The City and Borough of Sitka
Municipal Sanitary Sewer Master Plan October 2012
Prepared by:
G.V. Jones & Associates
O’Neill Surveying & Engineering
FCS Group
Carson Dorn
CITY AND BOROUGH OF SITKA MUNICIPAL SANITARY SEWER MASTER PLAN
Prepared for: City and Borough of Sitka Department of Public Works 100 Lincoln Street Sitka, Alaska 99835
Prepared by: DOWL HKM 4041 B Street Anchorage, Alaska 99503 (907) 562-2000
W.O. 60854 October 2012
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
TABLE OF CONTENTS Page EXECUTIVE SUMMARY ............................................................................................................. I 1.0 INTRODUCTION ...............................................................................................................1 1.1 Existing Conditions...........................................................................................................1 2.0 REGULATORY COMPLIANCE ANALYSIS ...................................................................3 2.1 Background .......................................................................................................................3 2.2 Wastewater Treatment Facilities.......................................................................................5 2.2.1 Secondary Treatment Facilities...................................................................................5 2.2.2 Water Quality Standard Regulations for Discharge to Water .....................................6 2.2.3 Marine Water Designation ..........................................................................................6 2.3 Mixing Zone Criteria ........................................................................................................7 2.4 Current Regulatory Permit Compliance............................................................................8 2.5 Wastewater Flows .............................................................................................................9 2.6 Wastewater Treatment Plant Performance......................................................................11 2.7 Receiving Water Quality Compliance ............................................................................16 2.8 Monitoring Programs ......................................................................................................17 2.9 Future Regulatory Implications ......................................................................................17 2.9.1 Wet-Weather Flows ..................................................................................................18 2.9.2 Nutrients ....................................................................................................................19 2.9.3 Disinfection By-Products ..........................................................................................21 2.9.4 Pharmaceuticals and Endocrine Disruptors ..............................................................22 2.10 Implications for City and Borough of Sitka Wastewater Treatment ..............................22 3.0 CONDITION ASSESSMENT METHODOLOGY ...........................................................23 3.1 Review of Closed-Circuit Television Reports ................................................................24 3.2 Smoke Testing and Inflow and Infiltration Assessment .................................................28 4.0 CONDITION ASSESSMENT RECOMMENDATIONS .................................................29 4.1 Gravity and Sewer Force Main Recommendations ........................................................29 4.1.1 Anna Drive Basin Sewer Main (Basin 2) .................................................................29 4.1.2 Jamestown Drive Basin Sewer Main (Basin 3) ........................................................30 4.1.3 Wolff Drive Sewer Main (Basin 4) ...........................................................................31 4.1.4 Lance Drive Sewer Main (Basin 5) ..........................................................................32 4.1.5 Sawmill Creek Road at Jarvis Street Sewer Main (Basins 6 and 6A) ......................32 4.1.6 Price Street Sewer Main (Basin 6B) .........................................................................33 4.1.7 Sawmill Creek Road, Degroff Street at Park Street Sewer Mains (Basin 9) ............34 4.1.8 Baranoff Street Sewer Main (Basin 11) ....................................................................35 4.1.9 Degroff Street, Hollywood Way, Highland, Baranof, and Merrill Sewer Mains (Basin 12) .......................................................................................................35 4.1.10 Princess Way, Seward Street and Barracks Street Sewer Main (Basin 18) ..............36 4.1.11 Tlingit Way, Marine, and Seward Streets Sewer Main (Basin 19) ...........................37 4.1.12 Observatory, Seward, and American Street Sewer Main (Basin 20) ........................38 4.1.13 Lake Street, Hirst, Kincaid and Monastery Streets Sewer Mains (Basin 23) ...........38 4.1.14 Kimsham, Tilson, and Petersen Street Sewer Main (Basin 31) ................................40 4.1.15 Old Harbor Mountain Road Sewer Main (Basin 42) ................................................40 4.1.16 Viking Way and Valhalla Drive Sewer Main (Basin 47) .........................................41 4.1.17 Monastery Street Sewer Main (Sawmill Creek Road to DeGroff Street) (Basin 13) ..................................................................................................................41 4.1.18 Verstovia Street (Basin 24) .......................................................................................42
Page i
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
TABLE OF CONTENTS (cont) Page 4.1.19 Verstovia Street (Basin 25) .......................................................................................42 4.1.20 Jeff Davis Street and Lincoln Street (Jeff Davis To Lake Street (Basin 10) ............43 4.1.21 Halibut Point Road Sewer Main ...............................................................................43 4.2 Inflow and Infiltration Improvements .............................................................................43 4.3 Lift Stations .....................................................................................................................44 4.3.1 Channel Lift Station ..................................................................................................44 4.3.2 Brady Lift Station .....................................................................................................45 4.3.3 Old Thomsen Harbor Lift Station .............................................................................45 4.3.4 Lake Street Lift Station .............................................................................................45 4.3.5 Jamestown Lift Station .............................................................................................45 4.3.6 East Jamestown Lift Station......................................................................................46 4.3.7 Crescent Lift Station .................................................................................................46 4.3.8 Lift Station Electrical and Supervisory Control and Data Acquisition Assessment Improvements........................................................................................46 4.4 Lift Station Capacity .......................................................................................................48 4.5 Future Developments ......................................................................................................50 4.6 Wastewater Treatment Recommendations .....................................................................52 4.6.1 Treated Wastewater Effluent Disinfection................................................................52 4.6.2 Biosolids Disposal Facility Upgrades .......................................................................56 4.6.3 Primary Effluent Heat Recovery ...............................................................................56 4.6.4 Leachate Treatment and Disposal .............................................................................57 5.0 CAPITAL IMPROVEMENT PROJECTS ........................................................................60 5.1 Short-Term (10-Year) Capital Improvement Programs ..................................................60 5.2 Long-Term Capital Improvement Projects .....................................................................66 5.2.1 Wastewater Secondary Treatment ............................................................................69 5.3 Cost Estimation Methodology ........................................................................................74 5.3.1 Collection System .....................................................................................................74 5.4 Wastewater Treatment Plant ...........................................................................................75 6.0 WASTEWATER SYSTEM FINANCIAL PROGRAM ...................................................76 6.1 Financial Policies ............................................................................................................77 6.1.1 Self-Supporting Enterprise Fund ..............................................................................77 6.1.2 Operating (Working Capital) Reserves .....................................................................79 6.1.3 Capital Contingency..................................................................................................80 6.1.4 System Reinvestment Funding .................................................................................81 6.1.5 Debt Management .....................................................................................................83 6.1.6 Cumulative Impact of Fiscal Policies .......................................................................83 6.2 Study Assumptions .........................................................................................................84 6.3 Revenue Requirement Analysis ......................................................................................85 6.3.1 Capital Financing Strategy ........................................................................................85 6.3.1.1 Six-Year Capital Financing Plan .....................................................................86 6.3.1.2 Ten-Year Capital Financing Plan.....................................................................86 6.3.1.3 Total Capital Financing Plan ...........................................................................86 6.3.2 Revenue Needs Assessment ......................................................................................87 6.3.3 Rate Schedule............................................................................................................87
Page ii
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
TABLE OF CONTENTS (cont) FIGURES Page Figure 1: Location and Vicinity Map...........................................................................................2 Figure 2: Wastewater Flows for 2009 through 2011 .................................................................10 Figure 3: Biochemical Oxygen Demand Effluent Discharge Concentration for 2009 through 2011...............................................................................................................11 Figure 4: Biochemical Oxygen Demand Effluent Mass Discharge for 2009 through 2011 ............................................................................................................................12 Figure 5: Total Suspended Solid Effluent Discharge Concentration for 2009 through 2011 ............................................................................................................................13 Figure 6: Total Suspended Solid Effluent Mass Discharge for 2009 through 2011 ..................14 Figure 7: Biochemical Oxygen Demand and Total Suspended Solid Monthly Average Removal Efficiency for 2009 through 2011 ...............................................................15 Figure 8: Drainage Basins ..........................................................................................................27 Figure 9: Short-Term Capital Improvement Projects ................................................................65 Figure 10: Long-Term Capital Improvement Projects .................................................................68 TABLES Table 1: Table 2: Table 3: Table 4: Table 5: Table 6: Table 7: Table 8: Table 9: Table 10: Table 11: Table 12: Table 13: Table 14: Table 15:
Secondary Treatment Criteria ......................................................................................6 State of Alaska Water Quality Standards for Fecal Coliform ......................................7 Effluent Limitations .....................................................................................................9 Influent/Effluent Monitoring Requirements .................................................................9 Fecal Coliform Surface Water Sampling Locations and Fecal Coliform Permit Limits ..............................................................................................................16 Drainage Basins Requiring Further Evaluation ..........................................................26 Lift Station Run Times During August 19-21 Rain Storm Event ..............................50 Future Developments Impacts to Lift Stations ...........................................................51 Modeled Wastewater Flow to Pre-Stressed Lift Stations ...........................................52 Mixing Zone Fecal Coliform Monitoring Results (CFU/100 mL) 2002-2011 ..........53 Short-Term (10-Year) Capital Improvement Projects................................................61 Near-Term Projects Annual O&M Cost Estimates ....................................................66 Long-Term Capital Improvement Projects .................................................................67 Upgrade to Secondary Treatment Capital Cost Estimates .........................................74 Secondary Treatment Annual Operation and Maintenance Cost Estimates ...............74
APPENDICES Appendix A ......................................................................................... Lift Station Inventory Forms Appendix B ........................................................ Short-Term Capital Improvement Project Figures
Page iii
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
LIST OF ACRONYMS AAC ..................................................................................................... Alaska Administrative Code APDES .................................................................. Alaska Pollutant Discharge Elimination System BOD .....................................................................................................biochemical oxygen demand CBS ......................................................................................................... City and Borough of Sitka CCTV ...........................................................................................................closed circuit television CFR ......................................................................................................Code of Federal Regulations CWA .......................................................................................................................Clean Water Act DBP .............................................................................................................. disinfection by-product DEC.................................................... State of Alaska Department of Environmental Conservation DO ..........................................................................................................................dissolved oxygen DOT&PF .................................State of Alaska Department of Transportation and Public Facilities FC ................................................................................................................................ fecal coliform FO ........................................................................................................................... forward osmosis GIS ................................................................................................. Geographic Information System I/I .................................................................................................................... inflow and infiltration lbs/day ....................................................................................................................... pounds per pay LTCIP .............................................................................. Long-Term Capital Improvement Project µg/L ................................................................................................................... micrograms per liter mg/L ....................................................................................................................milligrams per liter mgd ...............................................................................................................million gallons per day MH ....................................................................................................................................... manhole mL ........................................................................................................................................milliliter NPDES ............................................................... National Pollutant Discharge Elimination System O&M ...................................................................................................... operation and maintenance POTW ............................................................................................ publicly owned treatment works PVC ...................................................................................................................... polyvinyl chloride SCADA .......................................................................... Supervisory Control and Data Acquisition SCIP ................................................................................................... Sawmill Cove Industrial Park STCIP .............................................................................. Short-Term Capital Improvement Project TSS................................................................................................................... total suspended solid USEPA ................................................................. United States Environmental Protection Agency UV ..................................................................................................................................... ultraviolet VFD............................................................................................................ variable frequency drive WWTP ................................................................................................... wastewater treatment plant
Page iv
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
EXECUTIVE SUMMARY Key Aspects of the Plan:
A comprehensive wastewater treatment infrastructure Capital Improvement Plan has been developed through 2030. The plan identifies required infrastructure needs, target years, and anticipated funding sources.
A comprehensive financial analysis and forecast was completed in conjunction with the wastewater Capital Improvement Plan. This forecast modeled the financial impacts of the Capital Improvement Plan and was used as the basis for determining user rate increases.
Assembly Decision Point: We are recommending that wastewater user fees increase by 9.5% per year from FY 2013 through FY 2018, then by 6.5% per year from FY 2019 through FY 2022. Other Important Points: The City and Borough of Sitka engaged DOWL HKM and the FCS Group in early 2012 to prepare a comprehensive wastewater treatment system master plan. These consultants prepared the attached plan, with help and input from City and Borough of Sitka staff. The Finance department vetted the financial analysis and forecast prepared by the consultants and agrees with the recommended rate increases. Public Works’ staff is in agreement with the engineering scope of the plan and has had substantial input on both its requirements and on the timing of improvements. Maximum planning for use of federal and state loans and grants was done when developing recommended rate increases. Loans and grants were always considered as the first and primary source of project funding. Due diligence was accomplished by both the consultants and City and Borough of Sitka staff to ensure that all known environmental regulations will be complied with when developing the Capital Improvement Plan.
Page I
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
1.0
Sitka, Alaska October 2012
INTRODUCTION
The City and Borough of Sitka (CBS) and DOWL HKM entered into contract in July 2011 to complete the CBS Municipal Sanitary Sewer Master Plan. The objectives of the master plan are as follows:
Provide an inventory of the existing sanitary sewer system using closed circuit television (CCTV) records analysis, smoke testing record analysis, and infiltration and inflow analysis.
Recommendations for upgrades to the CBS Geographic Information System (GIS) database.
Present and future regulatory compliance analysis.
Condition assessment of the gravity mains, force mains, and lift stations.
Capital improvement project identification and cost estimation for the collection system and wastewater treatment plant (WWTP).
Sewer rate study including an operating forecast, capital financing analysis, and rate forecast.
1.1
Existing Conditions
The CBS sanitary sewer system collects and treats the sanitary wastewater from nearly 98% of the population consisting of approximately 3,000 residential and commercial customers. The maximum federally permitted average flow for the CBS WWTP is 1.8 million gallons per day (mgd) on a monthly basis. The average flow to the wastewater treatment facility is 1.2 to 1.4 mgd, a decrease from 1.8 mgd in the 1980s. The reduction is due to removal of extraneous flows resulting from inflow and infiltration (I/I) entering the system through leaks and improper connections. Current flows do not include Sawmill Cove Industrial Park (SCIP), which currently has a separate collection and treatment system. SCIP will soon be on-line with the CBS system with the completion of the new Sawmill Cove Lift Station. Currently, these flows are not significant when added to the existing flows to the WWTP.
Page 1
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Due to the geology and topography, the wastewater collection system is particularly complex for the community’s size. The collection system includes a combination of gravity and force mains, 41 major lift stations with 19 connected to Supervisory Control and Data Acquisition (SCADA) remote monitoring and control system. The collection system extends nearly 6 miles from the central business district to the north to just past the Alaska Marine Lines Barge Facility, 5.5 miles southeast to SCIP, and 2 miles west to the United States Coast Guard Air Station. In total, there is approximately 40 miles of collection system mains of various sizes and materials.
Figure 1: Location and Vicinity Map The CBS sewage collection system conveys domestic wastewater across the Sitka Channel to the municipal wastewater treatment facility located on Japonski Island owned and operated by the CBS. The WWTP consists of a conventional primary treatment process that provides raw sewage comminution, grit removal, and primary clarification prior to discharge to a marine outfall. Gravity thickened primary sludge is mechanically dewatered on a belt filter press. Lime
Page 2
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
is added after the sludge is pressed. Dewatered cake along with scum and grit are transported to a permitted facility for land disposal. The treatment system and discharge are monitored under a permit administered by the United States Environmental Protection Agency (USEPA). The current permit allows the plant to discharge primary effluent under Section 301(h) of the Clean Water Act (CWA) that waives secondary treatment requirements for the system pending continued compliance with the requirements of the waiver. 2.0
REGULATORY COMPLIANCE ANALYSIS
2.1
Background
In 1972, Congress passed the Federal Water Pollution Control Act Amendments termed the CWA. Key provisions of the CWA include requirements that all publicly owned treatment works (POTW) discharging to the waters of the United States meet secondary treatment standards.
These standards, defined by regulation (Code of Federal Regulations
40 CFR 132.102), include achieving performance goals for reduction of influent wastewater solids and organic concentrations and effluent wastewater quality criteria. To administer these regulatory requirements, the CWA promulgated the National Pollutant Discharge Elimination System (NPDES) permit program. Under this program, POTWs are issued individual permits for the discharge of treated wastewater to a receiving environment. These permits stipulate each plant’s specific performance requirements for both the reduction of influent loadings and effluent wastewater quality. In addition under Section 401, the CWA directs each state to develop and update its own set of water quality standard regulations. Water quality standard regulations define designated uses of waters receiving treated wastewater discharges, establish water quality criteria to be maintained in those receiving waters, and prohibit lowering receiving water quality to conditions that would prevent the designated use of the water body assigned by the state. The CWA charges states with the responsibility of reviewing proposed POTW discharge permits and to certify whether draft permits issued will degrade the use of the receiving water.
Page 3
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Congress amended the CWA in 1977 by adding Section 301(h) that authorized the USEPA to issue modified permits allowing discharge of effluent of less than secondary quality when discharging to marine waters. Eligibility for operation under a 301(h) waiver included submittal of an application by September 1979 (subsequently extended to December 1982) and demonstration that the proposed discharge complies with criteria intended to protect the marine environment, including attaining water quality standards. The USEPA initially received over 200 applications, they approved 54, and have since not reissued over 20 permits.
Alaska
currently has nine waivers (Anchorage, Haines, Ketchikan, Pelican, Petersburg, Sitka, Skagway, Whittier, and Wrangell)1. The waivers were issued based on nine criteria that the applicant was required to meet in order to obtain the waiver. The CWA specified that the permits may not be issued for longer than five-year terms, with applicants applications for renewal filed at least 180 days prior to the expiration date. If the reviewing authority (USEPA) did not reissue the permit prior to the expiration date, the existing permit was considered “administratively continued,” and the permit application process is considered “backlogged.” Permits under Section 301(h) have been issued case by case based on a demonstration that state water quality standards could be met, that no adverse impact to receiving water uses would occur, and that no industrial discharges would be included. They also required state certification that state receiving water quality standards could be attained (section 401 Reasonable Assurance Certifications). A discharge and receiving water-monitoring program established by the specific permit would be periodically reviewed at 5-year intervals and based on new information provided on plant performance and receiving water quality sampling. These data would be used to revise and re-issue the permit, or require additional treatment. On August 27, 2005, the governor of Alaska signed Senate Bill 10 that directed the State of Alaska Department of Environmental Conservation (DEC) to seek primacy for the NPDES wastewater permit program administered by the USEPA. The bill directed DEC to submit a primacy application to the USEPA by July 1, 2006. The USEPA granted the State of Alaska primacy to administer the NPDES program under the State’s Alaska Pollutant Discharge Elimination System (APDES) in October 2008. Authority to administer the program is being transferred from the USEPA to the DEC in phases that began in 1
Not including 77 Native Alaskan Villages included in 40 CFR 125.
Page 4
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
2008 and is due to be completed late in 2012. An APDES permit is to be obtained for any effluent discharge for facilities that DEC has received authority. Facilities for which the USEPA retained authority include:
federal facilities in Denali National Park and Preserve, Indian
Country facilities, facilities operating outside state waters (three miles from shore), and facilities issued CWA Section 301(h) waivers from secondary treatment standards, which would include Sitka. As such, Sitka’s permit is issued by the USEPA, but monitoring and performance reports are required to be submitted to both the USEPA and DEC. 2.2
Wastewater Treatment Facilities
States are required to comply with federal water pollution control regulations. The State of Alaska administers its own wastewater and water quality standard regulations (Alaska Administrative Codes 18 AAC 72 and 18 AAC 70, respectively). These regulations address the quality of treated effluent discharged and minimum water quality standards to be maintained for receiving waters.
The State of Alaska has adopted additional design and performance
requirements that are carried out through a plan review and approval process. The following provides a brief summary of the state wastewater regulations that may be applicable for wastewater treatment and disposal for Sitka should the existing 301(h) waiver be discontinued. 2.2.1 Secondary Treatment Facilities For point-source discharges to the land or water surface, both the State and USEPA require the equivalent of secondary wastewater treatment unless waived under Section 301(h). Secondary treatment is defined in federal statute (40 CFR 133) in terms of treated effluent quality using the 5-day biochemical oxygen demand (BOD5), a measure of organic concentration, total suspended solids (TSS), pH, and other wastewater quality parameters the permitting agency believe applicable for compliance with current regulatory criteria. At a minimum, the quality of treated effluent is regulated in terms of concentrations of organics and solids and in terms of percent removals achieved for these parameters by the treatment process. Table 1 summarizes the minimum treatment requirements for conventional treatment plants.
In this context,
conventional treatment systems are those systems using biological and/or mechanical processes to achieve secondary treatment standards.
Page 5
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Table 1: Secondary Treatment Criteria Criteria for Conventional Treatment Systems 30-day average shall not exceed 30 mg/L. 7-day average shall not exceed 45 mg/L. 30-day percent removal shall not be less than 85% unless influent waste strength is dilute. 30-day average shall not exceed 25 mg/L. 7-day average shall not exceed 40 mg/L. 30-day percent removal shall not be less than 85% unless influent waste strength is dilute. 30-day average shall not exceed 30 mg/L. 7-day average shall not exceed 45 mg/L. 30-day percent removal shall not be less than 85% unless influent waste strength is dilute. > 6.0 and < 9.0
Parameter
Concentration of Effluent BOD
Concentration of Effluent Carbonaceous BOD [Carbonaceous BOD may be substituted]
Concentration of Effluent TSSs Effluent pH
In addition to construction plan reviews for wastewater systems, DEC wastewater permitting requires periodic effluent sampling and reporting. 2.2.2 Water Quality Standard Regulations for Discharge to Water In addition to meeting secondary treatment, wastewater regulations also require point-source dischargers to meet state and federal receiving water quality standards as outlined in Alaska Statute (18 AAC 70).
In these regulations, release of treated wastewater into surface or
groundwater must not raise the concentration of contaminants in the receiving water at the edge of a designated mixing zone above the water quality criteria limitations stipulated in the regulations. In order to evaluate the impact on the receiving environment, a determination of water quality use designation is first required, as discussed below. 2.2.3 Marine Water Designation Alaska statue establishes four classifications of water quality that apply to marine waters (18 AAC 70). These classifications are based on intended water use as noted in the table below. The water quality criteria include fecal coliform (FC) bacteria, dissolved gases, pH, turbidity, temperature, dissolved organic substances, sediment, toxins and other deleterious organic and inorganic substances, petroleum hydrocarbons, total residual chlorine, radioactivity, and residues.
Page 6
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
For wastewater discharged from small community facilities, the most difficult water quality parameter to meet is normally the FC requirement.
The maximum allowable discharge
parameter for FC is based on a classification of water body use, as defined in Table 2. Table 2: State of Alaska Water Quality Standards for Fecal Coliform Fecal Coliform FC/100mL
Water Body Use (A) Water supply (i) aquaculture (ii) seafood processing (iii) industrial (B) Water recreation (i) contact recreation (ii) secondary recreation (C) Growth and propagation of fish, shellfish, other aquatic life and wildlife (D) Harvesting for consumption of raw mollusks or other raw aquatic life
20 20 200 100 200 Not applicable 14
The marine waters around Sitka are unclassified; the most stringent water quality criteria apply unless the community applies for a water body reclassification. The most stringent water quality standards require that the FC concentration not exceed 14 colonies per 100 milliliters (mL) of sample on a monthly average for samples outside of the designated mixing zone (described below). 2.3
Mixing Zone Criteria
The USEPA regulations give states the flexibility to “waive” applicable water quality standards under certain circumstances. Section 70.032 of AAC Chapter 70 (Water Quality Standards) includes provisions for defining a mixing zone as a region in which water quality criteria may be exceeded about the point of wastewater discharge. The concept of a mixing zone was developed as a method of administering the regulations in a practical methodology considering the treatment technology, economics, and environmental impacts. A mixing zone is designated by the applicant and then reviewed and approved by the DEC or USEPA. The regulations stipulate that the DEC will consider: (1) physical, biological, and chemical characteristics of the receiving water, including volume and rate; (2) effects the discharge may have on the uses of the receiving water; (3) flushing and mixing characteristics of the receiving water; (4) effluent treatment technology requirements under federal or state law; (5) characteristics of the effluent, including volume, flow rate, and quality after treatment; (6) methods to analyze and model near-field and
Page 7
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
far-field mixing; and (7) cumulative effects of multiple mixing zones and diffuse, non-pointsource inputs located within or affecting the receiving water. Water quality regulations require that the mixing zone must be as small as practicable and can be authorized only after the applicant has submitted evidence that demonstrates that the water quality standards will be met and that effluent treatment is adequate for the parameters of concern. The mixing zone must also comply with the maximum size limitations. “For estuarine and marine waters, the cumulative linear length of the mixing zones intersected on any given cross section of an estuary, inlet cove, channel, or other marine water, measured at mean lower low water, may not exceed 10% of the total length of that cross section, nor may the total horizontal area allocated to mixing zones in these waters exceed 10% of the surface as measured at mean lower low water.” (18 AAC 70.255(e)(1)(A)). 2.4
Current Regulatory Permit Compliance
The existing NPDES permit (AK-002147-4) for the City and Borough of Sitka was issued December 31, 2001 and expired on January 2, 2007. In accordance with the regulations, the CBS re-submitted their application for permit renewal on June 7, 2006. In December 2006, the USEPA responded that the application was complete and timely and that the USEPA would administratively extend the current permit until such time as the USEPA could issue a new permit. As of August 2012, the USEPA has not issued the CBS a new permit; the USEPA has placed the application review as a Tier 2 priority system. As previously noted, the USEPA retains permit authority over the nine 301(h) waivered systems; as such, DEC will continue to be required to provide a review and Certificate of Reasonable Assurance under provisions of Section 401. Any applicant for a Federal permit which may result in any discharge into the navigable waters is required to provide a certification from the State that such discharge will comply with the applicable provisions of the CWA. The current permit effluent limits for Sitka are shown in the table below.
