Table 1: Completed Projects-Oil & Gas Industry

PROJECT LIST / WORK EXPERIENCE Table 1: Completed Projects-Oil & Gas Industry S. N. Project Name 1. HSEIA 8th Power Generation at Das Island (FEED...
Author: Naomi Copeland
30 downloads 1 Views 925KB Size
PROJECT LIST / WORK EXPERIENCE

Table 1: Completed Projects-Oil & Gas Industry S. N.

Project Name

1.

HSEIA 8th Power Generation at Das Island (FEED)

2.

HSEIA - Das Flares Modification Revamp Project

3.

EBS & HSEIA Umm Shaif & Zakum Oil Fields

4.

Das Island Air Dispersion Modeling

5.

Atmospheric Relief Valves in Das Island

6.

EBS,EIA and HSEIA-Zirku Island

7.

Source Emission Monitoring Project

Blue Sea Environmental Consultants Est., Abu Dhabi

SOW Health Safety and Environmental Impact Assessment (HSEIA) for the proposed 8th Power Generation Project at Das Island (FEED Stage) in accordance with ADNOC code of Practice on HSEIA. Health Safety and Environmental Impact Assessment (HSEIA) for the proposed Facilities for Flares Modification /Revamp Project (FEED Stage) in accordance with ADNOC Code of Practice on HSEIA. Environmental Baseline Survey (EBS) and Health Safety and Environmental Impact Assessment for ADMA OPCO’s existing facilities in Umm Shaif and Zakum. Air Dispersion Modeling for ADGAS Facilities in Das Island in line with the requirements of ADGAS and ADNOC. Dispersion Modelling and Risk Assessment of atmospheric relief Valves in Das Island. ADMA OPCO plans to develop SARB and planned to develop off-shore facilities on ZIRKU to process the oil from the SARB and Umm Lulu oil field. The Blue Sea is to carryout Health Safety and Environmental Impact Assessment for the new ADMA-OPCO proposed facilities for processing on Zirku Island for new off shore oil and gas Fields – Sarb and Umm Lulu. Source Emission Monitoring of atmospheric pollutants at all ADMA-OPCO offshore facilities and operations and to compare with the

Client

Year

Country

ADGAS

2012

UAE

ADMA OPCO

2012

UAE

OPCO ADMA-OPCO

2012

UAE

ADGAS

2011

UAE

ADMA-OPCO OPCO

2010

UAE

ADMA-OPCO OPCO

2010

UAE

ADMA-OPCO OPCO

2010

UAE

1

PROJECT LIST / WORK EXPERIENCE

S. N.

8.

9.

10.

Project Name

EIA of ADMA-OPCO OPCO Existing Facilities and Operations on Das Island IVR for Health, Safety and Environmental Impact Assessment Phase-1 Umm Lulu Development Project IVR for Health, Safety and Environmental Impact Assessment Phase-1 NASR Development Project

11.

IVR for Health, Safety and Environmental Impact Assessment Phase-2 IGDP-USWHT USWHT

12.

Energy and Emission Reduction Study for ZADCO Facilities and Operations

13.

IVR for Health, Safety and Environmental Impact Assessment Phase-1 IGDP-USWHT USWHT

14.

EBS and EIA of Ghasha – Offshore Oilfields ilfields Butini West Mubarraz

15.

EBS and EIA –Offshore Oilfield NASR

Blue Sea Environmental Consultants Est., Abu Dhabi

SOW ADNOC guide lines. Identification Marine Environmental Resources around Das Island Environmental Impact Assessment ADMA OPCO Existing Facilities and Operations. IVR of the Phase-I HSEIA Report of Umm Lulu Phase-I Development Project in accordance with ADNOC Code of Practices. IVR of the Phase-I HSEIA Report of NASR Phase-I Development Project in accordance with ADNOC Code of Practices. Independent Verification of HSEIA report for ADMA-OPCO prepared for Umm Shaif wellhead tower construction project in accordance with ADNOC Code of Practices. Identification of Energy Consumption Major Equipment at ZADCO Facilities. Recommendations for short, medium and long term strategy to reduce Energy Consumption and Emission. Independent Verification of HSEIA report for ADMA-OPCO prepared for Umm Shaif wellhead tower construction project in accordance with ADNOC Code of Practices. Identification Marine Environmental Resources in Ghasha, Butini Oilfield Impact Assessment around Oil Field Development. Energy Consumption Audit Identification Marine Environmental Resources in NASR, Oilfield Impact Assessment around Oil Field Development. Energy Consumption Audit.

