Large Infrastructure Projects ltd. Sofia, Bulgaria
New Pan - European transport and water management project A special issue for TEN-T days and UIC Global Rail Freight Conference Rotterdam, 20 - 23 June 2016
• Large Infrastructure Projects Ltd. is a private Bulgarian company with headquarters in Sofia. • Large Infrastructure Projects ltd. is the creator and the developer of both ABC+De and Trerivs projects. • ABC+De means Aegean sea to Baltic sea Connection and Danube river. • ABC+De project is a new Pan- European transport and water management project for the Danube and tributaries. • Trerivs is a new water management and transport project for the rivers of Thrace- Maritsa ( Evros, Meric ), Arda, Tundza, Eritropotamos and Ergene. • The ABC + De project evolved from a study of new port on the Aegean Sea and new railway connecting the port and the site for the new plant in the middle of Bulgaria (town of Nikolaevo ) for processing of ores to the largest Pan-European project extending from the Aegean Sea, and Marmara Sea to Baltic Sea and North Sea as well as all along the Danube. • Project finance will be the method to provide funds for the building ABC+De railways, ports and logistics centers, based upon the projected cash flows. • Not planned to use EU funds for the ABC+De project design and construction costs.
The objectives of the ABC+De project are: 1. To create a new highly effective connection for transportation of goods between Suez Canal, Eastern Mediterranean, Middle East, Aegean sea and Marmara Sea regions , South East Europe and Eastern Europe, Central Europe, Northern Europe and the Baltic region; 2. Be set up a new Europe trade gateway to Africa, Middle and Far East; 3. To transform the Danube river into an efficient inland waterway, which can be relied on throughout the whole year; 4. To create a new passenger high-speed train lines between Istanbul, Bursa, Bucharest, Vienna, Sofia, Warsaw and Berlin; 5. To reduce greenhouse gases, environmental pollution and harmful impact of road transport; 6. Increasing economy of the regions covered by the project; development of tourism.
BALTIC SEA ENGLISH CHANNEL
WISLA BALTIC PORT
WLLC
ADRIATIC SEA
BUJORU PORT YANTRA PORT
TYRRHENIAN SEA
BLACK SEA
NEW AIRPOR STATIO T N
FERES PORT
IONIAN SEA
AEGEAN SEA
ABC + De project elements are: 1. A new port in the town of Feres (Greece) at Aegean sea; 2. SNS ( South- North Stream ) - high efficient new double line railway; 3. New ports on the 533+000th km on the Danube river, which will be hubs for the countries linked by the river; 4. A new port on the Baltic Sea; 5. Large number of new logistics centers around the ports and along new SNS railway; 6. Activities on the Danube that: - convert the river ( also Sava and Tisa ) into an effective, reliable and environmentally friendly transport way; - terminate the floods .
FERES PORT The new port will be composed of two parts. Deep section is located in Greek territorial waters. The part in land is intended for ships carrying new cars, for ferries and cruise ships. The two parts are connected with a channel.
Feres port • Deep sea water port, capable to handling more than 25 m draught ships; • Terminals for bulk cargo, containers, oil , LNG , general goods, agricultural products , semi – trailers , newly produced cars and other vehicles ; for acceptance of ferries and cruise ships; • May adopt ships due to the size and type of load can not pass through the Straits; • Feres will be one of the few European ports where can berth new 26 300 TEUs ULCS; • New European trade gate; • Hub for Eastern Mediterranean, Aegean sea, Marmara sea , Black Sea, Azov Sea. Provided all conditions for transshipments; • Connectivity with railways, available highway and international airport; • Existing and new build supporting infrastructure - water, electricity, gas main pipeline; • “Green” port; • Design capacity - 400 million tons per year (phased), quay walls over 100 km (phased).
WISLA BALTIC PORT
Wisla Baltic port • Designed primarily for the new Aegean sea- Baltic sea “green" corridor; • Terminals for containers, bulk cargo, LNG , general goods, agricultural products , semi –trailers , newly produced cars and other vehicles ; for acceptance of ferries; • Hub for the Baltic countries and Norway; • Design capacity - 150 million tons per year incl. 8 million TEUs, quay walls- 12,5 km.
