CIVIL AND BUILDING WORKS Site Reclamation No. 1 NAME OF PROJECT AND LOCATION DESCRIPTION OF WORK OWNER PERIOD  TUNU NORTH CAMP SITE PREPARATION ...
3 downloads 0 Views 112KB Size
CIVIL AND BUILDING WORKS Site Reclamation No.

1

NAME OF PROJECT AND LOCATION

DESCRIPTION OF WORK

OWNER

PERIOD

 TUNU NORTH CAMP SITE PREPARATION

 ‐ Engineering, Procurement and Construction of:

TOTALFINAELF

Aug. 2002

 TN / CSPI ‐ 01 PROJECT

   * Soil Investigation

E&P INDONESIE

Jul‐03

 TUNU, EAST KALIMANTAN

   * Site Preparation

VICO INDONESIA

Jun‐00

   * Dredging and Reclamation    * Wooden  Retaining Wall    * Loading  /  Unloading Jetty and Speed Boat Jetty    * Helipad and Bridge    * Perimeter Light and Floodlight for Helipad    * Cathodic Protection    * FRP for Fire Water Line

2

 MUTIARA SITE REHABILITATION

 ‐ Soil Improvement

 2000 / 2001 ( M ‐ 8 ) PROJECT

 ‐ Revegetation Works :

 MUARA BADAK, EAST KALIMANTAN

   * Slope Erosion Control

Nov. 2001

   * Supply and Installation of Planting Media    * Supply and Installation of Fruit Tree    * Supply and Installation of Non Fruit Tree    * Gabion Drainage Channel    * Bore Pile and Pile Cap    * Gabion Retaining Wall

3

 SITE PREPARATION WORK FOR

 ‐ Site Clearing 290,000 m2

 INDONESIA MERAK No. 2

 ‐ Soil Filling and Compaction 530,000 m

 PTA UNIT PROJECT, MERAK

 ‐ Shore Protection by Rip‐Rap 200 m

P.T. AMOCO 3

1995

MITSUI P.T.A. INDONESIA

WEST JAVA

CIVIL AND BUILDING WORKS Building, Housing and Other Facilities No. 1

NAME OF PROJECT AND LOCATION GELANGGANG OLAH RAGA DAN GRAHA  PEMUDA PROJECT BALIK PAPAN, EAST KALIMANTAN

DESCRIPTION OF WORK

OWNER

PERIOD

 ‐ Tribune capacity : 2000 persons. 2,000 m2

DEPARTMENT

Oct‐04

 ‐ Basefloor capacity : 1500 persons. 1,500 m2

PUBLIC WORKS

Oct‐06

 ‐ Parking capacity : 300 cars. 12,000 m2  ‐ Dome Shape with Ø 45.00 and 14.00 m high  ‐ Space Frame syst / Apora Bottle Connection  ‐ Roofing : Tegola Prestige copper  ‐ Special Polyuruthene Multi purpose Sport indoor floor  finish. Brand : Herculen  ‐ Elecrical Power and Grounding System  ‐ Generator Ste 1000 KVA with Sound Proofing,

 Brand : Cummins  ‐ Special Lighting for Sport Area  ‐ Hydrant pump 500 GPM Capacity, Brand : Acme ‐ USA  ‐ Split Ducted Air Conditioning System, 3.000.000 BTU / Hr  Brang : Carrier  ‐ Lightning Protection Active System, Radius 125 m

2

3

 TECHNICAL AND ELECTRICAL

 ‐ 10 stories, Car Park area 30,000 m2

 EQUIPMENTS PROJECT

 ‐  8   stories, Building Commercial area 34,500 m2

 CENTER KENARIMAS PROJECT

 ‐ Structural and Finishing Works

 CENTRAL JAKARTA

 ‐ Landscape Area: 1,000 m2

 PECIKO FIELD DEVELOPMENT PROJECT

 ‐ Detail Engineering, Procurement and

 THE REVAMPING OF SENIPAH CAMP

   Construction of: 

