Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)
Transmission Projects PG&E 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21.
Barton Sub: Switch installation as part of the CB 152 replacement Berry Petroleum and Fairfield, phase #1 California Flats Solar, phase #2 Crestwood Westcoast (This project was formerly known as Inergy Generation Interconnection Project ) Eagle Rock Substation: Replace CB102 East Nicolaus Substation: Replace 60kV Bus Structure, OB Insulators, and Switches Eureka E 60kV Bus Upgrade Fulton Sub Circuit Breaker Replacement HUMB BAY-HUMB #1 RE-CONDUCTOR LINE, phase #1 KASSON SUB: CB72, phase #1 Paige Solar Generation Interconnection Project, phase #1 Rio Bravo Solar 2, phase #1 Shafter Sub: Install Dist BK3 and 115 kV Ring Bus, two projects Smartville-Nicolaus 60kV line reconductor, phase #3 Spaulding 60 kV Bus Stanford Energy Center Load Interconnection Table Mountain Sub: Replace 230kV Circuit Breakers Table Mountain Sub: Replace 230kV Switches Weber - French Camp 60 kV Line, phase #2 Weber 230/60 kV Transformer Nos. 2 and 2A Replacement Wheatland to East Nicolaus 60 kV Pole Replacement, two projects
SCE 1. 2. 3. 4. 5. 6. 7.
Chino Hills Underground (Formerly Part of TRTP Segment 8 System Upgrades), phase #1 Chino Hills Underground (Formerly Part of TRTP Segment 8 System Upgrades) El Nido reconfigure BK 1A & 3A to double breaker, phase #1 El Nido reconfigure BK 1A & 3A to double breaker SGS Antelope Valley Interconnection 300 MW (Energy Only), phase #1 SONGS Segregation Upgrades to existing 220 kV Whirlwind Substation to interconnect new Desert Star Generation facility
SDGE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.
Basilone 69kV Capacitor, phase #2 Basilone 69kV Capacitor Bay Boulevard Substation- South Bay Substation Relocation, phase #3 Bay Boulevard Substation- South Bay Substation Relocation, phase #4 CNF MSUP and Power Line Replacements, phase #1 CNF MSUP and Power Line Replacements, phase #2 CNF MSUP and Power Line Replacements, phase #7 Generation Interconnection (Q137, Q189, & Encina 5 repower) Install Synchronous Condensers at Miguel 500kV, phase #1 Los Coches Sub- rebuild 138kV and 69kV sections Los Coches, phase #4 Pendleton 69kV Capacitor Poway - 69kV Rebuild, phase #1 Silvergate Transformer TL6906 Re-Arrangement Mesa Rim, phase #1 California ISO – Public
Page 1 of 6
Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)
15. TL690A San Luis Rey - Oceanside Tap reconductor, phase #1
VEA None
External 1. APS: Model updates for APS area 2. BANC(SMUD): SW581, 582, 583 and 585 should be connected to Unit #1 and SW181, 182, 183 and 185 should be connected to Unit #2 at MELONP 3. CFE: Add new SVC, Bank T50, CB 92500, and DSC 92508 at the TEK230 Substation 4. IID(IMPER): Needs 3 Gen units modelled in addition to the existing ones at ELCNTO substation 5. LADWP: Model HASKELL CANYON Switching Station 6. NEVP: Model updates for Nevada area 7. Northwest: Model updates for Northwest areas 8. PACE & PACW: Model updates for PacifiCorp area 9. PSE: Model updates for PSE area 10. WALC: Model the new bank KU2B at MEAD substation
California ISO – Public
Page 2 of 6
Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)
