SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 S.P._______________________ Last Rev. SP2016 # 12/02/16 1...
Author: Nancy Mosley
5 downloads 0 Views 294KB Size
SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 S.P._______________________ Last Rev.

SP2016 #

12/02/16 1

Item

Specification:

CHG.I.D.___________

Created August 20, 2015 Page 1 LETTING_____________ FUNDING_____________ When to use:

CONTACT INFORMATION .................................. Use on all jobs except when using SP2016-1.1 (CONTACT INFORMATION AND CLARIFICATION PROCESS). District needs to supply Resident Engineer's or Project Engineer’s name, phone number, and email address.

12/02/16 1.1

CONTACT INFORMATION AND CLARIFICATION PROCESS.................. District to use when needed. District needs to supply Resident Engineer's or Project Engineer’s name, phone number, and email address.

2

PRE-LETTING CONFERENCE .....................................................Use when requested by Dist.

3

SPECIAL PROVISIONS RELATING TO INDIAN EMPLOYMENT .................. Use when requested by Dist. Use SP2016-41 (NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FOR TRIBAL LANDS) with this write-up when there is a NPDES permit on the job and the project limits will be within Tribal Lands.

4

EQUAL PAY ...............................................................................................................Always

5

RESPONSIBLE CONTRACTOR ...............................................................................Always

6

COMPLIANCE WITH TAX LAW REQUIREMENTS .............................................Always

01/08/16 7

REFERENCE INFORMATION DOCUMENTS ............................Use when requested by Dist. District needs to supply the hyperlink in the first paragraph.

11/06/15 EC

REFERENCE INFORMATION DOCUMENTS (TEMPORARY EROSION CONTROL) To be used only on select construction projects. This spec is used with (2573) TEMPORARY EROSION CONTROL, which are in one file located at Z:\Public\TechSupport\Spec Prov\SP2016\2573 Temporary Erosion Control Provisions with RID spec Final November 2015.docx. See guidance document located at Temporary Erosion Control Guidance.) on the Erosion Control Web page for determining if these specs should be used on your project. Please contact Brett Troyer for help with these specs.

01/08/16 8

EMERALD ASH BORER COMPLIANCE ........... For use in Anoka, Chisago, Dakota, Hennepin, Houston, Olmsted, Ramsey, Scott, and Winona counties. Also use on jobs that are in counties that border these 9 counties just in case (Carver, Dodge, Fillmore, Goodhue, Kanabec, Isanti, Le Sueur, Mower, Pine, Rice, Sherburne, Sibley, Wabasha, Washington, and Wright).

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 04/08/16 9

Created August 20, 2015 Page 2

PARTNERING ........................................................................................................... Always. To be used on all projects. CO Special Provisions will use the informal partnering paragraphs unless told otherwise by the District. Use S-.1 and S-.2 for all projects unless formal partnering is required. Use S-.3 thru S-.6 for all projects requiring formal partnering. Use S-.7 and S-.8 for all projects (both formal and informal partnering).

10

USE OF ADHESIVE ANCHORS ...............................................................................Always

11

TARGETED GROUP BUSINESS (TGB) AND VETERAN-OWNED SMALL BUSINESS ............................................................ Use only on 100% State Funded jobs TARGETED GROUP BUSINESS (TGB) AND VETERAN-OWNED SMALL BUSINESS (IDIQ) ....................................... Use only on 100% State Funded IDIQ jobs.

IDIQ

This is in the IDIQ template.

12

MINNESOTA REPORT ON JOBS REQUIREMENTS ................Use on all jobs that have MN bond funds issued through legislation after the Chapter 152 bond funds. Contact a STIP or PPMS coordinator with questions regarding applicable bond funds.

13

ELECTRONIC SUBMISSION OF PAYROLLS AND STATEMENTS AND BIDDERS LISTS FOR FEDERALLY FUNDED PROJECTS ............................... Use only on Federally Funded jobs. For use on MnDOT administered projects only.

14

ELECTRONIC SUBMISSION OF PAYROLLS AND STATEMENTS AND BIDDERS LISTS FOR STATE FUNDED PROJECTS ............................ Use only on 100% State Funded jobs. For use on MnDOT administered projects only.

03/01/16 14.1

(1103)

DEFINITIONS .............................................................................................................Always

09/25/15 IDIQ

(1301)

09/25/15 14.2

(1301)

CONSIDERATION OF PROPOSALS (INDEFINITE DELIVERY/INDEFINITE QUANTITY) .................................................. Use only on IDIQ jobs. This is in the IDIQ template. CONSIDERATION OF PROPOSALS (LANE RENTAL METHOD).................. From Dist.

09/25/15 14.3

15

(1301)

Note: Contact Kevin Kosobud, Project Development Engineer, Office of Construction and Innovative Contracting, prior to incorporating this special provision. The Designer must indicate the Location allowed for each Type of Lane Rental & Assessment Rates. CONSIDERATION OF PROPOSALS (A+B METHOD) ..................................... From Dist. Note: Contact Kevin Kosobud, Project Development Engineer, Office of Construction and Innovative Contracting, prior to incorporating this special provision. The Designer must indicate the Location allowed for each Type of Lane Rental & Assessment Rates.

(1302)

AWARD OF CONTRACT .......................................... Use when requested by Dist. (Bid Escrow).

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17

Created August 20, 2015 Page 3 To be used on LARGE projects. BOND .......................................... Use only on IDIQ jobs. This is in the IDIQ template.

IDIQ

(1305)

REQUIREMENT OF CONTRACT

16

(1306)

EXECUTION AND APPROVAL OF CONTRACT ......................... Use when letting date and

ELLA (1306)

start date are 6 weeks or less apart EXECUTION AND APPROVAL OF CONTRACT ..............................Use on ELLA projects CO special provisions will insert this.

17

CONTRACT REVISIONS .................................................... Use on jobs with building removals

(1402)

where the buildings are still occupied at time of letting.

01/12/17 18 01/12/17 IDIQ

(1404) (1404)

MAINTENANCE OF TRAFFIC & (2563) TR. CTRL .... From Dist. – Always but for IDIQ jobs. MAINTENANCE OF TRAFFIC & (2012) TR. CTRL ........From Dist. – Use only on IDIQ jobs. This is in the IDIQ template.

RR

(1505)

19 20

(1505) (1505)

21

(1507)

COOPERATION BY CONTRACTORS............When have railroad on job; call railroad for specs. Railroad will provide this if it is needed. COOPERATION BY CONTRACTORS.........................................Use when requested by Dist. COOPERATION BY CONTRACTORS (BRIDGE) .................................... Use the following when a bridge assessment report has been prepared for a project and it indicates over 160 sq. ft. or 260 linear feet or 35 cubic feet of asbestos containing material on the bridge.

UTILITY PROPERTY & SERVICE ...................................................................... list utilities

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 22

(1508)

Created August 20, 2015 Page 4

CONSTRUCTION STAKES, LINES & GRADES ........................Use when requested by Dist. Only one 1508 writeup should be used when needed. They conflict with each other so be careful if you are using two of them together. DO NOT SEND THEM ALL IN. Do not use any 1508 writeup when have the pay item 2011.601 Construction Surveying on the plan. Instead use either SP2016-54 ((2011) CONSTRUCTION SURVEYING) or SP2016-54.1 ((2011) CONSTRUCTION SURVEYING (METRO)).

