MNDOT PAVEMENT DESIGN MANUAL

MnDOT Pavement Design Manual April 10, 2018 MNDOT PAVEMENT DESIGN MANUAL Chapter 8 – Documentation MnDOT Pavement Engineer Date MnDOT Pavement De...
Author: Imogen Davidson
55 downloads 0 Views 2MB Size
MnDOT Pavement Design Manual April 10, 2018

MNDOT PAVEMENT DESIGN MANUAL Chapter 8 – Documentation

MnDOT Pavement Engineer

Date

MnDOT Pavement Design Manual April 10, 2018

Contents Introduction ........................................................................................................................................................ 1 800 - Pavement Design Memorandum (PDM) ............................................................................................. 2 810 - Materials Design Recommendation (MDR) ........................................................................................ 3 820 - PDM Template Instructions .................................................................................................................. 6 830 - MDR Template Instructions ................................................................................................................29

MnDOT Pavement Design Manual April 10, 2018

Introduction

There are two documents that may be required to provide for a pavement project. A Pavement Design Memorandum (PDM) is required when the Alternate Bidding process is followed. This document enables the MnDOT Pavement Design Engineer to review and approve the pavement design. A Materials Design Recommendation (MDR) is required for all projects that include grading or pavement. It is used to document and communicate pavement and geotechnical design recommendations to the project designers. This chapter describes the content, development, review and approval processes of these two documents.

1

MnDOT Pavement Design Manual April 10, 2018

800 - Pavement Design Memorandum (PDM)

A PDM is required when the Alternate Bidding process is followed so that the pavement design can be reviewed and approved by the MnDOT Pavement Design Engineer. A PDM is written to document the alternate pavement designs that were considered, the information required for the pavement designs’ development, and the project’s LCCA. See Chapter 7 – Pavement-Type Selection to determine if the project will follow the Formal LCCA process and, therefore, will require the completion of a PDM. 1. Format The PDM template must be used for all PDMs. The template is available on the MnDOT Pavement Design website at http://www.dot.state.mn.us/materials/pvmtdesign/docs/index.html and directions for completing it are in Section 820 – PDM Template Instructions. 2. Distribution and Review A. The draft PDM is sent to the MnDOT Pavement Design Engineer. B. The MnDOT Pavement Design Engineer reviews the PDM and attachments and may request any necessary changes to be made. C. If the project will proceed to alternate bidding, the MnDOT Pavement Design Engineer will distribute the PDM to the FHWA Pavements, Materials and Construction Engineer and representatives of the Concrete Paving Association of Minnesota (CPAM) and Minnesota Asphalt Pavement Association (MAPA). The associations will have a comment period of two weeks and the MnDOT Pavement Design Engineer will address any comments. D. The MnDOT Pavement Design Engineer will sign the finalized PDM and the project may proceed with the pavement designs described in the PDM.

2

MnDOT Pavement Design Manual April 10, 2018

810 - Materials Design Recommendation (MDR)

The MDR provides pavement and geotechnical design recommendations for MnDOT projects to the project designer. This includes recommendations for layer thickness, materials, treatments, and specifications necessary to design the project. Note: Only the pavement designs that will be used in the project plans need to be included in the MDR. 1. Format A template for formatting the MDR is available on the MnDOT Pavement Design website at http://www.dot.state.mn.us/materials/pvmtdesign/docs/index.html. The template format is required for projects that will use Alternate Bidding. See Section 830 - MDR Template Instructions for directions for using this template. 2. Distribution and Review A. Complete a draft MDR. B. Complete a MDR routing sheet for the draft MDR. The MDR routing sheet template is available on the MnDOT pavement design website. C. Distribute the MDR and MDR routing sheet to the distribution list shown in Table 810.1. The method of distribution of the MDR, MDR routing sheet, and supporting documents vary by district preference and may be accomplished by e-mailing copies of the files, ProjectWise links, or electronic data management system (EDMS) links. These methods are all acceptable for review; however, the MDR, MDR routing sheet, and supporting material, must be archived in the MnDOT EDMS and should be placed there as early as possible. D. Provide for a review period of two weeks. E. Review comments, finalize, and archive the MDR.

3

MnDOT Pavement Design Manual April 10, 2018

Table 810.1 – Distribution List for Project MDRs Materials & Road Research, Maplewood MnDOT Pavement Engineer MnDOT Pavement Design Engineer MnDOT Bituminous Engineer MnDOT Concrete Engineer MnDOT Grading and Base Engineer MnDOT Pavement Preservation Engineer MnDOT Foundations Engineer MnDOT Geology

Pavement projects. Pavement projects. Projects that include HMA pavement. Projects that include PCC pavement. Projects that include any work to a roadway’s subgrade, base, or include aggregate shoulders. Projects that include FDR, SFDR, CIR or any HMA pavement preservation. Projects that include fills of cuts deeper than 30’. Projects that include rock cuts.

Central Office, St. Paul MnDOT Special Provisions Engineer MnDOT Design Support Engineer

Final MDR only Final MDR only

The District This is the district’s preference, but would typically include the Soils Engineer, Materials Engineer, Design Engineer, Project Engineer, and others.

District decision

FHWA

FHWA Area Engineer* * Note: Must be a copy of the file(s), cannot be ProjectWise or EDMS links.

Projects on the National Highway System that are a Project of Corporate Interest (POCI), Project of Division Interest PODI, or as requested. A list of PODI projects are available on the Pavement Design website at http://www.dot.state.mn.us/materials/pvmtdesign/docs/index.html Or contact the appropriate FHWA Area Engineer

FHWA Pavements, Materials Projects on the Interstate System and Construction Engineer Use the following to find the appropriate FHWA Area Engineer and contact information http://www.fhwa.dot.gov/mndiv/staff/districts.cfm

4

MnDOT Pavement Design Manual April 10, 2018

5

MnDOT Pavement Design Manual April 10, 2018

820 - PDM Template Instructions

This section contains directions for completing the template for PDMs. Note: Delete any tables or rows within tables that do not apply to the project.

6

MnDOT Pavement Design Manual April 10, 2018

Office Memorandum

TO:

Recipient's Name MnDOT Pavement Design Engineer

FROM:

Sender's Name Author’s Title

DATE:

Month, Day, Year

SUBJECT:

PAVEMENT DESIGN MEMORANDUM

SP #

The Project’s SP Number.

Highway #

The number(s) of the State Highway(s) within the project limits

Project Limits

Text Description of the Project Limits RP XXX+00.XXXX to RP XXX+00.XXXX

Length of Project

XX.XXX Miles

Funding Category

e.g. RC (Reconstruction), RD (Reconditioning), MC (Major Construction)

Programmed Letting Date XX/XX/XXXX

MnDOT Pavement Design Engineer

Date

7

MnDOT Pavement Design Manual April 10, 2018

Project Information Project Scope Type of Work Benefit LCCA Process Alternate Bid

General project description e.g. mainline reconstruction and overlay ramps.(may be found in scoping) The expected improvement the project will provide; be specific (i.e. the amount of ride improvement, or amount of life extension). Formal Yes or No (see Chapter 7)

Pavement Design Segments

This is a list of project segments that require separate pavement designs. Segment # 1

Highway #

From RP

To RP

Design Type PCC or HMA Overlay, Reconstruction, FDR,SFDR, etc.

