Hong Kong Head Office: Room 1001-6, 10/F Southmark, 11 Yip Hing Street, Wong Chuk Hang, Aberdeen, Hong Kong Tel : (852) 2393 2622
Fax : (852) 2392 2088
Email :
[email protected]
Macau Branch Office: Rua de Pequim, Macau Finance Centre 17/I, Macau Tel : (853) 2870 7223
Fax : (853) 2870 5022
Email :
[email protected]
Ibis Hotel, North Point
Stay Cable Gantry Stonecutters Bridge
Kwun Tong 750, (APM Millennium City 5) 30m Long BMU
Moving Ladder, Tuen Mun
Bridge Inspection Gantry Stonecutters Bridge
Website: http://www.wls.com.hk
Specific Design Features of BMU Turn-table System The design of turn-table system allows restricted corners to be negotiated
Auxiliary Hoist
Auxiliary Hoist (extra lifting mechanism is
Integrated
Screw Lift
suitable for replacing external elements such as curtain wall or glazing)
Depending on the availability of tracking system and roof parking areas, both Screw Lifts and Integrated Screw Lifts can be chosen to lift BMUs between levels, or to raise or lower BMU. Screw Lift
Satellite Cradle Cradle expands sideways to access recess areas.
SPECIAL FEATURES
Central Control Box
Programmable Logic Controls (PLCs)
Telescopic Jib Sway Restraint Design Variable Width Track
Hidden Hoist and Steel Wire Rope Storage
Building Maintenance Unit Equipment
Bridge Inspection Equipment
HIGHWAYS RAILING
SSD 86C
SSD 142
SSD 144
THRIE-BEAM
SSD 144
MILLENNIUM CITY 5 AT KTIL 750 KWUN TONG ROAD , HONG KONG
PK-BUILDING MAINTENANCE UNIT TYPE CP4-2500-200 TECNICAL DATA Maximum. Lifting height Working cradle Safe working load (SWL) Maximum. extension Minimum. extension Lifting speed Rope diameter Power diameter Control Total weight Wheelbase
220 m 0.60 x 2.50 x 1.00/1.20 m 250 kg (2 men + 90 kg material) 29.00 m from centre of front wheels 14.00 m from centre of front wheels 4-16 m/Min. 4 x 8.0 mm, galvanised 400 V, 32A, 50 Hz (3P+N+E) +/- 5 % 24 V approx. 22’500 kg (incl. SWL) 3000 mm
The drives for:
-Hoisting up / down -Traversing -Slewing machine-housing -Slewing jib suspension beam -Telescoping out / in
Are inverter-controlled with adjustable speed to suit the requirements of the building CUSTOM DESIGNED HIGHLY SOPHISTICATED BUILDING MAINTENANCE UNITS
Sinogain Engineering Limited Project References on Permanent and Other Access Equipment A) Access Equipment Project
Client
Island Place, North Point
Swire Properties Kwan & Ltd Associates
Peak Tram
HK & S Hotels
Shatin Racecourse Grandstand
Royal HK Jockey Club
Architect
Tsing Ma Bridge Highways Administration Building Department
Contractor
Equipment
Year
Gammon Contractors Ltd.
1 No.PK BMU 2 No. Spider
1996
Aluminium monorail Track and cradle
1995
CBM
Aluminium track & gantry
1995
MaedaCSCEC JV
Aluminium track & ladder
1996/97
MTRC Central Station Building
MTRC
Rocco Design
Aoki
2 No. PK BMU Aluminium monorail track & cradle
1997/98
Grand Century Place
Sun Hung Kai Properties
Wong & Ouyang
Cheung Fai Construction Co. Ltd.
7 No. PK BMU
1996/97
Royal Plaza Hotel
Sun Hung Kai Properties
Wong & Ouyang
Cheung Fai Construction Co. Ltd.
4 No. PK BMU 2 No. screw lifts
1996/97
Tin Shui Wai, Lot 4 Phase 1
Cheung Kong
Dennis Lau Ng Chun Man
Wing Hong Construction 1 No. PK BMU 1 No. 20m Al. gantry 1 No. Spider 2 No. Vertical Lifts
1997/99
Tin Shui Wai, Lot 4, Phase 2
Cheung Kong
Dennis Lau Ng Chun Man
Boldwin Construction
1 No. PK BMU 1 No. 20m Al. gantry 1 No. Spider 2 No. Vertical Lifts
1997/99
1063 King’s Road
HK Land MBM
Wong Tung
Gammon Construction
Monorail curtain wall delivery system
1998/99
136 Java Road
Allied Properties Ma Leung &
Grand Tech Construction 1 No. PK BMU Associates Parapet Mounted
1999/2000
Wong Chu Road
Highways Department
Hong Kong Construction Aluminium monorail Amec JV 5 No. 12m Al. ladders 2 No. 5m Al. ladders
2000/02
11 Chater Road
HK Land Liang Peddle MBM (curtain Thorp wall contractor)
Gammon Construction
Monorail curtain wall delivery system
2000/02
175 Eagle Street Brisbane, Australia
Consolidated Properties
Nettleton Tribe
Hutchinson Builders
1 No. PK BMU
2001/02
Kowloon Station
Wharf Properties
Wong & Ouyang
Hip Hing
1 No. Spider
2002
Scott Wilson Engineers
1
Proiect
Client
Architect
Kwun Tong 750 ( Millennium City 5)
Sun Hung Kai
Michael Chiang Yee Fai Properties Construction
Supply and installation of 1 No. PK BMU 2 No. monorail BMU
Contractor
'
Equipment
Chong Yip Street
Hutchison Whampoa
Twin Way
China Resources
Supply and installation of I No. SkymanBMU
EducationResources Centre
HK Government
Architectural ServicesDept.
Yau Lee Construction
Supply and installation of 2 No. BMU 2 No. ScissorLift
Ibis Hotel North Point
Grand Tech Construction
Grand Tech Consffuction
Supply and installation of I No. Tractel Devit BMU
HennessyRd CausewayBay
Grand Tech Construction
Grand Tech Construction
Supply and installation of I No. Tractel Davit BMU
Lok Ma Chau
KCRC ERE Station
Balfour Beaffy & Lam JV
Supply and installation of I Set of Fall Arrest System
Lok Ma Chau
KCRC ERE Station
Balfour Beatty & Lam JV
Supply and installation of 4 No. Tractel monorail BMU 5 No. ScissorLift
Rockhill Street
HK Government
Architectural ServicesDept.
Yau Lee Construction
Supply and installation of I No. Tractel BMU
Deep Bay Link S
HK Government
Highway Department
China StateConstruction Supply and installation of Engineering Corp. SSD 144 Aluminium ParapetRails
Route 8
HK Government
Highway Deparlment
China Harbour Engineering Co.
Supply and installation of SSD 144 Aluminium ParapetRails
Route 9 Nam Wan Tunnel
HK Government
Highway Departrnent
Gammon Construction Ltd
Supply and installation of SSD 144 Aluminium ParapetR
StonecuttersBridge AccessFacilities
HK Government
Highway Department
Maeda-Hitachi Yogokawa-Hsin Chong
Supply and Installation of 2 units of Steel Deck Gantry 4 units of Back Span Gantry 2 units of Tower Top BMU 2 units of Stay Cable Gantry 2 units of Rack & Pinion Lift 1 unit of Deck Shuttle
SinogainEngineeringLimited are included on the Hong Kong Governmentapprovedlist of suppliersof accessequipmen
2004