Clause Description (relevant portion) as existing in the Tender Documents

“Design and Construction Underground Stations and Tunnel including Finishes and excluding PHE, Electrical and HVAC from East End of East Ramp to  East...
Author: Guest
24 downloads 0 Views 3MB Size
“Design and Construction Underground Stations and Tunnel including Finishes and excluding PHE, Electrical and HVAC from East End of East Ramp to  East  End  of  Launching  Shaft  near  Kalupur  Metro  Station  from  Chainage  14328.88m  to  Chainage  11882.88m,  which  comprises  of  East  Ramp,  Twin  Bored Underground Tunnel between East Ramp and Kalupur Metro Station all cut and cover portion including Two Underground Station Kankaria  East  and  Kalupur  Metro  Station  including  a  portion  of  NATM  and  Launching  and  Receiving  Chambers  of  TBM  for  Ahmedabad  Metro  Rail  Project,  Phase‐1”   IFB No: MEGA/EW/UGSAT/PKG 1/CIVIL/2016, Dated 26thMarch 2016               S. N.

Part No.

Reference

Section No.

Section Name

Clause No / Item No.

Page No.

1

1

Sr. No.2 of Addendum - 5,

II

BDS

ITB 24.1

BDS 9

Dated: 28-07-16

2

1

Sr. No.3 of Addendum - 5,

II

BDS

ITB 27

BDS 10

Dated: 28-07-16

3

1

Sr. No.4 of Addendum - 5,

IV

BF

Sl. No. 13 of Appendix FT1

VI

I-Tender Drawings

Annexure10 of Addendum 2

Dated: 28-07-16

4

2

-

BF 44

Clause Description (relevant portion) as existing in the Tender Documents

ADDENDUM NO: 6 , DATED 12‐08‐2016 

IFB No: MEGA/EW/UGSAT/PKG 1/CIVIL/2016, Dated 26thMarch 2016             Clause Description (relevant portion) as amended now to be read as

For Bid submission purposes only, the Employer’s address is:

For Bid submission purposes only, the Employer’s address is:

Attention: Assistant General Manager (Procurement) Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan, Sector 10/A City: Gandhinagar (Gujarat), PIN Code: 382010 Country: India, Telephone: +91-79-26800000

Attention: Assistant General Manager (Procurement) Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan, Sector 10/A City: Gandhinagar (Gujarat), PIN Code: 382010 Country: India, Telephone: +91-79-26800000

The deadline for Bid submission is: Date: 22nd August 2016 Time: 11.00 AM Existing ITB 27 “Bid Opening” is to be replaced as under.

The deadline for Bid submission is: Date: 30th August 2016 Time: 3.00 PM Existing ITB 27 “Bid Opening” is to be replaced as under.

ITB 27.1 Except in the cases specified in ITB 25 and ITB 26, the Employer shall publicly open and read out in accordance with ITB 27.5 all Initial Filter cum Qualification Requirement Bids received by the deadline, at the date, time and place as specified below:

ITB 27.1 Except in the cases specified in ITB 25 and ITB 26, the Employer shall publicly open and read out in accordance with ITB 27.5 all Initial Filter cum Qualification Requirement Bids received by the deadline, at the date, time and place as specified below:

Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan, Sector 10/A City: Gandhinagar (Gujarat) PIN Code: 382010 Country: India

Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan, Sector 10/A City: Gandhinagar (Gujarat) PIN Code: 382010 Country: India

Date: 22nd August 2016 Time: 11.30 AM ……….. Place: Metro-Link Express for Gandhinagar and Ahmedabad (MEGA) Co. Limited Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan, Sector 10/A, Gandhinagar: 382010, Gujarat, India • Date for Tender Submission: Up to 11.00 hrs. (IST) on 22.08.2016. • Date for Tender Opening: At 11.30 hrs. (IST) on 22.08.2016. Annexure-10 of Addendum -2 -Drawing List

Date: 30th August 2016 Time: 3.30 PM ……….. Place: Metro-Link Express for Gandhinagar and Ahmedabad (MEGA) Co. Limited Block No.1, First Floor, Karmayogi Bhavan, Behind Nirman Bhavan, Sector 10/A, Gandhinagar: 382010, Gujarat, India • Date for Tender Submission: Up to 15.00 hrs. (IST) on 30.08.2016. • Date for Tender Opening: At 15.30 hrs. (IST) on 30.08.2016. The centre line alignment of UG1 is revised due to lateral shifting of proposed Kankaria metro station building towards west by approximate 8 metre. This will increase the tunnel length by 20 metre.

  Sd/‐     (Snehal Shah)  AGM – Con. & Proc 

  Sd/‐    (J K Shukla)  Addl. GM ‐ UG Const. 

  Sd/‐    (A. K. Gupta)  Director – P&P 

  Sd/‐    (Biren Parmar)  Director – Finance 

  Sd/‐    (I. P. Gautam)  Managing Director    Page 1 of 2 

IFB No: MEGA/EW/UGSAT/PKG 1/CIVIL/2016 

New total alignment (length) of UG1 Package is 2423.863 + 20 = 2443.863 metre. The new revised drawings list, Location and Architectural drawings of Kankaria Metro Station will be as per Annexure-1 to Addendum-6. Following revised drawings of Kankaria Metro Station to be referred. 1. 2. 3. 4. 5. 6. 7.

Land Plan Ground Level Plan Concourse Level Plan Under croft + Platform Level Plan Longitudinal Sections Cross sections Plan Ancillary Building for Kankaria East Station Plan

GEC-SEC1-UG1-TEN-STU-ARS-00001 – R2 GEC-SEC1-UG1-TEN-STU-ARS-00002 – R2 GEC-SEC1-UG1-TEN-STU-ARS-00003 – R2 GEC-SEC1-UG1-TEN-STU-ARS-00004 – R2 GEC-SEC1-UG1-TEN-STU-ARS-00006 – R2 GEC-SEC1-UG1-TEN-STU-ARS-00007 – R2 GEC-SEC1-UG1-TEN-STU-BSS-00001 – R2

The chainages given in tender drawings are indicative, final chainages will be provided to the successful bidder during contract agreement process. No change in alignment and contract length of UG2 Package. i.e. 4102.141.

