CIVIL AND BUILDING WORKS Site Reclamation No.
1
NAME OF PROJECT AND LOCATION
DESCRIPTION OF WORK
OWNER
PERIOD
TUNU NORTH CAMP SITE PREPARATION
‐ Engineering, Procurement and Construction of:
TOTALFINAELF
Aug. 2002
TN / CSPI ‐ 01 PROJECT
* Soil Investigation
E&P INDONESIE
Jul‐03
TUNU, EAST KALIMANTAN
* Site Preparation
VICO INDONESIA
Jun‐00
* Dredging and Reclamation * Wooden Retaining Wall * Loading / Unloading Jetty and Speed Boat Jetty * Helipad and Bridge * Perimeter Light and Floodlight for Helipad * Cathodic Protection * FRP for Fire Water Line
2
MUTIARA SITE REHABILITATION
‐ Soil Improvement
2000 / 2001 ( M ‐ 8 ) PROJECT
‐ Revegetation Works :
MUARA BADAK, EAST KALIMANTAN
* Slope Erosion Control
Nov. 2001
* Supply and Installation of Planting Media * Supply and Installation of Fruit Tree * Supply and Installation of Non Fruit Tree * Gabion Drainage Channel * Bore Pile and Pile Cap * Gabion Retaining Wall
3
SITE PREPARATION WORK FOR
‐ Site Clearing 290,000 m2
INDONESIA MERAK No. 2
‐ Soil Filling and Compaction 530,000 m
PTA UNIT PROJECT, MERAK
‐ Shore Protection by Rip‐Rap 200 m
P.T. AMOCO 3
1995
MITSUI P.T.A. INDONESIA
WEST JAVA
CIVIL AND BUILDING WORKS Building, Housing and Other Facilities No. 1
NAME OF PROJECT AND LOCATION GELANGGANG OLAH RAGA DAN GRAHA PEMUDA PROJECT BALIK PAPAN, EAST KALIMANTAN
DESCRIPTION OF WORK
OWNER
PERIOD
‐ Tribune capacity : 2000 persons. 2,000 m2
DEPARTMENT
Oct‐04
‐ Basefloor capacity : 1500 persons. 1,500 m2
PUBLIC WORKS
Oct‐06
‐ Parking capacity : 300 cars. 12,000 m2 ‐ Dome Shape with Ø 45.00 and 14.00 m high ‐ Space Frame syst / Apora Bottle Connection ‐ Roofing : Tegola Prestige copper ‐ Special Polyuruthene Multi purpose Sport indoor floor finish. Brand : Herculen ‐ Elecrical Power and Grounding System ‐ Generator Ste 1000 KVA with Sound Proofing,
Brand : Cummins ‐ Special Lighting for Sport Area ‐ Hydrant pump 500 GPM Capacity, Brand : Acme ‐ USA ‐ Split Ducted Air Conditioning System, 3.000.000 BTU / Hr Brang : Carrier ‐ Lightning Protection Active System, Radius 125 m
2
3
TECHNICAL AND ELECTRICAL
‐ 10 stories, Car Park area 30,000 m2
EQUIPMENTS PROJECT
‐ 8 stories, Building Commercial area 34,500 m2
CENTER KENARIMAS PROJECT
‐ Structural and Finishing Works
CENTRAL JAKARTA
‐ Landscape Area: 1,000 m2
PECIKO FIELD DEVELOPMENT PROJECT
‐ Detail Engineering, Procurement and
THE REVAMPING OF SENIPAH CAMP
Construction of:
PECIKO / EPSC 6
* Civil Works:
SENIPAH, EAST KALIMANTAN
+ Construction of Buildings
P.T. KENARIMAS
Jul‐02 Mar‐04
TOTAL INDONESIE
Mar‐98 Nov. 1999
