MnDOT Pavement Design Manual April 10, 2018
MNDOT PAVEMENT DESIGN MANUAL Chapter 8 – Documentation
MnDOT Pavement Engineer
Date
MnDOT Pavement Design Manual April 10, 2018
Contents Introduction ........................................................................................................................................................ 1 800 - Pavement Design Memorandum (PDM) ............................................................................................. 2 810 - Materials Design Recommendation (MDR) ........................................................................................ 3 820 - PDM Template Instructions .................................................................................................................. 6 830 - MDR Template Instructions ................................................................................................................29
MnDOT Pavement Design Manual April 10, 2018
Introduction
There are two documents that may be required to provide for a pavement project. A Pavement Design Memorandum (PDM) is required when the Alternate Bidding process is followed. This document enables the MnDOT Pavement Design Engineer to review and approve the pavement design. A Materials Design Recommendation (MDR) is required for all projects that include grading or pavement. It is used to document and communicate pavement and geotechnical design recommendations to the project designers. This chapter describes the content, development, review and approval processes of these two documents.
1
MnDOT Pavement Design Manual April 10, 2018
800 - Pavement Design Memorandum (PDM)
A PDM is required when the Alternate Bidding process is followed so that the pavement design can be reviewed and approved by the MnDOT Pavement Design Engineer. A PDM is written to document the alternate pavement designs that were considered, the information required for the pavement designs’ development, and the project’s LCCA. See Chapter 7 – Pavement-Type Selection to determine if the project will follow the Formal LCCA process and, therefore, will require the completion of a PDM. 1. Format The PDM template must be used for all PDMs. The template is available on the MnDOT Pavement Design website at http://www.dot.state.mn.us/materials/pvmtdesign/docs/index.html and directions for completing it are in Section 820 – PDM Template Instructions. 2. Distribution and Review A. The draft PDM is sent to the MnDOT Pavement Design Engineer. B. The MnDOT Pavement Design Engineer reviews the PDM and attachments and may request any necessary changes to be made. C. If the project will proceed to alternate bidding, the MnDOT Pavement Design Engineer will distribute the PDM to the FHWA Pavements, Materials and Construction Engineer and representatives of the Concrete Paving Association of Minnesota (CPAM) and Minnesota Asphalt Pavement Association (MAPA). The associations will have a comment period of two weeks and the MnDOT Pavement Design Engineer will address any comments. D. The MnDOT Pavement Design Engineer will sign the finalized PDM and the project may proceed with the pavement designs described in the PDM.
2
MnDOT Pavement Design Manual April 10, 2018
810 - Materials Design Recommendation (MDR)
The MDR provides pavement and geotechnical design recommendations for MnDOT projects to the project designer. This includes recommendations for layer thickness, materials, treatments, and specifications necessary to design the project. Note: Only the pavement designs that will be used in the project plans need to be included in the MDR. 1. Format A template for formatting the MDR is available on the MnDOT Pavement Design website at http://www.dot.state.mn.us/materials/pvmtdesign/docs/index.html. The template format is required for projects that will use Alternate Bidding. See Section 830 - MDR Template Instructions for directions for using this template. 2. Distribution and Review A. Complete a draft MDR. B. Complete a MDR routing sheet for the draft MDR. The MDR routing sheet template is available on the MnDOT pavement design website. C. Distribute the MDR and MDR routing sheet to the distribution list shown in Table 810.1. The method of distribution of the MDR, MDR routing sheet, and supporting documents vary by district preference and may be accomplished by e-mailing copies of the files, ProjectWise links, or electronic data management system (EDMS) links. These methods are all acceptable for review; however, the MDR, MDR routing sheet, and supporting material, must be archived in the MnDOT EDMS and should be placed there as early as possible. D. Provide for a review period of two weeks. E. Review comments, finalize, and archive the MDR.
3
MnDOT Pavement Design Manual April 10, 2018
Table 810.1 – Distribution List for Project MDRs Materials & Road Research, Maplewood MnDOT Pavement Engineer MnDOT Pavement Design Engineer MnDOT Bituminous Engineer MnDOT Concrete Engineer MnDOT Grading and Base Engineer MnDOT Pavement Preservation Engineer MnDOT Foundations Engineer MnDOT Geology
Pavement projects. Pavement projects. Projects that include HMA pavement. Projects that include PCC pavement. Projects that include any work to a roadway’s subgrade, base, or include aggregate shoulders. Projects that include FDR, SFDR, CIR or any HMA pavement preservation. Projects that include fills of cuts deeper than 30’. Projects that include rock cuts.
Central Office, St. Paul MnDOT Special Provisions Engineer MnDOT Design Support Engineer
Final MDR only Final MDR only
The District This is the district’s preference, but would typically include the Soils Engineer, Materials Engineer, Design Engineer, Project Engineer, and others.
District decision
FHWA
FHWA Area Engineer* * Note: Must be a copy of the file(s), cannot be ProjectWise or EDMS links.
Projects on the National Highway System that are a Project of Corporate Interest (POCI), Project of Division Interest PODI, or as requested. A list of PODI projects are available on the Pavement Design website at http://www.dot.state.mn.us/materials/pvmtdesign/docs/index.html Or contact the appropriate FHWA Area Engineer
FHWA Pavements, Materials Projects on the Interstate System and Construction Engineer Use the following to find the appropriate FHWA Area Engineer and contact information http://www.fhwa.dot.gov/mndiv/staff/districts.cfm
4
MnDOT Pavement Design Manual April 10, 2018
5
MnDOT Pavement Design Manual April 10, 2018
820 - PDM Template Instructions
This section contains directions for completing the template for PDMs. Note: Delete any tables or rows within tables that do not apply to the project.
6
MnDOT Pavement Design Manual April 10, 2018
Office Memorandum
TO:
Recipient's Name MnDOT Pavement Design Engineer
FROM:
Sender's Name Author’s Title
DATE:
Month, Day, Year
SUBJECT:
PAVEMENT DESIGN MEMORANDUM
SP #
The Project’s SP Number.
Highway #
The number(s) of the State Highway(s) within the project limits
Project Limits
Text Description of the Project Limits RP XXX+00.XXXX to RP XXX+00.XXXX
Length of Project
XX.XXX Miles
Funding Category
e.g. RC (Reconstruction), RD (Reconditioning), MC (Major Construction)
Programmed Letting Date XX/XX/XXXX
MnDOT Pavement Design Engineer
Date
7
MnDOT Pavement Design Manual April 10, 2018
Project Information Project Scope Type of Work Benefit LCCA Process Alternate Bid
General project description e.g. mainline reconstruction and overlay ramps.(may be found in scoping) The expected improvement the project will provide; be specific (i.e. the amount of ride improvement, or amount of life extension). Formal Yes or No (see Chapter 7)
Pavement Design Segments
This is a list of project segments that require separate pavement designs. Segment # 1
Highway #
From RP
To RP
Design Type PCC or HMA Overlay, Reconstruction, FDR,SFDR, etc.