  Sd/‐     (Snehal Shah)  AGM – Con. & Proc 

  Sd/‐    (J K Shukla)  Addl. GM ‐ UG Const. 

  Sd/‐    (A. K. Gupta)  Director – P&P 

  Sd/‐    (Biren Parmar)  Director – Finance 

  Sd/‐    (I. P. Gautam)  Managing Director    Page 2 of 2 

IFB No: MEGA/EW/UGSAT/PKG 1/CIVIL/2016 

EB

THALTEJ GAM (WEST)

EB

EB

SB B

U-23

DN

U-1

EB

DN

ASS & HT PANELS

LT PANEL

PUMP ROOM

EB

A

EB

EB

EB

EB

EB

SB

EB

EB

EB

SB

SB

EB

EB

B

EB EB

A

EB

EB

EB

EB

DN

EB EB

EB

SB

EB

EB

EB

EB

KANKARIA EAST(U/G) CH: 13054.951m

SB

EB

EB

SB

VASTRAL GAM (EAST)

DN UP DN

DG AREA

ARCHITECTURAL NOTES: · Architectural drawing shown here is only indicative as preliminary design and it is contractor's responsibility to finalize station design with all necessary function and performance as per SOD. · Contractor to refer land use drawings for land use and/or acquisition line information set by the employer for his clarification and design work. · Contractor to interface and coordinate with other system vide contractors to define all required layout of architecture / structures and system equipment. · All equipment shown in this drawing are indicative, and contractor to coordinate with all system contractors to finalize design and layout of the building suitably. · All cable route, ducts and shafts are only indicative, and contractor to arrange optimized functional layout with consultation to other system contractors. · Contractor to coordinate with all system vide contractors to design rooms with appropriate special arrangements to accommodate required equipments as well as furniture and finishes of the room as per requirements (interface matrix). · Contractor to designate location(s) for security screening within all unpaid sections as per the employer's projection, Contractor to coordinate with the employer/engineers as and when necessary. · Contractor to supply and install signage system throughout the station to maximize passenger comfort and convenience, and contractor to obtain the employer's prior approval. · Contractor to design all part of the station building safe and harmless to passengers as per NFPA norms. · Contractor to coordinate with E&M interfacing contractor for lighting fixture layout to make best ambient condition with ceiling finishes. · Contractor has the opportunity to propose ART-work installation within the station public space, subject to the employer's consultation and approval. · Contractor to design both the station and property development well coordinated in terms of service system,egress system and spatial order with compliance to the applicable code and regulation. · Contractor to furnish all necessary room finishing schedule as well as door/window schedule to achieve optimized performance and function within the station design. · These notes are not limited to station design drawing but applicable to where all it is necessary. Contractor has the responsibility to clear all with optimized solutions as per SOD. · All Dimensions are in meter, unless otherwise mentioned. · Structural member position & size may be proposed along the edge of the platform in accordance with the SOD & PSD arrangement and the functional requirement to ensure adequate space for passenger circulation in station. Structural member in all system room and back up house area may be place to suite equipment layout & it is subjected to approval of employer. · Ground levels, as shown are indicative and to be confirmed at site. · All architecture / structure dimensions are indicative and subject to detail design contractor meeting ODS requirement. · All minimum internal clearances are mandatory. · Minimum clearance at any point in undercroft should be 2100mm taking into account drainage at 1:200 slope in the screed. · Diaphragm wall + block work saucer drain (min 600mm) must be provided along the track side to suit the final track alignment. · Minimum platform width as per S.O.D. · Existing road, buildings and foot path shall be reinstated by contractor in his scope, if diverted for construction activities. · Contractor to coordinate with respective authority to finalize the road design incorporating all street elements viz ramp at access to buildings and at the street junctions, foot path, pickup & drop off bays, bus stops, taxi/auto stands, bollards etc,.. during the reinstatement of the roads. · contractor to design separate sumps for pumping out water from entry exit structures pumps shall be supplied and installed by E&M contractor. No water should be allowed enter station area via entrance structure. · Vent shaft's drainage dry sumps may be proposed by contractor with access provision.

CLIENT:

PROJECT:

AHMEDABAD METRO-LINK RAIL PROJECT PHASE I GENERAL ENGINEERING CONSULTANTS:

METRO-LINK EXPRESS FOR

MEGA-GEC

GANDHINAGAR & AHMEDABAD CO.LTD.

(a consortium of SYSTRA-RITES-OCG-AECOM) REVSION

DESCRIPTION

BY

DATE

APPROVED BY

REVSION

DESCRIPTION

BY

DATE

APPROVED BY

STATION SHIFTED TOWARDS WESTERN SIDE

12.08.2016

R1

ISSUED FOR TENDER

13.05.2016

R0

ISSUED FOR TENDER

04.04.2016

FILE NAME: E:\MEGA\TENDER DRAWINGS FOR MEGA\UG1 TENDER SUBMISSION TO MEGA\PACKAGE - UG1\4 STATION\REVISED PLAN\04 10.08.2016\KANKARIYA EAST - GROUND PLAN.DWG

DRAWING NO:

CAD FILE : CHECKED BY

R2

APPROVAL BY MEGA

TITLE :

DRAWN BY

KANKARIYA EAST STATION GROUND LEVEL PLAN

APPROVED BY

ORIGINATORS DWG NO:SCALE.

