Horsehead Holding Corp: Transformative Change with ~60% Upside

September 4, 2013 Horsehead Holding Corp: Transformative Change with ~60% Upside Horsehead Holding Corp. (“ZINC” or “the company”) is on schedule to...
Author: Darlene Powers
0 downloads 1 Views 1MB Size
September 4, 2013

Horsehead Holding Corp: Transformative Change with ~60% Upside

Horsehead Holding Corp. (“ZINC” or “the company”) is on schedule to complete a transformational process by Q3 2013, from which the company will emerge as one of the lowest-cost producers of zinc metal products in the world. The company is only months away from opening a new plant that will increase EBITDA by 300%, independent of the price of zinc. The increase in EBITDA will be driven primarily by cost savings, carrying very little in execution risk. Additionally, 95% of the plant financing is in place and cash flow is materially hedged, as Horsehead owns zinc put options with a $0.85/lb. strike price through Q4 2013. The new plant will also expand Horsehead’s addressable market, enabling it to enter the market for higher grades of metal that have more applications. ZINC’s under-followed stock is unreasonably cheap and does not reflect the imminent transformative change that will occur before the end of 2013. Once the new plant opens and begins operations, we expect investors to rerate Horsehead, resulting in material multiple expansion. At a conservative 6.0X 2015E EBITDA of $200mm, Horsehead should trade at ~$21.00 per share, representing ~72% upside from the current share price. Our blended valuation, using a DCF and an EV/EBITDA multiple of 6x results in a share price of $19.49, ~60% upside from current levels. Value investing luminary Mohnish Pabrai’s recent purchases of ZINC stock have made him the company’s largest shareholder. He apparently shares our conviction that shares of Horsehead provide for an incredibly asymmetric risk/reward. At current levels, the stock offers a large margin of safety against zinc price declines and immense upside leverage in the case of zinc price increases. The phrase he has coined – “Heads I win, Tails I Don't Lose Much!” – would seem readily applicable to this equity.

Disclaimer: This research report expresses Prescience Investment Group LLC’s opinions. Use of the research produced by Prescience Investment Group LLC is at your own risk. This is a short-biased report and you should assume the author of this report and its clients and/or investors hold a LONG position and derivatives tied to the security of Horsehead Holding Corp. that will benefit from a rise in the price of the common stock. Following publication of the report, the author (including members, partners, affiliates, employees, and/or consultants) along with its clients and/or investors intend to continue transacting in the securities covered therein, and may be long, short, or neutral at any time hereafter regardless of the initial recommendation. The author of this report has obtained all information contained herein from sources believed to be accurate and reliable and has included references where available and practical. However, such information is presented “as is,” without warranty of any kind– whether express or implied. The author of this report makes no representation, express or implied, as to the accuracy, timeliness, or completeness of any such information or with regard to the results to be obtained from its use. Forward looking statement and projections are inherently susceptible to uncertainty and involve many risks (known and unknown) that could cause actual results to differ materially from expected results. All expressions of opinion are subject to change without notice, and the author does not undertake to update or supplement this report or any of the information contained herein. Prescience Investment Group LLC is not a broker/dealer or financial advisor and nothing contained herein should be construed as an offer or solicitation to buy or sell any investment or security mentioned in this report. You should do your own research and due diligence before making any investment decision with respect to securities covered herein, including, but not limited to, the suitability of any transaction to your risk tolerance and investment objectives and consult your own tax, financial and legal experts as warranted. READ THE IMPORTANT LEGAL DISCLAIMER ON THE NEXT PAGE.

Legal Disclaimer: This research report expresses our opinions, which we have based upon certain facts, all of which are set out in this research report. Any investment involves substantial risks, including complete loss of capital. Any forecasts or estimates are for illustrative purpose only and should not be taken as limitations of the maximum possible loss or gain. Any information contained in this report may include forward-looking statements, expectations, and projections. You should assume these types of statements, expectations, and projections may turn out to be incorrect. Use of Prescience Investment Group LLC’s research is at your own risk. You should do your own research and due diligence before making any investment decision with respect to securities covered herein. You should assume that as of the publication date of any report or letter, Prescience Investment Group LLC (possibly along with or through our members, partners, affiliates, employees, and/or consultants) along with our clients and/or investors has a long position in all stocks (and/or are long puts/short call options of the stock) covered herein, including without limitation Horsehead Holding Corp. and therefore stands to realize significant gains in the event that the price of stock rises. Following publication of any report or letter, we intend to continue transacting in the securities covered therein, and we may be long, short, or neutral at any time hereafter regardless of our initial recommendation. This is not an offer to sell or a solicitation of an offer to buy any security, nor shall any security be offered or sold to any person, in any jurisdiction in which such offer would be unlawful under the securities laws of such jurisdiction. Prescience Investment Group LLC is not registered as an investment advisor. To the best of our ability and belief, all information contained herein is accurate and reliable, and has been obtained from public sources we believe to be accurate and reliable, and who are not insiders or connected persons of the stock covered herein or who may otherwise owe any fiduciary duty or duty of confidentiality to the issuer, or to any other person or entity that was breached by the transmission of information to Prescience Investment Group LLC. However, such information is presented “as is,” without warranty of any kind – whether express or implied. Prescience Investment Group LLC makes no representation, express or implied, as to the accuracy, timeliness, or completeness of any such information or with regard to the results to be obtained from its use.

