DEMOLITION OF EXISTING FLOORING MATERIALS IS TO SUCH EXISITNG BUILDING ELEMENTS AS WALLS, COLUMNS, EXISITNG THRESHOLDS AND SHOWER TILE, EXCEPT IN THE CELLS WHERE IT IS ACCEPTABLE TO REMOVE EXISTING FLOORING WITHIN TWO INCHES OF WALL UNDER THE BUNK BEDS AND WITHIN ONE INCH AT OTHER FIXED OBSTACLES SUCH AS THE FLOOR PLATE FOR THE WATER CLOSETS IN THE CELLS AND THE FIXED TV STANDS IN THE DORM AREAS. 7. DEMOLITION DRAWINGS DEMOLITION DRAWINGS SHOW SQUARE FOOTAGE AND TYPES OF EXISTING FLOORING. THE SQUARE FOOTAGE QUANTITIES ARE ESTIMATES BASED ON THE AS-BUILT DRAWINGS. THE BIDDERS/ CONTRACTORS ARE RESPONSIBLE TO FIELD VERIFY ALL QUANTITIES

PROJECT DEMOLITION NOTES

BID/PERMIT SUBMITTAL

A002

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

NEW WORK GENERAL NOTES

SCOPE OF WORK - NEW FLOORING NOTES

THE FOLLOWING GENERAL NOTES SHALL PERTAIN TO THE ENTIRE SET OF PRODUCED CONTRACT DOCUMENTS. REFER TO THE SHEET INDEX. 1. GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL PERFORM THEIR WORK IN ACCORDANCE WITH ALL APPLICABLE CODES GOVERING EACH TRADE. 2. EACH CONTRACTOR SHALL VERIFY EXISTING CONDITIONS IN THE FIELD PRIOR TO THE INITIATION OF WORK AND SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES OR CONDITIONS INTERFERING WITH THE ABILITY OF THE CONTRACTOR TO COMPLETE WORK AS OUTLINED ON THE CONSTRUCTION DRAWINGS. 3. CONTRACTOR SHALL REMAIN RESPONSIBLE FOR REPAIR AND REPLACEMENT OF ANY DAMAGES AS JUDGED SOLELY BY CORRECTIONS REPRESENTATIVES. 4. ALL SUBCONTRACTORS ARE REQUIRED TO COORDINATE THEIR WORK WITH OTHER TRADES. LACK OF THIS COORDINATION RESULTING IN ADDED COST TO THE CONTRACT WILL BE BORNE BY THE SUBCONTRACTOR. 5. TEMPORARY BARRICADES AND OTHER SAFETY MEASURES SHALL BE ERECTED AROUND HAZARDOUS AREAS IN ACCORDANCE WITH ALL APPLICABLE CODES AND ORDINANCES. 6. CUTTING OF EXISTING CONSTRUCTION FOR THE INSTALLATION OF ALL NEW WORK BY ALL TRADES, AND THE SUBSEQUENT PATCHING THEREOF, SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR, WHETHER THE WORK IS DONE BY HIS OWN FORCES OR NOT. CUTTING SHALL BE TO STRAIGHT LINE. UNWORKMANLIKE CUTTING, DAMAGE RESULTING THEREFROM AND UNACCEPTABLE PATCHING SHALL BE REPAIRED AND/OR REPLACED TO AN ACCEPTABLE CONDITION APPROVED BY THE ARCHITECT AND CORRECTIONS REPRESENTATIVE. 7. A CORRECTIONS PROJECT REPRESENTATIVE SHALL BE NOTIFIED PRIOR TO CUTTING OF ANY STRUCTURAL ITEM (I.E. CONCRETE FLOOR, MASONRY, WALL, ETC.) WITHIN THE EXISTING BUILDING. METHOD OF CUTTING SHALL BE APPROVED BY THE CORRECTIONS REPRESENTATIVE. 8. PATCHING MATERIAL SHALL MATCH EXISTING ADJACENT MATERIALS AS CLOSELY AS POSSIBLE IN COLOR, PATTERNS AND/OR TEXTURES. 9. ALL SALVAGE MATERIALS REMOVED SHALL REMAIN THE PROPERTY OF CORRECTIONS. ALL NON-SALVAGE CONSTRUCTION MATERIALS AND DEBRIS FROM DEMOLITION WORK SHALL BE REMOVED FROM THE SITE AS WORK PROGRESSES. 10. ISOLATE ALL DISSIMILAR METALS. 11. SEALANT SHALL BE COMPATIBLE WHERE IN CONTACT W/ ONE ANOTHER. 12. CAULK JOINTS OF DISSIMILAR EXPOSED TO VIEW MATERIALS AS REQUIRED BY THE ARCHITECT. 13. THE CONTRACTOR SHALL MAINTAIN A CLEAN AND ORGANIZED JOB SITE ACCEPTABLE TO THE OWNER. 14. GENERAL CONTRACTOR TO HAVE PORTABLE FIRE EXTINGUISHERS PLACED ON FLOOR DURING CONSTRUCTION. 15. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE IN QUESTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING CLARIFICATION FROM THE ARCHITECT BEFORE CONTINUING WITH CONSTRUCTION. 16. THE CONTRACTOR WILL VERIFY THAT EXIT EGRESS IS MAINTAINED FOR ALL OCCUPIED AREAS OF THE BUILDING THROUGHOUT ALL PHASES OF CONSTRUCTION. 17. THE CONTRACTOR SHALL COORDINATE THE SEQUENCE OF WORK WITH THE CORRECTIONS REPRESENTATIVE. 18. !! WARNING !! SCHEDULE & PERFORM ALL CONSTRUCTION WORK SUCH THAT SECURITY OF THE BUILDING IS MAINTAINED 100% OF THE TIME THROUGHOUT THE CONSTRUCTION PERIOD. COORDINATE WITH AND FOLLOW CORRECTIONS DIRECTIONS. 19. SEAL ALL PENETRATIONS IN WALLS, FLOORS, CEILINGS - FOR AIR, WATER AND/OR FIRE PROTECTION AS SPECIFIED IN CONSTRUCTION DOCUMENTS. 20. PRIOR TO COMMENCING WORK, THE CONTRACTOR SHALL SUBMIT (2) COPIES OF MATERIAL SAFETY DATA SHEETS (MSDS) FOR ALL PRODUCTS USED TO PERFORM THE WORK. 21. CONTRACTOR SHALL OBTAIN ALL PERMITS NECESSARY TO PERFORM THE PROJECT.