GEC-SEC1-UG1-TEN-STU-ARS-00002 SHEET NO:

R2

APPROVED BY DATE

12.08.2016

REV.

DATE

SHEET SIZE: A1

PLOTTING SCALE 1:1

EB

THALTEJ GAM (WEST)

EB

EB

SB B

U-23

DN

U-1

EB

DN

ASS & HT PANELS

LT PANEL

PUMP ROOM

EB

A

EB

EB

EB

EB

EB

SB

EB

EB

EB

SB

SB

EB

EB

B

EB EB

A

EB

EB

EB

EB

DN

EB EB

EB

SB

EB

EB

EB

EB

KANKARIA EAST(U/G) CH: 13054.951m

SB

EB

EB

SB

VASTRAL GAM (EAST)

DN UP DN

DG AREA

ARCHITECTURAL NOTES: · Architectural drawing shown here is only indicative as preliminary design and it is contractor's responsibility to finalize station design with all necessary function and performance as per SOD. · Contractor to refer land use drawings for land use and/or acquisition line information set by the employer for his clarification and design work. · Contractor to interface and coordinate with other system vide contractors to define all required layout of architecture / structures and system equipment. · All equipment shown in this drawing are indicative, and contractor to coordinate with all system contractors to finalize design and layout of the building suitably. · All cable route, ducts and shafts are only indicative, and contractor to arrange optimized functional layout with consultation to other system contractors. · Contractor to coordinate with all system vide contractors to design rooms with appropriate special arrangements to accommodate required equipments as well as furniture and finishes of the room as per requirements (interface matrix). · Contractor to designate location(s) for security screening within all unpaid sections as per the employer's projection, Contractor to coordinate with the employer/engineers as and when necessary. · Contractor to supply and install signage system throughout the station to maximize passenger comfort and convenience, and contractor to obtain the employer's prior approval. · Contractor to design all part of the station building safe and harmless to passengers as per NFPA norms. · Contractor to coordinate with E&M interfacing contractor for lighting fixture layout to make best ambient condition with ceiling finishes. · Contractor has the opportunity to propose ART-work installation within the station public space, subject to the employer's consultation and approval. · Contractor to design both the station and property development well coordinated in terms of service system,egress system and spatial order with compliance to the applicable code and regulation. · Contractor to furnish all necessary room finishing schedule as well as door/window schedule to achieve optimized performance and function within the station design. · These notes are not limited to station design drawing but applicable to where all it is necessary. Contractor has the responsibility to clear all with optimized solutions as per SOD. · All Dimensions are in meter, unless otherwise mentioned. · Structural member position & size may be proposed along the edge of the platform in accordance with the SOD & PSD arrangement and the functional requirement to ensure adequate space for passenger circulation in station. Structural member in all system room and back up house area may be place to suite equipment layout & it is subjected to approval of employer. · Ground levels, as shown are indicative and to be confirmed at site. · All architecture / structure dimensions are indicative and subject to detail design contractor meeting ODS requirement. · All minimum internal clearances are mandatory. · Minimum clearance at any point in undercroft should be 2100mm taking into account drainage at 1:200 slope in the screed. · Diaphragm wall + block work saucer drain (min 600mm) must be provided along the track side to suit the final track alignment. · Minimum platform width as per S.O.D. · Existing road, buildings and foot path shall be reinstated by contractor in his scope, if diverted for construction activities. · Contractor to coordinate with respective authority to finalize the road design incorporating all street elements viz ramp at access to buildings and at the street junctions, foot path, pickup & drop off bays, bus stops, taxi/auto stands, bollards etc,.. during the reinstatement of the roads. · contractor to design separate sumps for pumping out water from entry exit structures pumps shall be supplied and installed by E&M contractor. No water should be allowed enter station area via entrance structure. · Vent shaft's drainage dry sumps may be proposed by contractor with access provision.

CLIENT:

PROJECT:

AHMEDABAD METRO-LINK RAIL PROJECT PHASE I GENERAL ENGINEERING CONSULTANTS:

METRO-LINK EXPRESS FOR

MEGA-GEC

GANDHINAGAR & AHMEDABAD CO.LTD.

(a consortium of SYSTRA-RITES-OCG-AECOM) REVSION

DESCRIPTION

BY

DATE

APPROVED BY

REVSION

DESCRIPTION

BY

DATE

APPROVED BY

STATION SHIFTED TOWARDS WESTERN SIDE

12.08.2016

R1

ISSUED FOR TENDER

13.05.2016

R0

ISSUED FOR TENDER

04.04.2016

FILE NAME: E:\MEGA\TENDER DRAWINGS FOR MEGA\UG1 TENDER SUBMISSION TO MEGA\PACKAGE - UG1\4 STATION\REVISED PLAN\04 10.08.2016\KANKARIYA EAST - LAND PLAN.DWG

DRAWING NO:

CAD FILE : CHECKED BY

R2

APPROVAL BY MEGA

TITLE :

DRAWN BY

KANKARIYA EAST STATION LAND PLAN

APPROVED BY

ORIGINATORS DWG NO:SCALE.

GEC-SEC1-UG1-TEN-STU-ARS-00001 SHEET NO:

R2

APPROVED BY DATE

12.08.2016

REV.

