Infrastructure Sales Tax Capital Projects March 22, 2016

Infrastructure Sales Tax Capital Projects March 22, 2016 Project Engineering & Public Works Bridge Replacements District Description Expected Life...
Author: Miles Shields
1 downloads 4 Views 432KB Size
Infrastructure Sales Tax Capital Projects March 22, 2016

Project Engineering & Public Works Bridge Replacements

District

Description

Expected Life Cycle

Current Age

50

58

$2,000,000

50

46

$6,000,000

50

61

$900,000

50

79

50

50

$600,000

50

61

$1,000,000

50

49

$800,000

50

48

$700,000

50

48

$700,000

50

41

$1,800,000

Est. Cost

Prosperity Farms Rd. over SFWMD C-17 Canal (934116)

1

REPLACE -Bridge built in 1958. Replace bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, and enhance pedestrian sidewalk safety. Bridge is weight restricted and experiences heavy ADT (avg. daily traffic).

6th Ave. So. over Lake Osborne (LWDD E-4 Canal)(S Br/ East bound) (934307)

3

REPLACE -Bridge built in 1970. Replace bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, and enhance pedestrian sidewalk safety. Bridge experiences heavy ADT (avg. daily traffic) and recurring vehicular accidents impacting the guardrail system.

Corkscrew Blvd. over SFWMD Miami Canal (934502)

6

CR 880 (Old SR 80) Over C-51 Canal (930940)

6

Sam Senter Rd. over Ocean Canal (SFWMD Lat. 13 Canal) (934513)

6

Duda Rd. over SFWMD Lat. 14 Canal (Hillsboro Canal) (934519)

6

Congress Ave. over PBC Lat. 2 Canal (934251)

2

Florida Mango Rd. over LWDD Lat. 9 Canal (PB934337)

3

Florida Mango Rd. over LWDD Lat. 8 Canal (PB934338)

3

Belvedere Rd over E-3 canal (934205 & 934206)

2

Prairie Rd. over LWDD Lat. 8 Canal (PB934334)

3

REPLACE BRIDGE WITH CULVERT -Bridge built in 1966. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety.

50

50

$600,000

3

REPLACE BRIDGE WITH CULVERT -Bridge built in 1966. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update inadequate guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety. Roadway is a main traffic route experiencing high (ADT) in the City of Boynton Beach.

50

50

$600,000

Congress Ave. over LWDD Lat. 24 Canal (PB934479)

REPLACE -Bridge built in 1955. Replace bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, and parapets. Bridge is weight restricted. REPLACE -Bridge built in 1937. Replace steel thru-truss bridge to meet current FDOT design standards that will improve traffic safety (lane width and vehicle barrier) and eliminate weight restrictions due to recent FDOT Special Gusset Plate inspection findings. REPLACE (Steel Members) -Bridge built in 1966. Replace bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, and better accommodate Heavy Truck Traffic. REPLACE -Bridge built in 1955. Replace bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, and better accommodate Heavy Truck Traffic. REPLACE -Bridge built in 1967. Replace bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, and enhance pedestrian sidewalk safety. Bridge experiences heavy ADT (avg. daily traffic) and continual roadway drainage issues affecting the sheet piles. REPLACE -Bridge built in 1968. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety. REPLACE -Bridge built in 1968. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety. REPLACE -Both bridges built in 1975. Replace Functional Obsolete bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), deck geometry, update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety.

$2,700,000

Page 1 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project

Wabasso Dr. over LWDD Lat. 2 Canal (934237)

Kudza Rd. over LWDD Lat. 8 Canal (934312)

Seminole Dr. over LWDD Lat. 16 Canal (934319)

Jupiter Beach Rd. over Branch of ICWW (934125)

Summit Blvd. over C-51 Canal (934201)

District

Description

Expected Life Cycle

Current Age

Est. Cost

7

REPLACE BRIDGE WITH CULVERT -Bridge built in 1961. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety.

50

55

$700,000

2

REPLACE BRIDGE WITH CULVERT -Bridge built in 1960. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety.

50

56

$700,000

3

REPLACE BRIDGE WITH CULVERT-Bridge built in 1959. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety. Current bridge has sub-standard Post and Rail parapet and is built on 12" piles.

50

57

$700,000

1

REPLACE BRIDGE WITH CULVERT -Bridge built in 1961. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety. Tidal zone causes continual erosion and washout issues.

50

55

$700,000

50

49

$10,000,000

2

REPLACE - Bridge built in 1967. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/slope protection and enhance pedestrian sidewalk safety. New school immediately adjacent to bridge/ school zone. Replace removable steel span with concrete clear span design if feasible. Total Bridge Replacements:

$31,200,000

Bridge Modifications 7

MODIFY -Bridge built in 1965. Bridge to meet current FDOT design standards that will improve traffic safety (lane width, shoulders, add bike lane, add sidewalk, replace parapets).

50

51

$6,000,000

Clint Moore Rd. over LWDD E-4 Canal (PB934426)

4

MODIFY -Bridge built in 1973. Modify bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, and enhance pedestrian sidewalk safety. Bridge experiences heavy ADT (avg. daily traffic) and continual roadway drainage issues affecting the sheet piles.

50

43

$600,000

Lake Osborne Dr. over Lake Bass Canal (PB934354)

3

MODIFY -Bridge built in 1955. Modify bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety.

50

61

$600,000

Barwick Rd. over LWDD Lat. 30 Canal (934455)

4

REPLACE BRIDGE WITH CULVERT -Bridge built in 1964. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety.

50

52

$600,000

5

REPLACE BRIDGE WITH CULVERT -Bridge built in 1965. Replace bridge to meet current FDOT design standards that will improve traffic safety (lane width, bike lanes, parapets), update guardrail system, improve roadway drainage, restore the embankment/ slope protection and enhance pedestrian sidewalk safety.

50

51

$600,000

Palm Beach Lakes Blvd over FEC R/R (937709)

Smith Sundy Rd. over LWDD Lat. 33 Canal (PB934411)

Page 2 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project

District

East Ocean Ave. (C-812) over Hypoluxo Island Lagoon (934347)

4

CR-880 over SFWMD L-14 Canal @ 6 Mile Bend (930038)

6

CR-700 over SFWMD L-13 Canal (930085)

6

Donald Ross Rd. over Cypress Creek (N Br) (934128)

1

Donald Ross Rd. over Cypress Creek (S Br) (934129)

1

Resurfacing Northlake Blvd. from Military Trail to Beeline Hwy. Woolbright Road from Military Trail to Lawrence Road Haverhill Rd.from Okeechobee Blvd. to Roebuck Rd. Military Trail from PGA Blvd. to Donald Ross Rd. Gun Club Rd. from Jog Rd. to Congress Ave. Lantana Rd. from west of SR7 to Turnpike Lantana Rd from I-95 to US-1 Community Dr. from Haverhill Rd. to Military Trail Military Tr. from Hypoluxo Rd. to Lake Worth Rd. Pratt Whitney Rd. from Indiantown Rd. to north County line Congress Ave. from Miner Rd. to south of Hypoluxo Rd. Okeechobee Blvd. from Sem. Pratt Whitney Rd to Royal Palm Beach Blvd. CR A1A from Donald Ross Rd. to Marcinski Old Boynton Rd. from Knuth Rd. to Congress Ave. Lawrence Rd. from Boynton Beach Blvd. to Lantana Rd. Military Trail from County Line to Palmetto Park Rd Woolbright Rd. from Knuth Rd to Congress Ave. Lake Ida Rd from Congress Ave to Swinton Ave. Jog Road from Lake Ida Rd to Flavor Pict Rd. Jog Rd. from Summit Blvd to Gun Club Rd. Summit Blvd from Military Tr to Congress Ave. Congress Ave. from Lake Ida Rd. to Summit Dr. Golf Road from Military Trail to Congress Ave. Lyons Rd from Hillsboro Canal to Boca Lago Blvd. SW 18th St. from SR7 to Boca Rio Rd.

1 4 3&4 4 4 4&7 5 2 2 4 4 5 5

Okeechobee Blvd from Royal Palm Beach Blvd. to Wildcat Way Pinehurst Dr. from Lake Worth Rd. to Forest Hill Blvd.

Description MODIFY -Bridge built in 1989. Modify bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, and enhance pedestrian sidewalk safety. Bridge experiences heavy ADT (avg. daily traffic) and continual roadway drainage issues affecting the sheet piles. MODIFY -Bridge built in 1954. Modify bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, and parapets. MODIFY -Bridge built in 1968. Modify bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, guardrail system, and post-tensioning deck slab failure. MODIFY or Culvert -Bridge built in 1989. Repair bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, and enhance pedestrian sidewalk safety. Bridge experiences heavy ADT (avg. daily traffic), pavement settling, and continual roadway drainage issues affecting the sheet piles. MODIFY or Culvert -Bridge built in 1990. Repair bridge to meet current FDOT design standards that will improve traffic safety, deck/lane geometry, parapets, and enhance pedestrian sidewalk safety. Bridge experiences heavy ADT (avg. daily traffic), pavement settling, and continual roadway drainage issues affecting the sheet piles. Total Bridge Modifications:

Expected Life Cycle

Current Age

50

27

$600,000

50

62

$500,000

50

48

$900,000

50

27

$900,000

50

27

$900,000

Est. Cost

$12,200,000

PBC has about 3,400 lane miles of roads to maintain. The average asphalt life is 18-20 years before very serious deterioration (rippling, alligator cracking, and large potholes) sets in. Arterial roads average 12-15 years, while residential streets may last 20-25 years. Allowing a road to reach the “serious” state creates a situation where the base material may get significant water intrusion, and once this level of deterioration sets in, resurfacing alone will not keep the road from getting significantly worse each year. The cost of rebuilding a deteriorated road is over ten times the cost of resurfacing. To avoid having our roads become major maintenance problems, we should therefore be averaging 170 lane miles of resurfacing each year (3400 lane miles/20 years =170 lane miles/year). Our current average milling/resurfacing cost is about $70,000 per lane mile.

20 20 20 20 20 20 20 20 20 20 20

Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20

$1,500,000 $1,000,000 $1,200,000 $1,800,000 $1,400,000 $900,000 $500,000 $200,000 $2,200,000 $200,000 $600,000

We should therefore be spending an average of $12m each year to maintain the road infrastructure. (170 x $0.07m = $11.90m)

20

Over 15

$1,500,000

20 20 20 20 20 20 20 20 20 20 20 20 20

Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 13

$300,000 $200,000 $1,600,000 $900,000 $200,000 $700,000 $700,000 $400,000 $700,000 $500,000 $600,000 $1,000,000 $900,000

6

20

Over 20

$700,000

2

20

Over 20

$500,000

1 4 2&7 1 2 3 7 7 2&3 1 3 6

Page 3 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Frederick Small Rd from Central Blvd. to Military Trail Frederick Small Rd. from Military Trail to Palmwood Rd. El Clair Ranch Rd from Lake Ida Rd. to Woolbright Rd. Seacrest Blvd from Gulfstream Blvd. to Hypoluxo Rd. High Ridge Road from Hypoluxo Rd to Lake Osbourne Dr Folsom Rd from Crestwood Blvd. to Okeechobee Blvd. Crestwood Blvd. from Folsom Rd. to Okeechobee Blvd. Davis Road from Melaleuca Ln. to Lake Worth Rd. Lakes of Boca Raton (residential roads) Lakeside Green/Willow Pond Rd. (residential roads) Cannon Gate (residential roads) Boca Del Mar (Powerline to Palmetto) Northtree (residential roads) Seminole Manor (residential roads) Cam Estates (residential roads) Forest Hill Park, Forest Manor, Nazarene Park(residential roads) Belvedere Rd. from Benoist Farms to Jog Rd. CR 880 Brown's Farms Road Lantana Rd. from Hagen Ranch Rd. to I-95 Jog Rd. from Atlantic Ave to Boynton Beach Blvd. Lantana Rd. from Fla. Turnpike to Hagen Ranch Rd Cresthaven Blvd. from Jog Rd. to Military Trail 10Th Ave N. from Pinehurst Dr. to Haverhill Rd. 10Th Ave N. from Congress Ave. to I-95 Military Trail from Hillsboro Rd. to Clint Moore Rd. Meleleuca Ln. from Military Trail to Davis Rd. Orange Blvd. from Seminole Pratt Whitney Rd. to Coconut Rd.

1 1 5 7 3 6 6 3 5 2 6 4 3 3 2

Expected Life Cycle 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20

2 2 6 6 2&3 5 3 2 2 3 4 3

District

Description

Current Age Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 15 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20

Est. Cost $300,000 $200,000 $800,000 $2,400,000 $400,000 $300,000 $700,000 $200,000 $200,000 $200,000 $400,000 $400,000 $200,000 $500,000 $500,000

20

Over 20

$200,000

20 7 7 20 20 20 20 20 20 20 20

Over 20 Over 10 7 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20

$900,000 $3,000,000 $2,000,000 $2,000,000 $1,900,000 $300,000 $300,000 $700,000 $400,000 $2,300,000 $300,000

6

20

Over 20

$500,000

6 2&3 1 1 1 1 1 2 7 1 6 1 7 7&3 1 2 6

20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20

Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 13 Over 20 Over 20 Over 20 17 Over 20

$300,000 $200,000 $200,000 $300,000 $300,000 $300,000 $300,000 $600,000 $200,000 $300,000 $200,000 $300,000 $300,000 $1,400,000 $200,000 $600,000 $400,000

Indian / Scott / Spafford from Okeechobee Blvd. to Gardinia Ave.

7

20

Over 20

$200,000

Blanchette Trail from Lake Worth Rd. to Arrowhead Dr. Old Boynton Rd. from Military Trail to Knuth Rd. Kirk Rd. from Meleleuca Ln. to Purdy Ln.

6 4 3

20 20 20

Over 20 Over 20 Over 20

$200,000 $500,000 $400,000

Coconut Blvd. from Orange Blvd to Northlake Blvd Purdy Ln. from E-3 Canal to Kirk Rd. Randolph Siding Rd. from 110th to Jupiter Farms Rd. Sandy Run Rd. from 120th Place N. to Jupiter Farms Rd. Center St. from Indiantown Rd. to Alt A-1-A Alexander Run from Randolph Siding Rd. to Indiantown Rd. Prosperity Farms Rd. from Hood Rd. to Donald Ross Rd. Belvedere Rd. from Jog Rd. to Haverhill Rd. Austrailian Ave. from 45th St. to Blue Heron Blvd. Old Dixie Hwy. from Alt A-1-A to County Line Rd. Cannon Way. Loop Rd. @ Haverhill Rd. Central Blvd. from Indian Creek Parkway to Indiantown Rd. Garden Rd. from Bee Line Hwy. to Investment Ln. Hypoluxo Rd. from Military Trail to U.S. 1 Prosperity Farms Rd. from Northlake Blvd. to Alamanda Dr. Belvedere Rd. from Australian Ave. to U.S. 1 Royal Palm Beach Blvd. from 40th St. to Persimmon Blvd.

Page 4 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Jog Rd. from Glades Rd. to Yamato Rd. Woolbright Rd. from Knuth Rd. to Federal Hwy. Lake Ida Rd. from Hagen Ranch Rd. to Congress Ave. El Clair Ranch Rd. from Atlantic Ave. to Boynton Beach Blvd.

4&5 4, 3 & 7 5, 4 & 7

Expected Life Cycle 20 20 20

District

Description

Current Age Over 20 Over 20 Over 20

Est. Cost $700,000 $600,000 $1,200,000

5

20

Over 20

$700,000

4&7 4 5

20 20 20

Over 20 Over 20 Over 20

$2,400,000 $700,000 $300,000

4

20

Over 20

$1,200,000

4, 5 5 5 5 5 5 5 7 7

20 20 20 20 20 20 20 20 20

Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20 Over 20

$3,700,000 $200,000 $200,000 $200,000 $500,000 $300,000 $200,000 $400,000 $700,000

Fla Mango Rd. from Belvedere Rd. to N. of Old Okeechobee Rd.

2

20

Over 20

$200,000

Westgate Ave. from Military Trail to Congress Ave. Congress Ave. from Okeechobee Blvd. to Palm Beach Lakes Blvd. Pioneer Rd. from Dead End to Jog Rd. Haverhill Rd. from Roebuck Rd. to 45th St. S.W. 8th St. from S.W. 65th Ave. to Boca Rio Rd. Jog Rd. from Forest Hill Blvd. to Summit Blvd. Congress Ave. from Palm Beach Lakes to 45th St. Sam Center Rd. from C.R. 880 to Gator Blvd. Tabit Rd. from Dead End to N.W. Ave G Eldorado Dr. from Pee Hokey Dr. to Muck City Rd. Seville St. from Pee Hokey Dr. to Muck City Rd. Joe Louis Blvd. from Dead End to Muck City Rd. Curlee Rd. from State Rd 80 to West Sugar House Rd. Duda Extension from C.R. 880 to Gator Blvd. Wedgeworth Rd. from Dead End to State Rd 880 Rodgers Rd. from County line to E. 1.5 miles Hatton Hwy. from Gator Blvd. to State Rd 80 C.R. 827 from U.S. 27 to E. 2 miles C.R 827 from C.R. 827A to North 1 Mile Bolles Canal from U.S. 27 to West 5 Miles Boat Ramp Rd. from C.R. 880 to East 1 mile Ritta Rd. from Dead End to Corkscrew Blvd. Rodgers Rd. from County line to Miami Canal Rd. Corkscrew Blvd. from County line to U.S. 27 Muck City Rd. from S.R. 700 to State Market Rd. Hooker Hwy. from Harris Rd. to S.R. 715 Harris Rd. from Hooker Hwy. to Teddar Rd.