Page 8
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Table 3: Effluent Limitations Effluent Parameter
Unit of Measurement mg/L lbs/day mg/L lbs/day mgd # FC/100 mL µg/L mg/L
BOD51 TSSs1 Total Flow Fecal Coliform Copper Dissolved Oxygen 1 2
Monthly Average 140 2,100 140 2,100 1.8 1,000,000 243 --
Maximum Daily 200 3,000 200 3,000 5.3 1,500,000 354 2.02
The monthly average effluent loading shall not exceed 70% of the monthly average influent loading for 5-day BOD5 and TSSs. Minimum daily limitation.
The table below summarizes the required monitoring requirements. Table 4: Influent/Effluent Monitoring Requirements Effluent Parameter Average Monthly Flow, mgd BOD5, mg/L TSS, mg/L Temperature, ºC pH, S.U. Dissolved Oxygen, mg/L Fecal Coliform Bacteria, Colonies/100 mL Total Ammonia as N, mg/L Copper, µg/L1 Toxic Pollutants and Pesticides2 Whole Effluent Toxicity4, TUc 1 2 3
4 5
Sample Location Influent or Effluent Influent and Effluent Influent and Effluent Effluent Effluent Effluent
Sample Frequency Continuous Weekly Weekly Weekly Weekly Weekly
Sample Type Recording 24-hour composite 24-hour composite Grab Grab Grab
Effluent
Monthly
Grab
Effluent Effluent
Monthly Monthly
24-hour composite 24-hour composite
Effluent
2/permit term3
Grab
Effluent
2/permit term5
24-hour composite
Copper results will be reported as total recoverable copper. “Toxic pollutants” are defined as the 126 priority pollutants listed in 40 CFR 401.15. The permittee shall conduct analyses of the effluent for toxic pollutants and pesticides during the dry season (July through September) in the first and fourth years of the permit term. Samples shall be grab samples. Sampling and analysis shall be conducted according to methods approved in 40 CFR Part 136. See Part I.C. Whole Effluent Toxicity monitoring shall be conducted once per year in the first and fourth years of the permit term.
In order to evaluate treatment plant performance and permit compliance, the last three years of daily operator data (Discharge Monitoring Reports) were analyzed and are discussed below. 2.5
Wastewater Flows
The Discharge Monitoring Reports for the past two years of operation were analyzed for compliance with the wastewater permit requirements. Figure 2 shows the monthly average of
Page 9
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
the daily flows and the maximum daily flows for each month for the years 2009 through 2011. The results indicate that the plant has been in compliance with the permit requirements of 1.8 mgd for average daily flows, and 5.3 mgd for maximum day flows.
Figure 2: Wastewater Flows for 2009 through 2011
Page 10
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
2.6
Sitka, Alaska October 2012
Wastewater Treatment Plant Performance
The discharge permit establishes monthly average and maximum daily limits based on concentration (mg/L) and mass (lbs/day) limits for BOD5 and TSS as well as a minimum percentage removal (30%) for each. In addition maximum discharge concentrations of FC and copper, and a minimum daily dissolved oxygen (DO) concentration are stipulated. Figures 3 through 6 show the BOD and TSS concentration and mass discharge based on monthly averages (n=4) for 2009 through 2011. As shown, the facility has been in compliance.
Figure 3: Biochemical Oxygen Demand Effluent Discharge Concentration for 2009 through 2011 Page 11
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Figure 4: Biochemical Oxygen Demand Effluent Mass Discharge for 2009 through 2011
Page 12
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Figure 5: Total Suspended Solid Effluent Discharge Concentration for 2009 through 2011
Page 13
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Figure 6: Total Suspended Solid Effluent Mass Discharge for 2009 through 2011
Page 14
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Figure 7 shows the monthly average treatment removal efficiency for 2009 through 2011. As can be seen the plant has been in compliance with the permit requirements for BOD and TSS, and based on record review, also been in compliance with other permit parameters for DO, pH, and FC.
Figure 7: Biochemical Oxygen Demand and Total Suspended Solid Monthly Average Removal Efficiency for 2009 through 2011
Page 15
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
2.7
Sitka, Alaska October 2012
Receiving Water Quality Compliance
In addition to the effluent monitoring program as discussed in the previous section, the discharge permit requires periodic sampling of the receiving waters to determine compliance with water quality standard regulations. The permit required semi-annual sampling in the second and fourth years of the permit for temperature, salinity, DO, pH, and Secchi disk depth at the surface, middepth, and the bottom at four locations, including the eastern and western boundary of the zone of initial dilution as two reference stations (at least 750 meters west and east of the discharge and at the same depth). The zone of initial dilution is defined in the permit as a rectangle of 386.5 feet perpendicular to shore and 190.9 feet wide and was designated with an initial dilution of 122:1. The permit required FC monitoring in July of each year, and in the fourth year of the permit, required monitoring five times a year (April, June, July, August, and November) at the water surface at seven (7) locations listed below: Table 5: Fecal Coliform Surface Water Sampling Locations and Fecal Coliform Permit Limits Location
Description
1
Shoreline area of human use, close to the discharge point Shoreline area just outside of the point where the outer edge of the mixing zone touches the shoreline Outside the edge of the mixing zone between Passage and Smith Islands Shore area of human use inside the mixing zone in Sitka Harbor near the boat ramp Outside edge of the mixing zone between Morne Island and the Sitka National Park Outside the edge of the mixing zone between Whale and Kayak Islands 500 m southeast of the discharge (between Rockwell and Beardslee Islands)
2 3 4 5 6 7
Water Quality Permit Limitations 200 FC/100mL 14 FC/100mL 14 FC/100mL 200 FC/100mL 14 FC/100mL 14 FC/100mL 200 FC/100mL
The water quality standards for FC were set at 14 FC/100 mL on a monthly average, and 43 FC/100 mL as a maximum at the edge of a mixing zone defined as a circle of radius 1,600 meters centered over the outfall diffuser. In addition the FC value is not to exceed 200 FC/100mL at the shoreline within the designated mixing zone.
Page 16
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Results from the 2010 Monitoring summary indicate that the facility has been in compliance with the permit requirements with the exception of one sample in August 2010 for Location 2 which exceeded the standard with a reported value of 35 FC/100mL. The results of three re-samples had a mean value of 3 FC/100mL.
Results of the 2011 monitoring (July 2011) indicate
compliance with the standards at all sampling locations. 2.8
Monitoring Programs
In addition to fixed water quality standards for some parameters, the permit also requires establishment and maintenance of several different monitoring programs. 2.9
Future Regulatory Implications
As previously noted, the WWTP for Sitka is permitted to treat wastewater to less than secondary standards under provisions of USEPA’s 301(h) waiver program. The permit is issued at 5-year intervals based on information collected by the utility to show that no adverse impacts of solids accumulation, water quality standard violations, or negative biological impacts in the vicinity of the discharge has occurred. The permit also requires state concurrence. There are currently no proposed federal regulations that would change these regulations, although the nature of the water quality standards are such that they are subject to revision as new data become available or techniques are improved. There are few cities and communities that still continue to receive discharge permits under the 301(h) program; many larger communities have not been re-issued permits after litigation or changes in local or regional viewpoints. The Municipality of Anchorage has taken a pro-active approach to their permit renewal since it has expired in 2004. Since the listing of the Beluga Whale as an endangered species in Cook Inlet in 2008, the utility has conducted extensive sampling and monitoring, biological assessment, detailed hydrodynamic evaluations, as well as resource agency coordination and public presentations of their findings. The USEPA is still reviewing their submittal information. At the present time, there are several areas of wastewater treatment and disposal concern that the USEPA is pursuing, including:
Wet-weather flows
Page 17
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Nutrients
Disinfection by-products (DBP) Pharmaceuticals and endocrine disruptors
A brief discussion of each is provided below. 2.9.1 Wet-Weather Flows Wet weather discharges are point source discharges resulting from precipitation events, such as rainfall and snowmelt. They include stormwater runoff, combined sewer overflows, and wet weather sanitary sewer overflows. Release of stormwater runoff can pose receiving water quality concerns.
Stormwater
accumulates pollutants such as oil and grease, chemicals, nutrients, metals, and bacteria as it travels across land. Combined sewer overflows and wet weather sanitary sewer overflows contain a mixture of raw sewage, industrial wastewater, and stormwater. For POTWs, events of rainfall and/or snowmelt can pose excessive hydraulic loadings to the treatment plant. This in turn can result in plant flooding, loss of biomass for biological treatment systems, and release of poorly treated effluent. For coastal dischargers, wet weather events can result in beach closings, disruption to shellfish harvesting, and complaints of floating debris flushed from the treatment plant. Several POTWs that are adversely impacted by wet weather flows have installed wet weather flow side stream treatment infrastructure. For these systems, during wet weather events, influent wastewater flows are split. Part of the influent is directed to the main treatment plant where it receives the same treatment provided for dry weather flow conditions. The remainder of the influent flow is directed to a side stream wet weather flow treatment system comprised of screening, sedimentation, or other physical processes that primarily address solids reduction. Effluent from the wet weather side stream treatment train is then blended with treated effluent from POTW’s main treatment train prior to final discharge. The approach to wet weather treatment achieves compliance with the effluent quality requirements in the combined final discharge flow stream.
Page 18
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
From a regulatory perspective, the practice of blending treated wet-weather flows has been in a long-term state of flux. In 1979, the USEPA promulgated the bypass regulation which prohibits intentional bypassing of wastewater treatment facilities [40 CFR 122.41(m)]. In November of 2003, the USEPA proposed a policy in support of wet weather treated flow blending which maintained effluent quality compliance with discharge permits.
However lawsuits and
Congressional action caused the agency to retract this policy in 2005. In 2009, the USEPA proposed draft guidance suggesting all wet weather flows must receive biological treatment prior to discharge, and directing utilities that wish to blend to first complete and secure agency concurrence for the practice using a “Utility Analysis.”
The analysis requires a utility to
demonstrate why blending is necessary, and, if supported by the primacy agency, would provide the utility assurance that bypass enforcement action would not be taken. To date, USEPA’s draft guidance policy for blending is supported by the State of Alaska in its APDES permitting program.
For Sitka, if future wet weather flows are expected to pose
excessive hydraulic loading to the treatment facility, side stream wet weather treatment will need to demonstrate compliance with the USEPA and DEC policies for blending. 2.9.2 Nutrients The control of the discharge of nutrients (nitrogen and phosphorus) from municipal WWTPs is part of the water quality goals of the CWA. Permits establish effluent limitations on the concentrations of nutrients based on designated water body use, state water quality standards, or other issues related to water uses. In its various forms, excessive nutrient concentrations can deplete DO in receiving waters, stimulate aquatic plant growth, exhibit toxicity toward aquatic life, present a public health hazard, and affect the suitability of wastewater for reuse purposes. Ammonia in wastewater effluents is generally toxic to many marine organisms, especially salmonoid species, and therefore is currently addressed with permit limits for several Alaskan POTWs. Recent studies have reported that ammonium discharged to coastal waters can inhibit the uptake of nitrate by phytoplankton. Biological nitrification achieved with conventional secondary activated sludge treatment is used as means to reduce the impact of wastewater ammonia on receiving waters.
Page 19
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Wastewater effluents contribute to receiving water nitrogen and phosphorus concentrations that can cause eutrophication, the excessive growth of plant and/or algae blooms in lakes, streams, and rivers.
In northern marine waters, eutrophication occurs naturally due to seasonal
introduction of organics and nutrients into the water column that results in algal biomass production often manifest by green colored water. Whales migrating to Alaska have taken advantage of this phenomenon for millennia. But in some coastal areas, especially those with higher human population density and/or industrial activity, the nutrient loading from natural seasonal runoff is augmented with additional nutrient loadings that can degrade the receiving water. USEPA’s efforts to develop national nitrogen and phosphorous nutrient criteria were initiated in 1998 with its publication entitled “National Strategy for the Development of Regional Nutrient Criteria.” In this document, the USEPA suggested as a starting point that receiving water nitrogen and phosphorous concentration data extracted from multiple databases available at the time could be used to set water quality criteria to protect against over-enrichment of receiving waters.
However, as pointed out by several researchers, ambient receiving water nutrient
concentrations alone were not effective as indicators for the water body’s susceptibility to eutrophication. Factors other than concentrations of nitrogen and phosphorous in various forms can contribute to algal productivity including sunlight exposure, concentrations of dissolved organics, microbial predation, and water column hydrodynamic turbulence. Given the foregoing, dynamic modeling of water bodies was developed as a tool to quantitatively predict susceptibility to eutrophication. While these models have shown promise, they require extensive effort and expense to collect input data that reflect the character and condition of the receiving water’s environment. What the USEPA is currently using as guidance for establishing nutrient water quality criteria for marine and estuary waters is referred to as ecoregional nutrient criteria. These criteria attempt to classify a marine or estuary receiving water according to multiple factors which when compiled result in recommended nutrient water quality criteria to be maintained in the receiving water. For Alaska and other Region 10 states, most community POTWs discharging to marine waters are currently required to collect nutrient concentration data in the receiving water to be used in
Page 20
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
compiling a regional database. Data collected will be used to update the region’s nutrient water quality criteria limits. As this data collection process takes time, there is no anticipated nutrient effluent concentration limit anticipated in the near term for Sitka. 2.9.3 Disinfection By-Products DBPs are often halogenated organic compounds. Many have been determined to be carcinogenic in relatively low concentrations. They can be formed in both water and wastewater disinfection processes. To date, the USEPA has set maximum contaminant limits for nine halogenated organic compounds. However, epidemiological research has identified other DBPs that are yet to be regulated that occur in both treated water and wastewater. DBP occurrence in treated wastewater was noted as a concern for some public water systems producing potable water from source waters receiving treated wastewater from upstream POTWs. DBPs in those public water systems were traced to the source waters and eventually to the upstream wastewater treatment facilities. Like DBP formation in water treatment, wastewater treatment DBPs form when wastewater organics are exposed to oxidants such as halogens used for disinfection.
By-products of
disinfection can include residuals such as chloramines, inorganics such as chlorite, chlorate, bromate, and ammonia, oxidized organics such as aldehydes, carboxylic acids, and nitrosoamines, and halogenated organics such as TTHMs, HAA5s, haloacetonitriles, halokeyones, chloropheonols. For most community utility systems, treated wastewater is not directly recycled, reused, or otherwise consumed for human use without first being diluted and/or degraded by natural processes in the receiving environment. And therefore setting regulatory limits for treated wastewater DBPs has not been a priority for the USEPA or States. However, it has come to light that some wastewater DBPs are carcinogenic or otherwise harmful at extremely low concentrations.
One nitrosoamine, N-Nitrosodimethylamine or NDMA, has been shown to
produce cancer in every species of laboratory animal tested. And its formation in wastewater treatment systems appears to be enhanced by the presence of excess un-oxidized nitrogen compounds such as normally found in conventional primary effluents.
Page 21
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
While we found no research published to date on adverse impacts of treated wastewater DBPs on marine environments, preliminary indications are that nitrosoamine formation is likely occurring in chlorinated primary effluents, that it has wide-ranging adverse impacts on many animal species including humans, and could be the focus of regulatory action in the future as more data become available. 2.9.4 Pharmaceuticals and Endocrine Disruptors The term “endocrine disrupters” generally means the synthetic chemicals and natural plant compounds that may affect the endocrine system—the communication system of glands, hormones, and cellular receptors that control the body’s internal functions. Many of these disrupters have been associated with developmental, reproductive, and other health problems in wildlife and laboratory animals. The use and disposal of pharmaceuticals entering sewer systems can lead to endocrine disrupters. This may be related to the growing number of antibiotics, painkillers, and antidepressants in the population; prescription drug sales increased by an annual rate of 11% between 2000 and 2005. The two largest sources of pharmaceuticals entering our wastewater treatment systems are from hospitals and homeowners.
They enter the sanitary sewer primarily through excretion of
partially metabolized pharmaceuticals by the human body, and the disposal of unused or expired medications down the drain or toilet. WWTPs are designed to remove conventional pollutants, such as suspended solids and biodegradable organic compounds, but they are not designed to remove low concentrations of synthetic pollutants, such as pharmaceuticals. 2.10
Implications for City and Borough of Sitka Wastewater Treatment
Based on the available information the existing WWTP may be expected continue to perform at the same levels as in the past with the understanding that the permit requirements and continued waiver provisions are at the discretion of the permitting agency. Other locations have had their 301(h) waivers discontinued when they have not performed to the permit requirements, have exceeded regulated parameters, or have had new permit water quality parameters added which required plant upgrades to achieve compliance. For purposes of this study, future implications of more stringent marine water quality standards (such as ammonia, DBPs, or toxics) are speculative given the performance record of the facility and the limited receiving water quality
Page 22
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
sampling results performed to date. It is possible that additional water quality monitoring may be required in the future with the results influencing the need for future capital expenditures. Of note is that secondary treatment is defined by regulation to mean removal of conventional pollutants (BOD and TSS) to 85% removal level as compared to 30% for primary. Additional treatment process would be required in addition to conventional secondary treatment to achieve treatment objectives other than the conventional pollutant removals. 3.0
CONDITION ASSESSMENT METHODOLOGY
In association with DOWL HKM, O’Neill Surveying and Engineering assisted with the condition assessment of the existing sewer main collection system.
Drainage basins were
evaluated
maintenance
and
structural
deficiencies
and/or
operation
and
(O&M)
recommendations were identified using the following sources of information:
Historical knowledge of the CBS wastewater collection system, CCTV field reports on file at the treatment plant, and Previously completed smoke test data provided by the CBS.
Drainage basins were initially divided into the following categories:
1 - Excellent: Drainage basins that were constructed within the past 15 years and passed the CCTV inspection required for acceptance by CBS.
5 - Imminent of Collapse: Areas initially received this grade that contained the oldest mains, known maintenance problems, areas that cannot be videoed due to fittings (45 or 22-1/2 deg.) in the mains, substandard main size, squashed pipe, misaligned joints, etc.
2 - Good, 3 - Fair, or 4 - Poor rating: The remaining drainage basins were set aside for further evaluation.
The basins receiving an initial overall condition rating of Poor [4] and Imminent Collapse [5] ratings were assessed with special emphasis on: 1. Identify high-risk mains that could cause extensive service disruption to Sitkans or harm the environment. 2. Investigating sources of Infiltration and Inflow (I/I)
Page 23
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
3.1
Sitka, Alaska October 2012
Review of Closed-Circuit Television Reports
Using the 10- to 20-year-old CCTV reports, individual reaches of pipe with the [4] and [5] basins were categorized by structural defects (cracked, fractured, deformed, collapsed, break, hole, etc.), or operational defects (roots, debris, infiltration, and service condition) requiring maintenance. The defects were typically not quantified or qualified. A sanitary sewer CCTV worksheet was created and used to document the structural and maintenance ratings of each main. The following scoring criteria were used when evaluating the overall structural condition of each reach. 1 - Excellent: Main in “like new condition,” No action predicted in the foreseeable future. Thirty plus years of service life, very little risk to Sitkans or the environment. 2 - Good:
Main is in good condition but has some minor structural defects.
No
indication of an increased rate of deterioration. No action expected for 20 plus years. 3 - Fair: Main has moderate defects. Cracks in the main and at the joints, some infiltration, bellies present, depth up to double the average depth of liquid in the main, may have minor deformation. Rate of deterioration expected to be slightly advanced due to defects. Ten to twenty years of service life. Expect some action required in the next 15 years. 4 - Poor: Main is developing severe defects. Offset joints and breaks in the main, separation of joints, belly causing camera to go underwater, infiltration. Anticipate rate of deterioration to be accelerated. Five to ten years of service life. Expect some action in 7 years. 5 - Imminent of Collapse - Main is likely to collapse within the next 5 years. Main could cause collateral damage or harm to the environment. Reach requires immediate action. The following scoring criteria were used when evaluating the overall O&M condition of each reach.
Page 24
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
1 - None Required: Main in “like new condition.” No maintenance required in the foreseeable future. 2 - Infrequent Maintenance: Main is in good condition but has some minor grease visible, or debris in the main. No indication that the defects are increasing or are affecting the flow characteristics of the main. Main required infrequent maintenance. No action predicted for 20 plus years. 3 - Occasional Maintenance: Main that has moderate O&M issues but the main is adequate. Bellies in the main, grease, and debris in the main. Main will function adequately, but requires occasional maintenance. Action predicted in the next 10 to 20 years. More maintenance will extend the service life. 4 - Annual or Bi-annual Maintenance: Main is developing severe defects. Offset joints, breaks in the main, and separation of joints cause rocks/sediment to enter the main. Bellies cause solids to settle out. Expect some action required in 5 to 10 years. 5 - Many times per Year: Main is in very poor condition. Maintenance required many times per year.
Main may require weekly monitoring.
Reach requires immediate
attention. Action required in less than 5 years. Based on the results of the CCTV report review, the following drainage basins and streets were further evaluated.
Page 25
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Table 6: Drainage Basins Requiring Further Evaluation Drainage Basin 2 3 4 5 6&6A 6B 9 11 12 18 19 20 22 23 31 42 47 13 24 25 30
Street/Location Anna Drive Jamestown Drive Wolff Drive Lance Drive Sawmill Creek Road (SMCR) at Jarvis Street Price Street SMCR, DeGroff Street at Park Street Baranof Street DeGroff Street, Hollywood Way, Highland, Baranof, and Merrill Princess Way, Seward Street, and Barracks Street Tlingit Way, Marine, and Seward Streets Observatory, Seward, and American Streets New Archangel Sewer Upgrade Lake Street, Hirst, Kincaid, and Monastery Streets Kimsham, Tilson, and Petersen Streets Old Harbor Mountain Road Viking Way and Valhalla Drive Monastery Street (SMCR to Degroff Street) Verstovia Street Verstovia Street Jeff Davis Street and Lincoln Street
Page 26
Condition Ratings Structural O&M 3 4 4 3 4 3 4 4 3 4 3 4 5 4 3 4 5
4
4 4 4 4 4 5 4 4 3 2 2 2
3 3 3 5 5 5 2 2 2 2 2 2
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Figure 8: Drainage Basins
Page 27
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
3.2
Sitka, Alaska October 2012
Smoke Testing and Inflow and Infiltration Assessment
The CBS performed smoke testing of the wastewater collection system beginning in May of 1992 for a three-month period and again for two months starting in July of 2001, mostly in the core area of town. Other tests, confined to suspect areas of town, have been done in the intervening years. The drainage basins covered in the testing program included around 95% of the city sanitary sewer system. The drainage basins not smoke tested are:
Blatchley Middle School (Basin 29).
Peterson Street, Kimsham Street (Basin 31).
Benchlands (Basin 38).
Japonski Airport, Coast Guard Housing area, and Japonski Island Lift Station 6 (Basin 82).
Alice Island, Charcoal Island, and Japonski Island Lift Station 7 (Basin 83).
In all of the drainage basins tested, 130 defects identified by the presence of smoke were deemed worthy of follow up.
This included inspections of crawl spaces, basements, and in-house
plumbing requiring property owner involvement. About 20% of the defects were found to not be contributing to the I/I problem.
These included separated pipes above ground, uncapped
plumbing, and lack of or dry P-traps in building floor drains. About 60% of the defects were confirmed to contribute to infiltration and inflow into the CBS wastewater system. These included separated or offset joints, sewer service lines, uncapped cleanouts, yard drains, and roof leader connections. Although these were not exclusively in the older part of town, well over 60% were, and matched closely with the sanitary sewers installed in the 1950s and 1960s, or earlier. The remaining 20% of the problems were considered to be direct connections to the sanitary system or combined flows. No storm drain system exists in many of these drainage basins. A sanitary sewer manhole rehabilitation program commenced in 1992 focused on reducing inflow into the wastewater system. Watertight manhole frames and lids are replacing the older pick-hole type. Watertight plugs are being installed at the top of the mainline cleanouts. The CBS standard drawings have been modified to reflect these changes. A pressure grouting system Page 28
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
was used to abate all visible manhole leaks.
Manhole inverts, lifting eye holes, manhole
sections, and adjusting rings were re-grouted. Private and public roof drain connections were addressed and most have been removed from the wastewater collection system. Recently in drainage basin [7], the Crescent Harbor lift station pump run times increased dramatically. Smoke testing of the drainage basin revealed a fairly large flow attributed to the Sitka Sound Science Center and promptly removed. During this inspection, 2 additional service lines were found to be leaking. The housing in this area of town was constructed in the 1940s and it was common then to use combined sewer outfalls directly into Sitka Sound. To date, only a few of these properties are served with an available storm drain system. With the recent rehabilitation of Oja and Monastery Streets sewers, and the Brady Street sewer, it is probable that a great deal of infiltration was eliminated. Originally these segments of the collection system consisted of three-foot lengths of concrete bell and spigot pipe. It is speculated that between 50% and 75% of the CBS collection system I/I is from sewer services to individual properties. As the CBS replaces older sections of main throughout the system, the sewer services are typically replaced to the right-of-way where they are connected to the existing service. However, the majority of the leaks/defects found by smoke testing are on private property and continue to contribute to I/I. Further discussion on remaining I/I issues and recommendations are presented in Section 4.2. 4.0
CONDITION ASSESSMENT RECOMMENDATIONS
The following section provides a summary of each deficient portion of the collection system, and recommendations for improvements. 4.1
Gravity and Sewer Force Main Recommendations
4.1.1 Anna Drive Basin Sewer Main (Basin 2) This subdivision was constructed in the mid-1980s and lies at the base of a steep slope. A drainage basin ran through the subdivision but was relocated next to the roadway through the placement of fill. The 8-inch polyvinyl chloride (PVC) sewer main, which was constructed
Page 29
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
down the middle of the subdivision at a minimum slope, has settled creating bellies in the following sections of main:
From the first manhole (MH) upstream of the intersection of Sawmill Creek Road (SMCR) and Anna Drive (MH 2-1) up to the manhole at the intersection with Anna Court (MH 2-2).