DATE

SHEET SIZE: A1

PLOTTING SCALE 1:1

THALTEJ GAM (WEST)

UP

UP

VASTRAL GAM (EAST)

A

B

ENTRY/EXIT - B

ENTRY/EXIT - A U-5 U-7

U-8

U-5

U-17

U-17

U-13

U-9 U-10

BATTERY RACK

CHARGER RECTIFIER

U-18

FRONT

RADIO

ICMS

PIDS / ACID

CCTV 1

CCTV 2

SDH / MAN

MET/CORP LAN

PA/VA 1

PA/VA 2

OPERATION/ OFFFICE TEL

U-25

23

U-35 UNPAID CONCOURSE

U-4

U-6

U-6

U-14

U-25

U-19

U-9

U-12

U-34

U-3

U-39 U-1

U-8

PAID CONCOURSE U-1

U-15

UNPAID CONCOURSE

ENTRY/EXIT - C

ENTRY/EXIT - D

U-1

UP

U-1

B

U-24

U-16

24m

U-2

U-4

U-15

U-16

U-24

22m

24m

BACK

U-24

U-23

A

260m

CONCOURSE LVL PLAN KANKARIYA EAST STATION ARCHITECTURAL NOTES: · Architectural drawing shown here is only indicative as preliminary design and it is contractor's responsibility to finalize station design with all necessary function and performance as per SOD. · Contractor to refer land use drawings for land use and/or acquisition line information set by the employer for his clarification and design work. · Contractor to interface and coordinate with other system vide contractors to define all required layout of architecture / structures and system equipment. · All equipment shown in this drawing are indicative, and contractor to coordinate with all system contractors to finalize design and layout of the building suitably. · All cable route, ducts and shafts are only indicative, and contractor to arrange optimized functional layout with consultation to other system contractors. · Contractor to coordinate with all system vide contractors to design rooms with appropriate special arrangements to accommodate required equipments as well as furniture and finishes of the room as per requirements (interface matrix). · Contractor to designate location(s) for security screening within all unpaid sections as per the employer's projection, Contractor to coordinate with the employer/engineers as and when necessary. · Contractor to supply and install signage system throughout the station to maximize passenger comfort and convenience, and contractor to obtain the employer's prior approval. · Contractor to design all part of the station building safe and harmless to passengers as per NFPA norms. · Contractor to coordinate with E&M interfacing contractor for lighting fixture layout to make best ambient condition with ceiling finishes. · Contractor has the opportunity to propose ART-work installation within the station public space, subject to the employer's consultation and approval. · Contractor to design both the station and property development well coordinated in terms of service system,egress system and spatial order with compliance to the applicable code and regulation. · Contractor to furnish all necessary room finishing schedule as well as door/window schedule to achieve optimized performance and function within the station design. · These notes are not limited to station design drawing but applicable to where all it is necessary. Contractor has the responsibility to clear all with optimized solutions as per SOD. · All Dimensions are in meter, unless otherwise mentioned. · Structural member position & size may be proposed along the edge of the platform in accordance with the SOD & PSD arrangement and the functional requirement to ensure adequate space for passenger circulation in station. Structural member in all system room and back up house area may be place to suite equipment layout & it is subjected to approval of employer. · Ground levels, as shown are indicative and to be confirmed at site. · All architecture / structure dimensions are indicative and subject to detail design contractor meeting ODS requirement. · All minimum internal clearances are mandatory. · Minimum clearance at any point in undercroft should be 2100mm taking into account drainage at 1:200 slope in the screed. · Diaphragm wall + block work saucer drain (min 600mm) must be provided along the track side to suit the final track alignment. · Minimum platform width as per S.O.D. · Existing road, buildings and foot path shall be reinstated by contractor in his scope, if diverted for construction activities. · Contractor to coordinate with respective authority to finalize the road design incorporating all street elements viz ramp at access to buildings and at the street junctions, foot path, pickup & drop off bays, bus stops, taxi/auto stands, bollards etc,.. during the reinstatement of the roads. · contractor to design separate sumps for pumping out water from entry exit structures pumps shall be supplied and installed by E&M contractor. No water should be allowed enter station area via entrance structure. · Vent shaft's drainage dry sumps may be proposed by contractor with access provision. REVSION

DESCRIPTION

BY

DATE

APPROVED BY

REVSION

PROGRAM AREAS LEGEND U-01 U-02 U-03 U-04 U-05 U-06

Station Entrances & Passageways Station Control Room Station Manager’s Room Ticket Office (Ticket booth) (Supervisors room) Audit & cash storage room Excess Fare Office (free standing unit)

U-07 U-08 U-09 U-10 U-11 U-12

First Aid Room Security / Police Room Store Room Cleaners Room Refuse Store Staff Toilets - Male (inc. lockers)

U-13 Staff Toilets - Female (inc. lockers) U-14 Staff Mess Room U-15 Tunnel Ventilation Fan Room (including plenum and TVS plenum) U-16 ECS Plant Room (includes ECS & TVF control rooms, TVFs & AHU Rooms)

U-17 U-18 U-19 U-20 U-21 U-22

Signaling Equipment Room Telecom Equipment Room Telecom's UPS / Battery Auxiliary substation (ASS) Room Sewage Ejector Room Sump Pump Room

Lift Fire Fighter Staircase Emergency Staircase Tunnel Ventilation Shaft Ventilation Exhaust Shaft Ventilation Supply Shaft

U-29 U-30 U-31 U-32 U-33 U-34

Over track exhaust shaft Water Tank & Pump UPE Duct OTE Duct Cable Duct Fire Suppression Gas Room

U-35 U-36 U-37 U-38 U-39

Physically Handicapped Toilet Cooling Tower Chiller Plant Room Traction Substation (TSS) Room PSD Room

N

SHAHPUR SHAHPUR RAMP

GHEE KANTA KALUPUR

NOTES 1.

DETAILED DRAWINGS SHALL BE PREPARED BY CONTRACTOR & APPROVED BY THE ENGINEER.

KANKARIA EAST DEPOT

KEY ALIGNMENT OF STATIONS

APPAREL PARK RAMP

CLIENT:

PROJECT:

AHMEDABAD METRO-LINK RAIL PROJECT PHASE I GENERAL ENGINEERING CONSULTANTS:

METRO-LINK EXPRESS FOR

MEGA-GEC

GANDHINAGAR & AHMEDABAD CO.LTD.