1. POLISHED CONCRETE FLOORING THE LEGENDS ON THE NEW FLOORING PLANS INDICATE THE AREAS THAT WILL BE POLISHED TO 1,500 GRIT AND 3,000 GRIT. SEE SPECIFICATION 09900 POLISHED CONCRETE FLOORING SYSTEM FOR ADDTIONAL 2. POLISHED CONCRETE FLOORING LIMITS POLISHING CONCRETE FLOORING MATERIALS IS "UP TO" INCLUDE SUCH BUILDING ELEMENTS SUCH AS EXISITNG WALLS, COLUMNS, TILE AT SHOWERS, THRESHOLDS, EXCEPT IN THE CELLS WHERE IT IS ACCEPTABLE TO POLISH FLOORING WITHIN TWO INCHES OF WALL UNDER THE BUNK BEDS AND WITHIN ONE INCH AT OTHER FIXED OBSTACLES SUCH AS THE FLOOR PLATES FOR THE WATER CLOSETS IN THE CELLS AND THE FIXED TV STANDS IN THE DORM AREAS. 3. LVT FLOORING THE LEGENDS ON THE NEW FLOORING PLANS INDICATE THE AREAS WHERE LVT WILL BE INSTALLED AND WHICH LVT TYPES. SEE SPECIFICATION 09650 RESISLENT FLOORING FOR ADDITIONAL INFORMATION. WALL BASE FOR THE LVT INSTALLATION IS SCHEDUKLED IN THE FLOOR FINISHING ACCESSORIES BELOW. 4. NEW FLOORING DRAWINGS DEMOLITION DRAWINGS SHOW SQUARE FOOTAGE AND TYPES OF EXISTING FLOORING. THE SQUARE FOOTAGE QUANTITIES ARE ESTIMATES BASED ON THE AS-BUILT DRAWINGS. THE BIDDERS/ CONTRACTORS ARE RESPONSIBLE TO FIELD VERIFY ALL QUANTITIES.

FLOOR FINISHING ACCESSORIES

ALL MANUFACTURERES LISTED ARE BASIS OF DESIGN. OTHERS CAN BE "AS APPROVED EQUAL" .

NEW LUXURY VINYL TILE FLOORING

JOHNSONITE RUBBER WALL BASE, COVED, 63 BURNT UMBER B, 4" HIGH, 1/8" GAUGE, 120' ROLL LENGTH, CLASS B FLAME SPREAD.