 PECIKO / EPSC 6 

   * Civil Works:

 SENIPAH, EAST KALIMANTAN

     + Construction of Buildings

P.T. KENARIMAS

Jul‐02 Mar‐04

TOTAL INDONESIE

Mar‐98 Nov. 1999

     + Restaurant and Recreation Building      + Training Centre and Terrace Guest House      + Laundry, Container House, Corridor and         Garbage House     * Mechanical Works:      + Installation of Potable Water System      + Installation of Fire  Water System      + Installation of Sanitary Fixtures      + HVAC Installation    * Electrical and Instrumentation Works:      + Lighting Fixture, Switches and Socket Outlet      + Electrical Feeder Cables      + Transformer unit      + Electrical Main Distribution Panel      + Electrical Distribution Panel      + Lightning Protection      + Fire Alarm System and Telephone Cable

4

 KOTA KASABLANKA PROJECT

 ‐ Sub‐Structure, Foundation Work:

 HOTEL, OFFICE MIXED APARTMENT

   * 4 Basement

P.T. BENTALA

1997

MAHAYA

 JAKARTA

5

 TRADERS HOTEL PROJECT

 ‐ Structural Work: 

 JAKARTA

   * Building Area:   36,000 m2, 17 stories

P.T. NUSA PURI

1997‐1998

LESTARI JAYA

   * Basement Area:  4,600 m2,   2 stories

6

 DANAMON REGIONAL OFFICE  BUILDING PROJECT

 ‐ Design and Build:

P.T. DANAMON  2

   * Office Area: 4,350 m ,  9 stories

USAHA GEDUNG

1996‐1997

 BALIKPAPAN, EAST KALIMANTAN

   * Landscape and Parking area: 1,550 m2    * HVAC, Plumbing, Electrical, Fire Fighting,      Sound System, Elevator

7

 DANAMON DATA CENTRE PROJECT

 ‐ Design and Build:

P.T. DANAMON

 MEGA KUNINGAN, JAKARTA

   * Office Area:       19,350 m2, 17 stories

USAHA GEDUNG

1996‐1997

   * Basement Area:  6,862 m2,   3 stories    * Prestress Piles: .40 x .40 x 15 m : 388 pcs  ‐ Soil Excavation  22,000 m3  ‐ HVAC, Precission AC for Computer Room,    Plumbing, STP, Electrical, Fire Fighting,    Halon System, Sound System, Elevator,     Satellite Telecommunication System

8

 DANAMON REGIONAL OFFICE

 ‐ Design and Build:

P.T. DANAMON

 BUILDING PROJECT

   * Office Area:      10,620 m2, 12 stories

USAHA GEDUNG

 SEMARANG, CENTRAL JAVA

   * Basement Area: 1,040 m2,   2 stories

1996‐1997

   * Landscape and Parking area:  1,500 m2    * Bore Pile  Ø 1 m and  Ø 0.8 m,      depth 23 to 26 m    * HVAC, Plumbing, Electrical, Fire Fighting,      Sound System, Elevator

9

 DANAMON REGIONAL OFFICE

 ‐ Design and Build:

P.T. DANAMON 

 BUILDING PROJECT

   * Office Area  1,100 m2, 3 stories

USAHA GEDUNG

 SAMARINDA, EAST KALIMANTAN

   * Structural and Finishing Works

1994‐1995

   * Plumbing, Electrical, Fire Fighting,      Sound System, Air Condition

10

 DANAMON SQUARE OFFICE  DEVELOPMENT ANGGANA PROJECT

 ‐ Basement and Structural Works    * Excavation, Stage I :    85.000 m

SHIMIZU  3

 DANAMON COMPLEX AREA

   * Excavation, Stage II:  173.000 m

 CENTRAL JAKARTA

 ‐ Steel Sheet Pile:

