PELABUHAN PT. SAM KALIMANTAN PUTRA

PELABUHAN PT. SAM KALIMANTAN PUTRA Summary Content : 1. Legality Aspects 2. Organization And Management Aspects 3. Business Range 4. Location 5. Coa...
Author: Guest
6 downloads 2 Views 2MB Size
PELABUHAN PT. SAM KALIMANTAN PUTRA

Summary Content : 1. Legality Aspects 2. Organization And Management Aspects 3. Business Range 4. Location 5. Coal Reserve Potency 6. Technical Aspectc 7. Socio Economics Aspects 8. Marketing Aspects 9. Investment Budget 10. Financial Aspects 11. Photogaphs

1. Legality Aspects a. Charter of Company PT. Sam Kalimantan Putra established on year 1996 base on Notary Certificate No: 134 from Said Ahmad SH Notary at Banjarmasin and changing in several time but the last base on Certificate of minutes on Share holder general meeting no: 1, dated October 9th, 2007 created by Mr. Edi Frans Sarapung SH, MH Notary at Jakarta.

b. Capital Structure:   

Basic Capital amount Rp. 5.000.000.000 (five billion rupiah) = 500 share sheet Capital Placement Rp. 1.250.000.000 (one billion and two hundred fifty million rupiah) = 125 share sheets Capital Deposit Rp. 1.250.000.000 (one billion and two hundred fifty million rupiah) = 125 share sheets

c. Share holders:     

Drs. H. Tasminto Eko Ferdiana R Dwi Koerniawan R Noor Ihsantyana R Rose Qaulia R

= 85 share sheets = 10 share sheets = 10 share sheets = 10 share sheets = 10 share sheets

d. Port License: • • •



January 2006 we already take Recommendation Letter from Regent of Regency/Kabupaten of Tanah Laut. March 2006 we already take Recommendation Letter from Governor of South Kalimantan. October 2006 we already have Appointing Location of Coal Port Statement Letter that located at Desa Swarangan, Kecamatan Jorong, Kabupaten Tanah Laut from Ministry of Transportation Republic of Indonesia. Others permits such a SIUP, NPWP, TDP (Company basic permits) and others already require the Law No: 1 year 1995 about Limited Company and have status as legal company.

2. Organization and Management Aspects a. Organization Structure: PT. Sam Kalimantan Putra leading by a President Commissioner and a President Director that sub ordinating 4 manager such as:    

Finance & Admin. Manager Human Resources Manager Operational Manager Marketing Manager

: Eko Ferdiana R. SE. MM : H. Sugiyono : Ir. Sigit Rohadi R : Drs. H. Moh. Wahid Dimyati

The task & responsibilties of Commissioner & Director explained on Company Charter.

b. Board of Commissioner & Director: Commissioner Director

= Dwi Koerniawan R, SE, MM = Drs. H. Tasminto

c. Director Experience’s: Drs. H. Tasminto (57 years old), on 33 years was working in mining and shipping company, with the last position was a Director in as follows: 1. Year 1974 – 2008, at silica sand mining company (33 years) 2. Year 1994 – 2008, was working at shipping company (14 years) 3. Year 1995 – 2008, at Calsium Carbonat mining (13 years)

d. Commissioner Experience’s: Dwi Koerniawan R, SE, MM (30 years old), Business Accountant graduate from Institut Bisnis Indonesia (iBii), and Master of Finance from University of Gajah Mada and from year 2004 untill present working at PT. Indofood Sukses Makmur Tbk.

3. Business Range The core business of PT. Sam Kalimantan Putra is Special Coal Port Facility, the main reason that support this business are: a. Oil reserve in Indonesia become low and as the subsitutes by using coal, where the reserve deposit in Indonesia still over. b. Presidential Law No : 5 year 2006 about National Energy Policy, where the coal contribute on year 2025 is minimum 33% from the national energy requirement. c. For distribute the coal is important to have a special port for coal. Considering the problems above and with support by our experience, we confident that SPECIAL PORT FOR COAL BUSINESS WILL HAVE GOOD PROSPECT AND PROFITABLE.

4. Location The Coal Port of PT. SKP Desa Kecamatan Kabupaten Provinsi Posisi

: Swarangan : Jorong : Tanah Laut : Kalimantan Selatan : 4˚00`56,6” South Latitude and 115˚00`08,8” East Longitude

Considering on Appointing Location such as: a. The Kalimantan island currently possitively have low impact of earth quake b. South Kalimantan Province have so many of low calory coal reserve (as geological map from Central Geological Research and Development, Ministry of Energy Mineral Resources) d. Local overnment Law Number 3 Year 2008 South Kalimantan Province about Transporting of Mining Resources prohibited by using Provincial road. e. Strategic position between Banjarmasin City and Pulau Laut (Port of IBT and Port of Tanjung Pemancingan).