New railway - South-North Stream (SNS) • New double line railway running from Feres port, passing through Eastern and Central Europe to a new port on the Baltic Sea ( near the city of Elblag – Poland ); • The railway is intended primarily for freight trains. The parameters of railroad are designed also for high-speed trains movement; • Branches which connect to the railway backbone include new railway routes to and from Istanbul , Bursa , Bucharest (reconstruction) , Budapest, Vienna, Warsaw (reconstruction), Hamburg / Bremerhaven/Cuxhaven via Berlin; • SNS is characterized by: high capacity + high commercial speed = high efficiency in a block train: up to 149 km/h competitive prices 476 TEUs or 1092 new cars average speed for prompt deliveries or 4 529 980 Nm³ NG the freight trains fifteen times bigger throughput huge amount of loads up to than an average 1,2 billion t per year European railway
Scheme of the railway stations along the new ABC+De project railroad
• SNS railway • characteristics • • • • • • • • • • • • • • • •
Track gauge - 1435 mm; standard European railway; No of lines – 2; Ballastless tracks ; Static reference profile - width – 3250 mm, height- 6150 mm; appropriate for double stack container trains; Curve radius – not less than 7000 m ; Vertical curve – not less than 45000 m ; Max. slope -14 ‰ ; Warp - max. 110 mm; Maximum speed for freight trains - 160 km/h; Maximum speed for high-speed passenger trains - 380 km/h; Axle load - 31,5 t per axle; (in the rest European railways axel load is 22,5t) Train weight max. - 8500 t (Thinking about 20 000 ton trains ); Train length max. - 1775 m ; Rail stations length not less than 2250 m; Distance between stations – 16 300 m - 29 200 m; Catenary- AC 25 kV, 50 Hz; Total power of locomotives in a freight train – 21 600 kW; Designed for driverless trains.
Freight locomotives
ROLLING STOCK- freight in ABC+De project Electrical Locomotives 25 kV 50 Hz Co-Co , Bo-Bo, Bo-Bo-Bo-Bo Load per axle 31,5 t Power - not less 7000 kW; Total power of the locomotives no more than 21 600 kW Max. service speed 160 km / h Automatic coupling Train controlDRIVERLESS TRAINS (state of the art)
New innovative wagons Load per axle 31,5 t Max. service speed 160 km/h Monitoring system Low noise New type brakes, dynamic brakes, energy regeneration, remote control Automatic coupling
ABC+De freight trains timetables FERES PORT - WISLA BALTIC PORT FREIGHT TRAIN timetable
Feres sea port GR Lyubimets station BG Tsenovo station BG Alexandria East station Piteshti Nord station Sibiu West Logistic center station Mera ( Cluj- Napoca west) station Carei East station H-SK-UA Log Center station Mihalovce East station Tylawa station PL Debica North station WLLC station Radoszky station Wisla pre port station
Distance, km Duration of travel, h:min Average speed, km/h
1653,100 11:54 139,03
Time,h
Local time,h
0 0 2 2 3 4 5 6 6 7 8 8 10 11 11
0 0 2 2 3 4 5 6 5 6 7 7 9 10 10