2
8
MnDOT Pavement Design Manual April 10, 2018
Existing Facility
This is a description of the existing road and its general geometry. Scoping documents and the Pavement Management System (see Section 280) may be useful in completing this section. Highway From To Number of Lanes Mainline Pavement Type Mainline Pavement Width Shoulder Type Shoulder Width Seasonal Load Restriction Speed Limit
Multiple segments may be required to describe the existing road. Include a copy for each segment. From RP To RP No. of lanes, if it’s divided, and description of any median. HMA or PCC. For PCC include the joint spacing, # of dowels, thickness etc. Width in feet. HMA, PCC, aggregate, any curb and gutter. Width in feet of each shoulder. The posted seasonal load restriction in tons; 10 tons if there is no posted restriction. The posted speed limit.
Roadway Construction History
See Section 260 for guidance on obtaining this information. If this material is extensive, it may be placed as an appendix to this document. The following are examples of two sections of a project. RP 123.789 to RP 126.987 - MN 23 to 3rd Street Year
SP
Activity
Width
1989 1954 1945 1945 1945
2309-001 2309-123 2309-789 2309-789 2309-789
Minor CPR/ Patching CPR HMA Shoulders Doweled PCC Aggregate Base
30’
Depth
6’ 30’ 30’
2.5” 8” 6’
9
MnDOT Pavement Design Manual April 10, 2018
RP 126.987 to RP 129.102 – 3rd Street to E Limits Franklin Year
SP
Activity
Width
Depth
1989 1989 1973 1951 1950 1945
2309-01 2309-01 2309-12 2309-111 2309-22 2309-789
HMA Overlay HMA Milling HMA Overlay Chip Seal Spot Patching Doweled PCC with Aggregate Base
24’ 24’ 24’ 24’ 24’ 30’
4.5” 3” 4”
8”
Roadway Condition Pavement Distresses Areas of Concern
A general description of the visible distresses. For guidance see Section 270. Any areas that may need repair or special treatment, such as frost heaves or subgrade failure. For guidance see Section 270.
Attach photos or diagrams as needed. Pavement Performance Data
This section documents the Pavement Performance Data for the road within the project limits. Pavement Performance Data is available from Pavement Management System (see Section 280). Year: Year that the data was collected Segment Description
Dir.
From RP
To RP
RQI
SR
PQI
IRI (in/mile)
I, D, U
R-Value/FWD Data
This section reports the R-value from either FWD data or laboratory testing (or both). Use this table to document FWD data using the TONN method, see Section 200. Any FWD (TONN Analysis) and Laboratory R-Values must be attached in the appendix.
10
MnDOT Pavement Design Manual April 10, 2018
FWD Data Date: Date of Testing Reported Capacity
Overlay Thickness
R-Value
Mean Std. Dev.
Use this table to document any Laboratory R-values, see Section 220. Laboratory R-Values Count
Mean
Minimum
Maximum
Std. Dev.
# of tests
Comments: Any notes, comments, or concerns about the collected data. Core/GPR
This section reports the HMA thickness (and condition) collected from coring or GPR see Sections 230 & 240. Date: Date that the data was collected on. Segment: Segment # Location
Count
Average
Minimum
Maximum
Std. Dev.
Mainline, shoulder, turnlanes, etc
Provide the location of any photos of the cores and of any GPR report. These may be attached, in EDMS, or ProjectWise. Comments: Any notes, comments, or concerns about the collected data.
11
MnDOT Pavement Design Manual April 10, 2018
Traffic
A signed MnDOT traffic forecast is required for all PDMs. See Section 250. Traffic Forecast #:
Hwy
From RP
To RP
Traffic Forecast Date: Base Year 2-way Design Lane HCADT
2-way HCADT Growth/ Year
20 Yr. Design Lane Cumulative BESAL’s
20 Yr. Design Lane Cumulative CESAL’s
35 Yr. Design Lane Cumulative CESAL’s
Life-Cycle Cost Analysis (LCCA)
This section contains the results of the LCCA analysis according to Chapter 7.
Alternate #1
Alternate #2
Alternate #3
Description Design Life Project Net Present Cost % of Low Cost Selected
Exception: Does the district request an exception to either selecting the low-cost option or to following the alternate bidding process? See Chapter 7. Any exception form should be attached.
12
MnDOT Pavement Design Manual April 10, 2018
Pavement Recommendations This section contains the recommended pavement design(s) for the Pavement Design Segments (listed on the second page of the memo). If the project will follow the Alternate Bidding process then there will be HMA and PCC options for those segments that will be included in Alternate Bidding (see Chapter 7 – Pavement-Type Selection).
13
MnDOT Pavement Design Manual April 10, 2018
NEW HMA Segment #
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
New HMA
Thickness (inches)
Lifts
Mix Design/ Material
Wear
Sec. 400
----
----
---
----
Scoping
Non-Wear
Sec. 400
----
----
---
----
Scoping
#
Mainline Pavement
Smoothness
Spec.
Compaction Testing
Width (ft.)
---
Notes Mainline Subsurface
Thickness (inches)
Material
Spec.
Compaction Testing
Base
Sec. 400
Sec. 400 & 310
---
---
Subbase
Sec. 400
Sec. 400 & 310
---
---
Eng. Soil
Sec. 320
Sec. 320
---
---
Subgrade Prep.
Sec. 320
---
---
Width (ft.)
Notes
Thickness (inches)
Lifts
HMA
Sec. 610
---
Aggregate Surfacing Shoulder Agg. Base
HMA Shoulders
Mix Design/ Material
Spec.
Width (ft.)
Compaction Testing
Lt
Rt
---
---
---
Scope
Scope
Sec. 610
Sec. 610
---
---
610
610
As Needed
Match Agg. Base
---
---
Material
Spec.
Notes
Aggregate Shoulders
Thickness
Aggregate Surfacing
Sec. 610
Sec. 610
---
---
Added Aggregate Base
As Needed
Match Agg. Base
---
---
Width
Compaction Testing
Lt Scope
Notes
14
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
Cross-Section from RP XXX to RP XXX
X.X ft
XX.X ft
XX.X ft
X.X” YYYYYYY
X.X” YYYYYYY
X.X” Sub-base
X.X” HMA Wearing Course X.X” HMA Non-Wearing Course
X.X ft
X.X” Class X
X.X” Engineered Soil
Cross-Section from RP XXX to RP XXX
X.X ft
XX.X ft
XX.X ft
X.X” YYYYYYY
X.X” YYYYYYY
X.X” Sub-base
X.X” HMA Wearing Course X.X” HMA Non-Wearing Course
X.X ft
X.X” Class X
X.X” Engineered Soil
15
MnDOT Pavement Design Manual April 10, 2018
FDR/SFDR/CIR Segment #
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
FDR,SFDR or CIR
Depth (inches)
Material
#
Existing Mainline Pavement Existing HMA Existing Aggregate
Sec.230, 240, 260 Sec.230, 240, 260
Note
Width (ft.)
