ENERGY COGENERATION EFFICIENCY. >350 MW Service Contract >400 MW Installed AND. Turbine Cogeneration Systems. Engine Cogeneration Systems

ENERGY EFFICIENCY AND COGENERATION Turbine Cogeneration Systems Engine Cogeneration Systems Renewable energy power plants Service Air treatment plant...
Author: Aldous Nichols
7 downloads 2 Views 592KB Size
ENERGY EFFICIENCY AND

COGENERATION Turbine Cogeneration Systems Engine Cogeneration Systems Renewable energy power plants Service Air treatment plants

>350 MW Service Contract >400 MW Installed

BUSINESS UNIT IMPIANTI For over 80 years, Cefla has been designing, building and servicing MEP (Mechanic-Electric-Plumbing) complex systems for civil and industrial sector: - HVACR (Heating, Ventilation, Air Conditioning, Refrigeration) - Electrical LV and MV distribution and power systems - Intelligent building management systems Business Unit Impianti Business Unit Finishing Business Unit Arredamenti Business Unit Dentale

- Access Control and Security - Fire Protection - Power Generation and Recovery systems - Cogeneration Plants for natural gas and renewable sources Furthermore, in civil and industrial systems field, as well as in the Energy and Power Generation and in the Oil & Gas, Cefla is present with activities of Global Technologic Service. The high-quality value of our

Cefla was founded in 1932 with the scope to design and build electrical, plumbing, HVAC systems for

activities, the financial and assets solidity and the continuous focus on the most enhanced technologies

civil and industrial constructions. Since then, exploiting the opportunity offered by the market, Cefla

make Cefla the ideal partner for project financing activities or EPC (Engineering - Procurement -

evolved and diversified its business according to its own competencies and capabilities.

Contracting) in high complexity contracts.

TODAY CEFLA IS AN INTERNATIONAL COMPANY, PRESENT INTO FOUR DIFFERENT BUSINESS AREA:

Castello Sforzesco (Milano) Mechanical system and automation for control and supervision of functional/ climate ambient parameters.

TECHNOLOGICAL SYSTEMS FOR CIVIL AND INDUSTRIAL BUILDING AND ENERGY POWER PLANTS TURNKEY SOLUTIONS FOR SHOP AND SUPERMARKET: SHELVINGS, CHECKOUT AND INTEGRATED RACK TURNKEY SOLUTIONS FOR COATING, DRYING AND DECORATE: WOOD, GLASS, PLASTIC AND FIBERCEMENT DENTAL TREATMENT CENTRE, RADIOLOGY AND STERILISATION SYSTEMS

Niguarda Hospital (Milano) HVAC, Plumbing, Fire Fighting, medical gases systems.

The strenght of our group is expressed by the economic results, the value attributed to human resources and our worldwide presence:

Perugia University - Medicine and Surgery Faculty (Perugia) Technological central station and mechanical / electrical systems.

400 million of euro of revenue 1700 employees Production Sites and commercial branches in Cina, Usa, UAE, Germany, France, UK, Spain, Poland and Russia.

Milano Porta Nuova (Milano) HVAC system with exploitation of geothermal energy with heating pump.

Production Sites Imola - (I) Bologna - (I) Pesaro - (I) Verona - (I) Schloss Holte - Stuckenbrock (Bielefeld) - (D) Moscow - (RUS) Charlotte, NC - (USA) Suzhou - (PRC) Commercial Branches Madrid - (E) Warszawa- (PL) Dubai (UAE) Bischwiller (Strasbourg) - (F) Melun (Paris) - (F) Bangalore - (IN)

Trade Fair (Rimini) Centralized chilled water production with ice storage system (21.500 kW) and central cooling station for all the fairground.

Bologna City Hall Headquarter (Bologna) Mechanical, electrical and special systems. Special sunscreen, extended over the whole building, provides also a large area of over one thousand square meters for a photovoltaic system.

THE COGENERATION. WHAT IS IT? WITH TRIGENERATION The cogeneration is the combined production of electrical and thermal energy; the latter is made

Trigeneration system is a plant designed to produce cold water (>7°C) besides electricity and thermal

available as hot water, hot air or steam depending on the technology adopted according to the

energy, through the employment of a Lithium Bromide absorption chiller which use part of thermal

customer requirements. Moreover, the same technology may produce cold energy for refrigeration

energy produced by the Cogeneration plant. This configuration reduces the consumption of conventional

uses (tri-generation).

electrical chillers.

THE ADVANTAGES

Losses 350

FACTORY

Cogeneration allows valuable savings on energy bills that can reach 40% of the total cost: electricity,

1.000 ELECTRICITY

heating and refrigeration. 700 COLD ENERGY

Tri-GENERATION PLANT

1.000 THERMAL ENERGY

Total efficiency >85%

WITHOUT COGENERATION Losses 1.500

Energy saving -1.350 = -35% Fuel 2.500

FACTORY 1.000 ELECTRICITY

1.000 THERMAL ENERGY

ELECTRICITY FROM GRID

Total Fuel 3.650 BOILER HOUSE Losses 150

THE BENEFITS The cogeneration can give advantages to many applications as civil, industrial, commercial and oil & gas. This system is useful when the industrial process is based on at least 4.000 working hours per year as well as when there are simultaneous need of electricity, heat and refrigeration.

