NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
NORTH PERRY AIRPORT MASTER PLAN UPDATE Recognized as Florida Department of Transportation’s
“2007 General Aviation Airport of the Year”
Broward County Commission Presentation November 6, 2007
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Major Objectives of the Master Plan • Optimize the operational efficiency, effectiveness, capability and safety of North Perry Airport • Meet the long-range aviation needs of the community • Identify and address stakeholder issues • Ensure that future airport plans are environmentally compatible and in harmony with local and regional plans and objectives • Provide BCAD with guidelines, tools and systems for effectively implementing projects and operating and maintaining the Airport in a business-like, cost efficient manner 2
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Progress to Date – Analysis & Documentation WORKING PAPERS SUBMITTED • 1 Inventory • 2 Planning Guidelines
TASKS PENDING • Coordinate Draft Master Plan Report & ALP Set with Agencies
• 3 Forecasts
• Update Airport Property Map
• 4 Demand/Capacity Analysis
• Business Tools
• 5 Facility Requirements
− Update Economic Impact Analysis
• 6 Alternatives Analysis
− Update Minimum Standards
• 7 Land Use Evaluation
− Refine Leasing Policies & Development Standards
• 8 Environmental Overview • 9 Airport Layout Plan (ALP) Set • 10 Capital Improvement Program
− Develop Marketing Plan • Final Draft and Final Master Plan Report & ALP Set
• 11 Financial Feasibility • Preliminary Draft Master Plan Report & ALP Set
3
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Progress to Date – Stakeholder Outreach MEETINGS TO DATE
MEETINGS PENDING
• Public Scoping Meeting
June 14, 2006
• City of Miramar
January 2008 (tentative)
• TAC Meeting #1
December 13, 2006
• Plan Adoption
March 2008 (tentative)
• City of Hollywood
February 12, 2007
• City of Pembroke Pines
March 21, 2007
• Tenant Meeting #1
March 16, 2007
• TAC Meeting #2
May 30, 2007
• Tenant Meeting #2
June 27, 2007
• Public Workshop
August 28, 2007
• Broward County Commission Workshop
November 6, 2007
4
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Existing Conditions • Airport comprised of 536 acres • Designated as a General Aviation Reliever by FAA • Existing Broward County Ordinance restricts aircraft to a maximum takeoff weight of 12,500 pounds or less • Four paved runways (3,000 to 3,181 feet available length) with supporting taxiway system • Air Traffic Control Tower ( open 7am to 9pm Daily) • Interior roadway for Airport use • Fire Station located on Airport property • 32 tenants/subtenants in facilities including 2 Fixed Base Operators, T-Hangars, Corporate Hangars, and Tie-downs 5
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Airside Facility Requirements & Considerations • Rehabilitate runway pavements as needed • Evaluate lengthening of runway pavements • Evaluate use of declared distances to maximize runway lengths • Analyze need for Taxiway “A” with lights and signage • Upgrade and add lighted windsocks to runways • Identify location for relocated VOR (FAA navigational aid)
6
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Airside Alternatives RUNWAYS • Alternative 1 – No Build • Alternative 2 – Apply Declared Distances with Existing Pavement • Alternative 3 – Construct Additional Pavement & Apply Declared Distances (RECOMMENDED) • Alternative 4 – Accommodate Larger Aircraft
TAXIWAYS • Taxiway A (RECOMMENDED)
VERY HIGH FREQUENCY OMNI-DIRECTIONAL RANGE (VOR) • Site 1 – located in east midfield of Airport • Site 2 – located in west midfield of Airport (RECOMMENDED)
7
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Declared Distance Concept
9R
Additional Pavement
Existing & Future Displaced Threshold
27L
Existing & Future Displaced Threshold
34:1 A pproa ch Slo pe Existin g & Fu ture
255’
Additional Pavement 210’
Runway 9R Existing Pavement Length (ft)
Runway 27L
3,255
Threshold Displacements (ft)
255
210
Proposed Add’l. Pavement Length (ft)
700
655
Takeoff Run Available (ft)
3,745
3,655
Landing Distance Available (ft)
3,655
3,745 8
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Very Light Jet (VLJ) Aircraft Comparison Aircraft
Length
Wingspan
Approach Speed
Weight
Takeoff Distance
Landing Distance
VLJ Eclipse 500
33’ 1”
37’ 3”
90 knots
5,950 lbs.