CARPET TO POLISHED CONCRETE

JOHNSON ITE CTA-63-J 1/4" TRANSITION

CERAMIC TILE TO POLISHED CONCRETE

JOHNSONITE CRS-63-A 1/4" REDUCER

QUARRY TILE TO POLISHED CONCRETE

JOHNSONITE CRS-63-B 3/8" REDUCER

TERAZZO TO POLISHED CONCRETE

METZER MACGUIRE RS88 JOINT FILLER (COLOR TO MATCH FLOORING) IF THERE IS A JOINT, OTHERWISE PROVIDE LEVEL TRANSITION BETWEEN MATERIAL.

VCT/LVT TO POLISHED CONCRETE

JOHNSON ITE RRS-63-C 1/8" REDUCER

VCT/LVT TO DIFFERENT VCT/LVT

JOHNSON ITE FEATURE STRIP, FS-DW2 1/8"

DAMAGED/UNEVEN CONCRETE

STAINLESS STEEL DIAMOND PLATE, COMMERCIAL GRADE, 1/8" THICK, 4" WIDE, MECHANICALLY FASTENED WITH STAINLESS STEEL SCREWS; AT ELEVATOR DOOR OPENINGS AND IN FOOD SERVICE TO REPLACE EXISING METAL PLATE

NOTES: A. USE JOHNSON ITE 946 CONTACT BOND ADHESIVE FOR INSTALLATION. THE CONCRETE SHHOULD BE UNSEALED WHERE THE ADHESIVE WILL GO FOR A GOOD BOND. THESE REDUCERS HAVE "TEETH" ON THE BOTTOM TO GRIOP INTO THE ADHESIVE. B. CONTRACTOR TO FIELD VERIFY TRANSITION HEIGHTS TO BE DETERMINED DURING CONSTRUCTION. C. ALL MAUFACTURERS LISTED ARE BASIS OF DESIGN. OTHERS CAN BE AS "APPROVED EQUAL".

