PROJECT LIST / WORK EXPERIENCE
Table 1: Completed Projects-Oil & Gas Industry S. N.
Project Name
1.
HSEIA 8th Power Generation at Das Island (FEED)
2.
HSEIA - Das Flares Modification Revamp Project
3.
EBS & HSEIA Umm Shaif & Zakum Oil Fields
4.
Das Island Air Dispersion Modeling
5.
Atmospheric Relief Valves in Das Island
6.
EBS,EIA and HSEIA-Zirku Island
7.
Source Emission Monitoring Project
Blue Sea Environmental Consultants Est., Abu Dhabi
SOW Health Safety and Environmental Impact Assessment (HSEIA) for the proposed 8th Power Generation Project at Das Island (FEED Stage) in accordance with ADNOC code of Practice on HSEIA. Health Safety and Environmental Impact Assessment (HSEIA) for the proposed Facilities for Flares Modification /Revamp Project (FEED Stage) in accordance with ADNOC Code of Practice on HSEIA. Environmental Baseline Survey (EBS) and Health Safety and Environmental Impact Assessment for ADMA OPCO’s existing facilities in Umm Shaif and Zakum. Air Dispersion Modeling for ADGAS Facilities in Das Island in line with the requirements of ADGAS and ADNOC. Dispersion Modelling and Risk Assessment of atmospheric relief Valves in Das Island. ADMA OPCO plans to develop SARB and planned to develop off-shore facilities on ZIRKU to process the oil from the SARB and Umm Lulu oil field. The Blue Sea is to carryout Health Safety and Environmental Impact Assessment for the new ADMA-OPCO proposed facilities for processing on Zirku Island for new off shore oil and gas Fields – Sarb and Umm Lulu. Source Emission Monitoring of atmospheric pollutants at all ADMA-OPCO offshore facilities and operations and to compare with the
Client
Year
Country
ADGAS
2012
UAE
ADMA OPCO
2012
UAE
OPCO ADMA-OPCO
2012
UAE
ADGAS
2011
UAE
ADMA-OPCO OPCO
2010
UAE
ADMA-OPCO OPCO
2010
UAE
ADMA-OPCO OPCO
2010
UAE
1
PROJECT LIST / WORK EXPERIENCE
S. N.
8.
9.
10.
Project Name
EIA of ADMA-OPCO OPCO Existing Facilities and Operations on Das Island IVR for Health, Safety and Environmental Impact Assessment Phase-1 Umm Lulu Development Project IVR for Health, Safety and Environmental Impact Assessment Phase-1 NASR Development Project
11.
IVR for Health, Safety and Environmental Impact Assessment Phase-2 IGDP-USWHT USWHT
12.
Energy and Emission Reduction Study for ZADCO Facilities and Operations
13.
IVR for Health, Safety and Environmental Impact Assessment Phase-1 IGDP-USWHT USWHT
14.
EBS and EIA of Ghasha – Offshore Oilfields ilfields Butini West Mubarraz
15.
EBS and EIA –Offshore Oilfield NASR
Blue Sea Environmental Consultants Est., Abu Dhabi
SOW ADNOC guide lines. Identification Marine Environmental Resources around Das Island Environmental Impact Assessment ADMA OPCO Existing Facilities and Operations. IVR of the Phase-I HSEIA Report of Umm Lulu Phase-I Development Project in accordance with ADNOC Code of Practices. IVR of the Phase-I HSEIA Report of NASR Phase-I Development Project in accordance with ADNOC Code of Practices. Independent Verification of HSEIA report for ADMA-OPCO prepared for Umm Shaif wellhead tower construction project in accordance with ADNOC Code of Practices. Identification of Energy Consumption Major Equipment at ZADCO Facilities. Recommendations for short, medium and long term strategy to reduce Energy Consumption and Emission. Independent Verification of HSEIA report for ADMA-OPCO prepared for Umm Shaif wellhead tower construction project in accordance with ADNOC Code of Practices. Identification Marine Environmental Resources in Ghasha, Butini Oilfield Impact Assessment around Oil Field Development. Energy Consumption Audit Identification Marine Environmental Resources in NASR, Oilfield Impact Assessment around Oil Field Development. Energy Consumption Audit.