2

8

MnDOT Pavement Design Manual April 10, 2018

Existing Facility

This is a description of the existing road and its general geometry. Scoping documents and the Pavement Management System (see Section 280) may be useful in completing this section. Highway From To Number of Lanes Mainline Pavement Type Mainline Pavement Width Shoulder Type Shoulder Width Seasonal Load Restriction Speed Limit

Multiple segments may be required to describe the existing road. Include a copy for each segment. From RP To RP No. of lanes, if it’s divided, and description of any median. HMA or PCC. For PCC include the joint spacing, # of dowels, thickness etc. Width in feet. HMA, PCC, aggregate, any curb and gutter. Width in feet of each shoulder. The posted seasonal load restriction in tons; 10 tons if there is no posted restriction. The posted speed limit.

Roadway Construction History

See Section 260 for guidance on obtaining this information. If this material is extensive, it may be placed as an appendix to this document. The following are examples of two sections of a project. RP 123.789 to RP 126.987 - MN 23 to 3rd Street Year

SP

Activity

Width

1989 1954 1945 1945 1945

2309-001 2309-123 2309-789 2309-789 2309-789

Minor CPR/ Patching CPR HMA Shoulders Doweled PCC Aggregate Base

30’

Depth

6’ 30’ 30’

2.5” 8” 6’

9

MnDOT Pavement Design Manual April 10, 2018

RP 126.987 to RP 129.102 – 3rd Street to E Limits Franklin Year

SP

Activity

Width

Depth

1989 1989 1973 1951 1950 1945

2309-01 2309-01 2309-12 2309-111 2309-22 2309-789

HMA Overlay HMA Milling HMA Overlay Chip Seal Spot Patching Doweled PCC with Aggregate Base

24’ 24’ 24’ 24’ 24’ 30’

4.5” 3” 4”

8”

Roadway Condition Pavement Distresses Areas of Concern

A general description of the visible distresses. For guidance see Section 270. Any areas that may need repair or special treatment, such as frost heaves or subgrade failure. For guidance see Section 270.

Attach photos or diagrams as needed. Pavement Performance Data

This section documents the Pavement Performance Data for the road within the project limits. Pavement Performance Data is available from Pavement Management System (see Section 280). Year: Year that the data was collected Segment Description

Dir.

From RP

To RP

RQI

SR

PQI

IRI (in/mile)

I, D, U

R-Value/FWD Data

This section reports the R-value from either FWD data or laboratory testing (or both). Use this table to document FWD data using the TONN method, see Section 200. Any FWD (TONN Analysis) and Laboratory R-Values must be attached in the appendix.

10

MnDOT Pavement Design Manual April 10, 2018

FWD Data Date: Date of Testing Reported Capacity

Overlay Thickness

R-Value

Mean Std. Dev.

Use this table to document any Laboratory R-values, see Section 220. Laboratory R-Values Count

Mean

Minimum

Maximum

Std. Dev.

# of tests

Comments: Any notes, comments, or concerns about the collected data. Core/GPR

This section reports the HMA thickness (and condition) collected from coring or GPR see Sections 230 & 240. Date: Date that the data was collected on. Segment: Segment # Location

Count

Average

Minimum

Maximum

Std. Dev.

Mainline, shoulder, turnlanes, etc

Provide the location of any photos of the cores and of any GPR report. These may be attached, in EDMS, or ProjectWise. Comments: Any notes, comments, or concerns about the collected data.

11

MnDOT Pavement Design Manual April 10, 2018

Traffic

A signed MnDOT traffic forecast is required for all PDMs. See Section 250. Traffic Forecast #:

Hwy

From RP

To RP

Traffic Forecast Date: Base Year 2-way Design Lane HCADT

2-way HCADT Growth/ Year

20 Yr. Design Lane Cumulative BESAL’s

20 Yr. Design Lane Cumulative CESAL’s

35 Yr. Design Lane Cumulative CESAL’s

Life-Cycle Cost Analysis (LCCA)

This section contains the results of the LCCA analysis according to Chapter 7.

Alternate #1

Alternate #2

Alternate #3

Description Design Life Project Net Present Cost % of Low Cost Selected

Exception: Does the district request an exception to either selecting the low-cost option or to following the alternate bidding process? See Chapter 7. Any exception form should be attached.

12

MnDOT Pavement Design Manual April 10, 2018

Pavement Recommendations This section contains the recommended pavement design(s) for the Pavement Design Segments (listed on the second page of the memo). If the project will follow the Alternate Bidding process then there will be HMA and PCC options for those segments that will be included in Alternate Bidding (see Chapter 7 – Pavement-Type Selection).

13

MnDOT Pavement Design Manual April 10, 2018

NEW HMA Segment #

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

New HMA

Thickness (inches)

Lifts

Mix Design/ Material

Wear

Sec. 400

----

----

---

----

Scoping

Non-Wear

Sec. 400

----

----

---

----

Scoping

#

Mainline Pavement

Smoothness

Spec.

Compaction Testing

Width (ft.)

---

Notes Mainline Subsurface

Thickness (inches)

Material

Spec.

Compaction Testing

Base

Sec. 400

Sec. 400 & 310

---

---

Subbase

Sec. 400

Sec. 400 & 310

---

---

Eng. Soil

Sec. 320

Sec. 320

---

---

Subgrade Prep.

Sec. 320

---

---

Width (ft.)

Notes

Thickness (inches)

Lifts

HMA

Sec. 610

---

Aggregate Surfacing Shoulder Agg. Base

HMA Shoulders

Mix Design/ Material

Spec.

Width (ft.)

Compaction Testing

Lt

Rt

---

---

---

Scope

Scope

Sec. 610

Sec. 610

---

---

610

610

As Needed

Match Agg. Base

---

---

Material

Spec.

Notes

Aggregate Shoulders

Thickness

Aggregate Surfacing

Sec. 610

Sec. 610

---

---

Added Aggregate Base

As Needed

Match Agg. Base

---

---

Width

Compaction Testing

Lt Scope

Notes

14

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

Cross-Section from RP XXX to RP XXX

X.X ft

XX.X ft

XX.X ft

X.X” YYYYYYY

X.X” YYYYYYY

X.X” Sub-base

X.X” HMA Wearing Course X.X” HMA Non-Wearing Course

X.X ft

X.X” Class X

X.X” Engineered Soil

Cross-Section from RP XXX to RP XXX

X.X ft

XX.X ft

XX.X ft

X.X” YYYYYYY

X.X” YYYYYYY

X.X” Sub-base

X.X” HMA Wearing Course X.X” HMA Non-Wearing Course

X.X ft

X.X” Class X

X.X” Engineered Soil

15

MnDOT Pavement Design Manual April 10, 2018

FDR/SFDR/CIR Segment #

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

FDR,SFDR or CIR

Depth (inches)

Material

#

Existing Mainline Pavement Existing HMA Existing Aggregate

Sec.230, 240, 260 Sec.230, 240, 260

Note

Width (ft.)