1993‐1994

CORPORATION

3

   * Larssen type  L‐20 w,  16.50 m,  566 pcs    * Larssen type  L‐160 w,  9.00 m,  380 pcs    * Larssen type  GSP III, 12.00 m,  174 pcs  ‐ Ground Anchoring, 333 pcs  ‐ Matt Foundation (40 x 40 x 2.75) m3 11

 DANAMON REGIONAL OFFICE

 ‐ Design and Build:

P.T. BANK

 BUILDING PROJECT

   * Office area: 3.300 m2,  7 stories

DANAMON

 LAMPUNG, SOUTH SUMATERA

   * Landscape and Parking area: 3,000 m2

INDONESIA

 ‐ Precast Concrete Piles : ( 0.40 x .0.40 x 14 ) m   ‐ HVAC, Plumbing, Electrical, Fire Fighting,     Sound System, Elevator

1991‐1992

CIVIL AND BUILDING WORKS Road, Bridge and Air Strip No. 1

NAME OF PROJECT AND LOCATION

DESCRIPTION OF WORK

 ROAD AND BRIDGE WORKS PROJECT

 ‐ Road and Bridge Works, Phase II

 EAST KALIMANTAN

 (Join Operation)

OWNER

PERIOD

DEPARTEMEN 

Nov‐05

PERMUKIMAN & PRASARANA WILAYAH

2

 ROAD WORKS PROJECT

 ‐ Road Work:

 JALAN A. YAN ‐ Cs. P. SURYANATA

   * Aggregate Foundation

 SAMARINDA, EAST KALIMANTAN

   * Mortared Stone    * Hotmix ATB

3

PERMUKIMAN &

Dec‐05

PRASARANA WILAYAH

DEPARTEMEN

 ‐ Road Work:

 Km. 38.00 SEMOI SEPAKU‐PETUNG

   * Aggregate Foundation

PERMUKIMAN &

 SAMARINDA, EAST KALIMANTAN

   * Recycling Soil Cement

PRASARANA

 ROAD WORKS  PROJECT

 ‐ Ring Road Work

 JALAN  A. YANI ‐ Cs. P. SURYANATA

   * Mortared Stone

 SAMARINDA, EAST KALIMANTAN

   * Recycling Soil Cement    * Hotmix ATB

5

Jun‐05

 ROAD WORKS PROJECT

   * Hotmix ATB

4

DEPARTEMEN

 ROAD WORK PROJECT

 ‐ Rehabilitation and Upgrading Bridge Work:

 JALAN. P. DERAWAN, TANJUNG REDEB

   * Common Embankment

 BERAU, EAST KALIMANTAN

   * Aggregate Foundation

2003

WILAYAH

DEPARTEMEN

2003

PERMUKIMAN & PRASARANA WILAYAH

DINAS PEKERJAAN

2002

UMUM 

   * Hotmix ATB

6

7

 ROAD WORKS PROJECT

 ‐ Rehabilitation and Upgrading Road Work:

 Km. 38.00 SEMOI SEPAKU‐PETUNG

   * Aggregate Foundation

 SAMARINDA, EAST KALIMANTAN

   * Hotmix ATB

 ROAD WORKS PROJECT

 ‐ Road Work:

 Km. 38.00 SEMOI SEPAKU‐PETUNG

  ‐ Escalation Jalan Semoi Sepaku ‐ Petung

 SAMARINDA, EAST KALIMANTAN

  ‐ Soil Cement Implementation   ‐ Asphalt AC ‐ WC Implementation

DINAS PEKERJAAN

2002

UMUM 

DEPARTEMEN

2001

PERMUKIMAN & PRASARANA WILAYAH

  ‐ Structural Works Implementation

8

 'UPGRADING ROAD WORK PROJECT

‐ Road work

 JALAN  S. PARMAN ‐  A. YANI (PACKAGE)

  ‐ Upgrading Road ( ATB ) , 400 m'