HMA
Sec. 260
Sec.230, 240, 260
Notes
Mainline Pavement
Depth (inches)
Milling
Sec. 410
Added Aggregate
Sec. 410
Reclaim/ Recycle Stabilize
Lifts
Material
Spec.
Width (ft.)
---
#.#
Sec. 410
---
#.#
Sec. 410
Sec. 410
---
#.#
Sec. 410
Sec. 410
---
#.#
Notes Mainline Pavement
Thickness (inches)
Lifts
Mix Design/ Material
Wear
Sec. 400
---
Sec. 450
---
---
Scoping
Non-Wear
Sec. 400
---
Sec. 450
---
---
Scoping
Compaction Testing
Width (ft.)
Spec.
Compaction Testing
Width (ft.)
Smoothness --Notes
HMA Shoulders
Thickness (inches)
Lifts
HMA
Sec. 610
---
Aggregate Surfacing
Sec. 610
Shoulder Agg. As Needed Base
Mix Design/ Material
Spec.
Lt
Rt
Sec. 450
---
---
Scope
Scope
Sec. 610
---
---
610
610
Match Agg. Base
---
---
Notes
16
MnDOT Pavement Design Manual April 10, 2018
Aggregate Shoulders
Thickness
Aggregate Surfacing
Sec. 610
Sec. 610
---
---
Added Aggregate Base
As Needed
Match Agg. Base
---
---
Material
Spec.
Width (ft.)
Compaction Testing
Lt Scope
Notes
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft
XX.X ft
X.X ft X.X” YYYYYYY
X.X” YYYYYYY
X.X” New HMA Overlay X.X” SFDR
X.X” YYYYYYY X.X” FDR
X.X” YYYYYYY X.X” Existing Aggregate
17
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
Rubblize/Crack & Seat Segment # #
Mainline Pavement
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
Rubblize/Crack & Seat
Existing PCC
Depth (inches) Sec. 230, 240, 260 Sec. 260
Existing Aggregate
Sec. 230, 240, 260
Existing HMA
Material
Note
Width (ft.)
HMA
Sec. 260
PCC
Sec. 260
HMA
Notes
Mainline Pavement
Depth (inches)
Lifts
Material
Spec.
Width (ft.)
Mill HMA Sec. 410 --Rubblize/ Special Provision # and if any edits are required, Sec. 420 Crack & Seat Subsurface Type of drain & outlets and its specification, Sec. 420 Drains Notes Mainline Pavement
Mix Design/ Material
#.#
Thickness (inches)
Lifts
Wear
Sec. 420
---
Sec. 450
---
---
Scoping
Non-Wear
Sec. 420
---
Sec. 450
---
---
Scoping
Spec.
Compaction Testing
Width (ft.)
Smoothness Sec. 450 Notes
18
MnDOT Pavement Design Manual April 10, 2018
HMA Shoulders
Thickness (inches)
Lifts
HMA
Sec. 610
---
Aggregate Surfacing Shoulder Agg. Base
Mix Design/ Material
Spec.
Width (ft.)
Compaction Testing
Lt
Rt
Sec. 450
---
---
Scope
Scope
Sec. 610
Sec. 610
---
---
610
610
As Needed
Match Agg. Base
---
---
Notes
Aggregate Shoulders
Thickness
Aggregate Surfacing
Sec. 610
Sec. 610
---
---
Added Aggregate Base
As Needed
Match Agg. Base
---
---
Material
Spec.
Width
Compaction Testing
Lt Scope
Notes
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft
XX.X ft
X.X ft X.X” YYYYYYY
X.X” YYYYYYY
X.X” New HMA Overlay
X.X” YYYYYYY X.X” YYYYYYY
4” Perf. PE Pipe
X.X” Rubblized PCC
19
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
HMA Overlay
Segment # #
Mainline Pavement
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
HMA Overlay
Existing PCC
Depth (inches) Sec. 230, 240, 260 Sec. 260
Existing Aggregate
Sec. 230, 240, 260
Existing HMA
Material
Note
Width (ft.)
HMA
Sec. 260
PCC
Sec. 260
Notes
Mainline Pavement Mill HMA
Depth (inches)
Lifts
Material
Spec.
Sec. 440
Width (ft.)
---
#.#
Notes Mainline Pavement
Thickness (inches)
Lifts
Sec. 440
---
Sec. 450
Thickness (inches)
Lifts
Mix Design/ Material
HMA
Sec. 610
---
Aggregate Surfacing Shoulder Agg. Base
Wear
Mix Design/ Material
Spec.
Compaction Testing
---
Width (ft)
---
Scoping
Smoothness Sec. 450 Notes
HMA Shoulders
Spec.
Compaction Testing
Width (ft.) Lt
Rt
Sec. 450
---
---
Scope
Scope
Sec. 610
Sec. 610
---
---
610
610
As Needed
Match Agg. Base
---
---
Notes
20
MnDOT Pavement Design Manual April 10, 2018
Aggregate Shoulders
Thickness
Aggregate Surfacing
Sec. 610
Sec. 610
---
---
Added Aggregate Base
As Needed
Match Agg. Base
---
---
Material
Spec.
Width
Compaction Testing
Lt Scope
Notes
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft
X.X ft
XX.X ft
X.X” YYYYYYY
X.X” YYYYYYY
Mill X.X” Existing HMA Overlay
X.X” Sub-base
X.X” New HMA Overlay X.X” ExistingPave.
X.X” Class X
Cross-Section from RP XXX to RP XXX
X.X ft
XX.X ft
XX.X ft
X.X” YYYYYYY
X.X” YYYYYYY
X.X” Sub-base
X.X” HMA Overlay X.X” Class X X.X” Existing Pave.
X.X ft
X.X” Engineered Soil
Mill X.X” Existing HMA
21
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
NEW PCC
Segment #
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
New PCC
#
Mainline Pavement
Thickness (inches) Sec. 500
PCC
Joint Spacing Dowel (ft.) Arrangement Sec. 530
Sec. 530
Dowel Size 530
Sealant
Width (ft.)
Sec. 530
Scoping
Notes Mainline Subsurface
Thickness (inches)
Lifts
Material
Spec.
Compaction Testing
Base
Sec. 500
Sec. 500 & 310
---
---
Subbase
Sec. 500
Sec. 500 & 310
---
---
Eng. Soil
Sec. 320
Sec. 320
---
---
---
---
Subgrade Prep. Subsurface Drains Notes
HMA Shoulders
Sec. 320
Width (ft.)