23

(1508)

CONSTRUCTION STAKES, LINES & GRADES ........................Use when requested by Dist. Only one 1508 writeup should be used when needed. They conflict with each other so be careful if you are using two of them together. DO NOT SEND THEM ALL IN. Do not use any 1508 writeup when have the pay item 2011.601 Construction Surveying on the plan. Instead use either SP2016-54 ((2011) CONSTRUCTION SURVEYING) or SP2016-54.1 ((2011) CONSTRUCTION SURVEYING (METRO)).

24

(1508)

CONSTRUCTION STAKES, LINES & GRADES ........................Use when requested by Dist. Only one 1508 writeup should be used when needed. They conflict with each other so be careful if you are using two of them together. DO NOT SEND THEM ALL IN. Do not use any 1508 writeup when have the pay item 2011.601 Construction Surveying on the plan. Instead use either SP2016-54 ((2011) CONSTRUCTION SURVEYING) or SP2016-54.1 ((2011) CONSTRUCTION SURVEYING (METRO)).

25

(1508)

CONSTRUCTION STAKES, LINES & GRADES ........................Use when requested by Dist. Only one 1508 writeup should be used when needed. They conflict with each other so be careful if you are using two of them together. DO NOT SEND THEM ALL IN. Do not use any 1508 writeup when have the pay item 2011.601 Construction Surveying on the plan. Instead use either SP2016-54 ((2011) CONSTRUCTION SURVEYING) or SP2016-54.1 ((2011) CONSTRUCTION SURVEYING (METRO)).

26

(1508)

CONSTRUCTION STAKES, LINES & GRADES ........................Use when requested by Dist. Only one 1508 writeup should be used when needed. They conflict with each other so be careful if you are using two of them together. DO NOT SEND THEM ALL IN. Do not use any 1508 writeup when have the pay item 2011.601 Construction Surveying on the plan. Instead use either SP2016-54 ((2011) CONSTRUCTION SURVEYING) or SP2016-54.1 ((2011) CONSTRUCTION SURVEYING (METRO)).

27

(1514)

MAINTENANCE DURING CONSTRUCTION ........................................................Always

06/03/16 28

(1601)

SOURCE OF SUPPLY & QUALITY ..................................... Use only on Federally funded jobs

29

(1602)

NATURAL MATERIAL SOURCES ....................................... Use on most jobs for all Districts. Always use S- .1 when using this write-up. If the Plan includes pits then include S-.2 through S-.4 & either S-.5 or S-.6. Use S-.5 for all Districts except District 3 when have pits. Use S-.6 for District 3 ONLY when have pits. DISTRICT TO SUPPLY PRICES OF MATERIAL FROM PITS. District also needs to contact Cultural Resources Unit ([email protected]) for SHPO confirmation of pits. Special Provisions Unit will request aggregate source pit sheets and leases from Terry Beaudry at Office of Materials. Always use SP2016-34 (LAWS TO BE OBSERVED (CULTURAL RESOURCES – FEDERALLY FUNDED)) or SP2016-35 (LAWS TO BE OBSERVED (CULTURAL RESOURCES – STATE FUNDED)) with this write-up.

30

(1606)

STORAGE OF MATERIALS .................................................... Use when requested by District. This can be used by the District when there is excavation.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17

Created August 20, 2015 Page 5

31

(1701)

LAWS TO BE OBSERVED (WET LANDS) ................... Use when material will be hauled from

32

(1701)

LAWS TO BE OBSERVED (BUILDING REMOVALS OR MOVES)......... Use on building

33

(1701)

LAWS

removals or when buildings are being moved. TO BE OBSERVED (BRIDGE) .......................... Use when there is a Removal of Bridge or Bridge Deck on either the grading plan or the bridge plan. Keep in the “S” section on all jobs

34

(1701)

LAWS TO BE OBSERVED (CULTURAL RESOURCES – FEDERALLY FUNDED)

or brought to the construction site.

Use only on FEDERALLY FUNDED JOBS. Do not need when have only building removal, landscaping, signals, lighting, or signing.

35

(1701)

LAWS TO BE OBSERVED (CULTURAL RESOURCES – STATE FUNDED) Use only on 100% STATE FUNDED JOBS. Do not need when have only building removal, landscaping, signals, lighting, or signing.

01/08/16 35.1

(1701)

LAWS TO BE OBSERVED – CARGO PREFERENCE ACT, USE OF UNITED STATES - FLAGGED VESSELS ........................... Use only on Federally funded jobs

36

(1706)

EMPLOYEE HEALTH & WELFARE....................................... Use when requested by District,

37

(1707)

PUBLIC CONVENIENCE AND SAFETY ....................................Use when requested by Dist.

RR

(1708)

RAILROAD-HIGHWAY PROVISIONS ...........When have railroad on job; call railroad for specs. Railroad will provide this if it is needed.

38

(1712)

PROTECTION AND REST. OF PROPERTY ........................................................ Use when requested by District. District will use this when environmental permits or documents are required.

39

(1717)

AIR, LAND, AND WATER POLLUTION (CONCRETE GRINDING) ............... Use when have concrete pavement or bridge approach panels on job. Use on projects with concrete grinding or bridge approach panels. Always use this when using SP2016-123 (CONCRETE GRINDING), SP2016-124 (CONCRETE GRINDING WITH NO INCENTIVES), and Texture Planing of Bridge Deck Slab Surface which is in the Division SB.

04/26/16 40

(1717)

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT......................................................... Use only when NPDES permit is required In Section S-.1 choose A, B, C, or D. Use A when there is a single NPDES permit on the job and the Contractor applies and pays for it. Use B when MnDOT has purchased the NPDES permit and the Contractor must complete and apply for the transfer. Use C when there are multiple NPDES permits on the job and the Contractor pays and applies for the permits. The number of permits needs to be filled in. Use D when there are multiple NPDES permits on the job and MnDOT has purchased the permits and the Contractor must complete and apply for the transfers. The number of permits needs to be filled in. District needs to provide the permit ID number(s) under S-.1.

04/26/16 41

(1717)

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT FOR TRIBAL LANDS ............................. Use only when NPDES permit is required and when SP2016-3 (SPECIAL PROVISIONS ENCOURAGING INDIAN EMPLOYMENT) is used on the job and the project limits will be within Tribal Lands.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 42

(1718)

43

44

Created August 20, 2015 Page 6

FURNISHING RIGHT OF WAY ....................................................Use when requested by Dist.

IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT ............................... Use only on Federally funded jobs

(1801)

SUBLETTING OF CONTRACT ...................................................Use S-.1 and S-.2 on all jobs. Use S-.3 for All Building Removal jobs, i.e. where building removal is not part of the grading Contract, but is the majority of the work.

04/08/16 45 05/13/16 46

(1802)

01/12/17 47

BLANK TRAINING FOR CONSTRUCTION TRUCK OPERATORS ...................................Always

PROSECUTION OF WORK (ADA) ................................. Use on all jobs with curb ramps/ADA

48

(1803)

49

(1803)

Improvements in them. Absolutely no changes can be made to this language!! PROGRESS SCHEDULES .......................................................... Always use either S-.1 or S-.2. Always use S-.1 on IDIQ jobs unless CPM schedule is approved to be used by OCIC. The blank in S-.4 needs to be filled in by Construction. The value should be from 14 to 30 calendar days. If no value is inserted, CO Special Provisions will use 14 as the value. Always use S-.3 thru S-.5. Always use S-.6 when using S-.2. The tables in S-.6 need to be adjusted with project specific data found under the heading of “Weather Contingency” at the following website: http://www.dot.state.mn.us/const/tools/contracttime.html under the heading Weather Contingency Study.

LIMITATION OF OPERATIONS - NIGHT CONSTRUCTION Include for Metro projects when applicable. Metro Construction will decide when this is to be used. Metro Construction needs to fill in the blanks for the times in the first sentence.