 SAMARINDA, EAST KALIMANTAN

DEPARTEMEN PERMUKIMAN & PRASARANA WILAYAH

2001

9

 LATI BRIDGE PROJECT

 ‐ Steel Pipe Pile Ø 400 mm

 BERAU, EAST KALIMANTAN

 ‐ Austria Truss type B  , length 60 m 

DINAS PEKERJAAN 2000 ‐ 2001 UMUM 

 ‐ Pile Slab Concrete   , length 20 m  ‐ Girder type Bridge    , length 30 m   ‐ Road Embankment  , 2 x 100 m

CIVIL AND BUILDING WORKS Retaining Wall and Sheet Piling No. 1

NAME OF PROJECT AND LOCATION  RETAINING WALL WORK PROJECT

DESCRIPTION OF WORK  ‐ Retaining Wall Work:

 SEI  KANDILO ‐ JALAN  YOS SUDARSO

   * Bore Pile 

 EAST KALIMANTAN

   * Driving Concrete Sheet Pile

OWNER

PERIOD

DINAS PEKERJAAN

2002

UMUM 

   * Common Embankment

2

3

 RETAINING WALL WORK PROJECT

 ‐ Retaining Wall Work:

 SANGALAKI ‐ JALAN  P. DERAWAN

   * Steel Sheet Pile FSP III A x 15 m

 BERAU, EAST KALIMANTAN

   * Soil Filling

 RETAINING WALL SEI  KaNDILO

 ‐ Retaining Wall Work:

 JALAN  YOS SUDARSO PROJECT

   * Driving Concrete Sheet Pile

 'EAST KALIMANTAN

   * Common Embankment

DINAS PEKERJAAN

2001

UMUM 

DINAS PEKERJAAN

2001

UMUM 

   * Prestressed Concrete Spun Pile      94 pcs of Ø 600 mm: 11 m, JIS A 5335‐1985

4

 'RETAINING WALL WORK PROJECT

 ‐ Retaining Wall Work:

 JALAN  A. YANI, TANJUNG REDEB

   * Steel Sheet Pile, FSP IIIA x 15 m

 BERAU, EAST KALIMANTAN

DINAS PEKERJAAN 2000‐ 2001 UMUM 

   * Steel Sheet Pile, FSP IVA x 15 m    * Steel Sheet Pile, FSP IVA x 20 m    * Anchor Steel Pipe Pile,Ø 500 and Ø 600 mm    * Soil Filling 40,000 m3

5

 PILE SLAB PROJECT

 ‐ Gravity Retaining Wall

DINAS PEKERJAAN

 JALAN  INHUTANI, BERAU

   * Pile Slab, length 40 m

UMUM 

 EAST KALIMANTAN

   * Steel Pipe Pile E 400 mm: 18 m, 27 pcs

2001

 ‐ Reinforced Concrete Beam and Slab  ‐ Asphalt Road Works

6

 RECLAMATION PROJECT, PASAR BARU

 ‐ Reclamation Work, Phase  III:

 BALIKPAPAN, EAST KALIMANTAN

   * Concrete Sheet Pile for Retaining Wall

 EAST KALIMANTAN

   * Armour Stone 500 kg/pcs for counter weight    * Back Fill with Sand and selected material

DINAS PEKERJAAN UMUM 

2001

CIVIL AND BUILDING WORKS Marine Works No. 1

NAME OF PROJECT AND LOCATION

DESCRIPTION OF WORK 3

 URGENT DEVELOPMENT OF SEMARANG

 ‐ Dredging 556,000 m

 PHASE II,  STAGE I  PROJECT

 ‐ Container Wharf ( 345 x 25 ) m

 OECF LOAN  IP ‐ 379

 ‐ Retaining Wall 357 m

 CENTRAL JAVA

 ‐ Reclamation Revertment 1,420 m

OWNER

PERIOD

DIRECTORATE

1995

GENERAL OF SEA COMMUNICATION

 ‐ Reclamation  500,000 m3  ‐ Soil Improvement 106,000 m2 of Vertical Drain  ‐ Pavement Container Yard     :   70,000 m2  ‐ Road and Building Site         :   32,000 m2  ‐ Concrete Beam Foundation :     7,100 m3  ‐ Drainage System                  :      5,310 m  ‐ Building Construction           :      8,180 m2  ‐ Utility Water Piping Installation and     Electrical System