Type of Drain & outlets, Sec. 500 ---
Thickness (inches)
Lifts
HMA
Sec. 610
---
Aggregate Surfacing
Sec. 610
Shoulder Agg. As Needed Base
Mix Design/ Material
Spec.
Width (ft.)
Compaction Testing
Lt
Rt
Sec. 450
---
---
Scope
Scope
Sec. 610
---
---
610
610
Match Agg. Base
---
---
Notes
22
MnDOT Pavement Design Manual April 10, 2018
Aggregate Shoulders
Thickness
Aggregate Surfacing
Sec. 610
Sec. 610
---
---
Added Aggregate Base
As Needed
Match Agg. Base
---
---
Material
Spec.
Width
Compaction Testing
Lt
Rt
Scope
Scope
Notes
PCC Shoulders
Thickness
PCC
Sec. 610
Aggregate Surfacing
Sec. 610
Shoulder Agg. As Needed Base
Material
Spec.
Width
Compaction Testing
Sec. 610
---
---
Match Agg. Base
---
---
Lt
Rt
Scope
Scope
610
610
Notes
23
MnDOT Pavement Design Manual April 10, 2018
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft X.X” YYYYYYY
YYYY Joint
X.X” New PCC
X.X ft
XX.X ft YYY Joint
YYY Joint
X.X” YYYYYYY
X.X” YYYYYYY
X.X” YYYY
X.X” YYYYYYY X.X” Sub-base
4” Perf. PE Pipe
X.X” Class X
Cross-Section from RP XXX to RP XXX
X.X ft
XX.X ft YYYY Joint
X.X” YYYYYYY
XX.X ft YYYY Joint
X.X ft X.X” YYYYYYY
X.X” Sub-base
X.X” New PCC X.X” Class X
X.X” Engineered Soil
24
MnDOT Pavement Design Manual April 10, 2018
Whitetopping
Segment # #
Mainline Pavement Mill HMA
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
Whitetopping
Depth (inches)
Lifts
Material
Spec.
Sec. 510
Width (ft.)
Sec. 510
#.#
Notes Mainline Pavement PCC Overlay
Thickness (inches) Sec. 500
Joint Spacing Dowel (ft.) Arrangement Sec. 530
Sec. 530
Dowel Size 530
Sealant
Width (ft.)
Sec. 530
Scoping
Notes
HMA Shoulders
Thickness (inches)
Lifts
HMA
Sec. 610
---
Aggregate Surfacing
Sec. 610
Shoulder Agg. As Needed Base
Mix Design/ Material
Spec.
Width (ft.)
Compaction Testing
Lt
Rt
Sec. 450
---
---
Scope
Scope
Sec. 610
---
---
610
610
Match Agg. Base
---
---
Notes
Aggregate Shoulders
Thickness
Aggregate Surfacing
Sec. 610
Sec. 610
---
---
Added Aggregate Base
As Needed
Match Agg. Base
---
---
Material
Spec.
Width
Compaction Testing
Lt Scope
Notes
25
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
PCC Shoulders
Thickness
PCC
Sec. 610
Aggregate Surfacing
Sec. 610
Material
Shoulder Agg. As Needed Base
Width
Compaction Testing
Spec.
Sec. 610
---
---
Match Agg. Base
---
---
Lt Scope
Scope
610
610
Notes
Cross-Section from RP XXX to RP XXX
X.X ft
XX.X ft
XX.X ft
X.X ft X.X” YYYYYYY
X.X” YYYYYYY
X.X” New PCC Overlay
Rt
X.X” YYYYYYY X.X” YYYYYYY X.X” Existing HMA
26
MnDOT Pavement Design Manual April 10, 2018
UBOL
Segment # #
Mainline Pavement Mill HMA
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
Unbonded Overlay
Depth (inches)
Lifts
Material
Spec.
Sec. 520
Width (ft.)
---
#.#
Notes Mainline Pavement PCC Overlay
Thickness Joint Spacing Dowel (inches) (ft.) Arrangement
Dowel Size
Sec. 500
530
Sec. 530
Sec. 530
Sealant Sec. 530
Width (ft.) Scoping
Notes Mainline Subsurface
Thickness (inches)
Lifts
Material
Interlayer Sec. 520 Sec. 520 Subsurface Type of drain & outlets, Sec. 520 Drains Notes
HMA Shoulders
Thickness (inches)
Lifts
HMA
Sec. 610
---
Aggregate Surfacing Shoulder Agg. Base
Mix Design/ Material
Spec. ---
Spec.
Compaction Testing
Width (ft.)
---
Compaction Testing
Width (ft.) Lt
Rt
Sec. 450
---
---
Scope
Scope
Sec. 610
Sec. 610
---
---
610
610
As Needed
Match Agg. Base
---
--
Notes
Aggregate Shoulders
Thickness
Aggregate Surfacing
Sec. 610
Sec. 610
---
---
Added Aggregate Base
As Needed
Match Agg. Base
---
---
Material
Spec.
Compaction Testing
Width Lt Scope
Notes
27
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
PCC Shoulders
Thickness
Material
Spec.
Compaction Testing
PCC
Sec. 610
Aggregate Surfacing
Sec. 610
Sec. 610
---
---
Shoulder Agg. Base
As Needed
Match Agg. Base
---
---
Width Lt Scope
Scope
610
610
Notes
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft
X.X ft
XX.X ft
X.X” YYYYYYY
X.X” YYYYYYY
X.X” New PCC Overlay
X.X” YYYYYYY X.X” YYYYYYY
4” Perf. PE Pipe
X.X” Existing PCC
Rt
X.X” Interlayer
Attachments: Attach or provide a link to the location of the following: Printouts of the pavement design programs’ output for each pavement design. Signed Traffic Forecast Summaries. Soil Borings and Cores (or link) The LCCA and any supporting calculations. Any LCCA or Alternate Bidding Exceptions. Any GPR, Geotechnical, or other reports.
28
MnDOT Pavement Design Manual April 10, 2018
830 - MDR Template Instructions
This section contains directions for completing the template for MDR. Note: Delete any tables or rows within tables that do not apply to the project.
29
MnDOT Pavement Design Manual April 10, 2018
Office Memorandum TO:
Recipient's Name Recipient’s Title
FROM:
Sender's Name Author’s Title
DATE:
Month, Day, Year
SUBJECT:
MATERIALS DESIGN RECOMMENDATION
SP #
The Project’s SP Number.