7

20

Over 20

$500,000

7

20

Over 20

$400,000

2 7 5 2 7 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

20 20 20 20 20 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10

Over 20 Over 20 Over 20 Over 20 12 Over 10 Over 10 Over 10 Over 10 Over 10 Over 10 Over 10 Over 10 Over 10 9 Over 10 Over 10 Over 10 Over 10 10 Over 10 14 10 13 Over 10

$200,000 $500,000 $400,000 $400,000 $1,000,000 $200,000 $200,000 $200,000 $200,000 $200,000 $200,000 $300,000 $200,000 $200,000 $300,000 $300,000 $200,000 $600,000 $200,000 $200,000 $500,000 $900,000 $800,000 $600,000 $200,000 $77,600,000

Congress Ave. from Clint Moore Rd. to Lake Ida Rd. S.W. 18th St. from Boca Rio Rd. to Military Trail Boca Rio Rd. from S.W. 18th St. to Glades Rd. Old Dixie Hwy. from South County Line to Spanish River Blvd. Palmetto Park Rd. from Glades Rd. to Crawford Blvd. Lake Ridge Blvd. from State Rd. 7 to Yamato Rd. Boca Chase Dr. from Waterberry Dr. to State Rd. 7 Flavor Pict Rd. from Jog Rd. to Military Trail Judge Winnikoff Rd. from State Rd. 7 to Glades Rd. Ponderosa Dr. from Judge Winnikoff Rd. to Glades Rd. Pipers Glen Blvd. from Jog Rd. to Military Trail Palm Beach Lakes Blvd. from Okeechobee Blvd. to I-95 Palm Beach Lakes Blvd. from I-95 to U.S. 1

Total Resurfacing:

Page 5 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project

District

Description Pipe LWDD L-3 Canal and provide pedestrian path on south side of road for residents accessing park and school located on Drexel Rd. north of Belvedere New pedestrian paths that have not been able to secure funding through the County's Pathway Program.

Expected Life Cycle

Current Age

Est. Cost

Pathways Belvedere Road canal piping and sidewalk addition (62nd Dr. N. to Haverhill park) Center St. from Old Dixie Highway to Alt. A1A Hood Road from Briarlake Dr. to W. of Turnpike

20

N/A

$2,400,000

1 1

20 20

N/A N/A

$400,000 $200,000

Indiantown Rd. from Loxahatchee River Bridge to Taylor Rd.

1

20

N/A

$200,000

Randolph Siding Rd. from 110th Ave. N. to Jupiter Farms Rd.

1

20

N/A

$400,000

Roan Ln. from Kenas St. to Roan Court Seminole Dr. from Lantana Rd. to Tallulah Rd. SW 18th St. from Via De Sonrisa Del Sur to Military Trail

1 3 4

20 20 20

N/A N/A N/A

$200,000 $500,000 $700,000 $5,000,000

10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10

over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10 over 10

$325,000 $800,000 $400,000 $275,000 $375,000 $1,100,000 $375,000 $900,000 $200,000 $375,000 $275,000 $600,000 $175,000 $200,000 $175,000 $175,000 $275,000 $175,000 $200,000 $100,000 $200,000 $200,000 $200,000 $200,000 $200,000 $325,000 $200,000 $9,000,000

25 / 50 25 / 50 25 / 50 25 / 50

22 20 16 26

2

Total Pathways: Striping Sections of Australian Avenue Sections of Congress Avenue Sections of Haverhill Road Sections of Hypoluxo Road Sections of Indiantown Road Sections of Jog Road Sections of Lantana Road Sections of Military Trail Sections of Seacrest Blvd. Sections of Old Dixie Hwy. Sections of Palmetto Park Road Sections of Lyons Road Sections of Yamato Road Sections of Clint Moore Road Sections of Linton Blvd. Sections of Lake Ida Road Sections of Hagen Ranch Road Sections of 45th Street Sections of Okeechobee Blvd. Sections of Palm Beach Lakes Blvd. Sections of Woolbright Road Sections of Gateway Blvd. Sections of Lawrence Road Sections of 10th Avenue North Sections of Summit Blvd. Sections of Belvedere Road Sections of Donald Ross Road

7 3, 4 & 7 2, 3 & 7 3&7 1 2, 3 & 5 2&3 ALL 7 ALL 4&5 3&5 4&5 4&5 4&5 4&5 3&5 7 2, 6 & 7 7 3, 4 & 5 3 3&4 2&3 2 2&7 1

A road generally needs resurfacing once every 20 years. A road generally needs restriped once every 8-10 years. Note that road resurfacing includes restriping. Due to budget constraints, the funding for resurfacing and restriping has not kept up with the demand, and there is a great need to ‘catch up’ and bring the worst of the County roads up to safe striping levels.

Total Striping: Signals and Signal Systems Donald Ross Road & Military Trail Okeechobee Blvd. & Haverhill Road Lantana Road & Congress Avenue Hypoluxo Road & Military Trail

1 7&2 3 3

Mast Arm signal systems perform much better that traditional span-wire signal systems during major storm events; there is much less damage and repairs are less costly and can be made much faster.

$400,000 $500,000 $400,000 $400,000

Page 6 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Boynton Beach Blvd. & Military Trail Atlantic Avenue & Military Trail Blue Heron Blvd. & Riviera FS # 2 Old Boynton & Military Trail Okeechobee Blvd. & Sapodilla Avenue Okeechobee Blvd. & Quadrille Blvd. 15th Street & Tamarind Avenue Boynton Beach Blvd. & Seacrest Blvd. Le Chalet Blvd. & Military Trail Atlantic Avenue & Hamlet Drive Summit Blvd. & Haverhill Road Cascades Isle Blvd. & Jog Road Okeechobee Blvd. & Military Trail Southern Blvd/SR 80 (Big Blue Tr to Royal Palm Beach Blvd.) 45th Street (Military Tr. to Broadway) Blue Heron Blvd. (Military Tr. To Broadway) SR 7 (Glades to SW 18th Avenue) Forest Hill Blvd. (South Shore Blvd. to I-95) Boynton Beach Blvd. (SR7 to I-95) W. Atlantic Avenue (Lyons Rd. to Congress Ave) Mostly along US-1/Dixie Highway Network Routers Video Detection (80 +/- intersection) Various Other TSMO Locations School Zone System Upgrade

District 4&5 4&5 7 4&5 7 7 7 7 3 4 2 5 7 6 7 1&7 5 2, 3 & 6 3, 4 & 5 4, 5 & 7 1,2,3,4&7 ALL ALL ALL ALL

Description

Transportation Systems Management and Operations (TSMO) will enable proper monitoring and effective management of traffic congestion with the help of closed circuit TVs, travel-time and volume/speed/occupancy data and collection systems deployed along the route

Expected Life Cycle 25 / 50 25 / 50 25 / 50 25 / 50 25 / 50 25 / 50 25 / 50 25 / 50 25 / 50 25 / 50 25 / 50 25 / 50 25 / 50

Current Age 14 25 unknown 26 23 21 16 32 25 23 14 16 24

10

N/A

$400,000

10 10 10 10 10 10 10 10 10 10 10

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

$400,000 $400,000 $300,000 $500,000 $500,000 $400,000 $500,000 $500,000 $2,200,000 $1,000,000 $500,000 $15,000,000

25 25 25 25 25 25 25

17 N/A N/A N/A N/A N/A N/A

$500,000 $180,000 $180,000 $180,000 $180,000 $180,000 $180,000

N/A

over 15

$40,000

N/A

over 15

$175,000

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15

$250,000 $30,000 $70,000 $35,000 $65,000 $75,000 $75,000 $45,000 $150,000 $120,000

Total Signals and Signal Systems: Street Lighting SR-7 High Mast Towers Rehab (Hypoluxo to N. of Lake Worth Rd.)

Belvedere Homes San Castle Southern Blvd. Pines / Wallis Rd. west Limestone Creek Ranch Haven/Laura Lane Pleasant Ridge 10th Avenue North (Haverhill Road to Kirk Road) Belvedere Road (Royal Palm Beach City Limits to Haverhill City Limits) Boynton Beach Blvd. (Turnpike to Knuth Road) Community Drive (Haverhill Road to Military Trail) Congress Avenue (Okeechobee Blvd. to Belvedere Road) Congress Avenue (Gun Club Road to Summit Blvd.) Congress Avenue (Lantana Road to Hypoluxo Road) Forest Hill Blvd. (Turnpike to Pinehurst Drive) Forest Hill Blvd. (Jog Road to Military Trail) Gateway Blvd. (Military Trail to Windward Passage Drive) Glades Road (SR7 to Boca Rio Road) Gun Club Road (Bosque Blvd. to Congress Avenue)

6&3 6 3 2 1 3 1 3&2 2&6 5&4 7 2&7 2 3 2 2 3 5 2

SR-7 Rehab of existing system New Street Light Systems for Countywide Community Revitalization Team (CCRT) Neighborhoods

Phase One -- We have identified arterial street lighting that has been operating over 15 years as High Pressure Sodium (HPS) and maintained by FPL. Given that new LED technology is available, the County could save over $700,000 per year in energy costs once the existing lights are changed our from HPS to LED. This saving would be created after an initial capital investment to have FPL change them out, and the breakeven point is estimated at 7 to 10 years.

Est. Cost $400,000 $400,000 $400,000 $400,000 $500,000 $500,000 $500,000 $400,000 $400,000 $400,000 $400,000 $400,000 $600,000

Page 7 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Haverhill Road (West Palm Beach City Limits to Haverhill City Limits) Haverhill Road (SR80 to Lake Worth Road) Hypoluxo Road (Hagen Ranch Road to I-95) Jog Road (Okeechobee Blvd. to Belvedere Road) Jog Road (Belvedere Road to SR80) Jog Road (SR80 to Forest Hill Blvd.) Jog Road (Gateway Blvd. to Woolbright Road) Jog Road (Lake Ida Road to Old Clint Moore Road) Lake Worth Road (SR7 - Jog Road) Lantana Road (Turnpike to High Ridge Road ) Linton Blvd. (Military Trail to Jog Road) Lyons Road (Clint Moore Road to Broward County Line) Melalueca Lane (Greenacres City Limits to Kirk Road) Military Trail (Northlake Blvd. to Leo Lane) Military Trail (Okeechobee Blvd. to Lake Worth Road) Military Trail (Lake Worth Road to Clint Moore Road) Northlake Blvd. (Kelso Drive to Military Trail)

Expected Life Cycle

Current Age

2&7

N/A

over 15

$175,000

2 3 2 2 2 3&5 5 6&2 2&3 5 5 2&3 1 7, 3 & 2

over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15 over 15

$250,000 $275,000 $75,000 $120,000 $120,000 $135,000 $170,000 $225,000 $260,000 $70,000 $235,000 $65,000 $75,000 $335,000 $750,000 $50,000

District

Description

Est. Cost

1

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Okeechobee Blvd. (Turnpike to West Palm Beach City Limits

2&7

N/A

over 15

$175,000

Palmetto Park (University Blvd. to Military Trail) Seacrest Blvd. (Hypoluxo Road to Mentone Road) Summit Blvd. (Jog Road to C-51 Canal ) SW 18th Street (SR7 to Turnpike) West Atlantic Avenue (Turnpike to Military Trail) Yamato Road (SR7 to Boca City Limits)

5&4 7 2&3 5 5 4&5

N/A N/A N/A N/A N/A N/A

over 15 over 15 over 15 over 15 over 15 over 15

$385,000 $30,000 $175,000 $100,000 $135,000 $85,000

Boca Chase Drive (Cain Blvd. to 102 Way South) Boynton Beach Blvd. (SR7 to Turnpike) Clint Moore Road (SR7 to Turnpike)

5 5 5

N/A N/A N/A

under 15 under 15 under 15

$6,000 $125,000 $150,000

Donald Ross Road (Jog Road Roundabout to 64th Drive North)

1

N/A

under 15

$65,000

Gateway Blvd. (Lawrence Road to Savannah Lakes Drive) Gun Club Road (Kirk Road to Congress Avenue) Hagen Ranch Road (Boynton Beach Blvd. to W. Atlantic Avenue) Hypoluxo Road (SR7 to Hagen Ranch Road) Jog Road (Hypoluxo Road to Joe de Long Blvd.) Jog Road (Woolbright Road to Lake Ida Road) Lantana Road (SR7 to Jog Road) Lake Worth Road (Wellington City Limits to SR7) Lake Worth Road (at Pinehurst Drive) Lawrence Road (Gateway Blvd. to Boynton Beach Blvd.) Lawrence Road (Hypoluxo Road to Miner Road) Lyons Road (Lantana Road to Boynton Beach Blvd) Military Trail (Waditika Way to Okeechobee Blvd.) Military Trail (Camino Real Road to S.W. 18th Street) Northlake Blvd. (Coconut Blvd. to Ibis ) Okeechobee Blvd. (SR7 to Turnpike)

3 2

N/A N/A

under 15 under 15

$45,000 $50,000

5

N/A

under 15

$135,000

3 3 5 2&3 6 2 3&4 3 3&5 7 4 1&6 2&6

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

under 15 under 15 under 15 under 15 under 15 under 15 under 15 under 15 under 15 under 15 under 15 under 15 under 15

$155,000 $80,000 $170,000 $185,000 $70,000 $6,000 $60,000 $70,000 $285,000 $170,000 $50,000 $115,000 $155,000

Powerline Road (south of Glades Road to Broward County Line)

4&5

N/A

under 15

$120,000

2, 3, 4 & 5

Phase Two -- We have identified arterial street lighting that has been operating under 15 years as High Pressure Sodium (HPS) and maintained by FPL. Given that new LED technology is available, the County could save over $350,000 per year in energy costs once the existing lights are changed our from HPS to LED. This saving would be created after an initial capital investment to have FPL change them out, and the breakeven point is estimated at 7 to 10 years.

Page 8 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Seminole Pratt Whitney Road (Sycamore Drive to Whitton Drive) Seminole Pratt Whitney Road (Whitton Drive to SR80) S.W. 18 Street (East and West of Powerline Road) Westgate Avenue (Military Trail to Congress Avenue) Woolbright Road (Hagen Ranch Road to Knuth Road) Discretionary Projects - (438 lights) Australian Ave. and Congress @ SR-80 Flyover / Ramps Beeline Hwy. @ Pratt Whitney Rd & Pratt's main entrance Lake Ida and Via Flora Roundabout Hagen Ranch Rd. & Gateway/Aberdeen Lakes Dr. Roundabout

Jog Rd. (Joe DeLong Blvd. to Gateway) SR-7 (Whitehorse Dr. to Hypoluxo Rd.) SR-7 @ Boynton Beach Blvd. SR-7 @ Atlantic Ave. SR-7 (north of Clint Moore Rd. to north of Glades Rd.) SR-7 (north of Glades Rd. to Broward County Line) Southern Blvd. (west of Turnpike to Gem Lake intersection) Southern Blvd. (Sunshine Rd. to west of Turnpike) Military Trail north of Southern Blvd. W. Atlantic (Starkey Rd. to west of FL Turnpike) Hypoluxo Rd. bridge over FL TP Isolated locations (400 Lights)

Expected Life Cycle

Current Age

6

N/A

under 15

$150,000

6 4 7 4&5

N/A N/A N/A N/A N/A

under 15 under 15 under 15 under 15 under 15

$95,000 $35,000 $60,000 $240,000 $653,000

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

14 12 18 17 9 22 14 14 14 13 10 7 8 7 6 N/A

50

N/A

District

Description

2, 3, 5 & 6

2 1 5 3 3 3&6 5 5 5 5 2&7 2 2&7 5 3 ALL

Phase Three -- We have identified arterial street lighting that has been operating under 15 years as High Pressure Sodium (HPS) and maintained by PBC. Given that new LED technology is available, the County could save over $125,000 per year in energy costs once the existing lights are changed our from HPS to LED. This saving would be created after an initial capital investment to have FPL change them out, and the breakeven point is estimated at 7 to 10 years.

Total Street Lighting:

6 CR 880 Canal Bank Stabilization

7 Belvedere Rd. Canal Piping

Drainage Improvements Seminole Colony west (Okeechobee/Military) Seminole Colony east (Okeechobee/Military) Orange Blvd. from Seminole Pratt Whitney to Royal Palm Beach Blvd. A1A from US1 to Donald Ross Congress Ave. north of Linton Blvd. Congress Ave. @ Palm Beach Lakes Haverhill Rd from Lake Worth Road to 10th Ave. Austrailian Ave. from Banyan St. to 45th St.

7 7

The County owns and maintains CR 880. The SFWMD’s L-13 Canal parallels and is very close to CR 880. The embankment area from CR 880 to the canal is minimal. The undermining of the CR 880 embankment continues due to storm events and increased SFWMD pumping and has progressively deteriorated. Repair of the embankment is necessary to prevent the eventual collapse of CR 880. Total CR 880 Canal Bank Stabilization: The embankment area for the ditch around the curve on Belvedere Road is small and difficult to maintain. The undermining of this area continues and compromises the integrity of the sidewalk and road. Piping of the ditch is necessary to properly protect the road and sidewalk. Total Belvedere Rd. Canal Piping: Drainage improvement projects are generally included in Engineering’s Capital Project request list but due to budget constraints have not received funding.