2

 SEA WATER INTAKE PIT

 ‐ Sea Water Intake Pit

 ANYER, WEST JAVA

 ‐ Furnish and Driving Steel Sheet Pile for 

P.T. AMOCO

   Conferdam (42 x 21) m2

1995 ‐ 1996

MITSUI P.T.A INDONESIA

   * Larsen 16 w, depth 15 m    * Reinforced Concrete Pit      (34,500 L x 17,900 W x 9,000 D) m

3

 SAMARINDA PORT PROJECT

 ‐ Replacement of Wooden Jetty to Concrete Jetty

 SAMARINDA  

   100 m  x 50 m

 EAST KALIMANTAN

   * P.C. Spun Pile Ø 500 mm, 3,920 m

DIRECTORATE GENERAL OF SEA

1995

COMMUNICATION

3

   * Reinforced Concrete 1,230 m      * Rubber Fender 24 pcs    * Bollard 6 pcs    * Retaining Wall 125 m    * Reclamation Works 11,960 m3    * Dredging 22,500  m3    * Steel Sheet Pile FSP II A, 17 m, 370 pcs    * Steel Sheet Pile FSP II A, 30 m, 150 pcs

4

 EXTENTION JETTY PROJECT

 ‐ Offshore Piling 

 BIRINGKASI, TONASA  IV

   * Pile CP Work, Phase  I

 SOUTH SULAWESI

 ‐ Onshore Precast Fabrication    * Beam Fender Wall Precast    * Installation of all Precast System    * Cast Insitu, Phase  II    * Install Bollard, Rubber Fender,

P.T. SEMEN TONASA

1995

     Cleat and Crud Ulin Timber

5

 SAMARINDA PORT PROJECT

 ‐ Concrete Jetty 120 m x 15 m

 SAMARINDA, EAST KALIMANTAN  

   * P.C. Spun Pile  Ø 500 mm, Total: 3,660 m    * Reinforced Concrete 1,375 m3

DIRECTORATE

1994

GENERAL OF SEA COMMUNICATION

   * Rubber Fender: 26 pcs    * Bollard: 7 pcs  ‐ Retaining Wall: 125 m    * P.C. Spun Pile Ø 500 mm, Total: 1,875 m    * Steel Sheet Pile FSP II A, 17 m : 370 pcs    * Steel Sheet Pile FSP II A, 30 m : 150 pcs    * Reclamation Works 19.688 m3

6

 JETTY CONSTRUCTION PROJECT

 ‐ Breasting Dolphin 4 pcs Works:

 MERAK, WEST JAVA

   * Supply and Driving Steel Pipe Pile

P.T. SARI

1992

SARANA KIMIA

      E 609.6 mm and E 508 mm, Total: 1,104 m    * Concrete: 401 m3    * Cathodic Protection Works  ‐ Mooring Dolphine 4 pcs Works:    * Supply and Driving Steel Pipe Pile      Ø 609.6 mm and Ø 508 mm, Total: 1,152 m    * Concrete  : 379.5 m3  ‐ Cathodic Protection  ‐ Mooring Bitt 70 ton ‐ 2 pcs, 50 ton ‐ 2 pcs  ‐ Loading Platform Works  ‐ Concrete Trestle : L 130 m 

7

 CONSTRUCTION OF MOORING DOLPHIN 

 ‐ Steel Pipe Pile: Ø 762 x L 30 m 3

 PROJECT, CIGADING PORT, CILEGON

 ‐ Concrete: 60.8 m

 WEST JAVA

 ‐ Cat Walk 

P.T. KRAKATAU

1989

STEEL

 ‐ Bollard 100 ton, 1 pcs  ‐ Cathodic Protection

8

 'PASSENGER TERMINAL AND 

 ‐ Passanger Terminal and Related Facilities

 RELATED FACILTIES PROJECT

   * Terminal Building

PELABUHAN  IV

PERUM .

