CRANKCASE AND CYLINDER HEAD

1B3-26 DIESEL ENGINE MECHANICAL CRANKCASE AND CYLINDER HEAD CYLINDER HEAD YAD1BBC0 SSANGYONG Y200 DIESEL ENGINE MECHANICAL 1B3-27 1 2 3 4 5 6 7 8...
Author: Melina Pope
15 downloads 0 Views 2MB Size
1B3-26 DIESEL ENGINE MECHANICAL

CRANKCASE AND CYLINDER HEAD CYLINDER HEAD

YAD1BBC0

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-27 1 2 3 4 5 6 7 8 9

Bolt.................................. 25 N•m (18 lb-ft)+90° Washer Camshaft Drive Sproket ......................... Relace Camshaft Bolt.......................................... 10 N•m (89 lb-in) Threaded Ring ...................... 130 N•m (96 lb-ft) Prechamber Bolt.......................................... 25 N•m (18 lb-ft) Camshaft Bearing Cap

SSANGYONG Y200

10 11 12 13 14 15 16 17

Cylinder Head Bolt ............................ See Table Plug Engine Coolant Temperature Thermo Valve Sensor Cylinder Block Gasket................................................... Replace Cylinder Head Sliding Rail

1B3-28 DIESEL ENGINE MECHANICAL Cylinder Head Bolt Tightening Torque Cylinder Head Bolts (12-sided socket head) (Engine cold)

1st Step

10 N•m (89 lb-in)

2nd Step

35 N•m (26 lb-ft)

3rd Step

180°

M8 Cylinder Head Bolts

25 N•m (18 lb-ft)

Tightening Sequence for Cylinder Head Bolts

YAD1BBD0

Notice: The cylinder head may only be removed when the engine has cooled down. The cylinder head is removed together with the exhaust manifold. As the cylinder head bolts undergo a permanent tightening. They require to be replaced if they exceed the maximum lengthes indicated in the table. Thread Dia. Length(L) When New

YAD1BBE0

Max. Length(L)

M10

80 mm

82 mm

M10

102 mm

104 mm

M10

115 mm

117 mm

The twelve-sided socket head bolts are tightened with each stages of torque and torque angle. It is not necessary to retighten the cylinder head bolts at the 1000~1500 km inspection or after 1000~1500 km of repairs.

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-29 Tools Required 116 589 02 34 00 116 589 03 07 00 116 589 20 33 00 602 589 00 40 00 603 589 00 40 00

Threaded Pin T Type Socket Wrench Sliding Hammer Engine Lock Counter Holder

Removal Procedure

YAD1BBF0

1. Completely drain the coolant from the radiator and cylinder block. 2. Remove the cooling fan shroud. 3. Hold the fan with counter holder 603 589 00 40 00 and remove the bolt and then remove the cooling fan.

4. Remove the bracket oil dipstick tube.

YAD1BBG0

5. Remove the tensioning lever nut. 6. Remove the nut on the tensioning lever and insert the rod(φ 18, 180 mm). By pushing the rod to the arrow direction, pull back the bolt.

YAD1BB30

SSANGYONG Y200

1B3-30 DIESEL ENGINE MECHANICAL 7. Push the tensioning lever to the opposite direction to release the spring tension and remove the poly V-belt.

YAD1BB40

8. Unscrew the EGR pipe mounting bolts onto the exhaust manifold. 9. Remove the duct bracket from the cylinder head.

YAD1BBH0

10. Unscrew the intake duct mounting bolts onto the intake manifold.

YAD1BBJ0

11. Separate the connecting rod from the control lever.

YAD1BBK0

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-31 12. Pull out the accelerator control linkage.

YAD1BBL0

13. Remove the fuel injection line (1) from the fuel injection nozzle (12).

YAD1BBM0

14. Remove the fuel injection line from the fuel injection pump.

YAD1BBN0

15. Remove the bracket mounting bolts and then remove the fuel injection line (1).

YAD1BBP0

SSANGYONG Y200

1B3-32 DIESEL ENGINE MECHANICAL 16. Disconnect the blow by hose from the cylinder head cover.

YAD1BBQ0

17. Disconnect the glow plug cables.

YAD1BBT0

18. Remove the intake manifold (10) and gasket.

YAD1BBR0

19. Remove the cylinder head cover and gasket.

YAD1BBS0

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-33 20. Remove the cable channel.