HMA

Sec. 260

Sec.230, 240, 260

Notes

Mainline Pavement

Depth (inches)

Milling

Sec. 410

Added Aggregate

Sec. 410

Reclaim/ Recycle Stabilize

Lifts

Material

Spec.

Width (ft.)

---

#.#

Sec. 410

---

#.#

Sec. 410

Sec. 410

---

#.#

Sec. 410

Sec. 410

---

#.#

Notes Mainline Pavement

Thickness (inches)

Lifts

Mix Design/ Material

Wear

Sec. 400

---

Sec. 450

---

---

Scoping

Non-Wear

Sec. 400

---

Sec. 450

---

---

Scoping

Compaction Testing

Width (ft.)

Spec.

Compaction Testing

Width (ft.)

Smoothness --Notes

HMA Shoulders

Thickness (inches)

Lifts

HMA

Sec. 610

---

Aggregate Surfacing

Sec. 610

Shoulder Agg. As Needed Base

Mix Design/ Material

Spec.

Lt

Rt

Sec. 450

---

---

Scope

Scope

Sec. 610

---

---

610

610

Match Agg. Base

---

---

Notes

16

MnDOT Pavement Design Manual April 10, 2018

Aggregate Shoulders

Thickness

Aggregate Surfacing

Sec. 610

Sec. 610

---

---

Added Aggregate Base

As Needed

Match Agg. Base

---

---

Material

Spec.

Width (ft.)

Compaction Testing

Lt Scope

Notes

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft

XX.X ft

X.X ft X.X” YYYYYYY

X.X” YYYYYYY

X.X” New HMA Overlay X.X” SFDR

X.X” YYYYYYY X.X” FDR

X.X” YYYYYYY X.X” Existing Aggregate

17

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

Rubblize/Crack & Seat Segment # #

Mainline Pavement

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

Rubblize/Crack & Seat

Existing PCC

Depth (inches) Sec. 230, 240, 260 Sec. 260

Existing Aggregate

Sec. 230, 240, 260

Existing HMA

Material

Note

Width (ft.)

HMA

Sec. 260

PCC

Sec. 260

HMA

Notes

Mainline Pavement

Depth (inches)

Lifts

Material

Spec.

Width (ft.)

Mill HMA Sec. 410 --Rubblize/ Special Provision # and if any edits are required, Sec. 420 Crack & Seat Subsurface Type of drain & outlets and its specification, Sec. 420 Drains Notes Mainline Pavement

Mix Design/ Material

#.#

Thickness (inches)

Lifts

Wear

Sec. 420

---

Sec. 450

---

---

Scoping

Non-Wear

Sec. 420

---

Sec. 450

---

---

Scoping

Spec.

Compaction Testing

Width (ft.)

Smoothness Sec. 450 Notes

18

MnDOT Pavement Design Manual April 10, 2018

HMA Shoulders

Thickness (inches)

Lifts

HMA

Sec. 610

---

Aggregate Surfacing Shoulder Agg. Base

Mix Design/ Material

Spec.

Width (ft.)

Compaction Testing

Lt

Rt

Sec. 450

---

---

Scope

Scope

Sec. 610

Sec. 610

---

---

610

610

As Needed

Match Agg. Base

---

---

Notes

Aggregate Shoulders

Thickness

Aggregate Surfacing

Sec. 610

Sec. 610

---

---

Added Aggregate Base

As Needed

Match Agg. Base

---

---

Material

Spec.

Width

Compaction Testing

Lt Scope

Notes

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft

XX.X ft

X.X ft X.X” YYYYYYY

X.X” YYYYYYY

X.X” New HMA Overlay

X.X” YYYYYYY X.X” YYYYYYY

4” Perf. PE Pipe

X.X” Rubblized PCC

19

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

HMA Overlay

Segment # #

Mainline Pavement

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

HMA Overlay

Existing PCC

Depth (inches) Sec. 230, 240, 260 Sec. 260

Existing Aggregate

Sec. 230, 240, 260

Existing HMA

Material

Note

Width (ft.)

HMA

Sec. 260

PCC

Sec. 260

Notes

Mainline Pavement Mill HMA

Depth (inches)

Lifts

Material

Spec.

Sec. 440

Width (ft.)

---

#.#

Notes Mainline Pavement

Thickness (inches)

Lifts

Sec. 440

---

Sec. 450

Thickness (inches)

Lifts

Mix Design/ Material

HMA

Sec. 610

---

Aggregate Surfacing Shoulder Agg. Base

Wear

Mix Design/ Material

Spec.

Compaction Testing

---

Width (ft)

---

Scoping

Smoothness Sec. 450 Notes

HMA Shoulders

Spec.

Compaction Testing

Width (ft.) Lt

Rt

Sec. 450

---

---

Scope

Scope

Sec. 610

Sec. 610

---

---

610

610

As Needed

Match Agg. Base

---

---

Notes

20

MnDOT Pavement Design Manual April 10, 2018

Aggregate Shoulders

Thickness

Aggregate Surfacing

Sec. 610

Sec. 610

---

---

Added Aggregate Base

As Needed

Match Agg. Base

---

---

Material

Spec.

Width

Compaction Testing

Lt Scope

Notes

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft

X.X ft

XX.X ft

X.X” YYYYYYY

X.X” YYYYYYY

Mill X.X” Existing HMA Overlay

X.X” Sub-base

X.X” New HMA Overlay X.X” ExistingPave.

X.X” Class X

Cross-Section from RP XXX to RP XXX

X.X ft

XX.X ft

XX.X ft

X.X” YYYYYYY

X.X” YYYYYYY

X.X” Sub-base

X.X” HMA Overlay X.X” Class X X.X” Existing Pave.

X.X ft

X.X” Engineered Soil

Mill X.X” Existing HMA

21

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

NEW PCC

Segment #

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

New PCC

#

Mainline Pavement

Thickness (inches) Sec. 500

PCC

Joint Spacing Dowel (ft.) Arrangement Sec. 530

Sec. 530

Dowel Size 530

Sealant

Width (ft.)

Sec. 530

Scoping

Notes Mainline Subsurface

Thickness (inches)

Lifts

Material

Spec.