FERES PORT - Vienna West Log. Center FREIGHT TRAIN timetable Minutes 0 54 24 41 45 37 38 28 58 15 15 42 8 9 54
Feres sea port GR Lyubimets station BG Tsenovo station BG Alexandria East station RO Piteshti Nord station Sibiu west logistic Center station Simeria, Deva station Carani East station RO Szeged South station H Szekesfehervar West station Gyor East station H Bratislava East Log. Center station SK Devinska Nova Ves North station SK Vienna West Log. Center A
Local Time,h time, h Minutes 0 0 0 0 0 59 2 2 17 2 2 34 3 3 40 4 4 31 5 5 3 6 6 3 6 5 36 7 6 42 8 7 12 8 7 35 8 7 47 9 8 16
FERES PORT - Berlin South Log. Center FREIGHT TRAIN timetable
Feres sea port GR Lyubimets station BG Tsenovo station BG Piteshti Nord station RO Sibiu West Logistic center station Carei East station RO Mihalovce East station SK Tylawa station PL Debica North station WLLC station Poznan South station PL Brieskow-Finkenheerd station D Berlin South Log. Center- Schonefeld airport connection
Distance , km
Distance, km Duration of travel, h:min Average speed, km/h
1361,320 9:16 146,9
1864,97
Duration of travel, h:min 12:32
Average speed, km/h
148,8
Time,h 0 0 2 3 4 5 6 7 7 9 10 11 12
Local time, h 0 0 2 3 4 5 5 6 6 8 9 10 11
minutes 0 56 11 32 21 55 43 31 58 19 57 52 32
SWEDEN
DENMARK UNITED KINGDOM
NORTH SEA BALTIC SEA
Cuxhaven Bremerhaven
Hamburg
RUSSIA LITHUANIA
Gdansk
NETHERLANDS ENGLISH CHANNEL
Berlin
RUSSIA
BELARUS
BELGIUM
GERMANY
Warsaw Lodz
POLAND
R=300km CZECH REPUBLIC
FRANCE
UKRAINE
Vienna
SWITZERLAND
SLOVAKIA Bratislava
AUSTRIA
Gyor
MOLDOVA
Budapest
ROMANIA
Iasi
Cluj-Napoca
SLOVENIA
Zagreb
Bacau
Szeged
HUNGARY
Sibiu
CROATIA
300 km distance from SNS railway for road transport feeding
Brasov
Pitesti Belgrade
ITALY
BOSNA AND HERZEGOVINA ADRIATIC SEA
Bucharest Constanta
SERBIA Varna
MONTENEGRO KOSOVO
BULGARIA Nikolaevo
Sofia
MAKEDONIA
TYRRHENIAN SEA
Edirne
ALBANIA GREECE
IONIAN SEA
BLACK SEA
Feres
AEGEAN SEA
Istanbul
Bursa
TURKEY
What is high speed passenger train? - On existing lines in excess of 200 km/h - On new lines in excess of 250 km/h In the ABC+De project the max. service speed for passenger trains is 360 km/h
High Speed Train destinations in the ABC+De project are: New Istanbul airport - Berlin New Istanbul airport - Bucharest New Istanbul airport - Warsaw New Istanbul airport - Vienna Bucharest - Berlin Bucharest - Warsaw Bucharest - Vienna Warsaw - Berlin New Istanbul airport - Sofia Bucharest - Sofia
ROLLING STOCK for high speed trains on ABC+De project • EMU ( electric multiple units ); • 25 kV, 50 Hz, triple voltage or hybrid Poland- 61,4 km route from Warsaw-Lodz Logistic Center (WLLC ) to Warsaw Centralna -3 kV DC; Germany- 25,3 km route from Berlin South Logistic Center (BSLC) to Berlin Hauptbahnhof- 15 kV AC 16 2/3 Hz; • Capacity- multiple about 500 passengers; • Service speed - 360 km/ h; • Bi-level EMUs are preferred; • Does not require tilting; • Train control- DRIVERLESS TRAINS ( state of the art ).