All expressions of opinion are subject to change without notice, and Prescience Investment Group LLC does not undertake to update or supplement this report or any of the information contained herein.

Business Overview Horsehead Holding Corp. is the largest zinc oxide and prime western (PW) grade zinc metal producer in the United States. The company is a fully integrated producer that uses cheap recycled electric-arc-furnace (EAF) dust and recycled zinc feedstock to produce zinc and zinc based products. Horsehead has three segments: (1) Acquiring EAF dust – Horsehead is paid by steel mills to gather EAF dust. EAF dust is a waste product rich in zinc. It cost less for steel mills to pay Horsehead to collect the EAF dust than if they were to pay landfills to take the dust due to environmental regulations. (2) Recycling Zinc waste (over ~75% of the waste Horsehead recycles is EAF dust) – Horsehead recycles the EAF dust and converts it into zinc metal and zinc oxide which it sells at a premium to the LME zinc price. The majority of Horsehead’s input cost is EAF dust which it acquires through long term contracts (~10 years) with steel manufacturers such as Nucor (NUE). Horsehead derives the majority of its revenues (greater than 75%) from the recycling and sale of zinc. (3) Recycling and converting nickel bearing waste into nickel products which it sells for prices that track the price of nickel. This division operates as INMETCO (acquired from Vale in 2009).

Near-Complete New Plant to Result in Transformational Value Horsehead is building a new plant in Rutherford County, North Carolina to replace the existing zinc smelting capacity of its primary zinc processing plant in Monaca, Pennsylvania. The company anticipates that its new facility will be capable of producing in excess of 150,000+ t/y of zinc metal with the ability to increase output to 175,000 t/y with no additional capex required1. The new plant will increase Horsehead’s EBITDA by 3x, primarily through cost savings. By enabling Horsehead to produce higher-margin metals with a broader range of applications, the new plant will also serve to expand the company’s addressable market. Currently, most of Horsehead’s zinc is of the lowest grade (i.e. Prime Western, or PW, Grade) that sells at a lower premium to LME prices. The new plant will focus on Special High Grade (SHG) and Continuous Galvanizing Grade (CGG) zinc, which sell at a higher premium (~$60/ton or $0.03/pound over PW zinc). The CGG addressable market is 10x the PW market2. 95% of plant financing is in place. The estimated capital outlays are currently $450M vs. Horsehead’s market capitalization of ~$545M. The company is using liquidity from a combination of a convertible offering, export financing, revolver, cash on hand, & expected cash from operations to fund the new plant’s operations. The plant cost estimate is $450mm, with roughly 75% of the project cost already having been booked, and the remaining based on firm quotes3. All the zinc produced by the new plant will be sold as metal. The oxide business will become incremental & will be shifted to the Zochem facility (Canada’s largest zinc oxide manufacturer).

1 2

3

Horsehead Holding Corp. Investor Presentation, June 2012: www.horsehead.net/downloadAttachmentNDO.php?ID=120 Horsehead Holding Corp. Investor Presentation, August 2013 pg. 10: www.horsehead.net/downloadAttachmentNDO.php?ID=151

Horsehead Holding Corp. Q2, 2013 10-Q pg.49: http://www.sec.gov/Archives/edgar/data/1385544/000119312513322791/d554321d10q.htm

Incremental Benefits Resulting from New Plant Opening Upon operation, the new plant should provide annual incremental EBITDA of $90-110mm, with its return on investment primarily driven by cost reduction rather than revenue growth. It is important to note that the incremental EBITDA forecast does not require any increase at all in the price of zinc. The new plant is expected to reduce annual operating costs by $60mm to $70mm due to a higher zinc recovery, lower energy usage, and reduced freight costs. Horsehead’s existing, 80 year old Monaca zinc smelter has a zinc recovery of 92%, while the new smelter will have a recovery of 97%-98%, resulting in fewer zinc units coming in per zinc unit going out (materially lower cogs)4. $40-$50mm of the cost benefit is expected to result from the elimination of conversion costs currently incurred at the Monaca smelter. For example, the new plant will not require metallurgical coke, for savings of roughly $26mm per year; and, it will employ 250 people, half the number of employees at the Monaca plant, resulting in another $20-25m in savings. Horsehead measures the conversion costs of raw materials to final product on a zinc-contained basis, which enables the comparison of different zinc products having varying levels of zinc on an apples to apples basis. Its 4