 CONSTRUCTION OF FUEL UNLOADING

 ‐ 2 units Breasting Dolphin and

P.T. STOWINDO

 JETTY PROJECT, PLTD SUPRA

   2 units Mooring Dolphin Works:

1988

 BALIKPAPAN, EAST KALIMANTAN 9

 PARE ‐ PARE, SULAWESI

   * Unloading Platform    * Steel Pipe Pile Ø 609 mm, t = 12 mm, L = 30 m    * Concrete Pile Cap and Fender Wall    * Rubber Fender Type Cell 100      1 unit each Breasting Dolphin    * Bollard, capacity 35 ton, 1 unit each Dolphin  ‐ 6 units Walk Way and Pipe Support  ‐ Steel Pipe Pile E 508 mm, t = 12 mm, L = 26 m    * Concrete Pile Cap

POWER

1997

CIVIL AND BUILDING WORKS Coal Handling and Storage Facilities No. 1

NAME OF PROJECT AND LOCATION  JETTY CONSRUCTION PROJECT SUNGAI 03  AND 04

DESCRIPTION OF WORK  ‐ Jetty and Trestle Platform 03 : 1,050 m2

 IN PALARAN SAMARINDA, EAST KALIMANTAN  ‐ Mooring Dolphin for Jetty 03 : 1 Unit

OWNER

PERIOD

PT. SARANA

Sep‐05

ABADI LESTARI

Jan‐06

PT. INDOMNICO

Oct‐04

 ‐ Cat Walk for Jetty 03 : 2 Unit  ‐ Jetty Platfor : 2 Unit  ‐ Breasting Dolphin Jetty 04  ‐ Cat Walk Span, span 55 m2 (Steel Truss Frame)  ‐ Silo Platform : 86 m  ‐ Steel Bollard : Capacity 25 Ton 9 Unit  ‐ Rubber Fender Da‐A400 (M1) 1000 + 1200 L    Complete with Accessories : 17 Units

2

 COAL WASH PLANT CONSTRUCTION MINE

 ‐ Foundation Of Retaining Walls 305 m2

 STOCKYARD, EAST KALIMANTAN

 ‐ Steel Structure Building 30.575 Kg

MANDIRI

 ‐ Machine Erection 70.000 Kg  ‐ Office, Electrical Room Store, 135 m2  ‐ Stacker and Conveyer System 200 TON /Hr  ‐ Water Supply and Piping System 500 m3/Hr  ‐ Electrical, PLC Control System  ‐ Water/Treatment Sump and Tailing Discharge Pipe  (HDPE) 1.260 Mtr  ‐ Miscelllaneous Works

3

 COAL LOADING JETTY AND CONVEYOR

 ‐ Loading Jetty Works:

 FOUNDATION CONSTRUCTION PROJECT

 ‐ 6 units of Breasting Dolphin for 8.000 DWT

 EAST KALIMANTAN

   Barge     * Steel Pipe Pile Foundation:      Ø 609 mm, t = 12 mm, L = 33 m    * Concrete Pile Cap and Fender Wall Structure    * 12 units Rubber Fender for Breasting Dolphin       type DA‐A.400 H ‐ 2000 L    * 6 units Bollard 35 ton  ‐ 3 units Conveyor Tower Support    * Steel pipe pile foundation      Ø 609 mm, t = 12 mm, L = 30 m    * Concrete Pile Cap   ‐ 7 Units Steel Walk Way    * Steel Pipe Pile: Ø 609, t = 9 mm       for Main Structure