12/02/16 50

(1806)

DETERMINATION & EXT. OF CONTRACT TIME ......................Always but for IDIQ jobs. • •

03/01/16 IDIQ 51

(1806) (1806)

Use S-.2 if you have a flexible start date on your project. Use S-.3 & S-.4 when clearing operations need to be performed prior to the start date due to there being Long Eared Bats in the project limits. Designer review and insert appropriate date to complete clearing operations by. • Use S-.5 & S-.6 when migratory bird protection needs to be performed prior to the start date. Include 2016-149 (REMOVAL OF EXISTING BRIDGES). • Use S-.7 thru S-.18 as necessary. • NOTE: All Special Provisions relating to Contract Time should either be in 1806 or 1807 – NOT 1803 -1404 or any other spec. DETERMINATION & EXT. OF CONTRACT TIME ......................... Use only on IDIQ jobs. This is in the IDIQ template. NOTE: All Special Provisions relating to Contract Time should either be in 1806 or 1807 – NOT 1803 -1404 or any other spec.

DETERMINATION AND EXT. OF CONTRACT TIME (LANDSCAPING) .................................................................................................................................... 100% Landscaping jobs Only use on jobs that are 100% landscaping. Do not use SP2016-50 (DETERMINATION AND EXTENSION OF CONTRACT TIME) on 100% landscaping jobs. Use SP2016-51 instead.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 09/25/15 52

(1807)

08/28/15 IDIQ

(1807)

09/25/15 IDIQ

(1903)

Created August 20, 2015 Page 7

FAILURE TO COMPLETE THE WORK ON TIME ........................Always but for IDIQ jobs. The District needs to choose the appropriate paragraphs which apply to their project. Use S-.1 when using SP2016-14.2 (CONSIDERATION OF PROPOSALS (A+B METHOD)). FAILURE TO COMPLETE THE WORK ON TIME ........................... Use only on IDIQ jobs. This is in the IDIQ template.

COMPENSATION FOR ALTERED QUANTITIES ............................ Use only on IDIQ jobs. This is in the IDIQ template.

53 IDIQ

(1910) (1910)

COST ESCALATION .................................................................................................Always COST ESCALATION (IDIQ) ....................... Use only on IDIQ jobs. This is in the IDIQ template.

54

(2011)

CONSTRUCTION SURVEYING ............................................................................. Pay item

(2011)

This write-up is to be used on all jobs when construction Project surveying is to be done by the Contractor. Construction needs to fill in sections S-.2 B & C. Do not use any 1508 special provision when using this writeup. CONSTRUCTION SURVEYING (METRO) ........................................................... Pay item This write-up is to be used on all Metro jobs when construction Project surveying is to be done by the Contractor. Construction needs to fill in sections S-.2 B & C. Do not use any 1508 special provision when using this writeup.

08/28/15 54.1

55

(2011)

CONSTRUCTION SURVEYING FOR ASPHALT BOND BREAKER LAYER UNDER CONCRETE OVERLAYS ................................... Use this when constructing concrete overlays on an asphalt bond breaker layer. For asphalt bond breaker layer, two alternates have been developed for control of payment for concrete overlays. The first option offers Agency surveying; the second option offers Contractor surveying. The designer should insert the selected option in the Special Provisions. The 2 options are listed below as S-.2 and S-.3. Provision S-.2 allows the Agency to have 5 days to survey the bond breaker layer, the designer should verify and alter that as needed in the District. AS-BUILTS ............................................................................................................... Pay item Include in all Metro Projects to be let after July 1, 2015 unless otherwise included from District for projects let prior or outside of Metro.

01/15/16 56

(2011)

57 58

(2013) (2013)

ROAD/WEATHER SENSOR AND CABLE............................................................ Pay item ROAD WEATHER INFORMATION SYSTEM (R/WIS) ....................................... Pay item

01/12/17 59

(2016)

01/12/17 60

(2016)

QUALITY MANAGEMENT - PAVER MOUNTED THERMAL PROFILE (PMTP) METHOD ................................................................................... Pay item QUALITY MANAGEMENT SPECIAL – INTELLIGENT COMPACTION (IC) METHOD................................................................................ Pay item

IDIQ

(2021)

MOBILIZATION ........................................... Use only on IDIQ jobs. This is in the IDIQ template.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17

Created August 20, 2015 Page 8

61

(2031)

FIELD OFFICE AND LABORATORY ..........................................Use when requested by Dist.

62

(2031)

FIELD OFFICE AND LABORATORY – BROADBAND SERVICES ................. Use when

District needs to choose which of the equipment in the write-up to use.

63

(2031)

64

(2041)

requested by Dist. The designer should consider the following: If wireless access will be required, the designer must modify the provision as needed. For Broadband service need: Duration of project, Size of staff, Location, Minimum bandwidth speeds to be required. (Consult with local MIS on available options). Suggested speeds: 1-15 Staff = 768k, 16 and above Staff = 1.5M. District to fill in minimum bandwidth required in S-.2. COMBINATION FIELD-LAB OFFICE ................................................................... Pay item The Designer needs to fill in the type of service required under S-.4. Use S-.3A(6) ONLY when a credit card will be used for long distance phone calls.

ON-THE-JOB TRAINING PROGRAM .......................................... EEO will provide this info. Used only on Fed. Funded jobs which are 100 working days or over in length and $1 million or more in cost. This write-up is for Mn/DOT projects ONLY.

11/20/15 65

(2051)

MAINTENANCE & RESTORATION OF HAUL ROADS ..................................... Pay item

08/04/16 66

(2101)

CLEARING AND GRUBBING ......................................................Use when requested by Dist. Use either S-.1 or S-.2 when it has been determined that there are Long Eared Bats in the project limits. District to choose when to use either of these. District to choose when S-.3 thru S-.10 are to be used on the Project.

08/28/15 67

(2102)

PAVEMENT MARKING REMOVAL ..................................................................... Pay item Lead Work - Use S-.1 only when requested by District. Use S-.2 when there is any pavement marking removal on the job. Construction needs to choose which option at the end of S-.2 is to be used.

68

(2103)

BUILDING REMOVAL ............................................................................................ Pay item Use S-.8 on building removals that have had asbestos testing done by District. District to supply asbestos & reg. waste assessment summary report. (Attachment may have a different name. If it does make sure to rename it in S-.8.) Use S-.9 when regulated waste is present in the building(s) to be removed but the regulated waste abatement process will be completed before contract award. When using S-.9 do not use S-.8. Use SP2016-69 (CONSTRUCTION WASTE MANAGEMENT AND DEBRIS RECYCLING REQUIREMENTS) when needed. Always use SP2016-72 (REMOVE TANK) with this write-up.

