VIRGINIA KEY MASTER PLAN
Virginia Key Master Plan City Commission October 8, 2009
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
VIRGINIA KEY: EXISTING CONDITIONS
FISHER ISLAND
BISCAYNE BAY
MIAMI
RICKENBACKER CAUSEWAY
VIRGINIA KEY
ATLANTIC OCEAN
KEY BISCAYNE
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
PUBLIC CONSENSUS BUILDING
•
STAKEHOLDER INTERVIEW PROCESS,
January 18-22, 2007 •
PUBLIC MEETING #1: SITE INVENTORY AND ANALYSIS,
March 29, 2007 •
PUBLIC MEETING #2: COMMUNITY WORKSHOP AND CONSENSUS BUILDING,
June 20, 2007 •
PUBLIC MEETING #3: PRELIMINARY MASTER PLANNING,
August 26, 2008 •
PUBLIC MEETING #4: VIRGINIA KEY MASTER PLAN,
May 20, 2009 •
WATERFRONT ADVISORY BOARD,
June 9, 2009 •
PLANNING ADVISORY BOARD,
June 17, 2009 •
WATERFRONT ADVISORY BOARD,
October 5, 2009
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
VIRGINIA KEY MASTER PLAN
JUNE 2009
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
VIRGINIA KEY MASTER PLAN
OCTOBER 2009
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
LAND USE SUMMARY
Of the 257 Acres being planned for Virginia Key, approximately 200 Acres (77%) are currently unusable. This includes the North Point and the Landfill which are not accessible to the public.
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
LAND USE SUMMARY
60.3 AC
1.1 AC 15.6 AC
21.4 AC 42.2 AC 116.5 AC
MASTER PLAN IMPROVEMENT AREAS: 257.1 ACRES (25% OF TOTAL AREA) EXISTING STRUCTURE: 5 ACRES (2% OF TOTAL IMPROVEMENTS AREA) PROPOSED ADDITIONAL STRUCTURE: 6 ACRES (2% OF TOTAL IMPROVEMENTS AREA)
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ACCESS AND CIRCULATION DIAGRAM
REFINEMENTS 1.
Alternate Transit Connectors added •
Future Water Taxi Stops
•
Island-wide Circulator (i.e. Public Tram)
DROP-OFF/PICK-UP AREAS FOR ISLAND-WIDE CIRCULATOR (I.E. PUBLIC TRAM) SYSTEM PROPOSED FUTURE WATER TAXI STOP PRIMARY VEHICULAR CIRCULATION WITH BUS STOPS FOR METRO BUS (CONNECTS TO BRICKELL METRORAIL STATION) SECONDARY VEHICULAR CIRCULATION
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
REFINEMENTS 1.
PEDESTRIAN AND BIKING TRAILS CIRCULATION DIAGRAM
Continuous pedestrian and bicycle trails added with connections to and within all improvement and existing areas (~9.25 miles in length)
PRIMARY PEDESTRIAN AND BICYCLE CIRCULATION SECONDARY PEDESTRIAN AND BICYCLE CIRCULATION UNDER-BRIDGE PEDESTRIAN CONNECTION
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
DEVELOPING CRITERIA FOR SUSTAINABILITY Unique opportunity for innovation and design ideas promoting environmental, economical and sociopolitical sustainability such as: 1.
Structures should follow USGBC’s LEED Criteria for environmental sustainability standards
2.
Use of Best Management Practices for stormwater management •
permeable surfaces for trails, parking areas, and roadways,
Source: www.floridapavers.us/images/LTurfblock1.jpg Vertical garden by Patrick Blanc in Madrid, Spain.
•
bioswales/raingardens,
•
green roofs and rain cisterns for runoff collection, etc)
3.
Use of onsite renewable energy resources (i.e. wind, sun, rain, etc)
4.
Use of reclaimed water from Sewage Treatment Plant for irrigation and other non-potable water needs
5.
Conservation of ecologically-sensitive areas with some opportunities for environmental education
6.
Encouraging use of biking and pedestrian circulation through extensive island-wide trails
7.
Reuse of brownfields and landfill area for green recreational opportunities
8.
Use of environmentally-friendly products and practices for maintenance of parks and recreation areas
Source: aptiveruse
Source: www.mainstreetportage.or g/Visuals.htm
Green techniques include use of permeable pavements, green walls and roofs that reduce runoff and provide onsite stormwater management.
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
BASIN AREA PROPERTIES
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
BASIN AREA PROPERTIES: EXISTING CONDITIONS
RICKENBACKER MARINA RUSTY PELICAN RESTAURANT
MAST ACADEMY
DRY-STACK BOAT STORAGE
MIAMI MARINE STADIUM & PARKING
MIAMI ROWING CLUB AND SWIM GYM
N VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
BASIN AREA PROPERTIES
JUNE 2009 BASIN
2
6
7
8
4
1
9
5
3
RICKENBACKER CAUSEWAY HOBIE BEACH
BISCAYNE BAY
LEGEND 1.
