CLOSURE OF THE KINROSS DELAMAR MINE. Steve Smith Environmental Manager Reclamation Operations (ROBU)

CLOSURE OF THE KINROSS DELAMAR MINE Steve Smith – Environmental Manager – Reclamation Operations (ROBU) OPERATIONS MAP RUSSIA NORTH AMERICA Dvoino...
9 downloads 0 Views 2MB Size
CLOSURE OF THE KINROSS DELAMAR MINE Steve Smith – Environmental Manager – Reclamation Operations (ROBU)

OPERATIONS MAP RUSSIA

NORTH AMERICA

Dvoinoye

Kupol

Fort Knox

Kettle River – Buckhorn Round Mountain

Toronto

WEST AFRICA Tasiast

Chirano

Lobo-Marte La Coipa

Paracatu

Maricunga Cerro Casale

SOUTH AMERICA

 Operations  Development Projects  Head Office

2 kinross.com

DELAMAR MINE LOCATION

3 kinross.com

DELAMAR SITE HISTORY ● Historic Mining District 1863 to 1914 ● Ownership 1977-1993 – Earth Resources and NERCO ● 1993 – Kinross purchase NERCO property from Kennecott ● Kinross production 1993-1998 ● Care & Maintenance 1999-2002; Closure began in 2003

4 kinross.com

SITE CONDITIONS AT SHUT-DOWN ● Prolonged low metal prices forced shut-down and subsequent closure ● Record high precipitation during shut-down period ● ARD conditions at waste rock facilities and open pits ● Tailings pond also used for ARD storage

5 kinross.com

PREPARATIONS FOR FINAL RECLAMATION AND CLOSURE ● Lead regulatory agencies are the Idaho Dept. of Lands (IDL) and US BLM ● Supporting agencies include IDEQ, IDWR, and US EPA. ● In early 2002, Kinross established the Reclamation Operations Business Unit (ROBU), a separate unit within the company to manage reclamation and closure sites. ● Later in 2002, Policy and Technical Groups were formed with agency and company staff to update the existing Reclamation Plan into a comprehensive Closure Plan. ● Technical Group met monthly over a two-year period to review, modify and finalize the numerous engineering plans, as well as the overall Closure Plan. ● Approved reclamation projects were authorized to begin in 2003. ● By mid-2004, the guiding Closure Plan, Water Management Plan, engineering design plans, and other support documents had been extensively reviewed, modified, and approved for implementation over a 7-year schedule.

6 kinross.com

RECLAMATION DESIGN BASICS ● Engineered low-permeability covers on waste rock, open pits, tailings pond ● Site-wide water management; segregate impacted water from storm water ● De-water tailings by treatment and land application; construct dry cover Proposed Cover Designs Cover B selected

Topsoil K = 1.4e-3 cm/sec

Topsoil K = 1.4e-3 cm/sec

Compacted Clay K = 6.8e-7 cm/sec

Cover A

8"

8"

F.M Haul Road Fill 10" K = 2.0e-3 cm/sec

24"

Compacted Clay K = 6.8e-7 cm/sec

Cover B

24"

Topsoil / Rock Blend K = 1.4e-3 cm/sec

18"

Compacted Clay K = 6.8e-7 cm/sec

24"

Cover C

7 kinross.com

View from the North - 2006 Silver City

Stone Cabin Mine

DeLamar Office

Fretwell LAT

Adit 16 Jordan Creek

kinross.com

DeLamar Overview March 2012

8

WASTE ROCK #1 CLOSURE -- 2003-2004 ● Regraded to 3:1V, low-permeability cover including storm water conveyances

9 kinross.com

WASTE ROCK #1 CLOSURE -- 2003-2004 ● WD1 completed in 2004 ● Includes three buried seep collection systems to segregate storm water

10 kinross.com

INITIAL EFFECTS OF ENGINEERED COVER ●WASTE ROCK #1 -- MOST NOTEABLE ●Pre-reclamation (1999-2002) – ~600 to 800 af/yr ● 2005 – 377 af

● ● ● ● ●

2009 – 162 af 2010 – 166 af 2011 – 236 af (Above average snowpack, very wet spring; contingency pond) 2012 – 150 af 2013 - 125 af (est)