69

(2103)

CONSTRUCTION WASTE MANAGEMENT AND DEBRIS RECYCLING REQUIREMENTS ................................................................. This writeup should be included for all building demolition projects. District needs to edit S-.3 for their project.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 70 71

(2104) (2104)

09/25/15 72

(2104)

73

(2104)

06/03/16 73.1

(2104)

74 75

(2104) (2104)

76

(2104)

77 78 79 80 81 82

(2104) (2104) (2104) (2104) (2104) (2104)

Created August 20, 2015 Page 9

REMOVING PAVEMENT AND MISCELLANEOUS STRUCTURES ...................Always REMOVAL AND HAUL TREATED WOOD............................... The designers should include this writeup whenever the project has work associated with known or suspected sources of treated wood such as but not limited to the following: noise walls, guard rail posts, fence posts, pilings, building demolition, temporary wooden bridge decks. REMOVE TANK............................Always use with any building, tank, or tank component removals. Let Carolyn Boben (D1, D2, D3, Metro East, Metro North) or Sarah Jarman (D4, D6, D7, D8, Metro South, Metro West) know about all projects with tank removals so they can get any special provision changes to us. For example, if tanks contain non-petroleum products, these provisions will need to be changed. If it is a locally led project, the provisions may also need to be changed pending the agreement between MnDOT and the local agency. ABATE ASBESTOS-CONTAINING PIPES OR CULVERTS .......................Use on all jobs that have excavation on them. ABESTOS CONTAINING WASTE MATERIAL ABATEMENT ........... Use when requested by the District. Pay item in this is 2105.609 (Haul and Dispose of Contaminated Material). ASBESTOS AND REGULATED WASTE ASSESSMENT.................................... Pay Item REGULATED WASTE ASSESSMENT (BRIDGE) ................... For Division S or Division SB depending on which plan contains pay items (Remove Old Bridge) and (Asbestos and Regulated Waste Assessment (Bridge)). REMOVAL OF ASBESTOS AND REGULATED WASTE (BRIDGE) ......... For Division S or Division SB depending on which plan contains pay items for (Remove Old Bridge), (Removal of Regulated Waste (Bridge)), and (Remove Regulated Waste Material (Utility)). REMOVE ASBESTOS AND REGULATED WASTE MATERIAL ....................... Pay Item HAUL SALVAGED MATERIALS .......................................................................... Pay item ABANDON PIPE SEWER ........................................................................................ Pay Item REMOVE SEALANT MATERIALS ........................................................................ Pay item REMOVE SEALANT MATERIALS ........................................................................ Pay item REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) ......................... Pay Item Always include SP2016-137.1 (PLANT MIXED ASPHALT PAVEMENT (MSCR)) or SP2016-139.1 (PLANT MIXED ASPHALT PAV’T FOR ALTERNATE BID (MSCR)) when using this pay item and select the appropriate mix type.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 01/08/16 82.1

(2105)

83 84 85 86 87 88 89 01/08/16 89.1

(2105) (2105) (2105) (2105) (2105) (2105) (2105) (2105)

90 91 11/01/16 91.1

(2105) (2105) (2105)

Created August 20, 2015 Page 10

EXCAVATION AND EMBANKMENT – QUALITY MANAGEMENT ............... Use with 2106.601 (Contractor Testing) when there are also 2105 pay items on the same plan. For CO Special Provisions - Make sure to use the revised Schedule of Materials Control (SMC) with this writeup when creating the pdf of the proposal!!! ROCK BLASTING SPECIFICATIONS ................................................................... Pay item ROCK EXCAVATION (PRODUCTION BLASTING) ........................................... Pay item SETTLEMENT PLATES .......................................................................................... Pay item CONSTRUCT TURN LANE .................................................................................... Pay item WEEP TRENCH........................................................................................................ Pay item SHOULDER TRENCHING ...................................................................................... Pay item SOIL STABILIZATION GEOGRID ......................................................................... Pay item

GEOTEXTILE FABRIC BOND BREAKER INTERLAYER FOR CONCRETE OVERLAY .......................................................................................... Pay item GEOTEXTILE FOR SEPARATION (STABILIZATION) ....................................... Pay item CONTROLLED EXCAVATION .............................................................................. Pay item SUBGRADE SOIL MODIFICATION ...................................................................... Pay item

--

(2105)

92

(2105)

Designer note: Designer needs to provide the mix design requirements in Table 2105-1. Use section 5-692.288, Soil-Cement Laboratory Design Procedure in the grading and Base Manual to determine the mix design requirements in table 2105-1. CONTAMINATED SOIL................................................... The Office of Environmental Services will provide this writeup to the Districts. The Districts need to contact: Carolyn Boben at 651-366-3621. (She handles D1, D2, D3, Metro East, Metro North.) or Sarah Jarman at 651-366-3609 (She handles D4, D6, D7, D8, Metro South, Metro West). RAILROAD TRACK SUB-BALLAST..................................................................... Pay item

93

(2106)

EXCAVATION & EMBANKMENT ................................... Use on all jobs with 2106 pay items Always use SP2016-34 (LAWS TO BE OBSERVED (CULTURAL RESOURCES – FEDERALLY FUNDED)) or SP2016-35 (LAWS TO BE OBSERVED (CULTURAL RESOURCES – STATE FUNDED)) with this write-up.

01/08/16 93.1

(2106)

EXCAVATION AND EMBANKMENT – COMPACTED VOLUME METHOD QUALITY MANAGEMENT .......................................... Use with 2106.601 (Contractor Testing) when there are also 2106 pay items on the same plan. For CO Special Provisions - Make sure to use the revised Schedule of Materials Control (SMC) with this writeup when creating the pdf of the proposal!!!

01/08/16 93.2

01/12/17 94

(2112)

SUBGRADE PREPARATION – QUALITY MANAGEMENT .............................. Use with

(2112)

2106.601 (Contractor Testing) when there is also a subgrade preparation pay item on the same plan. For CO Special Provisions - Make sure to use the revised Schedule of Materials Control (SMC) with this writeup when creating the pdf of the proposal!!! SHOULDER PREPARATION .................................................................................. Pay item Use S-.3 when Shoulder Preparation will be done sporadically along shoulders (where work on right and left shoulders is not equal. Use S-.4 when Shoulder Preparation will be equal (left and right sides roughly equal start and stop locations) for both sides of roadway.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 12/02/16 94.1

Created August 20, 2015 Page 11

(2118)

AGGREGATE SURFACING................................................ Use when have any 2118 pay items.

95

(2118)

Always use SP2016-252.1 (AGGREGATE FOR SURFACE AND BASES COURSES) with this writeup. AGGREGATE SURFACING (CV) CLASS __ .............. Only use when have 2118.607 pay item. District needs to fill in Class type and type of compaction.

96 97 12/02/16 98

(2123) (2123)

TRACTOR MOUNTED BACKHOE........................................................................ Pay item CRAWLER MOUNTED BACKHOE ....................................................................... Pay item BLANK

99 01/08/16 99.1

(2211) (2211)

AGGREGATE BASE ................................................................................... Use when needed. AGGREGATE BASE, (2118) AGGREGATE SURFACING, (2212) DRAINABLE AGGREGATE BASE, AND (2221) SHOULDER BASE AGGREGATE – QUALITY MANAGEMENT .......................................... Use with 2106.601 (Contractor Testing) when there are also 2211, 2118, 2212, and 2221 pay items on the same plan. For CO Special Provisions Make sure to use the revised Schedule of Materials Control (SMC) with this writeup when creating the pdf of the proposal!!!

01/12/17 100 01/08/16 100.1

(2215) (2215)

RECLAMATION....................................................................................................... Pay item RECLAMATION – QUALITY MANAGEMENT ......... Use with 2106.601 (Contractor Testing) when there are also 2215 pay items on the same plan. For CO Special Provisions - Make sure to use the revised Schedule of Materials Control (SMC) with this writeup when creating the pdf of the proposal!!!

101

(2221)

SHOULDER BASE AGGREGATE ............................................................. Use when needed.

102

(2231)

BITUMINOUS PATCHING MIXTURE ........................Use S-.1 & S-.2 when requested by Dist.