+ Restaurant and Recreation Building + Training Centre and Terrace Guest House + Laundry, Container House, Corridor and Garbage House * Mechanical Works: + Installation of Potable Water System + Installation of Fire Water System + Installation of Sanitary Fixtures + HVAC Installation * Electrical and Instrumentation Works: + Lighting Fixture, Switches and Socket Outlet + Electrical Feeder Cables + Transformer unit + Electrical Main Distribution Panel + Electrical Distribution Panel + Lightning Protection + Fire Alarm System and Telephone Cable
4
KOTA KASABLANKA PROJECT
‐ Sub‐Structure, Foundation Work:
HOTEL, OFFICE MIXED APARTMENT
* 4 Basement
P.T. BENTALA
1997
MAHAYA
JAKARTA
5
TRADERS HOTEL PROJECT
‐ Structural Work:
JAKARTA
* Building Area: 36,000 m2, 17 stories
P.T. NUSA PURI
1997‐1998
LESTARI JAYA
* Basement Area: 4,600 m2, 2 stories
6
DANAMON REGIONAL OFFICE BUILDING PROJECT
‐ Design and Build:
P.T. DANAMON 2
* Office Area: 4,350 m , 9 stories
USAHA GEDUNG
1996‐1997
BALIKPAPAN, EAST KALIMANTAN
* Landscape and Parking area: 1,550 m2 * HVAC, Plumbing, Electrical, Fire Fighting, Sound System, Elevator
7
DANAMON DATA CENTRE PROJECT
‐ Design and Build:
P.T. DANAMON
MEGA KUNINGAN, JAKARTA
* Office Area: 19,350 m2, 17 stories
USAHA GEDUNG
1996‐1997
* Basement Area: 6,862 m2, 3 stories * Prestress Piles: .40 x .40 x 15 m : 388 pcs ‐ Soil Excavation 22,000 m3 ‐ HVAC, Precission AC for Computer Room, Plumbing, STP, Electrical, Fire Fighting, Halon System, Sound System, Elevator, Satellite Telecommunication System
8
DANAMON REGIONAL OFFICE
‐ Design and Build:
P.T. DANAMON
BUILDING PROJECT
* Office Area: 10,620 m2, 12 stories
USAHA GEDUNG
SEMARANG, CENTRAL JAVA
* Basement Area: 1,040 m2, 2 stories
1996‐1997
* Landscape and Parking area: 1,500 m2 * Bore Pile Ø 1 m and Ø 0.8 m, depth 23 to 26 m * HVAC, Plumbing, Electrical, Fire Fighting, Sound System, Elevator
9
DANAMON REGIONAL OFFICE
‐ Design and Build:
P.T. DANAMON
BUILDING PROJECT
* Office Area 1,100 m2, 3 stories
USAHA GEDUNG
SAMARINDA, EAST KALIMANTAN
* Structural and Finishing Works
1994‐1995
* Plumbing, Electrical, Fire Fighting, Sound System, Air Condition
10
DANAMON SQUARE OFFICE DEVELOPMENT ANGGANA PROJECT
‐ Basement and Structural Works * Excavation, Stage I : 85.000 m
SHIMIZU 3
DANAMON COMPLEX AREA
* Excavation, Stage II: 173.000 m
CENTRAL JAKARTA
‐ Steel Sheet Pile:
1993‐1994
CORPORATION
3
* Larssen type L‐20 w, 16.50 m, 566 pcs * Larssen type L‐160 w, 9.00 m, 380 pcs * Larssen type GSP III, 12.00 m, 174 pcs ‐ Ground Anchoring, 333 pcs ‐ Matt Foundation (40 x 40 x 2.75) m3 11
DANAMON REGIONAL OFFICE
‐ Design and Build:
P.T. BANK
BUILDING PROJECT
* Office area: 3.300 m2, 7 stories
DANAMON
LAMPUNG, SOUTH SUMATERA
* Landscape and Parking area: 3,000 m2
INDONESIA
‐ Precast Concrete Piles : ( 0.40 x .0.40 x 14 ) m ‐ HVAC, Plumbing, Electrical, Fire Fighting, Sound System, Elevator
1991‐1992