Highway #
The number(s) of the State Highway(s) within the project limits
Project Limits
Text Description of the Project Limits RP XXX+00.XXXX to RP XXX+00.XXXX
Length of Project
XX.XXX Miles
Funding Category
e.g. RC (Reconstruction), RD (Reconditioning), MC (Major Construction)
Programmed Letting Date XX/XX/XXXX Pavement Design Memorandum Yes/No
30
MnDOT Pavement Design Manual April 10, 2018
Project Information Project Scope Type of Work Benefit LCCA Process Alternate Bid
General project description e.g. mainline reconstruction and overlay ramps.(may be found in scoping) The expected improvement the project will provide; be specific (i.e. the amount of ride improvement, or amount of life extension). Formal or District (see Chapter 7) Yes or No (see Chapter 7)
Pavement Design Segments
This is a list of project segments that require separate pavement designs. Segment # 1
Highway #
From RP
To RP
Design Type PCC or HMA Overlay, Reconstruction, FDR,SFDR, etc.
2
31
MnDOT Pavement Design Manual April 10, 2018
Existing Facility
This is a description of the existing road and its general geometry. Scoping documents and Pavement Management System (see Section 280) may be useful in completing this section. Highway From To Number of Lanes Mainline Pavement Type Mainline Pavement Width Shoulder Type Shoulder Width Seasonal Load Restriction Speed Limit
Multiple segments may be required to describe the existing road. Include a copy for each segment. From RP To RP No. of lanes, if it’s divided, and description of any median. HMA or PCC. For PCC include the joint spacing, # of dowels, thickness etc. Width in feet. HMA, PCC, aggregate, any curb and gutter. Width in feet of each shoulder. The posted seasonal load restriction in tons; 10 tons if there is no posted restriction. The posted speed limit.
Roadway Construction History
See Section 260 in Chapter 2 for guidance on obtaining this information. If this material is extensive, it may be placed as an appendix to this document. The following are examples of two sections of a project. RP 123.789 to RP 126.987 - MN 23 to 3rd Street Year
SP
Activity
Width
1989 1954 1945 1945 1945
2309-001 2309-123 2309-789 2309-789 2309-789
Minor CPR/ Patching CPR HMA Shoulders Doweled PCC Aggregate Base
30’ 6’ 30’ 30’
Depth
2.5” 8” 6’
32
MnDOT Pavement Design Manual April 10, 2018
RP 126.987 to RP 129.102 – 3rd Street to E Limits Franklin Year
SP
Activity
Width
Depth
1989 1989 1973 1951 1950 1945
2309-01 2309-01 2309-12 2309-111 2309-22 2309-789
HMA Overlay HMA Milling HMA Overlay Chip Seal Spot Patching Doweled PCC with Aggregate Base
24’ 24’ 24’ 24’ 24’ 30’
4.5” 3” 4”
8”
Roadway Condition Pavement Distresses Areas of Concern
A general description of the visible distresses. For guidance see Section 270. Any areas that may need repair or special treatment, such as frost heaves or subgrade failure. For guidance see Section 270.
Attach photos or diagrams as needed. Pavement Performance Data
This section documents the Pavement Performance Data for the road within the project limits. Pavement Performance Data is available from Pavement Management System (see Section 280). Year: Year that the data was collected Segment Description
Dir.
From RP
To RP
RQI
SR
PQI
IRI (in/mile)
I, D, U
R-Value/FWD Data
Projects must develop an R-value from either FWD data or laboratory testing (or both). Use this table to document FWD data using the TONN Method, see Section 200. Any FWD (TONN Analysis) and Laboratory R-Values must be attached in the appendix.
33
MnDOT Pavement Design Manual April 10, 2018
FWD Data Date: Date of Testing Reported Capacity
Overlay Thickness
R-Value
Mean Std. Dev.
Use this table to document any Laboratory R-values, see section 220. Laboratory R-Values Count
Mean
Minimum
Maximum
Std. Dev.
# of tests
Comments: Any notes, comments, or concerns about the collected data. Core/GPR
This section reports the HMA thickness (and condition) collected from coring or GPR see Sections 230 & 240. Date: Date that the data was collected on. Segment: Segment # Location
Count
Average
Minimum
Maximum
Std. Dev.
Mainline, shoulder, turnlanes, etc
Provide the location of any photos of the cores and of any GPR report. These may be attached, in EDMS, or ProjectWise. Comments: Any notes, comments, or concerns about the collected data.
34
MnDOT Pavement Design Manual April 10, 2018
Traffic
See Section 250. Traffic Forecast #:
Hwy
From RP
To RP
Traffic Forecast Date: Base Year 2-way Design Lane HCADT
2-way HCADT Growth/ Year
20 Yr. Design Lane Cumulative BESAL’s
20 Yr. Design Lane Cumulative CESAL’s
35 Yr. Design Lane Cumulative CESAL’s
Life-Cycle Cost Analysis (LCCA)
This section contains the results of the LCCA analysis according to Chapter 7.
Alternate #1
Alternate #2
Alternate #3
Description Design Life Project Net Present Cost % of Low Cost Selected
Exception: Does the district request an exception to either selecting the low-cost option or to following the alternate bidding process? See Chapter 7. Any exception form should be attached.
35
MnDOT Pavement Design Manual April 10, 2018
Pavement Recommendations This section contains the recommended pavement design(s) for the Pavement Design Segments (listed on the second page of the memo). Note: The table columns that have the heading “spec.” are intended to contain the number of the appropriate construction specification or special provision, or indicate that a plan note will be provided.
36
MnDOT Pavement Design Manual April 10, 2018
NEW HMA Segment # #
Mainline Pavement
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
New HMA
Thickness (inches)
Lifts
Mix Design/ Material
Wear
Sec. 400
Sec. 450
Sec. 450
Non-Wear
Sec. 400
Sec. 450
Sec. 450
Smoothness
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Compaction Testing
Width (ft.)
Sec. 450
Scoping
Sec. 450
Scoping
Sec. 450
Notes Mainline Subsurface
Thickness (inches)
Lifts
Material
Base
Sec. 400
Sec. 400 & 310
Subbase
Sec. 400
Sec. 400 & 310
Eng. Soil
Sec. 320
Sec. 320
Subgrade Prep.
Sec. 320
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note
Compaction Testing Sec. 330
Sec. 330
Sec. 330
Sec. 330
Notes
37
Width (ft.)
