DRIVEN BY INNOVATION DUTCH 100% ELECTRIC CITY BUS WITH A FULL DAY RANGE

DRIVEN BY INNOVATION DUTCH 100% ELECTRIC CITY BUS WITH A FULL DAY RANGE INTRODUCTION DUTCH 100% ELECTRIC BUS MANUFACTURER located near the High Tech...
Author: Alaina Jenkins
0 downloads 0 Views 7MB Size
DRIVEN BY INNOVATION DUTCH 100% ELECTRIC CITY BUS WITH A FULL DAY RANGE

INTRODUCTION DUTCH 100% ELECTRIC BUS MANUFACTURER located near the High Tech Automotive Campus in Helmond

FIRST EUROPEAN TYPE APPROVAL for a 12 meter Long Range 100% electric bus already in 2012

ENERGY CONSUMPTION TESTS BY TNO AND VTT since 2013 Transdev Finland operates EBUSCO buses in extreme weather conditions as part of a public-private research program

EUROPEAN BUS AWARDS ECW ECOLOGY AT BUSWORLD in both 2013 and 2015

100% ELECTRIC ZERO EMISSION

OPERATIONAL FLEXIBILITY > 300 km range within the city center for a flexible operation

> 90 passengers capacity aluminum light weight construction high energy density battery

Electric bus and charging infrastructure in-company developed 70% of the components used are well known by every workshop FINANCIAL FLEXIBILITY Low investment costs for the customer no expensive charging infrastructure

Short leasing is possible!

100% ELECTRIC ZERO EMISSION



COMPARISMENT INVESTMENT & EXPLOITATION COSTS - ELECTRIC BUS vs DIESEL BUS (EURO 6) Electric Bus

Batch amount Price Bus Discount Concessionperiod (year) Km per year Subsidy Price per bus with discount and Subsidy



€ €

Diesel Bus (Euro 6)

1 435.000,00 0% 12 Yr 75000 km 435.000,00

1 240.000,00 0% 12 Yr 75000 km 240.000,00



€ €

Costs per bus per year

a. Maintenance cost excl. Batterijpakket /km banden

b. Finance cost busvervoerder per jaar c. Garantietermijn bus excl. batterijpakket d. Garantie batterijpakket €7000/jr=€0,10/km



3,00% 2 jr €

e. Enegieverbruik per km (in kWh , Liters Diesel, L LNG) f. Energiekosten per kWhr, Lt diesel, Lt LNG, resp. per jaar

0,10



0,05

Totaal kosten per bus per jaar

Cost per km

15.000,00



6.525,00



7.500,00



75.000,00



3.750,00

-



€ €



0,20

3,00% 2 jr € 0,42 lt €

1,10

-



0,70

-

€ €

0,02 1.500,00

-

300.000,00 -



36.250,00

€ €

703,13 -



69.728,13



0,93

€ 15.000,00 € 3.622,50

-

-

0,03 lt

k. Afschrijving bus per jaar m. Laadstation voor 32 elektrische bussen, afschrijving 90% in 10 jaar n. Wegenbelasting per Jaar



-

01,00 kWh

g. Adblue verbruik per km in Liter (6% van Dieselverbruik) h. Adblueprijs per liter €0,70

i. Adbluekosten per km , totaal j. Restwaarde Bus na concessieperiode (10%)

0,20

Costs per bus per year

€ 31.500,00 € 34.650,00 € 1.890,00 € 1.323,00

€ 19.875,00

? €

? -

€ € 74.470,50



-

0,99

100% ELECTRIC ZERO EMISSION

EBUSCO 2.1 CITY BUS | IN-COMPANY NEW DEVELOPED

MAIN DIMENSIONS Length: 12,000 mm

Width: 2,550 mm

Height: 3,270 mm

SPECIFICATIONS Total: Seated:

> 90 persons up to 41 seats

Empty weight, incl. battery: 12,300 kg Battery pack weight 311 kWh: 2,150 kg incl. BMS

100% ELECTRIC ZERO EMISSION

EBUSCO 2.1 CITY BUS - TECHNICAL

HIGHEST ENERGY DENSITY 311 kWh battery package 160 Wh/kg energy density No batteries in interior!

HIGH VOLTAGE Power Torque Max. Torque Rated

max. 220 kW 3000 Nm 1050 Nm

EXCELLENT PERFORMANCE

LIGHT WEIGHT BODY

Max. speed > 80 km/h Max. grade ability > 18% full load

AI

HIGH VOLTAGE ACCELARATION

RANGE

0-30 km/h 0-40 km/h

< 6 sec. < 9 sec.