Client

Year

Country

ADMA-OPCO OPCO

2010

UAE

ADMA-OPCO OPCO

2010

UAE

ADMA-OPCO OPCO

2010

UAE

ADMA-OPCO OPCO

2009

UAE

ZADCO

2008

UAE

ADMA-OPCO OPCO

2008

UAE

ADMA-OPCO OPCO

2006

UAE

OPCO ADMA-OPCO

2006

UAE

2

PROJECT LIST / WORK EXPERIENCE

S. N.

Project Name

SOW

16.

EBS and EIA - Offshore Oilfield SARB

17.

EBS and EIA – Offshore Oilfield ilfield of Umm Lulu

Identification Marine Environmental Resources in SARB, Oilfield Impact Assessment around Oil Field Development. Energy Consumption Audit. Identification Marine Environmental Resources in Umm Lulu, Oilfield Impact Assessment around Oil Field Development. Energy Consumption Audit.

Client

Year

Country

ADMA-OPCO OPCO

2006

UAE

OPCO ADMA-OPCO

2006

UAE

Table 2:: Projects Completed By Blue Sea in Last 5 Years (General) S. N.

Project Name

SOW

Client

Year

Country

Bin Murshed Holdings/ Clean Middle East

2012

UAE

2012

UAE

2012

UAE

Marinetek Force 10 LLC

2012

UAE

Hydra Properties

2012

UAE

ItalConsult Sviluppo

2012

UAE

1.

Environmental Evaluation Services – Clean Middle East

Environmental evaluation or assessment of resources conservation and competence of environment-friendly practices for Clean Middle East

2.

Peer Review of CEMP for J381 ADNOC Explosive Storage Facilities at Western Region

Peer Review of Construction Environmental Management Plan (CEMP) for J381 ADNOC Explosive Storage Facilities at Western Region

3.

Peer Review of CEMP for Mosanada Schools: Baniyas, Al Shamkha & Al Shwamekh

Peer Review of Construction Environmental Management Plan (CEMP) for three Mosanada Schools: Baniyas, Al Shamkha & Al Shwamekh

4.

CEMP – Al Taweelah Marina Project in Khalifa Port

5.

Environmental Audit (CEMP) – Hydra Village

6.

PER – Expansion of Water Network Distribution Mains in Al Faya and South

Blue Sea Environmental Consultants Est., Abu Dhabi

Construction Environmental Management Plan for Al Taweelah Marina Project in Khalifa Port, Abu Dhabi Environmental Audit Report – Compliance to Construction Environmental Management Plan (CEMP) for Hydra Village, Abu Dhabi Preparation of Preliminary Environmental Review for an Italian consulting engineering

AMANA Contracting & Steel Buildings Co. AMANA Contracting & Steel Buildings Co.

3

PROJECT LIST / WORK EXPERIENCE

S. N.

Project Name Shamkha Area

7.

PER – Water Supply to Al Faya, Bu Theib Stables and Al Ghweiliyat

8.

Water Analysis for Submarine Cable between Sir Bani Yas and Main Land (Shuwait)

9.

Environmental Audit (CEMP) – Al Bateen Park Development

10.

Inspect & Measure the VOC Levels in Abu Dhabi & Al Ain Laboratories

11.

TIS Jebel Hafeet Emirati mirati Housing Community

12.

EBS Emirati Housing Community in Yas Island

13.

PER – Marawah Island

14.

