Never Used Turbine! -technical brochure-! VESTAS!! V90 3MW

Never Used Turbine! -technical brochure- ! ! VESTAS! ! V90 3MW Proven technology to safeguard your investment ! ! ! ! ! What is Never Installed T...
89 downloads 0 Views 722KB Size
Never Used Turbine! -technical brochure-

!

! VESTAS! ! V90 3MW

Proven technology to safeguard your investment !

! ! ! ! What is Never Installed Turbine?!

!

Included in the scope!

What’s in a name. Never Used Turbines are brand

The Never Used Turbine is supplied consisting of

new wind turbines, produced few years ago and

the following main components:

delivered by OEM’s to the hands of project

• • • • • • • •

owners. Due to some reasons, such as legislation change, difficulties with finalization of the project development and others, the project owners were not able to erect these turbines and made a decision to offer them for sale.

!

In order to keep the turbines in good shape till the

!

Nacelle Hub 1 set of blades 80 m tower Elevator Foundation ring Transport frames (nacelle and blades) 60 days of free storage and security

moment they get commissioned, the owners have

!

been taking a very good care over the equipment

The following items are not included in the scope of

by investing money in proper and secure storage

our basic offer, please consult our team to proceed

conditions, as well as in the conservation and

with a request:

maintenance services during all period of storage in accordance with OEM’s recommendations.

!

As the result, the turbines are present in «as new» visual and technical condition, while the level of investment is almost half than for similar new turbines.

In order to guarantee the safety of

your investments, technical inspection and visit can be scheduled on request.

! !

! • • • • • • • •

!

Technical survey Customized retrofit Customized upgrade (SCADA, etc.) Loading Transportation Installation & Commissioning Switchgear supply Full maintenance Concept

!

Vestas! V90 3 MW! Technical specifications & data Power Regulation:

Pitch regulated with

Blade Dimensions:

variable speed

Length

44 m

Max.chord

3.5 m

Operating Data: Rated power

3,000 kW (50Hz)

Tower:

Cut-in wind speed

3,5 m/s

Type

Rated wind speed

15 m/s

Hub height

Cut-out wind speed

25 m/s

Nacelle Dimensions:!

Wind class

IEC IA

Transport height

Operating temperature range:

Length

standard:

-20° to 40° C

Width

low T turbine:

-30° to 40° C

Hub Dimensions:

Max107 dB

Max. transport height

Sound Power:!

!

!

Mode 0,10 m above ground, hub height 80 m, air density 1.225

Max. transport width /length

!

kg/m3

Rotor:! Rotor diameter Swept area Air brake

90 m 6,362

m2

full blade feathering

Electrical:!

Generator type

50 Hz 4-pole (50Hz) Doubly fed generator, slip rings

Nominal output

50 Hz: 3,000 kW

Gearbox:! Type

2 helical stages 1 planetary stage

! ! ! !

80 m

4m 12.2 m 3.5 m

3.6 m 4 m / 4.2 m

Max. transport weight per unit

with 3 pitch cylinders

Frequency

tubular steel tower

for transportation

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

79 t

! ! ! ! ! !

! !

Improving business case by thinking about weights

3 MW design!

!

SCADA!

3 MW Vestas wind turbine design is a perfect solution

For investors from some countries (list on request)

for middle wind speed sites. 90 m rotor size and

Never Used Vestas can be offered with installed

essential 3 MW capacity made V90 type very popular

latest version of Supervisory Control and Data

among worldwide project developers. Specially

Acquisition (SCADA). This flexible system includes

integrated technology upgrade serve to minimize the

an extensive range of monitoring and management

downtime and cut maintenance costs. The new

functions. It will enable you to optimize production

profile of the V90 blades also represents a significant

levels, monitor the real-time performance, get

aerodynamic advance.

professional reports.

! Transportation & Installation! !

When Vestas set out to establish a new benchmark for efficiency with its development of the V90 3 MW turbine, high priority was given to keeping weight down. The result is a showcase of innovative engineering – particularly as regards weight saved. Following the development of 2 MW platform, 3 MW Vestas was built to control loads on specific tower heights. This principle helps to reduce weight of the turbine and loads on the tower and foundation. This cuts your unnecessary foundation costs.

! Service and Maintenance! !

A series of improvements to the V90 have made service and maintenance calls less demanding – and less frequent. Turbine access has been simplified and working areas expanded, while the arrangement of tower and nacelle components has been optimised to facilitate service procedures.

!

! Optimization, Upgrades and other services! !

We aim not only deliver the best quality product, but improve its condition, customize it for your needs to strengthen the certainty of your investment in wind energy. Such services as retrofit with provided warrantees, software and other upgrades, re-built to 60 Hz and others are available on request.

! Full Maintenance Concept! ! For investors from some countries (list on request) we can offer a full maintenance Concept based on long ter m agreements for service and maintenance, online monitoring, optimization and trouble-shooting. Full maintenance concept ensures you with maximum power generation, preventive maintenance and benefits on saving many service costs.

!

Photo report

Never Used Turbine! -maximize your return-