Fuel 1.150

Total efficiency 55%

ENERGY EFFICIENCY GREENHOUSE GAS EMISSIONS (CO2) REDUCTION ENVIRONMENTAL BENEFIT CONTINUITY ENERGY SUPPLY (“ISLAND OPERATION”) POSSIBLE USE OF RENEWABLE SOURCES

WITH COGENERATION

GOVERNMENTAL ECONOMIC INCENTIVES (IF ANY) LOW PAY-BACK PERIOD

FACTORY 1.000 ELECTRICITY 1.000 THERMAL ENERGY

Fuel 2.350

Losses 350

Fuel 2.350

COGENERATION PLANT

Total efficiency >85%

Energy saving -1.350 = -35%

YOUR ENERGY EFFICIENCY SOLUTION PARTNER

TECHNOLOGICAL SERVICE

Cefla plays on the markets a General Contractor partner, providing complete assistance to the Customer

After the construction of the plant, Cefla proposes to the Customer long-term contract

in every step necessary for development and construction of the plant.

for the Operation and Maintenance of Civil technological plants, Power Generation &Cogeneration systems and Oil&Gas sector. Our wide experience offer to the Customer the possibility to have a unique supplier for all the O&M activities on utility systems, also in special industrial contexts.

ENERGY AUDIT

Hereafter our main activities:

Optimized sizing of the plant, based on the energy consumption of the user, their particular trends (if any)

ROUTINE MAINTENANCE PROGRAM, CORRECTIVE AND PREDICTIVE “ON CONDITION”

and the potential availability of renewable/alternative energy sources. For this activity, Cefla can perform a preliminary study with:

AVAILABILITY FOR H24 AND 365DAYS/YEAR

ANALYSIS OF REAL CONSUMPTION OF THE PLANT

MAINTENANCE ENGINEERING SYSTEMS

MASS AND ENERGY BALANCES FOR COGENERATION AND ELECTRICAL GENERATION SYSTEMS

OPTIMIZATION OF THE LIFE CYCLE OF THE PLANT

DETAILED FEASIBILITY STUDY

ANALYSIS OF ENERGY EFFICIENCY IMPROVEMENTS

BUSINESS PLAN AND CALCULATION OF RELEVANT ECONOMICAL PARAMETERS

RISK ASSESSMENT FOR THE SAFEGUARD OF ENVIRONMENT AND SAFETY

FINALLY, COMPARISON OF ALTERNATIVE SOLUTIONS WITH THE BUDGET ECONOMICAL EVALUATION ELECTRICAL POWER AVERAGE CONSUMPTION POWER (KW) 3.500 3.000 2.500 2.000

REMOTE CONTROL AND REMOTE ASSISTANCE

ELECTRICAL ENERGY REQUIREMENT - Factory working period

PLANT AVAILABILITY GUARANTEE

Electrical energy (kW) 6.000

Factory consumption curve

5.000

Process consumption curve

4.000

Electricity from cogenerator

OUR ENERGY SERVICE ACTUALLY MANAGE MORE THAN 350MWe

3.000

1.500

HOURS 1

5

1.000 9

13

500 17

More than 20 years maintenance activity in power generation plants based

1.000

on engine and gas turbine, makes Cefla a reliable partner for power generation

0

21

MONTHS

2.000

January

April

July

0

October

0

1.000

2.000

3.000

4.000

5.000

6.000

7.000

8.000

9.000

plants.

Hours per year (x) with electrical power over (y)

WORKSHOP AND MAJOR OVERHALL Cefla can directly provide Major Overhaul activity on several kind of engine, including operation on main parts of the engine core and specific maintenance activity. For instance in 2013, we have been involved in the 120’000h Major Overhall of n.5 gas engine (power of 2.600 MWe each).

DETAILED DESCRIPTION OF THE PURPOSES

CONSTRUCTION OF THE PLANT

With the final definition of the best solution, Cefla will follow

Cefla is able to propose to the Customer

all the construction, starting from the authorization process

different kind of solutions, starting from the

(if needed) till the definition of the Customer’s performance

supply of the standard cogeneration package

OIL&GAS SERVICE

warranties and service activities.

up to the complete TURN-KEY contract.

Cefla can directly operate for Operation&Maintenance of electrical and mechanical engines in Oil&Gas sector, both on-shore and off-shore. More we have developed a dedicated structure for this business. In 2014, there are actually more than 250 engines on-shore and off-shore serviced by contract.

Furthermore, Cefla offers specific financial to steam collector

solutions or specific contract of ENERGY Chimney

SERVICE to support the investment even through partnership and relationship that Cefla has developed with the main actors in the energy market.