Est. Cost

$60,000 $21,000 $5,000 $5,000 $24,000 $106,000 $20,000 $12,000 $116,000 $95,000 $325,000 $112,000 $17,000 $5,000 $30,000 $367,000 $12,000,000

$5,000,000

50

N/A $1,000,000

50 50

N/A N/A

$1,000,000 $1,200,000

6

50

N/A

$3,000,000

1 7 7 2 7

50 50 50 50 50

N/A N/A N/A N/A N/A

$500,000 $500,000 $500,000 $500,000 $17,800,000 $25,000,000

Total Drainage Improvements:

Page 9 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Drainage (Pipe Replacements) Sections of Randolph Siding Rd. Sections of Kirk Road Sections of Indiantown Road Various other locations Countywide

District

1 2&3 1 ALL

Description Engineering has experienced an increase of pipe failures in County roads due to aging infrastructure. The Road and Bridge Division has developed a priority list for storm pipe replacements. Any failed pipes need to be repaired or replaced in order to properly drain and maintain our roads in a safe operating condition. Total Drainage Pipe Replacements: Total Engineering:

Expected Life Cycle

Current Age

50 50 50 50

unknown unknown unknown unknown

Est. Cost

$600,000 $500,000 $200,000 $1,700,000 $3,000,000 $196,000,000

Page 10 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project

District

Description

Expected Life Cycle

Current Age

25 years

33 years

Est. Cost

Sheriff

CW/2

This project includes the replacement of all building systems (less the envelop) including HVAC, plumbing, electrical, ceiling and lighting, back-up power, flooring, and painting. The work will include renovations to increase functionality of key areas when the operations are relocated to accomodate the renewal/replacement work. The cost of this project includes the creation of temporary operating spaces to continue operations during the various phases of the work. This facility has been continuously operated on a 24/7 basis for approximately 33 years

$22,000,000

Headquarters R&R

2&3

Lake Worth West Substation

CW/2

Detention Center Facilities R/R (Phases 3-5) CW/2 Main Detention Center Electronics Detention Facilities R/R (Phase 6) - Repurpose MDC Admissions/ Court Evidence Building Vehicle Replacement Radios Replacement In car cameras Public Safety Equipment

CW/2 CW/2 CW CW CW CW

This project is a complete renewal/replacement of all building infrastructure, building interior and parking to re-purpose the facility for use by the Palm Beach County Sheriff’s Office Community Services Unit. This project was funded $500,000 in FY 2016, but the funding was allocated before the scope of work was determined and is insufficient based on the condition of the building. The use of the building for this purpose provides a significant PBSO presence in the community and maintains a County presence in the area. Replaces infrastructure at the Main Detention Center and in a portion of West Detention Center both of which has been continuously occupied for over 22-35 years. This includes the replacement of all building systems including HVAC, certain structural steel, plumbing, lighting, back-up power and site infrastructure. The project also includes improvements to increase compliance with current detention center standards. The project has been phased to maximize the work area without inmates present to; 1) reduce the duration and the costs of the project, 2) maximize the size of the work space that is not inmate accessible at the time of work, and 3) while maintaining the security of the detention center. Replaces infrastructure continuously occupied since the early 1980's/Replaces systems including locking control, fire alarm, intercom, CCTV, nurse call, and panic buttons which are over 20 years old. Renovation/replacement of the existing intake, holding and court areas to more effectively handle the increased bookings and avoid new construction at a higher one time and recurring cost. Consolidate and expand four existing locations Replace vehicles Radios In-car cameras IT Hardware replacements, data communication, & electronic equipment Total Sheriff:

25 years

36 years

$1,600,000

20 years

33 years

$33,950,000 20 years

33 years $11,300,000

35 years

33 years

Varies Varies Varies Varies Varies

Varies Varies Varies Varies Varies

$40,000,000 $20,000,000 $12,621,503 $7,432,384 $10,951,540 $11,182,970 $171,038,397

Page 11 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project

District

Description

Expected Life Cycle

Current Age

20 years

20 years

Est. Cost

Judicial

CW/2

Courthouse Electronics System R&R/Command Center

CW/2

Courthouse Buildout and Renovations

CW/2

Judicial Partners Records Warehouse

This project replaces CCTV, card access, fire alarm, intercom, elevator, FEAR system and panic buttons in the Main Courthouse and SA/PD Building which are over 20 years old and no longer servicable. The replacement project needs to be undertaken without interrupting daily operations of the building and without any loss of functionality. The replacement and renovation of the Command Center will need to take place concurrently in order to ensure that daily operations are not interrupted. Approximately 125,000 sf of the Main Courthouse in downtown West Palm Beach were intentionally left unfinished to fulfill future judicial expansion and programming. This space is made up by a large space on the 1 st floor as well as the entire 7th and 8th floors. A pending update to the Countywide Judicial Facilities Master Plan will: 1) identify the optimal use(s) for these floors to correct existing deficiencies, 2) fulfill present day needs of the court that are currently going unmet, prioritizing those which present security concerns or limit the effective provision of court services, and 3) prioritize other interior renovations to optimize the use of space within the Main Courthouse and meet the needs of the Court and all Court Partners within the building and system wide. This project constructs a facility to address the backlogged need to house judicial records which are required to be retained. The facility will allow the records of Clerk/State Attorney/Public Defender/Guardian Ad Litem to be removed from private facilities and temporary accommodations, reduce County operating costs, increase operating efficiency of the Courts and free up space within the Courthouses which needs to be used for its highest and best use in keeping with the purpose for its original construction. Total Judicial:

$10,300,000

25 years

N/A

$35,000,000

30 years

N/A

$23,000,000 $68,300,000

General Government Facilities

CW

Backlogged Building System Renewal & Replacement. Building Systems to be replaced range from envelop components (roof, walls, structural elements, window and weatherproofing), HVAC, plumbing, electrical, ceiling and lighting, back-up power, flooring and painting. Currently, this project consists of 363 individual System renewal/replacement activities in the next 7 years.

Varies

Varies $20,079,000

Countywide Buildings Renewal/Replacement

CW/2 Government Center Renewal/Replacement

CW/7

South County Admin Complex Redevelopment CW/2 810 Datura Building Replacement

This project includes the replacement of all building systems for five floors (less the envelop) including HVAC, plumbing, electrical, ceiling and lighting, back-up power, flooring, and painting. The work will include renovations to increase functionality of key areas of the building. The cost of this project includes the creation of temporary operating spaces to sustain continuous operations during the various phases of the work. This project includes a variety of renewal/replacement activities that have been backlogged since 2006. The projects include: 1) resurfacing all parking areas including the Tax Collector’s driving course and the Health Department, 2) ADA Restroom Improvements at South County Admin and Delray Health, 3) weatherproofing and exterior and interior painting at South County Admin, FMD Warehouse and Health Department, 4) HVAC work at South County Admin FMD Warehouse, PBSO Motor Pool and Delray Health, 5) roof replacement at Delray Tax Collector, 6) fire alarm, intrusion alarm and generator replacement at South County Admin, and 7) various electrical infrastructure improvements at all buildings. This project relocates Community Services from 810 Datura to the County's 45th Street Complex. This project will modernize that facility which is 50+ years old, provide adequate space for the services and programs.

25 years

31 years $26,000,000

25 years

45 years

$6,000,000 25 years

60 years $23,000,000

Page 12 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project

District

CW Countywide Parks Buildings

CW/2

Four Points

CW/2 Animal Care & Control

Description Backlogged Park System Renewal & Replacement. Building Systems to be replaced range from envelop components (roof, walls, structural elements, window and weatherproofing), HVAC, plumbing, electrical, ceiling and lighting, back-up power, flooring, painting, fire alarm, intrusion, and audio/video systems. Currently, this project consists of 107 individual System renewal/replacement activities in the next 7 years. This project renovates the 2 nd Floor North Wing for the Youth Services Department (YSD) and related PBSO Alternate Intervention Unit. The renovation will also consolidate YSD program staff currently located at Airport Center. The renovations will allow the space to serve the unique juvenile, safety and security requirements of this new Department as well as increase the effectiveness of service delivery by co-locating services provided to the children served. This project was funded $250,000 in FY 2016 with additional funding required in FY 2017. Renewal/replacement of the kennels, barn, clinic, lobby and adoption area at the ACC facility on Belvedere Road. The work will include renovations to increase functionality of key areas of the facility. The cost of this project includes the creation of temporary operating spaces to continue operations during the various phases of the work. This facility has been continuously operated on a 24/7 basis for approximately 23 years Total General GovernmentFacilities

Expected Life Cycle

Current Age

Varies

Varies

Est. Cost

$1,427,000

25 years

31 years

$450,000

25 years

23 years $21,000,000 $97,956,000

Page 13 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Parks & Recreation Playground Replacement John Prince Park - Osborne Boundless Playground Safety Surface John Stretch Park Playground Paul Rardin Park Playground Lake Lytal Park - Activity Building Playground Lake Ida Park - 4th St. Playground Dyer Park Playground Carlin Park West Playground - near tennis courts Morikami - Biwa Pavilion Playground Sanders Park Playground John Prince Park - Osborne Boundless Playground Structure Juno Park Playground Okeeheelee Park - Alligator Playground West Boynton Park Playground Seminole Palms Playground Loggerhead Picnic Area Playground John Prince - Center Drive Playground West Boynton Skate Park John Prince Park - Mound Circle Playground Carlin Park West Gumbo Limbo Playground Dubois Park Playground Jupiter Farms Park Playground Buttonwood Park Playground Glades Pioneer Park Playground Ocean Cay Park Playground Glades Pioneer Park Playground John Prince Park - Campground Playgrounds Lake Charleston Park Playground Burt Aaronson South County Regional - Boundless Playground Limestone Creek Park Playground Lake Belvedere Estates Park Playground Coral Cove Park Playground South Bay RV Park Playground Burt Aaronson South County Regional Park Playground near tennis courts

District

3

Description

(Safety Concern) - Play structures have exceeded the recommended life cycle for safe play. Components are worn and/or showing signs of deterioration. Surfacing is not ADA compliant and could present a fall hazard. Expected life cycle is 8 years for safety surfacing and 10 years for play structures - age of existing playgrounds and safety surfacing is between 8 and 23 years.

Expected Life Cycle

Current Age

8 - surface

11

10 10 10 10 10 8 - ocean 10 10

19 17 17 16 18 20 22 17

3

10

11

1 2 3 6 1 3 3 3 1 1 1 3 6 1 6 3 3

8 - ocean 10 8 - surface 10 8 - ocean 10 5 10 8 - ocean 8 - ocean 10 10 10 8 - ocean 10 10 10

19 19 14 18 15 23 8 14 14 18 19 14 14 14 18 18 19

5

8 - surface

7 - high use

1 2 1 6

10 10 8 - ocean 10

19 14 11 9

5

10

19

6 6 2 4 7 1 5 3

Total Playground Replacement:

Est. Cost

$175,000 $32,750 $52,750 $77,750 $52,750 $100,000 $30,000 $52,750 $32,750 $75,000 $52,750 $205,500 $85,000 $50,000 $82,750 $30,000 $150,000 $77,750 $32,750 $42,750 $70,000 $55,000 $80,500 $50,000 $30,000 $105,500 $50,000 $100,000 $40,000 $52,750 $50,000 $52,750 $32,750 $2,260,000

Page 14 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Sports Lighting Replacement Okeeheelee Park- Multipurpose Fields # 10,11,12,13 Okeeheelee Park - Softball Fields #1,2,3,4 Pinewoods Park - Baseball Fields #1,2,3 Burt Aaronson South County Regional Park - Fields #8,9,10,11 Caloosa Park - Softball Fields #1,2,3,4 Westgate Park and Recreation Center Caloosa Park - Multipurpose Fields #5,6 Juno Park Carlin Park Bert Winters Park - Ballfield #1 Bert Winters Park - Ballfield #2 Lake Lytal Park - T-ball Multipurpose Field #5 Glades Pioneer Park - Ballfield #2 Lake Charleston Park Jupiter Farms Park Burt Aaronson South County Regional Park - Fields# 4,5,6,7 Burt Aaronson South County Regional Park - Fields #12,13 Dyer Park Seminole Palms Park Haverhill Park Duncan Padget Park Okeeheelee Park - Tennis Courts Caloosa Park Lake Lytal Park - Tennis, Racquetball and Basketball Court Carlin Park Glades Pioneer Park Burt Aaronson South County Regional Park - Tennis Courts Burt Aaronson South County Regional Park - Basketball Courts Dyer Park Veterans Park

District 2 2 5 5

Description (Safety Concern) - The age of many lighting systems far exceeds recommended replacement interval resulting in decreased light levels and potential participant injury. Older units have increased mechanical failure and require greater maintenance resources and service expense. The expected life cycle of sports lighting is 20 years. Current lighting systems range between 15 and 36 years.

Expected Life Cycle

Current Age

20 20 20

33 33 32

$600,000 $600,000 $400,000 $400,000 $900,000 $200,000 $300,000 $150,000 $300,000 $150,000 $100,000 $100,000 $100,000 $400,000 $200,000

20

19

4 7 4 1 1 1 1 2 6 3 1

20 20 20 20 20 20 20 20 20 20 20

32 32 32 32 32 33 33 30 27 22 20

5

20

19

5 7 6 2 6 2 4 2 1 6 5

20 20 20 20 20 20 20 20 20 20 20

19 18 15 36 36 19 32 30 32 17 19

5

20

19

7 5

20 20

18 25

Total Sports Lighting Safety for Play: Sport Court Replacement/ Resurfacing Cabana Colony Basketball Courts Haverhill Park Racquetball Court Replacement Caloosa Park Racquetball Court Replacement West Jupiter Park and Recreation Center Basketball Courts Lake Lytal Park Racquetball Court Replacement Duncan Padget Park Racquetball Court Replacement

1 2 4 1 2 6

Various Fencing Replacement

Ctwde

15 25 25 15 25 25

Ctwde

(Safety Concern) - The public thoroughfares, pedestrian/bicycle pathways and parking areas are showing signs of degredation with potholes, cracks, faded markings and uneven surfaces resulting in potential hazards to the user. All

$400,000 $200,000 $600,000 $1,100,000 $300,000 $100,000 $400,000 $1,200,000 $800,000 $200,000 $200,000 $950,000 $100,000 $100,000 $300,000 $11,850,000

13 37 36 20 31 37

Total Sports Court Safety: Roadway/Bridges/Pathways/Parking Lots/ Access Various Beach Access, Dune Crossovers and Dock Renovations

Est. Cost

$12,000 $270,000 $810,000 $20,000 $270,000 $135,000 $1,517,000

10

15+

12

30

$250,000 $500,000

Page 15 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Dubois Park Pedestrian Bridge Deck Replacement Burt Aaronson South County Regional Park Dog Park Pathways (Asphalt) Burt Aaronson South County Regional Park Pathways (Asphalt)

District 1

Description facilities are currently beyond their expected life cycle.

Expected Life Cycle 10

Current Age 19

5

5

8

5

5

12

Cabana Colony Pathways (Asphalt) Caloosa Park Pathways (Asphalt) Dyer Park Pathways (Asphalt) Glades Pioneer Pathways (Asphalt) John Prince Pathways (Asphalt) Lake Ida Dog Park Pathways (Asphalt) Okeeheelee Nature Center Pathways (Asphalt) Okeeheelee North Pathways (Asphalt) Ocean Inlet Pathways (Asphalt) Santaluces Pathways (Asphalt) Seminole Palms Pathways (Asphalt) West Boynton Park Pathways (Asphalt) Veterns Park Pathways (Asphalt) South Bay Park - Pathway Repairs John Stretch Roadways Jupiter Farms Park Street/Parking Lot Lighting Replacement LED Lights Jupiter Beach Park Street/Parking Lot Lighting Replacement

1 4 7 6 3 4 2 2 4 3 6 3 5 6 6

5 5 5 5 5 5 5 5 5 5 5 5 5 5 10

13 12 7 8 6 5 14 9 9 12 11 13

10

1

20

20

1

20

30

Carlin Park Street/Parking Lot Lighting Replacement Caloosa Park Street/Parking Lot Lighting Replacement Buttonwood Park Street/Parking Lot Lighting Replacement LED Lights Ocean Inlet Park Street/Parking Lot Lighting Replacement LED Lights Ocean Reef Park Street/Parking Lot Lighting Replacement Morikami Street/Parking Lot Lighting Replacement LED Lights

1 4

20 20

27 32

3

20

14

4

20

27

1

20

28

5

20

38

2 2

20 5

33 20

3

20

13

3 5 Ctwde 6 4 2 4 4 6 2

5 5 15 5 5 15 15 15 5 20

13 5 15+ 10 6 20 15 11

6

20

27

7 7 1

20 15 15

18 18 20

Okeeheelee Park Street/Parking Lot Lighting Replacement Okeeheelee North Parking Lot - Striping West Boynton Park Street/Parking Lot Lighting Replacement LED Lights West Boynton Park Parking Lot - Striping Veterans Parking Lot - Striping Various Parking Lot Seminole Palms Parking Lot - Striping South Inlet Parking Lot - Striping Okeeheelee North Roadways Ocean Inlet Roadways Lake Ida 4th Roadways Triangle Park Parking Lot - Overlay and Striping Haverhill Park Street/Parking Lot Lighting Replacement Glades Pioneer Park Street/Parking Lot Lighting Replacement LED Lights Dyer Park Street/Parking Lot Lighting Dyer Park Parking Lot Dubois Park Parking Lot

36

Est. Cost $60,000 $25,000 $40,000 $8,000 $16,000 $25,000 $20,000 $50,000 $25,000 $35,000 $44,000 $7,000 $65,000 $4,000 $20,000 $45,000 $5,850 $180,000 $60,000 $250,000 $200,000 $200,000 $87,000 $84,000 $250,000 $144,000 $350,000 $65,000 $285,000 $10,000 $5,000 $50,000 $6,000 $8,100 $15,000 $10,000 $33,000 $6,400 $200,000 $60,000 $192,000 $45,000 $35,000

Page 16 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Caloosa Park Roadways Burt Reynolds Parking Lot Burt Reynolds Roadways John Prince Street/Parking Lot Lighting Replacement LED Lights Burt Aaronson South County Regional Park Street/Parking Lot Lighting Replacement Burt Aaronson South County Regional Park Nature Trail Boardwalk

4 1 1

Expected Life Cycle 15 15 15

3

20

39

5

20

19

5

10

20

District

Description

Current Age 20 30 30

Total Bridge/Pathway/Boardwalk/Parking Safety: Aquatic Facility Repair and Replacement Lake Lytal Aquatic Center Replace Public Aquatic Facility Aqua Crest Aquatic Complex Major Renovation and Reconstruction North County Aquatic Complex Aquatic Facility Renovation Therapeutic Recreation Complex - Gleneagle Aquatic Center (formerly Mary Prince Pool) Pool Resurfacing Santaluces Pool Aquatic Facility Renovation Coconut Cove Waterpark Facility Repairs and Renovation Calypso Bay Waterpark Facility Repairs and Renovation

2 7 1 3 3 5 6

(Safety Concern) - Aging pool facilities require ongoing capital maintenance of pump/filtration systems, decking and surfacing, drains, coping, leaks and other issues cited by Health Department. Numerous water park apparatuses are nonfunctional or aging and require replacement. Adequate capital funding is not currently available to address these increasing capital maintenance issues that could result in facility closure, loss of swim lessons, drowning prevention programs and decreased revenue. Every facility is at, or beyond, its expected useful life.