●Still see some climatic variation

11 kinross.com

MINE PIT CLOSURE – SOMMERCAMP PIT ● No static groundwater encountered ● Regrade to free-draining topography; backfill deeper, more reactive highwalls ● Construct low-permeability cover

12 kinross.com

MINE PIT CLOSURE -- SOMMERCAMP PIT ● Completed in 2006 ● Storm water free-drains to the north

13 kinross.com

MILL AREA DEMOLITION ● Removed building, refinery, mills, leach tanks, thickeners, AVR plant ● Due to good scrap metal prices, made a small profit ● Essentially everything was salvaged

14 kinross.com

TAILINGS POND CLOSURE -- 2003-2014 ● Very challenging circumstances; limited treat and discharge options ● 200-acre tailings surface ● Set aggressive schedule to retain agency support ● 4-layer cover; foundation, compacted clay, subsoil, soil; approx 8 ft total

15 kinross.com

TAILINGS POND CLOSURE -- 2006 ● Continued cover advance with declining water levels ● Foundation instability increasing ● Completed tailings embankment in 2006-2007

16 kinross.com

TAILINGS POND CLOSURE -- 2006 ● Stability concerns increased later in the construction season ● Began testing and changing over to smaller, LGP equipment ● October 2006 pond sonar survey; subsurface tailings waves Se ct io n

,2

Dit c

h

Te m po

ra ry

D 80 59 75 59

.5 % Be rm ,2 ,2 70 'l on g, 0

70

2.0%

A

ng, 0' lo

B

, 3,16

59

C

SOMMERCAMP REGAN PIT

Ditch

Se ct io n

B

,2 m er

5990

% .5

sion

Se ct io n

E

70

,0

iver r D te wa % -1.5

Se ct io n

5989 g on 'l

rm

Se ct io n

F

o St

Se ct io n

65 59

~26 acres

60 59

, e th lin ng pe ' le pi 7 33 2,

5 595

op dr 0' 14

pipeline 76 59

1

5976

p dro ne 0' 14 eli pip gth, len 7' ,10

0 595 5955' 5950' 5945' 5940'

contour contour contour contour

changes changes changes changes

DUMP #2

5945

6052

6020

Lime Addition System Building

Evap MCC Building

-1 .5

%

6014

17 kinross.com

TAILINGS POND CLOSURE -- 2007 ● Continue cover advancement ● Transition to LGP and geo-grid/geo-textile reinforced haul routes ● De-watering ACCELERATED due to reduced ARD flows to be stored ● Storm water diversion adjacent and on reclaimed areas

18 kinross.com

TAILINGS POND CLOSURE – LAND APP ● Land application best (only) reasonable option for de-watering ● Very closely controlled and monitoring by IDEQ ● Private land lease; very positive effect on landowner

19 kinross.com

TAILINGS POND CLOSURE -- 2008 ● Constructed water management pond ● Replaces lost water treatment/storage awaiting land application season ● Enlarged in 2012 to 350 acre-ft capacity

20 kinross.com

TAILINGS POND CLOSURE -- 2010 ● Continue cover advance with typical LGP D5 and 35 ton trucks ● Tailings surface essentially de-watered ● Increased management required for pore water and seeps

21 kinross.com

TAILINGS CLOSURE -- WATER ISSUES ● Increase in accumulated pore water drainage and seeps ● Increased water handling, tailings slimes handling ● Prepare to begin spillway excavation

22 kinross.com

TAILINGS POND CLOSURE -- 2011 ● Heavy snowpack and heavy spring rains ● Early season de-watering challenges ● Late season very successful

23 kinross.com

TAILINGS POND CLOSURE -- 2012 ● Normal spring weather patterns ● Previous year tailings drying and consolidation improve working conditions ● Successful construction season

24 kinross.com

TAILINGS POND CLOSURE -- 2013 ● Cover essentially complete, some localized areas and topsoil remaining ● Spillway excavation essentially complete and functional ● Variety of smaller projects in 2014 to finish earthworks

25 kinross.com

DELAMAR CLOSURE ●Key lesson learned (or confirmed) ●Need to focus on water inventory minimization during operation, especially as closure approaches. ●If not constrained by regulatory commitments or other requirements; then, more efficient to nearly complete tailings de-watering before cover construction.

26 kinross.com

DELAMAR CLOSURE – 1990’s