CIVIL AND BUILDING WORKS Road, Bridge and Air Strip No. 1
NAME OF PROJECT AND LOCATION
DESCRIPTION OF WORK
ROAD AND BRIDGE WORKS PROJECT
‐ Road and Bridge Works, Phase II
EAST KALIMANTAN
(Join Operation)
OWNER
PERIOD
DEPARTEMEN
Nov‐05
PERMUKIMAN & PRASARANA WILAYAH
2
ROAD WORKS PROJECT
‐ Road Work:
JALAN A. YAN ‐ Cs. P. SURYANATA
* Aggregate Foundation
SAMARINDA, EAST KALIMANTAN
* Mortared Stone * Hotmix ATB
3
PERMUKIMAN &
Dec‐05
PRASARANA WILAYAH
DEPARTEMEN
‐ Road Work:
Km. 38.00 SEMOI SEPAKU‐PETUNG
* Aggregate Foundation
PERMUKIMAN &
SAMARINDA, EAST KALIMANTAN
* Recycling Soil Cement
PRASARANA
ROAD WORKS PROJECT
‐ Ring Road Work
JALAN A. YANI ‐ Cs. P. SURYANATA
* Mortared Stone
SAMARINDA, EAST KALIMANTAN
* Recycling Soil Cement * Hotmix ATB
5
Jun‐05
ROAD WORKS PROJECT
* Hotmix ATB
4
DEPARTEMEN
ROAD WORK PROJECT
‐ Rehabilitation and Upgrading Bridge Work:
JALAN. P. DERAWAN, TANJUNG REDEB
* Common Embankment
BERAU, EAST KALIMANTAN
* Aggregate Foundation
2003
WILAYAH
DEPARTEMEN
2003
PERMUKIMAN & PRASARANA WILAYAH
DINAS PEKERJAAN
2002
UMUM
* Hotmix ATB
6
7
ROAD WORKS PROJECT
‐ Rehabilitation and Upgrading Road Work:
Km. 38.00 SEMOI SEPAKU‐PETUNG
* Aggregate Foundation
SAMARINDA, EAST KALIMANTAN
* Hotmix ATB
ROAD WORKS PROJECT
‐ Road Work:
Km. 38.00 SEMOI SEPAKU‐PETUNG
‐ Escalation Jalan Semoi Sepaku ‐ Petung
SAMARINDA, EAST KALIMANTAN
‐ Soil Cement Implementation ‐ Asphalt AC ‐ WC Implementation
DINAS PEKERJAAN
2002
UMUM
DEPARTEMEN
2001
PERMUKIMAN & PRASARANA WILAYAH
‐ Structural Works Implementation
8
'UPGRADING ROAD WORK PROJECT
‐ Road work
JALAN S. PARMAN ‐ A. YANI (PACKAGE)
‐ Upgrading Road ( ATB ) , 400 m'
SAMARINDA, EAST KALIMANTAN
DEPARTEMEN PERMUKIMAN & PRASARANA WILAYAH
2001
9
LATI BRIDGE PROJECT
‐ Steel Pipe Pile Ø 400 mm
BERAU, EAST KALIMANTAN
‐ Austria Truss type B , length 60 m
DINAS PEKERJAAN 2000 ‐ 2001 UMUM
‐ Pile Slab Concrete , length 20 m ‐ Girder type Bridge , length 30 m ‐ Road Embankment , 2 x 100 m
CIVIL AND BUILDING WORKS Retaining Wall and Sheet Piling No. 1
NAME OF PROJECT AND LOCATION RETAINING WALL WORK PROJECT
DESCRIPTION OF WORK ‐ Retaining Wall Work:
SEI KANDILO ‐ JALAN YOS SUDARSO
* Bore Pile
EAST KALIMANTAN
* Driving Concrete Sheet Pile
OWNER
PERIOD
DINAS PEKERJAAN
2002
UMUM
* Common Embankment
2
3
RETAINING WALL WORK PROJECT
‐ Retaining Wall Work:
SANGALAKI ‐ JALAN P. DERAWAN
* Steel Sheet Pile FSP III A x 15 m
BERAU, EAST KALIMANTAN
* Soil Filling
RETAINING WALL SEI KaNDILO
‐ Retaining Wall Work:
JALAN YOS SUDARSO PROJECT
* Driving Concrete Sheet Pile
'EAST KALIMANTAN
* Common Embankment
DINAS PEKERJAAN
2001
UMUM
DINAS PEKERJAAN
2001
UMUM
* Prestressed Concrete Spun Pile 94 pcs of Ø 600 mm: 11 m, JIS A 5335‐1985
4
'RETAINING WALL WORK PROJECT