Fully aluminum body

Average 250 kilometers Maximum > 300 kilometers

100% ELECTRIC ZERO EMISSION

EBUSCO DRIVE-LINE EBUSCO MOTOR CONTROLLER Dimensions: 584 x 408 x 132 mm Maximum capacity: 240 kW Weight: 32 kg

EBUSCO HIGH VOLTAGE DRIVE MOTOR Dimensions: ɸ510 x 636 mm Peak power: 220 kW Peak torque: 3000 Nm

EBUSCO BMS SYSTEM Rated input voltage: 24~28V Rated input current: 2A/DC Weight: 1 kg

EBUSCO VMS SYSTEM 580 x 400 x 111 mm Input Voltage range: DC300-700V

EBUSCO BATTERY CELL Dimensions: ɸ60 x 290 mm Specification: 90 Ah/ 3,2 V Energy density: 160Wh/kg

100% ELECTRIC ZERO EMISSION

Battery Pack Electric Air Conditioner

Onboard charger

VMS

Electric Hydraulic Booster Pump

Asynchronous Drive Motor BMS Battery Pack Motor Controller

EBUSCO ON/OFF-BOARD CHARGING EBUSCO Off-Board Charger

EBUSCO On-Board Charger

35 kW – 75 kW – 150 kW Simple installation at the depot

Charging at multiple locations In different power configurations

Specifications Off-Board Charger 75 kW Dimensions (mm): 530 x 400 x 1450 Output voltage (V): DC500-700 Input voltage (V): 3ph380V+N+T Constant output current (A): 105 Charging time: 4 hours Efficiency: 96% Weight: 95 kg

100% ELECTRIC ZERO EMISSION

EBUSCO OPPORTUNITY CHARGING PANTOGRAPH SOLUTION

Specifications

Smallest footstep: 0,46m² Time recommissioning (A-B): 16 hour High power transfer: > 5km/min

Input voltage (V): 400VAC Output voltage (V): 250-750VDC Output current (A): 0-440A Power: 308 kW @ 700V Efficiency: 95% Connection noise: 52 dB (A)

100% ELECTRIC ZERO EMISSION

FIRST EUROPEAN WVTA

EXCLUSIVE PARTNERSHIP – XIAMEN GOLDEN DRAGON THIRD LARGEST BUS MANUFACTURER IN CHINA Construction hall: Yearly volume:

310.000 m2 40.000 buses

100% ELECTRIC ZERO EMISSION

EXCLUSIVE PARTNERSHIP – YINLONG ENERGY

LARGEST LTO BATTERY MANUFACTURER IN THE WORLD

100% ELECTRIC ZERO EMISSION

VIRTUAL ORGANISATIONAL PROCES

Invoice parts Credit warranty

European Parts Centre

Invoice parts Credit warranty

EBUSCO-DID

Order parts Submissions Warranty Claims

AD/AR

Order cars/parts Submissions Warranty Claims

100% ELECTRIC ZERO EMISSION

SUPERIOR CONSUMPTION! (INDEPENDENT TESTS)

TESTS at VTT (FI) and TNO (NL) with 3000 KG PAYLOAD ADEME LONDON BRAUNSCHWEIG ESPOO

10.9 km/h 14.3 km/h 22.3 km/h 23.8 km/h

1.10 kWh/km 0.99 kWh/km 0.96 kWh/km 0.75 kWh/km

337 KILOMETER RANGE AT 3000 KG PAYLOAD

100% ELECTRIC ZERO EMISSION

EXTREME CONDITIONS INTENSE SLOPE TESTS Geiranger Fjord (NO) Geisbergspitze (AU)

10% slope 18% slope

HARSH WINTER CONDITIONS FINLAND For more than 2 years testing in Helsinki by Transdev Finland Operating temp. -25ᵒC tot -4ᵒC Average km/h 18 km/h 180 km/day Average kWh/km 0.98 kWh/km EBUSCO 2.0 bus at Geiranger Fjord

100% ELECTRIC ELECTRIC ZERO ZERO EMISSION EMISSION 100%

ELECTRIC BUS TRANSPORT IS REALITY! ALREADY TESTED IN:

MAASTRICHT BREMEN HELSINKI BONN JONKOPING KALSKRONA KALMAR BORAS LERUM AACHEN PARIS ROTTERDAM

FALUN ESKILSTUNA GLOSTRUP STAVANGER MUNCHEN COPENHAGEN BAD NEUSTADT PARIS PARIS COP 21 SALZBURG BORKUM UTRECHT 100% ELECTRIC ZERO EMISSION