Client
Year
Country
ADMA-OPCO OPCO
2010
UAE
ADMA-OPCO OPCO
2010
UAE
ADMA-OPCO OPCO
2010
UAE
ADMA-OPCO OPCO
2009
UAE
ZADCO
2008
UAE
ADMA-OPCO OPCO
2008
UAE
ADMA-OPCO OPCO
2006
UAE
OPCO ADMA-OPCO
2006
UAE
2
PROJECT LIST / WORK EXPERIENCE
S. N.
Project Name
SOW
16.
EBS and EIA - Offshore Oilfield SARB
17.
EBS and EIA – Offshore Oilfield ilfield of Umm Lulu
Identification Marine Environmental Resources in SARB, Oilfield Impact Assessment around Oil Field Development. Energy Consumption Audit. Identification Marine Environmental Resources in Umm Lulu, Oilfield Impact Assessment around Oil Field Development. Energy Consumption Audit.
Client
Year
Country
ADMA-OPCO OPCO
2006
UAE
OPCO ADMA-OPCO
2006
UAE
Table 2:: Projects Completed By Blue Sea in Last 5 Years (General) S. N.
Project Name
SOW
Client
Year
Country
Bin Murshed Holdings/ Clean Middle East
2012
UAE
2012
UAE
2012
UAE
Marinetek Force 10 LLC
2012
UAE
Hydra Properties
2012
UAE
ItalConsult Sviluppo
2012
UAE
1.
Environmental Evaluation Services – Clean Middle East
Environmental evaluation or assessment of resources conservation and competence of environment-friendly practices for Clean Middle East
2.
Peer Review of CEMP for J381 ADNOC Explosive Storage Facilities at Western Region
Peer Review of Construction Environmental Management Plan (CEMP) for J381 ADNOC Explosive Storage Facilities at Western Region
3.
Peer Review of CEMP for Mosanada Schools: Baniyas, Al Shamkha & Al Shwamekh
Peer Review of Construction Environmental Management Plan (CEMP) for three Mosanada Schools: Baniyas, Al Shamkha & Al Shwamekh
4.
CEMP – Al Taweelah Marina Project in Khalifa Port
5.
Environmental Audit (CEMP) – Hydra Village
6.
PER – Expansion of Water Network Distribution Mains in Al Faya and South
Blue Sea Environmental Consultants Est., Abu Dhabi
Construction Environmental Management Plan for Al Taweelah Marina Project in Khalifa Port, Abu Dhabi Environmental Audit Report – Compliance to Construction Environmental Management Plan (CEMP) for Hydra Village, Abu Dhabi Preparation of Preliminary Environmental Review for an Italian consulting engineering
AMANA Contracting & Steel Buildings Co. AMANA Contracting & Steel Buildings Co.
3
PROJECT LIST / WORK EXPERIENCE
S. N.
Project Name Shamkha Area
7.
PER – Water Supply to Al Faya, Bu Theib Stables and Al Ghweiliyat
8.
Water Analysis for Submarine Cable between Sir Bani Yas and Main Land (Shuwait)
9.
Environmental Audit (CEMP) – Al Bateen Park Development
10.
Inspect & Measure the VOC Levels in Abu Dhabi & Al Ain Laboratories
11.
TIS Jebel Hafeet Emirati mirati Housing Community
12.
EBS Emirati Housing Community in Yas Island
13.
PER – Marawah Island
14.