5. Coal Reserve Potency Map of Coal Reserve Potency in Indonesia

Mineral Reserve in Indonesia Data:

The Owner of Coal Mining Concession near the Special Coal Port of PT. SKP a. PT. HARISINDO BATU MULIA Production capacity : more than 120.000 ton. b. PT. BUMI TALA SEJAHTERA (BTS) Production capacity : more than 40.000 ton c. PT. SATRIA AGRO FORESTO Production capacity : more than 40.000 ton d. PT. BERKAT KARUNIA UTAMA Production capacity : more than 50.000 ton e. PT. ALFA RIUNG Production capacity : more than 40.000 ton

Achiever of Monthly Coal Trading exceed more than 200.000 ton • • • • • • • • • • • •

PT. Prima Multi Mineral PT. Redox Resource Indonesia (Trader dari Australia) PT. Daya Bambu Sejahtera (Suplier Indonesia Power) PT. Putra Tujuh Sebelas PT. Antang Gunung Meratus (AGM) – Tamara Group PT. Asia Prima Coal (APC) – Tamara Group PT. Rukum Makmur (RM) – Tamara Group PT. Bangun Benoa Persada Kalimantan (BBPK) – Tamara Group PT. Nobel PT. Total PT. Pinang Coal Sinar Mas Group The Companies above, his loading point at Taboneo and IBT,

6. Technical Aspects Anticipate increasing the request for Coal Port Facility, PT. Sam Kalimantan Putra in the beginning will build a coal port by using belt conveyor for 500 meters long for loading to barge 300 feet, and now changes to as follows: • • • • •

Overland Conveyor and Crushing Stockpile and Blending Facilities Barge Unloading Conveyor (1000 ton/hour) – 2 units Ship Loading Facilities Conveyor (2000ton/hour) Port Conveyor System

By changing the technical matter will influence the total amount of investment value.

7. Socio Economic Aspects 1. Social Aspects a. Positively impact by opened jobs. b. Supporting the Government program about National Energy Policy, where the coal constribute year 2025 minimum 33% from the National Energy Requirement. c. Accelerate the distribution of coal from the coal producer island to coal user island that useful for Power Plant to fulfilled the national electricity requirement.

2. Economic Aspects a. b. c.

Increasing workers income. Generate provincial income by retribution of minerals and others tax sector. Generate tax income, such as :  Company Income Tax/ Pajak penghasilan badan (PPH Badan)  Employees Income Tax/ Pajak penghasilan karyawan (PPH Pasal 21)  Value Add Tax/ Pajak Pertambahan Nilai (PPN)

8. Marketing Aspects For marketing the special coal port divide by two targets as follows: a. For the Coal concession owner around the Special Coal Port location less than 15 KM distance to reach the coal port by using truck. b. For the Coal concession and Coal trader who come from the South Kalimantan Province area and Central Kalimantan Province area to reach the coal port by barge.

9. Investment Budget Investment Budgeting According the changes on technical aspects then investment budget become more than Rp. 300.000.000.000 (three hundred billion rupiah) or about USD 34 million (Currency; 1 USD = Rp. 9,200.-), with recapitulation as explained below :

10. Financial Aspects Please see the attachment (Microsoft Office Excel format)

11. Photographs A. Lokasi Area Pelabuhan Bongkar Muat Batubara Desa/ Village Kecamatan/ Region Kabupaten/Regency Propinsi/ Province Posisi/ Position South Latitude East Longitude

: Swarangan : Jorong : Tanah Laut : South Kalimantan : : 4˚00`56,6” SL : 115˚00`08,8” EL

Coal Mining Area

Road to the Special Coal Port PT.SKP

Beach Area

Stock Pile & Office Planning Area

B. Lay Out

C. Coal Reserve Potency at South Kalimantan Province

High Calories Deposit Area Low Calories Deposit Area

PT.SKP (Coal Port Location)

D. Strategic Position of Special Coal Port of PT. SKP Desa/ Village Kecamatan/ Region Kabupaten/ Regency Propinsi/ Province Posisi/ Position

: Swarangan : Jorong : Tanah Laut : South Kalimantan : 4˚00`56,6” South Latitude & 115˚00`08,8” East Longitude

Tj. Pemancingan

Banjarmasin

PT. SKP

IBT

E. Illustration of Terminal & Special Loading-Unloading Coal Port of PT. SKP