From the manhole at the Anna Drive and Anna Court intersection (MH 2-2) to the eastern Anna Court manhole (MH 2-3).
From the Eastern Anna Court manhole (MH 2-3) to the clean out at Anna Court turnaround.
Recommendations 1. Clean and videotape the entire basin within next 1 to 5 years. Include from MH 2-2 to the clean out and continuing further up the hill toward Riggs Road and Miller Drive. This segment of the collection system was never videoed. 2. Reassess the drainage basin. 4.1.2 Jamestown Drive Basin Sewer Main (Basin 3) The Jamestown Drive Subdivision (Rosie Ashby Subdivision) was constructed in 1977. The wastewater originally collected into an 8-inch PVC main, passed through a septic tank along the SMCR side of 101 Jamestown Drive, crossed SMCR and discharged into Jamestown Bay. The Jamestown Bay Interceptor sewer project intercepted this outfall at the manhole at the intersection of Jamestown and SMCR (MH 1-15). The steep hillside the subdivision was constructed on in addition to the tremendous amount of stormwater flowing down the mountainside, made the subdivision prone to stormwater issues. The CBS revised the storm drainage system due to sloughing of the uphill slope (Jamestown Drive). It is believed that the sewer mains between the manholes in front of 107 Jamestown Drive (MH 3-2A) and 109 Jamestown Drive (MH 3-3), and MH 3-3 to the manhole in front of 115 Jamestown Drive (MH 3-4) were replaced with DIP as part of the storm/slope stabilization project. The reach between MH 3-4 and the cleanout at the end of Jamestown Drive still remains as the 1977 original sewer main and has developed bellies, point loads, and moderate leakage.
Page 30
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Recommendations 1. This reach should be replaced prior to the next paving project on Jamestown Drive. 4.1.3 Wolff Drive Sewer Main (Basin 4) The Wolff Drive subdivision was built in phases starting in 1975 and was constructed using the overburden as fill in the roadway prism and for lot preparation. Subsequently several of the homes have developed foundation problems along with the sewer mains. The problematic mains are between the following manholes:
From the manhole just upstream of the intersection of Wolf Drive and SMCR (MH 4-1) to the manhole where Wolf Drive tees (MH 4-4).
From the manhole between 107 and 108 Wolf Drive (MH 4-3) to clean out at 116 Wolf Drive.
From the manhole between 132 and 133 Wolf Drive (MH 4-6) to clean out at 124 Wolf Drive.
The above reaches have developed offset joints, deflection at joints, point loads causing dimples/pinnacles in the flow line, deformations/squashed mains, and infiltration at the service connections and pipe joints. As the subdivision continues to age, the organic matter in the roadway prism will continue to decay exacerbating the problem. Cleaning of the line is not foreseen as a maintenance concern due to the steepness of the subdivision. Recommendations 1. Clean and CCTV the entire subdivision. 2. Reassess the entire subdivision. 3. Reconstruct the sanitary sewer prior to the next asphalt-paving project or as indicated in the reassessment.
Page 31
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
4.1.4 Lance Drive Sewer Main (Basin 5) Lance Drive was constructed in three phases in 1978, 1981, and the final project to the top of the subdivision including the reach from the 216 Lance Drive manhole (MH 5-6) to the cleanout at the end of Lance Drive in the mid-1990s. The 612 feet of main between the 208 Lance Drive manhole (MH 5-5) and MH 5-6 is problematic due to the length of the main, age of 30 years, a 1-foot-long piece missing in the top of the main 179 feet downstream from MH 5-6, off-set joints and bellies up to 90% of the main depth causing stagnant water, and grease and sludge buildup in the main. Recommendation 1. Clean and CCTV the drainage basin 2. Reassess the basin 3. Replace length of main determined from reassessment. 4. Add a new manhole between MH 5-5 and MH 5-6 and replace the lids on the existing two manholes (MH 5-5 and MH 5-6) with watertight lids. 4.1.5 Sawmill Creek Road at Jarvis Street Sewer Main (Basins 6 and 6A) The following three 8-inch PVC mains were constructed in 1987 and have settled resulting in bellies:
The main from the 1207 SMCR manhole (MH 6-1) to the manhole at the Jarvis/SMCR intersection (MH 6A-1).
The main from MH 6A-1 to the first manhole up Jarvis Street (MH 6A-2).
The main from MH 6-1 to the next manhole up SMCR (MH 6-2).
The following mains have maintenance ratings of poor [4].
From the manhole at the Smith Street/SMCR intersection (MH 6-5) to the next manhole upstream on SMCR (MH 6-6),
From MH 6-6 to the 1315 SMCR manhole (MH 6-7),
Page 32
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
From the manhole at the Eagle Way/SMCR intersection (MH 6-11) to the manhole at the Price Street/SMCR (MH 6-12)
These two basins have high groundwater due to the Park Service discharge of a storm drain onto their property along the southerly side of SMCR. The existing soils are questionable in regards to their support capabilities but must have been acceptable when the main was first installed out of the roadway prism. In the early 1990s, the State of Alaska Department of Transportation and Public Facilities (DOT&PF) widened Jarvis Street and provided a turn lane, curb and gutter and repaving for access to the post office. Through this project the sanitary sewer main fell within the road prism. The settling of the sewer main may have resulted from compaction during road construction. Recommendations 1. Biannual cleaning with reassessment after the first cleaning. 2. CCTV video the reach from the upstream Eagle Way manhole (MH 6-8) through the Eagle Way/SMCR intersection manhole (MH 6-11) and assess this stretch of main. 3. Do nothing until the next repaving project if additional defects are not developing. 4. Replace the main between MH 6-1 to MH 6A-2 and MH 6-5 to MH 6-12. 4.1.6 Price Street Sewer Main (Basin 6B) Price Street was developed in several phases. The main in the initial phase was built in 1986, and now has a belly between the manhole upstream of the Price Street/SMCR intersection (MH 6B-0) and the manhole at the intersection of Burkhart and Price (MH 6B-1). The 8-inch PVC main has separated 7 feet downstream of MH 6B-1 toward MH 6B-0, and deflects to the right resulting in the main filling with groundwater. Sludge buildup is noted in the pool of water, the main then turns slightly to the left before it rises and enters MH 6B-0. This area is not in muskeg and should have a sound trench base. Do not expect any further settlement of the main. The separation is troublesome. Recommendations 1. Bi-annual cleaning and reassessment after the initial cleaning. Page 33
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
2. Replace the main from MH 6B-0 to MH 6B-1, prior to repaving depending on the reassessment. 4.1.7 Sawmill Creek Road, Degroff Street at Park Street Sewer Mains (Basin 9) The easterly half of the DeGroff Street sewer main (east of Baranof) from the cleanout to the 621 Degroff Street manhole (MH 9-9) has broken joints and leaks. There are holes, bellies, grease and slime growth, and three areas have been patched in the 8-inch transite main. This area has a high groundwater table and the ground consists of muskeg or soft soils. The sanitary sewer main from the Park Street extension manhole (MH 9-10) enters the reach between MH 9-9 and the manhole at the Park Street/Degroff Street intersection (MH 9-11) approximately 18 feet upstream from MH 9-11 and there is no manhole at the junction. The Park Street extension was reconstructed in conjunction with the Biorka and Park Street improvements in 2006. The existing 8-inch cast iron sewer main constructed in 1966 beneath SMCR between the following manholes is in Fair [3] condition:
From the manhole at 606 SMCR (MH 9-7) to the manhole at 620 SMCR (MH 9-8).
From the manhole at the Park Street/Degroff Street intersection (MH 9-11) to the manhole at 711 SMCR (MH 9-12) and up the manhole at the intersection of Jeff Davis and SMCR.
Recommendations 1. Replace the entire 46 year old main (MH 9-9 to CO) and add one additional manhole to meet the CBS design criteria of 150 feet maximum length of main leading to an end of line clean out. This area is in the older part of town and would recommend replacement of the sewer services to within 5 feet of the structures. The homeowners would be required to connect the new service to the building waste line. Consider replacement of the sewer main from MH 9-9 to MH 9-11 as part of this project. 2. The sanitary sewer beneath SMCR (Fair [3] condition) should be reassessed prior to the next scheduled paving project for SMCR.
Page 34
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
3. The collection system on the easterly end of Etolin Street, from the manhole just east of the intersection of Etolin and Park Street to the cleanout at 201 Jeff Davis Street (MHs 9-2, 9-3, 9-3A and cleanout) has never been CCTV inspected. It is recommended that this section of main is cleaned, video inspected and assessed. 4.1.8 Baranoff Street Sewer Main (Basin 11) The main between the manhole at the intersection of SMCR and Baranof (MH 11-3) to the manhole at the intersection of Baranof and Bjorka (MH 11-4) and between MH 11-4 and the cleanout at 406 Baranof Street has developed bellies and the pipe is over half full of wastewater and sludge in places. Recommendations 1. Replace the sewer main prior to the next paving schedule. 4.1.9 Degroff Street, Hollywood Way, Highland, Baranof, and Merrill Sewer Mains (Basin 12) The entire Drainage Basin 12 received a rating of Poor [4] in both the Structural and Maintenance aspects with the exception of the first and last reaches. The first reach from the manhole at the Degroff/Lake Street intersection (MH 13-4) to the manhole at the intersection of Degroff/Hollywood Way (MH 12-1) has received a rating of Imminent of Collapse [5] in the structural category due to the following commentary: Starting at MH 12-1 and working towards MH 13-4 (which contains standing water): 2' out of the manhole, “out of water”; 6' from manhole, “slope drops, joint leaky”; 18' - “getting deeper”; 22' - “pipe changes direction, drops left, waterfall”; 34' - “changes to PVC joints leaky”; 35' - “pipe flattens”; 38' - “camera under water”; 47' - “camera out of water and back to transite? or DIP?”; and 53' - “pipe drops considerable.”
Page 35
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
The last manhole on Merrill Street (MH 12-5) to the end-of-line cleanout on Merrill Street received a Fair [3] rating in both categories. The ground in this area is a muskeg/soft soil and there is a high groundwater table due to the proximity to Swan Lake and Wrinkleneck Creek. The sewer mains in this basin were constructed in 1967 with 8-inch transite main. The main has bellies, deflected and separated joints, sludge/sediment accumulation, leaky services, etc., similar to the reach described above. The main on Highland Street is in similar condition.
The
Hollywood Way sewer was constructed with 8-inch PVC as part of the Sitka Low Cost Housing Community Housing Project. The condition of the Hollywood Way main is similar to the remainder of the drainage basin. Recommendations 1. Replace Drainage Basin 12. 2. Lower the main on Lake Street between the manhole in front of 400 Lake Street (MH 13-2) to the manhole in front of 408 Lake Street (MH 13-3), and MH 13-3 to the manhole at the intersection of Degroff/Lake Street (MH 13-4). This will accommodate lowering the main through Drainage Basin 12. Lowering the main through Drainage Basin 12 will increase the slope in the mains, increase the fall through the manholes, help to match the crown of the DeGroff Street collector and the Lake Street trunk line, etc. 3. Replace the sewer services to within 5 feet of the structures. This area is an older part of town, with homes built in the 1950s. Smoke test data indicates a high percentage of these services leak. The homeowner could be responsible for connecting the structure’s existing service to the newly installed services. 4.1.10 Princess Way, Seward Street and Barracks Street Sewer Main (Basin 18) Princess Way is a platted, paved, and maintained as a CBS alley/one-lane street. Princess Way has around 400 feet of existing 4-inch sanitary sewer main that serves three houses with no cleanout at the end. The date the sewer line was constructed is unknown, but it is thought to date to the late 1930s despite minimal problems.
Page 36
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
The Princess Way sewer main connects to the Seward Street main at the manhole at the intersection of Seward Street and Princess Way (MH 18-3), which then flows to the manhole at the intersection of Seward and Barracks (MH 18-2). It is recommended that the feasibility be studied of redirecting the Seward Street flow (currently goes from Barracks to Lincoln Street) from MH 18-2 to the manhole at the intersection of Marine and Seward (MH 19-3). Barracks received a Poor [4] Structural rating due to the 8-inch diameter, 3-foot lengths of concrete pipe. Only the top 50 feet of Barracks Street has been videoed. A portion of the Pioneer Home roof leaders are reported to enter a manhole inside the southeast corner of the building which then enters the sanitary sewer system. A second manhole located outside near the southeast corner of the building by Barracks Street is also thought to contain stormwater that enters the sanitary sewer.
This drainage basin, along with the lower portion of Drainage Basin 19 requires
additional study prior to reconstruction. The concrete visible on the surface of Barracks Street is actually the cover for the Pioneers Home underground heating oil tanks. The portion of the main videoed was in Poor [4] condition, mainly due to the age and material of the pipe. Maintenance appears not to be a problem. Recommendations 1. Replace all of Princess Way, Seward, and Barracks Streets sanitary sewer. 2. Remove the roof leader ties to the sanitary sewer and reconnect to a new storm extended up Barracks from Lincoln Street. 4.1.11 Tlingit Way, Marine, and Seward Streets Sewer Main (Basin 19) The existing Tlingit Way sewer main is a 6-inch concrete and orangeburg main. The Seward Street main from the manhole at the intersection of Marine and Seward (MH 19-3) to the manhole at 204 Kaagwaantaan Street (MH 19-1) is a 6-inch concrete main with numerous holes. Both sewer mains are undersized and were in rated as Poor [4] or Imminent of Collapse [5] in the CCTV reports. Recommendations 1. Replace the Tlingit and Seward Street sewer mains.
Page 37
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
4.1.12 Observatory, Seward, and American Street Sewer Main (Basin 20) The existing 6-inch PVC main on American Street has two 45 degree bends just downstream of the manhole at the intersection of American/Seward Street (MH 20-1) making it impassable for the CBS cleaning equipment and for the CCTV camera. The 6-inch main is undersized per CBS and DEC standards. The main is intact and has required little maintenance due to the steep slope of the road. It is assumed the slope of the pipe flattens toward Lincoln Street following the road grade. There are no intermediate manholes in the over 300-foot reach. All of the joints leak in the reach of 3-foot concrete bell and spigot main from MH 20-1 to manhole at the intersection of Observatory/Seward Street (MH 20-2). Maintenance on the Seward Street main is not an issue. The over 450-foot length of 6-inch concrete bell and spigot sewer main on Observatory Street, constructed around the 1940s, is rated as Poor [4], but does not have a high occurrence of complaints. A cleanout was installed in the main prior to the main reducing to 4-inch for approximately the last 100 feet. This area of town sits on a hillside with an existing storm drain system. The groundwater table is low. The soils are buildable quality, with no muskeg. There are very few bellies and minimal debris as indicated by the CCTV field reports. Recommendations 1. Reconstruct the entire length of Observatory Street including Rigling Way and Seward Street from Observatory to American. 2. Add manholes on the Observatory Street main to meet CBS standards. I/I appears to be less of an issue in this area so replacement of the sewer services to within 5 feet of the house may not be warranted. 3. The American reach of sewer main is functioning well and has as a projected service life of over 20 years, but does not meet CBS standards.
If maintenance on American
becomes an issue add manholes to meet CBS standards. 4.1.13 Lake Street, Hirst, Kincaid and Monastery Streets Sewer Mains (Basin 23) Sewer Mains in the entire low-lying area of Blocks 1 through 6 of the Sirstad Addition exhibit the same characteristics. All of the 12- and 14-inch ductile iron main in Lake Street, between the
Page 38
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
manhole at the intersection of Hirst/Lake Street (MH 23-1) and the manhole at the intersection of First/Lake Street (MH 23-8), lays half full of sewage (bellies) collecting sediment.
The
manholes appear to be staying in their original positions or are at least higher than the mains between them. In addition to the scum, rocks have been noted in most of the sewer main reaches. The 8-inch transite main on Hirst Street between MH 23-1 and the manhole at the intersection of Hirst/Monastery Street (MH 23-2) had maintenance issues in the past (sewer backed up into the basement at 502 Hirst Street twice) and has numerous bellies similar to those in Lake Street and the joints appeared to be offset or separated and leaking. The reach to the east of MH 23-2 on Hirst Street is in similar condition. The main north from MH 23-2 has no CCTV record. The Kincaid Street sewer main from MH 23-5 to MH 23-4 is newer PVC main, constructed in 1971, but also has numerous bellies with grease and sludge build-up.
The
Monastery Street sewage system upstream of the manhole at the intersection of Kinkead/Monastery Street (MH 23-4) has numerous leaky service taps and several bellies. Recommendations 1. It is recommended that the entire lower portion of Drainage Basin 23 on Lake Street be replaced in phases. 2. Lower the main on Lake Street in Drainage Basin 13 to increase the slope of the Lake Street main line and to increase the slope of the existing services. The section of main between the manhole at the roundabout (MH 13-1) and the first manhole down Lake Street (MH 13-2) has already been lowered as part of the round-about project. The Hirst Street sewer main can also be lowered to further guard against the backup of sewage into the basement apartment at 502 Hirst Street, the lowest client in that drainage basin. The relative floor elevation of the basement should be obtained to establish the relief between there and the invert of the service at the main. The crowns of the smaller collectors to the larger trunk lines should match. Wrinkleneck Creek and the Swan Lake drainage were listed as a Tier I State of Alaska Impaired Water Body. As part of the CBS attempts to remove Swan Lake from the list a requirement is included to confirm sanitary sewer connections.
Page 39
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
3. Replace services to within 5 feet of the structures. It is further recommended that the homeowner extend the new main under the residence and connect directly into the building waste line. All of this work should be inspected. There are very few basements in this area of Sitka (or in Sitka in general) mainly due to the amount of rain per year (90 inches), high groundwater table (in this case the influence of Swan Lake and Wrinkleneck Creek, and soil conditions - muskeg in this area. It is strongly suggested that this drainage rehabilitation take precedence over other lower ranking mains. 4.1.14 Kimsham, Tilson, and Petersen Street Sewer Main (Basin 31) The following stretches of pipe have bellies, rock infiltration, offset joints, deflections, and sludge build up:
The entire stretch of main on Kimsham Street.
The main from the manhole at the intersection of Edgecumbe Drive and Peterson Street (MH 31-3) to the manhole at the intersection of Peterson/Kimsham Street (MH 31-5).
The main from the manhole at the intersection of Tilson/Kimsham Street (MH 31-9) to the manhole at 306 Tilson Street (MH 31-10).
The structural rating on these sections of pipe was Poor [4] or Imminent Failure [5] and the maintenance rating was Imminent Failure [5]. It is recommended that the entire drainage basin is cleaned and a CCTV inspection is performed to determine the condition of the entire basin. Recommendations 1. CCTV and reassess all of Drainage Basin 31. 2. Replace the entire Kimsham Street main, the Peterson Street main from MH 31-3 to MH 31-5, and the Tilson Street main from MH 31-9 to MH 31-10. 4.1.15 Old Harbor Mountain Road Sewer Main (Basin 42) The primary access to Harbor Mountain used to be through the Sea and Ski Trailer court on Gary’s Street. At that time the roadway was maintained by the State of Alaska. During their ownership an 8-inch PVC sewer main was extended from the manhole just to the west of the Shuler Drive and Halibut Point Road intersection up through the Sea and Ski trailer court
Page 40
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
(sometime after 1984). Since then, the ownership of the roadway corridor was transferred to the City and Borough of Sitka. Property owners along this portion of roadway requested connection to the 8-inch PVC main and their requests were approved. The CBS filmed the main by cutting the top out of the pipe as no cleanouts existed. Point loads (indicated by dimples at the flowline), deflection at joints, “zig-zagging” and two 45-degree elbows were found in the reach. Despite these deficiencies, maintenance has not been a problem due to the steepness of the road. Recommendations 1. Replace the sewer main prior to roadway improvements. 4.1.16 Viking Way and Valhalla Drive Sewer Main (Basin 47) This subdivision was constructed prior to the Cove Interceptor Sewer project along Halibut Point Road. The 8-inch PVC sewer main and manholes were originally constructed and maintained as a private system with an ocean outfall. This drainage was intercepted by the Cove Interceptor project in the mid-1980s. In the late 1990s the subdivision property requested ownership and maintenance of the sewer be taken over by CBS. At that time the manholes were upgraded by the addition of channels, I/I into the manholes was eliminated, and watertight frames and lids were installed. The main from the manhole at the intersection of Valhalla Drive and Viking Way (MH 47-2) to the manhole at 101 Viking Way (MH 47-1) contains offset and deformed joints, deflections at joints - “drop offs” and point loads - “bad bumps.” Maintenance has not been an issue due to the steep roadway slopes (17% plus). Recommendations 1. Replace the main between MH 47-1 and MH 47-2 prior to upgrades to the road. 2. CCTV and reassess the reach from the manhole at the intersection of Viking Way and Halibut Point Road (MH 47-0) to MH 47-1. This reach of main is not at a constant slope and is assumed to follow the roadway vertical curve. 4.1.17 Monastery Street Sewer Main (Sawmill Creek Road to DeGroff Street) (Basin 13) The 400+ foot stretch of 45 year old 8-inch diameter transite main is rated in Fair [3] condition with little maintenance needs. There is one protruding leaking service, three other leaking services at the main, and one “small belly or flat line” noted. None of the joints were mentioned Page 41
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
to be problematic. Two of the services were reported to be “running.” There are two cleanouts, one in the middle of the 400-foot run and the other at the end of the line. Recommendations 1. Replace the sanitary sewer main when a new water main is constructed or this stretch or road is repaved. 2. Addition of a storm sewer is also recommended. There is no storm sewer in this leg of Monastery. 4.1.18 Verstovia Street (Basin 24) The 8-inch PVC sewer main at the easterly end of Verstovia Street from A Street to Charles received a Good [2] rating. The main from the manhole at the intersection of A Street and Verstovia Street (MH 24-6) to the cleanout west is approximately 95 feet, contained wyes and noted only one defect as “bumpy” at 77 feet. The main approximately 315 feet to the east of MH 24-6 indicated one joint deformed. No I/I issues were noted. No maintenance issues were noted for this section of Verstovia main. Recommendations 1. The cleanouts are PVC and should be replaced with DIP to meet the City Standards. 2. A second manhole should be installed 150 feet from the east cleanout to meet City Standards. 3. Watertight manhole frame and lids should be added. 4.1.19 Verstovia Street (Basin 25) The main from the manhole at the intersection of Verstovia Street and Sirstad Street (MH 25-4) to the cleanout upstream to the east at 427 Verstovia Street is 334 feet, and from MH 25-4 to the cleanout at 400 Verstovia Street is 286 feet. Both sections of main are in Good [2] condition. Recommendations 1. Recommend replacement of cleanouts with DIP cleanouts. 2. Place an additional manhole to the west and east of MH 25-4.
Page 42
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
3. Add watertight frames and lids to meet CBS standards. 4.1.20 Jeff Davis Street and Lincoln Street (Jeff Davis To Lake Street (Basin 10) Both Jeff Davis and Lincoln Streets were assessed in Good [2] condition. Both Finn Alley and Barlo have DIP stubs across Lincoln to the back of the sidewalk for future upgrades. Recommendations 1. No additional upgrades are necessary at this time. 4.1.21 Halibut Point Road Sewer Main Following the review of the record drawings for the 1985 Halibut Point Road Interceptor (City Limits to Granite Creek), it was determined that numerous services and stub-outs were undersized for the number of residences they were serving. Numerous properties along Halibut Point Road did not receive a service during the 1985 project. It is recommended that the undersized services be upgraded and all lots provided a sewer service prior to the next paving schedule. Halibut Point Road’s ductile iron main constructed primarily in 1986 and 1999 is in good condition and there are no documented locations needing replacement or repair. Recommendations 1. Assess the Halibut Point Road sewer main, manholes, and services prior to the DOT&PF paving project. 2. The reconstruction and addition of services based on the assessment of Halibut Point Road is recommended in coordination with the repaving project. 4.2
Inflow and Infiltration Improvements
Recommendations for reducing infiltration on private property include:
For new construction where rehabilitating older drainage basins, the following options should be considered by CBS: 1. Replace the sewer service all the way to the house waste line under the house.
Page 43
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
2. Replace the sewer services to within 5’ of the building structure and require the property owner to connect with new pipe to the house waste line under the house. 3. Replace the sewer service to the property line and require the property owner to replace the remainder of the service to the building waste line under the house.
For areas not scheduled for main rehabilitation, the following options should be considered by CBS: 1. Establish penalty for noncompliance and reasonable time frame to comply. 2. Inspect property for:
Existing sump pumps connected to sanitary sewer
Footing drains
Roof drains
Area drains
Defects identified by smoke testing
Defects identified by video inspection
3. Require building permit and final inspection 4.3
Lift Stations
In association with DOWL HKM, Carson Dorn, Inc., assisted with the condition assessment of the CBS lift stations. Boreal Controls, Inc., assisted specifically with the assessment of the lift station electrical and control systems. A site visit to each of the lift stations was completed with Dan Cox, from the CBS Public Works Department.