YAD1BBU0

21. Disconnect the cables from the glow plug sensor and engine coolant temperature sensor.

YAD1BBV0

22. Remove the heater pipe bracket from the oil filter. 23. Pry off the clamp and push the heater feed pipe forward and then pull out the pipe.

YAD1BBW0

24. Disconnect the fuel lines from the fuel filter.

YAD1BBX0

SSANGYONG Y200

1B3-34 DIESEL ENGINE MECHANICAL 25. Disconnect the fuel lines from the injection pump.

YAD1BBY0

26. Remove the fuel filter.

YAD1BBZ0

27. Remove the fuel injection nozzle and nozzle washer.

YAD1BC00

28. Rotate the crankshaft and set the no.1 cylinder at TDC. Notice: Do not rotate the crankshaft to the opposite direction of engine revolution.

YAD1BC10

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-35 29. Place alignment marks on the camshaft gear and timing chain.

YAD1BC20

30. Ensure that the camshaft and the bearing cap marking are aligned.

YAD1BC30

31. Remove the starter motor and install the engine lock 602 589 00 40 00 onto the flywheel ring gear.

YAD1BC40

32. Remove the exhaust manifold and exhaust pipe.

YAD1BC50

SSANGYONG Y200

1B3-36 DIESEL ENGINE MECHANICAL 33. Remove the chain tensioner and seal.

YAD1BC60

34. Remove the bolt and separate the drive sprocket. Notice: During removal, be careful not to drop the sprocket and chain into the timing case. Carefully pull off the chain and then pull out the sprocket.

YAD1BC70

35. Remove the camshaft bearing cap bolts according to the numerical sequence. Notice: Remove the No.1 bolts first and then remove the No. 2 bolts. Do not remove the bolts at a time completely but remove them step by step evenly or camshaft can be seriously damaged.

YAD1BC80

36. Remove the bearing caps and then pull out the camshaft(20) upward. Notice: Be careful not to miss the locking washer. 37. Remove the locking washer. Notice: Check the locking washer and replace if necessary.

YAD1BC90

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-37 38. Using the sliding hammer 116 589 20 33 00 (36) and the threaded pin 116 589 02 34 00 (37), pull out the sliding rail pins (25, 26) and remove the sliding rail (24).

YAD1BCA0

39. Remove the vacuum line from the vacuum pump. 40. Disconnect the vacuum pipe from thermo valve.

YAD1BCB0

41. Remove the socket bolts (13) of the chain box using the T type socket wrench 116 589 03 07 00.

YAD1BCC0

42. Remove the cylinder head bolts in numerical sequence. 43. Remove the cylinder head and gasket.

YAD1BCD0

SSANGYONG Y200

1B3-38 DIESEL ENGINE MECHANICAL Installation Procedure 1. Replace the cylinder head gasket.

YAD1BCE0

2. Install the cylinder head onto the crankcase. Notice: Align the cylinder head holes with the guide pins.

YAD1BCF0

3. Measure the length(L) of cylinder head bolts. Notice: If the max. length is exceeded, replace the bolts. Thread Dia. Length (L) when New

Max. Limit(L)

M10

80 mm

82 mm

M10

102 mm

104 mm

M10

115 mm

117 mm

YAD1BBE0

4. Coat the head contact surface of bolts and thread with oil and insert them as shown. - Cylinder head bolts arrangement Bore 1 .............................................. M10 × 80 2 .............................................. M10 × 102 3 .............................................. M10 × 115 4 .............................................. M 8 × 50 5 .............................................. M 8 × 80

YAD1BCG0

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-39 5. Tighten the cylinder head bolts to specified torque and torque angle.

Tightening Torque

1st Step

10 N•m (89 lb-in)

2nd Step

35 N•m (26 lb-ft)

Torque Angle

90°

Wait for

10 minutes

Torque Angle

90°

YAD1BCH0

YAD1BBD0

6. Install the socket bolts in the chain box using the T type socket wrench 116 589 03 07 00. Installation Notice Tightening Torque

25 N•m (18 lb-ft)

YAD1BCK0

7. Connect the vacuum pipe to the thermo valve. 8. Connect the vacuum lines to the vacuum pump.

YAD1BCL0

SSANGYONG Y200

1B3-40 DIESEL ENGINE MECHANICAL 9. Install the fuel filter and connect the pipe. Installation Notice Tightening Torque

25 N•m (18 lb-ft)

Be careful not to be confused the connections and hoses.