HAZOP Study for Al Ghadeer Development – Phase 1
Blue Sea Environmental Consultants Est., Abu Dhabi
SOW company for the Expansion of Water Distribution Mains in Al Faya and South Shamkha Area. Preparation of Preliminary Environmental Review for an Italian consulting engineering company for the Water Supply to Al Faya, Bu Theib Stables and Al Ghweiliyat. Performed water analysis on 12 locations between Sir Bani Yas and Main Land (Shuwait) Environmental Audit Report – Compliance to Construction Environmental Management Plan (CEMP) for Al Bateen Park Development, Al Bateen, Abu Dhabi Inspection and measurement of Volatile Organic Compound (VOC) levels in 13 locations of Abu Dhabi Laboratory and 15 locations of Al Ain Laboratory. Traffic Impact Study of Emirati Housing Community in Al Ain to be carried out in accordance with EAD technical guidance documents and international best practiced standards. Environmental Baseline Survey (EBS) for Emirati Housing Community in Yas Island Preparation of Preliminary Environmental Review for the Marawah Island City of Abu Dhabi and submission of permit application to EAD via ZonesCorp. HAZOP study by certified company and implementation of HAZOP recommendations including the supply and installation of all the required equipment/instrumentation for
Client
Year
Country
ItalConsult Sviluppo Infrastrutture
2012
UAE
LD TravOcean
2012
UAE
Seidco General Contracting Company LLC
2012
UAE
ADFCA
2012
UAE
Dorsch Gruppe
2012
UAE
PAL Technology
2011
UAE
Areenouf Group of Est.
2011
UAE
Envicon
2011
UAE
Infrastrutture
4
PROJECT LIST / WORK EXPERIENCE
S. N.
Project Name
15.
Environmental Management Plan -Chilled Water Piping Network in Reem Island
16.
3 Party Audit CEMP Al Ruwais Bypass
17.
CEMP Al Bateen Park Development
18.
CEMP – Al Ain Trunk Sewer
19.
rd
Environmental Action Plan - Al Reef Villas
20.
CEMP – Saadiyat Island
21.
EHSS – Upgrading Road from Al Faya to Razeen and Al Quaa
22.
EBS & EIA Coastal Development Project Ras Al Hadd, Oman
Blue Sea Environmental Consultants Est., Abu Dhabi
SOW complete pump station and electro chlorination. Studying the process of Piping Cleaning. To measure the effects of the disposed effluents on the ecosystem, to ensure sample testing and analysis of the water is being discharged into the sea. Preparation of the audit report of the CEMP and local EAD laws in accordance with the technical guidance documents issued by EAD in April 2010. Final audit report shall be submitted to EAD for their comments and final approval. Preparation of the Construction Environmental Management Plan in accordance with the technical guidance documents issued by EAD in April 2010. Preparation of Construction Environmental Management Plan for Al Ain Trunk Sewer in Al Ain by Abu Dhabi Sewerage Services Company (ADSSC).
Preparation of the EAP in accordance with the Technical Guidance documents issued by EAD in April 2010. Preparation of Construction Environmental Management Plan for Concrete Batching Plant on Saadiyat Island and its approval by EAD via TDIC. Preparation of Environmental Health and Safety Studies for upgrading road from Al Faya to Razeen and Al Quaa. Environmental Baseline Survey (EBS) and EIA for Coastal Development Project in Ras Al
Client
Year
Country
Toledo
2011
UAE
Ghantoot Est.
2011
UAE
Seidco LLC
2011
UAE
Nael & Bin Harmal Hydroexpert Est. (NBHH)
2011
UAE
Fibrex Cont. Co.
2011
UAE
Xtramix Concrete Solution
2010
UAE
OTAK International
2010
UAE
PAL Technology
2010
OMAN 5
PROJECT LIST / WORK EXPERIENCE
S. N.
Project Name
SOW
Client
Year
Country
BUNYA
2010
UAE
Platinum Steel Industries
2010
UAE
Ghantoot Group
2010
UAE
Truth Economic Consultancy
2010
UAE
Shaw Middle East LLC
2010
UAE
National Food Products Company
2010
UAE
National Food Products Company
2010
UAE
BUNYA
2010
UAE
OQC
2010
UAE
INPEX PEX
2010
Iraq
Hadd, Sultanate of Oman. 23.