Compaction Testing

Base

Sec. 500

Sec. 500 & 310

---

---

Subbase

Sec. 500

Sec. 500 & 310

---

---

Eng. Soil

Sec. 320

Sec. 320

---

---

---

---

Subgrade Prep. Subsurface Drains Notes

HMA Shoulders

Sec. 320

Width (ft.)

Type of Drain & outlets, Sec. 500 ---

Thickness (inches)

Lifts

HMA

Sec. 610

---

Aggregate Surfacing

Sec. 610

Shoulder Agg. As Needed Base

Mix Design/ Material

Spec.

Width (ft.)

Compaction Testing

Lt

Rt

Sec. 450

---

---

Scope

Scope

Sec. 610

---

---

610

610

Match Agg. Base

---

---

Notes

22

MnDOT Pavement Design Manual April 10, 2018

Aggregate Shoulders

Thickness

Aggregate Surfacing

Sec. 610

Sec. 610

---

---

Added Aggregate Base

As Needed

Match Agg. Base

---

---

Material

Spec.

Width

Compaction Testing

Lt

Rt

Scope

Scope

Notes

PCC Shoulders

Thickness

PCC

Sec. 610

Aggregate Surfacing

Sec. 610

Shoulder Agg. As Needed Base

Material

Spec.

Width

Compaction Testing

Sec. 610

---

---

Match Agg. Base

---

---

Lt

Rt

Scope

Scope

610

610

Notes

23

MnDOT Pavement Design Manual April 10, 2018

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft X.X” YYYYYYY

YYYY Joint

X.X” New PCC

X.X ft

XX.X ft YYY Joint

YYY Joint

X.X” YYYYYYY

X.X” YYYYYYY

X.X” YYYY

X.X” YYYYYYY X.X” Sub-base

4” Perf. PE Pipe

X.X” Class X

Cross-Section from RP XXX to RP XXX

X.X ft

XX.X ft YYYY Joint

X.X” YYYYYYY

XX.X ft YYYY Joint

X.X ft X.X” YYYYYYY

X.X” Sub-base

X.X” New PCC X.X” Class X

X.X” Engineered Soil

24

MnDOT Pavement Design Manual April 10, 2018

Whitetopping

Segment # #

Mainline Pavement Mill HMA

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

Whitetopping

Depth (inches)

Lifts

Material

Spec.

Sec. 510

Width (ft.)

Sec. 510

#.#

Notes Mainline Pavement PCC Overlay

Thickness (inches) Sec. 500

Joint Spacing Dowel (ft.) Arrangement Sec. 530

Sec. 530

Dowel Size 530

Sealant

Width (ft.)

Sec. 530

Scoping

Notes

HMA Shoulders

Thickness (inches)

Lifts

HMA

Sec. 610

---

Aggregate Surfacing

Sec. 610

Shoulder Agg. As Needed Base

Mix Design/ Material

Spec.

Width (ft.)

Compaction Testing

Lt

Rt

Sec. 450

---

---

Scope

Scope

Sec. 610

---

---

610

610

Match Agg. Base

---

---

Notes

Aggregate Shoulders

Thickness

Aggregate Surfacing

Sec. 610

Sec. 610

---

---

Added Aggregate Base

As Needed

Match Agg. Base

---

---

Material

Spec.

Width

Compaction Testing

Lt Scope

Notes

25

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

PCC Shoulders

Thickness

PCC

Sec. 610

Aggregate Surfacing

Sec. 610

Material

Shoulder Agg. As Needed Base

Width

Compaction Testing

Spec.

Sec. 610

---

---

Match Agg. Base

---

---

Lt Scope

Scope

610

610

Notes

Cross-Section from RP XXX to RP XXX

X.X ft

XX.X ft

XX.X ft

X.X ft X.X” YYYYYYY

X.X” YYYYYYY

X.X” New PCC Overlay

Rt

X.X” YYYYYYY X.X” YYYYYYY X.X” Existing HMA

26

MnDOT Pavement Design Manual April 10, 2018

UBOL

Segment # #

Mainline Pavement Mill HMA

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

Unbonded Overlay

Depth (inches)

Lifts

Material

Spec.

Sec. 520

Width (ft.)

---

#.#

Notes Mainline Pavement PCC Overlay

Thickness Joint Spacing Dowel (inches) (ft.) Arrangement

Dowel Size

Sec. 500

530

Sec. 530

Sec. 530

Sealant Sec. 530

Width (ft.) Scoping

Notes Mainline Subsurface

Thickness (inches)

Lifts

Material

Interlayer Sec. 520 Sec. 520 Subsurface Type of drain & outlets, Sec. 520 Drains Notes

HMA Shoulders

Thickness (inches)

Lifts

HMA

Sec. 610

---

Aggregate Surfacing Shoulder Agg. Base

Mix Design/ Material

Spec. ---

Spec.

Compaction Testing

Width (ft.)

---

Compaction Testing

Width (ft.) Lt

Rt

Sec. 450

---

---

Scope

Scope

Sec. 610

Sec. 610

---

---

610

610

As Needed

Match Agg. Base

---

--

Notes

Aggregate Shoulders

Thickness

Aggregate Surfacing

Sec. 610

Sec. 610

---

---

Added Aggregate Base

As Needed

Match Agg. Base

---

---

Material

Spec.

Compaction Testing

Width Lt Scope

Notes

27

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

PCC Shoulders

Thickness

Material

Spec.

Compaction Testing

PCC

Sec. 610

Aggregate Surfacing

Sec. 610

Sec. 610

---

---

Shoulder Agg. Base

As Needed

Match Agg. Base

---

---

Width Lt Scope

Scope

610

610

Notes

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft

X.X ft

XX.X ft

X.X” YYYYYYY

X.X” YYYYYYY

X.X” New PCC Overlay

X.X” YYYYYYY X.X” YYYYYYY

4” Perf. PE Pipe

X.X” Existing PCC

Rt

X.X” Interlayer

Attachments: Attach or provide a link to the location of the following: Printouts of the pavement design programs’ output for each pavement design. Signed Traffic Forecast Summaries. Soil Borings and Cores (or link) The LCCA and any supporting calculations. Any LCCA or Alternate Bidding Exceptions. Any GPR, Geotechnical, or other reports.

28

MnDOT Pavement Design Manual April 10, 2018

830 - MDR Template Instructions

This section contains directions for completing the template for MDR. Note: Delete any tables or rows within tables that do not apply to the project.

29

MnDOT Pavement Design Manual April 10, 2018

Office Memorandum TO:

Recipient's Name Recipient’s Title

FROM:

Sender's Name Author’s Title

DATE:

Month, Day, Year

SUBJECT:

MATERIALS DESIGN RECOMMENDATION

SP #

The Project’s SP Number.