Sandalfoot Cove Park Athletic Facility/Building Replacement Dubois Park Historic Building Repair/Renovation Sunset Cove Amphitheater Audio & Lighting System Replacement Jim Brandon Equestrian Center Barn Painting and Rust Treatment Jim Brandon Equestrian Center Audio System Replacement Pinewoods Park Athletic Facility/Building Replacement Okeeheelee Park Athletic Facility/Building Replacement Lake Lytal Park Athletic Facility/Building Replacement

7 Ctwde 4 1

(Safety Concern) - Numerous park restrooms and other park structures are showing signs of deterioration with cracking concrete walls and foundations, roof leaks, plumbing failures and worn stained fixtures. Clean/functional restrooms are required to ensure adequate sanitary conditions are being maintained. All facilities are at, or beyond, their expected life cycle.

$540,000 $225,000 $5,227,550

20

40

20

37

20

22

20

25+

20 15 15

28 15 14

30 10

36 8 - 20

Total Aquatic Facility Health/Safety Public Building/Restroom Replacement Kreusler Park Restroom Replacement Ocean Rescue Refurbish wooden guard towers Ocean Inlet Park and Marina Improvements West Jupiter Park & Recreation Center Restroom Replacement with Storage Canal Point Restroom Replacement Triangle Park Restroom Replacement Juno Park Restroom Replacement John Stretch Restroom Replacement Carlin Park Restroom Replacement John Prince Park Campground Restroom Replacement John Prince Restroom Replacement John Prince Restroom Replacement John Prince Restroom Replacement Duncan Padget Park Restroom Replacement

Est. Cost $20,000 $22,650 $44,550 $300,000

30

35

6 6 1 6 1 3 3 3 3 6

30 30 30 30 30 30 30 30 30 30

45 38 38 38 30 25 30 25 25 36

5

30

30

1

N/A

117

5

15

7+

2

10

10

2

10

10

5 2 2

30 30 30

30 30 40

$6,000,000 $6,000,000 $1,800,000 $64,500 $850,000 $1,100,000 $1,330,000 $17,144,500

$200,000 $100,000 $5,000,000 $250,000 $270,000 $270,000 $270,000 $270,000 $270,000 $810,000 $270,000 $270,000 $270,000 $270,000 $780,000 $2,000,000 $150,000 $250,000 $120,000 $780,000 $780,000 $780,000

Page 17 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Lake Lytal Park Athletic Facility/Building Replacement Lake Lytal Park Maintenance Building Replacement Lake Ida Park Building Replacement John Prince Park Softball Triplex Athletic Facility/Building Replacement Dubois Park Building Replacement Carlin Park Building Replacement Canal Point Building Replacement Caloosa Park Athletic Facility/Press Box Replacement John Prince Park Parks Division Administration Building Addition West Delray Regional Park Building Replacement John Prince Park - Maintenance Trades Shop Building Replacement John Prince Park Campground Building Replacement Bert Winters Park Redevelopment - Phase 2

2 2 4

Expected Life Cycle 30 30 30

3

30

30

1 1 6 4

30 30 30 30

30 30 30 32

3

15

20+

5

N/A

N/A

3

30

30

3 1

30 Varies

39 33

Varies

30

Varies

13

Varies

10

District

Description

Current Age 30 45 30

Total Buildings: Athletic Field Renovations John Prince Park Athletic Field Renovations Sports Turf West Boynton Park Athletic Field Renovations Sports Turf Samuel Friedland Park - Sport Fields very pool drainage and 12 week closure per year Athletic Field Renovations, Sports Turf and Playground /Shade Structure Westgate Park & Recreation Center Athletic Field Renovation, Restroom w/Storage Glades Pioneer Park Athletic Facility Improvements Sports Turf Loggers Run Park Buttonwood Park Caloosa Park Athletic Field Renovations Sports Turf Dyer Park Athletic Field Improvements/Additions, Sports Turf

3 3

(Safety Concern) - Reconstruction of sports fields is necessary to meet high user demand and ensure safe playing field conditions for athletic participants. Poor turf coverage, uneven surfaces and drainage issues have resulted in premature field closure to prevent participant injury.

6

$780,000 $500,000 $500,000 $500,000 $780,000 $2,500,000 $500,000 $2,000,000 $750,000 $1,700,000 $26,720,000

$3,220,000 $2,000,000

$3,000,000 7

Varies

32

6

Varies

27

5 3

Varies Varies

13 15

4

Varies

32

7

Varies

18

5-10 5-10 5-10

12 6 12

Total Athletic Fields: Fresh Water Boat Ramps John Prince Burt Aaronson South County Regional Park Okeeheelee (ski lake)

Est. Cost $780,000 $500,000 $500,000

3 5 2

(Safety Concern) - As a result of prop dredging and high use, several park boat ramps have become uneven, undermined, broken or are too short for the vessels being launched. These conditions have rendered the ramps unsafe with one Total Fresh Water Boat Ramps:

$2,000,000 $2,000,000 $3,200,000 $2,400,000 $4,000,000 $6,000,000 $27,820,000

$400,000 $250,000 $400,000 $1,050,000

Page 18 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project Sanitary Sewer/Septic Systems Canal Point Okeeheelee Park Triangle Park Lake Ida West Park Jupiter Farms Park Juno Park Gulfstream Park Duncan Padget Park Caloosa Park Morikami Park Loxahatchee Groves Lake Lytal Park Veterans Park Irrigation Well Replacement South Bay RV Campground Electrical Upgrade

Group Pavilion Replacement Jupiter Beach Park Morikami Park John Prince Burt Aaronson South County Regional Park Various Carlin Park

District 6 2 6 4 1 1 4 6 4 5 6 2 5 6

1 5 3 5 CW 1

Description Septic System Replacement

Old well is sucking sand which effects both turf & irrigation infrastructure integrity. Can no longer be patch repaired. Need to meet industry standard and to accept larger recreational vehicles. This facility is designated for post disaster housing. Total Sanitary Sewer/Septic Systems:

(Safety Concern) - Many of these large wooden structures have exceeded their life expectancy and are showing signs of termite damage, roof leaks, rust and patch repairs. Replacement is necessary to avoid closure and associated revenue loss.

Total Group Pavilion Replacement: Total Parks and Recreation: Total All Departments:

Expected Life Cycle

Current Age

15 15 15 15 15 15 15 15 15 15 15 15

30 33 30 10 11 13 30 30 30 10 30 10

Not Adq.

$50,000 $50,000 $50,000 $150,000 $50,000 $50,000 $100,000 $50,000 $100,000 $150,000 $50,000 $50,000 $50,000

Not Adq.

15 - ocean 20-25 20-25 20-25 20-25 15 - ocean

Est. Cost

$200,000 $1,150,000

16 23 25 19 30 30

$150,000 $300,000 $150,000 $150,000 $300,000 $150,000 $1,200,000 $95,939,050 $629,233,447

Page 19 of 20

Infrastructure Sales Tax Capital Projects March 22, 2016

Project New Projects/Maintain Service Levels Sheriff Acreage Substation North County Substation

District

6 1

Description

New construction - new demand based on population New construction - new demand based on population Total Sheriff:

Expected Life Cycle

Current Age

25 years 25 years

N/A N/A

Est. Cost

$3,350,000 $2,800,000 $6,150,000

Parks & Recreation Development to Maintain Service Levels 3/5 Canyon's District Park New District Park Construction Acreage Community Park Recreation Center (ITID)

6 1

Gardens District Park

2 Okeeheelee Park South Regional Park Expansion Community Park

New District Park in West Boynton Beach due to population growth and in order to maintain target level of service per the County's Comprehensive Plan, Recreation and Open Space Element. Funding split between two commission districts (3 and 5). Request from Indian Trails Improvement District for an indoor/gymnasium facility to meet the demand of the residents in this area of the County. New District Park in Palm Beach Gardens in order to maintain target level of service per the County's Comprehensive Plan, Recreation and Open Space Element. Park will have both active and passive park elements. Passive park land - Central County Okeeheelee Regional Park - South. This project has been started but funding is required to complete this large regional passive park for public use (green space, hiking, biking, canoeing/kayaking, equestrian trails, group picnicking, nature playgrounds, parking, etc.)

$12,000,000 $3,000,000

$5,000,000

Underserved area for Central Countywide Community Revitalization Area Total Parks & Recreation:

$3,500,000 $5,900,000 $29,400,000

Total New/Maintain Service Levels

$35,550,000

Board Directed Projects

CW Central County Housing Resource Center Housing Units for Homeless, Extremely Low Income, & Low Income

CW

This facility would be sited in close proximity to a growing and underserved homeless population in and around John Prince Park, Bryant Park, downtown Lake Worth, the Lake Worth Road Corridor and surrounding area. The facility would serve as a resource center for homeless and at-risk homeless individuals and families. This proposal involves the acquisition and renovation of older, possibly rundown motel properties into efficiency units for use as temporary or longer term affordable housing for homeless and special populations. Total Board Directed Projects Total Projects

$5,700,000

$25,500,000 $31,200,000 $695,983,447

Page 20 of 20

The School Board of Palm Beach County Referendum Project List Projects funded with Sales Tax Proceeds Facility Renewal Projects Bleachers Building Envelope Compliance Custodial Equipment Fencing Fire/Life/Safety Furniture Replacement HVAC Intercom/Sound Systems Interior Repair/Improvement Lighting Parking Lot Playfields and Exterior Repairs/Improvements Plumbing Roofs     Subtotal Facility Renewal  Projects  Security     Subtotal Facility Renewal  & Security Projects 

Amount $                 7,540,600                 95,918,527                 70,019,193  3,669,466  8,303,620                 49,937,882                 36,616,748              215,073,423                 24,081,407              151,841,906                 45,867,702                 31,290,026                 29,872,008              100,450,015                 96,353,410              966,835,933                 30,727,500 $            997,563,433

Technology Infrastructure Projects  Classroom Technology   Back‐End Infrastructure   School Network Routers & Switches   School & District Servers   School Phone Systems & PBX   Wireless Infrastructure      Subtotal Technology Insfrastructure Projects 

             100,080,000                 11,000,000                 11,800,000  3,000,000  6,000,000  2,000,000              133,880,000

School Buses & Support Vehicles  School Buses   Support Vehicles      Subtotal School Buses & Support Vehicles 

                90,976,000                 12,000,000              102,976,000

Construction Projects  Roosevelt Full Service Center Remodel   Transportation ‐ North Modernization   Transportation ‐ South Modernization   Transportation ‐ West Central Modernization   West Tech Campus Modifications *      Subtotal Construction Projects 

                10,000,000                 12,500,000                 12,500,000                 15,000,000                 10,000,000                60,000,000

Other Items  Sales Tax Reserves      Subtotal Other Items 

Total Sales Tax Funded Projects

                51,323,663                51,323,663

$   1,345,743,096

* The West Tech Campus Modifications project will also include $1,471,714 of state funding

09/07/2016

Amounts shown are estimates based on currently available information and subject to change. Short‐term financing may be used to expedite projects.

p. 1

The School Board of Palm Beach County Referendum Project List Projects funded with Long Term Borrowing and Other Sources Construction Projects Facility Replacement/Modernization Projects  Addison Mizner ES Modernization   Grove Park ES Modernization   Melaleuca ES Modernization   Pine Grove ES Modernization   Verde ES Modernization   Washington ES Modernization   Wynnebrook ES Modernization      Subtotal Facility Replacement/Modernization Projects 

$              20,075,704                 16,266,360                 19,716,800                 10,893,532                 23,437,664  9,581,586                 21,491,312              121,462,958

Additions and Remodeling Projects  Delray Full Service Center Remodel   Forest Hill HS Parking Lot   Gold Coast CS Remodel Building 9 &10   Old DD Eisenhower ES Demo (restore fields)   Old Gove ES Demo (land bank)   Old Plumosa ES Demo (land bank)   Plumosa School of Arts Expansion to K‐8   Village Academy Kitchen Expansion   West Tech Campus Modifications *      Subtotal Additions and Remodeling Projects 

$              10,000,000  650,000  1,050,000  2,000,000  2,000,000  2,000,000                 18,083,003  1,200,000  1,471,714                38,454,717

New Schools  Greater WPB/Lake Worth Area High (03‐OOO)   Scripps/Gardens Area ES (04‐A)   South West Area ES (05‐C)   Western Communities ES (15‐A)   Western Communities HS (16‐AAA)      Subtotal New Schools 

                56,070,000                 26,392,343                 25,795,211                 27,104,711                 68,925,600              204,287,865

Other Items  Site Acquisiton or lease for select facilities      Subtotal Other Items 

                29,868,640                29,868,640

Total Projects Funded from other sources

$      394,074,180

 Grand Total for all Projects

$   1,739,817,276

Summary of Revenues

09/07/2016

 Sales Tax Revenues   Other Local Funds   COPS 

$         1,345,743,096              132,881,510              261,192,670

 Total Revenues 

$   1,739,817,276

Amounts shown are estimates based on currently available information and subject to change. Short‐term financing may be used to expedite projects.

p. 2

Updated 09/09/2016 Municipality (Cities) Infrastructure Surtax Income/Expense Summary Municipality Atlantis Belle Glade Boca Raton Boynton Beach Briny Breeze Cloud Lake Delray Beach Golf Greenacres Gulf Stream Haverhill Highland Beach Hypoluxo Juno Beach Jupiter Jupiter Inlet Colony Lake Clarke Shores Lake Park Lake Worth Lantana Loxahatchee Groves Manalapan Mangonia Park North Palm Beach Ocean Ridge Pahokee Palm Beach Palm Beach Gardens Palm Beach Shores Palm Springs Riviera Beach Royal Palm Beach South Bay South Palm Beach Tequesta Wellington West Palm Beach

Estimated Surtax Revenue 1/2% - YEARLY 1/2% - 10 YEAR $122,757 $1,227,565 $1,066,257 $10,662,570 $5,302,341 $53,023,405 $4,382,033 $43,820,325 $25,212 $252,120 $8,139 $81,390 $3,836,910 $38,369,100 $15,238 $152,375 $2,361,505 $23,615,050 $59,910 $599,095 $120,493 $1,204,925 $219,139 $2,191,385 $163,513 $1,635,125 $195,456 $1,954,560 $3,504,194 $35,041,940 $24,233 $242,330 $205,615 $2,056,145 $518,748 $5,187,480 $2,228,896 $22,288,960 $652,153 $6,521,525 $194,783 $1,947,830 $24,968 $249,675 $120,676 $1,206,760 $745,475 $7,454,745 $108,927 $1,089,265 $334,062 $3,340,620 $499,961 $4,999,610 $3,063,837 $30,638,370 $70,191 $701,905 $1,278,175 $12,781,745 $2,063,976 $20,639,760 $2,219,227 $22,192,270 $184,258 $1,842,575 $83,347 $833,470 $344,465 $3,444,650 $3,618,812 $36,188,120 $6,384,019 $63,840,185

Project Costs $1,479,000 $11,085,000 $0 $48,550,458 $4,000,000 $203,500 $41,568,000 $0 $24,051,791 $900,000 $900,000 $2,372,000 $0 $0 $0 $7,847,290 $2,056,200 $37,091,000 $23,068,262 $8,925,000 $63,000,000 $249,675 $655,000 $8,650,000 $0 $9,450,000 $96,550,000 $19,450,000 $1,000,000 $15,645,750 $39,750,000 $31,628,166 $12,353,520 $13,585,000 $0 $36,100,000 $0

Municipalities (Cities) Infrastructure Surtax Project Lists

Project

Description From Orange Tree Dr to Congress Ave (RRR) and 42" RCP replacement From Military Tr to North Country Club Dr & From N. Country Club Blvd to Troon Dr Turnberry Court N and S

Expected Current Life Cycle Age

Est. Cost

Local_Govt

Category

Atlantis

Roadway

$190,000

Atlantis

Roadway

$78,000

Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis

Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway

$94,000 $38,000 $86,000 $47,000 $72,000 $15,000 $58,000 $25,000 $25,000 $36,000 $38,000 $38,000 $34,000 $46,000 $65,000 $15,000 $15,000

Club House Blvd

IMPROVE

North Country Club Drive

IMPROVE

Turnberry Drive Glenbrook Court Villa Drive South Walton Heath Drive North Countrv Club Drive Troon Drive French Royale Circle Colony Key Circle Cedar Key Circle Rio Vista Circle Driftwood Circle Yorktowne Circle Fairway Court Muirfield Circle Cypress Key Circle Rosemont Court Greenbrier Ct

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

Atlantis Bouievard/JFK Boulevard

IMPROVE

Atlantis

Roadway

$150,000

Glenbrook Drive Atrium Circle Palm Circle Windsor Court Westwood Court City Hall Parking Lot

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

Atlantis Atlantis Atlantis Atlantis Atlantis Atlantis

Roadway Roadway Roadway Roadway Roadway Public Works

$140,000 $18,000 $80,000 $15,000 $26,000 $35,000

Engineering & Public Works Bridge Replacements Bridge Replacements Street Lighting Signals and Signal Systems Drainage Improvements Sidewalks