Proposed electrical and SCADA
improvement were based on information obtained from Rob Dahlquist of CBS. Inventory forms were created for information available such as year constructed, wet well dimensions, motor horsepower, and pump performance (see Appendix A).
The site visits and follow-up
conversations with CBS personnel resulted in the following recommended capital improvements. 4.3.1 Channel Lift Station This is an old lift station that uses pneumatic injectors and compressors for pumping wastewater. It is inefficient and is requiring significantly more maintenance in order to remain operational. There is also no vehicular access to the lift station to allow for maintenance. It is recommended
Page 44
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
that the lift station be replaced with a new lower maintenance submersible pump lift station and that access be improved. 4.3.2 Brady Lift Station The plug valve has failed in the dry pit and there is no way to isolate the pump for maintenance. The plug valve needs to be replaced. Additionally, the pumps can only operate at two speeds meaning there is no variable frequency drive (VFD) to allow for a smooth increase in pump flows as wastewater flows increase. As a result, the pump jumps from high flow to low flow. Recommend a new plug valve and three VFDs, one for each motor, and new pumps. At a minimum, new impellers will be required to prevent clogging that has occurred at other lift stations where similar improvements were made. 4.3.3 Old Thomsen Harbor Lift Station The lift station currently uses a calcium hypochlorite tablet feeder that is sufficient, but slightly more costly. In the future, a brine electrolysis hypochlorite generator could be added at this station to allow hypochlorite to be added to the wastewater flow as it is pumped across Sitka Channel to control odors at the WWTP. 4.3.4 Lake Street Lift Station The lift station and wet well are in a location that is difficult to access and the pumps, piping, and control panel are in very poor shape. The lift station needs to be replaced. Recommend replacement of the lift station. 4.3.5 Jamestown Lift Station Both pumps are pumping significantly less than the original design flow rate and have been in operation for nearly 30 years and they are beginning to wear out. The pumps should be replaced with similar pumps with consideration being given to increasing the pumping capacity to handle increased wastewater flows originating from the Sawmill Cove area.
Page 45
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
4.3.6 East Jamestown Lift Station This lift station is currently serving only a single house and is an old outdated pneumatic injector type pump. The pump station should be replaced with a small residential grinder type pump such as a Barnes or EOne. 4.3.7 Crescent Lift Station This lift station is reaching the end of its useful life and CBS staff have made modifications to keep it functioning as long as possible. Recommend full replacement of the lift station and controls. 4.3.8 Lift Station Electrical and Supervisory Control and Data Acquisition Assessment Improvements
Channel Lift Station - Electrical and controls are 28 years old and need to be replaced. Level controller is a bubbler system and needs to be replaced. Station is not part of SCADA system. Recommend replacing electrical and control systems. Install new pressure transducer for level controls. Add station to SCADA system.
Lake Street Lift Station - Electrical and controls are in very poor condition and need to be replaced. Service is 208V Wild Leg Delta. Level control is by float switch and needs to be replaced. Station is not part of SCADA system. Recommend replacing electrical and control systems. Upgrade electrical service to 480V. Install new pressure transducer for level controls and add station to SCADA system.
East Jamestown Lift Station - Electrical and controls are 29 years old and need to be replaced. Station is not part of SCADA system. Recommend installing new packaged lift station and add radio alarm to SCADA system.
Old Sitka Rocks Lift Station - Electrical and controls are 27 years old and need to be replaced. Level controller is a bubbler system and needs to be replaced. Station is not part of SCADA system. Recommend replacing electrical and control systems. Install new pressure transducer for level controls and add station to SCADA system.
Granite Creek Lift Station - Electrical and controls are 27 years old and need to be replaced. Level controller is a bubbler system and needs to be replaced. Station is not
Page 46
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
part of SCADA system. Recommend replacing electrical and control systems, installing new pressure transducer for level controls, and adding station to SCADA system.
Centennial Lift Station - Electrical and controls are approximately 30 years old and need to be replaced. Level control is by floats and needs to be replaced. Station is not part of SCADA system. Recommend replacing electrical and control systems, installing new pressure transducer for level controls, and adding station to SCADA system.
Castle Hill Lift Station - Electrical and controls are approximately 30 years old and need to be replaced. Level control is by floats and needs to be replaced. Station in not part of SCADA system.
Recommend replacing electrical and control systems, install new
pressure transducer for level controls, and add station to SCADA system.
Monastery Street Lift Station - Electrical and controls are 26 years old, in very poor condition, and need to be replaced. Level control is by float switches and needs to be replaced. Station is not part of SCADA system. Recommend replacing electrical and control systems, upgrade electrical service to 480V, install new pressure transducer for level controls, and add station to SCADA system.
BIHA Lift Station - Electrical and controls are approximately 20 years old and need to be replaced. Level control is by floats and needs to be replaced. Station is not part of SCADA system. Recommend replacing electrical and control systems, installing new pressure transducer for level controls, and adding station to SCADA system.
Japonski Island Lift Station 5 - Electrical and controls are in very poor condition, and need to be replaced. Level control is by float switches and needs to be replaced. Station is not part of SCADA system. Recommend replacing electrical and control systems, upgrade electrical service, install new pressure transducer for level controls, and add station to SCADA system.
Page 47
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
No capital improvements were recommended for the following lift stations: 4.4
Cove Lift Station Halibut Point Lift Station Sandy Beach Lift Station New Thomsen Harbor Lift Station Blatchley Lift Station Wachusetts Lift Station Landfill Lift Station Eagle Way Lift Station Blueberry Lane Lift Station
Whale Park Lift Station Sawmill Cove Lift Station Rands Drive Lift Station New BIHA Indian River Lift Station BIHA EOne Indian River Lift Station Lincoln Street Lift Station Lightering Lift Station Sealing Cove Lift Station Japonski Island 1, 2, 3, 4, 6, 7, and 8 Lift Stations
Lift Station Capacity
The community of Sitka experienced a significant storm event on August 19-21, 2011, during which time Sitka received a total of 5.19 inches of rain over the 3-day period. The daily rainfall total was 1.41 inches, 2.89 inches, and 0.89 inches on August, 19, 20, and 21, respectively. These rainfall totals were compared against historic precipitation records to determine the approximate exceedance probability (recurrence interval) associated with the storm to provide a level of perspective on the magnitude of the storm event. Since its publication in 1963, the United States Department of Commerce Weather Bureau’s Technical Paper No. 47: Probable Maximum Precipitation and Rainfall-Frequency Data for Alaska for Areas to 400 Square Miles, Durations to 24 Hours, and Return Periods from 1 to 100 Years (TP-47) has been the source for short-term precipitation data used for defining design storm precipitation levels for hydrologic analyses. TP-47 includes a series of isopluvial maps (rainfall contours) used to show regional precipitation patterns and allow for extrapolating precipitation data from weather stations to other areas within the project area. From TP-47, the 24-hour rainfall values for Sitka are approximately 5 inches for a 1-year storm, 8 inches for a 25-year storm, 9 inches for a 50-year storm, and 10 inches for a 100-year storm. By this standard, the recorded 2011 rain event would be considered on par with a 1-year storm event. Reviewing extensive rainfall data for Sitka suggests the August 2011 storm was a more substantial and less common rain event. The Western Regional Climate Center (WRCC) and analyzed and published rainfall data collected at the Sitka Rocky Gutierrez Airport is available
Page 48
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
for a 57-year period ranging from 1949 to 2006. Over this time period, the largest 24-hour rain event recorded is 8.50 inches, measured on September 1, 1967. The largest 24-hour rain event recorded during the month of August is 4.36 inches, measured August 11, 1961. Over the 57 years on record, there have only been three recorded events that exceeded 5 inches of rainfall within a 24-hour period. This suggests that a 5-inch storm event has a recurrence interval of approximately 20 years, rather than 1 year as indicated by TP-47. The discrepancy between TP-47 and the WRCC data is likely due to the fact that the isopluvial maps in TP-47 cannot account for extremely localized orthographic effects and rain shadow conditions. Additionally, at the time TP-47 was published, substantially less recorded rainfall data was available for analysis in Alaska. Given these conditions, the WRCC data is considered more applicable for estimating the relative magnitude of the 2011 storm even in Sitka. Comparing the 24-hour rainfall of 2.89 inches (August 21, 2011) against WRCC data indicates the exceedance probability is approximately 2 to 4%, correlating to a 25- to 50-year storm event. The 48-hour rainfall of 4.30 inches (August 19-20, 2011) has an exceedance probability of approximately 5%, correlating to a 20-year storm event. The 72-hour rainfall of 5.19 inches (August 19-21, 2011) has an exceedance probability of approximately 4 to 5%, correlating to a 20- to 25-year storm event. Therefore, it is reasonable to conclude that the August 19-21, 2011 storm event was equivalent to a 20- to 25-year storm event, having a 4 to 5% probability of occurring in any given year. Considering infiltration and inflow should be highest during large storm events, run times for the lift stations during this time should be representative of the high end. The following table shows the lift stations that exceeded 7 hours of pumping per day during this period.
Page 49
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Table 7: Lift Station Run Times During August 19-21 Rain Storm Event Run Times Lift Station Name Pump (hours/day) Pump 1 - 7.5 Channel Pump 2 - 7.1 Pump 1 - 7.9 Brady Pump 2 - 6.6 Pump 3 - 7.6 Pump 1 - 24 Thomsen Pump 2 - 7.3 Pump 3 - 7.6 Pump 1 - 2.5* Lincoln Street Pump 2 - 6.7 Pump 3 - 9.4 Pump 1 - 11.2 BIHA Pump 2 - 7.9 Pump 1 - 13.1 Landfill Pump 2 - 4.2 *Pump was pulled during August 19-21 rain storm event
4.5
Future Developments
Three future developments were evaluated as part of the condition. Both developments will have an effect on the future loading of the wastewater system. The loading calculations for future developments were based on an average of 2.1 people per residency and an average of 150 gallons of wastewater produced per day per capita. Therefore for projection purposes, 315 gallons of wastewater production per day per residential lot was used to predict the increased loading on the wastewater collection system. Five hundred gallons of wastewater production per day per commercial lot was used to predict the increased loading on the wastewater collection system due to commercial development. An average of 15 gallons of wastewater produced per day per capita was estimated for schools and training facilities. Whitcomb Heights Subdivision Initial roadway development and the platting of the Whitcomb Heights subdivision have occurred in preparation for the future development. One hundred fifty-two residential housing parcels have been platted as part of the Whitcomb Heights Subdivision development in Drainage Basin 38. The Whitcomb Heights development is approximately 1 mile long with Kramer Avenue to the South and Harbor Mountain Bypass Road to the North as the primary access points. The Whitcomb Heights developments are projected to increase the loading on the CBS wastewater collection system by approximately 50,000 gallons per day once developed.
Page 50
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Baranof Island Housing Authority (BIHA) Fourteen (14) lots have been platted on the southern edge of Indian River Road in Drainage Basin 10A. A facility for the State Troopers Training Academy is also in planning stage along Indian River Road. The Indian River Road developments are projected to increase the loading on the Sitka wastewater collection system by approximately 5,000 gallons per day once developed. Bus Driver Training Facility (Sitka Tribe of Alaska) The location of the bus driver training facility is on Charcoal Drive between Charcoal Island and Alice Island. A maximum occupancy of 20 people was estimated to determine the peak flow from the training facility. From the Minimum Standards for Public Water Systems, 15 gallons per capita per day was used to determine the peak flows resulting from students at the bus training facility. During peak flows the bus driver training facility is projected to increase the loading on the CBS wastewater collection system by 300 gallons per day once developed. Future developments within City and Borough limits will have impacts to the existing lift stations summarized in Table 8. Swimming Pool State funding for construction of a new swimming pool at Mount Edgecumbe High School is pending. To accommodate draining the pool, new pumps would likely need to be evaluated and potentially replaced at Japonski Island Lift Station 5, or complete replacement of Japonski Lift Station 5 depending on pool location. Design of the pool will likely require distributing drainage of the 670,000-gallon pool over several days due to limitations of the collection system, lift station(s), and possibly even the WWTP. Table 8: Future Developments Impacts to Lift Stations
Whitcomb Heights Subdivision
Sandy Beach, Brady, Thomsen
Estimated Additional Flow (gpd) 50,000
BIHA Developments
BIHA, Lincoln Street, Thomsen
5,000
Bus Driver Training Facility
Japonski 7
300
Swimming Pool
Japonski 5
10,000-20,000
Future Development
Impacted Lift Stations
Page 51
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
The overall future development impacts to the existing lift station downstream of the developments will be minimal on a percentage basis, increasing flows ranging from 1 to 5%. Table 9 estimates the flow for each of the lift stations during the rain event listed in Section 4.4 and the percent increase resulting from future development. Table 9: Modeled Wastewater Flow to Pre-Stressed Lift Stations
Channel
Modeled Existing Wastewater Flow Not impacted by future developments
Brady
1.0 mgd
4.7%
Thomsen
2.1 mgd
2.5%
Lincoln Street
1.0 mgd
0.5%
BIHA
0.17 GPD
2.9%
Landfill
Not impacted by future developments
N/A
Lift Station Name
4.6
Percentage Increase From Future Developments N/A
Wastewater Treatment Recommendations
In association with DOWL HKM, G.V. Jones & Associates assisted with the condition assessment of the CBS WWTP. 4.6.1 Treated Wastewater Effluent Disinfection As required under its existing operating discharge permit, FC concentrations measured outside the limits of the mixing zone must meet state water quality standards for the use of that water. For Sitka, these water quality standards have been met based on maintaining effluent limits of 1.0 million FC per 100 mL as a monthly average, and 1.5 million FC per 100 mL as a daily maximum. These effluent FC concentration limits have been attainable without the use of any effluent disinfection. However, during warmer months and with reduced plant influent flows resulting from successful corrective action to reduce collection system inflow/infiltration (I/I) flows, concentrations of FC in the plant effluent have increased. A summary of FC monitoring results for the plant is presented in Table 10.
Page 52
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Table 10: Mixing Zone Fecal Coliform Monitoring Results (CFU/100 mL) 2002-2011 Date 7/25/2002 7/1/2003 7/30/2004 4/14/2005 6/16/2005 7/14/2005 8/25/2005 8/26/2005 11/25/2005 7/18/2006 7/26/2007 7/3/2008 7/27/2009 4/28/2010 6/9/2010 7/7/2010 8/18/2010 8/26/2010 11/18/2010 7/6/2011
1 (Inside)* 5 2 9 0 0 0 16 14 2 8 53 1 4 1 0 2 3 3
Receiving Water Quality Monitoring Station Numbers 2 3 4 5 6 (Outside)* (Outside)* (Inside)* (Outside)* (Outside)* 3 0 6 1 0 10 0 1 0 1 4 4 17 8 0 0 0 0 0 0 0 0 0 0 0 1 0 5 0 0 67** 3 11 3 1 0 10 4 8 12 8 0 2 19 0 1 8 0 31 1 0 7 0 13 0 1 4 0 2 1 0 0 3 0 0 2 0 0 1 0 0 0 0 2 2 0 35 0 95 1 0 3 1 2 2 1 1 2 0 2 1 0
7 (Inside)* 1 2 1 0 0 1 0 12 0 1 3 0 4 0 0 2 7 6
*
Permit Limits: Monitoring stations inside the mixing zone shall not exceed 200 CFU/100 mL. Monitoring points outside the mixing zone shall not exceed a monthly average of 14 CFU/100 mL and a daily maximum of 43 CFU/100 mL. ** On 8/25/2005 Station 2 had a 67 CFU/100 mL count. Subsequent re-sampling the following day yielded a result of 0 CFU/100 mL.
To provide additional control of effluent FC concentrations, in 2011, the CBS set up equipment to hypochlorinate sewage flows entering the Thomsen Harbor Lift Station located upstream of the sewage treatment plant. Hypochlorination was achieved using calcium hypochlorite tablets which dissolve as flow passes over them. To continue to maintain permitted effluent FC counts in the receiving water at the designated sampling stations, a disinfection process is recommended for operation on the existing primary effluent. With disinfection in place, the FC concentrations in the effluent will be reduced thereby controlling their concentrations in the receiving water. Options for disinfecting primary effluent include: 1. Chemical oxidation processes A. Chlorine gas B. Hypochlorite C. Chlorine dioxide D. Ozone 2. Photo-oxidation or ultraviolet (UV) disinfection Page 53
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
For the disinfection processes deploying oxidation, regulatory requirements include extinguishing any free oxidant residual remaining after dosing the effluent with chlorine or ozone prior to release to the receiving water. For chlorine, dechlorination with a sulfur product such as bisulfite or sulfur dioxide is commonly used for this purpose. For ozone, the half-life of ozone is so short, the free residual disappears very rapidly following dosing. Of the oxidation processes, only chlorine has been used extensively for disinfection of primary effluents. By comparison, ozone is considerably more expensive. Comparing the chlorine disinfection alternatives, gas chlorination is by far less expensive than any other chlorine disinfection process. However concerns over the liability associated with an accidental release of chlorine gas, and the generation of DBPs formed when chlorine is exposed to incompletely nitrified effluents has caused many utilities to choose UV disinfection as their preferred method of effluent disinfection. UV disinfection has not typically been deployed for disinfection of primary effluent. For CBS, the primary effluent typically includes 50 mg/L of suspended solids. These solids can block the transmission of light through the water before reaching the target organisms. And dissolved organics in primary effluent can absorb UV light, thereby increasing the energy and costs required for photolytic disinfection. However newer configurations of UV disinfection equipment have been developed for disinfection of primary effluent. Caveats for its use on primary effluent include data collection to confirm the quality of primary effluent is compatible with the performance limits of the equipment, and collimated beam testing to identify the dose of UV light needed to achieve the target coliform inactivation performance objectives. For purposes of this plan, UV effluent disinfection is recommended as the basis for the wastewater effluent disinfection capital improvement project over the use of chlorination/dechlorination. Tablet chlorination similar to the program used in 2011 and 2012 at the Thomsen Harbor Lift Station can continue to be effective for control of FC counts and regulatory compliance, and should be continued as a practice for the near term. However chlorination of primary effluents creates elevated concentrations of nitrogenous DBPs, which are likely to be regulated in the future. As a consequence, deployment of UV disinfection at the plant is
Page 54
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
recommended over forms of chlorine disinfection. The timing for implementation of the UV upgrade would largely depend upon the future promulgation of regulations addressing effluent nitrogenous DBPs. Elements of the UV effluent disinfection upgrade project are outlined below. 1. Effluent Bypass Pumping during Construction 2. Earthwork A. Clearing and Grading B. Excavation for Channel Construction C. Site Grading and Drainage 3. Disinfection Process Infrastructure A. Electrical Power Supply B. Reinforced Concrete Effluent Channels i. Primary channel ii. Bypass channel sized for future UV banks C. Channel Grating D. Flow control gates and gate actuators 4. UV Equipment A. Banks of UV Lamps immersed in Channel i. Duty and redundant banks B. UV Lamp Cleaning System i. Hydraulic Drive Wiper System ii. Chemical Dosing System C. UV Power Supply and Disinfection Process Control Panel 5. Building Enclosure for UV Equipment A. Insulated, ventilated, heated, lighted structure B. Sized for enclosure of primary and bypass channels, and UV process control equipment 6. Connections to Existing Primary Effluent Box and 24-inch Outfall Sewer In support of this recommendation, the CBS is encouraged to implement a program of supplemental primary effluent quality data collection that would include UV transmittance in
Page 55
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
unfiltered samples, and soluble (Fe+2) concentrations for samples filtered through 1.2 μm glass fiber filters. 4.6.2 Biosolids Disposal Facility Upgrades Residuals generated at the treatment plant are dewatered and transported to an existing disposal facility, termed the “Biosolids Landfill.” This existing landfill is planned for expansion. Objectives of this expansion project are to develop a new disposal cell adjacent to the existing active Biosolids Landfill for placement of wastewater treatment residuals. Dredged fill material produced from the Swan Lake Restoration Project will be transported to the Biosolids Landfill for beneficial use as cover material over dewatered residuals placed in the facility. At the current rate of residuals generation, the existing Biosolids Landfill has a projected remaining life of approximately 6 years, and therefore additional capacity for local disposal of these solids is needed. Elements of work required to achieve this expansion are outlined below.
Clear and grub the expansion area of the existing Biosolids Landfill
Stockpile excavated material on the down-gradient edge of the new disposal cell as an earthen wall or dike for containment of deposited dewatered wastewater residual solids.
Upgrade the access road to the Biosolids Landfill to enable access to the new disposal cell.
Provide drainage collection for runoff leaving the new disposal cell. Direct this flow to forested wetland for natural treatment prior to reaching Granite Creek.
Route surface runoff from abutting areas around the disposal cell.
4.6.3 Primary Effluent Heat Recovery Treated primary effluent from the WWTP is currently discharged to a submerged diffuser system at the end of the marine outfall structure. Temperatures of the effluent vary between 7 and 14 degrees Celsius. Heat retained in the effluent following treatment is currently dissipated in the ocean at the outfall diffusers.
Page 56
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
This capital improvement project will deploy heat recovery equipment that would capture a portion of this heat for beneficial use. A pre-design evaluation of this upgrade is currently underway to confirm feasibility and identify equipment configurations. In general, the upgrade would deploy a heat pump process. In this process, a portion of the primary effluent would be treated for solids removal and disinfectant addition. The pre-treated primary effluent would then be directed through the evaporator portion of a heat pump loop wherein a pumped heat transfer medium such as ammonia or Freon is used to adsorb heat from the effluent, and then release that heat to a heating load within the treatment facility using a condenser. To make the process efficient, the primary effluent must be treated to reduce its potential to deposit scale or biofilms on wetted heat transfer surfaces. In addition, the physical distance between condenser and evaporator should be kept to a minimum.
And finally, the upper
temperature of the circulated heat transfer medium is may be limited making the process limited to application where only low temperature heat is needed. 4.6.4 Leachate Treatment and Disposal The closed Kimsham municipal solid waste disposal landfill is configured to collect leachate and convey it to the WWTP. Generation rates for collected leachate average 134,000 gallons per day. Compared to current average day flows of 1.3 mgd, the leachate poses a small percentage (10% +/-) of the hydraulic loading to the municipal wastewater treatment facility. A common textbook hydraulic loading rate for primary clarifiers achieving conventional performance of 60% solids removal is 750 gallons per day per square foot of surface area. This value can range between 400 and 1,000. The three primary basins at the treatment plant each have a surface area of 600 square feet. These data would suggest the plant with all three basins on line has a nominal sedimentation basin capacity of approximately 1.35 mgd, which is roughly equal to the current average day influent flow to the facility. Given the foregoing, the objective of the leachate treatment capital improvement project is to separate collected leachate from the municipal sewer system, and to provide dedicated leachate treatment and disposal separate from the domestic WWTP.
Page 57
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Leachate treatment requirements would depend on effluent quality stipulated by a discharge permit.
For Sitka, the quality of leachate generated by the landfill is reported to include
relatively dilute concentrations of metals (with the exception of iron which averages 38 mg/L) an average pH of 6.7, and moderate alkalinity and salinity. Based on available leachate quality reported for Sitka and elsewhere, and current regulatory criteria, the objectives of leachate treatment would be to provide flow equalization, reduce the concentration of iron and associated color from oxidized iron, and provide control of effluent pH and DO. Collected leachate would be directed to a flow equalization basin where pretreatment for iron removal would occur. From the equalization basin, leachate would be concentrated to between 10 and 20% of its original volume using membrane filtration operating on a forward osmosis (FO) process. The draw solution for the FO process would be seawater pumped from tidewater to the leachate treatment facility. Common leachate contaminants including metals and organics are rejected by the FO process. Treated leachate quality would be suitable for release back to tidewater with the draw solution. Concentrate produced by the FO process would be directed to the sewage collection system for conveyance to the existing wastewater treatment facility. For planning purposes, the assumptions made for this capital improvement project included a treatment facility located at or adjacent to the existing landfill. As available space for staging new infrastructure at the existing landfill is limited, the plan would deploy process equipment and supporting infrastructure with minimal footprint. Several residential sewer service customers are currently connected to the leachate collection sewer system. As this project would divert leachate to a separate treatment facility, a small domestic wastewater sewage lift station would be installed as part of this project to continue sewer service to these customers. Elements of this upgrade project used for pre-design planning level project cost estimating are summarized below. 1. Site Preparation A. Clearing and Grubbing B. Rock excavation C. D1 Gravel Pad Placement D. Access Road Extension
Page 58
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
E. Parking and Snow Stockpiling Areas F. Outdoor Area lighting 2. Yard Piping A. Leachate piping i. New diversion manhole with overflow to existing leachate drain to the municipal WWTP ii. New 8-inch gravity sewer to buried concrete flow EQ basin B. Domestic water piping i. Potable water service extension (a) Size: 8-inch service C. Domestic sewer for personnel restroom in new treatment building i. 6-inch sewer to existing leachate drain to WWTP 3. New Leachate Treatment Facility A. Flow EQ Basins B. Raw Leachate Pump station C. Leachate Treatment Equipment i. Prescreening ii. Iron Removal iii. pH reduction with acid addition iv. Forward Osmosis Membrane Skid for Concentrating Leachate v. Seawater UF Membrane Skid for Brine Draw Solution vi. Clean-in-Place membrane chemical cleaning skid vii. Concentrated Leachate Batch Tanks (a) pH neutralization (b) DO addition D. Seawater intake and pumping station for FO draw solution supply 4. Other Treatment Building Components A. Process Instrumentation and Control Station B. Motor Control Center C. Heating and Ventilation Systems D. Building Fire Protection System
Page 59
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
The decision to fund and implement this capital improvement would be based on whether or not reduction of leachate contributions to the existing domestic wastewater treatment facility are needed to maintain the performance, effluent quality, and regulatory compliance of the existing plant. Due to cost/benefit analysis, it is recommended that this capital improvement upgrade be deferred until such time as the existing treatment plant is unable to maintain regulatory compliance with discharge permit effluent limits and water quality criteria. This project was not included in the financial analysis. 5.0
CAPITAL IMPROVEMENT PROJECTS
The recommendations from the condition assessment were used to develop CIPs. Short-term projects are those that are higher priority and should be completed within a 6-year time frame. Long-term projects are those that are lesser priority, and should be completed sometime within the next 20 years. The time frames given in the condition assessment were used to aid in prioritization of the CIPs, but the project’s final prioritization was also based on annual budgets and discussions with CBS. 5.1
Short-Term (10-Year) Capital Improvement Programs
The Short-Term (10-year) Capital Improvement Projects (STCIP) presented in Table 11 were developed to address the recommendations from the condition assessment and comments made by the CBS. The projects presented in Table 11 should be implemented in the next 10 years. Figure 9 provides an overview of the STCIP locations. Appendix B includes individual figures for each sewer main replacement project included in the STCIP list.
