VF Turkey Network Energy Initiatives and Green Roadmap
Vodafone Turkey Technology Network 06 February 2010 Istanbul - Turkey
Infrastructure & Energy Team
Contents ¾Climate Challange ¾Infrastructure and Energy Team ¾VFTR and Energy ¾Key Energy Saving Points ¾ Reduction of CO2 emission ¾Energy Background ¾ Realized Energy Savings ¾Employee Awareness Programme ¾Ongoing Energy Efficiency Initiatives ¾Upcoming Energy Initiatives (Radio and MTX sites) 2 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Climate Challange of Vodafone Group It’s up to all of us to step up to the climate challenge and reduce our greenhouse gas emissions.
Energy is inside of us !
Vodafone has ambitious energy efficiency targets, and we’re taking every opportunity to green our operations. There’s a lot you can do too – at network and in every area of your work life.
“We will reduce our global CO2 emissions by 50%, against the 2006/07 total, by 2020” 3 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Infrastructure and Energy Team of Vodafone Turkey Green Network
Mehmet Ali Yıldırım Energy Systems Manager
Barış Aysel BSS Infrastructure Manager
Onur Tevfik KUTLU Senior Manager Infrastructure and Energy Özgerhan Koşdemir MTX Infrastructure Manager 4 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Vodafone Turkey and Energy The effect of VF Turkey became more than 100 millions kg CO2 additional to overall Vodafone carbon foot print at Vodafone
kWh
Energy Consumptions in kWh at FY08/09
80.000.000
VF Turkey
Retail, 0,03%
70.000.000
Other Network equipment ,14,76%
60.000.000
Offices, 3,16%
50.000.000 40.000.000
Radio sites, 82,06%
30.000.000 20.000.000 10.000.000 0 FY Quarters
5 VFTR NW Energy Strategy Infrastructure and Energy Team
Q1
Q2
Q3
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Q4
Key Energy Saving Points Green Network
• Energy Infrastructure 9High Efficient rectifier structure 9Rectifier optimization 9Power monitoring and metering
MW 4%
BTS 41%
A/C 49%
•Cooling Infrastructure 9 Efficient cooling systems and Free cooling 9Site isolation and insulation 9Room temperature setting •Radio Equipment related 9 Energy efficient BTS or Single RAN 9TRX Shutdown-BTS switch off
Other 6%
Power Consumption Rates at Medium-Size BTS
•Renewable and Alternative Energy 9Solar-Photovoltaic 9 Wind 9 Fuel Cell
•OpCo specific applications 9 Power tarrifing 9 Local consumer rights born from legislations (STB) 9 Self-Energy Generation
6 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Downstairs for carbon reduction Network expansion Today
1
2
3
Carbon footprint
4
Sharing
Reduce cooling
4
Energy efficient infrastructure
5
Distributed solar-wind hybrid
6
Opportunistic “green” sources
7 7 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Green grid
Energy Background
Power Consumption in MWh (RAN)
230.000
250.000
In 2008 electricity prices
212.920
200.000
increased 56% in Turkey
168.998 130.259
150.000
and additional 10% increase
100.000
done as of 1st of October’09
50.000 0 12000
FY 07/08
FY 08/09
1HFY09/10
Number of Physical Base Stations 2G Radio Network of VFTR has grown 70 % in 2,5 years.
11000
11.000
10000
FY08/09
9000
10.500
8000 7000
6.500
8.500
FY07/08
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
09
09 Ju ly
Ju n
09
M ay .0 9
A pr
09
09
08
08
M ar .0 9
Fe b
Ja n
D ec
N ov
08
08
08
08
O ct 08
S ep
A ug
Ju ly
Ju n
08
M ay .0 8
A pr
08
08
07
07
M ar .0 8
Fe b
Ja n
D ec
N ov
07
07
07
O ct 07
S ep
A ug
07
8 VFTR NW Energy Strategy Infrastructure and Energy Team
Ju ly
Ju n
07
M ay .0 7
A pr
M ar .0 7
6000
Energy Efficiency Initiatives at VF Turkey Network
9 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Realized Energy Saving Initiatives at Network in FYs 07/08 and 08/09 Swapped old BTSs 6000
• Swap of old type Motorola BTSs in our network
4000 BTS
average 10% reduction in power consumption
5000 3000 2000
5700 BTS swapped
1000
•Free Cooling Box Applications
Ş ub.07 M ar.07 N is .07 M ay .07 H az .07 T em .07 A ğu.07 E y l.07 E k i.07 K as .07 A ra.07 O c a.08 Ş ub.08 M ar.08 N is .08 M ay .08 H az .08 T em .08 A ğu.08 E y l.08 E k i.08 K as .08
0
91000 FCB systems from Stulz installed till end of July’09
• Solar Insulation Paint “SuperTherm” 9 710 sites in the hot areas painted with this special paint
10 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Date
Cooling related Energy Saving Actions in FY09/10 • Free Cooling Boxes ¾3060 systems under installation • Swap of existing conventional airconditioner units ¾ 850 sites under replacement process with inverter type air conditioners • Swap of old downflow package units with new ones
with free cooling feature ¾140 systems replaced with new type compact units Compact Airconditioning Units