ABC+De high speed passenger trains timetables Warsaw- Berlin Warsaw centralna
6
Makolice station Poznan South station
7
Berlin South Log. Center- Schonefeld airport connection Berlin Hauptbahnhof
8
0 14 0 19 0 New Istanbul airport station 30 30 30 Kapikule station TR 9 15 9 20 9 Nikolaevo south station
55 55 55 8 16 8 21 8
578 ,430 km distance 2h 9min duration 270,47 average speed
New Istanbul airport - Vienna
New Istanbul airport - Berlin
Piteshti East station Sibiu West Log. center station Mera (Cluj-Napoca west) station H-SK-UA Log Center station Debica North station Makolice station Poznan South station Berlin South Log. CenterSchonefeld airport connection Berlin Hauptbahnhof
6 6 7 8 8 9 9 10 11 11 12 12 6 h 52 min 292,70 2 008,25
0 44 11 1 31 0 8 40 9 22 10 15 10 54
16 16 17 18 18 19 19 20 21 21
18 19 20 20
0 44 71 1 31 0 40 22 15 54
11 39 22 21 39 11 52 22 21 52 duration km/haverage speed km distance
New Istanbul airport station Kapikule station TR
6 0 16 6 46 16 Nikolaevo south station 7 12 17 Piteshti East station 8 3 18 Sibiu West Logistic center station 8 33 18 Simeria, Deva station 8 52 18 Carani East station 9 23 19 Szeged South station 9 8 44 19 18 Kecskemet South Log. C. station 10 9 4 20 19 Budapest Keleti 10 9 32 20 19 11 4 Gyor East -station Gabchikovo 10 11 21 20 Bratislava hlavni stanica 11 10 26 21 20 Vienna central station 11 10 45 21 20 1487,345 km distance 5 h 46 min duration 258,48 km/haverage speed
0 46 12 3 33 52 23 44 4 32 4 11 26 45
ABC+De target market
NORTH SEA NORTH ATLANTIC OCEAN
BALTIC SEA ENGLISH CHANNEL
WISLA BALTIC PORT
WLLC
ADRIATIC SEA
STRAIT OF GIBRALTAR
BUJORU PORT YANTRA PORT
TYRRHENIAN SEA
BLACK SEA
NEW AIRPORT STATION
FERES PORT
IONIAN SEA
AEGEAN SEA
MEDITERRANEAN SEA
DANUBE RIVER NEW WATERWAY CHANNEL NEW DAM NEW RAILWAY
SUEZ CANAL
BALTIC SEA
Cuxhaven
BULGARIAGREECETURKEY-
Po z Lo na g. n S ce ou nt th er
W a Lo rsa g. wce Lo nt dz er
WLLC
CZECH REPUBLIC h ort aN r bic ente e D g. c Lo
SLOVAKIA
A H-SK-U ter Log. cen t s Ea t s r pe nte da e Bu og. c th Sou L MOLDOVA Budapest t met ter e s k s e n c ROMANIA e e c Iasi w K . g r o Iasi Log. center L va er ter ca o eh cen Bacau p f a er Zagrebes . HUNGARY Szeged Bacau Log. center t j-N ek og Clu . cen Sz L Log Sibiu Brasov
Gyor
es t
KOSOVO
sti
Sofia
Varna Nikolaevo
BLACK SEA
ter
en .c
g Lo
Edirne er nt e .c Feres og Istanbul lca sL Cata nter et Feres m i rFERES Log. ce b te i n e c L Log. PORT AEGEAN outh est Bursa ma S SEA Bandirg. center Bursa W Lo o ev
GREECE
Constanta
BULGARIA
MAKEDONIA ALBANIA
Bucharest
an e
Si
biu
W
MONTENEGRO
Ca lim
SERBIA
Bu c
.c
Lo g
Belgrade
Pi
ADRIATIC SEA
Pitesti
d a-
BOSNA AND HERZEGOVINA
Lo g. Lo te ce g. sti Ol nt c B te L er e og ra n Bu ni L t . c so er ch og vL e n ar . c te og es en r .c t W te en es r te r tL .c.