103 104

(2231) (2231)

105 106 107

(2231) (2231) (2231)

Use S-.3 when needed. PAVEMENT SEATING ............................................................................................ Pay item PAVEMENT CLEANING......................................................................................... Pay item Designer needs to fill in what bituminous patching mixture to use in S-.2. PAVEMENT CRACKING ........................................................................................ Pay item BIT. SURFACE (CRACK AND JOINT REPAIR) ................................................... Pay item PAVEMENT BREAKING (RUBBLIZING) ............................................................. Pay item

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17

Created August 20, 2015 Page 12

108 109

(2232) (2232)

MILL PAVEMENT SURFACE ..................................... Use S-.1 or S-.2 when requested by Dist. MILLED RUMBLE STRIPS ..................................................................................... Pay item

110

(2232)

MILLED RUMBLE STRIPS ..................................................................................... Pay item

(2232)

MILLED SINUSOIDAL RUMBLE STRIPS ............................................................ Pay item

Use for rumble strips at stop line locations. Use for continuous rumble strips on bituminous shoulders.

01/12/17 110.1 111

(2232)

01/12/17 111.1

(2232)

112 01/12/17 112.1

(2232) (2232)

113

(2232)

11/20/15 114

(2301)

Use for continuous sinusoidal rumble strips on bituminous pavements. MILLED RUMBLE STRIPS (CONCRETE) ............................................................ Pay item Use for continuous rumble strips on concrete shoulders. MILLED SINUSOIDAL RUMBLE STRIPS (CONCRETE).................................... Pay item Use for continuous sinusoidal rumble strips on concrete pavements. MILLED RUMBLE STRIPS - INTERMITTENT..................................................... Pay Item MILLED SINUSOIDAL RUMBLE STRIPS – INTERMITTENT ........................... Pay item Use for intermittent sinusoidal rumble strips on bituminous shoulders MILL AND PATCH BITUMINOUS PAVEMENT (ADA) ..................................... Pay Item Always include SP2016-137.1 (PLANT MIXED ASPHALT PAVEMENT (MSCR)) or SP2016-139.1 (PLANT MIXED ASPHALT PAVEMENT FOR ALTERNATE BID (MSCR)) when using this pay item and select the appropriate mix type.

CONCRETE PAVEMENT FOR ALTERNATE BID ................... For alternate bid jobs ONLY. •

11/20/15 115

(2301)

116 11/20/15 117

(2301) (2301)

11/20/15 118

(2301)

119 120 03/01/16 121

(2301) (2301)

Use this write-up whenever there is any concrete pavement pay items EXCEPT bridge approach panels and concrete pavement rehabilitation on the job. • Always use SP2016-144 (PAVEMENT SURFACE SMOOTHNESS FOR ALTERNATE BID), SP2016-39 (AIR, LAND AND WATER POLLUTION (CONCRETE GRINDING)), and SP2016-115 (CONCRETE PAVEMENT) with this write-up. CONCRETE PAVEMENT........................................................................................ Pay item • Use this write-up whenever there is any concrete pavement pay items EXCEPT bridge approach panels and concrete pavement rehabilitation on the job. • Use this write-up with SP2016-114 (CONCRETE PAVEMENT FOR ALTERNATE BID) AND with SP2016-39 (AIR, LAND AND WATER POLLUTION (CONCRETE GRINDING)). • Use one of the following with this write-up: o SP2016-143 (PAVEMENT SURFACE SMOOTHNESS) for non-alternate jobs OR o SP2016-144 (PAVEMENT SURFACE SMOOTHNESS FOR ALTERNATE BID) for alternate jobs. DRILL AND GROUT REINFORCEMENT BAR (EPOXY COATED) .................. Pay item HIGH PERFORMANCE DOWEL BAR – 1.25 inch (32 mm) .................. Use when enhanced dowel bars are desired. Always use S-.12 from SP2016-50 (DETERMINATION AND EXTENSION OF CONTRACT TIME) when using this writeup. HIGH PERFORMANCE DOWEL BAR – 1.5 inch (38 mm) .................... Use when enhanced dowel bars are desired. Always use S-.12 from SP2016-50 (DETERMINATION AND EXTENSION OF CONTRACT TIME) when using this writeup. CONCRETE PAVEMENT LUGS ............................................................................ Pay item SLAB JACKING ....................................................................................................... Pay item BLANK ....................................................................................... This is now under SP2016-89.1

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 04/08/16 122

(2302)

123

(2302)

124

(2302)

125 126 11/01/16 127

(2331) (2331) (2331)

11/01/16 127.1

128 129 130

01/15/16 130.1

Created August 20, 2015 Page 13

CONCRETE PAVEMENT REHABITILATION (CPR) .......................................... Pay item This write-up is to be used when there is concrete pavement rehabilitation on the project. When there is only concrete pavement rehabilitation on the project, then SP2016-115 (CONCRETE PAVEMENT) is not needed with this write-up. Note to Designer – The Designer and Construction personnel shall decide whether to include highlighted language related to MnDOT 1903 or not. The Designer may need to use SP2016-123 (CONCRETE GRINDING) or SP2016-124 (CONCRETE GRINDING WITH NO INCENTIVES) when concrete grinding is planned for the CPR project. NOTE to DESIGNER in Special Provisions: The Provisions are set up to require all partial and full-depth concrete repairs are completed by October 15th. If opening times are desired at < 12 hours – contact the Concrete Engineering Unit for additional special provisions. These do not cover early opening times. CONCRETE GRINDING ............................................................. Pay item (with ride incentives) This write-up is to be used when there are ride incentives for Concrete Grinding on the project and the speed limit is 50 mph or greater. Always use SP2016-39 (AIR, LAND AND WATER POLLUTION (CONCRETE GRINDING)) with this write-up. NOTE to DESIGNER: Use SP2016-124 (CONCRETE GRINDING WITH NO INCENTIVES) if you have a project with a speed limit of less than 50 mph and/or urban areas. CONCRETE GRINDING WITH NO INCENTIVES ..............Pay item (with no ride incentives) This write-up is to be used if you have a project with a speed limit of less than 50 mph and/or urban areas. Always use SP2016-39 (AIR, LAND AND WATER POLLUTION (CONCRETE GRINDING)) with this write-up. NOTE to DESIGNER: Use SP2016-123 (CONCRETE GRINDING) when the speed limit is 50 mph or greater.

BITUMINOUS JOINT SAWING AND SEALING .................................................. Pay item PAVEMENT JOINT ADHESIVE ............................................................................. Pay item COLD-IN-PLACE RECYCLED (CIR) BITUMINOUS ........................................... Pay item

(2331) (2331) (2331)

Use when requested by Dist. Designer Notes: A CIR mix design is recommended to determine the method (Foaming or Emulsion), bituminous type and amount of additives needed to construct CIR. Designer use mix design criteria for CIR in the Grading and Base Manual section 5-692.291. District provide completed “SFDR/CIR Mix Design Form G&B-408” found on the Grading and Base Website for Proposal incorporation. COLD CENTRAL PLANT RECYCLING (CCPR) BITUMINOUS ........................ Pay item Use when requested by Dist. Designer Notes: A CCPR mix design is recommended to determine the method (Foaming or Emulsion), bituminous type and amount of additives needed to construct CCPR. Designer use mix design criteria for CCPR in the Grading and Base Manual section 5-692.291. District provide completed “SFDR/CIR Mix Design Form G&B-408” found on the Grading and Base Website for Proposal incorporation. MASTIC FOR VOID FILLING ................................................................................. Pay item BITUMINOUS PAVEMENT CRACK TREATMENT ............................................ Pay item BITUMINOUS PAVEMENT CRACK TREATMENT CLEAN AND SEAL ......... Pay item

(2353)

ULTRATHIN BONDED WEARING COURSE (UTBWC) (MSCR) .................. Always use

(2331)

SP2016-253.1 (BITUMINOUS MATERIAL (MSCR)) with this writeup.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17

Created August 20, 2015 Page 14

04/08/16 131

(2356)

BITUMINOUS SEAL COAT ....................................... Use only on bituminous seal coat projects.