MnDOT Pavement Design Manual April 10, 2018
HMA Shoulders
Thickness (inches)
Lifts
Sec. 450
Mix Design/ Material
HMA
Sec. 610
Sec. 450
Aggregate Surfacing
Sec. 610
Sec. 610
Shoulder Agg. Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note
Compaction Testing
Width (ft.) Lt
Rt
Sec. 450
Scope
Scope
Sec. 330
610
610
Match Agg. Base
Notes
Aggregate Shoulders
Thickness
Material
Aggregate Surfacing
Sec. 610
Sec. 610
Added Aggregate Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Compaction Testing
Sec. 330
Match Agg. Base
Cross-Section from RP XXX to RP XXX
XX.X ft
XX.X ft
X.X” New HMA Wearing Couse X.X” New HMA Non-Wearing Couse
X.X ft X.X” YYYYYYY
X.X” YYYYYYY
X.X” Subbase X.X” Class X
Lt Scope
Notes
X.X ft
Width
X.X” Engineered Soil
38
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
Cross-Section from RP XXX to RP XXX
X.X ft
XX.X ft
XX.X ft
X.X” YYYYYYY
X.X” YYYYYYY
X.X” Sub-base
X.X” HMA Wearing Course X.X” HMA Non-Wearing Course
X.X ft
X.X” Class X
X.X” Engineered Soil
Misc. Pavement Recommendations and Instructions to Designers Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.
39
MnDOT Pavement Design Manual April 10, 2018
FDR/SFDR/CIR Segment # #
Existing Mainline Pavement Existing HMA Existing Aggregate
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
FDR,SFDR or CIR
Depth (inches)
Material
Note
Width (ft.)
Sec. 230,240, HMA 260 Sec. 230,240, Sec. 230, 240, 260 260
Sec. 260
Notes
Mainline Pavement
Depth (inches)
Milling
Sec. 410
Added Aggregate
Sec. 410
Reclaim/ Recycle Stabilize
Lifts
Material
Spec.
Width (ft.)
Sec. 410
#.#
Sec. 410
Sec. 410
#.#
Sec. 410
Sec. 410
Sec. 410
#.#
Sec. 410
Sec. 410
Sec. 410
#.#
Notes Mainline Pavement
Thickness (inches)
Lifts
Mix Design/ Material
Wear
Sec. 400
Sec. 450
Sec. 450
Non-Wear
Sec. 400
Sec. 450
Sec. 450
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Compaction Testing
Width (ft.)
Sec. 450
Scoping
Sec. 450
Scoping
Smoothness Sec. 450 Notes
40
MnDOT Pavement Design Manual April 10, 2018
HMA Shoulders
Thickness (inches)
HMA
Sec. 610
Aggregate Surfacing
Sec. 610
Lifts
Sec. 450
Mix Design/ Material
Sec. 450
Sec. 610
Shoulder Agg. As Needed Base
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base
Compaction Testing
Width (ft.) Lt
Rt
Sec. 450
Scope
Scope
Sec. 330
610
610
Match Agg. Base
Notes
Aggregate Shoulders
Thickness
Material
Aggregate Surfacing
Sec. 610
Sec. 610
Added Aggregate Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Compaction Testing
Sec. 330
Width Lt
Rt
Scope
Scope
Match Agg. Base
Notes
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft
XX.X ft
X.X ft X.X” YYYYYYY
X.X” YYYYYYY
X.X” New HMA Overlay X.X” SFDR
X.X” YYYYYYY X.X” FDR
X.X” YYYYYYY X.X” Existing Aggregate
Misc. Pavement Recommendations and Instructions to Designers
41
MnDOT Pavement Design Manual April 10, 2018
Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.
42
MnDOT Pavement Design Manual April 10, 2018
Rubblize/Crack & Seat Segment # #
Mainline Pavement
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
Rubblize/Crack & Seat
Existing PCC
Depth (inches) Sec. 230, 240, 260 Sec. 260
Existing Aggregate
Sec. 230, 240, 260
Existing HMA
Material
Note
Width (ft.)
HMA
Sec. 260
PCC
Sec. 260
HMA
Notes
Mainline Pavement
Depth (inches)
Lifts
Material
Spec.
Width (ft.)
Mill HMA Sec. 410 Sec. 410 Rubblize/ Special Provision # and if any edits are required, Sec. 420 Crack & Seat Subsurface Type of drain & outlets and its specification, Sec. 420 & 370 Drains Notes Mainline Pavement
Thickness (inches)
Lifts
Mix Design/ Material
Wear
Sec. 420
Sec. 450
Sec. 450
Non-Wear
Sec. 420
Sec. 450
Sec. 450
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Compaction Testing
#.#
Width (ft.)
Sec. 450
Scoping
Sec. 450
Scoping
Smoothness Sec. 450 Notes
43
MnDOT Pavement Design Manual April 10, 2018
HMA Shoulders
Thickness (inches)
Mix Design/ Material
Lifts
HMA
Sec. 610
Sec. 450
Sec. 450
Aggregate Surfacing
Sec. 610
Sec. 610
Shoulder Agg. Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base
Compaction Testing
Width (ft.) Lt
Rt
Sec. 450
Scope
Scope
Sec. 330
610
610
Match Agg. Base
Notes
Aggregate Shoulders
Thickness
Material
Aggregate Surfacing
Sec. 610
Sec. 610
Added Aggregate Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Compaction Testing
Sec. 330
Width Lt Scope
Match Agg. Base
Notes
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft
XX.X ft
X.X ft X.X” YYYYYYY
X.X” YYYYYYY
X.X” New HMA Overlay
X.X” YYYYYYY X.X” YYYYYYY
4” Perf. PE Pipe
X.X” Rubblized PCC
44
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
Misc. Pavement Recommendations and Instructions to Designers Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.
45
MnDOT Pavement Design Manual April 10, 2018
HMA Overlay
Segment # #
Mainline Pavement
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
HMA Overlay
Existing PCC
Depth (inches) Sec. 230, 240, 260 Sec. 260
Existing Aggregate
Sec. 230, 240, 260
Existing HMA
Material
Note
Width (ft.)
HMA
Sec. 260
PCC
Sec. 260
HMA
Notes
Mainline Pavement Mill HMA
Depth (inches)
Lifts
Material
Spec.
Sec. 440
Width (ft.)
Sec. 410
#.#
Notes Mainline Pavement Wear
Thickness (inches) Sec. 440
Lifts
Sec. 450
Mix Design/ Material Sec. 450
Compaction Testing
Spec. Spec, SP, or Plan Note
Width (ft)
Sec. 450
Scoping
Compaction Testing
Width (ft.)
Smoothness Sec. 450 Notes
HMA Shoulders
Thickness (inches)
Lifts
Sec. 450
Mix Design/ Material
HMA
Sec. 610
Sec. 450
Aggregate Surfacing
Sec. 610
Sec. 610
Shoulder Agg. Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base
Lt
Rt
Sec. 450
Scope
Scope
Sec. 330
610
610
Match Agg. Base
Notes
46
MnDOT Pavement Design Manual April 10, 2018
Aggregate Shoulders
Thickness
Material
Aggregate Surfacing
Sec. 610
Sec. 610
Added Aggregate Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Width
Compaction Testing
Sec. 330
Lt Scope
Match Agg. Base
Notes
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft
XX.X ft
X.X ft X.X” YYYYYYY
X.X” YYYYYYY
X.X” Subbase
X.X” New HMA Overlay X.X” ExistingPave.