Page 60
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Table 11: Short-Term (10-Year) Capital Improvement Projects Project Name Baranof Sewer Replacement STCIP#2- Brady Lift Station Plug Valve Upgrades
Description
Suggested Time Frame
Projected FY
Sanitary Sewer Improvements Cost Estimate (FY12 VALUE)
State Grant
State Loan
CBS WW Enterprise Fund
1,000 feet of Main, 6 MH, 15 services
1-3 years
2013
$740,000
$518,000
$222,000
-
Plug Valve Replacement
1-3 years
2013
$90,000
-
-
$90,000
1-3 years
2013
$50,000
-
-
$50,000
1-3 years
2013
$45,000
-
-
$45,000
1-3 years
2014
$275,000
-
$250,000
$25,000
1-6 years
2014
$275,000
-
$250,000
$25,000
1-3 years
2014
$75,000
-
-
$75,000
1-2 years (coordinated with ADOT repaving)
2014
$75,000
-
-
$75,000
Replace Pumps With STCIP#4- Jamestown Lift Similar Pumps or AntiStation Upgrades Clog Pumps. New check valves. Garage Door, Man Door STCIP#6-WWTP Rplacement, and Boiler Improvements FY13 Replacement STCIP#5- New Archangel 200 feet of Main, 2 Sewer Upgrades services 300 feet of Main, 2 MHs, STCIP#7- Hollywood Way 8 services ($25K funded in Sewer Main Upgrades 2013 for design, $250K for construction in FY14) Replace existing pump STCIP#8- Brady Lift with new pump equipped Station Pump Upgrades with variable frequency drive. Estimated 10 sewer services and stubouts to be added or replaced on the STCIP#11- Halibut Point Halibut Point Road main Road Sewer Upgrades During DOT roadway reconstruction. MH and mainline stub at Harbor Mountain Road
Page 61
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Project Name STCIP#3- Lake Street Lift Station Upgrades STCIP#1- Channel Lift Station Upgrades STCIP#9- Monastery Street Lift Station Electrical Upgrades STCIP#12- Crescent Lift Station Upgrades STCIP#20- WWTP Improvements FY15 STCIP#17- Biosolids Disposal Facility Upgrades
STCIP#10- Verstovia Sewer Improvements
STCIP#13- WWTP Improvements FY16 STCIP#16- SMC Road, Degroff Street at Park Street Sewer Main Upgrades
Sitka, Alaska October 2012
Suggested Time Frame
Projected FY
Sanitary Sewer Improvements Cost Estimate (FY12 VALUE)
State Grant
State Loan
CBS WW Enterprise Fund
Lift Station Replacement
1-3 years
2014
$450,000
-
$200,000
$250,000
Lift Station Replacement
1-3 years
2015
$450,000
$294,000
$126,000
$30,000
Replace Electrical and Control Systems. Upgrade Electrical service.
1-3 years
2015
$400,000
$259,000
$111,000
$30,000
Lift Station Replacement
1-6 years
2015
$450,000
$283,500
$121,500
$45,000
1-6 years
2015
$90,000
-
-
$90,000
1-6 years
2016
$800,000
$504,000
$216,000
$80,000
3-6 years
2016
$50,000
-
-
$50,000
3-6 years
2016
$709,000
-
$638,000
$71,000
3-6 years
2016
$1,020,000
$672,700
$288,300
$59,000
Description
Garage Door Replacement, New/Rebuild Blowers and Piping, High Pressure pump. Expand Biosolids Disposal Area And Access Improvements. Minor Improvements to Sewer Manholes and Services, as Required. Project is in Conjunction with a Verstovia Way Repaving Project. Exterior Paint, HVAC System, Plant Sump Pumps, Hypochlorite Generator, Clarifier Louvers 800 feet of Main, 5 MHs, 28 services
Page 62
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Suggested Time Frame
Projected FY
Sanitary Sewer Improvements Cost Estimate (FY12 VALUE)
State Grant
State Loan
CBS WW Enterprise Fund
STCIP#19- Lincoln Street Sewer Improvements
Minor Improvements to Sewer Manholes and Services, as Required. Project is in Conjunction with a Lincoln Street Repaving Project.
3-6 years
2017
$50,000
-
-
$50,000
STCIP#21- Degroff Street, Highland, Baranof, and Merrill Sewer Main Upgrades
1,600 feet of Main, 7 MHs, 64 services
3-6 years
2017
$1,877,500
3-6 years
2017
$180,000
$128,000
-
$52,000
3-6 years
2017
$1,200,000
$840,000
$360,000
-
3-6 years
2018
$120,000
-
-
$120,000
3-6 years
2018
$2,460,000
6-10 Years
2019
$70,000
-
-
$70,000
6-10 Years
2019
$500,000
-
$450,000
$50,000
Project Name
STCIP#23- Lift Station Cathodic Protection Systems STCIP#24- Primary Effluent Heat Recovery STCIP#22- WWTP Improvements FY18 STCIP#15- Lake, Hirst, Kincaid and Monastery Streets Sewer Main Upgrades STCIP#26- WWTP Improvements FY19
STCIP#27- Lift Station Improvements
Description
Thomsen, Brady, Lincoln, Sandy Beach, Halibut Point, and Eagle Way Lift Stations Deploy Heat Pump Process Generator Replacement, Clafier Drives 3,550 feet of Main, 14 MHs, 74 services Vinyl Floor Replacement, Scum Collector Replace Electrical and Control Systems and Install New Transducer for The Old Sitka rocks, Granite Creek, Centennial, Castle Hill and BIHA Lift Stations
Page 63
$1,314,250 $563,250
$1,502,900 $644,100
-
$313,000
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Project Name
Description
Sitka, Alaska October 2012
Suggested Time Frame
Projected FY
Sanitary Sewer Improvements Cost Estimate (FY12 VALUE)
State Grant
State Loan
CBS WW Enterprise Fund
STCIP#18- Japonski Island Lift Station #5
Lift Station Replacement
6-10 Years
2020
$300,000
$189,000
$81,000
$30,000
STCIP#14- Viking Way and Valhalla Drive Sewer Main Upgrades
400 feet of Main, 3 MHs, 8 ervices. Project to be completed in conjuction with paving project.
6-10 years
2020
$310,000
-
$279,000
$31,000
STCIP#32- WWTP Improvements FY20
Channel Monster
6-10 years
2020
$55,000
6-15 years
2021
$470,000
-
$423,000
$47,000
6-10 years
2021
$380,000
-
$340,000
$40,000
6-10 Years
2021
$75,000
-
-
$75,000
6-10 Years
2022
$85,000
6-15 years
2022
$420,000
-
$375,000
$45,000
6-10 years
2022
$990,000
$630,000
$270,000
$90,000
STCIP#28- Lance Drive Sewer Main Upgrades STCIP#29- Tlingit Way, Marine and Seward Streets Sewer Main Upgrades STCIP#31- WWTP Improvements FY21 STCIP#33- WWTP Improvements FY22 STCIP#25- Princess Way, Seward Street, and Barracks Street Sewer Main Upgrades STCIP#30- Kimsham and Petersen Street Sewer Main Upgrades
650 feet of main, 3 MHs, 14 services. Project to be completed in conjuction with paving project. 400 feet of Main, 4 MHs, 11 services. Project to be completed in conjuction with paving project. Interior Lighting, DorrClone Classifer Dorr-Oliver Grit Collector, Wemco pumps 550 feet of Main, 4 MHs, 11 services. Project to be completed in conjuction with paving project. 1,600 feet of main, 8 MHs, 24 services. Project to be completed in conjuction with paving project.
Page 64
$55,000
$85,000
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Figure 9: Short-Term Capital Improvement Projects
Page 65
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Table 12 presents O&M costs for the proposed STCIP WWTP related project. Table 12: Near-Term Projects Annual O&M Cost Estimates
Labor Energy Consumables Contingency Total, Rounded Up
5.2
Treated Wastewater Effluent Disinfection $6,365 $31,670 $76,488 $22,905 $140,000
Biosolids Disposal Facility Upgrades $38,708 $65,534 $2,389 $21,326 $130,000
Primary Effluent Heat Recovery
($5,000)
Leachate Treatment and Disposal $45,027 $21,468 $125,277 $38,354 $240,000
Long-Term Capital Improvement Projects
The projects presented in Table 13 were developed to address the recommendations from the condition assessment and comments made by the CBS.
These projects are numbered to
correspond with Figure 10. The projects presented in Table 13 should be implemented in the future 10 to 20 years. Figure 10 provides an overview of Long-Term Capital Improvement Project (LTCIP) location.
Page 66
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Table 13: Long-Term Capital Improvement Projects Project Name LTCIP#1- Anna Drive Basin Sewer Main Upgrade LTCIP#2- Wolff Drive Sewer Main Upgrade LTCIP#3- Price Street Sewer Main Upgrade LTCIP#6- Observatory and Seward Sewer Main Upgrade LTCIP#18- Thomsen Harbor Lift Station Upgrades LTCIP#9- WWTP Roof Replacement LTCIP#4- Old Harbor Mountain Road Sewer Main Upgrade LTCIP#7- Sawmill Creek Road at Jarvis Street Sewer Main Upgrade LTCIP#8- Jamestown Drive Sewer Main Upgrade LTCIP#11- Long-Term WWTP Improvements
Suggested Time Frame
Projected FY
Sanitary Sewer Improvements Cost Estimate (FY12 VALUE)
10-20 years
2024
$430,000
$270,900 $116,100
$43,000
10-20 years
2025
$1,070,000
$674,100 $288,900
$107,000
10-15 years
2026
$190,000
$119,700
$51,300
$19,000
1,050 feet of main, 7 MHs, 29 services
10-20 years
2026
$900,000
$567,000 $243,000
$90,000
Hypochlorite Generator Addition
10-20 years
2025-30 (2028)
$225,000
$158,000
-
$67,000
Roof Replacement
10-20 years
2027
$500,000
-
-
$500,000
500 feet of main, 3 MHs, 12 services
10-20 years
2030
$400,000
$252,000 $108,000
$40,000
600 feet of main, 1 MH, 3 services
10-20 years
2030
$250,000
$157,500
$67,500
$25,000
275 feet of main, 1 MH, 6 services
10-20 years
2030
$200,000
$126,000
$54,000
$20,000
Moyno Pumps (FY26), Sludge Press (FY30), and Lime Equipment (FY31)
6-20 years
2026-2030+
$655,000
-
-
$655,000
Description
500 feet of main, 3 MHs, 14 services 1,450 feet of main, 4 MHs, 38 services 300 feet of main, 2 MH, 3 services
Page 67
State Grant
State Loan
CBS WW Enterprise Fund
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Figure 10: Long-Term Capital Improvement Projects
Page 68
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
5.2.1 Wastewater Secondary Treatment The CBS requested information on what might be required as upgrades to the treatment system should the 301(h) waiver be withdrawn, and the plant be reconfigured to produce secondary quality effluent. While this upgrade is not anticipated to occur in the near term, it is used to develop a basis for a LTCIP for the CBS sewer utility. The future projected WWTP loadings used for this planning analysis are summarized below: Average day influent wastewater flow Maximum day influent flow Average Influent BOD5 concentration COD/BOD5 ratio Average TSSs concentration Average influent temperature Average influent TKN
2 mgd 5 mgd 187 mg/L 2 210 mg/L 8 degrees Celsius 40 mg/L
For purposes of this plan, the treatment objectives of a secondary treatment plant would be as follows: 1. Produce the following minimum effluent quality 2. Average 30 day effluent BOD5 of 30 mg/L or less 3. Average 30 day effluent TSS of 30 mg/L or less 4. Average 30 day NH3-N concentrations of 10 mg/L or less 5. Median 30 day FC counts of 200/100 mL There are a number of alternative secondary treatment process configurations that are able to operate on municipal wastewater to achieve the aforementioned treatment objectives. Some of the more commonly deployed processes include the following: 1. Conventional Activated Sludge Treatment 2. Sequencing Batch Reactor Treatment 3. Integrated Fixed Film Activated Sludge Treatment 4. Membrane Bioreactor Treatment
Page 69
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
The foregoing are all aerobic processes that deploy aeration systems to furnish DO to heterotrophic microorganisms in support of their metabolic processes in which they oxidize organics in the influent wastewater.
More recently there has been increasing interest in
deployment of anaerobic biological processes as the primary mode of wastewater stabilization. These emerging alternative treatment technologies are of interest because of their inherent savings in aeration energy and, for larger treatment plants, their compatibility in supporting onsite combined heat and power generation facilities. For purposes of this review, a conventional activated sludge configuration is assumed. The main elements required for operation of the existing plant as a secondary treatment process include biological reactor basins, secondary clarifiers, effluent disinfection, and associated pumps, conveyance structures, and process automation control systems. While larger secondary treatment plants include primary clarification as pretreatment to the secondary process basins, it is not uncommon for smaller treatment facilities such as Sitka’s to operate with only screening and grit removal as pretreatment to the secondary processes. Existing solids processing gravity thickening and belt filter press dewatering would remain in service. Existing Plant Hydraulic Profile The existing plant’s hydraulic profile as shown in the plant’s record drawings includes a water surface elevation in the grit basins of 30.28 and 31.25 MSL for flows of 0.5 and 5.3 mgd, respectively. Water surface elevations in the existing primary basins are reported as 27.30 and 27.41 MSL for flows of 0.5 and 5.3 mgd, respectively. These data would suggest that the existing plant hydraulic profile allows insertion of secondary process basins between the grit basins and primary effluent trough outlet weir with an available gravity head of between 2.98 and 3.84 feet for flows of 0.5 to 5.3 mgd, respectively. This available differential head is sufficient to avoid interim pumping to lift degritted wastewater to the secondary process basins. Replacement of Existing Primary Basins The existing primary treatment process includes three sedimentation basins, each with approximate plan dimensions of 18 feet wide by 68 feet long and a side water depth (SWD) of approximately 9.8 feet.
Page 70
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
The SWD of the three existing basins is less than what would normally be installed for new secondary clarifiers. Issues related to operating shallow clarifier basins include limited volume for settled sludge storage, lower settled sludge solids concentration, and greater potential for solids washout during events of events of high influent flow to the plant. For planning purposes, the existing primary clarifiers would be replaced in their current location with similar rectangular basins with SWDs of between 14 and 16 feet deep. The new secondary clarifier basins would be configured with the following elements: 1. Three each rectangular common wall reinforced concrete basins 2. Secondary Effluent Weirs and Troughs 3. Sludge Collection Mechanism 4. Scum Collection Mechanism A. Return Activated Sludge (RAS) Pumps B. Waste Activated Sludge (WAS) Pumps C. Waste Scum Pumps D. Basin Drain Pumps New Secondary Biological Process Building New reactor basins would be installed to support the biomass used for stabilization of influent organics. For this review, these new aerated reactors would be configured as two parallel basins, with a total installed volume of approximately 1 million gallons. A common influent flow split box would be configured to direct flow to either or both of these basins as needed. Assuming a SWD of 15 feet, these basins would occupy a footprint of approximately 56 feet wide by 94 feet long. A process building would be constructed as a weather enclosure for these basins and the blowers and associated process equipment. A fine bubble diffused aeration system would be used to supply air and DO to the suspended growth biomass within the basins. Blowers sized to maintain mixed liquor DO concentrations of between 2 and 4 mg/L would deliver 2,200 to 2,800 cfm requiring between 100 and 125 Hp operating power. Other significant operating costs include process building heat, ventilation, and operational labor.
Page 71
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Other components of the secondary basin building would include: i. Administrative Offices for Superintendent ii. SCADA Control Room and Plant Operations Center iii. Conference Room and Operator Training Center iv. Document Archives Area v. Restrooms and Showers for Operations Personnel vi. Break Room Effluent Disinfection To achieve the target effluent microbial quality performance objective, disinfection of secondary effluent would be required. For purposes of this review, it is assumed a new UV effluent disinfection system would be required. Major elements of this process upgrade would include: 1. Secondary Effluent Channels and Channel Flow Control Gates for UV Equipment 2. UV Lamp Equipment 3. Building Enclosure over the UV Process Equipment 4. Connections to existing 24-inch marine outfall Residuals Processing and Disposal The upgrade to secondary treatment will result in the production of a larger volume of residual biosolids than currently produced by the existing primary treatment facility. For example, for an existing average day flow of 2 mgd, an influent TSS of 210 mg/L, a 60% reduction in solids across the primary basins, and 28% cake solids from the belt filter press operating on gravity thickened sludge conditioned with lime at 100 gm lime/kg dry sludge solids, the average sludge production rate is approximately 4.9 cy/day. By contrast, for an average day flow of 2 mgd, with no primary clarifiers, a conventional activated sludge plant producing effluent BOD and TSS concentrations in the mid-teens, and using the existing belt filter press to produce a 13% cake solids concentration operating on gravity thickened polymer conditioned waste activated sludge, the average sludge production rate is approximately 5.7 cy/day.
Page 72
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Based on the foregoing data, the volume of waste residuals produced for the secondary treatment process is expected to be greater than the volume of residuals produced by the existing primary treatment process. The implication is that the Biosolids Landfill will fill more quickly, and require an alternative residuals management scheme sooner than current operations with the primary treatment process. Reuse of Existing Process Equipment and Facilities The following process equipment would continue to be reused with the existing plant upgraded to operate as a secondary process. 1. Influent Raw Sewage Comminuter 2. Grit Removal Process Equipment 3. Gravity Thickener Operating on WAS and Secondary Scum 4. Belt Filter Press 5. Truck Haul Wastewater Residuals Conveyance 6. Biosolids Landfill Disposal Area 7. Marine Outfall and Submerged Diffuser Capital and Operating Costs Estimates of capital and operating costs were prepared for the upgrade to secondary treatment and are presented in the paragraphs below. Procedures used to estimate the cost of upgrading the existing primary treatment plant to secondary treatment are identical to those described for the STCIPs. Table 14 summarizes the Capital Cost estimated for developing a conventional activated sludge process at the site of the existing treatment facility. Table 15 presents estimates of O&M costs for the facility. Comparing operating costs between primary and secondary treatment, the cost to operate a secondary treatment plant may be two to four times the cost to operate a primary treatment plant, depending on local conditions, unit pricing for power, labor, and consumables, and what if any consideration is given to capital replacement costs.
Page 73
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Table 14: Upgrade to Secondary Treatment Capital Cost Estimates Conversion to Secondary Treatment Construction Cost Subtotal Construction Contractor’s General Requirements Project Contingency Construction Contractor O&P Project Bonding and Insurance Pilot Testing Engineering Design and Construction Management Owner Project Administration Project Permitting and Legal Support Surveying and Geotechnical Investigation Total, Rounded Up
$34,836,512 $3,483,651 $11,496,049 $12,454,053 $498,162 $0 $12,454,053 $996,324 $498,162 $1,494,486 $78,200,000
Table 15: Secondary Treatment Annual Operation and Maintenance Cost Estimates Conversion to Secondary Treatment Disinfection Labor $82,086 Energy $296,436 Consumables $385,992 Contingency $152,935 Total, Rounded Up $920,000
5.3
Cost Estimation Methodology
5.3.1 Collection System The CBS bid tabs were provided for recent CBS utility projects. The Seward Street Repaving Project (2009), Oja Way Sewer and Water Replacement Project (2010), and Monastery Street Water and Sewer Project (2011) bid tabs were used as a basis for recent unit costs for sanitary sewer projects. The costs for per linear foot of new sewer main, new sewer services, and new sewer manholes were determined by averaging the unit prices from the three CBS bid tabs provided. Additional construction costs related to the projects such as mobilization, paving, filling existing mains w/slurry, traffic maintenance, etc., were calculated using the Oja Way and Monastery Street utility projects, which were believed to be most representative of the proposed CIP projects.
Additional construction costs were estimated at approximately 200% of the cost
directly associated with the sewer improvements (sewer main, services, manholes).
Page 74
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
In addition,
A 25% contingency cost was included in the total project cost to account for variances in the project scope, construction costs, and cost estimating methodology.
A 20% design, inspection, and construction administration cost was included in the total project cost.
Estimated lift station construction costs were estimated based on comparisons with similar projects in Southeast Alaska and total projects include the estimated construction cost plus 50% to account for design, inspection, and CBS administration and contingency. 5.4
Wastewater Treatment Plant
The following assumptions were used in the preparation of project capital costs. 1. Cost values are presented as year 2011 United States dollars. No escalation is assumed for future changes to construction costs. 2. Components of cost used to prepare estimates of project capital costs include: A. Construction Cost Subtotal, assumed to be the costs of constructing the project scope of work, exclusive of Contractor General Requirements, Contingency for Unidentified Work Scope, and Contractor Overhead and Profit. B. Construction Contractor’s General Requirements i. Defined as the Construction Contractor’s costs for project management, project facilities, utilities, permits and engineering, tools and supplies, miscellaneous equipment, travel, insurance, taxes, and maintenance, ii. Assumed to be 10% of the Construction Cost Subtotal. C. Project Contingency for Unidentified Work Scope identified during design is assumed to be 30% of the sum of the Construction Cost Subtotal and the Construction Contractor’s General Requirements D. Construction Cost without Overhead and Profit (O&P) is the sum of the Construction Cost Subtotal, the Contractor’s General Requirements, and the Project Contingency for Unidentified Work Scope. E. Contractor O&P, defined as 25% of the Construction Cost without O&P
Page 75
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
F. Total Constructed Cost, defined as the sum of the Construction Cost without O&P and the Contactor O&P G. Project Bonding and Insurance, assumed to be 1% of the Construction Cost without O&P H. Project Pilot Testing, including efforts to confirm proposed treatment process performance and identify design criteria I. Engineering Design and Construction Contract Administration Management, assumed to be 25% of the Construction Cost without O&P J. Owner Administration of the Project, assumed to be 2% of the Construction Cost without O&P K. Project Permitting and Legal Support Services, assumed to be 1% of the Construction Cost without O&P L. Surveying and Geotechnical Investigations, assumed to be 3% of the Construction Cost without O&P Components of cost used to prepare estimates of O&M costs include: 1. Labor costs assuming: A. O&M employee base pay of $50,000 per year with a benefits package equal to 25% of the annual base pay. 2. Energy Costs including electrical power and heat A. Electrical energy cost of $0.07/kWh 3. Consumables’ Costs including A. Procurement and shipping costs for replacement parts to maintain equipment B. Payments to a capital recovery fund to amortize major equipment C. Fuels and lubricants to operate rolling equipment D. Services required for operations such as phone, internet, and laboratory services 6.0
WASTEWATER SYSTEM FINANCIAL PROGRAM
Working with DOWL HKM, FCS Group provided the Financial Program in support of the CBS Wastewater System Master Plan. This section documents the objectives, assumptions, findings, Page 76
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
and recommendations for the Financial Program. An electronic copy of the wastewater rate model will be submitted separately on CD-ROM. Major study elements include:
Evaluation of Financial Policies Development of Capital Financing Strategies Assessment of Revenue Needs (FY 2012/13 to 2021/22) Forecast of Rate Adjustments (FY 2012/13 to 2021/22)
Capital Financing strategies were developed for a 6-year, 10-year, and 20-year period to coincide with the master planning effort. The revenue needs assessment and resulting rate forecast focused on the 10-year period (FY 2012/13 to 2021/22). 6.1
Financial Policies
In order to establish adequate rates, a utility must define its benchmark(s) for financial performance.
