SGT MW GAS TURBINE 11-IAGT-305

19th SYMPOSIUM ON INDUSTRIAL APPLICATIONS OF GAS TURBINES SGT-750 - 37 MW GAS TURBINE 11-IAGT-305 Anders Hellberg Siemens Presented at the 19th Symp...
Author: Preston Heath
160 downloads 2 Views 3MB Size
19th SYMPOSIUM ON INDUSTRIAL APPLICATIONS OF GAS TURBINES

SGT-750 - 37 MW GAS TURBINE 11-IAGT-305 Anders Hellberg Siemens

Presented at the 19th Symposium on Industrial Application of Gas Turbines (IAGT) Banff, Alberta, Canada - October 17-19, 2011 The IAGT Committee shall not be responsible for statements or opinions advanced in technical papers or in symposium or meeting discussions.

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved.

Utility Turbines

Siemens industrial gas turbines SGT5-8000H

375

SGT5-4000F

287

SGT6-8000H

266

Industrial Turbines

SGT6-5000F SGT5-2000E SGT6-2000E SGT-800 SGT-750 SGT-700 SGT-600 SGT-500 SGT-400 SGT-300 SGT-200 SGT-100

198 168 113 47

36

Filling the gap

31 25 19 15 8 7 5

(MWe)

Page 2

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

SGT-750 Launch 18:th November

Page 3

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

SGT-750 General description 13 stage compressor - pressure ratio 24:1

4th generation DLE technology - NOx on gas 15 ppmv (15% O2)

Free power turbine 6 100 rpm

- NOx on liq.(wet) 42 ppmv (15% O2)

Performance Power, Efficiency Exhaust temp Mass flow

Page 4

October 2011

Shaft 37.1 40.0

Electrical 35.9 MW 38.7 % 462 oC 113 kg/s

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

SGT-750 Program – High Performance and Flexibility

Generic

Applications

Options Inlet filtration

Static Driver module

Power generation

Lube oil pump

Mechanical Gas Turbine Page 5

October 2011

Jet pulse

Electric

Mechanical drive Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

High level of reliability

ƒ Development of reliability model to ensure a GT-design meeting reliability requirements ƒ Improve start reliability ƒ Development of spare part concept to minimize downtime for customers

Page 6

October 2011

Example only

The reliability model for the package running on gas fuel

Package MTBF=3699.76 h MDT=43.8375 h OR

Generator MTBF=44642.5 h MDT=86.6191 h

Gas Fuel System MTBF=16668.3 h MDT=74.6841 h

Air Intake Filter System MTBF=55944.1 h MDT=37.8059 h

Ventilation System MTBF=48830.5 h MDT=125.804 h

T GENERATOR

T GFS

T AFS

T VS

Purge Air System MTBF=525688 h MDT=45.0285 h

Gas Detection System MTBF=122279 h MDT=24.0015 h

T PAS_FOR_GFS

T GDS

T FDES

T IAS

Control System MTBF=16184.4 h MDT=2.53032 h

Lube Oil System MTBF=38317.4 h MDT=51.2398 h

Power Supply Single Line MTBF=24365.8 h MDT=24.011 h

Power Supply System MTBF=14484.4 h MDT=24.5666 h

T CS

T LOS

T PS1

T PSS

Fire Detection-Extinguishing MTBF=213542 h MDT=23.9429 h

Instrumentation Air System MTBF=35398.4 h MDT=42.0877 h

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Built in serviceability

In the full scale 3D model it was discovered that it was difficult and time-consuming to exchange instrumentation on the power turbine. Solution: ƒ

The Power turbine was redesigned, utilizing the 3-D model and the instrumentation exchange was verified in the 3-D model.

ƒ

This is an example of how uptime is increased using new design tools.

Core engine 3-D model in studio

Page 7

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Technical

Protection notice / Copyright notice Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved.