HAZOP Study for Al Ghadeer Development – Phase 1

Blue Sea Environmental Consultants Est., Abu Dhabi

SOW company for the Expansion of Water Distribution Mains in Al Faya and South Shamkha Area. Preparation of Preliminary Environmental Review for an Italian consulting engineering company for the Water Supply to Al Faya, Bu Theib Stables and Al Ghweiliyat. Performed water analysis on 12 locations between Sir Bani Yas and Main Land (Shuwait) Environmental Audit Report – Compliance to Construction Environmental Management Plan (CEMP) for Al Bateen Park Development, Al Bateen, Abu Dhabi Inspection and measurement of Volatile Organic Compound (VOC) levels in 13 locations of Abu Dhabi Laboratory and 15 locations of Al Ain Laboratory. Traffic Impact Study of Emirati Housing Community in Al Ain to be carried out in accordance with EAD technical guidance documents and international best practiced standards. Environmental Baseline Survey (EBS) for Emirati Housing Community in Yas Island Preparation of Preliminary Environmental Review for the Marawah Island City of Abu Dhabi and submission of permit application to EAD via ZonesCorp. HAZOP study by certified company and implementation of HAZOP recommendations including the supply and installation of all the required equipment/instrumentation for

Client

Year

Country

ItalConsult Sviluppo Infrastrutture

2012

UAE

LD TravOcean

2012

UAE

Seidco General Contracting Company LLC

2012

UAE

ADFCA

2012

UAE

Dorsch Gruppe

2012

UAE

PAL Technology

2011

UAE

Areenouf Group of Est.

2011

UAE

Envicon

2011

UAE

Infrastrutture

4

PROJECT LIST / WORK EXPERIENCE

S. N.

Project Name

15.

Environmental Management Plan -Chilled Water Piping Network in Reem Island

16.

3 Party Audit CEMP Al Ruwais Bypass

17.

CEMP Al Bateen Park Development

18.

CEMP – Al Ain Trunk Sewer

19.

rd

Environmental Action Plan - Al Reef Villas

20.

CEMP – Saadiyat Island

21.

EHSS – Upgrading Road from Al Faya to Razeen and Al Quaa

22.

EBS & EIA Coastal Development Project Ras Al Hadd, Oman

Blue Sea Environmental Consultants Est., Abu Dhabi

SOW complete pump station and electro chlorination. Studying the process of Piping Cleaning. To measure the effects of the disposed effluents on the ecosystem, to ensure sample testing and analysis of the water is being discharged into the sea. Preparation of the audit report of the CEMP and local EAD laws in accordance with the technical guidance documents issued by EAD in April 2010. Final audit report shall be submitted to EAD for their comments and final approval. Preparation of the Construction Environmental Management Plan in accordance with the technical guidance documents issued by EAD in April 2010. Preparation of Construction Environmental Management Plan for Al Ain Trunk Sewer in Al Ain by Abu Dhabi Sewerage Services Company (ADSSC).

Preparation of the EAP in accordance with the Technical Guidance documents issued by EAD in April 2010. Preparation of Construction Environmental Management Plan for Concrete Batching Plant on Saadiyat Island and its approval by EAD via TDIC. Preparation of Environmental Health and Safety Studies for upgrading road from Al Faya to Razeen and Al Quaa. Environmental Baseline Survey (EBS) and EIA for Coastal Development Project in Ras Al

Client

Year

Country

Toledo

2011

UAE

Ghantoot Est.

2011

UAE

Seidco LLC

2011

UAE

Nael & Bin Harmal Hydroexpert Est. (NBHH)

2011

UAE

Fibrex Cont. Co.

2011

UAE

Xtramix Concrete Solution

2010

UAE

OTAK International

2010

UAE

PAL Technology

2010

OMAN 5

PROJECT LIST / WORK EXPERIENCE

S. N.

Project Name

SOW

Client

Year

Country

BUNYA

2010

UAE

Platinum Steel Industries

2010

UAE

Ghantoot Group

2010

UAE

Truth Economic Consultancy

2010

UAE

Shaw Middle East LLC

2010

UAE

National Food Products Company

2010

UAE

National Food Products Company

2010

UAE

BUNYA

2010

UAE

OQC

2010

UAE

INPEX PEX

2010

Iraq

Hadd, Sultanate of Oman. 23.