Typically, several different standards are necessary to satisfy all financial
objectives. Like any business, a municipal utility requires certain minimum levels of cash reserves to operate; these reserves address variability and timing of expenditures and receipts, as well as occasional disruptions in activities, costs, or revenues. In addition, as a public service provider, a municipal utility has a commitment to provide an essential service at a certain standard. Therefore, protection against financial disruption is very important. This section outlines best practice financial policies that the CBS might consider in the context of this mission. It also addresses policy direction from CBS staff for incorporation of selected policies into this rate study, appropriate to the unique needs and circumstances of the CBS. These policies form the foundation of utility management and, with routine application, can act as overarching guidelines for consistent decision making. The following policies are evaluated:
Self-Supporting Enterprise Fund Cash Reserves
System Reinvestment Funding Debt Management
6.1.1 Self-Supporting Enterprise Fund A fund is an accountability unit used to maintain control over resources segregated for specific activities or objectives. Proprietary, or enterprise, funds report services for which a utility
Page 77
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
charges customers a fee. These funds are generally self-supporting, receiving revenues for payment of services on a user fee basis as opposed to property taxes or other general fund revenue sources. Conceptually, and by accounting convention, a utility is divided into two primary activity centers; operating and capital. For financial forecasting purposes, operating costs tend to be ongoing and predictable, while capital costs are highly variable in comparison. In addition, each of these has specific funding sources and mechanisms available to them. When determining the amount of rate revenue required, we necessarily separate these cost centers to reflect these differences. Note, however, that there is some interaction between the two centers - for example, capital projects may be funded through a policy of system reinvestment funding from rates, direct rate funding, or through debt issuance. In each case, rates are paying for capital projects. These demands on operational resources (primarily rates) thus become expenditures from that perspective. This ideal separation is illustrated in the exhibit below. Capital Account Sources of Funding Connection Charges Debt Proceeds Transfers from Operations Interest Earnings Grants Uses Capital Project Funding
Operating Account Sources of Funding User Rates Interest Earnings Miscellaneous Service Fees Uses Operating & Maintenance Expenses Rate-Funded Capital System Reinvestment (R&R) Funding Debt Service Addition to Operating Reserves
Though virtually all utilities maintain reserves in some form, the segregation of those reserves can vary greatly between utilities. While a complete delineation of the functions of reserves is not always documented, the underlying purposes remain valid components of reserve management. Further, as reserve objectives are identified, the mechanisms for managing, using, and replenishing those reserves become important elements of financial management.
Page 78
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
When evaluating reserve levels and objectives, it is vital to recognize that the value of reserves lies in their use. It goes without saying that a strategy that deliberately avoids the use of reserves negates their purpose. Fluctuations of reserve levels merely indicate that the system is working, while lack of variation strongly suggests that the reserves are, in fact, unnecessary. The CBS maintains a single Wastewater Fund in which operating and capital-related cash deposits and withdrawals are made. No specific policy is in place to establish the desired level of cash balances. For purposes of this financial analysis, we have separated the Wastewater Fund into an Operating Account and a Capital Account to identify appropriate sources and uses for each account. The rate strategy developed for this study presumes that the Wastewater Fund will operate as a self-supporting enterprise fund, with minimum cash balances established as further discussed below. 6.1.2 Operating (Working Capital) Reserves An operating reserve is essentially a minimum unrestricted fund balance used to accommodate the short-term cycles of revenues and expenses. For rate modeling, it would be a minimum balance that is maintained through rate increases as necessary; for budgeting, it would be a minimum ending balance for the utility operating fund; and for accounting, the balance would simply appear as part of unrestricted cash and investments. Operating or working capital reserves provide a “cushion” that can be used to cover cash balance fluctuations. These reserves are intended to address both anticipated and unanticipated changes in revenues and expenses. Examples of the former include billing and receipt cycles, payroll cycles, and other payables; examples of the latter include droughts, economic cycles, and other periods of low demand. Target funding levels are often characterized in terms of a recommended number of days of cash O&M expenses, with the minimum number of days varying with the expected risk of unanticipated needs - these are likely to vary among utilities based on the relative volatility of revenues and expenses.
Page 79
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Industry practice ranges from 30 days to 120 days of O&M, with the lower end more appropriate for utilities with very stable revenue streams and the higher end more appropriate for utilities with significant seasonal variations. This study incorporates an operating account cash balance target of between 30 and 45 days of O&M expense. This target level is consistent with industry practice for utilities with primarily flat rate systems with relatively stable revenues year around. The target balance should be evaluated as of June 30 of each fiscal year, with the balance expected to vary during the course of a year. In any year where the cash balance exceeds the target, we recommend transferring the excess to the capital account to help pay for capital projects. The rate management strategy presented in this study demonstrates that this target is met in each year of the study period. 6.1.3 Capital Contingency In addition to protecting against variations in operating costs and revenues, it is prudent to establish and maintain a capital contingency reserve to meet unexpected emergency capital outlays. While it would be impractical to reserve against major system-wide failures such as earthquake or other catastrophic events, it is reasonable and prudent to identify and quantify possible failures of individual system components. There are several methods used in the industry to set the level of these types of reserves, including:
Most Costly Piece of Equipment: A utility may predict the cost of replacing the most expensive piece of equipment or facility that each utility relies on, such as its largest or most powerful pump, and reserve an amount equal to the cost of a major repair of that facility.
Average Annual Cost of Capital Program: Alternatively, a utility may use a percentage of its 5- or 10-year capital program, or set the reserve equal to the average annual costs of it capital program.
Percentage of Utility Plant: As a rule of thumb, a utility may elect to hold a contingency reserve equal to a percentage of its fixed assets, usually 1% to 2% of the original cost of total assets. Essentially, the contingency reserve becomes a minimum balance in the
Page 80
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
utility capital account. If a system reinvestment funding policy has been established, those cash resources can also be relied on for this purpose (nesting system reinvestment funding monies within the contingency reserve). This would avoid the need for multiple reserve policies when they can serve overlapping purposes.
Reliance on Other Reserve Resources: Many cities maintain “rainy day” funds as hedges against emergencies or unusual circumstances. In such cases, extending the applicability of these funds to utility emergency repairs could preclude the need for a separate utility contingency.
The rate strategy developed for this study incorporates a minimum capital contingency of 1% of utility assets, nested with the policy to fund system reinvestment through rates, further discussed below. Additional resources used toward this balance include interest earnings and transfers of excess operating reserves. 6.1.4 System Reinvestment Funding System reinvestment funding from rates provides for: (1) ongoing system integrity through reinvestment in the system - replacing physical assets with cash assets; (2) rate stability through regular accumulation of cash toward funding future replacement costs; and (3) charging customers commensurate with their consumption of system facilities. Each year, wastewater system assets lose value, and as they lose value they are moving toward eventual replacement. That accumulating loss in value and future liability is measured for financial purposes as annual depreciation expense, which is based on the original cost of the asset over its anticipated useful life. While this expense reflects the consumption of the existing asset at its original investment, the replacement of that asset will likely cost much more, factoring in inflation and construction conditions. Therefore, the added annual replacement liability is even greater than the recorded annual depreciation. Given the integrated nature of system assets, it is likely that multiple assets will have to be replaced concurrently. This further exacerbates the issue of capital investment “spikes.” It is prudent to develop a long-term replacement funding strategy to mitigate the impacts to ratepayers during these periods of substantial system investment.
Page 81
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
System reinvestment funding specifically addresses the concept of funding repair and replacements through a regular and predictable rate provision. By establishing a steady funding mechanism, a system reinvestment funding program can then be structured, which takes into account the defined funding source, accumulation of funds when funding exceeds near-term needs, and augmentation of funds (for example through debt) when repair and replacement needs exceed available cash resources. A common approach of municipal utilities is to establish a policy of system reinvestment funding through rates using depreciation expense as the benchmark for the appropriate level of funding. Depreciation is a commonly used accounting measure of the decline in asset value attributable to the wear and tear associated with routine use. Depreciation expense is recorded as a system expense for purposes of financial reporting. However, because depreciation expense is a non-cash expense, it generally does not appear in cash-based budgets, thus potentially disguising a very real and accumulating cost of the system. Collecting the amount of annual depreciation expense through rates provides a stable funding source for capital expenditures, especially those related to repair and replacement of existing system plant. It is important to note that depreciation is not equal to the future replacement cost of the utility systems, but serves simply as a starting point for addressing long-term replacement needs. As noted previously, actual system replacement costs will be significantly higher than the cost originally incurred to build the systems. The CBS’s historical practice has been to fund capital needs through a combination of grants, loans, and “pay-as-you-go” funding from rates.
While this approach meets annual capital
funding needs, it would likely result in significant “spikes” in rates to fund inevitable peaks in infrastructure needs as wastewater system assets age. A system reinvestment funding policy to annually fund from rates an amount equal to annual depreciation expense is included beginning in FY 2013/14. To mitigate near-term rate impacts, this policy was phased in over the 10-year study period. Once system reinvestment funding is fully phased in, funds will accumulate in years where system reinvestment funding deposits exceed capital replacement needs and will be drawn down as needed to appropriately balance the use of cash and debt financing of capital projects.
Page 82
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
It is worth noting that as state grant and low-cost loans are becoming more and more competitive, eligibility criterion are expanding to include review of best management practices such as system reinvestment funding policies. 6.1.5 Debt Management Debt management policies are intended to: (1) provide an appropriate balance of debt and equity financing of capital needs; (2) maintain credit worthiness for future debt issuance; and (3) promote equity between existing and future ratepayers. As noted above, a combination of sources (grants, loans, and cash) are assumed to fund capital needs. The priority of funding will of course continue to secure as much grant funding as possible, followed by the combination of low cost loans and cash financing. Historically, the CBS has had limited cash to fund the capital program and thus has relied on the issuance of loans. With the implementation of a system reinvestment funding policy, the CBS will have more flexibility in its decision to use cash or debt in the future. Standard loan/bond underwriter preference for municipalities is to maintain a debt-to-equity ratio of no greater than 50% debt/50% equity (cash). The wastewater utility is currently at a 19% debt to 81% equity ratio, which is well within these guidelines. To assist the CBS in maintaining this ratio, we recommend debt-financing no more than 75% of the capital program over a 6-year rolling period. 6.1.6 Cumulative Impact of Fiscal Policies Satisfying all of these policy objectives might seem daunting at first, but the outcome is that multiple benchmarks overlap, resulting in the simultaneous achievement of multiple objectives within the same level of rates. For example, the policy for system reinvestment funding through rates serves several beneficial purposes: it provides a cash resource to the capital account that helps build capital contingency reserves; it contributes to the cash funding of capital, helping to maintain healthy debt-to-equity ratios; and it helps to avoid rate spikes during periods of significant replacement needs. Each criterion provides a different perspective on how much revenue is appropriate, and satisfying them all generally results in higher rates than if only a single standard is considered. However, this approach reduces financial risk and increases financial stability - any near-term increases that result will help to promote more stable, and lower, long-term rates.
Page 83
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
In summary, utility reserves are intended to absorb fluctuation in revenues or expenditures without abrupt rate impacts.
As reserve levels vary, a policy structure can define the
mechanisms for regulating those levels and returning them to intended targets. The general objectives of these and other policy elements are stable and predictable rates and funding sources, along with equitable recovery of costs from customers as they are being incurred. 6.2
Study Assumptions
In addition to the financial policies summarized above, the following major assumptions were used in preparing this analysis:
The study period includes FY 2012/13 - FY 2031/32 for capital financing strategies and FY 2012/13 - FY 2021/22 for focused revenue needs and rate adjustment strategies.
The FY 2011/12 beginning cash balance of $3.6 million was first allocated to the operating account to meet the maximum target of 45 days of O&M in 2018 ($500,000), with the remainder allocated to the capital reserves ($3.1 million).
Interest earnings are generated in the operating and capital accounts based on the assumed interest rate applied to annual beginning cash balances. Interested earnings are estimated at 3.0% in the current year, reducing to 1.0% over the study period, consistent with economic forecasts.
Revenue under existing rates is assumed to remain fairly flat over the study period, currently at about $2.0 million. For rate setting purposes, conservative customer growth is assumed at about 10 new lots per year (0.25% per year).
Miscellaneous revenues (jobbing labor, bad debt and other miscellaneous revenues) are budgeted at $161,200 and average about $185,000 over the study period.
O&M expenditures are based on the FY 2011/12 operating budget, escalated by 2.5% annual inflation, with the exception of employee benefits, which are escalated at 3.5%. O&M expenses range from $2.1 million to $2.7 million by the end of the study period.
Connection charge revenue, estimated at $6,000 per year (calculated at $600 per new lot), is assumed to be used to help fund capital projects.
Page 84
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Debt service on existing state loans averages about $213,000 a year over the 10-year study period.
The annual capital program was provided in 2012 costs, then escalated by 3.0% per year to the year of anticipated construction for each project.
Future years’ debt service payments incorporate impacts of the proposed capital financing plan. State loans assume an interest rate of 1.5% and a 20-year repayment term, and are assumed to fund capital needs in excess of grant and cash funding. Incremental debt service of about $119,000 begins in FY 2012/13, increasing to about $207,000 by the end of the 10-year study period.
System reinvestment funding (equal to annual depreciation expense) is phased in over the 10-year study period beginning in FY 2013/14 at about $162,000, increasing to about $1.7 million by the end of study period.
6.3
Revenue Requirement Analysis
The revenue requirement analysis determines the total amount of revenue needed each year of the study period to pay O&M costs, capital-related costs, and impacts of financial policies. A capital funding analysis, revenue needs assessment, rate forecast and reserves analysis was prepared for the wastewater utility. Forecasted total financial requirements were compared against forecasted total rate revenue under existing rates to determine annual and cumulative rate adjustments needed to ensure financial sustainability over time. Results are summarized below. 6.3.1 Capital Financing Strategy The CBS has identified approximately $26 million (escalated) in wastewater capital projects planned for construction through FY 2031/32. Capital spending levels vary from year to year, with an average annual spending of roughly $1.3 million. The capital funding plan assumes a mix of funding from cash balances (including system reinvestment funding from rates) and state grants and loans. Exhibit 1 summarizes funding sources for the 6-year, 10-year, and 20-year capital programs. As noted previously, the rate strategy and forecast focuses on the 6-and 10-year capital plan, as shown in Exhibit 2.
Page 85
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Exhibit 1: Total Capital Financing Plan Capital Funding
6-Yr Total
10-Yr Total
20-Yr Total
$ 13,508,544
$ 18,268,045
$ 25,882,211
Grants
7,212,287
8,298,374
11,878,443
State Loans
1,506,282
1,506,282
1,506,282
Capital Fund Balance
4,789,976
8,463,389
12,497,486
$ 13,508,544
$ 18,268,045
$ 25,882,211
Total Capital Projects
Total Funding Sources
6.3.1.1 Six-Year Capital Financing Plan Of the $26 million in planned capital costs, about $13.5 million, or 52%, is scheduled to occur during the 6-year study period. About $7.2 million (53%) is expected to be funded with grants, another $1.5 million (11%) funded from loans, with the remaining $4.8 million (35%) funded from cash, generated through existing cash balances and system reinvestment funding. 6.3.1.2 Ten-Year Capital Financing Plan Exhibit 2 summarizes the 10-year capital financing plan (FY 2012/13 - 2021/22). Exhibit 2: Ten-Year Capital Financing Plan FY Ending
Capital Funding Total Capital Projects Grants State Loans Capital Fund Balance Total Funding Sources
2013
2014
2015
2016
2017
2018
Subtotal
2019
2020
2021
2022
Total
$ 978,500
$ 1,193,513
$ 1,518,891
$ 2,902,687
$ 3,834,299
$ 3,080,655
$13,508,544
$ 701,028
$ 842,402
$ 1,206,915
$ 2,009,155
$18,268,045
533,540
-
914,066
1,324,386
2,645,753
1,794,541
7,212,287
-
239,420
-
846,667
8,298,374
-
-
-
259,032
662,554
584,695
1,506,282
-
-
-
-
1,506,282
444,960
1,193,513
604,824
1,319,269
525,992
701,418
4,789,976
701,028
602,983
1,206,915
1,162,488
8,463,389
$ 978,500
$ 1,193,513
$ 1,518,891
$ 2,902,687
$ 3,834,299
$ 3,080,655
$13,508,544
$ 701,028
$ 842,402
$ 1,206,915
$ 2,009,155
$18,268,045
About $18.3 million (71%) of the planned capital needs occur within the 10-year study period. About $8.3 million (45%) is expected to be funded with grants, $1.5 million (8%) funded from loans, with the remaining $8.5 million (46%) funded from cash balances. Based on this financing plan, the capital program will remain within the suggested debt management policy of funding no more than 75% of the program with debt. 6.3.1.3 Total Capital Financing Plan The total capital financing plan was summarized in Exhibit 1. Over the 20-year study period, about $11.9 million (46%) is expected to be funded with grants, $1.5 million (6%) funded from loans, with the remaining $12.5 million (48%) funded from cash balances.
Page 86
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
6.3.2 Revenue Needs Assessment Wastewater revenue requirements (summarized in Exhibit 3) reflect the assumptions described herein. Existing rate revenues are based on FY 2011/12 rates, plus growth, prior to any proposed rate increases. Interest earnings are based on the fiscal year’s beginning operating account balance. As shown, forecasted revenues under existing rates are not sufficient to meet the needs of the utility over the study period. Exhibit 3: Revenue Needs Assessment FY Ending
Revenue Requirements
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
$ 2,040,062
$ 2,045,162
$ 2,050,275
$ 2,055,401
$ 2,060,539
$ 2,065,691
$ 2,070,855
$ 2,076,032
$ 2,081,222
$ 2,086,425
166,800
170,970
175,244
179,625
184,116
188,719
193,437
198,273
203,230
208,310
15,084
8,660
5,711
3,630
2,317
2,747
2,981
2,814
2,642
2,573
$ 2,221,946
$ 2,224,792
$ 2,231,230
$ 2,238,656
$ 2,246,973
$ 2,257,156
$ 2,267,273
$ 2,277,118
$ 2,287,094
$ 2,297,309
Revenues Existing Rate Revenues Other Operating Revenues Operating Acct Interest Earnings Total Revenues Expenses Annual O&M Expenditures
$ 2,117,901
$ 2,174,735
$ 2,233,125
$ 2,293,117
$ 2,354,754
$ 2,418,082
$ 2,483,150
$ 2,550,006
$ 2,618,701
$ 2,689,286
Existing Debt Service
238,500
237,760
237,019
236,280
208,430
207,689
206,950
206,209
205,469
204,729
New Debt Service
118,862
118,862
118,862
118,862
133,950
172,541
206,597
206,597
206,597
206,597
-
161,309
327,393
500,203
690,158
901,041
1,118,217
1,314,401
1,515,651
1,726,832
$ 2,475,263
$ 2,692,667
$ 2,916,400
$ 3,148,462
$ 3,387,292
$ 3,699,353
$ 4,014,914
$ 4,277,213
$ 4,546,418
$ 4,827,444
System Reinvestment Total Expenses
Annual Surplus / (Deficiency) $ (253,317) $ (467,875) $ (685,170) $ (909,806) $ (1,140,320) $ (1,442,197) $ (1,747,642) $ (2,000,095) $ (2,259,324) $ (2,530,136)
A summary of ending fund balances is shown in Exhibit 4. Exhibit 4: Ending Fund Balances FY Ending
Ending Fund Balances
2013
Operating Fund
2014
2015
2016
2017
2018
2019
2020
2021
2022
346,384
285,547
241,975
231,737
274,659
298,120
281,377
264,240
257,325
267,619
Capital Fund
2,522,647
1,559,510
1,319,269
525,992
701,418
943,526
1,376,150
2,107,330
2,443,139
3,037,915
Total
2,869,031
1,845,057
1,561,244
757,729
976,077
1,241,646
1,657,527
2,371,570
2,700,464
3,305,534
6.3.3 Rate Schedule Exhibit 5 presents the proposed rate schedule for the study period. This rate strategy was designed to smooth the necessary rate increases over time, while integrating financial policies, funding the capital program, and meeting the annual operational needs of the wastewater utility.
Page 87
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Exhibit 5: Rate Schedule FY Ending
Rate Forecast
Existing
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
Annual Rate Adjustment
9.50%
9.50%
9.50%
9.50%
9.50%
9.50%
6.50%
6.50%
6.50%
6.50%
Cumulative Rate Increase
9.50%
19.90%
31.29%
43.77%
57.42%
72.38%
83.58%
95.52%
108.23%
121.76%
$42.19
$46.20
$50.59
$55.39
$60.66
$66.42
$70.73
$75.33
$80.23
$85.44
$3.66
$4.01
$4.39
$4.81
$5.26
$5.76
$4.32
$4.60
$4.90
$5.21
$42.19
$46.20
$50.59
$55.39
$60.66
$66.42
$70.73
$75.33
$80.23
$85.44
Monthly Residential Rate
$38.53
Monthly Dollar Impact Commercial (General, Misc)
$38.53
Commercial Specifics (additional) Bar, lounge, restaurant (per seat)
$1.93
$2.11
$2.31
$2.53
$2.77
$3.03
$3.32
$3.54
$3.77
$4.01
$4.27
Barber, beauty shop (per station)
$23.12
$25.31
$27.72
$30.35
$33.24
$36.39
$39.85
$42.44
$45.20
$48.14
$51.27
Bowling alley (per lane)
$85.44
$38.53
$42.19
$46.20
$50.59
$55.39
$60.66
$66.42
$70.73
$75.33
$80.23
Church (per 10 seats)
$3.85
$4.22
$4.62
$5.06
$5.54
$6.07
$6.64
$7.07
$7.53
$8.02
$8.54
Office/office space (over 10 emp.)
$7.71
$8.44
$9.24
$10.12
$11.08
$12.13
$13.28
$14.15
$15.07
$16.05
$17.09
Hospital (per bed)
$30.82
$33.75
$36.96
$40.47
$44.31
$48.52
$53.13
$56.59
$60.27
$64.18
$68.36
Meat Market
$115.59
$126.57
$138.60
$151.76
$166.18
$181.97
$199.25
$212.20
$226.00
$240.69
$256.33
Grocery store
$308.24
$337.52
$369.59
$404.70
$443.14
$485.24
$531.34
$565.88
$602.66
$641.83
$683.55
Rest Home (per bed)
$7.71
$8.44
$9.24
$10.12
$11.08
$12.13
$13.28
$14.15
$15.07
$16.05
$17.09
Hotel/motel (per room)
$11.56
$12.66
$13.86
$15.18
$16.62
$18.20
$19.93
$21.22
$22.60
$24.07
$25.63
Dormitory/boarding house (per bed)
$11.56
$12.66
$13.86
$15.18
$16.62
$18.20
$19.93
$21.22
$22.60
$24.07
$25.63
$5.78
$6.33
$6.93
$7.59
$8.31
$9.10
$9.96
$10.61
$11.30
$12.03
$12.82
$308.24
$337.52
$369.59
$404.70
$443.14
$485.24
$531.34
$565.88
$602.66
$641.83
$683.55
Launderette (per wet machine)
$38.53
$42.19
$46.20
$50.59
$55.39
$60.66
$66.42
$70.73
$75.33
$80.23
$85.44
Schools, college, day care (per 10 students)
$15.41
$16.88
$18.48
$20.23
$22.16
$24.26
$26.57
$28.29
$30.13
$32.09
$34.18
$7.71
$8.44
$9.24
$10.12
$11.08
$12.13
$13.28
$14.15
$15.07
$16.05
$17.09
$77.06
$84.38
$92.40
$101.17
$110.79
$121.31
$132.84
$141.47
$150.67
$160.46
$170.89
$38.53
$42.19
$46.20
$50.59
$55.39
$60.66
$66.42
$70.73
$75.33
$80.23
$85.44
$1.93
$2.11
$2.31
$2.53
$2.77
$3.04
$3.33
$3.54
$3.77
$4.02
$4.28
Bed & breakfast (per room) Commercial Laundry (per wet machine)
Theater (per 10 seats) Car wash (per stall); no minimum Sewer Service with Metered Water Base Rate Volume Rate (per kgal)
For informational purposes only, Exhibit 6 presents a comparison of residential wastewater bills and proposed rates with a sampling of neighboring jurisdictions.
Page 88
City and Borough of Sitka Municipal Sanitary Sewer Master Plan
Sitka, Alaska October 2012
Exhibit 6: Comparison of Residential Wastewater Bills
Residential Wastewater Bills (as of October 2012) $90.00 $80.69 $80.00 $70.00
$64.13
Monthly Bill
$60.00 $50.00 $42.19 $40.00
$34.32
$35.19
Petersburg [a]
Wrangell
$37.35
$37.45
Anchorage
Ketchikan
$44.40
$38.53
$30.00 $20.00 $10.00 $Sitka (current) Sitka (proposed 2013)
[a] Assumes average monthly use of 4,200 gallons
Page 89
Haines
Juneau
Fairbanks
APPENDIX A Lift Station Inventory Forms
Lift Station Name Cove Lift Station Location
Lift Station Data Year Constructed
2010
Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
6.5
Voltage
480
Phase
3
Pump Data Date Pumps Installed
2010
Manufacturer
FLYGT
Pump Model
NP3102.095SH
Design Flow Rate Design Discharge Head
49'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) 2 pump station
Capital Improvements
_________________________________________________ Appendix A - Page 1
Lift Station Name Old Sitka Rocks Lift Station Location
Lift Station Data Year Constructed
1985
Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
7.5
Voltage
480
Phase
3
Pump Data Date Pumps Installed Manufacturer
Cornell
Pump Model
4NNT-YM
Design Flow Rate
185 gpm
Design Discharge Head
42'
Pump 1 Measured Flow Rate Date Measured
1/13/2003
Pump 2 Measured Flow Rate Date Measured
128 122
1/13/2003
Comments 1) 2 Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 2
Lift Station Name Granite Creek Lift Station Location
Lift Station Data Year Constructed
1985
Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev
15.40'
Wet Well Depth Force Main Diameter
5" HDPE
Electrical Data Motor Horsepower
2
Voltage
480
Phase
3
Pump Data Date Pumps Installed Manufacturer
Cornell
Pump Model
4 NNT-VM
Design Flow Rate
235 gpm
Design Discharge Head
17'
Pump 1 Measured Flow Rate Date Measured
1/13/2003
Pump 2 Measured Flow Rate Date Measured
163 165
1/13/2003
Comments 1) Record Drawing From Cove Interceptor (Granite Creek Interceptor to Cove) Sheets 3,10,12 2) 2 Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 3
Lift Station Name Halibut Point Lift Station Location
Lift Station Data Year Constructed
1984
Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter
8.0' X 9.0'
Wet Well Lid Elev
18.00'
Wet Well Invert Elev
3.17'
Wet Well Depth
14.83'
Force Main Diameter
10"
Electrical Data Motor Horsepower
7.5
Voltage
200
Phase
3
Pump Data Date Pumps Installed
1984
Manufacturer
Cornell
Pump Model
6NHT-VM
Design Flow Rate
650 gpm
Design Discharge Head
20'
Pump 1 Measured Flow Rate Date Measured
2/22/1993
Pump 2 Measured Flow Rate Date Measured
702 687
2/22/1993
Comments 1) 3 Pump Station 2) Record Drawings From Granite Creek Interceptor (Granite Creek to City Limits) Sheet 16
Capital Improvements None.