132 133

(2356) (2356)

Do not use when using either SP2016-132 (BITUMINOUS UNDERSEAL) or SP2016-133 (OTTA SEAL). BITUMINOUS UNDERSEAL ................................................................................. Pay item. OTTA SEAL ............................................................................................................. Pay item.

04/08/16 134

(2357)

BITUMINOUS TACK COAT ............................. Use whenever there is any bituminous on the job.

01/08/16 135

(2357)

Use S-.1 on all jobs when using this write-up. Use S-.2 when no pay item on the plan. (Tack incidental). Use S-.3 when there is a pay item for tack. Always use with SP2016-137.1 (PLANT MIXED ASPHALT PAVEMENT (MSCR)), SP2016-139.1 (PLANT MIXED ASPHALT PAVEMENT FOR ALTERNATE BID (MSCR)), SP2016-140 (POROUS ASPHALT PAVEMENT), and SP2016-142.1 (STONE MATRIX ASPHALT – SMA (MSCR)). BITUMINOUS MATERIAL FOR SHOULDER TACK .......................................... Pay item

0804/16

(2358)

BITUMINOUS PRIME COAT...............................................Only use when paid for in the Plan.

(2360)

BLANK BLANK PLANT MIXED ASPHALT PAVEMENT (MSCR) ........................... Always use SP2016-134

135.1

12/02/16 136 12/02/16 137 08/04/16 137.1

(BITUMINOUS TACK COAT), SP2016-143 (PAVEMENT SURFACE SMOOTHNESS), and SP2016-253.1 (BITUMINOUS MATERIAL (MSCR)) with this write-up.

12/02/16 138 08/04/16 138.1

(2360)

BLANK PLANT MIXED ASPHALT PAVEMENT (LOCAL AGENCY) (MSCR) □

Use on local agency projects only where the local agency does not want to evaluate longitudinal joint cores. Always use SP2016-134 (BITUMINOUS TACK COAT) and SP2016-253.1 (BITUMINOUS MATERIAL (MSCR)) with this write-up.

12/02/16 139 08/04/16 139.1

140 03/01/16 140.1 141

05/13/16 141.1

(2360)

(2360) (2360) (2360)

BLANK PLANT MIXED ASPHALT PAVEMENT FOR ALTERNATE BID (MSCR) Only use when District requests this. Include SP2016-134 (BITUMINOUS TACK COAT), SP2016-144 (PAVEMENT SURFACE SMOOTHNESS FOR ALTERNATE BID), and SP2016-253.1 (BITUMINOUS MATERIAL (MSCR)) with this writeup. POROUS ASPHALT PAVEMENT .......................................................................... Pay Item ONLY USE WITH CONSENT OF BITUMINOUS OFFICE. Include SP2016-134 (BITUMINOUS TACK COAT) with this writeup. FINE-GRADED (4.75 mm) ASPHALT MIXTURE ................................................. Pay item Always use SP2016-252.2 (GRADED AGGREGATE FOR FINE GRADED (4.75 mm) ASPHALT MIXTURE) with this write-up.

PLANT MIXED ASPHALT PAVEMENT - THICKNESS PAYMENT SCHEDULE ................................................................. Use when have 2360 square yard pay items

BLANK

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 01/15/16 141.2

(2363)

Created August 20, 2015 Page 15

PERMEABLE ASPHALT STABILIZED STRESS RELIEF COURSE (PASSRC) AND PERMEABLE ASPHALT STABILIZED BASE (PASB) (MSCR) Only use when District requests this. Always use SP2016-253.1 (BITUMINOUS MATERIAL (MSCR)) with this write-up.

12/02/16 142 01/15/16 142.1

(2365)

BLANK STONE MATRIX ASPHALT - SMA (MSCR) ........................................ Include SP2016-134 (BITUMINOUS TACK COAT) and SP2016-253.1 (BITUMINOUS MATERIAL (MSCR)) with this writeup.

08/04/16 143

(2399)

PAVEMENT SURFACE SMOOTHNESS ............................................................... Use with

144

(2399)

SP2016-115 (CONCRETE PAVEMENT) (unless it’s an alternate job) and SP2016-137.1 (PLANT MIXED ASPHALT PAVEMENT (MSCR)). PAVEMENT SURFACE SMOOTHNESS FOR ALTERNATE BID ...................... Use with SP2016-114 (CONCRETE PAVEMENT FOR ALTERNATE BID) and SP2016-139.1 (PLANT MIXED ASPHALT PAVEMENT FOR ALTERNATE BID (MSCR)).

145

(2406)

BRIDGE APPROACH PANELS ..................................................... Use whenever there are any bridge approach panels on the job.

146 147

(2411) (2411)

CONSTRUCT CONCRETE OR MASONRY PLUG ............................................... Pay item MECHANICALLY STABILIZED EARTH WALLS WITH PRECAST CONCRETE PANELS ............................................................................ Pay item A version of this spec can be found at http://www.dot.state.mn.us/pre-letting/prov/index.html. Designers will need to work with Khalid Obeidat of the Bridge Office when needed.

148

(2411)

PREFABRICATED MODULAR BLOCK WALL (PMBW) WITH AND WITHOUT SOIL REINFORCEMENT ........................................................... Pay item A version of this spec can be found at http://www.dot.state.mn.us/pre-letting/prov/index.html. Designers will need to work with Khalid Obeidat of the Bridge Office when needed.

08/04/16 149

(2442)

REMOVAL OF EXISTING BRIDGES..................................................................... Pay item Use S-.1 & S-.2 when needed and when not included in Division SB. Use S-.3 & S-.4 when have "Removal of Old Bridge" item on grading plan. Use S-.5 when there are swallows and choose the appropriate paragraph for payment.

11/06/15 149.1

150

(2451)

STRUCTURE EXCAVATION AND BACKFILLS ...................... Use with all 2451 Pay items.

(2452)

STEEL SHEET PILING - TEMPORARY ................................................................ Pay item

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 04/08/16 151

(2461)

Created August 20, 2015 Page 16

STRUCTURAL CONCRETE ............................................... Use when have any concrete on job (pavement, curb, gutter, sidewalk, barriers lighting, signing, signals, etc.). (If the job is signing, see if there is any concrete on the details. If none is shown, then this writeup is not needed.) (This writeup is not needed for RC pipe, precast concrete barriers, or precast concrete box culverts.) Always use SP2016-251 (BAGGED PORTLAND CEMENT CONCRETE PATCHING MIX GRADE 3U18 AND 3U18M) and SP2016-252 (COARSE AGGREGATE FOR PORTLAND CEMENT CONCRETE) with this writeup.

152

(2462)

PRECAST CONCRETE ........................................... Use when there any precast concrete products on the job (bridge girders, noisewall posts or panels, box culverts, retaining wall blocks, RC pipe, precast concrete barrier, etc.) Always use SP2016-252 (COARSE AGGREGATE FOR PORTLAND CEMENT CONCRETE) with this writeup.

01/08/16 153

(2471)

STRUCTURAL METALS ................................... Use for jobs that have structural metals on them. Use S-.1 and S-.2 if there is a Division SB (with no 2471 in it), SL, SS, and/or ST. If there is a Division SB and it has 2471 in it, use our S-.3 ONLY. Do not use on signing only jobs when there are only Type C and/or D signs on them.