•Solar Insulation Paint “SuperTherm” ¾ 720 sites painted 11 VFTR NW Energy Strategy Infrastructure and Energy Team
Free Cooling Box
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Power infrastructure related Energy Saving Actions • Remote Power Metering ¾ Energy consumption of the sites more than 1500 to be metered remotely
• Swap of old DC Power Systems at base stations ¾ Existing old 650 DC systems to be replaced with high capacity and efficiency systems
• Swap of Analogue Power Meters with remotely readable ones ¾ 1500 analogue power meters under replacement process with digital ones
• Green Site Applications ¾ 4 new sites to be powered with solar and wind energy VF TR Green Site 12 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Energy Consumption Monitoring and Metering CREMA® is “Central Remote Energy Metering Application” of VFTR Network ¾ Switching Rooms and offices (7 + 5 locations) ¾ BSC locations (60 +100 sites)
Phase 1
¾ Base Stations ( 1500 sites)
You cannot manage what you do not measure 13 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Ongoing Renewable Energy Projects The green sites below are to be implemented •Bozdoğan -Başalan –Aydın (new site with PV) •Toptepe -Göcek –Muğla ( new site with PV) •Zeytinli -Çeşme –İzmir (new site with PV + wind turbine)
Fakıtepe
• Fakıtepe –Muğla (revision- PV upgrade + wind turbine) Vendor to implement these green sites is;
HUAWEI 14 VFTR NW Energy Strategy Infrastructure and Energy Team
Zeytinler Site
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Green Mobile BTS Green Network
VFTR, Huawei and BSS Boray prepared a green mobile bts prototype for seasonal and temporary site applications Components of Prototype •BBU and RRU (S1) • Microwave •12 x 180 W PV panels • Solar Controller • 8 x 12 V 100 Ah batteries • Free Cooling fan • Mobile shelter • Manual extendable tower
Total Consumption ~350 W Maximum Autonomy 12 hrs Green Mobile BTS 15 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
OpCo specific Energy Actions • Energy Supplier- independant Electricity Consumership ¾ Certificate received for 6 VF buildings ¾10% discount obtained from a private energy company
¾Applied to Local electricity Authorities for entire network ¾Certificates received for separate group of base stations more than 6550 sites
16 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Employee Awareness Programme At Vodafone Turkey Earth needs you!
Energy Efficiency Posters at VFTR
VFTR Energy Efficiency Portal launched at Intranet in March’09 17 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Upcoming Energy Objectives in FY10/11 • Hybrid Renewable Applications : 15 new sites 9Solar 9Solar-Wind 9Wind -Grid •Alternative Energy Solutions 9 Fuel Cells 9Flow Batteries •Efficient/Green Radio Applications 9 Energy efficient BTS or Single RAN 9TRX Shutdown-BTS switch off • Green MTX (Istanbul- Europe MTX) •Basic Energy Saving Initiatives 9 Free Cooling Boxes : 1000 sites 9 Swap of old DC power supply units :1000 systems 9 Swap of old airconditioners : 500 sites 18 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Green Network
Green Radio Green Network
• Single RAN (with Huawei) • TRX Shutdown BCCH Turn-off with Assumptions (Motorola): 60% of BTSs are in urban and suburban areas & can use this feature 30% of suburban BTSs may be turned off during quiet periods. This feature can be used 6 hours per day. Turning off a quiet BCCH carrier saves an additional 200W. Network has 10.000 4/4/4 BTSs. Electricity costs $0.15 per kWh Savings are: 60% * 30% * 10.000 * 3 BCCH radios * 0.2kWh * (6/24) * 24 * 365 * 0.15 Savings = $355k for a 10.000 BTS network 19 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Energy Action Plans for Switching Sites/MTXs • Infrastructure Improvements at Switching Rooms ¾Cabling revision under raised floors at Switching Centers ¾Air-Conditioning Optimization (thermal assessment) ¾ Hot-Cold Aisle arrangements for INV-VAS systems •High Efficient DC Power Supply Systems (more than 96%) ¾High Efficient rectifier system to be installed (4 platforms) •Digital Scroll type Air Conditioners at new MTX buildings (15% saving) ¾20 systems planned at new MTXs
20 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Expected Total Savings from Year 2009 to 2014
21 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone
Vodafone Turkey Technology Infrastructure and Energy Team
22 VFTR NW Energy Strategy Infrastructure and Energy Team
Copyright notification No part of this document may be reproduced without written authorisation. The copyright and the foregoing restriction extend to reproduction in all media. © 2010, Vodafone