_________________________________________________ Appendix A - Page 4
Lift Station Name Channel Lift Station Location
Lift Station Data Year Constructed
1984
Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
3
Voltage
230
Phase
1
Pump Data Date Pumps Installed
1984 1 Compressor Replaced 1985
Manufacturer
Speedaire Compressor
Pump Model
Pneumatic Ejector 32172
Design Flow Rate Design Discharge Head Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) 2 Airpots 2 Compressors
Capital Improvements 1) No vehicle access to lift station. Need to provide vehicle access to lift station. 2) Lift Station in poor shape and needs to be replaced with new lower maintenance submersible pump lift station.
_________________________________________________ Appendix A - Page 5
Lift Station Name Sandy Beach Lift Station Location
Lift Station Data 1984
Year Constructed Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter
14.0' X 9.0'
Wet Well Lid Elev
24.00'
Wet Well Invert Elev
2.00'
Wet Well Depth
22.00'
Force Main Diameter
12"
Electrical Data Motor Horsepower
7.5
Voltage
200
Phase
3
Pump Data Date Pumps Installed
1984
Manufacturer
Cornell
Pump Model
6 NHT-VM
Design Flow Rate
645 GPM
Design Discharge Head
20'
Pump 1 Measured Flow Rate Date Measured
1/14/2003
Pump 2 Measured Flow Rate Date Measured
485
1/14/2003
Pump 3 Measured Flow Rate Date Measured
445
433
1/14/2003
Comments 1) Record Drawings From Granite Creek Interceptor (Granite Creek to City Limits) Sheet 16 2) 3 Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 6
Lift Station Name Brady Lift Station Location
Lift Station Data Year Constructed
1983
Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter
9'X14' Rectangle
Wet Well Lid Elev
16.0'
Wet Well Invert Elev Wet Well Depth Force Main Diameter
14"
Electrical Data Motor Horsepower
25/14
Voltage
460
Phase
3
Pump Data 1983
Date Pumps Installed Allis Chalmers
Manufacturer
400
Pump Model Design Flow Rate
2490 High 1620 Low
Design Discharge Head
21'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Brady Lift Station has three pumps. Halibut Point Road Interceptor 9 of 11. 2) Record Drawings From Lift Station Brady Street Sheets 9,10 3) No VFD Pump runs low and kicks into high with larger flows.
1) Plug valve has failed in the dry pit and there is no way to isolate pumps for maintenance. Plug valve needs to be replaced.
_________________________________________________ Appendix A - Page 7
Lift Station Name Old Thomsen Harbor Lift Station Location
Lift Station Data Year Constructed
1982
Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter
9.0' X 15.0'
Wet Well Lid Elev
6.51'
Wet Well Invert Elev
-6.7'
Wet Well Depth
13.21'
Force Main Diameter
16" and 12"
Electrical Data Motor Horsepower Voltage Phase
#1 60 on VFD
#2- #3 100
460
460
3
3
Pump Data 1982
Date Pumps Installed Manufacturer
Allis Chalmers
Allis Chalmers
Pump Model
NSWV
NSWV
Design Flow Rate
3340 High 1470 Low
Design Discharge Head
#2-80'
#3-56'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) 2) 3) 4)
Old Thomsen Harbor Lift Station has three pumps. Main lift station to pump wastewater from downtown to the wastewater treatment plant. Record Drawings From Lift Stations Thomsen Harbor Sheets 13,14,15,16,27,30,31 3 Pump Station
Capital Improvements 1) Need to add a brine electrolosis disinfection system to add hypochlorite for odor control at the wastewater treatment plant.
_________________________________________________ Appendix A - Page 8
Lift Station Name New Thomsen Harbor Lift Station Location
Lift Station Data Year Constructed Type Submersible Suction Lift
X
Dry Pit Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
1.5
1.5
1.5
Voltage
230
230
230
1
1
1
At Old Thompsen
At Crescent Harbor
Phase
Pump Data Date Pumps Installed Manufacturer
ABS
ABS
ABS
Pump Model
Piranha
Piranha
S20
30
30
35
Design Flow Rate Design Discharge Head Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Small suction lift system to pump waste water from vessel on-board holding tanks. 2) Lift station only has a single pump.
Capital Improvements None.
_________________________________________________ Appendix A - Page 9
Lift Station Name Blatchley Lift Station Location
Lift Station Data Year Constructed
mid 1990's
Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
5.0'
Wet Well Lid Elev
38.0'
Wet Well Invert Elev
31.49'
Wet Well Depth
6.51'
Force Main Diameter
Electrical Data Motor Horsepower
1.4
Voltage
230
Phase
1
Pump Data Date Pumps Installed
mid 1990s
Manufacturer
ABS
Pump Model
Piranha Grinder
Design Flow Rate
30 gpm
Design Discharge Head
8'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Small submerisble pump serving the ball field. 2) Lift station only has a single pump. 3) Record Drawings From Blatchley Jr. High School Sewer Improvement Details Sheet 3.02
Capital Improvements None.
_________________________________________________ Appendix A - Page 10
Lift Station Name Monastery Street Lift Station Location
Lift Station Data Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev
17.6
Wet Well Depth Force Main Diameter
4" P.V.C.
Electrical Data Motor Horsepower Voltage Phase
Pump Data Date Pumps Installed Manufacturer Pump Model Design Flow Rate Design Discharge Head Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Record Drawings From Sirstad St. Lift Station Sheet 31.
Capital Improvements None.
_________________________________________________ Appendix A - Page 11
Lift Station Name Lake Street Lift Station Location
Lift Station Data Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev
22.0'
Wet Well Depth Force Main Diameter
4"
Electrical Data Motor Horsepower
5
Voltage
208
Phase
Wild Leg Delta
Pump Data Date Pumps Installed Manufacturer
Paco
Pump Model
QDN-495
Design Flow Rate Design Discharge Head Pump 1 Measured Flow Rate Date Measured
1/14/2003
Pump 2 Measured Flow Rate Date Measured
182 200
1/14/2003
Comments 1) Lift station may not be located in public right-of-way. Property survey needs to be conducted to locate property lines and right-of-way. 2) Record Drawings From Lake Street Sewer and Sewer Lift Station Sheets 1,2 3) 2 Pump Station
Capital Improvements 1) Lift station and control panel needs to be completely replaced.
_________________________________________________ Appendix A - Page 12
Lift Station Name Wachusetts Lift Station Location
Lift Station Data 2009
Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
4" A.C.
Electrical Data Motor Horsepower
2
Voltage
230
Phase
1
Pump Data Date Pumps Installed
2009
Manufacturer
ABS
Pump Model
S20
Design Flow Rate
35 gpm
Design Discharge Head Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Record Drawings From Wachusetts Street Sewer Sheet 1 2) Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 13
Lift Station Name Landfill Lift Station Location
Lift Station Data 2001
Year Constructed Type Submersible Suction Lift
X
Dry Pit Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
10
Voltage
460
Phase
3
Pump Data Date Pumps Installed
2001
Manufacturer
Hydronix
Pump Model
40 MP
Design Flow Rate Design Discharge Head Pump 1 Measured Flow Rate Date Measured
4/21/2005
Pump 2 Measured Flow Rate Date Measured
222 235
4/21/2005
Comments 1) 2 pump station.
Capital Improvements None.
_________________________________________________ Appendix A - Page 14
Lift Station Name Eagle Way Lift Station Location
Lift Station Data 1984
Year Constructed Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
25
Voltage
208
Phase
3
Pump Data Date Pumps Installed
1984 #1 Replaced in 2002
Manufacturer
Fairbanks Morse
Pump Model
B5433C
Design Flow Rate
870 gpm
Design Discharge Head
69.5
Pump 1 Measured Flow Rate Date Measured
1/14/2003
Pump 2 Measured Flow Rate Date Measured
750 567
1/14/2003
Comments 1) 2 Pump Station 2) Inlet and Discharge Pipe are 10". Pump size is 4". Pump needs to be properly sized.
Capital Improvements None.
_________________________________________________ Appendix A - Page 15
Lift Station Name Jamestown Lift Station Location
Lift Station Data 1984
Year Constructed Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter
8.0'
Wet Well Lid Elev
19.4'
Wet Well Invert Elev
-0.3'
Wet Well Depth
19.7'
Force Main Diameter
8"
Electrical Data Motor Horsepower Voltage Phase
Pump Data Date Pumps Installed
March 1984
Manufacturer
Fairbanks Morse
Pump Model
5432 c
Design Flow Rate
580 gpm
Design Discharge Head
21'
Pump 1 Measured Flow Rate Date Measured
1/14/2003 (New Impeller Installed 2009)
Pump 2 Measured Flow Rate Date Measured
490 440
1/14/2003 (New Impeller Installed 2009)
Comments 1) Record Drawings From Jamestown Bay Interceptor Jamestown Bay to City Limits Sheet 12,14,23. 2) Both pumps need to be replaced. Pumps need to be properly sized.
Capital Improvements 1) 2 Pump Station
_________________________________________________ Appendix A - Page 16
Lift Station Name East Jamestown Lift Station Location
Lift Station Data Year Constructed
1985
Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter
4.0'
Wet Well Lid Elev
15.8
Wet Well Invert Elev
8.0'
Wet Well Depth
7.8'
Force Main Diameter
4"
Electrical Data Motor Horsepower
3 - 1750 RPM
Voltage
230
Phase
1
Pump Data Date Pumps Installed
March 6 1985
Manufacturer
UseMCD L.S. Quincy Compressor
Pump Model
Pneumatic Ejector
Design Flow Rate
50
Design Discharge Head
25
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Lift station is only serving one house. 2) Record Drawings From Jamestown Bay Interceptor Jamestown Bay to City Limits Sheet 8.2 3) 1 Pot, 2 Compressors
Capital Improvements 1) Plan to replace lift station pumps with a residential grinder pump such as a Barnes Pump. 2) Add water header to lift station location to serve beach houses on Jamestown Bay that do not have access to CBS water system.
_________________________________________________ Appendix A - Page 17
Lift Station Name Blueberry Lane Lift Station Location
Lift Station Data Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
8' Diameter
Wet Well Lid Elev
70.0'
Wet Well Invert Elev
59.8'
Wet Well Depth
10.2'
Force Main Diameter
6" Dia HDPE
Electrical Data Motor Horsepower
18 hp
Voltage
480 v
Phase
3 Phase
Pump Data Date Pumps Installed Manufacturer
Flygt
Pump Model
Model NP3153 454 Impeller
Design Flow Rate
210 gpm
Design Discharge Head
105'
Pump 1 Measured Flow Rate Date Measured
8/28/2007
Pump 2 Measured Flow Rate Date Measured
262 gpm 259 gpm
8'28'2007
Comments No comments.
Capital Improvements None.
_________________________________________________ Appendix A - Page 18
Lift Station Name Peace Lane Location
Lift Station Data 2007
Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
8' Diameter
Wet Well Lid Elev
51.0'
Wet Well Invert Elev
40.6'
Wet Well Depth
10.4'
Force Main Diameter
6-inch
Electrical Data Motor Horsepower
7.5 HP
Voltage
480 v
Phase
3 Phase
Pump Data Date Pumps Installed
August, 2007
Manufacturer
Flygt
Pump Model
NP3127 489 Impeller
Design Flow Rate
210 gpm
Design Discharge Head
48'
Pump 1 Measured Flow Rate Date Measured
8/29/2007
Pump 2 Measured Flow Rate Date Measured
242 gpm 248 gpm
8/29/2007
Comments No comments.
Capital Improvements None.
_________________________________________________ Appendix A - Page 19
Lift Station Name Whale Park Lift Station Location
Lift Station Data Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
29.5"
Wet Well Lid Elev
82.00'
Wet Well Invert Elev
74.35'
Wet Well Depth
7.65'
Force Main Diameter
1 1/4"
Electrical Data Motor Horsepower
1 HP
Voltage
240v
Phase
1 Phase
Pump Data Date Pumps Installed
August, 2007
Manufacturer
EOne Corporation
Pump Model
Model 1020 Residential Grinder Pump
Design Flow Rate
15 gpm @ 0' TDH, 9 gpm @ 138' TDH
Design Discharge Head
25'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Lift station only has one pump and handles flows from the Whale Park bathrooms.
Capital Improvements None.
_________________________________________________ Appendix A - Page 20
Lift Station Name Sawmill Cove Lift Station Location
Lift Station Data 2011
Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
8' diameter
Wet Well Lid Elev
20.0'
Wet Well Invert Elev
8.5'
Wet Well Depth
11.5'
Force Main Diameter
6" HDPE
Electrical Data Motor Horsepower
11 HP
Voltage
480v
Phase
3 Phase
Pump Data Date Pumps Installed
1/25/2011
Manufacturer
Flygt
Pump Model
NP3127 w/ 248 Impeller
Design Flow Rate
175 gpm
Design Discharge Head
105'
Pump 1 Measured Flow Rate Date Measured
1/25/2011
Pump 2 Measured Flow Rate Date Measured
165 gpm 167 gpm
1/25/2011
Comments No comments.
Capital Improvements None.
_________________________________________________ Appendix A - Page 21
Lift Station Name Rands Drive Lift Station Location
Lift Station Data Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
8' diameter
Wet Well Lid Elev
54.85'
Wet Well Invert Elev
39.26'
Wet Well Depth
15.59'
Force Main Diameter
4" HDPE
Electrical Data Motor Horsepower
15 hp
Voltage
480v
Phase
3 Phase
Pump Data Date Pumps Installed
21-Aug-02
Manufacturer
Ebara
Pump Model Design Flow Rate Design Discharge Head Pump 1 Measured Flow Rate Date Measured
8/21/2002
Pump 2 Measured Flow Rate Date Measured
150 gpm 141 gpm
8/21/2002
Comments No comments.
Capital Improvements None.
_________________________________________________ Appendix A - Page 22
Lift Station Name New BIHA Indian River Lift Station Location
Lift Station Data 2008
Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
6'
Wet Well Lid Elev Wet Well Invert Elev 9' 6"
Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
3
Voltage
480
Phase
3
Pump Data Date Pumps Installed
2008 (Start Up Day 11/14/08)
Manufacturer
FLYGT
Pump Model
NP3085.092
Design Flow Rate
119 GPM
Design Discharge Head
21'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) 2 pump station
Capital Improvements None.
_________________________________________________ Appendix A - Page 23
Lift Station Name BIHA Indian River Lift Station Location
Lift Station Data Year Constructed Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower Voltage Phase
Pump Data Date Pumps Installed Manufacturer
Hydronix
Pump Model
40 MP
Design Flow Rate Design Discharge Head Pump 1 Measured Flow Rate Date Measured
1/15/2003
Pump 2 Measured Flow Rate Date Measured
103 101
1/15/2003
Comments 1) 2 Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 24
Lift Station Name BIHA EOne Indian River Lift Station Location
Lift Station Data 1998
Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
2
Voltage
230
Phase
1
Pump Data Date Pumps Installed E-One
Manufacturer Pump Model
14 gpm
Design Flow Rate Design Discharge Head
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments No comments.
Capital Improvements None.
_________________________________________________ Appendix A - Page 25
Lift Station Name Crescent Lift Station Location
Lift Station Data Year Constructed
1983
Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter
4.0'
Wet Well Lid Elev
19.8'
Wet Well Invert Elev
12.54'
Wet Well Depth
7.26
Force Main Diameter
4"
Electrical Data Motor Horsepower
2
Voltage
230
Phase
1
Pump Data Date Pumps Installed
Late 90's
Manufacturer
ABS
Pump Model
S20
Design Flow Rate
40 GPM
Design Discharge Head
34'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Record Drawings From Jamestown Bay Interceptor Jamestown Bay to City Limits Sheet 13,26 2) 2 Pump Station
Capital Improvements 1) Pump station needs to be replaced with new lift station with submersible pumps.
_________________________________________________ Appendix A - Page 26
Lift Station Name Lincoln Street Lift Station Location
Lift Station Data 1982
Year Constructed Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter
14.0'X9.0'
Wet Well Lid Elev Wet Well Invert Elev
-2.4'
Wet Well Depth
10' 8-1/2"
Force Main Diameter
14"
Electrical Data Motor Horsepower
#2 and #3
#1 20 on VFD 460
460
3
3
2011
1982
Manufacturer
Allis Chalmers
Allis Chalmers
Pump Model
NSWV
NSWV
Voltage Phase
Pump Data Date Pumps Installed
Low 1250 gpm High 2150 gpm
Design Flow Rate Design Discharge Head
Low 23' High 40'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Record Drawings From Central Interceptor Sheet 17,34 2) 3 Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 27
Lift Station Name Lightering Lift Station Location
Lift Station Data Year Constructed
1998
Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
1.5
Voltage
230
Phase
1
Pump Data Date Pumps Installed
1998
Manufacturer
ABS
Pump Model
Piranha Grinder
Design Flow Rate
30 gpm
Design Discharge Head
6'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) Small seasonal lift station serving a public restroom. 2) 2 Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 28
Lift Station Name Castle Hill Lift Station Location
Lift Station Data 1982
Year Constructed Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
4" D.I.P.
Electrical Data Motor Horsepower
5
Voltage
230
Phase
1
Pump Data Date Pumps Installed
January 2003
Manufacturer
HYDROMATIC
Pump Model
40 MP
Design Flow Rate
150 GPM
Design Discharge Head
31'
Pump 1 Measured Flow Rate Date Measured
1/15/2003
Pump 2 Measured Flow Rate Date Measured
156 156
1/15/2003
Comments 1) Record Drawings From Central Interceptor Sawmill Creeek to Thomsen Harbor Sheet 12,36 2) 2 Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 29
Lift Station Name Centennial Lift Station Location
Lift Station Data Year Constructed Type Submersible Suction Lift Dry Pit
X
Wet Well Diameter
4'
Wet Well Lid Elev
18.5'
Wet Well Invert Elev
1.2'
Wet Well Depth
17.3'
Force Main Diameter
4"
Electrical Data Motor Horsepower
3 1750 rpm
Voltage
230
Phase
1
Pump Data Date Pumps Installed
Late 1991
Manufacturer
HYDR-O-MATIC
Pump Model
40 MP
Design Flow Rate
80 gpm
Design Discharge Head
25'
Pump 1 Measured Flow Rate Date Measured
1/15/2003
Pump 2 Measured Flow Rate Date Measured
60 65
1/15/2003
Comments 1) 2 Pump Station 2) Record Drawings From Central Interceptor 20,35
Capital Improvements None.
_________________________________________________ Appendix A - Page 30
Lift Station Name Sealing Cove Lift Station Location
Lift Station Data mid 1990's
Year Constructed Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
3'
Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
2
Voltage
230
Phase
1
Pump Data Date Pumps Installed
mid 1990's
Manufacturer
ABS
Pump Model
Piranha
Design Flow Rate
25 gpm
Design Discharge Head
20'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) 1 Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 31
Lift Station Name Japonski LS-1 Lift Station Location
Lift Station Data Year Constructed
2012
Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
4'
Wet Well Lid Elev
22.0'
Wet Well Invert Elev
9.40'
Wet Well Depth
12.6'
Force Main Diameter
2" HDPE
Electrical Data Motor Horsepower
2 hp
Voltage
200 v
Phase
3 phase
Pump Data Date Pumps Installed
2012
Manufacturer
Barnes
Pump Model
SGVF
Design Flow Rate
25 gpm
Design Discharge Head
20'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments Barnes SGVF Recessed Vortex Submersible Grinder Pump
Capital Improvements Replaced in 2012
_________________________________________________ Appendix A - Page 32
Lift Station Name Japonski LS-2 Lift Station Location
Lift Station Data Year Constructed
2012
Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
5'
Wet Well Lid Elev
25.74'
Wet Well Invert Elev
15.04'
Wet Well Depth
10.70'
Force Main Diameter
4"
Electrical Data Motor Horsepower
2.7 hp
Voltage
200 v
Phase
3 phase
Pump Data Date Pumps Installed
2012
Manufacturer
Flygt
Pump Model
FP3068.090LT
Design Flow Rate
120 gpm
Design Discharge Head
16.5'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments No comments.
Capital Improvements Replaced in 2012
_________________________________________________ Appendix A - Page 33
Lift Station Name Japonski LS-3 Lift Station Location
Lift Station Data Year Constructed
2012
Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
8'
Wet Well Lid Elev
18.20'
Wet Well Invert Elev
6.33'
Wet Well Depth
11.87'
Force Main Diameter
4"
Electrical Data Motor Horsepower
11 hp
Voltage
200 v
Phase
3 phase
Pump Data Date Pumps Installed
2012
Manufacturer
Flygt
Pump Model
NP3127.090SH
Design Flow Rate
200 gpm
Design Discharge Head
60.0'
Pump 1 Measured Flow Rate
209 gpm
Date Measured Pump 2 Measured Flow Rate
191 gpm
Date Measured
Comments Measured pump flows will vary depending on whether the force main is connected to the 10", 16" or both force mains from Thomson Harbor. Pump flow rates will also vary depending on flow rate in the force mains from Thomson Harbor as a result of high heads that will occur during higher flow periods.
Capital Improvements Replaced in 2012
_________________________________________________ Appendix A - Page 34
Lift Station Name Japonski LS-4 Lift Station Location
Lift Station Data Year Constructed
2012
Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
8'
Wet Well Lid Elev
18.00'
Wet Well Invert Elev
4.45'
Wet Well Depth
13.55'
Force Main Diameter
6"
Electrical Data Motor Horsepower
17 hp
Voltage
200 v
Phase
3 phase
Pump Data Date Pumps Installed
2012
Manufacturer
Flygt
Pump Model
NP3153.091SH
Design Flow Rate
450 gpm
Design Discharge Head
67.4'
Pump 1 Measured Flow Rate Date Measured
7/25/2012
Pump 2 Measured Flow Rate Date Measured
512 gpm 505 gpm
7/25/2012
Comments Measured pump flows will vary depending on whether the force main is connected to the 10", 16" or both force mains from Thomson Harbor. Pump flow rates will also vary depending on flow rate in the force mains from Thomson Harbor as a result of high heads that will occur during higher flow periods.
Capital Improvements Replaced in 2012.
_________________________________________________ Appendix A - Page 35
Lift Station Name Japonski LS-5 Lift Station Location
Lift Station Data Year Constructed Type Submersible Suction Lift
X
Dry Pit Wet Well Diameter Wet Well Lid Elev Wet Well Invert Elev Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower Voltage Phase
Pump Data Date Pumps Installed Manufacturer Pump Model Design Flow Rate Design Discharge Head Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments No comments.
Capital Improvements Long Term Plan FY 20 Replacement.
_________________________________________________ Appendix A - Page 36
Lift Station Name Japonski LS-6 Lift Station Location
Lift Station Data Year Constructed
2012
Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
8'
Wet Well Lid Elev
15.00'
Wet Well Invert Elev
2.83'
Wet Well Depth
12.17'
Force Main Diameter
6"
Electrical Data Motor Horsepower
6.5 hp
Voltage
200 v
Phase
3 phase
Pump Data Date Pumps Installed
2012
Manufacturer
Flygt
Pump Model
NP3102.090.SH
Design Flow Rate
250 gpm
Design Discharge Head
56'
Pump 1 Measured Flow Rate
214 gpm
Date Measured Pump 2 Measured Flow Rate
205 gpm
Date Measured
Comments Measured pump flows will vary depending on whether the force main is connected to the 10", 16" or both force mains from Thomson Harbor. Pump flow rates will also vary depending on flow rate in the force mains from Thomson Harbor as a result of high heads that will occur during higher flow periods.
Capital Improvements Replaced in 2012.
_________________________________________________ Appendix A - Page 37
Lift Station Name Japonski LS-7 Lift Station Location
Lift Station Data Year Constructed
2012
Type Submersible
X
Suction Lift Dry Pit Wet Well Diameter
5'
Wet Well Lid Elev
19.35'
Wet Well Invert Elev
1.54'
Wet Well Depth
17.81'
Force Main Diameter
6"
Electrical Data Motor Horsepower
4 hp
Voltage
200 v
Phase
3 phase
Pump Data Date Pumps Installed
2012
Manufacturer
Flygt
Pump Model
NP3085.092SH
Design Flow Rate
150 gpm
Design Discharge Head
54'
Pump 1 Measured Flow Rate Date Measured
7/24/2012
Pump 2 Measured Flow Rate Date Measured
180 gpm 180 gpm
7/24/2012
Comments Measured pump flows will vary depending on whether the force main is connected to the 10", 16" or both force mains from Thomson Harbor. Pump flow rates will also vary depending on flow rate in the force mains from Thomson Harbor as a result of high heads that will occur during higher flow periods.