(a consortium of SYSTRA-RITES-OCG-AECOM) DESCRIPTION

BY

DATE

APPROVED BY

STATION SHIFTED TOWARDS WESTERN SIDE

12.08.2016

R1

ISSUED FOR TENDER

13.05.2016

R0

ISSUED FOR TENDER

04.04.2016

APPROVAL BY MEGA

TITLE :

DRAWN BY

CAD FILE : CHECKED BY

R2

U-23 U-24 U-25 U-26 U-27 U-28

KANKARIYA EAST STATION CONCOURSE LEVEL PLAN

APPROVED BY

ORIGINATORS DWG NO:SCALE. APPROVED BY

DATE

12.08.2016

DATE

DRAWING NO:

GEC-SEC1-UG1-TEN-STU-ARS-00003

REV.

SHEET NO:

R2

THALTEJ GAM (WEST)

VASTRAL GAM (EAST)

260m STATION BOX A

B

END OF PLATFORM

END OF PLATFORM

DEMOUNTABLE WALL 4M x 4M

DEMOUNTABLE WALL 4M x 4M

23

UP

TSS (U-38) ASS (U-20) DEMOUNTABLE WALL 4M x 4M

22m

24m

U-21

UP

ASS (U-20)

DEMOUNTABLE WALL 4M x 4M

DEMOUNTABLE WALL 4M x 4M

4000

24m

4000

4000

4000

B A

PLATFORM LEVEL PLAN

260m STATION BOX A

24m

22m

24m

B

B A

ARCHITECTURAL NOTES: · Architectural drawing shown here is only indicative as preliminary design and it is contractor's responsibility to finalize station design with all necessary function and performance as per SOD. · Contractor to refer land use drawings for land use and/or acquisition line information set by the employer for his clarification and design work. · Contractor to interface and coordinate with other system vide contractors to define all required layout of architecture / structures and system equipment. · All equipment shown in this drawing are indicative, and contractor to coordinate with all system contractors to finalize design and layout of the building suitably. · All cable route, ducts and shafts are only indicative, and contractor to arrange optimized functional layout with consultation to other system contractors. · Contractor to coordinate with all system vide contractors to design rooms with appropriate special arrangements to accommodate required equipments as well as furniture and finishes of the room as per requirements (interface matrix). · Contractor to designate location(s) for security screening within all unpaid sections as per the employer's projection, Contractor to coordinate with the employer/engineers as and when necessary. · Contractor to supply and install signage system throughout the station to maximize passenger comfort and convenience, and contractor to obtain the employer's prior approval. · Contractor to design all part of the station building safe and harmless to passengers as per NFPA norms. · Contractor to coordinate with E&M interfacing contractor for lighting fixture layout to make best ambient condition with ceiling finishes. · Contractor has the opportunity to propose ART-work installation within the station public space, subject to the employer's consultation and approval. · Contractor to design both the station and property development well coordinated in terms of service system,egress system and spatial order with compliance to the applicable code and regulation. · Contractor to furnish all necessary room finishing schedule as well as door/window schedule to achieve optimized performance and function within the station design. · These notes are not limited to station design drawing but applicable to where all it is necessary. Contractor has the responsibility to clear all with optimized solutions as per SOD. · All Dimensions are in meter, unless otherwise mentioned. · Structural member position & size may be proposed along the edge of the platform in accordance with the SOD & PSD arrangement and the functional requirement to ensure adequate space for passenger circulation in station. Structural member in all system room and back up house area may be place to suite equipment layout & it is subjected to approval of employer. · Ground levels, as shown are indicative and to be confirmed at site. · All architecture / structure dimensions are indicative and subject to detail design contractor meeting ODS requirement. · All minimum internal clearances are mandatory. · Minimum clearance at any point in undercroft should be 2100mm taking into account drainage at 1:200 slope in the screed. · Diaphragm wall + block work saucer drain (min 600mm) must be provided along the track side to suit the final track alignment. · Minimum platform width as per S.O.D. · Existing road, buildings and foot path shall be reinstated by contractor in his scope, if diverted for construction activities. · Contractor to coordinate with respective authority to finalize the road design incorporating all street elements viz ramp at access to buildings and at the street junctions, foot path, pickup & drop off bays, bus stops, taxi/auto stands, bollards etc,.. during the reinstatement of the roads. · contractor to design separate sumps for pumping out water from entry exit structures pumps shall be supplied and installed by E&M contractor. No water should be allowed enter station area via entrance structure. · Vent shaft's drainage dry sumps may be proposed by contractor with access provision. REVSION

DESCRIPTION

BY

DATE

APPROVED BY

REVSION

UNDERCROFT LEVEL PLAN KANKARIYA EAST STATION PROGRAM AREAS LEGEND U-01 U-02 U-03 U-04 U-05 U-06

Station Entrances & Passageways Station Control Room Station Manager’s Room Ticket Office (Ticket booth) (Supervisors room) Audit & cash storage room Excess Fare Office (free standing unit)

U-07 U-08 U-09 U-10 U-11 U-12

First Aid Room Security / Police Room Store Room Cleaners Room Refuse Store Staff Toilets - Male (inc. lockers)

U-13 Staff Toilets - Female (inc. lockers) U-14 Staff Mess Room U-15 Tunnel Ventilation Fan Room (including plenum and TVS plenum) U-16 ECS Plant Room (includes ECS & TVF control rooms, TVFs & AHU Rooms)

U-17 U-18 U-19 U-20 U-21 U-22

Signaling Equipment Room Telecom Equipment Room Telecom's UPS / Battery Auxiliary substation (ASS) Room Sewage Ejector Room Sump Pump Room

Lift Fire Fighter Staircase Emergency Staircase Tunnel Ventilation Shaft Ventilation Exhaust Shaft Ventilation Supply Shaft

U-29 U-30 U-31 U-32 U-33 U-34

Over track exhaust shaft Water Tank & Pump UPE Duct OTE Duct Cable Duct Fire Suppression Gas Room

U-35 U-36 U-37 U-38 U-39

Physically Handicapped Toilet Cooling Tower Chiller Plant Room Traction Substation (TSS) Room PSD Room

N

SHAHPUR SHAHPUR RAMP

GHEE KANTA KALUPUR

NOTES 1.