Highway #

The number(s) of the State Highway(s) within the project limits

Project Limits

Text Description of the Project Limits RP XXX+00.XXXX to RP XXX+00.XXXX

Length of Project

XX.XXX Miles

Funding Category

e.g. RC (Reconstruction), RD (Reconditioning), MC (Major Construction)

Programmed Letting Date XX/XX/XXXX Pavement Design Memorandum Yes/No

30

MnDOT Pavement Design Manual April 10, 2018

Project Information Project Scope Type of Work Benefit LCCA Process Alternate Bid

General project description e.g. mainline reconstruction and overlay ramps.(may be found in scoping) The expected improvement the project will provide; be specific (i.e. the amount of ride improvement, or amount of life extension). Formal or District (see Chapter 7) Yes or No (see Chapter 7)

Pavement Design Segments

This is a list of project segments that require separate pavement designs. Segment # 1

Highway #

From RP

To RP

Design Type PCC or HMA Overlay, Reconstruction, FDR,SFDR, etc.

2

31

MnDOT Pavement Design Manual April 10, 2018

Existing Facility

This is a description of the existing road and its general geometry. Scoping documents and Pavement Management System (see Section 280) may be useful in completing this section. Highway From To Number of Lanes Mainline Pavement Type Mainline Pavement Width Shoulder Type Shoulder Width Seasonal Load Restriction Speed Limit

Multiple segments may be required to describe the existing road. Include a copy for each segment. From RP To RP No. of lanes, if it’s divided, and description of any median. HMA or PCC. For PCC include the joint spacing, # of dowels, thickness etc. Width in feet. HMA, PCC, aggregate, any curb and gutter. Width in feet of each shoulder. The posted seasonal load restriction in tons; 10 tons if there is no posted restriction. The posted speed limit.

Roadway Construction History

See Section 260 in Chapter 2 for guidance on obtaining this information. If this material is extensive, it may be placed as an appendix to this document. The following are examples of two sections of a project. RP 123.789 to RP 126.987 - MN 23 to 3rd Street Year

SP

Activity

Width

1989 1954 1945 1945 1945

2309-001 2309-123 2309-789 2309-789 2309-789

Minor CPR/ Patching CPR HMA Shoulders Doweled PCC Aggregate Base

30’ 6’ 30’ 30’

Depth

2.5” 8” 6’

32

MnDOT Pavement Design Manual April 10, 2018

RP 126.987 to RP 129.102 – 3rd Street to E Limits Franklin Year

SP

Activity

Width

Depth

1989 1989 1973 1951 1950 1945

2309-01 2309-01 2309-12 2309-111 2309-22 2309-789

HMA Overlay HMA Milling HMA Overlay Chip Seal Spot Patching Doweled PCC with Aggregate Base

24’ 24’ 24’ 24’ 24’ 30’

4.5” 3” 4”

8”

Roadway Condition Pavement Distresses Areas of Concern

A general description of the visible distresses. For guidance see Section 270. Any areas that may need repair or special treatment, such as frost heaves or subgrade failure. For guidance see Section 270.

Attach photos or diagrams as needed. Pavement Performance Data

This section documents the Pavement Performance Data for the road within the project limits. Pavement Performance Data is available from Pavement Management System (see Section 280). Year: Year that the data was collected Segment Description

Dir.

From RP

To RP

RQI

SR

PQI

IRI (in/mile)

I, D, U

R-Value/FWD Data

Projects must develop an R-value from either FWD data or laboratory testing (or both). Use this table to document FWD data using the TONN Method, see Section 200. Any FWD (TONN Analysis) and Laboratory R-Values must be attached in the appendix.

33

MnDOT Pavement Design Manual April 10, 2018

FWD Data Date: Date of Testing Reported Capacity

Overlay Thickness

R-Value

Mean Std. Dev.

Use this table to document any Laboratory R-values, see section 220. Laboratory R-Values Count

Mean

Minimum

Maximum

Std. Dev.

# of tests

Comments: Any notes, comments, or concerns about the collected data. Core/GPR

This section reports the HMA thickness (and condition) collected from coring or GPR see Sections 230 & 240. Date: Date that the data was collected on. Segment: Segment # Location

Count

Average

Minimum

Maximum

Std. Dev.

Mainline, shoulder, turnlanes, etc

Provide the location of any photos of the cores and of any GPR report. These may be attached, in EDMS, or ProjectWise. Comments: Any notes, comments, or concerns about the collected data.

34

MnDOT Pavement Design Manual April 10, 2018

Traffic

See Section 250. Traffic Forecast #:

Hwy

From RP

To RP

Traffic Forecast Date: Base Year 2-way Design Lane HCADT

2-way HCADT Growth/ Year

20 Yr. Design Lane Cumulative BESAL’s

20 Yr. Design Lane Cumulative CESAL’s

35 Yr. Design Lane Cumulative CESAL’s

Life-Cycle Cost Analysis (LCCA)

This section contains the results of the LCCA analysis according to Chapter 7.

Alternate #1

Alternate #2

Alternate #3

Description Design Life Project Net Present Cost % of Low Cost Selected

Exception: Does the district request an exception to either selecting the low-cost option or to following the alternate bidding process? See Chapter 7. Any exception form should be attached.

35

MnDOT Pavement Design Manual April 10, 2018

Pavement Recommendations This section contains the recommended pavement design(s) for the Pavement Design Segments (listed on the second page of the memo). Note: The table columns that have the heading “spec.” are intended to contain the number of the appropriate construction specification or special provision, or indicate that a plan note will be provided.

36

MnDOT Pavement Design Manual April 10, 2018

NEW HMA Segment # #

Mainline Pavement

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

New HMA

Thickness (inches)

Lifts

Mix Design/ Material

Wear

Sec. 400

Sec. 450

Sec. 450

Non-Wear

Sec. 400

Sec. 450

Sec. 450

Smoothness

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Compaction Testing

Width (ft.)

Sec. 450

Scoping

Sec. 450

Scoping

Sec. 450

Notes Mainline Subsurface

Thickness (inches)

Lifts

Material

Base

Sec. 400

Sec. 400 & 310

Subbase

Sec. 400

Sec. 400 & 310

Eng. Soil

Sec. 320

Sec. 320

Subgrade Prep.

Sec. 320

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note

Compaction Testing Sec. 330

Sec. 330

Sec. 330

Sec. 330

Notes

37

Width (ft.)