Hydrodynamic Modeling – Al Reem Island

24.

Preliminary Environmental Review

25.

Preliminary Environmental Review

26.

Preliminary Environmental Review

27.

Preliminary Environmental Review

28.

Noise Monitoring Survey

29.

Noise & Air Quality Monitoring Survey

30.

TOR for Hydrodynamic Modelling – Al Reem Island

31.

HSEIA-ADCO-BAB BAB Gas Compression Project

32.

EBS and EIA Nassiriya Oil Field Development-

Blue Sea Environmental Consultants Est., Abu Dhabi

Preparation of Hydrodynamic Modeling Report in Al Reem Island, Abu Dhabi. Preparation of PER for Platinum Steel Industries in ICAD III and submission to EAD via ZonesCorp. Preparation of PER for Eurofab Readymade Homes Factory in ICAD I and submission to EAD via ZonesCorp. Preparation of PER for the Al Omaira Printing Press and Paper Roll Converter Facility in ICAD and submission of permit application to EAD via ZonesCorp. Preparation of PER for the Pipe Manufacturing Plant in ICAD-III and submission of permit application to EAD via ZonesCorp. Indoor Noise Monitoring Survey as per the ZonesCorp requirements in Plastic Division of National Food Products Company. Indoor Air Quality Monitoring and Noise Monitoring as per the ZonesCorp requirements in Plastic Division of National Food Products Company. Preparation of Terms of Reference for Hydrodynamic Modelling of the Reem Island Health Safety and Environmental Impact Assessment study for Labour Camp construction for BAB gas compression project at the Habshan site. Environmental Baseline and Socio Economic Survey for the development of new oil field in

6

PROJECT LIST / WORK EXPERIENCE

S. N.

Project Name

33.

Construction Environmental Management Plan

34.

Operation Environmental Management Plan

35.

Construction Environmental Management Plan -1

36.

Construction Environmental Management Plan -2

37.

TOR for EBS & EIA Emirati Housing Community in Yas Island

38.

Preliminary Environmental Review

39.

CEMP New Ruwais Bypass

40.

EHSMS Services

Blue Sea Environmental Consultants Est., Abu Dhabi

SOW Nassiriya area of Basra Iraq. Preparation of Construction Environmental Management Plan for Concrete Batching Plant on Sir Bani Yas Island and its approval by EAD via TDIC. Preparation of Operation Environmental Management Plan for Concrete Batching Plant on Sir Bani Yas Island and its approval by EAD via TDIC. Preparation of Construction Environmental Management Plan for enabling works on Sir Bani Yas Island and its approval by EAD via TDIC. Preparation of Construction Environmental Management Plan for coastal works on Sir Bani Yas Island and its approval by EAD via TDIC. Preparation of Terms of Reference (TOR) followed by Environmental Impact Assessment Study for the proposed Emirati Housing Community Development Project on Yas Island. Preparation of Preliminary Environmental Review for the Electric Manufacturing Company in ICAD-3 and submission of permit application to EAD via ZonesCorp. Construction Environmental Management Plan for the construction of bypass at Saadiyat Island for TDIC & DOT. Preparation of EHSMS documents and EHS Manual, as per the requirements of EAD’s EHSMS Guidelines and provided assistance in

Client

Year

Country

UNIBETON

2010

UAE

UNIBETON

2010

UAE

HILALCO

2010

UAE

HILALCO

2010

UAE

Pal Tech

2010

UAE

Eaton

2010

UAE

Ghantoot

2009

UAE

Tamouh LLC

2009

UAE

7

PROJECT LIST / WORK EXPERIENCE

S. N.

Project Name

SOW

Client

Year

Country

Al Jaber

2009

UAE

Super Plastic Industry

2009

UAE

Gulfar

2009

UAE

First Emirates Group

2009

UAE

Royal Group

2009

UAE

Hydra Properties

2008

UAE

Hydra Properties

2008

UAE

NUROL LLC LL

2008

UAE

getting the EHSMS approved by Abu Dhabi Municipality. 41.