154 155 156 157 158

(2501) (2501) (2501) (2501) (2501)

PIPE TIES ................................................................................................................. Pay item BULKHEAD CULVERT .......................................................................................... Pay item PLUG FILL AND ABANDON PIPE CULVERT ..................................................... Pay item TRASH GRATE FOR BOX CULVERT................................................................... Pay item SAFETY APRON .......................................................Only need to use when have alternates listed on the Plan for safety aprons. When have alternates those pay items will be 2501.602 (__ mm [__"] Safety Apron). SAFETY GRATE ...................................................................................................... Pay item CLEAN PIPE CULVERT .......................................................................................... Pay item PIPE CULVERTS ...................................................................................................... Pay item Use S-.1 if pipe options are allowed or when needed.

159 160 161

(2501) (2501) (2501)

162

(2502)

SUBSURFACE DRAINS .......................................................................................... Pay item

163 08/28/15 164

(2502)

INTERCEPTOR BLANK

Do not use S-.2 if the District has modified how the subcut drain will be paid for. DRAINS ......................................................................................... Pay item

165 166 167 168 169 170

(2503) (2503) (2503) (2503) (2503) (2503)

PIPE SEWERS.................................... Use S-.1 and S-.2 if pipe options are allowed or when needed. CONNECT TO EXISTING STORM SEWER .......................................................... Pay item CONSTRUCT BULKHEAD ..................................................................................... Pay item SLOTTED DRAIN .................................................................................................... Pay item PLUG FILL AND ABANDON PIPE SEWER .......................................................... Pay item 18" STEEL CASING PIPE ........................................................................................ Pay item

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17

Created August 20, 2015 Page 17

171 172 173 174 175 176 177 178

(2504) (2504) (2504) (2504) (2504) (2504) (2504) (2504)

CHANGES IN CITY UTILITY SYSTEM ...............................................................Pay items RELOCATE HYDRANT AND VALVE .................................................................. Pay item INSTALL HYDRANT............................................................................................... Pay item INSTALL VALVE AND BOX.................................................................................. Pay item ADJUST VALVE BOX - WATER ........................................................................... Pay item ADJUST CURB BOX ............................................................................................... Pay item 18" STEEL CASING PIPE ........................................................................................ Pay item POLYSTYRENE INSULATION .............................................................................. Pay item

179 180 181 182 183

(2506) (2506) (2506) (2506) (2506)

MANHOLES AND CATCH BASINS ............... Use only when requested/required by the District. INFILTRATION AND FILTRATION SYSTEMS ................................................... Pay item CLEAN OUT CATCH BASIN.................................................................................. Pay item CONNECT INTO EXISTING DRAINAGE STRUCTURE ..................................... Pay item CONSTRUCT CONTROL STRUCTURE................................................................ Pay item

184

(2514)

SLOPE PAVING ..................................................................... Use on all jobs with slope paving.

185

(2515)

REVETMENT SYSTEM............................ Use whenever there are any 2515 pay items on the plan.

186

(2521)

CONCRETE WALK (ADA) ..................................................................................... Pay item

187

(2531)

CONCRETE CURB AND GUTTER (ADA) ............................................................ Pay Item

188 189

(2531) (2531)

Include this writeup in all projects that have ADA work. If pay item 2531.603 Concrete Curb and Gutter is not being used delete measurement and payment sections. CONCRETE CURB DESIGN V (ADA) ................................................................... Pay Item TRUNCATED DOMES ............................................................................................ Pay item

190 191

(2533) (2533)

192 193 194

(2533) (2533) (2533)

195

(2533)

PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 .......................... Pay item. PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 - ANCHORED .......................................................................................................... Pay item. CONCRETE MEDIAN BARRIER DESIGN 8308 AND 8309 ................................ Pay item RELOCATE PORT. PRECAST CONC. BARRIER DESIGN 8337 ........................ Pay item RELOCATE PORT. PRECAST CONC. BARRIER DESIGN 8337 - ANCHORED ........................................................................................................... Pay item INSTALL CONCRETE MEDIAN BARRIER .......................................................... Pay item Fill in the blank under S-.1 with the location the barrier is to come from and fill in the blanks under S-.2 & S-.4 where the barrier is to be taken to at the completion of the Project.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17

Created August 20, 2015 Page 18

196 197

(2540) (2540)

MAIL BOX SUPPORT ............................................................................................. Pay item RELOCATE MAIL BOX SUPPORT ........................................................................ Pay item

11/01/16 198

(2554)

TRAFFIC BARRIERS ........................... Always use when have any plate beam guardrail installation Use for all Districts including Metro.

11/01/16 199 200 201 11/01/16 202 11/01/16 203 11/01/16 204 11/01/16 204.1

(2554) (2554)

(2554)

BLANK TRAFFIC BARRIER DESIGN SPECIAL A ............................................................ Pay item END TREATMENT – ENERGY ABSORBING TERMINAL ................................ Pay item BLANK BLANK END TREATMENT - TANGENT TERMINAL ...................................................... Pay item Use for all Districts including Metro. TERMINAL ...................................... Pay item Use for all Districts including Metro.

(2554)

END TREATMENT – TYPE 31 TANGENT

(2554)

BLANK END TREATMENT – FLARED TERMINAL ......................................................... Pay item

11/01/16 207 208 209 210 211 212 213 214 11/01/16 215 216 217 218 219 220 05/13/16 221

(2554) (2554) (2554) (2554) (2554) (2554) (2554) (2554) (2554) (2554) (2554) (2554) (2554) (2554)

BLANK IMPACT ATTENUATOR BARRELS ...................................................................... Pay item RELOCATE IMPACT ATTENUATOR BARRELS ................................................ Pay item CONNECTING PIN .................................................................................................. Pay item POST ASSEMBLY - PLATE BEAM ....................................................................... Pay item GUARDRAIL TERMINAL POST ............................................................................ Pay item GUARDRAIL POST SEAT ...................................................................................... Pay item T-BARRIER BRIDGE CONN. DES. 8318 ............................................................... Pay item GUIDE POST TYPE SPECIAL ............................................................................... Pay item INSTALL CONCRETE ANCHOR BLOCK ............................................................. Pay item INSTALL ANCHOR ASSEMBLY - 3 CABLE ........................................................ Pay item INSTALL ANCHOR ASSEMBLY-PLATE BEAM ................................................. Pay item WATER FILLED BARRIER..................................................................................... Pay item RELOCATE WATER FILLED BARRIER ............................................................... Pay item TENSION CABLE GUARDRAIL ............................................................................ Pay item

222

(2554)

TENSION CABLE GUARDRAIL WARRANTY ......................... Designer needs to make sure

(2554) (2554) (2554) (2554) (2554)

that the District has identified who will be responsible for checking the Warranty Work. If HTCB is part of the overall project: use S-.2 and indicate the value of the bond. IMPACT ATTENUATOR ......................................................................................... Pay item IMPACT ATTENUATOR (C-A-T) .......................................................................... Pay item IMPACT ATTENUATOR (QUAD GUARD) .......................................................... Pay item IMPACT ATTENUATOR (SMART CUSHION)..................................................... Pay item RELOCATE IMPACT ATTENUATOR ................................................................... Pay item

11/01/16 205 11/01/16 206

Use for all Districts including Metro.

Designer needs to fill in number of days needed in S-.12.