MnDOT Pavement Design Manual April 10, 2018

HMA Shoulders

Thickness (inches)

Lifts

Sec. 450

Mix Design/ Material

HMA

Sec. 610

Sec. 450

Aggregate Surfacing

Sec. 610

Sec. 610

Shoulder Agg. Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note

Compaction Testing

Width (ft.) Lt

Rt

Sec. 450

Scope

Scope

Sec. 330

610

610

Match Agg. Base

Notes

Aggregate Shoulders

Thickness

Material

Aggregate Surfacing

Sec. 610

Sec. 610

Added Aggregate Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Compaction Testing

Sec. 330

Match Agg. Base

Cross-Section from RP XXX to RP XXX

XX.X ft

XX.X ft

X.X” New HMA Wearing Couse X.X” New HMA Non-Wearing Couse

X.X ft X.X” YYYYYYY

X.X” YYYYYYY

X.X” Subbase X.X” Class X

Lt Scope

Notes

X.X ft

Width

X.X” Engineered Soil

38

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

Cross-Section from RP XXX to RP XXX

X.X ft

XX.X ft

XX.X ft

X.X” YYYYYYY

X.X” YYYYYYY

X.X” Sub-base

X.X” HMA Wearing Course X.X” HMA Non-Wearing Course

X.X ft

X.X” Class X

X.X” Engineered Soil

Misc. Pavement Recommendations and Instructions to Designers Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.

39

MnDOT Pavement Design Manual April 10, 2018

FDR/SFDR/CIR Segment # #

Existing Mainline Pavement Existing HMA Existing Aggregate

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

FDR,SFDR or CIR

Depth (inches)

Material

Note

Width (ft.)

Sec. 230,240, HMA 260 Sec. 230,240, Sec. 230, 240, 260 260

Sec. 260

Notes

Mainline Pavement

Depth (inches)

Milling

Sec. 410

Added Aggregate

Sec. 410

Reclaim/ Recycle Stabilize

Lifts

Material

Spec.

Width (ft.)

Sec. 410

#.#

Sec. 410

Sec. 410

#.#

Sec. 410

Sec. 410

Sec. 410

#.#

Sec. 410

Sec. 410

Sec. 410

#.#

Notes Mainline Pavement

Thickness (inches)

Lifts

Mix Design/ Material

Wear

Sec. 400

Sec. 450

Sec. 450

Non-Wear

Sec. 400

Sec. 450

Sec. 450

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Compaction Testing

Width (ft.)

Sec. 450

Scoping

Sec. 450

Scoping

Smoothness Sec. 450 Notes

40

MnDOT Pavement Design Manual April 10, 2018

HMA Shoulders

Thickness (inches)

HMA

Sec. 610

Aggregate Surfacing

Sec. 610

Lifts

Sec. 450

Mix Design/ Material

Sec. 450

Sec. 610

Shoulder Agg. As Needed Base

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base

Compaction Testing

Width (ft.) Lt

Rt

Sec. 450

Scope

Scope

Sec. 330

610

610

Match Agg. Base

Notes

Aggregate Shoulders

Thickness

Material

Aggregate Surfacing

Sec. 610

Sec. 610

Added Aggregate Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Compaction Testing

Sec. 330

Width Lt

Rt

Scope

Scope

Match Agg. Base

Notes

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft

XX.X ft

X.X ft X.X” YYYYYYY

X.X” YYYYYYY

X.X” New HMA Overlay X.X” SFDR

X.X” YYYYYYY X.X” FDR

X.X” YYYYYYY X.X” Existing Aggregate

Misc. Pavement Recommendations and Instructions to Designers

41

MnDOT Pavement Design Manual April 10, 2018

Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.

42

MnDOT Pavement Design Manual April 10, 2018

Rubblize/Crack & Seat Segment # #

Mainline Pavement

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

Rubblize/Crack & Seat

Existing PCC

Depth (inches) Sec. 230, 240, 260 Sec. 260

Existing Aggregate

Sec. 230, 240, 260

Existing HMA

Material

Note

Width (ft.)

HMA

Sec. 260

PCC

Sec. 260

HMA

Notes

Mainline Pavement

Depth (inches)

Lifts

Material

Spec.

Width (ft.)

Mill HMA Sec. 410 Sec. 410 Rubblize/ Special Provision # and if any edits are required, Sec. 420 Crack & Seat Subsurface Type of drain & outlets and its specification, Sec. 420 & 370 Drains Notes Mainline Pavement

Thickness (inches)

Lifts

Mix Design/ Material

Wear

Sec. 420

Sec. 450

Sec. 450

Non-Wear

Sec. 420

Sec. 450

Sec. 450

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Compaction Testing

#.#

Width (ft.)

Sec. 450

Scoping

Sec. 450

Scoping

Smoothness Sec. 450 Notes

43

MnDOT Pavement Design Manual April 10, 2018

HMA Shoulders

Thickness (inches)

Mix Design/ Material

Lifts

HMA

Sec. 610

Sec. 450

Sec. 450

Aggregate Surfacing

Sec. 610

Sec. 610

Shoulder Agg. Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base

Compaction Testing

Width (ft.) Lt

Rt

Sec. 450

Scope

Scope

Sec. 330

610

610

Match Agg. Base

Notes

Aggregate Shoulders

Thickness

Material

Aggregate Surfacing

Sec. 610

Sec. 610

Added Aggregate Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Compaction Testing

Sec. 330

Width Lt Scope

Match Agg. Base

Notes

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft

XX.X ft

X.X ft X.X” YYYYYYY

X.X” YYYYYYY

X.X” New HMA Overlay

X.X” YYYYYYY X.X” YYYYYYY

4” Perf. PE Pipe

X.X” Rubblized PCC

44

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

Misc. Pavement Recommendations and Instructions to Designers Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.

45

MnDOT Pavement Design Manual April 10, 2018

HMA Overlay

Segment # #

Mainline Pavement

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

HMA Overlay

Existing PCC

Depth (inches) Sec. 230, 240, 260 Sec. 260

Existing Aggregate

Sec. 230, 240, 260

Existing HMA

Material

Note

Width (ft.)

HMA

Sec. 260

PCC

Sec. 260

HMA

Notes

Mainline Pavement Mill HMA

Depth (inches)

Lifts

Material

Spec.

Sec. 440

Width (ft.)

Sec. 410

#.#

Notes Mainline Pavement Wear

Thickness (inches) Sec. 440

Lifts

Sec. 450

Mix Design/ Material Sec. 450

Compaction Testing

Spec. Spec, SP, or Plan Note

Width (ft)

Sec. 450

Scoping

Compaction Testing

Width (ft.)

Smoothness Sec. 450 Notes

HMA Shoulders

Thickness (inches)

Lifts

Sec. 450

Mix Design/ Material

HMA

Sec. 610

Sec. 450

Aggregate Surfacing

Sec. 610

Sec. 610

Shoulder Agg. Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base

Lt

Rt

Sec. 450

Scope

Scope

Sec. 330

610

610

Match Agg. Base

Notes

46

MnDOT Pavement Design Manual April 10, 2018

Aggregate Shoulders

Thickness

Material

Aggregate Surfacing

Sec. 610

Sec. 610

Added Aggregate Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Width

Compaction Testing

Sec. 330

Lt Scope

Match Agg. Base

Notes

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft

XX.X ft

X.X ft X.X” YYYYYYY

X.X” YYYYYYY

X.X” Subbase

X.X” New HMA Overlay X.X” ExistingPave.