Capital Improvements Replaced in 2012
_________________________________________________ Appendix A - Page 38
Lift Station Name Japonski LS-8 Lift Station Location
Lift Station Data Year Constructed
1984
Type Submersible Suction Lift
X
Dry Pit Wet Well Diameter
60"
Wet Well Lid Elev Wet Well Invert Elev 90"
Wet Well Depth Force Main Diameter
Electrical Data Motor Horsepower
1.5
Voltage
208
Phase
3
Pump Data Date Pumps Installed
1984
Manufacturer
Hydronix
Pump Model
40MP
Design Flow Rate
50 gpm
Design Discharge Head
15'
Pump 1 Measured Flow Rate Date Measured Pump 2 Measured Flow Rate Date Measured
Comments 1) 2 Pump Station
Capital Improvements None.
_________________________________________________ Appendix A - Page 39
APPENDIX B Short-Term Capital Improvement Project Figures
# *
! 29
Cleanouts
Ha lib ut
Sewer Manhole Mains Parcels Drainage Basins Proposed Cleanout
tR Existing Conditions: oa
508 204
d
Belly, plugging
509
Scope of Work:
Proposed Manhole
506
200' of Main
601
Proposed Main Potential for Redirecting Flow
27
2 Ser vices
y p re Os
S tr
SANITARY SEWER
206 200
Po in
504
ee t
CITY AND BOROUGH OF SITKA
502
NEW ARCHANGEL STREET SEWER MAIN UPGRADES
# *
( !
504 507 400
Mar
504
in e S tr
507
e et
122
201
( !
120 503
22 118
(t !
501
123
New
Ar
204
r ee l St nge cha
423
Sitka Aerial 2007
200
¹
117
u Sp r
28
417
ee S tr ce
115 421
414
t
He m
Mar in e
120
e et
DeA
t re et
413
nd rm o
116
kS
418
S tr
419
lo c
415
¹
413
ee Str
417
411
418
0
t
25 Feet
50
414 417
415
414
October 15, 2012
411
415
412
412 413
_________________________________________________ Appendix B - Page 1
409
409
STCIP #5
# *
!
506
510
505
SANITARY SEWER
505
Sewer Manhole
23
Mains Parcels Drainage Basins Proposed Cleanout
502 403
401
503
504
405
Proposed Manhole
407
Proposed Main Potential for Redirecting Flow
409
411
503 505
!
MH 12-1
Existing Conditions:
509
Bellies in Pipe Leaky and Offset Joints
DeGro
Scope of Work:
CITY AND BOROUGH OF SITKA
HOLLYWOOD WAY SEWER MAIN UPGRADES
( !
504
Cleanouts
High land Stre et
# *
ff Stre et
402
420
300' of Main 2 MHs 8 Ser vices
406
419
498
12
418
500 417
416
506
415 0
502
400
416
414
508
504
Mo na
413
tre et
410 411
t La ke S tr ee
13
¹
S ste ry
414
Sitka Aerial 2007
412
410
409
Hollywo
408
411
o d Wa y
408
! # *
¹
409
406 404
0
25
50
Feet 405 407
October 15, 2012
406
402
405
P:\Projects\D60854\GIS\ENG\Projects\Project 7-Hollywood Way.mxd
Oct 15, 2012
2:30:08 PM
User: charrington
_________________________________________________ Appendix B - Page 2
STCIP #7
Cleanouts
Mains Parcels Drainage Basins Proposed Cleanout
# *
!
SANITARY SEWER
102
Sewer Manhole
106
815 814
Existing Conditions:
Main is in Good Condition
Proposed Manhole
Scope of Work:
Proposed Main Potential for Redirecting Flow
813
Upgrade Cleanouts to Ductile Iron
101
Add 2 MH
26
1000
Add Watertight Frames and Lids
CITY AND BOROUGH OF SITKA
Austin Street
809
Cha r t re e t les S
805 330
102
VERSTOVIA SEWER IMPROVEMENTS
# *
( !
800
801 905
401
403
405
407
411
415
419
423
427
431
435
903
MH 25-4
!
# * 901
443
447
511
501
505
MH 24-6
Verstovia Stree t
( !
439
# *
( !
!
# * Verstov ia Street
# * 424 406 718
802
815
Upgrade cleanouts to ductile iron.
Upgrade cleanouts to ductile iron.
400
506 714
721
Sitka Aerial 2007
716 807
810
800
¹
25
719
813
A
805
808
24
803
806
720
et
709
801
Si rs
802 721
ta d
707
713
716
St
re et
708
714 807
a ste Mo n
St re et
710
715
718 804
La ke
712
717
811
809
711
St re
711
800 719
717 400
720
803
23
212 725 723
tre et
27
709
710
0
721
October 15, 2012 713
714
100
701
708 716
50 Feet
704
715
718
¹
ry S
712 722
805
705 706
501 711
_________________________________________________ Appendix B - Page 3
706
STCIP #10
# *
( !
2314
Cleanouts
2308
Sewer Manhole
SANITARY SEWER
2310 2306 112 2304
39
e 109
2222
107
2220
108 106
2219
104 102
105 2221
0
0
0
101
103
2178
2216
38
2217 2214 2180 2212
105
bs
102
2168
Ci
105
rc
104
103
le
2166
109
co
2210
Ja
100
2174
2213
CITY AND BOROUGH OF SITKA
107
2176
0
111
HALIBUT POINT ROAD SEWER UPGRADES
2301
ns
r iv
e ri v rD
Proposed Main Potential for Redirecting Flow
a rg Me
D er
l la
2303 2309
110
Do
2307
Proposed Manhole
111
2302
Kramer Avenue
2305
nd
101
2160
106 2150
108 2017
0
2018
2015
0
2011
Ha lib
2016
2007
ut
2013
Po
2014 2010
2009
int Ro
0
2008 2005
ad
2012 2003 2006 2002
2102 2000 203
1922
1921 2038
205
204 1920 1919
2040
2034
1923
2036 2041
Existing Conditions:
2030
1916 1915
1952
2028
207
Sitka Aerial 2007
1914
2037
Numerous Undersized Services Numerous Properties without Ser vice Stub Outs
Scope of Work:
1913
2028
1950
2026
2028 2035
2028
36A
2026 2026
Construct New Services and Upgrade Undersized Ser vices
Time Frame:
2027
1948 1917 1946
2026
1908
1944 1909 1942
1943
2024
2025
1910
¹
!
2309
Sa
# *
Mains Parcels Drainage Basins Proposed Cleanout
1938
1940
1939
1906
36
1911 1904
2022 2023
1924 2018
In Coordination with the DOT&PF Paving Schedule
1937 1935
2014
1910
Do
1840
l ir c
1906
1925
1919
1904
2004
201 1905
1901
1980
1960
1815
1903
1911
1901 1952
200
115 109
1950
114 107
1904
103
_________________________________________________ Appendix B - Page 4
1820
1822
0
108
1804 118
1805
150
300
Feet 1812
1814
October 15, 2012
1810
112 105
1818
1809
111 116
101
1816
e Dr ive
1970
204
1907
1972
Edgeco mb
1915
1830
206
2002 1982
¹
205
e
1929
2006
211
eC
1921 1923
1860
1900
1903
dg
2008
2010
1900
1905
1933 1931
37
1902
1907
1806
34
1808
STCIP #11
!
4409
SANITARY SEWER
104
Sewer Manhole
4420 4401
106
W ay
Mains Parcels Drainage Basins Proposed Cleanout
102
on
# *
102
Cleanouts
Ho ri z
# *
( !
Proposed Manhole Proposed Main Potential for Redirecting Flow
103
4401 104
4416
4403
CITY AND BOROUGH OF SITKA
4408
Existing 46 Conditions:
oa
d
4319
tR
104
Po in
Scope of Work: 400' of Main 3 MHs 101 8 Ser vices
4317
Pi ra
te s
4406
Ha lib ut
Point Loads
!MH 47-0
VIKING WAY & VALHALLA DRIVE SEWER MAIN UPGRADES
Deflections at Joints Deformed Joints
4410
4400
4323
W ay 4404 4390
4321
4313
4324
101 4319
4311
!VMH 47-1
Sitka Aerial 2007 105
ay
a
W
47
4307
4320
¹
W
ay
g
!
104 102
ha l
102
4322 103
4318
Va l
ik in
4309
0
MH 47-2 106 4316 4305 4313
4309 4314
¹
4312
4307
4308
0
50
100
Feet
October 15, 2012
4306
4306
STCIP #14
4302
P:\Projects\D60854\GIS\ENG\Projects\Project 14-Viking Way & Valhalla Dr.mxd
Oct 15, 2012
2:28:58 PM
User: charrington
_________________________________________________ Appendix B - Page 5
# *
( !
212
618
707
Sewer Manhole
# *
!
SANITARY SEWER
504
417
415
705
Mains Parcels Drainage Basins Proposed Cleanout
220
24
619
709
Cleanouts
703 413 701
MH61523-7
!
ee d S tr w he a A rro
Proposed Manhole Proposed Main Potential for Redirecting Flow
Ar
t
!
615
612
501
ro w
612
he ad
St
613
re et
608 613 501
218
506
611 606 607
611
!
!
604
601
MH 23-5
50% Bellies in Sewer Mains 212 Grease/Sludge Build-Up Rocks in Mains
!
!
510 502
!
525
520 524
524 600
521
Scope of Work:
MH 23-3 !
27
3550' of Main 210 14 MHs 74 Services
520 521
519
520 518 505 519 516 507 517
Hirs
!MH 23-2
ee t t Str
508
Alp
502
MH 23-1
204
513
!
408 406 404
507
509 506
504 505
403
401
12
!
505
502
405 407
507
High land Stre et
510 502
MH 13-4
et S t re ine
503
409 411 503 505
Ge od
602
510
604 606
eti c
608
Sitka Aerial 2007
Wa
y
¹
407
206
601
!
t Str ee Hirs t
514 514
S tree t
400 208
Bara no f
211
K
!
511
602
re et
MH 23-4 et S t re d a e in k
LAKE, HIRST, KINCAID, AND MONASTERY SEWER MAIN UPGRADES
401
ry S t
Existing Conditions:
604
a ste Mo n
602
600
213
515
605
et S tr e
23 214
La ke
MH 23-6
216
CITY AND BOROUGH OF SITKA
606
610
508
612 605 607
506
609 611
613
615 617
Merr il
503 504
l S tr ee t
621
504 602 604 606 610 612
509
614
501
616 618
420
402
601
620 603
423
406
419
498
607 609
418 414
613
412
lo c
411
410
kS
t re et
408
409 406
412
414
Po in
410
tR
oa
407
409 410
405
409
d
MH 13-3
!
411
408
404
o d Wa y
411
Ha lib ut
504
Hollywo
He m
405
617
508
414 412
13
413 410 409
411 408 505 409
DeGr
415
0
502
416
615
506
416
413
409
611 500
417 415
406 407
_________________________________________________ Appendix B - Page 6
ee t o f S tr Bara n
22
¹
605
604
600
9
408
619
o ff Str eet
621
0
606
75
150
Feet 608
610
612
614
619
406
11
October 15, 2012 617 603
404 605 402
607
609
611
613
615
STCIP #15
# *
503
504
Sewer Manhole
# *
Mains Parcels Drainage Basins Proposed Cleanout
!
606
502
612
614
SANITARY SEWER
616
501
618
601
630
620
12
603 605 607
0
622 624 626
505
609
CO
500 Proposed Manhole
Proposed Main
610
509
611 613
# * !
506
416
604
505
( ! 418
623
602
Cleanouts
700 615
503 617 619
415
0
Potential for Redirecting Flow 508
414
!
604
600
DeGr
504
623 625
0
MH 9-10
( !
621
o ff Str eet
704
701 627 629 631
413
408
ee t o f S tr Bara n
410 409
408
13
!
606
610
608
612
MH-9-9
707
709
614
711
705
406
617
713
! MH-9-11
622 619
715
621
404
615 613 611
603
406
609
( !
( !
607 605 402 505
407
CITY AND BOROUGH OF SITKA
703
701
SMC ROAD, DEGROFF STREET AT PARK STREET SEWER MAIN UPGRADES
412
706
704
304 624
402
622
601
620
Ro ad
618 616 614 612
501
9
401
610 608
606
711
tre et
Sa
Cree k wm ill
303
715
713
709
Pa rk S
405
705 703 701 716
308 617
MH-9-6
301
304
Existing Conditions:
( !
611
607 609
302 605 603
308
Bio rk
412
702
et a S tre
700 211 618
Mo na S ste ry
209
302
Stre et
307
5 MHs 28 Services
608
210
tre et
14
208 210
610
11
Sitka Aerial 2007
800' of Main
616 612
304
712
Scope of Work:
300
306
305
714
Broken Joints Leaks 708 Bellies 706 704 Grease and Slime Build-Up
¹
615 613
MH-9-4
! (( !
613 611
tree Oja S
t
719
715 713 711
609
206
709
607
707 614 705
301 304
¹
612
300
703 716
205
615
606
MH-9-2
200
609
611
708 200 207
603 605
Eto lin
410 408
S tree
t
706 614
700
702
612
205 603 608
610
_________________________________________________ Appendix B - Page 7
111
ey
( !
607
Fin n A ll
Oja Way
714 117
50
100
Feet
712
112
0
October 15, 2012
10
110 106
115
113
STCIP #16
204
Cleanouts
Mains Parcels Drainage Basins Proposed Cleanout
Existing Conditions:
315
Lincoln S
Minor Improvements to MHs and ser vices during the Repavement of Lincoln Street
treet
( !
337
Time Frame:
200
In Coordination with Next Paving Schedule 320
20
407
Scope of Work:
305
Proposed Main Potential for Redirecting Flow
SANITARY SEWER
401
330
323
Mains are in Good Condition
Proposed Manhole
14
Seward Street
( !
n Li
! (
l co
n
St
re
CITY AND BOROUGH OF SITKA
et
LINCOLN STREET SEWER IMPROVEMENTS
!
327
319
Sewer Manhole
( !
# *
tr ee t La ke S
# *
( !
331
15
107
ay
210
lW
321
Ca th e d ra
342
315
10
107
334
104
20
103
Sitka Aerial 2007
¹
303
329
322
335
330
237
30 110
16
328
503 318 250
ff S u to et
224
r Ha
r bo
D
e r iv
0
25
50
Feet
October 15, 2012
t re
236
¹
300
k so Ma
( !
STCIP #19 320
_________________________________________________ Appendix B - Page 8
SANITARY SEWER
521
Mains Parcels Drainage Basins Proposed Cleanout
519
520 518
600 505
519
Proposed Manhole Proposed Main Potential for Redirecting Flow
23
a ste Mo n
!
521 520
Sewer Manhole
517
507
ry S t
Existing Conditions: 514
514
Hirs t
601
t Str ee
re et
Offset Joints Bellied Pipe Flattened Pipe ee t t Str Scope of HirsWork: 1600' of Main 7 MHs 64 Services
516
407
Alp
508
ine
e S t re
502 513 408 406 507
509 506
!
510 504
502
405
503
12
507
12-4
High land Stre et
505
505
403
Ge od
602
510
604
404
401
CITY AND BOROUGH OF SITKA
t
407 409 411
Wa
y
608 610 508 612 605 607
506
609
!
611 613
12-5 Merr il
! 503
504
eti c
606
DEGROFF ST, HIGHLAND, BARANOF, AND MERRILL SEWER MAIN UPGRADES
# *
524
524
S tree t
( !
525
Cleanouts
Bara no f
# *
615 617 621
l S tr ee t
504 602 604
503
12-1
606 505
!
400
612
!
402
420
610 509
614 501
12-2
616 618 620
601
622
603 419
!
498
605
Sitka Aerial 2007
607 609
418
!12-3
500
417
506
416 415 416
615 617
DeGr
508
414
613
415
0
502
611
¹
406
604
600
619 621
o ff Str eet
623
504 412 414
410
413
411
408
ee t o f S tr Bara n
410 409 411 408
Hollywo
13
409
404
608
610
612
614
406
9
619
617
404
615
609 607 605
407
402 505
11
406
405
402 405
618 601
Sa wm
404
e ill Cre
d k Ro a
0
22
401 402
610
October 15, 2012
612
606 308
_________________________________________________ Appendix B - Page 9
100
616
608
501
409
50 Feet
614 402 405
¹
613 611
603
406
o d Wa y
t La ke S tr ee
408
606
615
617
STCIP #21
Cleanouts Sewer Manhole
# *
Mains Parcels Drainage Basins Proposed Cleanout
!
215
215
325
214 219
SANITARY SEWER
210 209
206
319
Existing Conditions: Concrete Pipe in Poor Condition Storm Water Entering Sanitar y Sewer System
207
Proposed Manhole
204
550' of Main
206
207
205
4 MHs
y g Wa Rig lin Determine feasibility of redirecting flow to Marine and Seward.
11 Services
ee ry S tr r va to Obs e
Scope of Work:
210
Proposed Main Potential for Redirecting Flow
315
CITY AND BOROUGH OF SITKA
202
t
208
305
ri n Ma
# *
207
15
211
eS
206
PRINCESS WAY, SEWARD ST, BARRACKS ST SEWER MAIN UPGRADES
# *
( !
200
et
217
s ce s
204 226
y Wa
205
19
209
n Pri
t re
204
202
20
202 208
107 201
!MH 18-3
202
MH 18-2
!
210
Sitka Aerial 2007
204
!
206
S tr
e et
an 103
ee t
S tr
107
e ric
Se
rd wa
200
rra Ba
125
Am
204
18
200
¹
MH 19-3
ck s
112
S tr
118
e et 209 237
110
205
¹
110 200
120
! e Rac
S tr
30
ee t
0 503 250
209 215
25 Feet
50
October 15, 2012
205 203 201
_________________________________________________ Appendix B - Page 10
STCIP #25
317
320
1302 103
318
105
107
228 310
225
Beard
306
sle e
223
222
205
6B
220
219 202
214
217
218
215
116
181
5
208 118 202
( !
213
207
120
220
211 0
179
114
Harvest Street
209
207
201
219
Existing Conditions: 109
1303 1307
101
103
105
Scope of Work:
210
104
205
101
103 105 107 109 111 113
100
S aw 1318
104 111
le W
m il
115
6D
Lillian Drive 1319
E ag
230
336
334 334
332
339
337
335
333
101
103
105
312
331
Kiksadi Court
107
314
316
102 104 106 108 110
117 119
105
121
329
128
126
327
124
102
104
123
134
133
123
136
135
113
137
111
116
106
138 216
139
l Cr
eek
132
Ro
143
ad
125
130
114 114
110
110
109 1623
107
1535
1537
142
108 146 105
110 1545
1613
106
1615 1617
105
1701
1703
1621
104
1705
1707
104 103
144
1527
Sitka Aerial 2007
106
1515 1547
1601
1603
1607
MH 5-2 106
106
1
1511
1619
102
135
1610
104
127
ay
103
141
1613
112
112
108 1533
1529
( MH 5-1 !
139
4 1531
110
108
118 118
220
218
108
120
116 100
201
112
323
325
122
132
114
( !
112
318
108
MH 5-4 112
107
1308
1314
203
202
106
317
308
e Wol f Driv
102
1321
108
313
321
207
206
( !
104
110
306
209
208
109 1319
1317
1302
304
310
( MH 5-5 !
201
311
211
204
Burkhart Street
141
1315
1312
302
140
Reassess Basin 102 145 650' 100 of Main (Assumed) 149 3 MHs 14 Services 1311
6
5A 600 602 309
319
212
203
601
213
!
Lance Drive
1305
1' section missing from top of main 104 153 Offset Joints Bellies up to 90% of Main 151 143 147
116
315
215
214
205
165
105 103
1211
113
115
401
MH 5-6 216
119
St r e et
101
403
217
107 1209
CITY AND BOROUGH OF SITKA
112
604
117
1207
108 104
219
197
212
0 1602
606
( ! 405
180
216
608
605
199
201
215 215 215 215 215 215 215
612
610
407
203
218
217
101 222
MH 5-7 Price Street
221
( !
221
302
224
210
104
Jewels Court
Way
Vitskari Street
1204
Lance Drive
1202
226
223 5-8 MH
101
¹
Proposed Main Potential for Redirecting Flow
W ay
609
307
Chirikov Drive
302
110
Hale y
103 227
LANCE DRIVE SEWER MAIN UPGRADES
314
Proposed Manhole
6C
230
229
1205
6A
# *
231
101
Marys Court
304
Sm ith
!
311
t
# *
Sewer Manhole Mains Parcels Drainage Basins Proposed Cleanout
SANITARY SEWER
0
308
St r ee
( !
1000
312
310
Cleanouts
Jar v is
# *
1604
1612
101
131
100
129
102
1614
0
1616
1402
111
1618
1703
1707
1512
C an
1410 1410 1410 1410 1504 1410 1410 1502
non Isla rive nd D
¹
1616 1506
1408 1406 1412
1510
0
150
300
Feet
October 15, 2012
STCIP #28
_________________________________________________ Appendix B - Page 11
# *
118
0
105
Cleanouts
307
114 106
( Sewer Manhole ! 416
306
418 303
305
13A
106 110
304
380 106
Proposed Manhole 344
362
238
301
Proposed Main
!
302
338
Potential for Redirecting Flow
354
356
306 344
332
MH-19-4
209
224
# *
236
332
215 350
361
311
304
in Tl
a Ka
328
gi
230
gw 338
332
a nt an
221
re
Ob s
et
336
220
337
223
278
288
218
15 216
t
21
305
282 289
218
tre e
19
300
304 309
220
ry S at o
305
298
335
310
er v
314
301
!
307
St 339 329
224
222
aa
320
CITY AND BOROUGH OF SITKA
ay tW
214
270
273
212
215
280 285
325
219
278 264
214
270
271
MH-19-3A
258
264
262 256
209 319
252
263
217
207
260
210
204
206
207
205
250
248 246 246
e rin
0 242
204
206
200
Pr in
230
236
205 202
ay sW
226 231
209
ces
204
232 239
226
30
223
202 224
229
220
107
208
216
Ka t 213
201
215
lia
202
216
n
210
212 203
nu e
210
MH-19-3
MH-19-1
204
204
107
103
¹
eet
112
sS
18
118
tr ee
( MH-19-2 !
202
t
209
200
237
110
205
Scope of Work: 400' of Main 4 MHs 11 Services
200
S tr
w Se
211
ard
t
k ra c Bar
125
ee S tr
an
200
201
Mains are Undersized (Currently 6") Mains are in Poor Condition (Immenent Collapse)
( !
206
r ic
( ! 204
e Am
Av e
208
Existing Conditions:
Sitka Aerial 2007
211
t
234
244
315
202
305 207
ee
251 245
Way
208
S tr
242
g Rig lin
20
Ma
238
265
235
206
210
( !
254
¹
# *
!
414 Mains Parcels Drainage Basins 350 Proposed Cleanout
SANITARY SEWER
22
106
TLINGIT WAY, MARINE, AND SEWARD STREETS SEWER MAIN UPGRADES
404
110
eS Rac
0 120
t r ee
t 0
201 215
201
_________________________________________________ Appendix B - Page 12
203
205
209
30
50
100
Feet
503 250
October 15, 2012
STCIP #29
et
Fu r
1109
t re
Cleanouts
1114
fS
1107
Sewer Manhole
of
1112
" # *
!
m
1105
Mains Force Main Liftstation Parcels Drainage Basins Proposed Cleanout
Ka sh ev ar
1201
1102
uh el
St
1110
308
re et
MH 31-9
1103
n Tils o
1108
t S t re e
MH 31-10
SANITARY SEWER
( !
0 312
!
314
310 308 306
307 304
Proposed Manhole
1106
Proposed Main1111 1113 Potential for Redirecting Flow
306 321
1109
1104
CITY AND BOROUGH OF SITKA
S tree
t
315
1107 1102
32
! MH 31-8
1110
1105
Ed g
1103
309
Kim s ham
1107
311
303
ec o
m
be
1108
Dr
( !
305 303
301
iv
u se Wa ch
e
tre et
( !
330 320
uz of S
209
Kr
312
1104
1,600' of Main 8 MHs 24 Services
316
328
1011
322 310
!MH 31-7
31
Scope of Work: 1104
tts S
t re
1106
"
( !
et
1101
307
KIMSHAM AND PETERSEN STREET SEWER MAIN UPGRADES
# *
( !
211
304
215
324
302 316 314 308
1100
213 306
1107 210
315
Sitka Aerial 2007
1105
313 214
r
210
ut lib Ha
1008
¹
301
215
s Pe ter
209
on S
tre et 314
MH 31-3
( !
MH 31-4
( !
1006
Ro ad
37
207
( !
in t Po
1011
305 213
Kim
1103
1101
307
! MH 31-6
sh a m
D z of K ru
1103
S t re et
209
iv e
311
312 310
¹
308
205 306 304
1009 212
300
214
321 1007
210
26
1004
( MH 31-5 !
208
319 206
215 313
214
202 910
315
213
204 1005 1003
0
211 209
_________________________________________________ Appendix B - Page 13
311 309
50 Feet
100
October 15, 2012
STCIP #30
G.V. Jones & Associates O’Niell Surveying & Engineering FCS Group Carson Dorn