Hydrodynamic Modeling – Al Reem Island
24.
Preliminary Environmental Review
25.
Preliminary Environmental Review
26.
Preliminary Environmental Review
27.
Preliminary Environmental Review
28.
Noise Monitoring Survey
29.
Noise & Air Quality Monitoring Survey
30.
TOR for Hydrodynamic Modelling – Al Reem Island
31.
HSEIA-ADCO-BAB BAB Gas Compression Project
32.
EBS and EIA Nassiriya Oil Field Development-
Blue Sea Environmental Consultants Est., Abu Dhabi
Preparation of Hydrodynamic Modeling Report in Al Reem Island, Abu Dhabi. Preparation of PER for Platinum Steel Industries in ICAD III and submission to EAD via ZonesCorp. Preparation of PER for Eurofab Readymade Homes Factory in ICAD I and submission to EAD via ZonesCorp. Preparation of PER for the Al Omaira Printing Press and Paper Roll Converter Facility in ICAD and submission of permit application to EAD via ZonesCorp. Preparation of PER for the Pipe Manufacturing Plant in ICAD-III and submission of permit application to EAD via ZonesCorp. Indoor Noise Monitoring Survey as per the ZonesCorp requirements in Plastic Division of National Food Products Company. Indoor Air Quality Monitoring and Noise Monitoring as per the ZonesCorp requirements in Plastic Division of National Food Products Company. Preparation of Terms of Reference for Hydrodynamic Modelling of the Reem Island Health Safety and Environmental Impact Assessment study for Labour Camp construction for BAB gas compression project at the Habshan site. Environmental Baseline and Socio Economic Survey for the development of new oil field in
6
PROJECT LIST / WORK EXPERIENCE
S. N.
Project Name
33.
Construction Environmental Management Plan
34.
Operation Environmental Management Plan
35.
Construction Environmental Management Plan -1
36.
Construction Environmental Management Plan -2
37.
TOR for EBS & EIA Emirati Housing Community in Yas Island
38.
Preliminary Environmental Review
39.
CEMP New Ruwais Bypass
40.
EHSMS Services
Blue Sea Environmental Consultants Est., Abu Dhabi
SOW Nassiriya area of Basra Iraq. Preparation of Construction Environmental Management Plan for Concrete Batching Plant on Sir Bani Yas Island and its approval by EAD via TDIC. Preparation of Operation Environmental Management Plan for Concrete Batching Plant on Sir Bani Yas Island and its approval by EAD via TDIC. Preparation of Construction Environmental Management Plan for enabling works on Sir Bani Yas Island and its approval by EAD via TDIC. Preparation of Construction Environmental Management Plan for coastal works on Sir Bani Yas Island and its approval by EAD via TDIC. Preparation of Terms of Reference (TOR) followed by Environmental Impact Assessment Study for the proposed Emirati Housing Community Development Project on Yas Island. Preparation of Preliminary Environmental Review for the Electric Manufacturing Company in ICAD-3 and submission of permit application to EAD via ZonesCorp. Construction Environmental Management Plan for the construction of bypass at Saadiyat Island for TDIC & DOT. Preparation of EHSMS documents and EHS Manual, as per the requirements of EAD’s EHSMS Guidelines and provided assistance in
Client
Year
Country
UNIBETON
2010
UAE
UNIBETON
2010
UAE
HILALCO
2010
UAE
HILALCO
2010
UAE
Pal Tech
2010
UAE
Eaton
2010
UAE
Ghantoot
2009
UAE
Tamouh LLC
2009
UAE
7
PROJECT LIST / WORK EXPERIENCE
S. N.
Project Name
SOW
Client
Year
Country
Al Jaber
2009
UAE
Super Plastic Industry
2009
UAE
Gulfar
2009
UAE
First Emirates Group
2009
UAE
Royal Group
2009
UAE
Hydra Properties
2008
UAE
Hydra Properties
2008
UAE
NUROL LLC LL
2008
UAE
getting the EHSMS approved by Abu Dhabi Municipality. 41.