X.X” Class X

Cross-Section from RP XXX to RP XXX

X.X ft

XX.X ft

XX.X ft

X.X” YYYYYYY

X.X” YYYYYYY

X.X” Sub-base

X.X” HMA Overlay X.X” Class X X.X” Existing Pave.

X.X ft

X.X” Engineered Soil

Mill X.X” Existing HMA

47

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

Misc. Pavement Recommendations and Instructions to Designers Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.

48

MnDOT Pavement Design Manual April 10, 2018

NEW PCC

Segment # #

Mainline Pavement PCC

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

New PCC

Thickness (inches) Sec. 500

Joint Spacing Dowel (ft.) Arrangement Sec. 530

Sec. 530

Dowel Size

Sealant

530

Width (ft.)

Sec. 530

Scoping

Notes Mainline Subsurface

Thickness (inches)

Lifts

Material

Base

Sec. 500

Sec. 500 & 310

Subbase

Sec. 500

Sec. 500 & 310

Eng. Soil

Sec. 320

Sec. 320

Subgrade Prep.

Sec. 320

Subsurface Drains Notes

HMA Shoulders

Spec.

Compaction Testing

Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note Spec, SP, or Plan Note

Width (ft.)

Sec. 330

Sec. 330

Sec. 330

Sec. 330

Type of drain & outlets and its specification, sec. 500 & 370

Thickness (inches)

HMA

Sec. 610

Aggregate Surfacing

Sec. 610

Shoulder Agg. As Needed Base

Lifts

Sec. 450

Mix Design/ Material

Sec. 450

Sec. 610

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base

Width (ft.)

Compaction Testing

Lt

Rt

Sec. 450

Scope

Scope

Sec. 330

610

610

Match Agg. Base

Notes

49

MnDOT Pavement Design Manual April 10, 2018

Aggregate Shoulders

Thickness

Material

Aggregate Surfacing

Sec. 610

Sec. 610

Added Aggregate Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Width

Compaction Testing

Sec. 330

Lt

Rt

Scope

Scope

Match Agg. Base

Notes

PCC Shoulders PCC Aggregate Surfacing

Thickness

Material

Spec.

Sec. 610 Sec. 610

Shoulder Agg. As Needed Base

Sec. 610

Match Agg. Base

Spec, SP, or Plan Note Match Agg. Base

Width

Compaction Testing

Sec. 330

Lt Scope

Scope

610

610

Match Agg. Base

Notes

PCC Joint Designation (MnDOT Standard Plan 5-297.221) Joint Contraction Joint

Type Sec. 530

Sealant Spec.

Longitudinal Joint

Sec. 530

Sec. 530

Outside Shoulder Joint

Sec. 530

Sec. 530

XXXXXXX Joint

Sec. 530

Sec. 530

Rt

Sec. 530

50

MnDOT Pavement Design Manual April 10, 2018

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft X.X” YYYYYYY

YYYY Joint

X.X” New PCC

X.X ft

XX.X ft YYY Joint

YYY Joint

X.X” YYYYYYY

X.X” YYYYYYY

X.X” YYYY

X.X” YYYYYYY X.X” Subbase

4” Perf. PE Pipe

X.X” Class X

Cross-Section from RP XXX to RP XXX

X.X ft

XX.X ft YYYY Joint

X.X” YYYYYYY

XX.X ft YYYY Joint

X.X ft X.X” YYYYYYY

X.X” Sub-base

X.X” New PCC X.X” Class X

X.X” Engineered Soil

Misc. Pavement Recommendations and Instructions to Designers Provide a list of the PCC paving standard plans and plates that the designer must include in the project plans (see Section 550). Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.

51

MnDOT Pavement Design Manual April 10, 2018

Whitetopping

Segment # #

Mainline Pavement Mill HMA

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

Whitetopping

Depth (inches)

Lifts

Material

Spec.

Sec. 510

Width (ft.)

Sec. 510

#.#

Notes Mainline Pavement PCC Overlay

Thickness (inches) Sec. 500

Joint Spacing Dowel (ft.) Arrangement Sec. 530

Sec. 530

Dowel Size 530

Sealant

Width (ft.)

Sec. 530

Scoping

Notes

HMA Shoulders

Thickness (inches)

HMA

Sec. 610

Aggregate Surfacing

Sec. 610

Shoulder Agg. As Needed Base

Lifts No. and Thickness, Sec. 450

Mix Design/ Material

Sec. 450

Sec. 610

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base

Width (ft)

Compaction Testing

Lt

Rt

Sec. 450

Scope

Scope

Sec. 330

610

610

Match Agg. Base

Notes

Aggregate Shoulders

Thickness

Material

Aggregate Surfacing

Sec. 610

Sec. 610

Added Aggregate Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Width

Compaction Testing

Sec. 330

Lt Scope

Match Agg. Base

Notes

52

Rt Scope

MnDOT Pavement Design Manual April 10, 2018

PCC Shoulders PCC Aggregate Surfacing

Thickness

Material

Sec. 610 Sec. 610

Sec. 610

Shoulder Agg. As Needed Base

Match Agg. Base

Width

Compaction Testing

Spec.

Spec, SP, or Plan Note Match Agg. Base

Sec. 330

Lt

Rt

Scope

Scope

610

610

Match Agg. Base

Notes

PCC Joint Designation (MnDOT Standard Plan 5-297.221) Joint Contraction Joint

Type Sec. 530

Sealant Spec. Sec. 530

Longitudinal Joint

Sec. 530

Sec. 530

Outside Shoulder Joint

Sec. 530

Sec. 530

XXXXXXX Joint

Sec. 530

Sec. 530

Cross-Section from RP XXX to RP XXX

X.X ft X.X” YYYYYYY

XX.X ft YYYY Joint

XX.X ft YYY Joint

YYY Joint

X.X” New PCC Overlay

X.X ft X.X” YYYYYYY

X.X” YYYYYYY X.X” YYYYYYY X.X” Existing HMA

Misc. Pavement Recommendations and Instructions to Designers Provide a list of the PCC paving standard plans and plates that the designer must include in the project plans (see Section 550). Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.

53

MnDOT Pavement Design Manual April 10, 2018

UBOL

Segment # #

Mainline Pavement Mill HMA

Highway #

From RP

To RP

Design Type

TH #

###.###

###.###

Unbonded Overlay

Depth (inches)

Lifts

Material

Spec.

Sec. 520

Width (ft.)

Sec. 520

#.#

Notes Mainline Pavement PCC Overlay

Thickness Joint Spacing Dowel (inches) (ft.) Arrangement

Dowel Size

Sec. 500

530

Sec. 530

Sec. 530

Sealant Sec. 530

Width (ft.) Scoping

Notes Mainline Subsurface

Thickness (inches)

Lifts

Material

Spec.

Compaction Testing

Width (ft.)