Demineralized water (steam circuit feeding) Cold water circuit (temp. min.)

TECHNOLOGICAL PLANT SERVICE

reintegration water

Since more than 30-years ago, we perform service activity in all the technological utilities of extended users, such as - electrical and anti-fire systems - heating systems - hot water boilers - air conditioning systems and air treatment system

Centergross Bologna Total thermal energy installed: 50.000 kWt Total cooling capacity: 700 kWt Ait treated: about 19.000 Nmc/h Site area: 1.000.000 square meter

INDUSTRIAL COGENERATION

CASE HISTORY CERAMIC INDUSTRY

CASALGRANDE PADANA The industrial sector needs flexible and high-efficiency energy systems, with a low pay-back period. For these reasons, Cefla has developed standardized solutions for cogeneration plants with the aim to satisfy all these features.

6.000 kW gas turbine, electrical power Heat recovery of exhaust gas to n.3 spray-driers Full-service maintenance

STANDARDIZED COGENERATION PACKAGE SCHEME Exhaust gas Air-cooling secutiry system

CASE HISTORY CERAMIC INDUSTRY

COOPERATIVA CERAMICA IMOLA Ambient ventilation

n.1 gas engine 6.000 kWe n.1 gas engine 1.800 kWe Exhaust gas complete thermal recovery for spray-drying process (4.400 kW)

Heat recovery exchanger

Electrical panel

Hot water circuit recovery for ATM combustion air pre-heating (1.200 kW) and slip pre-heating

Gas engine system

This approach provides solutions suitable for several industrial sectors, such as food industry, wood transformation industry, ceramic manufacturing, mechanical manufacturing companies, chemical industry, papermill industry, textile industry and many others.

COGENERATION FOR DISTRICT HEATING The same cogeneration technology allows to exploit electrical energy and thermal energy (hot and cold) for many different users such as utilities, hospitals and residential.

CASE HISTORY FOOD INDUSTRY

HERA COMM 999 kWe CHP plant Plant installed in existing building Heat recovery: steam in main manifold and hot water Full-service maintenance

CASE HISTORY UTILITIES SECTOR

FIERA BOLOGNA METROPOLITANA Gas turbine 4.350 kWe Complete thermal recovery (7.860 kW) Production of steam and superheated water

CASE HISTORY BEVERAGE INDUSTRY

CAVIRO 1500 kWe CHP plant

CASE HISTORY RESIDENTIAL SECTOR

HERA TELERISCALDAMENTO

Outdoor package installation

n.2 gas engine

Heat recovery: steam in main manifold and hot water

Electrical power 4.850 kWe

Supervision system for the complete accounting of energy streams

superheated and hot water (120°C and 90°C)

Full-service maintenance

Thermal power 4.350 kW production of Thermal energy in integration 6.600 kW

RENEWABLE ENERGY PLANTS

OIL&GAS SECTOR

Cefla provides solutions with renewable energy for several application and for different renewable sources. CASE HISTORY

OIL EXTRACTION FIELD ROTELLO (CB) CASE HISTORY BIOGAS COGENERATION PACKAGE

CLAI Biogas derived from anaerobic digestion of food industry by-products Electrical power 888 kWe Biogas pre-treatment system Total thermal recovery for digestors heating, biomass sanitization pre-treatment and heating of the nearby factory Full service maintenance of engine and auxiliary systems

CASE HISTORY VEGETABLE OIL COGENERATION PLANT

Power generation plant Residual gas of oil extraction as fuel n.8 gas engine Total power 21.560 kW Global service for O&M Spare part logistic management with guaranteed availability Direct operation of the plant since 20 years Service provided through Major overhall after 120.000h on n.5 engine

AIR TREAMENT SYSTEMS

LLYOD RAVENNA (Micron Mineral) Cefla provides air treatments systems since more than 30 years. Cogeneration plant with vegetable oil

The experience has been developed in both industrial sectors (ceramic industry, wood finishing

Electrical power 7,158 kWe

industry, leather industry, etc…) and energy&environmental field (Waste-to-energy, landfill, renewable

Partial thermal recovery of 2.600 kWt for nearby industrial processes

plants, etc…).

Full service maintenance of engine and auxiliary systems

CASE HISTORY

Flat glass production Recuperative Thermal Oxidizer CASE HISTORY TURN-KEY ANAEROBIC DIGESTION PLANT

Thermal recovery for air pre-heating of inlet air and process air

COOP IL RACCOLTO Plant for anaerobic digestion of energy crops, food industry by-products and agricultural by-products General Contractor Role for Turn-key complete plant Total power 999 kWe Full service contract for the cogeneration system and auxiliary systems

CASE HISTORY

Wood finishing plant Regenerative Thermal Oxidizer

Cefla s.c. Via Selice Prov.le 23/a - 40026 Imola (BO) Italy - Tel. +39 0542 653111 - e-mail: [email protected] www.ceflaimpianti.it

Suggest Documents