Horsehead Holding Corp. Q3, 2012 Earnings Call: http://seekingalpha.com/article/979351-horsehead-holding-management-discussesq3-2012-results-earnings-call-transcript

conversion costs should be in the low-to-mid $0.20’s per pound range at the new plant5. Horsehead’s current breakeven on a zinc contained basis is a mid-$0.70’s per pound. After the new plant is operational Horsehead’s breakeven will be in the mid-$0.40’s per pound6. The new plant will also increase revenues by roughly $30-$40mm, primarily from the recovery of metals such as silver and lead from the EAF dust, increased premiums on special high-grade zinc, and increased metal shipments. Management has indicated that commodity price swings in lead and silver can easily move the incremental EBITDA contribution by ~$5-$10mm. We are assuming a lead price of $1 per pound, a silver price of $30 per ounce, and 95% recoveries.

Proven ZINCEX Technology The new plant uses a patented solvent extraction process called ZINCEX – developed by Tecnicas Reunidas -that offers ~5-10% higher production of SHG zinc at ~15% lower capex. A corollary solvent extraction process has been used for decades in the production of copper. This process is currently being successfully used for zinc production in Japan and in Namibia. The most recent implementation of the technology was by Akita Zinc in Japan, with the installation having gone smoothly and on schedule. In Namibia, the technology has been implemented in the Skorpian Project, the eighth largest zinc mine in the world, commissioned in 2004. The successful application of the ZINCEX process at Skorpian to consistently produce zinc has demonstrated the technology’s robustness7. Horsehead management has made two trips to the Skorpian facility, focusing on operations, maintenance, and management, for guidance in operating the Horsehead’s Rutherford County, North Carolina facility post-completion. Additionally, ZINC has put in charge of operating the new process someone who comes from a copper extraction background. 5

Horsehead Holding Corp. Q4, 2012 Earnings Call: http://seekingalpha.com/article/1207841-horsehead-holding-management-discussesq4-2012-results-earnings-call-transcript 6 Horsehead Holding Corp. Rating Agency Presentation: http://www.horsehead.net/downloadAttachmentNDO.php?ID=119 7 Skorpion Zinc: Mine-to-metal zinc production via solvent extraction: www.mintek.co.za/Mintek75/Proceedings/B04-Sole.pdf

ZINC Metal While the impending catalyst underlying our thesis does not depend on the price of zinc, an increase in zinc prices would dramatically benefit Horsehead. Zinc is a commonly used metal with strong, long-term fundamentals supported by numerous structural trends.

Zinc demand will rise due to an increase in worldwide auto production8, and an increase in the volume of global construction output9. Zinc is often used to galvanize steel as it is the most cost-effective way to prevent corrosion. Further, zinc is showing impressive demand growth as an additive to fertilizers. Zinc has been incredibly successful at increasing crop yields when used in fertilizer, particularly in Asia10. These trends underpin our confidence in the stability of zinc prices and serve as a tailwind for possible price increases.

Competitive Landscape Long-standing customer relationships and close geographic proximity to customers provide Horsehead with distinct competitive advantages in its end markets. Zinc is sold at a slight premium to the LME price depending on the grade & product (oxide versus metal). Premiums to the LME price are pretty much the same across the market. End customers tend to base zinc supplier selections based on the transportation costs passed on to them, amongst other factors. By virtue of being the largest U.S. producer, located in North Carolina, and having facilities strategically located close to its customers, Horsehead enjoys competitive advantage to its Canadian peers. Horsehead’s four company-owned EAF dust recycling facilities are deliberately located near EAF operators, reducing transportation costs. This enables Horsehead to pass the savings on to its customers11.

8

KPMG Global Auto Executive Survey 2013: http://www.kpmg.com/US/en/IssuesAndInsights/ArticlesPublications/Documents/globalauto-executive-survey-2013.pdf 9 PwC: Global Construction 2025: http://www.pwc.com/gx/en/engineering-construction/publications/global-construction-2025.jhtml 10 International Zinc Association (IZA), Zinc in Fertilizers, www.zinc.org/general/ZincInFertilizers,_January_2013.pdf 11 Horsehead Holding Corp. S-1, pg. 45: http://www.sec.gov/Archives/edgar/data/1385544/000095015207005616/l25563dsv1za.htm

The company’s main competitor in the U.S. is Nyrstar NV’s plant in Clarksville Tennessee. Its other competitors are located outside the U.S., primarily in Canada, and as such, operate at a competitive disadvantage in supplying US steel plants with Zinc raw material. Canada-based suppliers include Teck Cominco, HudBay (HBM), and Xstrata.