DETAILED DRAWINGS SHALL BE PREPARED BY CONTRACTOR & APPROVED BY THE ENGINEER.

KANKARIA EAST DEPOT

KEY ALIGNMENT OF STATIONS

APPAREL PARK RAMP

CLIENT:

PROJECT:

AHMEDABAD METRO-LINK RAIL PROJECT PHASE I GENERAL ENGINEERING CONSULTANTS:

METRO-LINK EXPRESS FOR

MEGA-GEC

GANDHINAGAR & AHMEDABAD CO.LTD.

(a consortium of SYSTRA-RITES-OCG-AECOM) DESCRIPTION

BY

DATE

APPROVED BY

STATION SHIFTED TOWARDS WESTERN SIDE

12.08.2016

R1

ISSUED FOR TENDER

13.05.2016

R0

ISSUED FOR TENDER

04.04.2016

APPROVAL BY MEGA

TITLE :

DRAWN BY

CAD FILE : CHECKED BY

R2

U-23 U-24 U-25 U-26 U-27 U-28

KANKARIYA EAST STATION UNDERCROFT + PLATFORM LEVEL PLAN

APPROVED BY 12.08.2016

GEC-SEC1-UG1-TEN-STU-ARS-00004

ORIGINATORS DWG NO:SCALE. APPROVED BY

DATE

DRAWING NO:

DATE

REV.

SHEET NO:

R2

UIC60

UIC60

UIC60

UIC60

SECTION B-B

DESCRIPTION

BY

DATE

APPROVED BY

REVSION

UIC60

REVSION

UIC60

CROSS SECTION KANKARIYA EAST STATION

SECTION A-A

N

SHAHPUR SHAHPUR RAMP

GHEE KANTA KALUPUR

NOTES 1.

DETAILED DRAWINGS SHALL BE PREPARED BY CONTRACTOR & APPROVED BY THE ENGINEER.

KANKARIA EAST DEPOT

KEY ALIGNMENT OF STATIONS

APPAREL PARK RAMP

CLIENT:

PROJECT:

AHMEDABAD METRO-LINK RAIL PROJECT PHASE I GENERAL ENGINEERING CONSULTANTS:

METRO-LINK EXPRESS FOR

MEGA-GEC

GANDHINAGAR & AHMEDABAD CO.LTD.

(a consortium of SYSTRA-RITES-OCG-AECOM) DESCRIPTION

BY

DATE

APPROVED BY

STATION SHIFTED TOWARDS WESTERN SIDE

12.08.2016

R1

ISSUED FOR TENDER

13.05.2016

R0

ISSUED FOR TENDER

04.04.2016

APPROVAL BY MEGA

TITLE :

DRAWN BY

CAD FILE : CHECKED BY

R2

UIC60

UIC60

ARCHITECTURAL NOTES: · Architectural drawing shown here is only indicative as preliminary design and it is contractor's responsibility to finalize station design with all necessary function and performance as per SOD. · Contractor to refer land use drawings for land use and/or acquisition line information set by the employer for his clarification and design work. · Contractor to interface and coordinate with other system vide contractors to define all required layout of architecture / structures and system equipment. · All equipment shown in this drawing are indicative, and contractor to coordinate with all system contractors to finalize design and layout of the building suitably. · All cable route, ducts and shafts are only indicative, and contractor to arrange optimized functional layout with consultation to other system contractors. · Contractor to coordinate with all system vide contractors to design rooms with appropriate special arrangements to accommodate required equipments as well as furniture and finishes of the room as per requirements (interface matrix). · Contractor to designate location(s) for security screening within all unpaid sections as per the employer's projection, Contractor to coordinate with the employer/engineers as and when necessary. · Contractor to supply and install signage system throughout the station to maximize passenger comfort and convenience, and contractor to obtain the employer's prior approval. · Contractor to design all part of the station building safe and harmless to passengers as per NFPA norms. · Contractor to coordinate with E&M interfacing contractor for lighting fixture layout to make best ambient condition with ceiling finishes. · Contractor has the opportunity to propose ART-work installation within the station public space, subject to the employer's consultation and approval. · Contractor to design both the station and property development well coordinated in terms of service system,egress system and spatial order with compliance to the applicable code and regulation. · Contractor to furnish all necessary room finishing schedule as well as door/window schedule to achieve optimized performance and function within the station design. · These notes are not limited to station design drawing but applicable to where all it is necessary. Contractor has the responsibility to clear all with optimized solutions as per SOD. · All Dimensions are in meter, unless otherwise mentioned. · Structural member position & size may be proposed along the edge of the platform in accordance with the SOD & PSD arrangement and the functional requirement to ensure adequate space for passenger circulation in station. Structural member in all system room and back up house area may be place to suite equipment layout & it is subjected to approval of employer. · Ground levels, as shown are indicative and to be confirmed at site. · All architecture / structure dimensions are indicative and subject to detail design contractor meeting ODS requirement. · All minimum internal clearances are mandatory. · Minimum clearance at any point in undercroft should be 2100mm taking into account drainage at 1:200 slope in the screed. · Diaphragm wall + block work saucer drain (min 600mm) must be provided along the track side to suit the final track alignment. · Minimum platform width as per S.O.D. · Existing road, buildings and foot path shall be reinstated by contractor in his scope, if diverted for construction activities. · Contractor to coordinate with respective authority to finalize the road design incorporating all street elements viz ramp at access to buildings and at the street junctions, foot path, pickup & drop off bays, bus stops, taxi/auto stands, bollards etc,.. during the reinstatement of the roads. · contractor to design separate sumps for pumping out water from entry exit structures pumps shall be supplied and installed by E&M contractor. No water should be allowed enter station area via entrance structure. · Vent shaft's drainage dry sumps may be proposed by contractor with access provision.