CEMP Saadiyat Beach Villas
42.
Preliminary Environmental Review
43.
Gulfar Food Stuff Industry Preliminary Environmental Review
44.
Aircraft Interior Manufacturing CompanyPreliminary Environmental Review
45.
Survey, Designing and Masterplanning Services
46.
Solid Waste Management Plan for Hydra Village Project
47.
Environmental Monitoring and Audit Services
48.
Construction Environmental Management Plan (CEMP) for Bridges and Canals Construction Al Reem Island
Blue Sea Environmental Consultants Est., Abu Dhabi
Construction Environmental Management Plan for construction of more than 450 Beech villas project, at Saadiyat Island for TDIC. Preparation of PER for Plastic Water Tank Manufacturing Factory in Al Ain Industrial City1 And submission to EAD via ZonesCorp. Preliminary Environmental Review for a food processing & packing facility at Free Zone Al Ain, submitted to EAD. Preliminary Environmental Review for manufacturing spare parts for aviation industry in ICAD Mussafah. To carryout following services: • Site survey and baseline information • Concept design • Detailed master plan Preparation of Solid Waste Management Plan for the construction phase of Hydra Village project for the Royal Group Abu Dhabi on Dubai Road and was submitted to Abu Dhabi Municipality. To prepare, submit, and for approval of “Environmental Monitoring, Auditing and Reporting and Noise Survey Report”. Construction Environmental Management Plan for construction of bridge connecting Reem Island to Abu Dhabi and which is to be followed by the contractor HSE manager on site.
8
PROJECT LIST / WORK EXPERIENCE
S. N.
Project Name
SOW
Client
Year
Country
49.
Construction Environmental Management Plan (CEMP) for Land Reclamation and Rock Revetment Project Al Reem Island
The Construction Environmental Management Plan for the dredging and reclamation of the land on Reem Island which was submitted to Bunya for implementation during the construction and was approved by EAD.
Pal Technology
2008
UAE
50.
Testing and Certification Services
To provide testing and certification services for a fuel additive company.
MeCorp
2008
UAE
51.
Construction Environmental Management Plan (CEMP) for Hydra Village Project
Hydra Properties
2008
UAE
52.
Terms of Reference for EIA of Dayyinah Island Development Project Abu Dhabi
O.H.H. Shaikh Tahnoon Bin Zayed Al Nahyan
2008
UAE
53.
Preliminary Environmental Review
Preparation of Preliminary Environmental Review.
Gulf Sail Galvanizing Factory
2008
UAE
54.
Preliminary Environmental Review
Preparation of Preliminary Environmental Review.
Electrocab Emarat Ltd
2008
UAE
Unibeton Ready Mix
2008
UAE
BUNYA
2007
UAE
55.
Environment Permit Application
56.
Preliminary Construction Environmental Management Plan (CEMP) Al Reem Island
Blue Sea Environmental Consultants Est., Abu Dhabi
Construction Environmental Management Plan for the construction of more than four thousand villas for Hydra Village Project on Dubai Road. TOR for the tourist resort situated in the sea near the Qatar, the resort is to be developed for tourism as per initial SOW containing construction hotel, leisure facilities and an air strip.
Preparation and submission of Environment Permit Application to ZonesCorp and preparation of Preliminary Environmental Review. Construction Environmental Management Plan for the Phase 1 construction activities on Reem Island. The aim was prepare guide lines for all developer to be followed during the initial phase development. The CEMP was prepared as per the EAD guidelines.
9
PROJECT LIST / WORK EXPERIENCE
S. N.
57.
Project Name
CEMP for Shams Abu Dhabi project on Al Reem
58.
CEMP for Shams District Cooling Project
59.
