European Construction Products Regulation (CPR) New requirements for cables in construction works. Jan Fleuren - Configuration Manager

European Construction Products Regulation (CPR) New requirements for cables in construction works Jan Fleuren - Configuration Manager Ittervoort | Dec...
Author: Alyson Martin
3 downloads 0 Views 3MB Size
European Construction Products Regulation (CPR) New requirements for cables in construction works Jan Fleuren - Configuration Manager Ittervoort | December 2015

CONTENTS

1. CPR

3

2. Risk Assesment for Buildings and Regulations

4

3. Fire Tests

5

4. Fire Classes of Fire Performance of Electrical Cables for CPR

6

5. CPR Fire Classification

7

6. CE Marking and Certification 6.1. CE MARKING ON CONSTRUCTION PRODUCTS: REGULATION (EU) NO 305/2011

8

7. Portfolio 7.1. CHANGED PRODUCT NAMES OF CABLE TYPES IN ACCORDANCE WITH CPR AND NEN 8012

9

8. Eldra & CPR

10



EUROPESE VERORDENING BOUWPRODUCTEN (CPR)

Copyright © Eldra bv

2

1. CPR The purpose of CPR (Construction Products Regulation) is to facilitate reliable, clear information about construction products and the relationship with their applications. This clarity is achieved through uniform agreements about certain essential characteristics of products.The fire properties of cables must be tested for that purpose; other properties of cables remain in accordance with the specifications included in the current standards. The new fire tests have been laid down in EN 50399. This fire standard will eventually be included in the cable specifications. CEN-Cenelec and the European Commission have determined that the European standard EN 50575 will come into force on 1 July 2016. EN 50575 specifies the requirements for the fire performance of cables which are used in permanent electrical systems in buildings. This start date has been shifted by six months to give all EU countries sufficient time to implement CPR for cables in their national regulations. This document provides information about the following: • • • • • •

Risk assessment for buildings and regulations; Fire tests; Fire classification for CPR and NEN 8012; CE marking and certification; Portfolio; Eldra & CPR.

EUROPESE VERORDENING BOUWPRODUCTEN (CPR)

Copyright © Eldra bv

3

2. Risk Assesment for Buildings and Regulations The new NEN8012 will replace the NTA8012. The NEN8012 applies to electrical wiring and optical fibre systems for the transport of energy, signals and data in electrical systems in accordance with the NEN1010, with the aim of limiting the generation and development of fire and smoke. The NEN1010, the new Dutch Buildings Decree 2012 and the NEN8012 together form a solid basis for increasing and guaranteeing the fire safety of buildings in the Netherlands. The NEN8012 describes two methods for determining the fire class and additional classes for smoke production, flaming droplets/particles and the corrosiveness/acidity of the combustion gases which is necessary for a particular system. The number of fire classes is limited to four in the standard, if we do not include Fca. Methods: 1) Completion of a step-by-step plan in combination with flow diagrams. The necessary Euroclass and supplementary classes follow directly from this. 2) A risk analysis. Completing the above methods results in a score which can be read in the table below. Cable classification required subject to fire risk Fire Risk

Designation in risk graph and the minium and maximum value of the fire risk

Classification of the cable

Low

1-6

Eca

Medium

7-11

Dca - s3,d2,a3

Large

12-19

Cca - s1,d1,a1

Very Large

20-22

B2ca - s1,d1,a1

EUROPESE VERORDENING BOUWPRODUCTEN (CPR)

Copyright © Eldra bv

4

3. Fire Tests Since the classification and test methods are changing, all cable product families which come under the CPR must be tested again by means of fire tests in accordance with the new test method EN 50399. The fire tests must all be validated externally; Eldra collaborates with Dekra for this purpose. The outcomes of these fire tests form the basis for classifying the cables according to the new CPR Euroclasses which will be enforced for all cables in permanent electrical systems in buildings. This EN 50399 standard includes the following aspects: • Flame propagation and heat release; • Smoke production; • Flaming droplets/particles; • Acidity. Heat release and flaming droplets/particles are new aspects on which cables must be assessed. This new EN50399 enforces an integral approach. The relationship between Euroclasses and fire performance has been laid down in EN 13501-6. This standard provides innumerable combinations for the different aspects. In this case, too, the Euroclasses to be prescribed must be determined at a national level.