223 224 225 11/06/15 225.1 226

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17

Created August 20, 2015 Page 19

227 228 229

(2557) (2557) (2557)

FLEXIBLE PLASTIC GLARE SCREEN ................................................................. Pay item TEMPORARY GLARE SCREEN ............................................................................ Pay item INSTALL CHAIN LINK FENCE.............................................................................. Pay item

230

(2563)

TRAFFIC CONTROL SUPERVISOR ...................................................................... Pay item

233 234 235 236 237 238 239 239.1 240 241

(2563) (2563) (2563) (2563) (2563) (2563) (2563) (2563) (2563) (2563)

WHENEVER YOU USE THIS WRITEUP, YOU HAVE TO HAVE THE PAY ITEM FOR THIS ON THE PLAN. IT CAN NOT BE INCIDENTAL TO TRAFFIC CONTROL. INTELLIGENT WORK ZONE SYSTEM ............................................................... Pay item ALTERNATE PEDESTRIAN ROUTE ..................................District to decide when to use this. To be used on all projects in which pedestrian movements may be impacted by construction – including sidewalks; intersection pedestrian crossings; as well as access to businesses, residences, schools and other pedestrian destinations. All projects that impact pedestrian movements shall include Alternate Pedestrian Routes (APRs). An APR maintains the existing level of ADA accessibility. The Designer needs to work with the District Traffic and Construction offices to determine how to meet pedestrian requirements for a particular job. The following write-up or some form of it may be used to help meet these requirements or the District may use their own language. The language may be included in the Time and Traffic or this writeup can be used if the District prefers to use a pay item. Please contact Ken Johnson at 651-234-7386 or Ted Ulven at 651-366-4222 for help with this if needed. THE SPECIAL PROVISIONS UNIT CAN NOT DO THIS FOR YOU. RAISED PAVEMENT MARKERS TEMPORARY ................................................ Pay item PORTABLE CONCRETE BARRIER DELINEATOR ............................................ Pay item MEDIAN BARRIER DELINEATOR ....................................................................... Pay item TUBE DELINEATORS ............................................................................................. Pay item FLAGGER ................................................................................................................. Pay item POLICE OFFICER .................................................................................................... Pay item WORKERS PRESENT SPEED LIMIT .................................................................... Pay Item TRUCK/TRAILER MOUNTED IMPACT ATTENUATOR (TMA) ....................... Pay item PORTABLE CHANGEABLE MESSAGE SIGN ..................................................... Pay item CONSTRUCTION SIGN - SPECIAL ....................................................................... Pay item

242

(2571)

GEOTEXTILE WEED BARRIER FABRIC ............................................................. Pay item

03/01/16 243 EC

(2573) (2573)

STORM WATER MANAGEMENT............................................................. Use on most jobs. TEMPORARY EROSION CONTROL ................. To be used only on select construction projects.

03/01/16 231 08/04/16 232

01/12/17 01/12/17 01/12/17 03/01/16 01/12/17

(2563) (2563)

This spec is used with REFERENCE INFORMATION DOCUMENTS (TEMPORARY EROSION CONTROL, which are in one file located at Z:\Public\TechSupport\Spec Prov\SP2016\2573 Temporary Erosion Control Provisions with RID spec Final November 2015.docx. See guidance document located at Temporary Erosion Control Guidance.) on the Erosion Control Web page for determining if these specs should be used on your project. Please contact Brett Troyer for help with these specs.

244

(2574)

SOIL PREPARATION .................................................................................. Use on most jobs.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17

Created August 20, 2015 Page 20

11/06/15 245 246

(2575) (2575)

ESTABLISHING TURF AND CONTROLLING EROSION ....................... Use on most jobs. SITE RESTORATION (ADA) .................................................................................. Pay item

01/12/17 247 248

(2580) (2580)

INTERIM PAVEMENT MARKING ........................................................................ Pay item PAVEMENT MARKINGS – LATE SEASON .............Use on projects where late season striping is anticipated such as multi-year projects or paving into October. If striping is expected to happen after October 1, this specification should be included. If striping is expected to happen after October 15, this specification and a pay item should be included.

01/12/17 249

(2581)

REMOVABLE PREFORMED PLASTIC MASK (BLACK) ................................... Pay item

01/12/17 250 03/01/16 250.1

(2582) (2582)

PERMANENT PAVEMENT MARKINGS ........ Use when mobile reflectometer pay item on plan. TEMPORARY PAVEMENT MARKINGS ............................... Use when requested by District.

(3105)

BAGGED PORTLAND CEMENT CONCRETE PATCHING MIX GRADE 3U18 AND 3U18M.................................................................. Use when there is concrete on job

251

(pavement, curb, gutter, sidewalk, barriers, lighting, signing, signals, etc.). (If the job is only signing, then see if there is any concrete on the details. If none is shown, then this write-up is not needed.) (This writeup is not needed for RC pipe.) Use with SP2016-151 (STRUCTURAL CONCRETE).

01/08/16 252

(3137)

COARSE AGGREGATE FOR PORTLAND CEMENT CONCRETE ........ Use when there is concrete on job (pavement, curb, gutter, sidewalk, barriers, lighting, signing, signals, etc.). (If the job is only signing, then see if there is any concrete on the details. If none is shown, then this write-up is not needed.) (This write-up is not needed for RC pipe.) Use with SP2016-151 (STRUCTURAL CONCRETE) and SP2016-152 (PRECAST CONCRETE).

12/02/16 252.1

(3138)

AGGREGATE FOR SURFACE AND BASES COURSES ....................... Use when have any 2105, 2106, 2118, 2211, 2221 or 2232 pay items.

03/01/16 252.2

(3139)

GRADED AGGREGATE FOR FINE GRADED (4.75 mm) ASPHALT MIXTURE Always use with SP2016-140.1 (FINE-GRADED (4.75 mm) ASPHALT MIXTURE).

12/02/16 252.3

(3149)

GRANULAR MATERIAL ............................................................................ Use on most jobs.

SP2016LIST.DOC (Use with the 2016 Spec. Book) Revised by CO Special Provisions on 01/12/17 12/02/16 253 01/15/16 253.1

(3151)

Created August 20, 2015 Page 21

BLANK BITUMINOUS MATERIAL (MSCR) ............................................. This is only to be used with SP2016-130.1 (ULTRATHIN BONDED WEARING COURSE (UTBWC) (MSCR)), SP2016-137.1 (PLANT MIXED ASPHALT PAVEMENT (MSCR)), SP2016-138.1 (PLANT MIXED ASPHALT PAVEMENT (LOCAL AGENCY) (MSCR)), SP2016-139.1 (PLANT MIXED ASPHALT PAVEMENT FOR ALTERNATE BID (MSCR)), SP2016-142.1 (STONE MATRIX ASPHALT - SMA (MSCR)), and SP2016-141.2 (PERMEABLE ASPHALT STABILIZED STRESS RELIEF COURSE (PASSRC) AND PERMEABLE ASPHALT STABILIZED BASE (PASB) (MSCR)).

254

(3236)

REINFORCED CONCRETE PIPE ........................................................ Use this whenever you have (2501) RC Pipe, (2501) RC Dissipator Ring, (2502) RC Pipe, (2503) RC Pipe Sewer, or (2506) RC Pipe.

255

(3356)

PREFORMED THERMOPLASTIC PAVEMENT MARKING ................. Use when there are thermoplastic pavement markings on the job.

256

(3591)

HIGH SOLIDS WATER BASED TRAFFIC PAINT (FOR HIGH BUILD PAINT) Use for paint markings that are either High-Build Latex Paint that is NOT wet-reflective/recoverable, or whenever the PAINT (WR) item is used.

01/08/16 256.1

(3877)

TOPSOIL MATERIAL .................................................................................. Use on most jobs.

03/01/16 256.2

(3882)

MULCH MATERIAL.................................................................................... Use on most jobs.

257

FINAL ESTIMATE AND FINAL PAYMENT ...........................................................Always