er
en t
.c
Lo g
ut h So
CROATIA
ha r Lo est g. No ce rth nt -W er es t
Cluj-Napoca
en te r
SLOVENIA
Bratislava
Ar a
AUSTRIA
UKRAINE
Bu d Lo ape g. st ce W nt es er t
Vienna
m iso ar
ROMANIA-
Lodz
POLAND
eg ed
SLOVAKIAHUNGARY-
Warsaw
Ti
AUSTRIA-
RUSSIA
BELARUS
Sz
POLAND-
Hamburg South; Uelzen North; Berlin South Poznan South; Warsaw-Lodz; FRANCE Debica North Vienna West; Heimatland; Devinska Nova Ves North SWITZERLAND H-SK-UA; Gyor; Szekesfehervar West; Budapest West; Budapest East; Kecskemet South; Szeged South Timisoara-Arad; Cluj-Napoca; Sibiu West; Calimanesti; Pitesti; ITALY Brasov; Bacau; Iasi; Bucharest North-West Bucharest West; Olteni TYRRHENIAN Nikolaevo; SEA Lyubimets Feres Catalca; Bandirma South Bursa
Berlin
He Vi e im at Log nna lan .c W e De d L en st v No inska og. ter rth No ce Lo g va nt Lo Gy . cen Veesr g. or ter ce nt er
GERMANY-
GERMANY
LITHUANIA
BALTIC PORT
Lo Zag g. re ce b nt er
BELGIUM
RUSSIA Gdansk WISLA
Be Lo rlin g. S o ce ut nt h er
New Logistic centers
Hamburg
Ue Lo lzen g. ce Nor nt th er
NETHERLANDS
Bremerhaven h out gS bur nter m a e H .c Log
la ko Ni
TURKEY
The principle of the ABC + De project for the Danube is “ add value ” The formula of the ABC + De project for Middle and Lower Danube is
7 in 1 1. no more floods 2. less drought 3. effective river navigation- all around year , 4 m draft 4. ecology and biodiversity 5. connectivity 6. green energy 7. unified management of the river and its tributaries , in one - the ABC+De project In the ABC+De project the elements of the infrastructure on the Danube are compulsorily in the following order: 1. Dams and other hydraulic structures on the river and its tributaries; 2. Railways; 3. Highways and roads; 4. Joint transport solutions for cities on both sides of the river; 5. Recreational trails for bicycle and tourism.
The ABC+De project activities will make the Danube river in a effective waterway • From the river mouth to 1895th km the characteristics of a convoy of barges and pusher will be: • Dimensions: - length - 301,00 m ; - draft - 4,00 m in the whole year (even at the lowest waters); - beam - 33,20 m. Speed up to 17 km/ h • Capacity up to 29 000 tones of cargo ; up to 2250 TEUs. • As a result of the reduced distance and increased speed, the travel time from the new ports, located at the 533,000th km to Bratislava / Vienna will be halved.
ABC+De project 1. To create a new highly effective connection for transportation of goods between Suez Canal, Eastern Mediterranean, Middle East, Aegean Sea and Marmara Sea regions , South East Europe and Eastern Europe, Central Europe, Northern Europe and the Baltic region; 2. Be set up a new Europe trade gateway to Africa, Middle and Far East; 3. Conversion of the Danube in constant all year around, efficient and environmentally friendly transport corridor; 4. To create a new passenger high-speed railway lines between Istanbul, Bursa, Aegean Sea, Bucharest, Budapest, Bratislava, Vienna, Sofia, Warsaw and Berlin; 5. To reduce greenhouse gases, environmental pollution and harmful impact of road transport; 6. Increasing the growth rate of the economies of the regions (respectively of countries) in the project scope. The objectives of the Large Infrastructure Projects ltd. are to realize the ABC + De project . Large Infrastructure Projects ltd. is in process of preparing the action plan that will involve the governments, municipalities, NGOs, expert and public for project implementation.
Proposal to include the ABC+De project in the Core Network Corridors as New Aegean-Baltic corridor NORTH ATLANTIC OCEAN
TEN-T CORE NETWORK CORRIDORS BALTIC SEA
NORTH SEA
Gdansk
Wisla Baltic Port
Hamburg Bremerhaven Warsaw
Berlin
ENGLISH CHANNEL
Passau
ABC+De PROJECT: NEW RAILWAY BYPASS AND NAVIGATION CHANNALS New Dam
Bratislava Vienna
BALTIC - ADRIATIC NORTH SEA - BALTIC MEDITERRANEAN ORIENT / EAST - MED SCANDINAVIAN - MEDITERRANEAN RHINE - ALPINE ATLANTIC NORTH SEA - MEDITERRANEAN RHINE - DANUBE
Budapest
AEGEAN-BALTIC Sebes Sibiu
Bucharest Pitesti
BLACK SEA
Belgrade
Yantra Port Nikolaevo Sofia
Edirne
Istanbul
ADRIATIC SEA Bursa
Feres Port TYRRHENIAN SEA
IONIAN SEA STRAIT OF GIBRALTAR
AEGEAN SEA
MEDITERRANEAN SEA SUEZ CANAL
LARGE INFRASTRUCTURE PROJECTS LTD, 1407 Sofia, 28 Banat str., Bulgaria, tel. +35929632099, f. +35928657326, e-mail:
[email protected]