PROJECT NEW WORK NOTES

BID/PERMIT SUBMITTAL

A003

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND ENTRY LOBBY - DEMO VCT

1,047

ENTRY R/R - DEMO VCT

208

TRAINING AREA - DEMO VCT

4,972

OFFICE BY CONTROL ROOM - DEMO VCT

204

CONTROL ROOM - DEMO VCT

256

DEMO VCT - PREP FOR NEW LVT

6,687

OTHER AREAS NOTED - DEMO VCT

7,012

DEMO VCT - PREP FOR POLISHING

7,012 2,132

BACK OF HOUSE - DEMO PAINTED CONCRETE

2,132

DEMO PAINTED CONCRETE - PREP FOR POLISHING

1ST FLOOR - DEMOLITION N

NOT TO SCALE BID/PERMIT SUBMITTAL

D101

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND CELL - DEMO VCT

5,358

CORRIDOR & MULTI-PURPOSE - DEMO VCT

5,580

CLASSROOM - DEMO VCT

2,424

OFFICE - DEMO VCT

601

STORAGE - DEMO VCT

274 50

R/R - DEMO VCT OFFICE

476

ELEVATOR CORRIDOR - DEMO VCT DEMO VCT

14,763

CELL - DEMO PAINTED CONCRETE

658

OFFICE

DEMO PAINTED CONCRETE

658

DORM - DEMO CARPET

6,607

DEMO PAINTED CARPET

6,607

2ND FLOOR - DEMOLITION N

NOT TO SCALE BID/PERMIT SUBMITTAL

D201

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND

OPEN TO BELOW

OPEN AREA CARPET

CELL - DEMO VCT

5,452

CORRIDOR - DEMO VCT

5,232

INTERVIEW ROOM - DEMO VCT

208

STAIR LANDING - DEMO VCT

307

DEMO VCT

OPEN AREA CARPET

11,199

CELL - DEMO PAINTED CONCRETE

564

STAIR - DEMO PAINTED CONCRETE

589

DEMO PAINTED CONCRETE OPEN TO BELOW

1,153

OPEN TO BELOW

OPEN AREA CARPET

INMATE INTERVIEW - DEMO CARPET

4,289

OPEN AREA - DEMO CARPET

1,140

DEMO CARPET

5,429

OPEN AREA CARPET

OPEN TO BELOW

3RD FLOOR - DEMOLITION N

NOT TO SCALE BID/PERMIT SUBMITTAL

D301

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND CELL - DEMO VCT

5,076

CORRIDOR & MULTI-PURPOSE - DEMO VCT

5,580

CLASSROOM - DEMO VCT

2,424

OFFICE - DEMO VCT

601

STORAGE - DEMO VCT

274 50

R/R - DEMO VCT OFFICE

476

ELEVATOR CORRIDOR - DEMO VCT DEMO VCT

14,481

CELL - DEMO PAINTED CONCRETE

940

OFFICE

DEMO PAINTED CONCRETE

940

DORM - DEMO CARPET

6,607

DEMO PAINTED CARPET

6,607

4TH FLOOR - DEMOLITION N

NOT TO SCALE BID/PERMIT SUBMITTAL

D401

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND

OPEN TO BELOW

CELL - DEMO VCT

5,452

CORRIDOR - DEMO VCT

5,232

INTERVIEW ROOM - DEMO VCT

208

STAIR LANDING - DEMO VCT

307

OPEN AREA CARPET

11,199

DEMO VCT OPEN AREA CARPET

CELL - DEMO PAINTED CONCRETE

564

STAIR - DEMO PAINTED CONCRETE

589

DEMO PAINTED CONCRETE OPEN TO BELOW

OPEN TO BELOW

1,153

INMATE INTERVIEW - DEMO CARPET

4,289

OPEN AREA - DEMO CARPET

1,140

DEMO CARPET

OPEN AREA CARPET

5,429

OPEN AREA CARPET

OPEN TO BELOW

5TH FLOOR - DEMOLITION N

NOT TO SCALE BID/PERMIT SUBMITTAL

D501

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND CELL - DEMO VCT

4,418

CORRIDOR & MULTI-PURPOSE - DEMO VCT

5,580

CLASSROOM - DEMO VCT

2,424

OFFICE - DEMO VCT

601

STORAGE - DEMO VCT

274 50

R/R - DEMO VCT OFFICE

476

ELEVATOR CORRIDOR - DEMO VCT DEMO VCT

14,698

CELL - DEMO PAINTED CONCRETE OFFICE

1,598

DEMO PAINTED CONCRETE

1,598 6,607

DORM - DEMO CARPET DEMO PAINTED CARPET

6,607

6TH FLOOR - DEMOLITION N

NOT TO SCALE BID/PERMIT SUBMITTAL

D601

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND

OPEN TO BELOW

CELL - DEMO VCT

5,452

CORRIDOR - DEMO VCT

5,232

INTERVIEW ROOM - DEMO VCT

208

STAIR LANDING - DEMO VCT

307

OPEN AREA CARPET

DEMO VCT

11,199

OPEN AREA CARPET

CELL - DEMO PAINTED CONCRETE

564

STAIR - DEMO PAINTED CONCRETE

589 1,153

DEMO PAINTED CONCRETE OPEN TO BELOW

OPEN TO BELOW

INMATE INTERVIEW - DEMO CARPET

4,289

OPEN AREA - DEMO CARPET

1,140 5,429

DEMO CARPET