EUROPESE VERORDENING BOUWPRODUCTEN (CPR)

Copyright © Eldra bv

5

4. Fire Classes of Fire Performance of Electrical Cables for CPR Class

Test method

Classification criteria

Aca

EN ISO 1716

PCS ≤ 2,0 MJ/kg

B1ca

EN 50399 (30 kW burner) and

FS ≤ 1,75 m and THR1200s ≤ 10 MJ and Peak HRR ≤ 20 kW and FIGRA ≤ 120 Ws−1

Smoke production and flaming droplets/particles and acidity

EN 60332–1-2

H ≤ 425 mm

EN 61034-2 EN 60754-2

EN 50399 (20,5 kW burner) and

FS ≤ 1,5 m; and THR1200s ≤ 15 MJ; and Peak HRR ≤ 30 kW; and FIGRA ≤ 150 Ws−1

Smoke production and flaming droplets/particles and acidity

EN 60332–1-2

H ≤ 425 mm

EN 61034-2 EN 60754-2

EN 50399 (20,5 kW burner) and

FS ≤ 2.0 m; and THR1200s ≤ 30 MJ; and Peak HRR ≤ 60 kW; and FIGRA ≤ 300 Ws−1

Smoke production and flaming droplets/particles and acidity

EN 60332–1-2

H ≤ 425 mm

EN 61034-2 EN 60754-2

EN 50399 (20,5 kW burner) and

THR1200s ≤ 70 MJ; and Peak HRR ≤ 400 kW; and FIGRA ≤ 1 300 Ws−1

Smoke production (2,6) and flaming droplets/particles (3) and acidity (4)

EN 60332–1-2

H ≤ 425 mm

EN 61034-2 EN 60754-2

Eca

EN 60332–1-2

H ≤ 425 mm

Fca

No performance determined

B2ca

Cca

Dca

Additional classification

Source: NEN-EN 13501-6:2014

Definitions: FS

Flame spread: vertical flame propagation (affected height)

THR1200s,MJ

Total Heat Release: total heat released from start to end of the test (-/- burner heat)

Peak HRR,kW

Maximum Heat Release Rate: maximum value of the released heat from start to end of the test (-/- burner heat)

FIGRA, WS-1

Fire growth Rate index: indication of heat increase as a function of time.

EUROPESE VERORDENING BOUWPRODUCTEN (CPR)

Copyright © Eldra bv

6

5. CPR Fire Classification

Euroclass (ca)

Flame propagation and heat release

Smoke production

Flaming droplets/particles

Acidity

Aca

None

N/A

N/A

N/A

B1ca

Negligible

N/A

N/A

N/A

B2ca

Very limited

s1

d1

a1

Cca

Limited

s1

d1

a1

Dca

Medium

s3

d2

a3

Eca

High

N/A

N/A

N/A

Fca

Not determined

N/A

N/A

N/A

s = smoke

d = droplets

a = acidity

s1 little

d0 none

a1 low

s2 medium

d1 limited

a2 limited

s3 strong (no criteria)

d2 high (no criteria)

a3 high (no criteria)

EUROPESE VERORDENING BOUWPRODUCTEN (CPR)

Copyright © Eldra bv

7

6. CE Marking and Certification The social importance of fire safety is increasing so that it is essential to guarantee quality. Self-certification does not offer sufficient guarantee of quality and continuity, so an AVCP system (Assessment and Verification of Constancy of Performance) has been chosen for fire-safe cables. This entails independent product release and quality control. Type examination, factory inspections and random checks can be performed by an independent certification institute, subject to the level of fire safety.

6.1. CE MARKING OND CONSTRUCTION PRODUCTS: REGULATION (EU) NO 305/2011 Euroclass

AVCP level

Aca, B1ca, B2ca, Cca

1+

Responsibilities of the notified body (test institute): • Type examination • Regular company audits • Regular sampling from ordinary production and stocks Responsibilities of the manufacturer • Production control in the factory • Further tests on samples taken in the factory in accordance with the prescribed testing programme • Declaration of Performance (DoP)

Dca, Eca 3

3

Responsibilities of the notified body (test institute): • Type examination Responsibilities of the manufacturer • Production control in the factory • Declaration of Performance (DoP)

Fca

4

Responsibilities of the notified body (test institute): • none Responsibilities of the manufacturer • Type examination • Production control in the factory • Declaration of Performance (DoP)

The requirements and methodology have been set out in the European standard EN50575. The European Union published this standard in July 2015 and this also established the start date, 1 December 2015, and the transitional period of 1 year. This implementation process has since been shifted from 1 July 2016 to 1 July 2017. The schedule below shows the relevant standards, regulations and relationships.