CEMP Saadiyat Beach Villas

42.

Preliminary Environmental Review

43.

Gulfar Food Stuff Industry Preliminary Environmental Review

44.

Aircraft Interior Manufacturing CompanyPreliminary Environmental Review

45.

Survey, Designing and Masterplanning Services

46.

Solid Waste Management Plan for Hydra Village Project

47.

Environmental Monitoring and Audit Services

48.

Construction Environmental Management Plan (CEMP) for Bridges and Canals Construction Al Reem Island

Blue Sea Environmental Consultants Est., Abu Dhabi

Construction Environmental Management Plan for construction of more than 450 Beech villas project, at Saadiyat Island for TDIC. Preparation of PER for Plastic Water Tank Manufacturing Factory in Al Ain Industrial City1 And submission to EAD via ZonesCorp. Preliminary Environmental Review for a food processing & packing facility at Free Zone Al Ain, submitted to EAD. Preliminary Environmental Review for manufacturing spare parts for aviation industry in ICAD Mussafah. To carryout following services: • Site survey and baseline information • Concept design • Detailed master plan Preparation of Solid Waste Management Plan for the construction phase of Hydra Village project for the Royal Group Abu Dhabi on Dubai Road and was submitted to Abu Dhabi Municipality. To prepare, submit, and for approval of “Environmental Monitoring, Auditing and Reporting and Noise Survey Report”. Construction Environmental Management Plan for construction of bridge connecting Reem Island to Abu Dhabi and which is to be followed by the contractor HSE manager on site.

8

PROJECT LIST / WORK EXPERIENCE

S. N.

Project Name

SOW

Client

Year

Country

49.

Construction Environmental Management Plan (CEMP) for Land Reclamation and Rock Revetment Project Al Reem Island

The Construction Environmental Management Plan for the dredging and reclamation of the land on Reem Island which was submitted to Bunya for implementation during the construction and was approved by EAD.

Pal Technology

2008

UAE

50.

Testing and Certification Services

To provide testing and certification services for a fuel additive company.

MeCorp

2008

UAE

51.

Construction Environmental Management Plan (CEMP) for Hydra Village Project

Hydra Properties

2008

UAE

52.

Terms of Reference for EIA of Dayyinah Island Development Project Abu Dhabi

O.H.H. Shaikh Tahnoon Bin Zayed Al Nahyan

2008

UAE

53.

Preliminary Environmental Review

Preparation of Preliminary Environmental Review.

Gulf Sail Galvanizing Factory

2008

UAE

54.

Preliminary Environmental Review

Preparation of Preliminary Environmental Review.

Electrocab Emarat Ltd

2008

UAE

Unibeton Ready Mix

2008

UAE

BUNYA

2007

UAE

55.

Environment Permit Application

56.

Preliminary Construction Environmental Management Plan (CEMP) Al Reem Island

Blue Sea Environmental Consultants Est., Abu Dhabi

Construction Environmental Management Plan for the construction of more than four thousand villas for Hydra Village Project on Dubai Road. TOR for the tourist resort situated in the sea near the Qatar, the resort is to be developed for tourism as per initial SOW containing construction hotel, leisure facilities and an air strip.

Preparation and submission of Environment Permit Application to ZonesCorp and preparation of Preliminary Environmental Review. Construction Environmental Management Plan for the Phase 1 construction activities on Reem Island. The aim was prepare guide lines for all developer to be followed during the initial phase development. The CEMP was prepared as per the EAD guidelines.

9

PROJECT LIST / WORK EXPERIENCE

S. N.

57.

Project Name

CEMP for Shams Abu Dhabi project on Al Reem

58.

CEMP for Shams District Cooling Project

59.