P.T. MAHAKAM SUMBER JAYA

2004

4

 RENOVATION DOLPHIN PROJECT

 ‐ Loading Jetty Works:

P.T. JORONG

 NEW COAL LOADING JETTY 

 ‐ 6 units of Breasting Dolphin for 8.000 DWT

BARUTAMA

 EAST KALIMANTAN

   Barge 

2003

GRESTON

   * Steel Pipe Pile Foundation,      Ø 609, t = 12 mm, L = 24 m    * Concrete Pipe Cap and Fender Wall Structure    * 12 units Rubber Fender for Breasting Dolphin       Type DA‐A.400 H ‐ 1500 L    * 6 units Bollard 35 ton  ‐ Conveyor Foundation Works:    * 2 units Conveyor Tower Support    * Steel Pipe Pile Foundation,      Ø 609, t = 12 mm, L = 24 m    * Concrete Pile Cap    * Demolish: 6 units Marine Steel Gravity Dolphin      Ø 6 m, H = 8 m    * Repair: 1 unit Marine Steel Gravity Dolphin      Ø 8 m, H = 8.5 m

5

 COAL LOADING JETTY PROJECT

 ‐ Loading Jetty :

P.T. SUMBER

 SAMBARATA, TANJUNG. REDEB

 ‐ 6 units of Breasting Dolphin for 5.000 DWT

MITRA JAYA

 BERAU, EAST KALIMANTAN

2000

   Barge     * Steel Pipe Pile Foundation:      Ø 609 mm, t = 12 mm, L = 48 m    * Concrete Pile Cap and Fender Wall Structure    * 12 units Rubber Fender for Breasting Dolphin       type DA‐A.400 H ‐ 1,500 L    * 6 units Bollard 35 ton  ‐ 2 units Conveyor Tower Support    * Steel Pipe Pile Foundation       Ø 609 mm, t = 12 mm, L = 36 m    * Concrete Pile Cap   ‐ 6 units Steel Walk Way    * Steel Pipe, E 609, t = 9 mm for Main Structure

6

 JORONG COAL PORT PROJECT  SOUTH KALIMANTAN

 ‐ Construction of Rock Armoured Slope Protection

P.T. JORONG

 ‐ Construction of Breakwater

BARUTAMA

 ‐ Construction of Dolphins :    * Gravity Steel Tank Dolphins :      + 1 unit    Ø 8 m,   H = 8.5 m      + 6 units  Ø 6 m,   H = 8.5 m      + 5 units Walk way W = 1 m  ‐ 1 unit Walk Way, W = 2 m  ‐ Loading Conveyor Foundation  ‐ Reclaim Conveyor Foundation  ‐ Concrete Tunnel Foundation  ‐ Concrete Feeder Conveyor Foundation

GRESTON

1998

 ‐ Tripper Conveyor Foundation  ‐ Transfer Conveyor Foundation  ‐ Screen Foundation  ‐ Crusher Foundation  ‐ Concrete Retaining Wall

7

 JETTY AND DOLPHINS PROJECT

 ‐ Coal Loading Jetty for 10,000 D.W.T Barge 

 SUARAN PORT AND LATI PORT,

   * 9 units Breasting Dolphin

 TANJUNG REDEB, BERAU

     + Steel Pipe Pile Foundation,

 EAST KALIMANTAN

        Ø 1,000 mm, t = 14 mm, L = 36 m      + Concrete Pile Cap and Fender Wall Structure      + Rubber Fender Type H = 500,  L = 2000      + Bollard Capacity: 50 ton       + Marine Ladder      + Marine Navigation Lighting      + Walk Way and Walk Way Support  ‐ Repair Dolphin at Sungai Lati Port    * Steel Pipe Dolphine Structure       Ø 1,000 mm, t = 14 mm, L = 12 m    * Rubber Fender