KANKARIYA EAST STATION CROSS SECTIONS

APPROVED BY

ORIGINATORS DWG NO:SCALE. APPROVED BY

DATE

12.08.2016

DATE

DRAWING NO:

GEC-SEC1-UG1-TEN-STU-ARS-00007

REV.

SHEET NO:

R2

260m STATION BOX

GROUND VARIES

TOP SLAB

CONCOURSE LEVEL

PLATFORM LEVEL RAIL LEVEL

2

PARTIAL LONG SECTION

260m STATION BOX

GROUND VARIES

GROUND VARIES TOP SLAB

TOP SLAB CONCOURSE LEVEL

CONCOURSE LEVEL

PLATFORM LEVEL

PLATFORM LEVEL RAIL LEVEL

RAIL LEVEL

1

LONGITUDINAL SECTION

ARCHITECTURAL NOTES: · Architectural drawing shown here is only indicative as preliminary design and it is contractor's responsibility to finalize station design with all necessary function and performance as per SOD. · Contractor to refer land use drawings for land use and/or acquisition line information set by the employer for his clarification and design work. · Contractor to interface and coordinate with other system vide contractors to define all required layout of architecture / structures and system equipment. · All equipment shown in this drawing are indicative, and contractor to coordinate with all system contractors to finalize design and layout of the building suitably. · All cable route, ducts and shafts are only indicative, and contractor to arrange optimized functional layout with consultation to other system contractors. · Contractor to coordinate with all system vide contractors to design rooms with appropriate special arrangements to accommodate required equipments as well as furniture and finishes of the room as per requirements (interface matrix). · Contractor to designate location(s) for security screening within all unpaid sections as per the employer's projection, Contractor to coordinate with the employer/engineers as and when necessary. · Contractor to supply and install signage system throughout the station to maximize passenger comfort and convenience, and contractor to obtain the employer's prior approval. · Contractor to design all part of the station building safe and harmless to passengers as per NFPA norms. · Contractor to coordinate with E&M interfacing contractor for lighting fixture layout to make best ambient condition with ceiling finishes. · Contractor has the opportunity to propose ART-work installation within the station public space, subject to the employer's consultation and approval. · Contractor to design both the station and property development well coordinated in terms of service system,egress system and spatial order with compliance to the applicable code and regulation. · Contractor to furnish all necessary room finishing schedule as well as door/window schedule to achieve optimized performance and function within the station design. · These notes are not limited to station design drawing but applicable to where all it is necessary. Contractor has the responsibility to clear all with optimized solutions as per SOD. · All Dimensions are in meter, unless otherwise mentioned. · Structural member position & size may be proposed along the edge of the platform in accordance with the SOD & PSD arrangement and the functional requirement to ensure adequate space for passenger circulation in station. Structural member in all system room and back up house area may be place to suite equipment layout & it is subjected to approval of employer. · Ground levels, as shown are indicative and to be confirmed at site. · All architecture / structure dimensions are indicative and subject to detail design contractor meeting ODS requirement. · All minimum internal clearances are mandatory. · Minimum clearance at any point in undercroft should be 2100mm taking into account drainage at 1:200 slope in the screed. · Diaphragm wall + block work saucer drain (min 600mm) must be provided along the track side to suit the final track alignment. · Minimum platform width as per S.O.D. · Existing road, buildings and foot path shall be reinstated by contractor in his scope, if diverted for construction activities. · Contractor to coordinate with respective authority to finalize the road design incorporating all street elements viz ramp at access to buildings and at the street junctions, foot path, pickup & drop off bays, bus stops, taxi/auto stands, bollards etc,.. during the reinstatement of the roads. · contractor to design separate sumps for pumping out water from entry exit structures pumps shall be supplied and installed by E&M contractor. No water should be allowed enter station area via entrance structure. · Vent shaft's drainage dry sumps may be proposed by contractor with access provision. REVSION

DESCRIPTION

BY

DATE

APPROVED BY

REVSION

DESCRIPTION

BY

DATE

NOTES 1.

CLIENT:

PROJECT:

AHMEDABAD METRO-LINK RAIL PROJECT PHASE I GENERAL ENGINEERING CONSULTANTS:

STATION SHIFTED TOWARDS WESTERN SIDE

12.08.2016

R1

ISSUED FOR TENDER

13.05.2016

R0

ISSUED FOR TENDER

04.04.2016

METRO-LINK EXPRESS FOR

MEGA-GEC

GANDHINAGAR & AHMEDABAD CO.LTD.

(a consortium of SYSTRA-RITES-OCG-AECOM) APPROVED BY

APPROVAL BY MEGA

TITLE :

DRAWN BY

DRAWING NO:

CAD FILE : CHECKED BY

R2

DETAILED DRAWINGS SHALL BE PREPARED BY CONTRACTOR & APPROVED BY THE ENGINEER.

KANKARIA EAST STATION LONGITUDINAL SECTION

APPROVED BY

ORIGINATORS DWG NO:SCALE. APPROVED BY

DATE

12.08.2016

DATE

GEC-SEC1-UG1-TEN-STU-ARS-00006

REV.