2.
3.
Mooring field and renovated City Marina (206 slips and 40 moorings) Waterfront Promenade, Harbor Master and Welcome Center
4.
Drystack Boat Storage Facility ( ~750 racks)
7.
Small-scale retail and restaurants
5.
Parking Garage (200 Spaces)
8.
Aquatic Center and Public Pool
6.
Marine Stadium Entry Drive and Gardens
9.
Parking Garage (1,050 spaces)
Parking Garage (600 Spaces)
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
BASIN AREA PROPERTIES
OCTOBER 2009 BASIN
2
3
1
BISCAYNE BAY
REFINEMENTS 1.
Relocated wetslips and mooring field outside of basin (215 wetslips; 40 moorings; 2,200 LF of side-tie dockage)
2.
Reduced parking garages
3.
Revised drystack building footprint (~ 750 racks) with solar panels
VIRGINIA KEY MASTER PLAN PRESENTATION
Marina Slip Mix 40 ft. = 31 slips 50 ft. = 86 slips 60 ft. = 80 slips 70 ft. = 18 slips
Drystack Mix 30 ft. = 260 racks 35 ft. = 310 racks 40 ft. = 120 racks 45 ft. = 60 racks
OCTOBER 8, 2009
BASIN AREA PROPERTIES
OCTOBER 2009 BASIN
3 2 1
BISCAYNE BAY
REFINEMENTS 1.
Open Vista to Marine Stadium
2.
Reduced Parking Garage Footprint
3.
Green Public Space added
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
BASIN AREA PROPERTIES
OCTOBER 2009 BASIN
3 4
2
1
BISCAYNE BAY
REFINEMENTS 1.
Open Vista to Marine Stadium
2.
Reduced Parking Garage Footprint
3.
Green Public Space added
4.
Future Marine Stadium Village and Supporting Facilities
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
BASIN AREA PROPERTIES
OCTOBER 2009 BASIN
7 8 4 1 2
5
6
3
BISCAYNE BAY
REFINEMENTS 1.
2.
Relocated wetslips and mooring field outside of basin (215 wetslips; 40 moorings; 2,200 LF of side-tie dockage) Reduced parking garages; green roofs to be incorporated on parking structures
3.
Revised drystack building footprint (~ 750 racks) with solar panels
4.
Open Vista to Marine Stadium
5.
Consolidated and Reduced Marine Stadium Village footprint area
VIRGINIA KEY MASTER PLAN PRESENTATION
6.
Structured parking reduced
7.
MRC (Miami Rowing Club and Swim Gym) to remain as existing; Aquatic Center and Public Pool removed
8.
Green public space added
OCTOBER 8, 2009
ALTERNATIVES EXPLORED FOR PUBLIC BOAT RAMP ON VIRGINIA KEY
RICKENBACKER SWALE AREA (ADJACENT TO DRYSTACK FACILITY)
ADJACENT TO SEWAGE TREATMENT PLANT
CONSIDERATIONS 1.
Located within Rickenbacker ROW swale area and Miami-Dade County jurisdiction lands
2.
Increase in boat traffic within Basin waters
CONSIDERATIONS
3.
Increase in roadway congestion on Rickenbacker Causeway
1.
4.
Views to Key and to Marine Stadium are compromised
5.
Trailer parking removes opportunities for landscape buffer and increases pavement area
6.
Boat Ramp access negatively impacts drystack operations
7.
Current leased properties
2.
Consultant team made recommendations for this location along with potential mitigation and further study that may be required Concerns voiced by environmental permitting agencies
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ALTERNATIVES EXPLORED FOR PUBLIC BOAT RAMP WITHIN THE REGION (NEED TO BE STUDIED IN GREATER DETAIL BY MIAMI-DADE COUNTY)
RICKENBACKER RIGHT OF WAY SOUTH OF TOLL
CRANDON PARK MARINA
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ACTIVE RECREATION PARK
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ACTIVE RECREATION PARK EXISTING CONDITIONS
MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT BILL SADOWSKI CRITICAL WILDLIFE AREA
LANDFILL
VIRGINIA KEY HISTORIC BEACH PARK
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ACTIVE RECREATION PARK
JUNE 2009 LEGEND MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT
(* Please note that the plan depicts a long-term potential site carrying capacity.)
1.
Baseball Fields
2.
Softball Fields
3.
Batting Cages
4.
Soccer Fields
5.
Tennis Courts
6.
Competition Stadium, Track and Field, and Football
7.
Active Recreation and Wellness Campus and Dormitories
8.
Central Green
9.