X.X” Class X
Cross-Section from RP XXX to RP XXX
X.X ft
XX.X ft
XX.X ft
X.X” YYYYYYY
X.X” YYYYYYY
X.X” Sub-base
X.X” HMA Overlay X.X” Class X X.X” Existing Pave.
X.X ft
X.X” Engineered Soil
Mill X.X” Existing HMA
47
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
Misc. Pavement Recommendations and Instructions to Designers Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.
48
MnDOT Pavement Design Manual April 10, 2018
NEW PCC
Segment # #
Mainline Pavement PCC
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
New PCC
Thickness (inches) Sec. 500
Joint Spacing Dowel (ft.) Arrangement Sec. 530
Sec. 530
Dowel Size
Sealant
530
Width (ft.)
Sec. 530
Scoping
Notes Mainline Subsurface
Thickness (inches)
Lifts
Material
Base
Sec. 500
Sec. 500 & 310
Subbase
Sec. 500
Sec. 500 & 310
Eng. Soil
Sec. 320
Sec. 320
Subgrade Prep.
Sec. 320
Subsurface Drains Notes
HMA Shoulders
Spec.
Compaction Testing
Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note
Width (ft.)
Sec. 330
Sec. 330
Sec. 330
Sec. 330
Type of drain & outlets and its specification, sec. 500 & 370
Thickness (inches)
HMA
Sec. 610
Aggregate Surfacing
Sec. 610
Shoulder Agg. As Needed Base
Lifts
Sec. 450
Mix Design/ Material
Sec. 450
Sec. 610
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base
Width (ft.)
Compaction Testing
Lt
Rt
Sec. 450
Scope
Scope
Sec. 330
610
610
Match Agg. Base
Notes
49
MnDOT Pavement Design Manual April 10, 2018
Aggregate Shoulders
Thickness
Material
Aggregate Surfacing
Sec. 610
Sec. 610
Added Aggregate Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Width
Compaction Testing
Sec. 330
Lt
Rt
Scope
Scope
Match Agg. Base
Notes
PCC Shoulders PCC Aggregate Surfacing
Thickness
Material
Spec.
Sec. 610 Sec. 610
Shoulder Agg. As Needed Base
Sec. 610
Match Agg. Base
Spec, SP, or Plan Note Match Agg. Base
Width
Compaction Testing
Sec. 330
Lt Scope
Scope
610
610
Match Agg. Base
Notes
PCC Joint Designation (MnDOT Standard Plan 5-297.221) Joint Contraction Joint
Type Sec. 530
Sealant Spec.
Longitudinal Joint
Sec. 530
Sec. 530
Outside Shoulder Joint
Sec. 530
Sec. 530
XXXXXXX Joint
Sec. 530
Sec. 530
Rt
Sec. 530
50
MnDOT Pavement Design Manual April 10, 2018
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft X.X” YYYYYYY
YYYY Joint
X.X” New PCC
X.X ft
XX.X ft YYY Joint
YYY Joint
X.X” YYYYYYY
X.X” YYYYYYY
X.X” YYYY
X.X” YYYYYYY X.X” Subbase
4” Perf. PE Pipe
X.X” Class X
Cross-Section from RP XXX to RP XXX
X.X ft
XX.X ft YYYY Joint
X.X” YYYYYYY
XX.X ft YYYY Joint
X.X ft X.X” YYYYYYY
X.X” Sub-base
X.X” New PCC X.X” Class X
X.X” Engineered Soil
Misc. Pavement Recommendations and Instructions to Designers Provide a list of the PCC paving standard plans and plates that the designer must include in the project plans (see Section 550). Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.
51
MnDOT Pavement Design Manual April 10, 2018
Whitetopping
Segment # #
Mainline Pavement Mill HMA
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
Whitetopping
Depth (inches)
Lifts
Material
Spec.
Sec. 510
Width (ft.)
Sec. 510
#.#
Notes Mainline Pavement PCC Overlay
Thickness (inches) Sec. 500
Joint Spacing Dowel (ft.) Arrangement Sec. 530
Sec. 530
Dowel Size 530
Sealant
Width (ft.)
Sec. 530
Scoping
Notes
HMA Shoulders
Thickness (inches)
HMA
Sec. 610
Aggregate Surfacing
Sec. 610
Shoulder Agg. As Needed Base
Lifts No. and Thickness, Sec. 450
Mix Design/ Material
Sec. 450
Sec. 610
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base
Width (ft)
Compaction Testing
Lt
Rt
Sec. 450
Scope
Scope
Sec. 330
610
610
Match Agg. Base
Notes
Aggregate Shoulders
Thickness
Material
Aggregate Surfacing
Sec. 610
Sec. 610
Added Aggregate Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Width
Compaction Testing
Sec. 330
Lt Scope
Match Agg. Base
Notes
52
Rt Scope
MnDOT Pavement Design Manual April 10, 2018
PCC Shoulders PCC Aggregate Surfacing
Thickness
Material
Sec. 610 Sec. 610
Sec. 610
Shoulder Agg. As Needed Base
Match Agg. Base
Width
Compaction Testing
Spec.
Spec, SP, or Plan Note Match Agg. Base
Sec. 330
Lt
Rt
Scope
Scope
610
610
Match Agg. Base
Notes
PCC Joint Designation (MnDOT Standard Plan 5-297.221) Joint Contraction Joint
Type Sec. 530
Sealant Spec. Sec. 530
Longitudinal Joint
Sec. 530
Sec. 530
Outside Shoulder Joint
Sec. 530
Sec. 530
XXXXXXX Joint
Sec. 530
Sec. 530
Cross-Section from RP XXX to RP XXX
X.X ft X.X” YYYYYYY
XX.X ft YYYY Joint
XX.X ft YYY Joint
YYY Joint
X.X” New PCC Overlay
X.X ft X.X” YYYYYYY
X.X” YYYYYYY X.X” YYYYYYY X.X” Existing HMA
Misc. Pavement Recommendations and Instructions to Designers Provide a list of the PCC paving standard plans and plates that the designer must include in the project plans (see Section 550). Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.
53
MnDOT Pavement Design Manual April 10, 2018
UBOL
Segment # #
Mainline Pavement Mill HMA
Highway #
From RP
To RP
Design Type
TH #
###.###
###.###
Unbonded Overlay
Depth (inches)
Lifts
Material
Spec.
Sec. 520
Width (ft.)
Sec. 520
#.#
Notes Mainline Pavement PCC Overlay
Thickness Joint Spacing Dowel (inches) (ft.) Arrangement
Dowel Size
Sec. 500
530
Sec. 530
Sec. 530
Sealant Sec. 530
Width (ft.) Scoping
Notes Mainline Subsurface
Thickness (inches)
Lifts
Material
Spec.