SHEET NO:

R2

UTILITY CORRIDOR

N

SHAHPUR SHAHPUR RAMP

GHEE KANTA KALUPUR

KANKARIA EAST DEPOT

WATER TANK

KEY ALIGNMENT OF STATIONS

APPAREL PARK RAMP

-

DN

B

UP

B

-

-

DN

PUMP ROOM

B UP DN

CHILLER PLANT ROOM UP

STAIRS UP TO WATER TANK ACCESS

LT PANEL

DG AREA COOLING TOWERS ON PLINTH ASS & HT PANELS

FLOOR PLAN - BASEMENT

A

-

A

-

-

DN

A

FLOOR PLAN - TERRACE

FLOOR PLAN - PLINTH COOLING TOWERS ON PLINTH

STAIRS

PARAPET

LT PANEL WATER TANK

COOLING TOWERS TERRACE STAIRS DG AREA PLINTH

EQPT ACCESS ASS & HT PANELS

PUMP ROOM

GRADE

BASEMENT

CHILLER PLANT ROOM

CHILLER PLANT ROOM

UTILITY CORRIDOR

SECTION - B

SECTION - A

ARCHITECTURAL NOTES: · Architectural drawing shown here is only indicative as preliminary design and it is contractor's responsibility to finalize station design with all necessary function and performance as per SOD. · Contractor to refer land use drawings for land use and/or acquisition line information set by the employer for his clarification and design work. · Contractor to interface and coordinate with other system vide contractors to define all required layout of architecture / structures and system equipment. · All equipment shown in this drawing are indicative, and contractor to coordinate with all system contractors to finalize design and layout of the building suitably. · All cable route, ducts and shafts are only indicative, and contractor to arrange optimized functional layout with consultation to other system contractors. · Contractor to coordinate with all system vide contractors to design rooms with appropriate special arrangements to accommodate required equipments as well as furniture and finishes of the room as per requirements (interface matrix). · Contractor to designate location(s) for security screening within all unpaid sections as per the employer's projection, Contractor to coordinate with the employer/engineers as and when necessary. · Contractor to supply and install signage system throughout the station to maximize passenger comfort and convenience, and contractor to obtain the employer's prior approval. · Contractor to design all part of the station building safe and harmless to passengers as per NFPA norms. · Contractor to coordinate with E&M interfacing contractor for lighting fixture layout to make best ambient condition with ceiling finishes. · Contractor has the opportunity to propose ART-work installation within the station public space, subject to the employer's consultation and approval. · Contractor to design both the station and property development well coordinated in terms of service system,egress system and spatial order with compliance to the applicable code and regulation. · Contractor to furnish all necessary room finishing schedule as well as door/window schedule to achieve optimized performance and function within the station design. · These notes are not limited to station design drawing but applicable to where all it is necessary. Contractor has the responsibility to clear all with optimized solutions as per SOD. · All Dimensions are in meter, unless otherwise mentioned. · Structural member position & size may be proposed along the edge of the platform in accordance with the SOD & PSD arrangement and the functional requirement to ensure adequate space for passenger circulation in station. Structural member in all system room and back up house area may be place to suite equipment layout & it is subjected to approval of employer. · Ground levels, as shown are indicative and to be confirmed at site. · All architecture / structure dimensions are indicative and subject to detail design contractor meeting ODS requirement. · All minimum internal clearances are mandatory. · Minimum clearance at any point in undercroft should be 2100mm taking into account drainage at 1:200 slope in the screed. · Diaphragm wall + block work saucer drain (min 600mm) must be provided along the track side to suit the final track alignment. · Minimum platform width as per S.O.D. · Existing road, buildings and foot path shall be reinstated by contractor in his scope, if diverted for construction activities. · Contractor to coordinate with respective authority to finalize the road design incorporating all street elements viz ramp at access to buildings and at the street junctions, foot path, pickup & drop off bays, bus stops, taxi/auto stands, bollards etc,.. during the reinstatement of the roads. · contractor to design separate sumps for pumping out water from entry exit structures pumps shall be supplied and installed by E&M contractor. No water should be allowed enter station area via entrance structure. · Vent shaft's drainage dry sumps may be proposed by contractor with access provision.

REVSION

DESCRIPTION

BY

DATE

APPROVED BY

REVSION

DESCRIPTION

CLIENT:

PROJECT:

AHMEDABAD METRO-LINK RAIL PROJECT PHASE I NOTES 1.

BY

GENERAL ENGINEERING CONSULTANTS:

DETAILED DRAWINGS SHALL BE PREPARED BY CONTRACTOR & APPROVED BY THE ENGINEER.

DATE

APPROVED BY

R1 R0

STATION SHIFTED TOWARDS WESTERN SIDE ISSUED FOR TENDER ISSUED FOR TENDER

FILE NAME: E:\MEGA\TENDER DRAWINGS FOR MEGA\UG1 TENDER SUBMISSION TO MEGA\PACKAGE - UG1\4 STATION\REVISED PLAN\04 10.08.2016\ANCI BU_UG-1 - WITH AREA FOR KANKARIYA STATION R1.DWG

12.08.2016

MEGA-GEC

GANDHINAGAR & AHMEDABAD CO.LTD. APPROVAL BY MEGA

TITLE :

DRAWN BY

CAD FILE :

ANCILLARY BUILDING FOR KANKARIYA STATION

APPROVED BY

13.05.2016 04.04.2016

METRO-LINK EXPRESS FOR

(a consortium of SYSTRA-RITES-OCG-AECOM)

CHECKED BY R2

CHILLER PLANT ROOM

DATE

12.08.2016

ORIGINATORS DWG NO:SCALE.

DRAWING NO:

GEC-SEC1-UG1-TEN-STU-BSS-00001

REV.

SHEET NO:

APPROVED BY

R2

DATE

SHEET SIZE: A1

PLOTTING SCALE 1:1