Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016) Transmission Projects PG&E 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 1...
2 downloads 2 Views 275KB Size
Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)

Transmission Projects PG&E 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21.

Barton Sub: Switch installation as part of the CB 152 replacement Berry Petroleum and Fairfield, phase #1 California Flats Solar, phase #2 Crestwood Westcoast (This project was formerly known as Inergy Generation Interconnection Project ) Eagle Rock Substation: Replace CB102 East Nicolaus Substation: Replace 60kV Bus Structure, OB Insulators, and Switches Eureka E 60kV Bus Upgrade Fulton Sub Circuit Breaker Replacement HUMB BAY-HUMB #1 RE-CONDUCTOR LINE, phase #1 KASSON SUB: CB72, phase #1 Paige Solar Generation Interconnection Project, phase #1 Rio Bravo Solar 2, phase #1 Shafter Sub: Install Dist BK3 and 115 kV Ring Bus, two projects Smartville-Nicolaus 60kV line reconductor, phase #3 Spaulding 60 kV Bus Stanford Energy Center Load Interconnection Table Mountain Sub: Replace 230kV Circuit Breakers Table Mountain Sub: Replace 230kV Switches Weber - French Camp 60 kV Line, phase #2 Weber 230/60 kV Transformer Nos. 2 and 2A Replacement Wheatland to East Nicolaus 60 kV Pole Replacement, two projects

SCE 1. 2. 3. 4. 5. 6. 7.

Chino Hills Underground (Formerly Part of TRTP Segment 8 System Upgrades), phase #1 Chino Hills Underground (Formerly Part of TRTP Segment 8 System Upgrades) El Nido reconfigure BK 1A & 3A to double breaker, phase #1 El Nido reconfigure BK 1A & 3A to double breaker SGS Antelope Valley Interconnection 300 MW (Energy Only), phase #1 SONGS Segregation Upgrades to existing 220 kV Whirlwind Substation to interconnect new Desert Star Generation facility

SDGE 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.

Basilone 69kV Capacitor, phase #2 Basilone 69kV Capacitor Bay Boulevard Substation- South Bay Substation Relocation, phase #3 Bay Boulevard Substation- South Bay Substation Relocation, phase #4 CNF MSUP and Power Line Replacements, phase #1 CNF MSUP and Power Line Replacements, phase #2 CNF MSUP and Power Line Replacements, phase #7 Generation Interconnection (Q137, Q189, & Encina 5 repower) Install Synchronous Condensers at Miguel 500kV, phase #1 Los Coches Sub- rebuild 138kV and 69kV sections Los Coches, phase #4 Pendleton 69kV Capacitor Poway - 69kV Rebuild, phase #1 Silvergate Transformer TL6906 Re-Arrangement Mesa Rim, phase #1 California ISO – Public

Page 1 of 6

Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)

15. TL690A San Luis Rey - Oceanside Tap reconductor, phase #1

VEA None

External 1. APS: Model updates for APS area 2. BANC(SMUD): SW581, 582, 583 and 585 should be connected to Unit #1 and SW181, 182, 183 and 185 should be connected to Unit #2 at MELONP 3. CFE: Add new SVC, Bank T50, CB 92500, and DSC 92508 at the TEK230 Substation 4. IID(IMPER): Needs 3 Gen units modelled in addition to the existing ones at ELCNTO substation 5. LADWP: Model HASKELL CANYON Switching Station 6. NEVP: Model updates for Nevada area 7. Northwest: Model updates for Northwest areas 8. PACE & PACW: Model updates for PacifiCorp area 9. PSE: Model updates for PSE area 10. WALC: Model the new bank KU2B at MEAD substation

California ISO – Public

Page 2 of 6

Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)

Generation Projects 1. Barre Peaker - Increase EMS PMax from 49MW to 59MW  SCE  Capacity: 59MW  RES_ID: BARRE_6_PEAKER 2. Big Sky 5  SCE  Capacity: 5MW  RES_ID: BIGSKY_2_SOLAR5  POD: Antelope 230kV Bus 3. Solverde 1  SCE  Capacity: 85MW  RES_ID: BIGSKY_2_SOLAR6  POD: Antelope 230kV Bus 4. Antelope 1  SCE  Capacity: 50MW  RES_ID: BIGSKY_2_SOLAR7  POD: Antelope 230kV Bus 5. Blythe Solar II  SCE  Capacity: 20MW  RES_ID: BLYTHE_1_SOLAR2  POD: Blythe 161kV Bus 6. Center Peaker - Increase EMS PMax from 49MW to 59MW  SCE  Capacity: 59MW  RES_ID: CENTER_6_PEAKER 7. Clover Creek - Decrease EMS PMax from 1.5MW to 1MW  PGAE  Capacity: 1MW  RES_ID: CLOVER_2_UNIT 8. Golden Springs Building F - Increase EMS PMax from 1.3MW to 1.4MW  SCE  Capacity: 1.4MW  RES_ID: DELAMO_2_SOLAR4 9. Grapeland Peaker - Increase EMS PMax from 49MW to 59MW  Capacity: 59MW  RES_ID: ETIWND_6_GRPLND 10. Portal Ridge B  SCE  Capacity: 20MW  RES_ID: GLDFGR_6_SOLAR1 California ISO – Public