EIA Study Mangrove Golf Course

SOW

Client

Year

Country

Al Geemi & Partners Contracting Co. W.L.L

2007

UAE

PAL Tech

2007

UAE

Tamouh LLC

2007

UAE

SOW

Client

Year

Country

Construction Environmental Management Plan for Western Mangrove Canal and Beach Works at Shams Abu Dhabi in Reem Island Preliminary Construction Environmental Management Plan (PCEMP) Audit for Reem Island Development Project

Parks Biodiversity Management Services

2012

UAE

Bunya

2012

UAE

Construction Waste Management Plan (CWMP) for the additional cafeteria of an existing school building located in Delma Island

Al Wafi Contracting & General Maintenance

2012

UAE

Areenouf

2012

UAE

Seidco

2012

UAE

To prepare Construction Environmental Management Plan for the Construction of Roads and Utilities on Reem Island. Preparation of CEMP for Shams Abu Chilled Water Piping Network for Sector 1-4 on Al Reem Island. CEMP was submitted to Sorouh for implementation during the construction period. To prepare Terms of Reference(TOR) and carry out Environmental Impact Assessment (EIA) study for the Mangrove Golf Course, Pearl of Emirate, Al Reem Island, Abu Dhabi.

Table 3: Ongoing Projects S. N.

Project Name

1.

CEMP – Western Mangrove Canal and Beach Works at Shams Abu Dhabi in Reem Island

2.

PCEMP Audit – Reem Island Development Project

3.

CWMP - Additional Cafeteria for Existing School Building in Delma Island

4.

CEMP – Environmental Enhancement & Rehabilitation of Marawah Island

5.

CEMP - Abu Dhabi Future School Program Package No. 2

Blue Sea Environmental Consultants Est., Abu Dhabi

Construction Environmental Management Plan for Environmental Enhancement & Rehabilitation of Marawah Island Construction Environmental Management Plan for Abu Dhabi Future School Program Package

10

PROJECT LIST / WORK EXPERIENCE

S. N.

Project Name

6.

PER - Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works for Sila Emirati Housing

7.

HSEMP Review - Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works for Sila Emirati Housing

8.

HAZCOM & HAZOP - Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works for Sila Emirati Housing

9.

Dispersion Analysis and Risk Assessment of LNG Coanda Flares in Das Island

10.

PER – Construction of Pipeline between Unit V Pumping Station and Al Khatim

11.

HSEIA Umm m Al Dalkh Field SE Exploration Well

12.

EIA Jebel Hafeet Emirati Housing Community munity

Blue Sea Environmental Consultants Est., Abu Dhabi

SOW No. 2 in Baniyas & Shamkha Schools Abu Dhabi Preliminary Environmental Review (PER) for “Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works - Sila Emirati Housing” project. Review the existing Health, Safety & Environmental Management Plan (HSEMP) for “Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works - Sila Emirati Housing” project. Hazard Communication (HAZCOM) Program & Hazard & Operability (HAZOP) Study for “Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works - Sila Emirati Housing” project. Dispersion Analysis and Risk Assessment for release of unburnt hydrocarbon gases containing H2S through LNG Coanda Flare in Das Island, Abu Dhabi Preparation of Preliminary Environmental Review for an Italian consulting engineering company for the Construction of Pipeline between Unit V Pumping Station and Al Khatim. Health Safety and Environmental Impact Assessment for Umm Al Dalkh Field SE Exploration Well. Environmental Impact Assessment of Emirati Housing Community in Al Ain to be carried out in accordance with EAD technical guidance documents and international best practiced

Client

Year

Country

Purewater Technology

2012

UAE

Purewater Technology

2012

UAE

Purewater Technology

2012

UAE

ADMA-OPCO OPCO

2012

UAE

ItalConsult Sviluppo Infrastrutture

2011

UAE

ZADCO

2011

UAE

Dorsch Gruppe

2011

UAE

11

PROJECT LIST / WORK EXPERIENCE

S. N.

Project Name

SOW

Client

Year

Country

PAL Technology

2010

UAE

standards.

13.

EIA Emirati Housing Community in Yas Island

Blue Sea Environmental Consultants Est., Abu Dhabi

Environmental Impact Assessment (EIA) for Emirati Housing Community in Yas Island

12