OPEN AREA CARPET

OPEN AREA CARPET

OPEN TO BELOW

7TH FLOOR - DEMOLITION N

NOT TO SCALE BID/PERMIT SUBMITTAL

D701

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

EXISTING METAL EXPANSION JOINT COVER

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND EXISITNG TERAZZO

EXISITNG CARPET EXISITNG LVT

ENTRY LOBBY - LVT. BOD: SHAW JEOGORI 0215V JUTE

1,047

ENTRY R/R - LVT. BOD: SHAW JEOGORI 0215V JUTE

208

CONTROL ROOM - LVT. BOD: SHAW JEOGORI 0215V JUTE

256

OFFICE BY CONTROL RM - LVT. BOD: SHAW JEOGORI 0215V JUTE

204

NEW DP

TRAINING - LVT. BOD: PHILIDELPHIA FRESCO 00501 GRAPHITE

4,972

LVT

6,687

POLISHED CONCRETE - 3000 GRIT MEDICAL DP EXISITNG QUARRY TILE

DP

3,483

POLISHED CONCRETE - 3000 GRIT MEDICAL

DP DP

3,483

POLISHED CONCRETE - 3000 GRIT AREAS AS NOTED

DP

3,507

POLISHED CONCRETE - 3000 GRIT

3,507

POLISHED CONCRETE - 1500 GRIT

2,363 2,363

POLISHED CONCRETE - 1500 GRIT EXISITNG VCT

EXISITNG CERAMIC TILE WITH MARBLE THRESHOLD

NOTE: 1. INSTALL 1/8" THICK STAINLESS SYEEL DIAMOND PLATE AT ALL ELEVATOR DOORS ( EXISTING METAL THRESHOLDS TO REMAIN). (DP TAG ON PLAN). 2. REPLACE EXISITNG METAL TRANSISITION PLATE AT FOOD LAUNDRY RECEIVING AND CORRIDOR. (DP TAG ON PLAN). 3. ALL EXISITNG FLOORING ABUTTING NEW FLOORING IS SEALED CONCRETE UNLESS OTHERWISE NOTED BELOW ROOM NAME.

EXISITNG LVT

EXISITNG CERAMIC TILE WITH MARBLE THRESHOLD

1ST FLOOR - NEW N

NOT TO SCALE BID/PERMIT SUBMITTAL

A101

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND CELL - POLISHED CONCRETE - 1500 GRIT

6,016

CORRIDOR & MULTI-PURPOSE - POLISHED CONCRETE - 1500 GRIT

5,580

DORM - POLISHED CONCRETE - 1500 GRIT

6,607 2,424

CLASSROOM - POLISHED CONCRETE - 1500 GRIT

274

STORAGE - POLISHED CONCRETE - 1500 GRIT R/R - POLISHED CONCRETE - 1500 GRIT

50

OFFICE

ELEVATOR CORRIDOR - POLISHED CONCRETE - 1500 GRIT

TV STAND

476

DP POLISHED CONCRETE - 1500 GRIT

DP DP DP

21,427 601

OFFICE - LUXURY VINYL TILE

TV STAND OFFICE

LUXURY VINYL TILE

601

NOTE: 1. INSTALL 1/8" THICK STAINLESS SYEEL DIAMOND PLATE AT ALL ELEVATOR DOORS. (EXISTING METAL THRESHOLDS TO REMAIN). (DP TAG ON PLAN). 2. ALL EXISITNG FLOORING ABUTTING NEW FLOORING IS SEALED CONCRETE UNLESS OTHERWISE NOTED BELOW ROOM NAME.

2ND,4TH,6TH FLOORS- NEW N

NOT TO SCALE BID/PERMIT SUBMITTAL

A246

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

SQUARE MATERIAL FOOTAGE SF TOTAL

LEGEND

OPEN TO BELOW

CELL - POLISHED CONCRETE- 1500 GRIT

5,452

CORRIDOR - POLISHED CONCRETE - 1500 GRIT

5,232

INMATE INTERVIEW - POLISHED CONCRETE - - 1500 GRIT

4,289

OPEN AREA - POLISHED CONCRETE- 1500 GRIT

1,140

OPEN AREA CARPET

STAIR LANDING- POLISHED CONCRETE - 1500 GRIT

307

STAIR- POLISHED CONCRETE - 1500 GRIT

589

OPEN AREA CARPET EXISITNG VCT

EXISITNG VCT

17,009

POLISHED CONCRETE - 1500 GRIT DP

OPEN TO BELOW

208

INTERVIEW ROOM - LUXURY VINYL TILE

DP DP OPEN TO BELOW

DP

208

LUXURY VINYL TILE

EXISITNG VCT

EXISITNG VCT

OPEN AREA CARPET

OPEN AREA CARPET

NOTE: 1. INSTALL 1/8" THICK STAINLESS SYEEL DIAMOND PLATE AT ALL ELEVATOR DOORS. (EXISTING METAL THRESHOLDS TO REMAIN). (DP TAG ON PLAN).

OPEN TO BELOW

2. ALL EXISITNG FLOORING ABUTTING NEW FLOORING IS SEALED CONCRETE UNLESS OTHERWISE NOTED BELOW ROOM NAME.

3RD,5TH, 7TH FLOORS- NEW N

NOT TO SCALE BID/PERMIT SUBMITTAL

A357

ORANGE COUNTY CORRECTIONS HORIZON'S FLOORING RENOVATION APRIL 15, 2015

R-A1 - FIRST FLOOR.

FOR REFERENCE ONLY

R-A2 - SECOND FLOOR. FOR REFERENCE ONLY FOURTH AND SIXTH FLOORS SIMILIAR

R-A3 - THIRD FLOOR. FOR REFERENCE ONLY FIFTH AND SEVENTH FLOORS SIMILIAR