Page 3 of 6

Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)



POD: Antelope 66kV Bus

11. Portal Ridge C  SCE  Capacity: 11.4MW  RES_ID: GLDFGR_6_SOLAR2  POD: Antelope 66kV Bus 12. Black Diamond Energy Storage  PGAE  Capacity: 2MW  RES_ID: KIRKER_1_BATTRY  POD: Kirker 115kV Bus 13. Bell Bandini Commerce Refuse  SCE  Capacity: 10.1MW  RES_ID: LAGBEL_2_STG1  POD: Laguna Bell 230kV Bus 14. SEPV Sierra  SCE  Capacity: 7.5MW  RES_ID: LNCSTR_6_SOLAR2  POD: Antelope 66kV Bus 15. Mira Loma Peaker - Increase EMS PMax from 49MW to 59MW  SCE  Capacity: 59MW  RES_ID: MIRLOM_6_PEAKER 16. McGrath Beach Peaker - Increase EMS PMax from 49MW to 59MW  SCE  Capacity: 59MW  RES_ID: MNDALY_6_MCGRTH 17. 92942Grossmont Hospital Corporation  SDGE  Capacity: 4.6MW  RES_ID: MURRAY_6_UNIT  POD: Murray 69kV Bus 18. Redwood Renewable Energy Facility- WMRE  PGAE  Capacity: 3.9MW  RES_ID: NOVATO_6_LNDFL  POD: Novato 60kV Bus 19. White River 2 BESS  PGAE  Capacity: 2MW  RES_ID: OLIVEP_1_BATTRY  POD: Olive Switching Station 115kV Bus 20. Oro Loma Solar 1 California ISO – Public

Page 4 of 6

Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)

   

PGAE Capacity: 10MW RES_ID: OROLOM_1_SOLAR1 POD: Oro Loma 115kV Bus

21. Oro Loma Solar 2  PGAE  Capacity: 10MW  RES_ID: OROLOM_1_SOLAR2  POD: Oro Loma 115kV Bus 22. Paige Solar  PGAE  Capacity: 22MW  RES_ID: PAIGES_6_SOLAR  POD: Schindler-Coalinga #2 70kV Line at pole 001/011 & new pole A01/11 23. PearBlossom  SCE  Capacity: 9.5MW  RES_ID: PBLOSM_2_SOLAR  POD: Vincent 230kV Bus 24. Rock Creek Hydro - Decrease EMS PMax from 5MW to 3.6MW  PGAE  Capacity: 3.6MW  RES_ID: PLACVL_1_RCKCRE 25. Rio Bravo II  PGAE  Capacity: 20MW  RES_ID: PMPJCK_1_RB2SLR  POD: Midway-Temblor 115kV Line at Pole 11/140 26. Rosamond Phase I  SCE  Capacity: 55MW  RES_ID: RTEDDY_2_SOLAR1  POD: 230 KV BUS AT WHIRLWIND SUB 27. Rosamond Phase II  SCE  Capacity: 55MW  RES_ID: RTEDDY_2_SOLAR2  POD: 230 KV BUS AT WHIRLWIND SUB 28. Rosamond Phase III  SCE  Capacity: 86MW  RES_ID: RTEDDY_2_SOLAR3  POD: 230 KV BUS AT WHIRLWIND SUB 29. Rosamond Phase IV  SCE  Capacity: 88MW California ISO – Public

Page 5 of 6

Full Network Model Scope for FNM DB2016Q3 Production (08/18/2016)

 

RES_ID: RTEDDY_2_SOLAR4 POD: 230 KV BUS AT WHIRLWIND SUB

30. Smoke Tree  SCE  Capacity: 10.2MW  RES_ID: SMKTRE_2_WIND  POD: Devers 230kV Bus 31. CSU-Channel Islands CIPower  SCE  Capacity: 28MW  RES_ID: SNCLRA_2_UNIT  POD: Santa Clara 230kV Bus 32. Longboat Solar LLC.  SCE  Capacity: 20MW  RES_ID: TORTLA_1_SOLAR  POD: Tortilla 115kV Bus 33. Whitney Point Solar  PGAE  Capacity: 22MW  RES_ID: WHITNY_6_SOLAR  POD: Five Points Switching Station 70kV Bus 34. Midway Solar Farm - Pseudo Tie  Capacity: 50MW  RES_ID: MIDWYS_2_MIDSL1  POI: Midway-Bannister 230 kV Transmission Line 35. Broadview 1 - Dynamic Scheduling  Host Balancing Authority Area: Western Interconnect LLC  Capacity: 130MW  RES_ID: BEKWJS_5_BV1SCEDYN  Associated CAISO Intertie ID: WILLOWBEACH 36. Broadview 2 - Dynamic Scheduling  Host Balancing Authority Area: Western Interconnect LLC  Capacity: 167MW  RES_ID: BEJNLS_5_BV2SCEDYN  Associated CAISO Intertie ID: WILLOWBEACH 37. Salton Sea Unit - Dynamic Scheduling  Host Balancing Authority Area: Imperial Irrigation District  Capacity: 46MW  RES_ID: RAMON_2_SALTONDYN  Associated CAISO Intertie ID: MIR2