Parks & Recreation

Type

Pathways Playground Equipment Replacement

From Glenbrook Dr. to Orange Tree Dr

Belle Glade Replace NW 2nd Street Bridge Replace NE 7th Street Bridge Upgrade all city-owned street lights to modern technology/LED; approx. 100 lts Upgrade all city-owned traffic lights to modern technology/LED; 11 lights Multiple drainage projects throughout the city Construct new sidewalks throughout city Rebuild campground boardwalk; resurface/build heart paths in city parks/marina

Belle Glade Belle Glade Belle Glade Belle Glade Belle Glade Belle Glade Belle Glade

Replace playground equipment at all city parks

2 of 22

1,500,000 1,800,000 1,000,000 385,000 1,000,000 750,000 500,000 500,000

Updated 09/23/2016

Municipalities (Cities) Infrastructure Surtax Project Lists

Sports Lighting Replacement

Replace tennis court and basketball court lighting at all parks

Sport Court Replacement/Resurfacing/Fencing Aquatic Facility Repair and Replacement Public Building/Restroom Replacement Sanitary Sewer Systems Veteran's Memorial Boynton Beach Blvd Extension Paver Repair Boynton Beach Blvd Extension Landscaping Boynton Beach Blvd Extension Paint Overhead Lighting Poles Boynton Beach Blvd (East of Federal Hwy) - Planters Box Repairs Children's Museum - Plaza Renovation Children's Museum - Painting Exterior & Soffit Repair

Belle Glade

750,000

Belle Glade Repair or replace tennis and basketball courts; replace fencing

750,000 Belle Glade

Repairs to Lake Shore Civic Center Pool

500,000

Belle Glade

Repair or replace bathrooms at City parks/marina Construct sanitary sewer system at Torry Island Marina/Campground Construct new veteran's memorial on City property

750,000

Belle Glade

800,000 100,000

Belle Glade

IMPROVE

Boynton Beach

Roadway

$10,000

IMPROVE

Boynton Beach

Roadway

$18,000

IMPROVE

Boynton Beach

Roadway

$16,000

IMPROVE

Boynton Beach

Roadway

$75,000

IMPROVE

Boynton Beach

Building

$20,000

IMPROVE

Boynton Beach

Building

$35,000

City Hall Complex – Amphitheatre Shade Replacement

REPLACE

Boynton Beach

Building

$5,000

City Hall Complex – Amphitheatre Paint Shade Structure

IMPROVE

Boynton Beach

Building

$10,000

IMPROVE

Boynton Beach

Building

$4,000

REPLACE

Boynton Beach

Building

$20,000

City Hall Complex – Commission Chambers Renovation

IMPROVE

Boynton Beach

Building

$120,000

City Hall Complex – Commission Chambers Replace Air Handler

REPLACE

Boynton Beach

Building

$0

REPLACE

Boynton Beach

Building

$750,000

IMPROVE

Boynton Beach

Building

$200,000

IMPROVE

Boynton Beach

Building

$90,000

City Hall Complex – Amphitheatre Paint Exterior City Hall Complex – City Hall Lobby paint and replace carpet

City Hall Complex – Generators and Switchgear City Hall Complex – Parking Garage Floors City Hall Complex – Rebuild Chillers

3 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists City Hall Complex – Kids Kingdom Play Area City Hall Complex – Kids Kingdom Parking area sealcoat City Hall Complex – Re-Roof City Hall Complex – Paint City Hall and Fire Station 1

IMPROVE

Boynton Beach

Building

$300,000

IMPROVE

Boynton Beach

Building

$10,000

REPLACE

Boynton Beach

Building

$325,000

IMPROVE

Boynton Beach

Building

$110,000

City Hall Complex – Sealcoat HS Parking (north) & Overlay West

IMPROVE

Boynton Beach

Building

$22,000

City Hall Complex – West Wing 1st floor restroom renovation

IMPROVE

Boynton Beach

Building

$55,000

City Hall Complex – West Wing 1st floor restroom renovation ADA

IMPROVE

Boynton Beach

Building

$15,000

City Hall Complex – West Wing Carpet change to VCT

IMPROVE

Boynton Beach

Building

$10,000

City Hall Complex – West Wing Bldg. Dept. Plan Review floor tile

IMPROVE

Boynton Beach

Building

$15,000

REPLACE

Boynton Beach

Building

$250,000

IMPROVE

Boynton Beach

Building

$40,000

IMPROVE

Boynton Beach

Building

$40,000

IMPROVE

Boynton Beach

Building

$4,000

IMPROVE

Boynton Beach

Building

$0

REPLACE

Boynton Beach

Building

$0

Civic Center – Roof Replacement

REPLACE

Boynton Beach

Building

$150,000

Civic Center – Sealcoat south lot

IMPROVE

Boynton Beach

Building

$0

Civic Center – Dumpster enclosure

IMPROVE

Boynton Beach

Building

$12,000

Civic Center – Paint Exterior Civic Center - Restrooms ADA Head Start Center – Seal coat parking lot Head Start Center – Seal coat parking lot ADA General Government - Carpet Replacement General Government - HVAC Repairs

IMPROVE IMPROVE

Boynton Beach Boynton Beach

Building Building

$25,000 $60,000

IMPROVE

Boynton Beach

Building

$10,000

IMPROVE

Boynton Beach

Building

$4,000

REPLACE

Boynton Beach

Building

$40,000

IMPROVE

Boynton Beach

Building

$160,000

City Hall Complex – West Wing Air Handler replacement Civic Center – Renovate Auditorium Stage Civic Center –Auditorium Ceiling Renovation Civic Center – Renovate Auditorium Stage ADA Civic Center – Playground Path ADA Civic Center – Playground Replacement

4 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists Library - Exterior Painting Library - Youth & Technical Services Space Modification Library - 2nd Floor Space Modification Library – Digital Sign Library – Youth Services Carpet Library – Seal Coat all lots Library – Renovate Restrooms Library – Renovate Restrooms ADA Library – Exterior Lighting and Security upgrades Library – Program Room Carpet and paint Library - ADA* Miscellaneous Small Projects Pistol Range ADA* Public Works Complex - Admin Bldg. & Warehouse Roofing Public Works Complex Painting Public Works Compound – Sealcoat parking lot Public Works Compound – Parking Lot ADA Public Works Compound – Paint all building exterior Public Works Compound – Paint fuel tanks Public Works Compound – Fleet Maintenance bay painting Public Works Compound – Fleet Maintenance Remodel

IMPROVE

Boynton Beach

Building

$0

IMPROVE

Boynton Beach

Building

$35,000

IMPROVE

Boynton Beach

Building

$30,000

IMPROVE IMPROVE IMPROVE IMPROVE

Boynton Beach Boynton Beach Boynton Beach Boynton Beach

Building Building Building Building

$35,000 $10,000 $20,000 $20,000

IMPROVE

Boynton Beach

Building

$22,000

IMPROVE

Boynton Beach

Building

$200,000

IMPROVE

Boynton Beach

Building

$14,000

IMPROVE IMPROVE IMPROVE

Boynton Beach Boynton Beach Boynton Beach

Building Building Building

$34,149 $40,000 $6,794

IMPROVE

Boynton Beach

Building

$60,000

IMPROVE

Boynton Beach

Building

$43,000

IMPROVE

Boynton Beach

Building

$9,000

IMPROVE

Boynton Beach

Building

$11,000

IMPROVE

Boynton Beach

Building

$20,000

IMPROVE

Boynton Beach

Building

$4,000

IMPROVE

Boynton Beach

Building

$25,000

IMPROVE

Boynton Beach

Building

$185,000

Public Works Compound – ADA*

IMPROVE

Boynton Beach

Building

$25,863

IMPROVE

Boynton Beach

Building

$16,088

IMPROVE

Boynton Beach

Building

$40,000

IMPROVE

Boynton Beach

Building

$75,000

REPLACE

Boynton Beach

Building

$30,000

IMPROVE

Boynton Beach

Building

$7,000

Art Center - Parking Lot Resealing

IMPROVE

Boynton Beach

Building

$16,000

Art Center - Parking Lot Lighting Art Center - ADA*

IMPROVE IMPROVE

Boynton Beach Boynton Beach

Building Building

$50,000 $22,905

Schoolhouse Children's Museum ADA* Misc. Interior/Exterior Building Projects Security - City Wide Upgrades Door Hardware Art Center - Ceiling Tile Replacement Art Center - Awning

5 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists

Barton Park - Replace Monument Sign & Paint Restroom

IMPROVE

Boynton Beach

Parks

$5,000

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$3,000

IMPROVE

Boynton Beach

Parks

$4,200

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$12,000

IMPROVE

Boynton Beach

Parks

$9,000

IMPROVE

Boynton Beach

Parks

$2,558

IMPROVE

Boynton Beach

Parks

$5,000

Boynton Lakes Park - Playground Equipment & Gazebo Painting

IMPROVE

Boynton Beach

Parks

$32,000

Boynton Lakes Park - Playground Equip & Gazebo Painting ADA

IMPROVE

Boynton Beach

Parks

$9,000

IMPROVE

Boynton Beach

Parks

$29,145

IMPROVE

Boynton Beach

Building

$25,000

IMPROVE

Boynton Beach

Building

$12,000

IMPROVE

Boynton Beach

Building

$11,000

REPLACE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$10,000

IMPROVE

Boynton Beach

Parks

$30,000

REPLACE

Boynton Beach

Building

$0

Barton Park - Restroom Renovation Barton Park - Restroom Renovation - ADA Betty Thomas Neighborhood Park Pavilion Wood Sealing Betty Thomas Neighborhood Park Parking Lot Resealing ADA Betty Thomas Neighborhood Park Spit Rail Fence Betty Thomas Neighborhood Park Playground Equipment Betty Thomas Neighborhood Park Basketball Court Fence Betty Thomas Neighborhood Park Tables and Cans Betty Thomas Neighborhood Park Tables and Cans ADA Bicentennial Park - ADA* Boynton Lakes Park - Park Furnishing

Boynton Beach Memorial Park (Cemetery) - ADA* Carolyn Sims Center and Denson Pool - Paint exterior Carolyn Sims Center – Sealcoat Parking Lot ADA Carolyn Sims Center –Sealcoat Parking Lot Carolyn Sims Center –Playground equipment replacement Carolyn Sims Center –Paint Pavilion and table Carolyn Sims Center –Paint site lighting poles and fixtures Carolyn Sims Center - HVAC Replacement

6 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists Congress Ave Barrier Free Park – Paint Poles

IMPROVE

Boynton Beach

Parks

$12,000

Congress Ave Barrier Free Park – Restroom Refurbishment

IMPROVE

Boynton Beach

Parks

$29,000

Congress Ave Pavilions painting

IMPROVE

Boynton Beach

Parks

$0

NEW

Boynton Beach

Parks

$200,000

IMPROVE

Boynton Beach

Parks

$3,756

IMPROVE

Boynton Beach

Parks

$0

REPLACE

Boynton Beach

Parks

$0

REPLACE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$3,548

IMPROVE

Boynton Beach

Parks

$12,000

IMPROVE

Boynton Beach

Parks

$15,000

IMPROVE

Boynton Beach

Building

$30,000

IMPROVE

Boynton Beach

Building

$150,000

IMPROVE

Boynton Beach

Parks

$20,000

IMPROVE

Boynton Beach

Parks

$5,000

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Building

$0

IMPROVE

Boynton Beach

Sewer

$40,000

IMPROVE

Boynton Beach

Building

$0

IMPROVE

Boynton Beach

Building

$0

IMPROVE

Boynton Beach

Building

$300,000

IMPROVE

Boynton Beach

Sewer

$25,000

IMPROVE

Boynton Beach

Parks

$100,000

Congress Ave Barrier Free Park – New Playground apparatus Edward Harmening Arbor Park ADA* Forest Hill Park – Basketball court upgrades Forest Hill Park – Playground Replacement ADA Forest Hill Park – Playground Replacement Galaxy Park - ADA* Hester Center - Basketball Court Resurfacing Hester Center - Park Furnishing Hester Center Building – Lobby Renovation Architect Services Hester Center Building – Lobby Renovation Construction Hester Center Ball fields – Football fence Hester Center Ball fields – Paint pavilion Hester Ball fields – Restroom Refurbishment Hester Ball fields – Restroom Refurbishment ADA Hester Center Building – Exterior Painting Hester Center – East Irrigation Well Hester Center Building – Game room carpeting Hester Center Building – Game room restrooms and ADA Hester Center Building – HVAC Hester Center Building – Administration Offices Drainage Repair Hester Center – Playground Equipment

7 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists Hester Center – Playground Equipment for ADA Hester Center – Playground Restroom Painting Hester Center – Pavilion Painting and roofing Hester Center – Parking Lot Seal Coat ADA Hester Center – Scrub Fence Hester Center – Accessible route from Center to Park Hester Center – Playground Restroom Refurbishment Hester Center – Tennis Court Resurfacing Hester Center – Tennis Court Resurfacing ADA Hester Center – Parking Lot Seal Coat Hester Center – Wood Pavilion Painting and roofing Hester Center – Wood Pavilion Painting and roofing ADA Heritage Park - ADA* Hibiscus Park – ADA* Hibiscus Park – Playground Equipment Hibiscus Park – Playground Equipment ADA Intracoastal Park - Carpet Replacement Intracoastal Park - Intracoastal Parking Lot Resealing Intracoastal Park – Sealcoat parking lot Intracoastal Park – Sealcoat parking lot ADA Intracoastal Park – Refurbish restrooms Intracoastal Park – Refurbish restrooms ADA Jaycee Park - Pavilion #1 and #2 Painting Jaycee Park - Interpretive Art Jaycee Park - Restroom Building Exterior Painting Jaycee Park - Park Furnishings

IMPROVE

Boynton Beach

Parks

$360,000

IMPROVE

Boynton Beach

Parks

$6,000

IMPROVE

Boynton Beach

Parks

$8,000

IMPROVE

Boynton Beach

Building

$25,000

IMPROVE

Boynton Beach

Building

$60,000

IMPROVE

Boynton Beach

Building

$8,000

IMPROVE

Boynton Beach

Parks

$16,000

IMPROVE

Boynton Beach

Parks

$10,000

IMPROVE

Boynton Beach

Parks

$3,000

IMPROVE

Boynton Beach

Building

$80,000

IMPROVE

Boynton Beach

Building

$8,000

IMPROVE

Boynton Beach

Building

$500

IMPROVE IMPROVE

Boynton Beach Boynton Beach

Parks Parks

$858 $24,164

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$30,000

IMPROVE

Boynton Beach

Parks

$45,000

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$50,000

IMPROVE

Boynton Beach

Parks

$25,000

IMPROVE

Boynton Beach

Parks

$8,000

IMPROVE

Boynton Beach

Parks

$10,000

IMPROVE

Boynton Beach

Parks

$12,000

IMPROVE

Boynton Beach

Parks

$10,000

8 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists Jaycee Park - Parking Lot Resealing Jaycee Park –Replace Playground equipment Jaycee Park –Sealcoat parking lot Jaycee Park –Sealcoat parking lot ADA Jaycee Park –Paint Pavilions Kiwanis Sierra Park - ADA* Knollwood Park - Gazebo Painting Knollwood Park – Gazebo Painting ADA Knollwood Park – Parking Lot Laurel Hills Park - Basketball Court Restoration Laurel Hills Park – Parking Lot Laurel Hills Park – Basketball Court ADA Laurel Hills – Split Rail Fence Laurel Hills Park – Playground Equipment Madsen Center - ADA* Mangrove Park - Flooring Mangrove Park - Boardwalk Mangrove Park – Fence Repair Mangrove Park – Bench replacement Mangrove Park – Interpretive markers Mangrove Park – Refurbish Restrooms Mangrove Park – Refurbish Restrooms ADA Mangrove Park – Sealcoat Parking Mangrove Park – trash can replacement Mangrove Walk at the Marina ADA* Meadows Park - Restroom Building Exterior Painting Meadows Park - Fitness Trail Equipment Meadows Park - Park Furnishings

IMPROVE

Boynton Beach

Parks

$5,000

REPLACE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE IMPROVE

Boynton Beach Boynton Beach

Parks Parks

$7,000 $2,039

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$3,000

IMPROVE

Boynton Beach

Parks

$8,000

IMPROVE

Boynton Beach

Parks

$2,000

IMPROVE

Boynton Beach

Parks

$20,000

IMPROVE

Boynton Beach

Parks

$50,000

IMPROVE

Boynton Beach

Parks

$0

IMPROVE IMPROVE IMPROVE IMPROVE

Boynton Beach Boynton Beach Boynton Beach Boynton Beach

Building Parks Parks Parks

$28,825 $7,500 $1,600,000 $8,000

IMPROVE

Boynton Beach

Parks

$3,000

IMPROVE

Boynton Beach

Parks

$10,000

IMPROVE

Boynton Beach

Parks

$6,000

IMPROVE

Boynton Beach

Parks

$7,000

IMPROVE

Boynton Beach

Parks

$12,000

REPLACE

Boynton Beach

Parks

$5,000

IMPROVE

Boynton Beach

Parks

$9,438

IMPROVE

Boynton Beach

Parks

$6,000

IMPROVE

Boynton Beach

Parks

$9,000

IMPROVE

Boynton Beach

Parks

$25,000

9 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists Meadows Park Pathways/Sidewalks Repair Meadows Park - Tennis Courts Fencing