Heads I win, Tails I Don’t Lose Much! Mohnish Pabrai Now ZINC’s Largest Shareholder Astute value investor Mohnish Pabrai is often compared to investing luminaries such as Warren Buffett, Joel Greenblatt, and Seth Klarman. A recent 13F reveals that Pabrai’s investment vehicle, Dalal Street LLC, has accumulated over 5 million shares of Horsehead, equating to >11% of the company’s shares outstanding. Apparently Mr. Pabrai shares our conviction that Horsehead is incredibly mispriced in light of the coming low risk, transformational catalyst that will increase the company’s EBITDA, providing for an asymmetric risk/reward from the current price -- a large margin of safety against zinc price declines and immense upside leverage in the case of zinc price increases. In accordance with the phrase he coined, “Heads I win, Tails I Don't Lose Much!”

Valuation ZINC trades at 4.1x our 2015 EV/EBITDA estimate of $200mm. We use 2015E EBITDA as it reflects the maturation of revenue potential from the Rutherford plant. This represents a substantial discount to specialty metals peers trading at 8.2x. At 6.0x our 2015 EBITDA estimate, ZINC would trade at $21.00 per share, representing 72% upside and a 13.5% FCF yield.

Valuing ZINC using a DCF methodology affirms our price target. We use a 12% WACC and assume a growth rate of 1.5% which values ZINC at $17.80 per share. Our blended price target of $19.49 per share represents an average of both methods.

Sensitivity Analysis Zinc is currently trading for $0.88/lb on the LME. For conservatism, our analysis assumes a constant zinc price of $0.83/lb12. Horsehead is highly levered to changes in the spot price of Zinc. Horsehead’s EBITDA has a $25-$30M delta to a $0.10/lb. increase in the price of Zinc13. A ~10% increase in the price / lb. of ZINC results in a ~50% increase in the share price.

DCF Valuation

12LME 13

zinc price: http://www.lme.com/en-gb/metals/non-ferrous/zinc/ Horsehead Holding Corp. Investor Presentation January 2013: http://www.horsehead.net/downloadAttachmentNDO.php?ID=132

Free Cash Flow Estimate

Investor Relations Correspondence Question I - Horsehead’s current breakeven on a zinc contained basis is a mid $0.70’s per pound. After the new plant is operational Horsehead’s breakeven will be in the low $0.40’s per pound. Is this firm wide? Should I apply this roughly $0.33 difference to total firm zinc & zinc oxide production? IR Answer - This is EBITDA break-even and total company. Question II - After Zochem picks up Monaca’s share of zinc oxide production, Horsehead’s firm-wide zinc oxide production will decrease from roughly 90k tons per year to 70k tons per year? IR Answer - Correct Question III - Horsehead’s EBITDA has a $25-$30M delta to a $0.10/lb or 200/ton increase in the price of Zinc? Does that sound roughly correct to you? IR Answer - Correct Question IV - What is the cost per pound of the zinc units coming into the new plant? Can you hold my hand here and walk me through the new plant economics in terms of input costs, conversion / operating costs, and output pricing? IR Answer - 30-35 cent feed cost, 25 cent conversion; sell at 5-8 cent premium to the LME Question V - In determining the incremental effect of the new plant, I am subtracting your current breakeven from the new breakeven and multiplying that by the premium of SHG over PW ($0.03), and then multiplying that number by an output of 150,000 tons. I get 108,000,000. What am I doing wrong here? ($0.33 * $0.03 * 2000 * 150,000) IR Answer - .33 x 2000 x 156,000 = 102,960,000 this approximates our estimate of $100 million

Illustrative ZINC Economics

Assumptions

1) Horsehead’s current breakeven on a zinc contained basis is in the mid ~$0.70’s per pound. After the new plant is operational Horsehead’s breakeven will be in the low $0.40’s per pound. This is EBITDA breakeven for the entire firm. 2) In Q3 2013, firm wide zinc oxide production will decrease due to the closure of the Monaca facility 3) Feedstock from EAAF dust could reach 85%+ if domestic steel output increases 4) Downside protection on zinc prices is in place until Q1 2014 ($0.85 put options for 8,000 metric tons per month for FY 2013, and 4,000 metric tons per month for Q1 2014) 5) From a timing perspective, the plant’s zinc production circuit and the lead recovery circuit should be analyzed separately. The lead and silver recovery circuit will be delayed two to three months (management guidance per the Q4 2012 earnings call). The ramp-up of the zinc circuit should take roughly six months before operating at full production (150,000 ton rate). The ramp-up of the lead & silver recovery circuit will take twelve months to reach full production. Management guidance indicates that it could take until the end of 2014 before the new plant produces $90-110mm of incremental EBITDA.