Generation Projects 1. Barre Peaker - Increase EMS PMax from 49MW to 59MW SCE Capacity: 59MW RES_ID: BARRE_6_PEAKER 2. Big Sky 5 SCE Capacity: 5MW RES_ID: BIGSKY_2_SOLAR5 POD: Antelope 230kV Bus 3. Solverde 1 SCE Capacity: 85MW RES_ID: BIGSKY_2_SOLAR6 POD: Antelope 230kV Bus 4. Antelope 1 SCE Capacity: 50MW RES_ID: BIGSKY_2_SOLAR7 POD: Antelope 230kV Bus 5. Blythe Solar II SCE Capacity: 20MW RES_ID: BLYTHE_1_SOLAR2 POD: Blythe 161kV Bus 6. Center Peaker - Increase EMS PMax from 49MW to 59MW SCE Capacity: 59MW RES_ID: CENTER_6_PEAKER 7. Clover Creek - Decrease EMS PMax from 1.5MW to 1MW PGAE Capacity: 1MW RES_ID: CLOVER_2_UNIT 8. Golden Springs Building F - Increase EMS PMax from 1.3MW to 1.4MW SCE Capacity: 1.4MW RES_ID: DELAMO_2_SOLAR4 9. Grapeland Peaker - Increase EMS PMax from 49MW to 59MW Capacity: 59MW RES_ID: ETIWND_6_GRPLND 10. Portal Ridge B SCE Capacity: 20MW RES_ID: GLDFGR_6_SOLAR1 California ISO – Public
Page 3 of 6
Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)
POD: Antelope 66kV Bus
11. Portal Ridge C SCE Capacity: 11.4MW RES_ID: GLDFGR_6_SOLAR2 POD: Antelope 66kV Bus 12. Black Diamond Energy Storage PGAE Capacity: 2MW RES_ID: KIRKER_1_BATTRY POD: Kirker 115kV Bus 13. Bell Bandini Commerce Refuse SCE Capacity: 10.1MW RES_ID: LAGBEL_2_STG1 POD: Laguna Bell 230kV Bus 14. SEPV Sierra SCE Capacity: 7.5MW RES_ID: LNCSTR_6_SOLAR2 POD: Antelope 66kV Bus 15. Mira Loma Peaker - Increase EMS PMax from 49MW to 59MW SCE Capacity: 59MW RES_ID: MIRLOM_6_PEAKER 16. McGrath Beach Peaker - Increase EMS PMax from 49MW to 59MW SCE Capacity: 59MW RES_ID: MNDALY_6_MCGRTH 17. 92942Grossmont Hospital Corporation SDGE Capacity: 4.6MW RES_ID: MURRAY_6_UNIT POD: Murray 69kV Bus 18. Redwood Renewable Energy Facility- WMRE PGAE Capacity: 3.9MW RES_ID: NOVATO_6_LNDFL POD: Novato 60kV Bus 19. White River 2 BESS PGAE Capacity: 2MW RES_ID: OLIVEP_1_BATTRY POD: Olive Switching Station 115kV Bus 20. Oro Loma Solar 1 California ISO – Public
Page 4 of 6
Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)
PGAE Capacity: 10MW RES_ID: OROLOM_1_SOLAR1 POD: Oro Loma 115kV Bus
21. Oro Loma Solar 2 PGAE Capacity: 10MW RES_ID: OROLOM_1_SOLAR2 POD: Oro Loma 115kV Bus 22. Paige Solar PGAE Capacity: 22MW RES_ID: PAIGES_6_SOLAR POD: Schindler-Coalinga #2 70kV Line at pole 001/011 & new pole A01/11 23. PearBlossom SCE Capacity: 9.5MW RES_ID: PBLOSM_2_SOLAR POD: Vincent 230kV Bus 24. Rock Creek Hydro - Decrease EMS PMax from 5MW to 3.6MW PGAE Capacity: 3.6MW RES_ID: PLACVL_1_RCKCRE 25. Rio Bravo II PGAE Capacity: 20MW RES_ID: PMPJCK_1_RB2SLR POD: Midway-Temblor 115kV Line at Pole 11/140 26. Rosamond Phase I SCE Capacity: 55MW RES_ID: RTEDDY_2_SOLAR1 POD: 230 KV BUS AT WHIRLWIND SUB 27. Rosamond Phase II SCE Capacity: 55MW RES_ID: RTEDDY_2_SOLAR2 POD: 230 KV BUS AT WHIRLWIND SUB 28. Rosamond Phase III SCE Capacity: 86MW RES_ID: RTEDDY_2_SOLAR3 POD: 230 KV BUS AT WHIRLWIND SUB 29. Rosamond Phase IV SCE Capacity: 88MW California ISO – Public
Page 5 of 6
Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)
RES_ID: RTEDDY_2_SOLAR4 POD: 230 KV BUS AT WHIRLWIND SUB
30. Smoke Tree SCE Capacity: 10.2MW RES_ID: SMKTRE_2_WIND POD: Devers 230kV Bus 31. CSU-Channel Islands CIPower SCE Capacity: 28MW RES_ID: SNCLRA_2_UNIT POD: Santa Clara 230kV Bus 32. Longboat Solar LLC. SCE Capacity: 20MW RES_ID: TORTLA_1_SOLAR POD: Tortilla 115kV Bus 33. Whitney Point Solar PGAE Capacity: 22MW RES_ID: WHITNY_6_SOLAR POD: Five Points Switching Station 70kV Bus 34. Midway Solar Farm - Pseudo Tie Capacity: 50MW RES_ID: MIDWYS_2_MIDSL1 POI: Midway-Bannister 230 kV Transmission Line 35. Broadview 1 - Dynamic Scheduling Host Balancing Authority Area: Western Interconnect LLC Capacity: 130MW RES_ID: BEKWJS_5_BV1SCEDYN Associated CAISO Intertie ID: WILLOWBEACH 36. Broadview 2 - Dynamic Scheduling Host Balancing Authority Area: Western Interconnect LLC Capacity: 167MW RES_ID: BEJNLS_5_BV2SCEDYN Associated CAISO Intertie ID: WILLOWBEACH 37. Salton Sea Unit - Dynamic Scheduling Host Balancing Authority Area: Imperial Irrigation District Capacity: 46MW RES_ID: RAMON_2_SALTONDYN Associated CAISO Intertie ID: MIR2