IMPROVE

Boynton Beach

Parks

$75,000

IMPROVE

Boynton Beach

Parks

$12,000

Meadows Park – Fence Removal

IMPROVE

Boynton Beach

Parks

$6,000

Meadows Park – Basketball court

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$16,000

IMPROVE

Boynton Beach

Parks

$14,000

IMPROVE

Boynton Beach

Parks

$8,000

IMPROVE

Boynton Beach

Parks

$95,000

IMPROVE

Boynton Beach

Parks

$16,000

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$7,000

IMPROVE

Boynton Beach

Parks

$40,000

IMPROVE

Boynton Beach

Parks

$30,000

IMPROVE

Boynton Beach

Parks

$60,000

IMPROVE

Boynton Beach

Parks

$7,000

IMPROVE

Boynton Beach

Parks

$20,000

IMPROVE

Boynton Beach

Parks

$35,000

IMPROVE

Boynton Beach

Parks

$15,000

IMPROVE

Boynton Beach

Parks

$6,000

IMPROVE

Boynton Beach

Parks

$6,000

IMPROVE

Boynton Beach

Parks

$38,000

IMPROVE

Boynton Beach

Parks

$25,000

REPLACE

Boynton Beach

Parks

$0

Meadows Park – Parking Lot Sealcoat Meadows Park – Restroom Refurbishment Meadows Park – Restroom Refurbishment ADA Meadows Park – Playground Equipment Meadows Park – Playground Equipment ADA Meadows Park – Tennis Court Resurfacing and Fencing Meadows Park – Restroom Painting Miscellaneous Small Parks Projects Oceanfront Park - Parking Lot Lights Oceanfront Park – Sealcoat parking lot Oceanfront Park – Sealcoat parking lot ADA Oceanfront Park – Paint beachfront buildings and pavilion Oceanfront Park – Asphalt pathway Oceanfront Park – Stairway retaining wall Oceanfront Park – Refurbish restrooms Oceanfront Park – Refurbish restrooms ADA Oceanfront Park – South and Center Shade Sail poles Oceanfront Park – Shade sail poles Oceanfront Park – Playground replacement

10 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists

Oyer Park - Parking Lot Resealing

IMPROVE

Boynton Beach

Parks

$100,000

Oyer Park - Shade Sails Oyer Park – Coast Guard Bldg. and pavilion painting Oyer Park – Coast Guard Bldg. and pavilion painting ADA Oyer Park – Coast Guard Bldg. window replacement Oyer Park – Coast Guard Bldg. window replacement ADA Oyer Park - Dredge Channel Oyer Park – Restroom Refurbishment Oyer Park – Restroom Refurbishment ADA Oyer Park – Fishing Pier deck replacement Oyer Park – Playground Replacement Oyer Park – New Dumpster Enclosure Oyer Park – Paint Restroom Exterior Palmetto Greens Linear Park – Playground ADA Palmetto Greens Linear Park – Replace/maintain Picnic tables ADA Palmetto Greens Linear Park – Paint pavilion Palmetto Greens Linear Park – Overlay internal park path Palmetto Greens Linear Park – Overlay internal park path ADA Palmetto Greens Linear Park – Playground Palmetto Greens Linear Park – Playground ADA Parks-Furnishings (Cans, benches, picnic tables, etc.) Pence Park - Park Furnishings Pence Park – Basket Ball Court Pence Park – Basket Ball Court ADA Pence Park – Playground Replacement

IMPROVE

Boynton Beach

Parks

$15,000

IMPROVE

Boynton Beach

Parks

$14,000

IMPROVE

Boynton Beach

Parks

$2,000

REPLACE

Boynton Beach

Parks

$7,000

REPLACE

Boynton Beach

Parks

$7,000

IMPROVE

Boynton Beach

Parks

$100,000

IMPROVE

Boynton Beach

Parks

$8,000

IMPROVE

Boynton Beach

Parks

$7,000

REPLACE

Boynton Beach

Parks

$0

REPLACE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$15,000

IMPROVE

Boynton Beach

Parks

$5,000

IMPROVE

Boynton Beach

Parks

$4,000

IMPROVE

Boynton Beach

Parks

$5,000

IMPROVE

Boynton Beach

Parks

$3,000

IMPROVE

Boynton Beach

Parks

$8,000

IMPROVE

Boynton Beach

Parks

$4,000

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$20,000

IMPROVE IMPROVE

Boynton Beach Boynton Beach

Parks Parks

$6,000 $0

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$0

11 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists Pence Park – Playground Replacement ADA Pence Park – Paint Restroom exterior Pence Park –Restroom refurbishment Pence Park –Restroom refurbishment ADA Pence Park – Parking Spaces, new ADA Pioneer Canal Park - Fishing Pier Repair Pioneer Canal Park – Fishing Pier Path ADA Pioneer Canal Park – Split Rail Fence Pioneer Canal Park - Tennis Court Fencing Pioneer Canal Park – Basketball and Tennis Courts

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$5,000

IMPROVE

Boynton Beach

Parks

$6,000

IMPROVE

Boynton Beach

Parks

$14,000

IMPROVE

Boynton Beach

Parks

$5,000

IMPROVE

Boynton Beach

Parks

$8,000

IMPROVE

Boynton Beach

Parks

$8,000

IMPROVE

Boynton Beach

Parks

$75,000

IMPROVE

Boynton Beach

Parks

$15,000

IMPROVE

Boynton Beach

Parks

$16,000

IMPROVE

Boynton Beach

Parks

$18,000

IMPROVE

Boynton Beach

Parks

$10,000

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$10,000

IMPROVE

Boynton Beach

Parks

$0

IMPROVE

Boynton Beach

Parks

$14,000

IMPROVE

Boynton Beach

Parks

$13,000

IMPROVE

Boynton Beach

Parks

$16,000

IMPROVE

Boynton Beach

Parks

$8,000

IMPROVE

Boynton Beach

Parks

$9,000

IMPROVE

Boynton Beach

Parks

$20,000

IMPROVE

Boynton Beach

Parks

$13,000

Sara Sims Park Irrigation Upgrade

IMPROVE

Boynton Beach

Parks

$100,000

Sara Sims Park Parking Lot

IMPROVE

Boynton Beach

Parks

$40,000

Pioneer Canal Park – Basketball and Tennis Courts ADA Pioneer Canal Park – Can, Benches and Grills Pioneer Canal Park – Replace Boat Ramps Pioneer Canal Park – Parking Lot Pioneer Canal Park – Playground Equipment Pioneer Canal Park – Refurbish Volleyball court ADA Pioneer Canal Park – Restroom Refurbishment Pioneer Canal Park – Restroom ADA Sara Sims Park - Basketball Court Restoration Sara Sims Park - Park Furnishings Sara Sims Park – Restroom Renovation Sara Sims Park Restroom Renovation ADA

12 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists

Sara Sims Park Parking Lot ADA

IMPROVE

Boynton Beach

Parks

$7,000

Sara Sims Park Pavilion Sara Sims Park Water Fountain Sara Sims Park - ADA* Senior Center - Flooring Senior Center - Patio & Awning Repairs Tennis Center – Parking Lot Sealcoat Tennis Center – Parking Lot Sealcoat ADA Tennis Center – Parking Lot Median Upgrade Tennis Center – Clubhouse Repairs Tennis Center – Clubhouse Repairs ADA Tennis Center – Entry Sign Tennis Center – Entry Roadway Rehab Veterans Park - ADA* Citywide Public Safety Radio System

IMPROVE IMPROVE IMPROVE IMPROVE

Boynton Beach Boynton Beach Boynton Beach Boynton Beach

Parks Parks Parks Building

$40,000 $12,000 $30,198 $38,000

IMPROVE

Boynton Beach

Building

$8,000

IMPROVE

Boynton Beach

Building

$30,000

IMPROVE

Boynton Beach

Building

$5,000

IMPROVE

Boynton Beach

Building

$48,000

IMPROVE

Boynton Beach

Building

$41,000

IMPROVE

Boynton Beach

Building

$1,000

IMPROVE

Boynton Beach

Building

$3,000

IMPROVE

Boynton Beach

Building

$0

IMPROVE

Boynton Beach

Parks

$1,072

IMPROVE

Boynton Beach

Equipment

$2,500,000

Fire Training Site at Rolling Green

IMPROVE

Boynton Beach

Building

$100,000

IMPROVE

Boynton Beach

Building

$100,000

IMPROVE

Boynton Beach

Building

$30,000

IMPROVE

Boynton Beach

Building

$45,000

IMPROVE

Boynton Beach

Building

$30,000

IMPROVE

Boynton Beach

Building

$30,000

IMPROVE

Boynton Beach

Building

$55,000

IMPROVE

Boynton Beach

Building

$0

IMPROVE

Boynton Beach

Building

$0

IMPROVE

Boynton Beach

Building

$30,000

IMPROVE

Boynton Beach

Building

$23,000

IMPROVE

Boynton Beach

Building

$20,000

IMPROVE

Boynton Beach

Building

$20,000

Fire Station 2, 4, & 5 - Kitchen Renovations Fire Station #3 - Parking Lot Resealing Fire Station #4 - Exterior Painting Fire Station #3 – Apparatus bay ceiling Fire Station #3 – Community Room Soffits and Lighting Fire Station #5 – Reseal roof Fire Station #3 – Impact Windows Fire Station #3 – HVAC Condensers Fire Station #2 – Paint Building exterior Fire Station #3 – Sealcoat parking lot Fire Station #3 – Paint Exterior Fire Station #3 – Kitchen ceiling repair

13 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists Fire Station #5 - ADA* Fire & Rescue Records Management System Upgrade Police CAD Records Management System Alternative to SunGard/HTE ERP system Network Access Control Sidewalks - Replacement

IMPROVE

Boynton Beach

Building

$11,960

IMPROVE

Boynton Beach

Equipment

$190,138

IMPROVE

Boynton Beach

Equipment

$762,560

NEW

Boynton Beach

Equipment

$1,000,000

IMPROVE IMPROVE

Boynton Beach Boynton Beach

Equipment Roadway

$95,000 $300,000

Sidewalks Ramp - ADA (estimate)

IMPROVE

Boynton Beach

Roadway

$600,000

Street Maintenance/Impv. Bridge Repair - Maintenance & Improvements Golf Course Clubhouse - Pre Design/Consultant (TBD) Golf Course Clubhouse Construction/Renovation (TBD) Golf Course - Pave Cart Paths Golf Course - Cart Garage

IMPROVE

Boynton Beach

Roadway

$2,300,000

IMPROVE

Boynton Beach

Roadway

$180,000

IMPROVE

Boynton Beach

Parks

$80,000

IMPROVE

Boynton Beach

Parks

$2,000,000

IMPROVE IMPROVE

Boynton Beach Boynton Beach

Parks Parks

$250,000 $220,000

Golf Course - Course Restrooms

IMPROVE

Boynton Beach

Parks

$14,000

IMPROVE

Boynton Beach

Parks

$40,200

IMPROVE IMPROVE IMPROVE NEW

Boynton Beach Boynton Beach Boynton Beach Boynton Beach Briny Breeze Briny Breeze

Parks Parks Parks Building Drainage

$33,000 $8,000 $20,000 $28,000,000 $1,000,000 $3,000,000

Cloud Lake

Building

$75,000

Cloud Lake

Roadway

$8,500

Cloud Lake

Roadway

$120,000

Delray Beach

Building

40 years

Delray Beach Delray Beach Delray Beach

Roadway Parks

50 5+ 10

$1,042,000 $310,000 $150,000

Delray Beach

Roadway

20

$18,000,000

Delray Beach

Parks

15

$410,000

Golf Course - Course Restrooms ADA Golf Course - Parking Golf Course - Parking ADA Golf Course - Pavilion New Police Facility Drainage Improvements Sanitary Sewer/Septic Systems Town Hall Modification

REPLACE

Lang Road Traffic Calming

IMPROVE

Resurfacing

IMPROVE

New Fire Station #3

NEW

Seacrest Bv-NE 8th St G Stream FS Lifeguard Towers LED lights parking garages

IMPROVE REPLACE REPLACE

Streets, sidewalks, alleys

IMPROVE

Teen Center Skate Park

REPLACE

Town Hall modification for hardening and energy efficiency by replacing the flat roof with a pitched standing seam metal hip roof and seal/stucco the building at a projected cost for design, engineering and construction. Extended length speed hump where the two (2) lakes meet with railing on either side at a projected cost for design, engineering and construction. Milling, resurfacing, striping and pavement marking on all five (5) streets in Town. Replace Fire Station #3 to meet current codes and regulations including Engineering Design and Construction Management Utility and Streetscape improvements Replace lifeguard towers at municipal beach Replacement of lights in parking garages with LED Deferred maintenance and replacement for streets, sidewalks, and alleys Skate park repair and replacement

14 of 22

25 years+

$4,600,000

Municipalities (Cities) Infrastructure Surtax Project Lists Hilltopper Park Pompey Park Old School Square Tactical Observation Platform

IMPROVE IMPROVE IMPROVE NEW

Buildings and street lights

IMPROVE

Tennis Center Jail Doors Replacement

REPLACE

Elevator Upgrade

IMPROVE

Front Lobby Doors and Windows Replacement Water Vessel Mobile Command Vehicle

Soundproofing - Investigations

REPLACE NEW NEW

IMPROVE

New building and lights Pool redesign, shade system, gym improvements Old School Square Site/Park Improvements Tactical Observation Platform for Events and Incidents Deferred maintenance and replacement for buildings and upgrade of street lights to LED Seat replacement and court rehabilitation Replacement of steel jail doors that are no longer repairable and need replacing for proper operation. Upgrades to the elevator to increase safety and ensure proper function. Replacement of front lobby doors and windows to impact/hurricane rated. Boat to provide patrol of waterways Mobile Command to be utilized during incidents, special events, natural disasters, tactical operations Soundproof polygraph and interview rooms with soundproof material; this will allow utilization of multiple interview rooms at the same time when mutiple suspects are involved.

Delray Beach Delray Beach Delray Beach Delray Beach

Parks Parks Parks Equipment

25 15 25 5+

$640,000 $470,000 $320,000 $75,000

Delray Beach

Building

10

$768,000

Delray Beach

Parks

5+

$425,000

Delray Beach

Building

10+

$175,000

Delray Beach

Building

10+

$35,000

Delray Beach

Building

10+

$60,000

Delray Beach

Vehicle

Delray Beach

Vehicle

10+

$600,000

Delray Beach

Building

10+

$40,000

Delray Beach

Equipment

5+

$100,000

Delray Beach

Equipment

5+

$165,000

Delray Beach

Equipment

10+

$400,000

Delray Beach

Building

10+

$65,000

Delray Beach

Vehicles

5+

$200,000

Delray Beach

Utilities

50

$1,275,000

$130,000

In-car video and equipment

NEW

Patrol Vehicle GPS

NEW

ALPR and Downtown Cameras

NEW

Video Control Room

NEW

Crime Scene Investigator vehicles

NEW

Golf Club Estates Wtr Swr

NEW

New equipment (in-car video cameras, docking stations, command boxes, etc.) to equip new vehicles purchased to replace old and unrepairable vehicles. GPS equipment for patrol vehicles To reduce crimes in high tourist areas. ALPR cameras are license plate recognition cameras. Nearby cities are already utlizing these technologies to reduce crimes and have higher percentage of crimes solved. Consultant, design and wall repositioning if needed. Purchase of CSI vehicles as take home vehicles to ensure prompt response time to crime scenes and equipment availability. Water and Sewer construction

NEW

Design and Construction of Reclaim Water System expansion

Delray Beach

Utilities

50

$2,500,000

Delray Beach Delray Beach Delray Beach Delray Beach Delray Beach Delray Beach

Water Equipment Building Building Seawall Roadway

50 7 years 5+ 5+ 50 50

$983,000 $1,500,000 $70,000 $60,000 $3,000,000 $3,000,000

Reclaimed Water, Area 12C Delray Shores W/M PH 3 Downtown Roundabout Fire Station 1 Fire Station 5 Public Seawalls Marine Way

IMPROVE NEW IMPROVE IMPROVE REPLACE IMPROVE

Upgrade to 8" Water Mains New electric or hybrid or natural gas trolleys Apparatus floor and living quarters improvements Apparatus floor improvements Increase public seawall height to adapt to higher tides Replace street including streetscape improvements

Tenth Ave Corridor Improvement

IMPROVE

Entry feature, special pavement markings

Greenacres

Roadway

$431,500

Haverhill and Melaleuca Bowman Street Dillman Road Sidewalk Swain Blvd Sewer Study City Parks Improvements

IMPROVE IMPROVE NEW IMPROVE REPLACE

Median landscaping, irrigation, electrical Drainage, repaving, sidewalk Sidewalk, including right-of-way purchase Initial engineering for sewer extension project Replacement of play structures and amenities

Greenacres Greenacres Greenacres Greenacres Greenacres

Roadway Roadway Sidewalk Sewer Parks

$115,000 $150,000 $94,750 $20,000 $793,500

15 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists Parks Court Resurfacing Parks/Building Parking Lot Resurfacing Public Grounds Rejuvenation Park Lighting Enhancement Community Center Expansion Equipment

REPLACE

Resurface courts in various parks

Greenacres

Parks

$170,000

IMPROVE

Repave parking areas, improve ADA access

Greenacres

Parks

$320,000

REPLACE IMPROVE IMPROVE NEW

Replace dead, missing material various parks and bldg Retrofit park lighting with LED lights Expand existing Community Center Equipment for new city park

Greenacres Greenacres Greenacres Greenacres

Parks Parks Parks Parks

$90,000 $149,000 $3,500,000 $75,000

Public Works Equip. Replacement

REPLACE

Replace lawn equipment, tractors, trailers, etc.