SGT-750 Inlet and Compressor

2 Variable guide vanes Visual access to compressor inlet during operation

Electrical starter motor in front of compressor

Low weight inlet plenum on wheels for easy maintenance Page 9

October 2011

Boroscope ports for each stage

3 Compressor Bleeds

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Combustor system Single-digit NOx capability Can combustor system 4th generation DLE burner Wide turndown ratio

8 Combustor cans

Page 10

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Combustor layout Based on latest Siemens technology Technology proven in other Siemens gas turbines

4th generation DLE burner Convective combustor cooling Combustor Rich Pilot Lean Burner

Transition duct

Pilot Burner Main Burner

Page 11

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Combustion Verification Experience from Siemens gas turbine fleet Atmospheric Test ƒ Combustion tests ƒ Ignition Tests ƒ Flow tests Medium Pressure Test ƒ Optimisation of burner ƒ Flame detector test ƒ Ignition test High Pressure Test ƒ Burner tests ƒ Combustion test

Flowtest of casing, burner and combustor

Page 12

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Compressor Turbine

Conventional materials

Two turbine stages IR camera access to blade 1 & 2

Bolted to compressor rotor

Page 13

October 2011

Turbine blade 1 cooling based on Siemens experiences

Brush seals Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

On-line turbine blade monitoring Direct IR imaging of moving gas turbine blades

Row 1 & 2 blades

20C isolevel temperature mapping 3D model of blade

3D temperature mapping

Change of 3D view point for cracks detection

Page 14

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

SGT-750 Industrial power turbine •2-stage high-speed (6100 rpm) Power Turbine •Compact and efficient •Suitable for both power generation and mechanical drive •Power turbine inlet guide vane can be set for different ambient conditions Two shrouded uncooled blades and honeycomb seals

Bolted rotor Page 15

High efficiency diffuser

Two tilting pad (long life) bearings October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

SGT-750 Package Mechanical drive and Power generation

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved.

Layout Air intake

Exhaust

Foot print Driver package 12,8 x 4,3 m Power generation 20,3 x 4,8 m

AC-generator

Main Gear

Maintenance crane Auxiliary room GT room Maintenance door Page 17

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Maintenance

Protection notice / Copyright notice Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved.

Maintenance concept for lowest life cycle cost ƒ ƒ ƒ ƒ ƒ ƒ

Long time between major overhaul TBO 68 000 EOH Highest up-time only 17 maintenance days in 17 years 24-hour GG exchange in the swap concept On-site or swap service concept Increased TBO at part load operation Wide program for long-term service agreements

Page 19

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Outstanding serviceability key to high availability

ƒ 3-years work in a 3DStudio ƒ Visible ”Jack” and ”Jill” simulates access ƒ Working team; designers engineers, assembly technicians, service engineers ƒ Many improvements!

Page 20

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Serviceability means access everywhere Borescope insp.

VGV insp.

Skid equipment

Burner

Page 21

October 2011

Outlet

Engine supports

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Maintenance Plan, 17 years Level “C” Level “B” Level “A” 34

68

102 136 Eq. Op. Hrs x 1000 at DPL

Yearly On-line check 1

2

3

4

5

6

7

8

9

10

11

12

13

14 15 16 17 Year, calender time

Fast maintenance (17 days)

Normal maintenance (48 days)

1 day A-inspection (boroscope)

1 day A-inspection (boroscope)

2 days B-inspection (core exchange)

12 days B-inspection (hot section parts

5 days C-inspection (core exchange with power

replacement)

turbine inspection)

16 days C-inspection (overhaul)

Page 22

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

SGT-750 Summary ‰ ‰ ‰ ‰

Highest Power in class and high efficiency Highest availability in class Siemens well proven DLE technology gives reliable combustion Smart service concept to for highest uptime

Page 23

October 2011

Copyright © Siemens Industrial Turbomachinery AB 2011. All rights reserved. Anders Hellberg Siemens EOIP TI

Thank you for your attention!

Anders Hellberg SGT-750 Product Manager Siemens EOIP TI E-mail: [email protected] Webb SGT-750

Page 24

October 2011

For internal use only / © Siemens AG 2008. All rights reserved. Copyright © Siemens Industrial Turbomachinery AB 2011. Anders Hellberg Siemens EOIP TI