2,500 ft.
2,155 ft.
VLJ Embraer Phenom 100
41’ 8”
40’ 4”
n/a
n/a
3,400 ft.
3,000 ft.
Design Aircraft Beech King Air
39’ 8”
45’ 9”
108 knots
10,950 lbs.
2,392 ft.
2,355 ft.
• VLJs are smaller and lighter than Beech King Air • VLJs have advanced turbofan engines that are extremely quiet and produce noise levels well below FAA’s most stringent Stage 4 standards • Existing runway lengths at North Perry can accommodate about 30% of existing VLJ fleet • A runway length of 4,600 feet maximizes the existing Airport property and can accommodate 100% of the VLJ fleet 9
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Airside Recommendations N LEGEND Runway Protection Zones Additional Pavement
t.
VOR
Alternative 3 – Construct Additional Pavement & Apply Declared Distances to Runways 9R-27L
1,0
00 f
Taxiway A
Take-off Run Available - 3,745 ft. Landing Distance Available – 3,655 ft.
VOR – Site 2 in west midfield
Landing Distance Available – 3,745 ft. Take-off Run Available – 3,655 ft.
10
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Landside Facility Requirements & Considerations • Enhance service level of Fixed Base Operators • Consider development of a General Aviation terminal building • Renovate or remove deteriorating buildings • Extend interior road to access property between Runways 27R and 27L • Establish a helipad or operational agreement for helicopter operations • Consider consolidated fuel farm • Develop banner towing area in highest and best use • Improve landscaping and signage 11
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Landside Recommendations N CONSOLIDATED FUEL FARM
LEGEND Runway Protection Zones Proposed Aviation Development Proposed Non-Aviation Development
Aprons T-Hangars/Corporate Areas FBO/GA Terminal
HELIPAD H
Helipad Consolidated Fuel Farm
12
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Recommended Improvement Plan N CONSOLIDATED FUEL FARM
LEGEND Runway Protection Zones Additional Pavement 00 f
t.
Proposed Aviation Development
1,0
HELIPAD H
Take-off Run Available - 3,745 ft. Landing Distance Available – 3,655 ft.
Proposed Non-Aviation Development VOR
Landing Distance Available – 3,745 ft. Take-off Run Available – 3,655 ft.
13
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Airside/Landside Alternatives Analyzed But Not Recommended • Extending any runway to 6,500 feet to serve business jets • Using “declared distances” concept with existing pavement length • Adding pavement with declared distances for runways with visual approaches • Establishing a precision instrument approach • Developing a user-fee customs facility • Lighting additional runways/taxiways 14
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Preliminary Capital Improvement Program
Total
FAA Share
FDOT Share
Local Share
Short-Term (0-5 Years)
$7,739,700
$2,080,600
$2,890,040
$2,769,040
Mid-Term (6-11 Years)
$10,542,800
$4,540,500
$4,346,690
$1,655,610
Long-Term (11-20 Years)
$ 12,545,900
$4,595,310
$5,504,235
$2,446,355
TOTAL
$30,678,400 $11,216,430
$12,740,965 $6,871,005
Notes: Based on 2007 dollars Funding based on current federal/state programs. Funding not guaranteed.
15
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Financial Feasibility • Revenue − Primary sources are land leases and building/hangar leases − Secondary sources are fuel flowage fees and tie-down rentals
• Expenses − Primary expenses are staffing costs − Other expenses are insurance and capital improvement outlay
• Financing Capital Improvement Program − Expenses with capital improvement program are greater than revenue − Historical budgets supplemented by other BCAD revenues − Must maximize FAA, FDOT and local funding to support improvements − North Perry Airport included in FLL Airline Use and Lease Agreement − Need to increase airport revenue to fund capital improvements 16
NORTH PERRY AIRPORT MASTER PLAN UPDATE
BOCC Presentation November 6, 2007
Next Steps • Address comments received at Broward County Commissioners Workshop • Submit draft Airport Layout Plan and Master Plan Report to FAA/FDOT/State Clearinghouse/Public • Prepare economic impact analysis and business tools • Incorporate comments from FAA/FDOT/State Clearinghouse/Public • Submit Final Master Plan Report and Airport Layout Plan set to Broward County Commissioners for Plan adoption
17