YAD1BBX0

10. Connect the fuel line to the injection pump. Installation Notice Tightening Torque

13 N•m (10 lb-ft)

YAD1BBY0

11. Install the sliding rail (24) and insert the sliding rail pins (25, 26) using the sliding hammer 116 589 20 33 00 (36) and threaded pin 116 589 02 34 00 (37). Notice: Apply sealing compound on the each collar of the sliding rail pins.

YAD1BCA0

12. Insert the locking washer. 13. Inspect the valve tappet and check that the tappet moves smoothly.

YAD1BCM0

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-41 14. Coat the camshaft with oil and install the camshaft on the cylinder head to be TDC mark(arrow) upward. 15. Measure the axial end play of the camshaft. Installation Notice End Play

0.06 ~ 0.21 mm

If out of standard, adjust it with the proper thickness of locking washer.

YAD1BCN0

16. Install the bearing caps on the camshaft according to the number on the caps.

YAD1BCP0

17. Tighten the bearing cap bolts according to the numerical sequence. Installation Notice Tightening Torque

25 N•m (18 lb-ft)

Tighten the No. 1 bolts (light arrow) first and then tighten the No. 2 bolts (dark arrow) stage by stage.

YAD1BCQ0

18. Position the camshaft on marking and install the camshaft sprocket. Notice: Align the alignment marks on the chain and sprocket.

YAD1BC30

SSANGYONG Y200

1B3-42 DIESEL ENGINE MECHANICAL

YAD1BCR0

19. Check the TDC position of the crankshaft.

YAD1BC10

20. Install the camshaft sprocket bolt. Installation Notice Tightening Torque

1st Step 25 N•m (18 lb-ft) 2nd Step 90°

YAD1BC70

Notice: Measure the max. length ‘L’ and replace the bolt if it exceeds 53.6 mm.

YAD1BCS0

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-43 21. Install the exhaust manifold and gasket. Installation Notice Tightening Torque

25 N•m (18 lb-ft)

YAD1BCT0

22. Replace the seal and then install the chain tensioner. Installation Notice Tightening Torque

80 N•m (59 lb-ft)

YAD1BC60

23. Remove the engine lock 602 589 00 40 00.

YAD1BC40

24. Insert the nozzle washer into the hole to face round part downward. 25. Install the fuel injection nozzle. Installation Notice Tightening Torque

YAD1BCU0

SSANGYONG Y200

40 N•m (30 lb-ft)

1B3-44 DIESEL ENGINE MECHANICAL 26. Connect the fuel hose. 27. Install the cable channel and connect the cables to glow plugs.

YAD1BBU0

28. Replace the gasket and install the cylinder head cover. Installation Notice Tightening Torque

10 N•m (89 lb-in)

29. Install the blow-by hose.

YAD1BCV0

30. Connect the wires to the engine coolant temperature sensor and the glow plug sensor.

YAD1BBV0

31. Replace the intake manifold gasket. 32. Install the intake manifold. Installation Notice Tightening Torque

25 N•m (18 lb-ft)

YAD1BCW0

SSANGYONG Y200

DIESEL ENGINE MECHANICAL 1B3-45 33. Replace the O-ring of heater feed pipe and install it to the cylinder head. Notice: For installation, clean the hole. 34. Install the bracket of heater feed pipe to the oil filter.

YAD1BCX0

35. Install the fuel pipe and the accelerator control linkage.

YAD1BCY0

36. Connect the fuel lines to the injection nozzles and to the injection pump. Installation Notice Tightening Torque

18 N•m (13 lb-ft)

YAD1BBN0

37. Install the poly V-belt. Notice: Be careful not to contaminate the belt.

YAD1BCZ0

SSANGYONG Y200

1B3-46 DIESEL ENGINE MECHANICAL 38. By inserting a rod into the tensioning lever upper hole and pulling the rod, install the bolt and then tighten the nut. Installation Notice Tightening Torque

21 N•m (15 lb-ft)

YAD1BB30

39. Install the oil dipstick tube bracket. Installation Notice Tightening Torque

10 N•m (89 lb-in)

YAD1BBG0

40. Hold the cooling fan with the counter holder 603 589 00 40 00 and tighten the bolt.

YAD1BBF0

SSANGYONG Y200

Suggest Documents