‐ Retaining Wall Work:
JALAN A. YANI, TANJUNG REDEB
* Steel Sheet Pile, FSP IIIA x 15 m
BERAU, EAST KALIMANTAN
DINAS PEKERJAAN 2000‐ 2001 UMUM
* Steel Sheet Pile, FSP IVA x 15 m * Steel Sheet Pile, FSP IVA x 20 m * Anchor Steel Pipe Pile,Ø 500 and Ø 600 mm * Soil Filling 40,000 m3
5
PILE SLAB PROJECT
‐ Gravity Retaining Wall
DINAS PEKERJAAN
JALAN INHUTANI, BERAU
* Pile Slab, length 40 m
UMUM
EAST KALIMANTAN
* Steel Pipe Pile E 400 mm: 18 m, 27 pcs
2001
‐ Reinforced Concrete Beam and Slab ‐ Asphalt Road Works
6
RECLAMATION PROJECT, PASAR BARU
‐ Reclamation Work, Phase III:
BALIKPAPAN, EAST KALIMANTAN
* Concrete Sheet Pile for Retaining Wall
EAST KALIMANTAN
* Armour Stone 500 kg/pcs for counter weight * Back Fill with Sand and selected material
DINAS PEKERJAAN UMUM
2001
CIVIL AND BUILDING WORKS Marine Works No. 1
NAME OF PROJECT AND LOCATION
DESCRIPTION OF WORK 3
URGENT DEVELOPMENT OF SEMARANG
‐ Dredging 556,000 m
PHASE II, STAGE I PROJECT
‐ Container Wharf ( 345 x 25 ) m
OECF LOAN IP ‐ 379
‐ Retaining Wall 357 m
CENTRAL JAVA
‐ Reclamation Revertment 1,420 m
OWNER
PERIOD
DIRECTORATE
1995
GENERAL OF SEA COMMUNICATION
‐ Reclamation 500,000 m3 ‐ Soil Improvement 106,000 m2 of Vertical Drain ‐ Pavement Container Yard : 70,000 m2 ‐ Road and Building Site : 32,000 m2 ‐ Concrete Beam Foundation : 7,100 m3 ‐ Drainage System : 5,310 m ‐ Building Construction : 8,180 m2 ‐ Utility Water Piping Installation and Electrical System
2
SEA WATER INTAKE PIT
‐ Sea Water Intake Pit
ANYER, WEST JAVA
‐ Furnish and Driving Steel Sheet Pile for
P.T. AMOCO
Conferdam (42 x 21) m2
1995 ‐ 1996
MITSUI P.T.A INDONESIA
* Larsen 16 w, depth 15 m * Reinforced Concrete Pit (34,500 L x 17,900 W x 9,000 D) m
3
SAMARINDA PORT PROJECT
‐ Replacement of Wooden Jetty to Concrete Jetty
SAMARINDA
100 m x 50 m
EAST KALIMANTAN
* P.C. Spun Pile Ø 500 mm, 3,920 m
DIRECTORATE GENERAL OF SEA
1995
COMMUNICATION
3
* Reinforced Concrete 1,230 m * Rubber Fender 24 pcs * Bollard 6 pcs * Retaining Wall 125 m * Reclamation Works 11,960 m3 * Dredging 22,500 m3 * Steel Sheet Pile FSP II A, 17 m, 370 pcs * Steel Sheet Pile FSP II A, 30 m, 150 pcs
4
EXTENTION JETTY PROJECT
‐ Offshore Piling
BIRINGKASI, TONASA IV
* Pile CP Work, Phase I
SOUTH SULAWESI
‐ Onshore Precast Fabrication * Beam Fender Wall Precast * Installation of all Precast System * Cast Insitu, Phase II * Install Bollard, Rubber Fender,
P.T. SEMEN TONASA
1995
Cleat and Crud Ulin Timber
5
SAMARINDA PORT PROJECT
‐ Concrete Jetty 120 m x 15 m
SAMARINDA, EAST KALIMANTAN
* P.C. Spun Pile Ø 500 mm, Total: 3,660 m * Reinforced Concrete 1,375 m3
DIRECTORATE
1994
GENERAL OF SEA COMMUNICATION