Greenacres

Public Works

$207,800

Vehicle Replacement Computer Terminal Hardware Roof Replacement Painting Storm Water Pipe Road Resurfacing Restriping Air Conditioning Public Safety HQ Reno Original Section Drainage

REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE REPLACE IMPROVE IMPROVE

Replace public works, fire department passenger veh. Replace obsolete computers in all departments Replace worn out roofs at various buildings Repaint various public and parks buildings Repair and replacement of stormwater drainage pipe Repave various public streets per schedule Replace obsolete airconditioners various buildings Adapt spaces to current Fire Department functions Install engineered storm drainage in oldest neighborhood

Greenacres Greenacres Greenacres Greenacres Greenacres Greenacres Greenacres Greenacres Greenacres

Public Works Public Works Public Works Public Works Public Works Roadway Public Works Public Works Sewer

$1,079,441 $284,900 $188,000 $257,100 $185,000 $708,000 $327,800 $150,000 $1,425,000

Median Landscape Rejuvenation

IMPROVE

Lanscaping and irrigation on Jog Road

Greenacres

Roadway

$600,000

Fire Apparatus Replacement

REPLACE

Replace obsolete aerial platform ladder truck and pumper Install sanitary sewer in oldest neighborhood to replace septic tanks Install sidewalks throughout city to fill in gaps and provide complete system

Greenacres

Vehicle

$1,980,000

Greenacres

Sewer

$10,000,000

Greenacres

Sidewalk

$750,000

Sanitary sewer for Original Section

NEW

Sidewalks

NEW

Town-wide Street Paving

IMPROVE

Gulf Stream

Roadway

$500,000

Town-wide Drainage Improvement

IMPROVE

Gulf Stream

Drainage

$400,000

IMPROVE

Haverhill

Roadway

IMPROVE

Haverhill

Drainage

Highland Beach Highland Beach

Vehicle Vehicle

Highland Beach

Roadway

$1,200,000

Jupiter Inlet Colony

Planning/Engine ering

$898,000

Jupiter Inlet Colony

Sewer

50

$3,472,594

Jupiter Inlet Colony

Sewer

50

$2,053,720

Jupiter Inlet Colony

Roadway

20

$1,407,976

Resurface Concord Avenue and Charlotte Street Park and Cyprus Lane Drainage Improvements; Club Road Drainage Improvements Fire Rescue Vehicle Fire Rescue Vehicle Design & Construct Walkpath Improvements

2016R2

NEW NEW

Fire truck Emergency rescue van

IMPROVE

General Planning and Engineering

NEW

Sanitary Sewer Installation

NEW

Drainage/Stormwater Improvements

IMPROVE

Roadway Replacement

REPLACE

Anticipated Annual Maintenance Year 2 Road Resurfacing Plan

IMPROVE IMPROVE

Planning, engineering and miscellaneous expenses. Eliminate all septic systems and install new sanitary sewer system throughout Town. Install new exfiltration trench drainage system to greatly reduce outflow to waterways. Install new roadways throughout Town with 18" valley gutters along each side to direct runoff into new exfiltration trench drainage system. Maintaining/repairing infra-structure elements. Nemec Drive, Clark Rd, Palm Rd, Edgewater

16 of 22

Jupiter Inlet Colony Lake Clarke Shores

20

18

$60,000

40

$840,000

10+ 10+

15yrs

$850,000 $322,000

UNK

$15,000 $205,000

Municipalities (Cities) Infrastructure Surtax Project Lists 2017R3 2017D1 2018R4 2019R5 2019D1 2020R6 2021R7 2022R8 2023B1 2024B2 2024D1

Year 3 Road Resurfacing Plan Drainage improvements Year 4 Road Resurfacing Plan Year 5 Road Resurfacing Plan Drainage Improvements Year 6 Road Resurfacing Plan Year 7 Road Resurfacing Plan Year 8 Road Resurfacing Plan Replace the Pinetree Bridge Second Yr Construction PT Brg Drainage Improvements

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE NEW NEW IMPROVE

Carambola, Carandis and Venetian Way Westlake Drive Drainage Improvements Travis, Lin Mar, Haden, Alpha Ct, Beta Ct Pine Tree Lane Arlington, Palm Drainage Improvements Barbados, Antigua, Laurel Ln Gregory, Bartlett, West Lake MICA's, North Lake, South Lake Replace the Pinetree Bridge 2nd yr of Bridge construction Barbados Rd Drainage Improvements

Mill roadways in advance of paving

IMPROVE

62 Lane Miles

Lake Park

Roadway

$875,000

Overlay roads with 1" asphalt

IMPROVE

62 Lane Miles

Lake Park

Roadway

$3,800,000

Replace sidewalks (50% of total)

REPLACE

Lake Park

Sidewalk

$6,100,000

Roadway centerline striping

IMPROVE

(100 ft. back from ea. Intersection), skip lane striping, & pavement edge striping 15 Miles

Lake Park

Roadway

$36,000

(91) 4-way Intersections

Lake Park

Roadway

$550,000

(91) 4-way Intersections

Lake Park

Roadway

$76,000

(91) 4-way Intersections

Lake Park

Roadway

$11,000

(91) 4-way Intersections

Lake Park

Roadway

$4,000

(43) 3-way Intersections

Lake Park

Roadway

$130,000

(43) 3-way Intersections

Lake Park

Roadway

$65,000

(86) 3-way Intersections

Lake Park

Roadway

$36,000

(86) 3-way Intersections

Lake Park

Roadway

$6,000

(86) 3-way Intersections

Lake Park

Roadway

$2,000

Lake Shore Drive Reconstruction

3500 ft. - Less Pump Station ($1,571/ft)

Lake Park

Roadway

$5,500,000

Park Avenue - Six blocks Street Light Improvements Tenth Street Design & Reconstruct (2,300 ft) Gateway Road (1,320 ft) 10TH AVE S 10TH AVE S 12TH AVE S 14TH AVE N 14TH AVE N

3800 ft. ($1,737/ft)

Lake Park Lake Park

Roadway Roadway

$6,600,000 $8,000,000

($1,571/ft)

Lake Park

Roadway

$3,600,000

Lake Park LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

Roadway ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

$1,700,000 49,412.24 31,651.21 49,415.14 37,656.23 19,616.70

ADA compliant sidewalk corners (8 /intersection) Street name signs ($830 ea. intersection) Thermo-plastic stop bars ($125 ea. intersection) Roadway centerline striping (2 approaches@ 50' ea.) ADA compliant sidewalk corners (4 I intersection) ADA compliant sidewalk corners (2/ intersection) Street name signs ($415 ea. intersection) Thermo-plastic stop bars ($65 ea. intersection) Roadway centerline striping (1 approach @ 50')

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

Lake Clarke Shores Lake Clarke Shores Lake Clarke Shores Lake Clarke Shores Lake Clarke Shores Lake Clarke Shores Lake Clarke Shores Lake Clarke Shores Lake Clarke Shores Lake Clarke Shores Lake Clarke Shores

($1,311/ft) ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

17 of 22

15yrs 15yrs 15yrs 15yrs 15yrs 15yrs 15yrs 15yrs 50 50 15

20+ 20+ 20+ 20+ 20+

UNK UNK UNK UNK UNK UNK UNK UNK 50 50 UNK

$205,000 $45,200 $205,000 $205,000 $39,000 $205,000 $205,000 $205,000 $245,000 $245,000 $47,000

Municipalities (Cities) Infrastructure Surtax Project Lists 18TH AVE N 1ST AVE S 20TH AVE N 3RD AVE N 4TH AVE N 4TH AVE N AKRON ST COLGATE LN N F ST N H ST N J ST N N ST N O ST N PALM WAY S M ST S M ST S M ST S N ST YALE DR 12TH AVE N 12TH AVE S 14TH AVE N 14TH AVE S 17TH AVE N 18TH AVE N 18TH AVE N 21ST AVE N 3RD AVE S 4TH AVE N 4TH AVE S 5TH AVE N 6TH AVE N BARNETT DR LAKE GENEVA DR LAKE GENEVA DR LAKESIDE PALMS CT N D ST N G ST N H ST N L ST N M ST N PALM WAY PARK ST S E ST S L ST S M ST

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

18 of 22

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+

33,320.20 49,412.01 67,754.70 49,412.24 50,956.49 49,412.24 108,190.89 35,317.07 40,155.26 71,393.39 40,155.26 67,935.63 40,164.67 67,954.92 67,935.63 67,935.63 67,927.62 67,935.86 186,054.35 46,900.03 49,408.80 37,053.38 54,804.38 38,594.15 32,061.29 32,053.49 42,044.78 36,863.71 49,412.24 50,956.49 49,421.66 50,946.84 188,516.93 31,708.93 31,708.93 30,877.03 62,654.06 67,954.92 53,765.70 67,954.92 67,935.63 67,964.57 41,687.90 136,343.98 67,945.51 67,954.92

Municipalities (Cities) Infrastructure Surtax Project Lists S N ST S RIDGE ST WELLESLEY DR 11TH AVE S 12TH AVE S 13TH AVE N 15TH AVE N 18TH AVE N 23RD AVE N 24TH AVE N 6TH AVE S 7TH AVE N 7TH AVE N 8TH AVE S 9TH AVE N N K ST N L ST N LAKESIDE DR N PALM WAY PINE TER SOUTH RD 12TH AVE S 15TH AVE N 19TH AVE N 1ST AVE S 4TH AVE S 5TH AVE S 7TH AVE N 8TH AVE N 9TH AVE N COCHRAN DR LAKE GENEVA DR N B ST N G ST N H ST N J ST S M ST S PINE ST YALE DR 10TH AVE S 12TH CT N 13TH AVE N 15TH AVE N 15TH AVE S 16TH CT N 17TH AVE N

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

19 of 22

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+

67,935.86 302,300.63 52,636.03 27,189.14 27,791.95 42,927.78 38,594.15 32,061.51 68,951.64 69,357.30 54,035.80 49,412.24 47,863.37 31,660.86 49,402.36 67,954.92 67,954.92 67,935.63 67,964.80 39,207.70 23,185.31 49,409.00 38,603.80 136,200.95 43,495.04 50,985.66 50,947.07 49,412.01 49,412.01 24,778.47 34,525.95 118,198.86 64,585.62 67,964.57 69,203.74 67,954.92 46,364.07 106,644.27 72,989.43 49,402.59 124,796.19 32,425.64 123,336.86 38,605.92 156,905.62 40,128.98

Municipalities (Cities) Infrastructure Surtax Project Lists 21ST AVE N 2ND AVE N 4TH AVE N 5TH AVE S 9TH AVE N COCHRAN DR COCHRAN DR CREST DR N B ST N B ST N C ST N C ST N C ST N G ST N GOLFVIEW RD N K ST N L ST OCEAN BREEZE PRINCETON DR S DOUGLAS ST S L ST SUNSET AVE 11TH AVE N 12TH AVE S 12TH AVE S 13TH AVE N 13TH AVE N 14TH CT S 4TH AVE N 4TH AVE S 4TH AVE S 7TH AVE N 7TH AVE S 9TH AVE N CENTRAL TER DARTMOUTH DR FORDHAM DR GEORGIA LN GRISWOLD DR N B ST N C ST N C ST N L ST N L ST N L ST N LAKESIDE DR

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

20 of 22

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+

68,150.46 131,619.32 49,402.59 27,045.84 50,956.72 38,602.19 21,410.91 31,271.48 67,957.52 67,969.32 67,954.92 67,954.70 64,818.64 67,954.92 40,155.26 67,066.92 67,954.92 67,964.34 83,038.54 38,176.42 67,993.74 91,547.41 49,412.24 20,880.14 8,128.05 16,980.36 6,178.16 123,521.91 49,412.01 26,226.48 49,402.59 51,665.25 51,004.95 49,412.24 49,364.14 23,512.90 23,512.90 35,317.27 161,136.02 71,337.36 67,964.57 67,964.34 67,964.80 67,954.92 67,964.57 67,954.92

Municipalities (Cities) Infrastructure Surtax Project Lists N LAKESIDE DR N N ST N N ST N N ST S E ST 22ND AVE N 2ND AVE N 3RD AVE N 4TH AVE S 5TH AVE S 9TH AVE N 9TH AVE S CLEMSON CT COCHRAN DR DARTMOUTH DR KILGORE LN N B ST N C ST N J ST N L ST N L ST N LAKESIDE DR N N ST OCEAN BREEZE S G ST S LAKESIDE DR S LAKESIDE DR 11TH AVE N 12TH AVE S 12TH AVE S 12TH AVE S 13TH AVE N 15TH AVE S 16TH AVE S 17TH AVE N 18TH AVE S 22ND AVE N 7TH AVE N N DETROIT ST N G ST N H ST N LAKESIDE DR N O ST N PALM WAY PIERCE DR PIERCE DR

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

21 of 22

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+

40,155.03 67,935.63 75,300.61 67,945.51 38,946.28 23,582.48 43,118.80 127,193.34 43,591.51 17,750.71 15,743.16 43,746.10 46,321.17 88,142.33 83,028.89 31,103.03 68,044.35 71,100.86 93,055.91 67,954.92 67,964.80 67,954.92 67,935.63 67,954.70 61,225.52 67,964.34 69,498.95 33,210.30 11,907.86 33,214.47 32,394.64 15,567.87 32,881.71 21,801.18 25,950.77 28,594.37 72,652.36 33,210.30 137,630.87 45,681.88 45,681.88 45,682.03 45,681.88 45,681.88 30,863.18 38,174.42

Municipalities (Cities) Infrastructure Surtax Project Lists S B ST S E ST S K ST S PALMWAY S PALMWAY S PINE ST 10TH AVE N 11TH AVE S 14TH AVE N 17TH AVE N 17TH AVE N 17TH AVE S 1ST AVE S 4TH AVE S 4TH AVE S 7TH AVE N 9TH AVE N GODFREY DR COCHRAN DR COLUMBIA DR CREST DR N GOLFVIEW RD N H ST N J ST N O ST PARK ST 14TH AVE N 17TH AVE S 22ND AVE N 24TH AVE N 3RD AVE N 4TH AVE S 5TH AVE S 7TH AVE N 7TH AVE N 8TH AVE S COCHRAN DR CREST DR HIGHLAND AVE N C ST N D ST N H ST N J ST N M ST N O ST 12TH AVE N

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

22 of 22

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+

68,888.50 68,316.83 45,149.93 45,681.72 45,688.21 203,390.74 33,216.63 30,241.24 24,924.95 170,794.06 170,794.06 40,141.73 33,223.27 33,223.27 33,216.78 39,542.66 10,584.45 34,024.93 11,204.97 71,615.09 27,514.19 46,726.62 45,681.88 50,327.93 46,720.13 14,021.89 26,470.07 37,007.27 18,688.79 15,859.36 33,216.78 33,216.78 33,216.78 25,235.42 25,858.49 19,233.20 25,023.77 20,986.07 23,055.03 45,681.88 42,118.34 45,681.88 45,688.36 26,993.73 45,688.36 74,465.38

Municipalities (Cities) Infrastructure Surtax Project Lists 12TH AVE S 13TH AVE N 13TH AVE S 15TH AVE S 18TH AVE N 1ST AVE S 22ND AVE N 22ND AVE N 22ND AVE N 23RD AVE N 24TH AVE N 3RD AVE N 4TH AVE N 4TH AVE N 5TH AVE N 5TH AVE S 7TH AVE N 8TH AVE N COLUMBIA DR MOOR DR N A ST N A ST N A ST N D ST N J ST N LAKESIDE DR N O ST N PALM WAY PENNSYLVANIA DR PINE TER S J ST S J ST S K ST S LAKESIDE DR S M ST 12TH AVE S 16TH AVE N 16TH AVE N 2ND AVE S 4TH AVE N 5TH AVE N 6TH AVE S ALTON RD CINDY DR DUKE DR N C ST

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

23 of 22

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+

21,623.49 24,912.68 21,794.83 25,945.88 26,470.07 36,311.94 46,085.86 70,704.67 17,759.12 27,254.40 26,871.46 33,223.27 33,210.30 33,216.63 34,261.37 25,670.12 37,340.81 34,255.04 65,405.32 36,341.86 45,687.61 35,672.98 45,682.03 35,547.87 49,893.27 45,681.88 45,681.88 45,688.36 26,987.40 39,507.20 46,201.01 46,726.47 43,092.72 45,681.72 45,707.67 33,212.24 25,944.45 25,950.94 33,216.63 34,255.04 33,210.30 33,210.30 49,651.33 60,143.38 25,947.68 46,719.98

Municipalities (Cities) Infrastructure Surtax Project Lists N E ST N RIDGE RD NOTRE DAME DR PENNSYLVANIA DR S K ST 11TH AVE S 12TH AVE N 19TH AVE N 1ST AVE S 23RD AVE N 7TH AVE S 8TH AVE N BUCKNELL LN CRESTWOOD BLVD E COAST AVE N EMORY LN MARYLAND DR N F ST N G ST N J ST N RIDGE RD S F ST S K ST S L ST S LAKESIDE DR S N ST WASHINGTON AVE WELLESLEY DR WELLESLEY DR 15TH AVE S 15TH AVE S 17TH AVE S 20TH AVE N 5TH AVE S 6TH AVE N 8TH AVE N 8TH AVE N 8TH AVE N 8TH AVE S BARTON CT DUQUESNE LN FINN ST MARYLAND DR N C ST N D ST N L ST

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

24 of 22

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+

43,603.68 44,773.91 31,565.32 26,980.92 45,668.91 21,277.15 33,223.27 88,745.34 34,254.88 15,859.52 33,210.30 64,137.52 23,741.47 12,761.18 28,026.97 23,741.47 12,912.16 45,681.88 45,681.88 45,681.88 14,499.82 45,681.88 28,540.51 45,681.88 15,054.72 45,513.26 19,719.17 15,729.18 18,715.75 25,747.17 25,952.36 45,644.39 81,613.17 22,211.65 33,210.30 33,210.30 33,216.63 33,216.78 27,954.32 22,565.47 23,741.47 43,170.09 44,420.50 45,675.39 26,993.89 44,987.49