Compaction Testing
Width (ft.)
Interlayer Sec. 520 Sec. 520 520 Sec. 450 Subsurface Type of drain & outlets and its specification, Sec. 520 & 370 Drains Notes
Scoping
HMA Shoulders
Width (ft)
Thickness (inches)
Lifts
Sec. 450
Mix Design/ Material
HMA
Sec. 610
Sec. 450
Aggregate Surfacing
Sec. 610
Sec. 610
Shoulder Agg. Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base
Compaction Testing
Lt
Rt
Sec. 450
Scope
Scope
Sec. 330
610
610
Match Agg. Base
Notes
54
MnDOT Pavement Design Manual April 10, 2018
Aggregate Shoulders
Thickness
Material
Aggregate Surfacing
Sec. 610
Sec. 610
Added Aggregate Base
As Needed
Match Agg. Base
Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note
Compaction Testing
Sec. 330
Width Lt
Rt
Scope
Scope
Match Agg. Base
Notes
PCC Shoulders PCC
Thickness
Material
Spec.
Compaction Testing
Sec. 610
Aggregate Surfacing
Sec. 610
Sec. 610
Shoulder Agg. Base
As Needed
Match Agg. Base
Spec, SP, or Plan Note Match Agg. Base
Sec. 330
Width Lt Scope
Scope
610
610
Match Agg. Base
Notes
PCC Joint Designation (MnDOT Standard Plan 5-297.221) Joint Contraction Joint
Type Sec. 530
Sealant Spec.
Longitudinal Joint
Sec. 530
Sec. 530
Outside Shoulder Joint
Sec. 530
Sec. 530
XXXXXXX Joint
Sec. 530
Sec. 530
Rt
Sec. 530
55
MnDOT Pavement Design Manual April 10, 2018
Cross-Section from RP XXX to RP XXX
XX.X ft
X.X ft X.X” YYYYYYY
YYYY Joint
X.X ft
XX.X ft YYY Joint
YYY Joint
X.X” New PCC Overlay
X.X” YYYYYYY
X.X” YYYYYYY X.X” YYYYYYY
4” Perf. PE Pipe
X.X” Existing PCC
X.X” Interlayer
Misc. Pavement Recommendations and Instructions to Designers Provide a list of the PCC paving standard plans and plates that the designer must include in the project plans (see Section 550). Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.
56
MnDOT Pavement Design Manual April 10, 2018
Use of Paver Mounted Thermal Profile (PMTP) and Intelligent Compaction (IC) Methods Paver Mounted Thermal Profiling (PMTP) is the process of continuously monitoring and recording the location and temperature of the asphalt mat immediately behind the paver screed during placement operations. This identifies any thermal segregation in the uncompacted asphalt which may affect the pavement’s performance and durability. Intelligent Compaction (IC) refers to the compaction of road materials, such as soil, aggregate base, or asphalt, using self-propelled rollers integrated with a position monitoring system and an onboard documentation system that can display real-time, color coded maps of roller location, number of passes, roller speeds, amplitudes and vibration frequencies of the roller drum. Some systems are also equipped with drum vibration instrumentation, infrared temperature sensors, and/or automatic feedback control. The onboard documentation system on these rollers also displays real-time, colorcoded maps of stiffness response or pavement surface temperatures, or both. This improves monitoring and recording of the compaction process to ensure that the material is properly and uniformly compacted. The PMTP and IC methods are recommended for use when the following project/site conditions are met: 1. The technology can be used with the following specifications:
Table 830.1 - Use of Intelligent Compaction and Thermal Profiling Technology
Specification
Intelligent Compaction (IC)—SP 2016 Quality Management Special
2215 (SFDR), 2331 (CIR), 23531, 2360, 2365
Paver Mounted Thermal Profile (PMTP) Method—SP 2016 Quality Management
2360, 2365
1
IC is recommended for use on 2353, only when used in conjunction with 2360 (i.e., when IC is already being used with 2360).
2. Net lane miles are greater than or equal to 4. Note: These technologies can be used on smaller projects. It is anticipated that the recommended lane miles will decrease with time as more contractors are equipped with these systems.
57
MnDOT Pavement Design Manual April 10, 2018
3. Cellular coverage, to allow for automatic transfer of data to the cloud, at least one time per day. Areas with intermittent locations of limited to no cellular coverage are allowed within the project limits, since the systems can store data until adequate data cellular coverage is available. 4. Adequate global navigation satellite system (GNSS) coverage through the project limits is required for recording of the real-time, spatial location of equipment. Table 830.2 lists the required accuracies.
Table 830.2 – Required GNSS Accuracy Technology
Accuracy
Intelligent Compaction (IC) Method— SP 2016 Quality Management Special
± 2 in (50 mm) in the X and Y Direction
Paver Mounted Thermal Profile (PMTP) Method — SP 2016 Quality Management
± 4 feet (1.2 m) in the X and Y Direction
Removals Any needed directions to the designer to provide for the removal of existing materials.
Geotechnical Recommendations Special Treatments Swamp areas, shadow treatments, rock excavation, or subgrade corrections: For any of these areas specify:
The depth of the correction/treatment and its limits (Section 320.2) The backfill material and its specification (Section 320.2) Compaction testing (Section 330) Any tapers or transitions in materials (Section 320.4)
Embankment If there will be any additional embankment construction specify the: Embankment material, its specification, and any plan note or special provision edits to modify the material (Section 320.3) Compaction testing (Section 330) Application of any surcharge (Section 320.3.c) 58
MnDOT Pavement Design Manual April 10, 2018
Monitoring equipment (Section 320.3.d) Topsoil If construction activities will disturb any topsoil, provide the depth of topsoil to be stripped and reused. Borrow Shrinkage Factor If there will be a quantity of borrow using specification 2105 then develop a borrow shrinkage factor (Section 340). Culverts Frost depth and soil-type: Provide an estimated frost depth and soil-type (plastic or granular). This information is used to select the correct culvert backfill treatment (Section 360.1). Fabric: Specify if any geotextile fabric, and type, (Section 360.2) should be included in the culvert backfill treatment. Plastic Soil Cap: Specify if a plastic soil cap treatment (Section 360.3) is required for any culverts. Modifications: Give full instructions, and specify the materials, of any modifications to the standard culvert backfill treatment drawings (Figures 360.1-4).
Plan Notes Provide the text to any notes to be included in the project plans.
Edits or Additions to Special Provisions Provide any changes or text that is intended to be added to any special provisions.
Attachments: Attach or provide a link to the location of the following: Printouts of the pavement design programs’ output for each pavement design. Signed traffic forecast summaries. Soil borings and cores (or link). The LCCA and any supporting calculations. Any LCCA or alternate bidding exceptions. Any GPR, geotechnical, or other reports. 59