* Rubber Fender: 26 pcs * Bollard: 7 pcs ‐ Retaining Wall: 125 m * P.C. Spun Pile Ø 500 mm, Total: 1,875 m * Steel Sheet Pile FSP II A, 17 m : 370 pcs * Steel Sheet Pile FSP II A, 30 m : 150 pcs * Reclamation Works 19.688 m3
6
JETTY CONSTRUCTION PROJECT
‐ Breasting Dolphin 4 pcs Works:
MERAK, WEST JAVA
* Supply and Driving Steel Pipe Pile
P.T. SARI
1992
SARANA KIMIA
E 609.6 mm and E 508 mm, Total: 1,104 m * Concrete: 401 m3 * Cathodic Protection Works ‐ Mooring Dolphine 4 pcs Works: * Supply and Driving Steel Pipe Pile Ø 609.6 mm and Ø 508 mm, Total: 1,152 m * Concrete : 379.5 m3 ‐ Cathodic Protection ‐ Mooring Bitt 70 ton ‐ 2 pcs, 50 ton ‐ 2 pcs ‐ Loading Platform Works ‐ Concrete Trestle : L 130 m
7
CONSTRUCTION OF MOORING DOLPHIN
‐ Steel Pipe Pile: Ø 762 x L 30 m 3
PROJECT, CIGADING PORT, CILEGON
‐ Concrete: 60.8 m
WEST JAVA
‐ Cat Walk
P.T. KRAKATAU
1989
STEEL
‐ Bollard 100 ton, 1 pcs ‐ Cathodic Protection
8
'PASSENGER TERMINAL AND
‐ Passanger Terminal and Related Facilities
RELATED FACILTIES PROJECT
* Terminal Building
PELABUHAN IV
PERUM .
CONSTRUCTION OF FUEL UNLOADING
‐ 2 units Breasting Dolphin and
P.T. STOWINDO
JETTY PROJECT, PLTD SUPRA
2 units Mooring Dolphin Works:
1988
BALIKPAPAN, EAST KALIMANTAN 9
PARE ‐ PARE, SULAWESI
* Unloading Platform * Steel Pipe Pile Ø 609 mm, t = 12 mm, L = 30 m * Concrete Pile Cap and Fender Wall * Rubber Fender Type Cell 100 1 unit each Breasting Dolphin * Bollard, capacity 35 ton, 1 unit each Dolphin ‐ 6 units Walk Way and Pipe Support ‐ Steel Pipe Pile E 508 mm, t = 12 mm, L = 26 m * Concrete Pile Cap
POWER
1997
CIVIL AND BUILDING WORKS Coal Handling and Storage Facilities No. 1
NAME OF PROJECT AND LOCATION JETTY CONSRUCTION PROJECT SUNGAI 03 AND 04
DESCRIPTION OF WORK ‐ Jetty and Trestle Platform 03 : 1,050 m2
IN PALARAN SAMARINDA, EAST KALIMANTAN ‐ Mooring Dolphin for Jetty 03 : 1 Unit
OWNER
PERIOD
PT. SARANA
Sep‐05
ABADI LESTARI
Jan‐06
PT. INDOMNICO
Oct‐04
‐ Cat Walk for Jetty 03 : 2 Unit ‐ Jetty Platfor : 2 Unit ‐ Breasting Dolphin Jetty 04 ‐ Cat Walk Span, span 55 m2 (Steel Truss Frame) ‐ Silo Platform : 86 m ‐ Steel Bollard : Capacity 25 Ton 9 Unit ‐ Rubber Fender Da‐A400 (M1) 1000 + 1200 L Complete with Accessories : 17 Units
2
COAL WASH PLANT CONSTRUCTION MINE
‐ Foundation Of Retaining Walls 305 m2
STOCKYARD, EAST KALIMANTAN
‐ Steel Structure Building 30.575 Kg
MANDIRI
‐ Machine Erection 70.000 Kg ‐ Office, Electrical Room Store, 135 m2 ‐ Stacker and Conveyer System 200 TON /Hr ‐ Water Supply and Piping System 500 m3/Hr ‐ Electrical, PLC Control System ‐ Water/Treatment Sump and Tailing Discharge Pipe (HDPE) 1.260 Mtr ‐ Miscelllaneous Works
3
COAL LOADING JETTY AND CONVEYOR
‐ Loading Jetty Works:
FOUNDATION CONSTRUCTION PROJECT
‐ 6 units of Breasting Dolphin for 8.000 DWT
EAST KALIMANTAN