Dutch Buildings+ Decree + NEN1010 + NEN8012 Bouwbesluit NEN1010 + NEN 8012

EXAP monitoring system CLC/TS 50576

EN 50575: CE Marking

European Construction Products Regulation (CPR)

13501-6: classification EN EN 13501-6: classificatie

EN 50399, EN 60322-1-2, EN 61034-2 EN 60754-2 tests Bouwbesluit + NEN1010 + NENand 8012

Normen: EN NEN3617, NEN3618 and EN 50525 series 13501-6: classificatie

EUROPESE VERORDENING BOUWPRODUCTEN (CPR)

Copyright © Eldra bv

8

7. Portfolio The list below shows our portfolio of cables which can be used in buildings. The fire class is also given for each cable group. The tests for the Installation Cables product group have almost been completed; this will be followed by the certification process for these cables. Currently there are no applicable classification rules yet for flexible cables and signal cables. Once these rules are known, we will start the testing and certification processes for these product groups. Smoke class

Flaming droplets/ particles

Corrosiveness Acidity

Installation cables

Flexible cables

Signal cables Telephone cables

B2ca

s1

d1

a1

Special versions FB-kabels

Custom made solutions

FB Cables

Cca

s1

d1

a1

YMz1Kmbzh ZO-YMz1Kasmbzh ZG-YMz1Kasmbzh Instalflex mbzh

Instalflex-H EMC ELDFLEX-H

ELDSIG-H

Dca

s3

d2

a3

YMvKmb Instalflex mb VO-YMvKasmb VO-YMvKasmb VDEN VG-YMvKasmb XMvK

Instalflex EMC+ mb PVCmb stuurstroomleidingen

ELDSIG INDUCOM

Eca

N/A

N/A

N/A

XMvK

Standard PVC and rubber control cables

MD - MS

H05V2-U H05V2-K H05V2-R H07V2-U H07V2-K H07V2-U H05Z-U H05Z-K H05Z-R H07Z-U H07Z-K H07Z-R

Fca

N/A

N/A

N/A

H05BQ-F H07BQ-F H05RR-F

7.1. CHANGED PRODUCT NAMES OF CABLE TYPES IN ACCORDANCE WITH CPR AND NEN 8012 Current

New

YMvKmb

YMvK Dca - s3, d2, d3

ZO-YMz1Kasmbzh

ZO-YMz1Kas Cca - s1, s1, a1

VD

VD Eca

ELDSIG-H JH(st)Hmbzh

ELDSIG-H JH(st)H B2ca - s1, d1, a1

EUROPESE VERORDENING BOUWPRODUCTEN (CPR)

Copyright © Eldra bv

9

8. Eldra & CPR We are happy to inform you about all the developments in our preparation for the CPR. You can expect information from us via the following media. • Presentations and talks Our account managers contact you for a personal conversation to inform you about the developments at Eldra concerning the CPR. • Website We regularly place items about CPR on our website: www.eldra.nl/MVO/CPR. You can also access this white paper through the above link. • Newsletter You receive a newsletter which combines the news we place on our website. • Monthly internal update We keep our employees informed of the latest developments so they can provide you with the best possible information. Do you have any questions about the changes concerning the CPR? Please contact us. We are happy to assist you further. O&T Jan Fleuren

Configuration Manager

[email protected]

0475 – 56 67 67

Sales Manager Accountmanager Accountmanager

[email protected] [email protected] [email protected]

06 – 23 88 10 12 06 – 22 91 74 56 06 – 53 70 63 29

Sales Sjef Verberne Victor Rossner Gert Koerselman

EUROPESE VERORDENING BOUWPRODUCTEN (CPR)

Copyright © Eldra bv

10

Eldra bv Branskamp 7 NL-6014 CB Ittervoort The Netherlands T +31 (0)475 566 767 F +31 (0)475 565 005 [email protected] www.eldra.nl