Municipalities (Cities) Infrastructure Surtax Project Lists N LAKESIDE DR PARK ST PIERCE DR PIERCE DR RAILROAD AVE S LAKESIDE DR S N ST VERNON ST VERNON ST 10TH AVE N 12TH AVE N 12TH AVE N 12TH AVE S 13TH AVE S 22ND AVE N 2ND AVE N 5TH AVE S 7TH AVE N 9TH AVE N BARNETT DR BARTON RD CARSON AVE CRESTWOOD BLVD FLORIDA ST N A ST N B ST N B ST N B ST N B ST N D ST N D ST N D ST S DOUGLAS ST S GOLFVIEW RD S LAKESIDE DR S PALMWAY SUNSET DR VANDERBILT DR 12TH AVE N 12TH AVE N 13TH AVE N 13TH AVE N 15TH AVE S 1ST AVE S 22ND AVE N 3RD AVE N

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

25 of 22

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY

20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+

44,552.83 42,773.29 70,704.53 19,547.09 58,386.85 45,681.72 45,668.91 32,810.40 33,935.32 33,216.78 34,261.37 33,216.63 75,425.09 48,125.16 44,447.64 15,845.91 26,044.91 51,320.21 34,261.37 19,694.31 2,205.76 70,704.67 84,981.32 28,019.17 31,145.34 45,683.96 45,683.96 45,684.12 46,715.73 42,118.34 48,079.32 45,688.21 26,053.98 45,639.24 11,725.78 38,290.87 18,046.19 15,806.85 33,216.78 33,210.30 33,225.04 14,529.61 34,736.77 33,216.78 22,707.96 33,216.78

Municipalities (Cities) Infrastructure Surtax Project Lists 5TH AVE N 6TH AVE N 8TH AVE N 9TH AVE S AMHERST LN BARNETT DR BARTON RD BRENTWOOD DR CARTER LN N A ST N E ST N K ST N LAKESIDE DR N M ST N PALM WAY PARK ST PARK ST PARK ST PARK ST PARK ST PRINCETON DR S D ST S D ST S DOUGLAS ST S LAKESIDE DR S LAKESIDE DR S LAKESIDE DR S N ST S PALMWAY VERNON ST WASHINGTON AVE WELLESLEY DR WELLESLEY DR STORMWATER MASTER PROJECT 6 STORMWATER MASTER PROJECT 8 STORMWATER MASTER PROJECT 17 Renovation/Addition of Town Hall Rennovation/Addition to Town Library 901 S. 8th St building improvements

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE NEW

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY STORMWATER

LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH LAKE WORTH

ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY STORM

20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+ 20+

33,216.63 33,216.63 33,210.14 33,223.11 23,741.47 33,567.14 82,772.54 85,857.10 36,603.24 20,460.64 26,993.89 43,267.98 46,726.77 50,327.93 45,681.88 28,822.84 28,024.33 28,024.19 28,024.05 16,936.33 65,392.35 44,468.37 51,934.01 34,248.40 53,118.29 45,668.91 26,373.88 45,669.06 50,228.45 45,013.31 13,970.99 25,948.99 11,238.77 380,000.00

NEW

STORMWATER

LAKE WORTH

STORM

20+

3,011,000.00

NEW

STORMWATER

LAKE WORTH

STORM

20+

251,000.00

IMPROVE

Lantana

Building

$1,250,000

IMPROVE

Lantana

Building

$500,000

Lantana

Building

$500,000

IMPROVE

Improvements to the 10,000 sf building to be used to house the Police Department.

26 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists

Improvements to beach Improvements to master lift station building and property Repavement of 66 lane miles of town roads Repavement of parking lots

IMPROVE

Improvements/repairs to boardwalk/handrails, pavilions, playground, parking meters.

Lantana

Beach

$200,000

IMPROVE

Replace existing building and fence/landscape.

Lantana

Sewer

$400,000

IMPROVE

$74,700/per lane mile x 66 lane miles

Lantana

Roadway

$5,000,000

IMPROVE

Operations Dept, Maddock Park, 901 8th St

Lantana

Building

$400,000

Lantana

Sidewalk

$200,000

Lantana

Parks

$75,000

IMPROVE

Lantana

Building

$250,000

IMPROVE

Lantana

Building

$150,000

Loxahatchee Groves Loxahatchee Groves

Roadway Water

Town-wide sidewalk improvements

IMPROVE

Lyman Kayak Park improvements

IMPROVE

Marine Safety Building renovation improvements Beach building renovation improvements Road Improvements Water Utilities Sidewalk Replacement Impact Windows Towhall Repave roadways Regrade swales 53rd Street & Byrd Mawr Neightborhood Drainage Town Hall Modification Deck System Replacement Dugouts and Gress Infield Jackie Robinson Field Park Restroom Remodel Jackie Robinson Field Lights Basketball Court Resurfacing Engineering &   Bridges

NEW NEW

Kayak park equipment, seating, pavilion.

Improve 58 miles of roadway install main water lines

IMPROVE

Replace sidewalks on Point Manalapan

Manalapan

NEW IMPROVE IMPROVE

Replace/install impact windows Repave Town Roads Regrade swales on Point Manalapan for drainage

Manalapan Manalapan Manalapan

0 0 5 yr - 12 yrs 6 yrs 20 yrs

$58,000,000 $5,000,000 $56,000 $50,000 $83,675 $60,000

IMPROVE

Mangonia Park

Roadway

35

IMPROVE REPLACE

Mangonia Park Mangonia Park

Building Parks

30 30

IMPROVE

Mangonia Park

Parks

30

$35,000

IMPROVE IMPROVE IMPROVE

Parks Parks Parks

25 30 15

$45,000 $175,000 $25,000

IMPROVE NEW

Mangonia Park Mangonia Park Mangonia Park North Palm Beach North Palm Beach North Palm Beach North Palm Beach North Palm Beach North Palm Beach North Palm Beach North Palm Beach North Palm Beach North Palm Beach Pahokee Pahokee

Roadway Public Works

IMPROVE

Pahokee

Public Works

$1,000,000

NEW NEW

Pahokee Pahokee

Building Building

$4,000,000 $2,000,000

Lighthouse Drive Bridge Rehabilitation Resurfacing Roadway Resurfacing Pathways Residential Sidewalk Repair & Replacement Street Lighting Western Communities Drainage Improvements Stormwater Drainage System Improvements Resurfacing City limits entry signage (2) East Lake Village Canal reconstruction New City Hall Public Works Facility

20 years 30 years

27 of 22

$250,000 30 15

$75,000 $50,000

50 Years

$1,165,000

20 Years

$3,450,000

40 Years

$300,000

40 Years

$1,000,000

50 Years

$2,735,000 $350,000 $100,000

Municipalities (Cities) Infrastructure Surtax Project Lists Renovate Parks & Rec. Facility/Campus

IMPROVE

Pahokee

Building

$2,000,000

Town-wide Underground Utilities

NEW

Palm Beach

Sewer

$90,000,000

Lake Trail Improvements Town-wide Improvements Town-wide Street Paving Storm Water Structures/Pipe Fire Station One Shady Lakes Blvd. Extension City Park Expansion Johnson Dairy Road/Military Improvements City Hall Expansion Hardened Records Facility Resurface Roads & Improve Intersections Drainage improvements Paving unpaved streets Playground improvements Park improvements Park land acquisition Ball field renovations Dock replacements Water playground replacement Outdoor exercise facility with shade canopy Vehicle replacement New and replacement motorized equipment Sidewalks/walking paths Police car cameras Remodel and equip Utility Billing office Police Department 2nd floor Emergency generators Police Radios & radio system Indoor shooting range Storage for seized vehicles and evidence (includes land) Parks video surveillance Information Technology Infrastructure GIS linked government management software Street resurfacing Congress Avenue “complete street” improvements

IMPROVE IMPROVE IMPROVE REPLACE IMPROVE NEW IMPROVE

Palm Beach Palm Beach Palm Beach Palm Beach Gardens Palm Beach Gardens Palm Beach Gardens Palm Beach Gardens

Sidewalk Sidewalk Roadway Sewer Fire Roadway Parks

$950,000 $600,000 $5,000,000 $3,700,000 $5,000,000 $3,000,000 $3,500,000

IMPROVE

Palm Beach Gardens

Roadway

$2,000,000

IMPROVE NEW

Palm Beach Gardens Palm Beach Gardens

Building Building

$2,000,000 $250,000

IMPROVE

Palm Beach Shores

Roads

$1,000,000

IMPROVE NEW IMPROVE IMPROVE NEW IMPROVE IMPROVE REPLACE

Palm Springs Palm Springs Palm Springs Palm Springs Palm Springs Palm Springs Palm Springs Palm Springs

Sewer Roadway Parks Parks Parks Parks Parks Parks

$2,000,000 $545,000 $275,000 $420,000 $250,000 $500,000 $50,000 $250,000

NEW

Palm Springs

Parks

$150,000

REPLACE

Palm Springs

Vehicle

$2,392,000

REPLACE

Palm Springs

Vehicle

$188,500

NEW NEW

Palm Springs Palm Springs

Sidewalk Equipment

$700,000 $200,000

REPLACE

Palm Springs

Building

$30,000

NEW NEW NEW NEW

Palm Springs Palm Springs Palm Springs Palm Springs

Building Building Equipment Building

$2,625,000 $155,000 $300,250 $150,000

NEW

Palm Springs

Land

$1,000,000

NEW

Palm Springs

Equipment

$135,000

NEW

Palm Springs

Equipment

$150,000

NEW

Palm Springs

Equipment

$100,000

IMPROVE

Palm Springs

Roadway

$1,500,000

IMPROVE

Palm Springs

Roadway

$1,500,000

Drainage / ADA / Curb & Gutter / Sidewalk Based on condition assessment. To 117th Court

28 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists Bike lanes, 2nd Ave North to 6th Avenue South Pedestrian safety enhancements at Congress and 10th Avenue North

IMPROVE

Palm Springs

Roadway

$30,000

IMPROVE

Palm Springs

Roadway

$50,000

New City Hall

Replace

New Library

Replace

Palm Beach Isles Roadway Connection Land for Fire Station #2

Improve Improve Acquisition

Site selection, engineering, design and construction of a new City Hall Complex. Site selection, engineering, design and construction of a new Library Design, permitting and construction cost for the replace of coverts for access to Palm Beach Isles Includes design, permitting and construction for connection Purchase of land adjacent to Fire Station #2

New Fire Station #2

Replace

New Fire Station #3

Replace

Singer Island Phase II Partfidge Walkway Improv. Okeechobee Blvd. Lighting Sparrow Pathway Villagewide ADA Improv. Basketball/Tennis Court Repair Windows Replacement Renovations Cultural Center

Replace IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE

Riviera Beach

Building

50 yrs.

40 yrs.

$15,000,000

Riviera Beach

Building Coverts Replacement Roadway

50yrs.

40 yrs.

$10,000,000

30 - 40 yrs 30 yrs. 30 - 40 yrs 30 yrs.

$1,274,000 $883,400 $750,000

Site engineering, design and construction of a new Fire Station. Riviera Beach

Building

50yrs

30 yrs.

$4,500,000

Site engineering, design and construction of a new Fire Station. Design, permiting and construction cost for roadway reconstruction in Palm Beach Isles

Riviera Beach

Building

50 yrs.

30 yrs.

$4,500,000

Riviera Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach

Roadway Sidewalk Roadway Sidewalk Sidewalk Parks Building Building

30 -40 yrs

30 yrs.

$2,842,600 $52,067 $970,000 $750,116 $725,000 $219,155 $18,000 $133,477

Riviera Beach Riviera Beach Riviera Beach

Bob Marcello Park Enhancements

IMPROVE

Royal Palm Beach

Parks

$86,195

ADA Access to Kayak Commons Amphitheatre Commons N. Access/Pathway Commons Park Restrooms Skate Park Phase II Playscape Cultural Center Expansion Park Furniture Camellia Parking Lot Commons 3 Hole Golf Course Commons Parking lot paving Sports Light replacement Recreation Center Expansion Park Security Cameras Driveway R&R Over Inline Draining Inline Drainage Willows Subdivision Road Resurfacing

IMPROVE NEW NEW NEW IMPROVE REPLACE IMPROVE REPLACE NEW NEW IMPROVE REPLACE IMPROVE IMPROVE

Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach

Parks Buildings Sidewalk Buildings Parks Parks Building Parks Parks Parks Parks Parks Buildings Parks

$75,000 $550,000 $470,000 $320,000 $110,000 $1,500,000 $1,620,000 $156,000 $1,000,000 $1,225,000 $750,000 $350,000 $3,200,000 $150,000

IMPROVE

Royal Palm Beach

Drainage

$17,500

IMPROVE

Royal Palm Beach

Drainage

$12,500

REPLACE

Royal Palm Beach

Roadway

$10,250,000

29 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists

Storm Drain Outfall Replacement

REPLACE

Royal Palm Beach

Drainage

$162,000

Bus Shelters Roof Replacement VH Restroom/Lobby ADA Improvements PBSO District #9 Locker Room Renovation A/C Replacement FOC Louver Cover Rec Ctr Chiller Inline Drainage Willows PBSO Lobby Hardening

NEW REPLACE

Royal Palm Beach Royal Palm Beach

Roadway Building

$36,000 $793,250

IMPROVE

Royal Palm Beach

Building

$40,000

IMPROVE

Royal Palm Beach

Building

$30,000

REPLACE REPLACE IMPROVE IMPROVE

Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach

Building Building Drainage Building

$17,500 $20,000 $12,500 $107,500

Backflow Preventer Replacement

REPLACE

Royal Palm Beach

Building

$100,000

Street Restriping Street Sign R&R Village Hall Outfall Replacement Canal System Dredging Communty Center Storm Water Drainage Improvement SE 1st Ave RRR SE 2nd Ave RRR SE 3rd Ave RRR SE 4th Ave RRR SE 3rd St RRR NW 1st St RRR NW 6th Ave RRR NW 9th Ave RRR NW 10th Ave RRR NW 5th Ave RRR NW 7th Ave RRR NW 11th Ave RRR NW 2nd St RRR NW 12th Ave RRR SW 10th Ave RRR SW 4th Ave RRR SW 7th Ave RRR SW 6th Ave RRR SW 5th Ave RRR SW 4th Ave RRR SW 1st St RRR SW 3rd Ave RRR Sidewalks Real Property Purchase Kayak Launch Roof Replacement Lift Station Building

REPLACE REPLACE REPLACE IMPROVE IMPROVE

Royal Palm Beach Royal Palm Beach Royal Palm Beach Royal Palm Beach South Bay

Roadway Roadway Drainage Drainage Building

$200,000 $200,000 $30,000 $5,169,406 $2,137,000

South Bay

Sewer

$1,353,100

IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE IMPROVE NEW NEW NEW

South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Bay South Palm Beach South Palm Beach

Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Roadway Sidewalk Land Parks

$412,605 $412,605 $412,605 $412,605 $331,780 $756,840 $98,580 $332,045 $332,045 $98,580 $98,580 $332,045 $662,500 $332,045 $343,705 $343,705 $343,705 $343,705 $343,705 $185,500 $251,750 $212,000 $1,470,185 $7,000,000 $250,000

REPLACE

South Palm Beach

Building

$100,000

IMPROVE

Engineering, surveying and construction of the identified problem areas

30 of 22

Municipalities (Cities) Infrastructure Surtax Project Lists

Town Hall ADA Compliant Egress

IMPROVE

South Palm Beach

Sidewalk

$50,000

Street Light Upgrades LED Powerline Undergrounding Recreational Trail AIA East Side Beach Re-nourishment and Groin Construction Town Entrance Sign Enhancements

IMPROVE IMPROVE NEW

South Palm Beach South Palm Beach South Palm Beach

Roadway Utilities Sidewalk

$200,000 $2,000,000 $1,000,000

REPLACE

South Palm Beach

Beach

$1,600,000

IMPROVE

South Palm Beach

Public Works

$50,000

Generator Replacement Town Hall

REPLACE

South Palm Beach

Building

$70,000

Generator Replacement Sanitary Lift Station

REPLACE

South Palm Beach

Building

$70,000

Gasoline Fuel Tank Replacement

REPLACE

South Palm Beach

Building

$25,000

Sanitary Sewer Line Replacements

REPLACE

South Palm Beach

Sewer

$645,000

REPLACE

South Palm Beach

Sewer

$125,000

REPLACE

South Palm Beach

Sewer

$400,000

Sanitary Sewer Force Main Replacement Sanitary Sewer Lift Station Replacement C‐9 Canal Conveyance Improvements Community Park Renovation

Improve the conveyance of the C‐9 canal

Wellington

Renovate existing park facilities and fields Wellington

Crosswalk Upgrades ‐ ADA Compliance

Install ADA Crosswalk Equipment at All Signalized Intersections ‐ $200,000 per yr for 10 yrs

Equestrian Trail Improvements

Improve existing trails and construct new trails in equestrian areas Rebuild existing segment of roadway ‐ existing road is substandard & asphalt surface fails prematurely Renovate the existing multipurpose field Rebuild existing segment of roadway ‐ existing road is substandard & asphalt surface fails prematurely Rebuild existing segment of roadway ‐ existing road is substandard & asphalt surface fails prematurely New and enhanced streetlighting on Village thoroughfares, $2.5 million, 5 year plan $500,000 per year

Greenview Shores North Rebuild Olympia Field Renovations Pierson Road East Rebuild South Shore Central Rebuild Streetlight Additions

VP Maintenance Complex Wellington Environmental Preserve Wellington Trace East Rebuild

Expand facility at Village Park to accommodate park maintenanceneeds Permanent storage structure to replace sheds

Wellington

Wellington Wellington Wellington Wellington Wellington Wellington Wellington Wellington

Rebuild existing segment of roadway ‐ existing road is substandard & asphalt surface fails prematurely 31 of 22

Wellington

Canal maintenance Maintenance of added features & equipment Equipment maintenance and replacement

$2,600,000

Trail maintenance NA

$4,000,000

NA NA

$1,000,000 $4,250,000

NA

$6,000,000

Annual electric ($240/yr per light) Building maintenance Building maintenance NA

$2,500,000

$6,500,000

$2,000,000

$2,750,000

$750,000 $500,000 $3,250,000