Barge * Steel Pipe Pile Foundation: Ø 609 mm, t = 12 mm, L = 33 m * Concrete Pile Cap and Fender Wall Structure * 12 units Rubber Fender for Breasting Dolphin type DA‐A.400 H ‐ 2000 L * 6 units Bollard 35 ton ‐ 3 units Conveyor Tower Support * Steel pipe pile foundation Ø 609 mm, t = 12 mm, L = 30 m * Concrete Pile Cap ‐ 7 Units Steel Walk Way * Steel Pipe Pile: Ø 609, t = 9 mm for Main Structure
P.T. MAHAKAM SUMBER JAYA
2004
4
RENOVATION DOLPHIN PROJECT
‐ Loading Jetty Works:
P.T. JORONG
NEW COAL LOADING JETTY
‐ 6 units of Breasting Dolphin for 8.000 DWT
BARUTAMA
EAST KALIMANTAN
Barge
2003
GRESTON
* Steel Pipe Pile Foundation, Ø 609, t = 12 mm, L = 24 m * Concrete Pipe Cap and Fender Wall Structure * 12 units Rubber Fender for Breasting Dolphin Type DA‐A.400 H ‐ 1500 L * 6 units Bollard 35 ton ‐ Conveyor Foundation Works: * 2 units Conveyor Tower Support * Steel Pipe Pile Foundation, Ø 609, t = 12 mm, L = 24 m * Concrete Pile Cap * Demolish: 6 units Marine Steel Gravity Dolphin Ø 6 m, H = 8 m * Repair: 1 unit Marine Steel Gravity Dolphin Ø 8 m, H = 8.5 m
5
COAL LOADING JETTY PROJECT
‐ Loading Jetty :
P.T. SUMBER
SAMBARATA, TANJUNG. REDEB
‐ 6 units of Breasting Dolphin for 5.000 DWT
MITRA JAYA
BERAU, EAST KALIMANTAN
2000
Barge * Steel Pipe Pile Foundation: Ø 609 mm, t = 12 mm, L = 48 m * Concrete Pile Cap and Fender Wall Structure * 12 units Rubber Fender for Breasting Dolphin type DA‐A.400 H ‐ 1,500 L * 6 units Bollard 35 ton ‐ 2 units Conveyor Tower Support * Steel Pipe Pile Foundation Ø 609 mm, t = 12 mm, L = 36 m * Concrete Pile Cap ‐ 6 units Steel Walk Way * Steel Pipe, E 609, t = 9 mm for Main Structure
6
JORONG COAL PORT PROJECT SOUTH KALIMANTAN
‐ Construction of Rock Armoured Slope Protection
P.T. JORONG
‐ Construction of Breakwater
BARUTAMA
‐ Construction of Dolphins : * Gravity Steel Tank Dolphins : + 1 unit Ø 8 m, H = 8.5 m + 6 units Ø 6 m, H = 8.5 m + 5 units Walk way W = 1 m ‐ 1 unit Walk Way, W = 2 m ‐ Loading Conveyor Foundation ‐ Reclaim Conveyor Foundation ‐ Concrete Tunnel Foundation ‐ Concrete Feeder Conveyor Foundation
GRESTON
1998
‐ Tripper Conveyor Foundation ‐ Transfer Conveyor Foundation ‐ Screen Foundation ‐ Crusher Foundation ‐ Concrete Retaining Wall
7
JETTY AND DOLPHINS PROJECT
‐ Coal Loading Jetty for 10,000 D.W.T Barge
SUARAN PORT AND LATI PORT,
* 9 units Breasting Dolphin
TANJUNG REDEB, BERAU
+ Steel Pipe Pile Foundation,
EAST KALIMANTAN
Ø 1,000 mm, t = 14 mm, L = 36 m + Concrete Pile Cap and Fender Wall Structure + Rubber Fender Type H = 500, L = 2000 + Bollard Capacity: 50 ton + Marine Ladder + Marine Navigation Lighting + Walk Way and Walk Way Support ‐ Repair Dolphin at Sungai Lati Port * Steel Pipe Dolphine Structure Ø 1,000 mm, t = 14 mm, L = 12 m * Rubber Fender
P.T. BERAU COAL
1997