Open Meadow
9
10
2 3
4 7
10. Parking Garages
8 5 1
6
COASTAL HARDWOOD HAMMOCK
EXISTING MANGROVE AREA
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ACTIVE RECREATION PARK
OCTOBER 2009
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ACTIVE RECREATION PARK
OCTOBER 2009
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ACTIVE RECREATION PARK
OCTOBER 2009
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ACTIVE RECREATION PARK
OCTOBER 2009
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ACTIVE RECREATION PARK
OCTOBER 2009 REFINEMENTS 1.
Building Footprint reduced
2.
Green Public Space increased; shade increased
3.
Six parking garages removed
4.
Coastal Hardwood hammock and trails added around entire perimeter of fields
5.
Track and Field facility seating reduced
6.
3
3
6
Baseball, Softball, Soccer, and Tennis reduced
4 1 6
2
4
6 5
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
NORTH POINT
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
NORTH POINT EXISTING CONDITIONS
NORRIS CUT
ATLANTIC OCEAN
FAA TOWER
MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
NORTH POINT RECREATION PARK
JUNE 2009
LEGEND 1.
North Point Recreational Center (Community Meeting Rooms, Dormitories, etc)
2.
Confidence/Ropes Course
3.
Public Picnic Area
4.
Mountain Biking Trails (varying skill levels, approx. 3 miles total)
5.
Eco-campgrounds (46 sites)
6.
BMX Course
7.
Parking (with bio-swales and pervious pavement) and Enhanced Public Beach
8.
Public Pedestrian and Bicycle Trails (2.75 miles)
5
8 4 1
6 7
2 3
MIAMI-DADE WATER AND SEWAGE TREATMENT PLANT
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
NORTH POINT RECREATION PARK
OCTOBER 2009
REFINEMENTS 1.
Mountain Biking Trails and BMX Biking removed
2.
Additional Public Pedestrian and Bicycle Trails added for a total of 4 miles of trails
3.
Public Open Space Increased (i.e. Public Picnic and Passive Recreation Area)
4.
Confidence/Ropes Course
5.
Eco-campgrounds (same number of sites maintained)
6.
5 200’+ BUFFER
North Point Recreational Center
1
2
6 4
3
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
SHRIMPERS LAGOON AND COASTAL HARDWOOD HAMMOCK
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
SHRIMPERS LAGOON: PUBLIC BEACH AND COASTAL HARDWOOD HAMMOCK RESTORATION EXISTING CONDITIONS
2
1
PUBLIC BEACH AND COASTAL HARDWOOD HAMMOCK AREA
SHRIMPERS LAGOON
LEGEND
EXISTING TRAIL MAP
3
4 5
6 7 ATLANTIC OCEAN
1.
Renovated Boat Launch with Canoe/Kayak Rentals and Food Concessions; Retain traditional features/uses in order to enhance film industry opportunities within the area’s naturalized setting
2.
Elevated Boardwalks with Environmental Educational Signage
3.
Parking (with bio-swales and pervious pavement)
4.
Beach Pavilion and Facilities Building, Playground/Tot-lot, Beach Volleyball Courts, and Public Picnic Area
5.
Enhanced Public Beach Area and Trails
6.
Coastal Hardwood Hammock Restoration Area with Enhanced Interpretive Trail System with Environmental Education Opportunities (minor improvements and additions to existing trails)
7.
Public Restrooms and Shelter Building
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
BILL SADOWSKI CRITICAL WILDLIFE AREA
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
BILL SADOWSKI CRITICAL WILDLIFE AREA: ENVIRONMENTAL EDUCATIONAL TRAILS
LEGEND 1.
Circulator Drop-off Area at Arthur J. Lamb Road
2.
Wildlife Watch Tower, Boardwalks, and Environmental Education Signage
3.
Miami Skyline Viewing Point (Pedestrian and Bicycle Access only)
4.
Vehicular Circulation to Wildlife Watch Tower RemovedPEDESTRIAN and BIKING ACCESS ONLY
3
BILL SADOWSKI CRITICAL WILDLIFE AREA
2 4
BASIN
1
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
BILL SADOWSKI CRITICAL WILDLIFE AREA: ENVIRONMENTAL EDUCATIONAL TRAILS
West Lake Park, Florida
Tradewinds Park, Broward County, Florida
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ROADWAY IMPROVEMENTS
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
ROADWAY IMPROVEMENTS
2
1
1. Proposed Improvements on Rickenbacker Causeway
2. Proposed Improvements on Arthur J. Lamb Road
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
FISHING PIER IMPROVEMENTS
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
FISHING PIER: Graphic representation only (under the jurisdiction of Miami-Dade County)
LEGEND 1.
30” Raised Landscape Planter with Seating
2.
42” Raised Planters with Railing
3.
Boardwalk with Guardrail (under bridge connection)
BISCAYNE BAY
3 RICKENBACKER CAUSEWAY
1 2
VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009
THANK YOU VIRGINIA KEY MASTER PLAN PRESENTATION
OCTOBER 8, 2009