EIA Study Mangrove Golf Course
SOW
Client
Year
Country
Al Geemi & Partners Contracting Co. W.L.L
2007
UAE
PAL Tech
2007
UAE
Tamouh LLC
2007
UAE
SOW
Client
Year
Country
Construction Environmental Management Plan for Western Mangrove Canal and Beach Works at Shams Abu Dhabi in Reem Island Preliminary Construction Environmental Management Plan (PCEMP) Audit for Reem Island Development Project
Parks Biodiversity Management Services
2012
UAE
Bunya
2012
UAE
Construction Waste Management Plan (CWMP) for the additional cafeteria of an existing school building located in Delma Island
Al Wafi Contracting & General Maintenance
2012
UAE
Areenouf
2012
UAE
Seidco
2012
UAE
To prepare Construction Environmental Management Plan for the Construction of Roads and Utilities on Reem Island. Preparation of CEMP for Shams Abu Chilled Water Piping Network for Sector 1-4 on Al Reem Island. CEMP was submitted to Sorouh for implementation during the construction period. To prepare Terms of Reference(TOR) and carry out Environmental Impact Assessment (EIA) study for the Mangrove Golf Course, Pearl of Emirate, Al Reem Island, Abu Dhabi.
Table 3: Ongoing Projects S. N.
Project Name
1.
CEMP – Western Mangrove Canal and Beach Works at Shams Abu Dhabi in Reem Island
2.
PCEMP Audit – Reem Island Development Project
3.
CWMP - Additional Cafeteria for Existing School Building in Delma Island
4.
CEMP – Environmental Enhancement & Rehabilitation of Marawah Island
5.
CEMP - Abu Dhabi Future School Program Package No. 2
Blue Sea Environmental Consultants Est., Abu Dhabi
Construction Environmental Management Plan for Environmental Enhancement & Rehabilitation of Marawah Island Construction Environmental Management Plan for Abu Dhabi Future School Program Package
10
PROJECT LIST / WORK EXPERIENCE
S. N.
Project Name
6.
PER - Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works for Sila Emirati Housing
7.
HSEMP Review - Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works for Sila Emirati Housing
8.
HAZCOM & HAZOP - Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works for Sila Emirati Housing
9.
Dispersion Analysis and Risk Assessment of LNG Coanda Flares in Das Island
10.
PER – Construction of Pipeline between Unit V Pumping Station and Al Khatim
11.
HSEIA Umm m Al Dalkh Field SE Exploration Well
12.
EIA Jebel Hafeet Emirati Housing Community munity
Blue Sea Environmental Consultants Est., Abu Dhabi
SOW No. 2 in Baniyas & Shamkha Schools Abu Dhabi Preliminary Environmental Review (PER) for “Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works - Sila Emirati Housing” project. Review the existing Health, Safety & Environmental Management Plan (HSEMP) for “Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works - Sila Emirati Housing” project. Hazard Communication (HAZCOM) Program & Hazard & Operability (HAZOP) Study for “Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works - Sila Emirati Housing” project. Dispersion Analysis and Risk Assessment for release of unburnt hydrocarbon gases containing H2S through LNG Coanda Flare in Das Island, Abu Dhabi Preparation of Preliminary Environmental Review for an Italian consulting engineering company for the Construction of Pipeline between Unit V Pumping Station and Al Khatim. Health Safety and Environmental Impact Assessment for Umm Al Dalkh Field SE Exploration Well. Environmental Impact Assessment of Emirati Housing Community in Al Ain to be carried out in accordance with EAD technical guidance documents and international best practiced
Client
Year
Country
Purewater Technology
2012
UAE
Purewater Technology
2012
UAE
Purewater Technology
2012
UAE
ADMA-OPCO OPCO
2012
UAE
ItalConsult Sviluppo Infrastrutture
2011
UAE
ZADCO
2011
UAE
Dorsch Gruppe
2011
UAE
11
PROJECT LIST / WORK EXPERIENCE
S. N.
Project Name
SOW
Client
Year
Country
PAL Technology
2010
UAE
standards.
13.
EIA Emirati Housing Community in Yas Island
Blue Sea Environmental Consultants Est., Abu Dhabi
Environmental Impact Assessment (EIA) for Emirati Housing Community in Yas Island
12