Interlayer Sec. 520 Sec. 520 520 Sec. 450 Subsurface Type of drain & outlets and its specification, Sec. 520 & 370 Drains Notes

Scoping

HMA Shoulders

Width (ft)

Thickness (inches)

Lifts

Sec. 450

Mix Design/ Material

HMA

Sec. 610

Sec. 450

Aggregate Surfacing

Sec. 610

Sec. 610

Shoulder Agg. Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note Match Agg. Base

Compaction Testing

Lt

Rt

Sec. 450

Scope

Scope

Sec. 330

610

610

Match Agg. Base

Notes

54

MnDOT Pavement Design Manual April 10, 2018

Aggregate Shoulders

Thickness

Material

Aggregate Surfacing

Sec. 610

Sec. 610

Added Aggregate Base

As Needed

Match Agg. Base

Spec. Spec, SP, or Plan Note Spec, SP, or Plan Note

Compaction Testing

Sec. 330

Width Lt

Rt

Scope

Scope

Match Agg. Base

Notes

PCC Shoulders PCC

Thickness

Material

Spec.

Compaction Testing

Sec. 610

Aggregate Surfacing

Sec. 610

Sec. 610

Shoulder Agg. Base

As Needed

Match Agg. Base

Spec, SP, or Plan Note Match Agg. Base

Sec. 330

Width Lt Scope

Scope

610

610

Match Agg. Base

Notes

PCC Joint Designation (MnDOT Standard Plan 5-297.221) Joint Contraction Joint

Type Sec. 530

Sealant Spec.

Longitudinal Joint

Sec. 530

Sec. 530

Outside Shoulder Joint

Sec. 530

Sec. 530

XXXXXXX Joint

Sec. 530

Sec. 530

Rt

Sec. 530

55

MnDOT Pavement Design Manual April 10, 2018

Cross-Section from RP XXX to RP XXX

XX.X ft

X.X ft X.X” YYYYYYY

YYYY Joint

X.X ft

XX.X ft YYY Joint

YYY Joint

X.X” New PCC Overlay

X.X” YYYYYYY

X.X” YYYYYYY X.X” YYYYYYY

4” Perf. PE Pipe

X.X” Existing PCC

X.X” Interlayer

Misc. Pavement Recommendations and Instructions to Designers Provide a list of the PCC paving standard plans and plates that the designer must include in the project plans (see Section 550). Provide any other necessary instructions to the project designer for the design and construction of this pavement segment that were not provided in the previous tables.

56

MnDOT Pavement Design Manual April 10, 2018

Use of Paver Mounted Thermal Profile (PMTP) and Intelligent Compaction (IC) Methods Paver Mounted Thermal Profiling (PMTP) is the process of continuously monitoring and recording the location and temperature of the asphalt mat immediately behind the paver screed during placement operations. This identifies any thermal segregation in the uncompacted asphalt which may affect the pavement’s performance and durability. Intelligent Compaction (IC) refers to the compaction of road materials, such as soil, aggregate base, or asphalt, using self-propelled rollers integrated with a position monitoring system and an onboard documentation system that can display real-time, color coded maps of roller location, number of passes, roller speeds, amplitudes and vibration frequencies of the roller drum. Some systems are also equipped with drum vibration instrumentation, infrared temperature sensors, and/or automatic feedback control. The onboard documentation system on these rollers also displays real-time, colorcoded maps of stiffness response or pavement surface temperatures, or both. This improves monitoring and recording of the compaction process to ensure that the material is properly and uniformly compacted. The PMTP and IC methods are recommended for use when the following project/site conditions are met: 1. The technology can be used with the following specifications:

Table 830.1 - Use of Intelligent Compaction and Thermal Profiling Technology

Specification

Intelligent Compaction (IC)—SP 2016 Quality Management Special

2215 (SFDR), 2331 (CIR), 23531, 2360, 2365

Paver Mounted Thermal Profile (PMTP) Method—SP 2016 Quality Management

2360, 2365

1

IC is recommended for use on 2353, only when used in conjunction with 2360 (i.e., when IC is already being used with 2360).

2. Net lane miles are greater than or equal to 4. Note: These technologies can be used on smaller projects. It is anticipated that the recommended lane miles will decrease with time as more contractors are equipped with these systems.

57

MnDOT Pavement Design Manual April 10, 2018

3. Cellular coverage, to allow for automatic transfer of data to the cloud, at least one time per day. Areas with intermittent locations of limited to no cellular coverage are allowed within the project limits, since the systems can store data until adequate data cellular coverage is available. 4. Adequate global navigation satellite system (GNSS) coverage through the project limits is required for recording of the real-time, spatial location of equipment. Table 830.2 lists the required accuracies.

Table 830.2 – Required GNSS Accuracy Technology

Accuracy

Intelligent Compaction (IC) Method— SP 2016 Quality Management Special

± 2 in (50 mm) in the X and Y Direction

Paver Mounted Thermal Profile (PMTP) Method — SP 2016 Quality Management

± 4 feet (1.2 m) in the X and Y Direction

Removals Any needed directions to the designer to provide for the removal of existing materials.

Geotechnical Recommendations Special Treatments Swamp areas, shadow treatments, rock excavation, or subgrade corrections: For any of these areas specify:    

The depth of the correction/treatment and its limits (Section 320.2) The backfill material and its specification (Section 320.2) Compaction testing (Section 330) Any tapers or transitions in materials (Section 320.4)

Embankment If there will be any additional embankment construction specify the:  Embankment material, its specification, and any plan note or special provision edits to modify the material (Section 320.3)  Compaction testing (Section 330)  Application of any surcharge (Section 320.3.c) 58

MnDOT Pavement Design Manual April 10, 2018

 Monitoring equipment (Section 320.3.d) Topsoil If construction activities will disturb any topsoil, provide the depth of topsoil to be stripped and reused. Borrow Shrinkage Factor If there will be a quantity of borrow using specification 2105 then develop a borrow shrinkage factor (Section 340). Culverts  Frost depth and soil-type: Provide an estimated frost depth and soil-type (plastic or granular). This information is used to select the correct culvert backfill treatment (Section 360.1).  Fabric: Specify if any geotextile fabric, and type, (Section 360.2) should be included in the culvert backfill treatment.  Plastic Soil Cap: Specify if a plastic soil cap treatment (Section 360.3) is required for any culverts.  Modifications: Give full instructions, and specify the materials, of any modifications to the standard culvert backfill treatment drawings (Figures 360.1-4).

Plan Notes Provide the text to any notes to be included in the project plans.

Edits or Additions to Special Provisions Provide any changes or text that is intended to be added to any special provisions.

Attachments: Attach or provide a link to the location of the following: Printouts of the pavement design programs’ output for each pavement design. Signed traffic forecast summaries. Soil borings and cores (or link). The LCCA and any supporting calculations. Any LCCA or alternate bidding exceptions. Any GPR, geotechnical, or other reports. 59