BREMEN

STADTWERKE BREMEN

GERMANY

BREMEN GERMANY

YEAR 2013

DATE 26 October

BUS LINE line 29

100% ELECTRIC ZERO EMISSION

HELSINKI

VEOLIA

FINLAND

HELSINKI FINLAND

YEAR 2013 - 2015

START DATE 4 December

BUS LINE line 11

100% ELECTRIC ZERO EMISSION

BONN

STADTWERKE BONN

GERMANY

BONN GERMANY

YEAR 2014

DATE 7 – 17 October

BUS LINE line 607

100% ELECTRIC ZERO EMISSION

COPENHAGEN

MOVIA

DENMARK

COPENHAGEN DENMARK

YEAR 2014

DATE 15 September

BUS LINE line 25

100% ELECTRIC ZERO EMISSION

KARLSKRONA

BLEKINGETRAFIKEN SWEDEN

KARLSKRONA SWEDEN

YEAR 2014

DATE 26 November

BUS LINE line 1

100% ELECTRIC ZERO EMISSION

KALMAR

KALMAR LANS TRAFIK

SWEDEN

KALMAR SWEDEN

YEAR 2014

DATE 17 December

BUS LINE line 401

100% ELECTRIC ZERO EMISSION

JONKOPING

KEOLIS

SWEDEN

JONKOPING SWEDEN

YEAR 2015

DATE 7 January

BUS LINE line 12/18

100% ELECTRIC ZERO EMISSION

BORAS

VASTTRAFIK

SWEDEN

BORAS SWEDEN

YEAR 2015

DATE 28 January

BUS LINE line 1

100% ELECTRIC ZERO EMISSION

LERUM

VASTTRAFIK

SWEDEN

LERUM SWEDEN

YEAR 2015

DATE 2 February

BUS LINE line 525

100% ELECTRIC ZERO EMISSION

STAVANGER

BOREAL

NORWAY

STAVANGER NORWAY

YEAR 2015 - now

START DATE 16 February

BUS LINE line 525

100% ELECTRIC ZERO EMISSION

MUNCHEN

STADTWERKE MUNCHEN

GERMANY

MUNCHEN GERMANY

YEAR 2015

DATE 16-19 February

BUS LINE line 100

100% ELECTRIC ZERO EMISSION

BERLIN

BVG

GERMANY

MUNCHEN GERMANY

YEAR 2015

DATE 22-28 February

BUS LINE line 15

100% ELECTRIC ZERO EMISSION

AACHEN

ASEAG

GERMANY

AACHEN GERMANY

YEAR 2015

DATE 24 July

BUS LINE line 13B

100% ELECTRIC ZERO EMISSION

GAISBERGSPITZE

ALBUS

AUSTRIA

SALZBURG AUSTRIA

YEAR 2015

DATE 31 October

BUS LINE line 151

100% ELECTRIC ZERO EMISSION

PARIS

TRANSDEV

FRANCE

PARIS FRANCE

YEAR 2015 - now

START DATE 1 October

BUS LINE line 1

100% ELECTRIC ZERO EMISSION

PARIS - COP21

KEOLIS

FRANCE

PARIS FRANCE

YEAR 2015

DATE 30 Nov. – 12 Dec.

BUS LINE COP 21

100% ELECTRIC ZERO EMISSION

BAD NEUSTADT SBN

GERMANY

BAD NEUSTADT GERMANY

YEAR 2016

DATE 26 January

BUS LINE Nessi 2

100% ELECTRIC ZERO EMISSION

BERN

POSTAUTO

SWITZERLAND

BERN Switzerland

YEAR 2016

DATE 28 January

BUS LINE line 1

100% ELECTRIC ZERO EMISSION

UTRECHT

QBUZZ

NETHERLANDS

UTRECHT NETHERLANDS

YEAR 2016

DATE 21 June

BUS LINE Line 1

100% ELECTRIC ZERO EMISSION

ROTTERDAM

RET

NETHERLANDS

ROTTERDAM NETHERLANDS

YEAR 2016

DATE 28 June

BUS LINE Line 16

100% ELECTRIC ZERO EMISSION

ALREADY SOLD TO 1

HELSINKI

2

STAVANGER

1

BREMEN

2

MUNCHEN

3

STAVANGER

1

BORKUM

8

PARIS

1

BERN

1

BAD NEUSTADT

2

GRONINGEN

11

UTRECHT

100% ELECTRIC ZERO EMISSION

PARIS TRANSDEV - 8 buses sold

Paris Climate Conference - COP21

Signed during the presence of His Majesty the

Only electric bus manufacturer who drove with an

King of The Netherlands

electric bus during the COP21.

100% ELECTRIC ZERO EMISSION

EBUSCO LIVE! OUTSTANDING ONLINE MONITORING real time monitoring of the bus analyses of the parameters to find cause of occurred issues insight of the bus performances driver statistics technical statistics route log

QUESTIONS SOLVED WITH EBUSCO LIVE How are the buses performing? Is the range sufficient on every day? When can I expect a battery failure? What was the energy consumption on “Route 12” today? How is the fleet manager informed about the remaining range? Can I expect a bus jam in front of the opportunity charging station?

ONLINE OVERVIEW REAL TIME STATUS

CONTACT P.H.A.M. (Peter) Bijvelds CEO Email: [email protected] Mobile: +31 6 55863115

W.J.T.H. (Walter) Luijten Managing Director Email: [email protected] Mobile: +31 6 43087019

J-L M.J.L. (Jean-Luc) Deflandre CCO Email: [email protected] Mobile: +31 6 29074416

100% ELECTRIC ZERO EMISSION