TXDOT S PROGRAMMATIC QUALITY ASSURANCE PROGRAM FOR DESIGN-BUILD PROJECTS AND IMPLEMENTATION GUIDE

TXDOT’S PROGRAMMATIC QUALITY ASSURANCE PROGRAM FOR DESIGN-BUILD PROJECTS AND IMPLEMENTATION GUIDE 2015 WASHTO Subcommittee on Materials & Construction...
Author: Marvin Chambers
2 downloads 0 Views 3MB Size
TXDOT’S PROGRAMMATIC QUALITY ASSURANCE PROGRAM FOR DESIGN-BUILD PROJECTS AND IMPLEMENTATION GUIDE 2015 WASHTO Subcommittee on Materials & Construction J. Jeffrey Seiders, Jr., P.E., Raba-Kistner Infrastructure Darren G. Hazlett, P.E., TxDOT, Construction Division

March 23, 2015 Footer Text

Date

Quality Assurance Program for DesignBuild Projects

2015 WASHTO Subcommittee on Materials & Construction

2

Risk allocation comparisons of TxDOT D-B-B, D-B, and Concession projects. Risk Allocations Comparison Risk

Design-Bid-Build

Design-Build

Concession

Project Scope

Owner

Owner

Owner

Right of Way

Owner

Shared/Owner

Shared/Contractor

Utilities

Owner

Shared

Shared

Design

Owner

Contractor

Contractor

Contractor

Contractor

Contractor

Site Conditions

Owner

Shared

Contractor

QA/QC

Owner

Shared

Contractor

Hazmat

Owner

Shared

Shared

Operation & Maintenance

Owner

Shared/Owner 3-5yr. Optional Terms

Concessionaire 50yr. Required

Traffic (Demand / Revenue)

Owner

Owner

Concessionaire

Financial

Owner

Owner

Owner/Concessionaire

Toll Technology

Owner

Owner

Concessionaire

Force Majeure

Shared

Shared

Shared

Construction

Risk transfer from the Owner to the Contractor/ Concessionaire will generally increase in proportion to the length of the maintenance agreement including long-term preservation and responsibilities for traffic and revenue.

2015 WASHTO Subcommittee on Materials & Construction

3

Testing Components and Relationships in the QAP

2015 WASHTO Subcommittee on Materials & Construction

4

Quality Control

2015 WASHTO Subcommittee on Materials & Construction

5

Testing Acceptance Program

2015 WASHTO Subcommittee on Materials & Construction

6

Testing Quality Assurance by Contractor’s Quality Acceptance Firm

2015 WASHTO Subcommittee on Materials & Construction

7

Testing Quality Acceptance by TxDOT District

2015 WASHTO Subcommittee on Materials & Construction

8

2015 WASHTO Subcommittee on Materials & Construction

9

Quality Assurance Program for Design-Build Projects

2015 WASHTO Subcommittee on Materials & Construction

10

Figure 3 – Participant teams grouping the failures 2015 WASHTO Subcommittee on Materials & Construction

11

Quality Assurance Program for Design-Build Projects”

2015 WASHTO Subcommittee on Materials & Construction

12

Risk based tiered verification testing table for SH 130 Segments 5 and 6 Concession project

2015 WASHTO Subcommittee on Materials & Construction

13

FHWA Requirements “Quarterly Report”

 Statistical analysis results, to include specification requirements and status of validation process during start-up and completion of an item  Non-validation investigation  Engineering judgment log  Non-conformance log  Materials certification

2015 WASHTO Subcommittee on Materials & Construction

14

I2MS - Purpose • Assist with statistical analysis portion for the Quarterly Report to FHWA • Automates – Report generation – Analyzing QA and OV results – Verification of certifications/accreditations and key parameters

2015 WASHTO Subcommittee on Materials & Construction

15

Report Generation – What to Expect Level 1

2015 WASHTO Subcommittee on Materials & Construction

16

Report Generation – What to Expect Level 2

2015 WASHTO Subcommittee on Materials & Construction

17

Report Generation – What to Expect Level 3

2015 WASHTO Subcommittee on Materials & Construction

18

“Trust but Verify”

2015 WASHTO Subcommittee on Materials & Construction

19

2015 WASHTO Subcommittee on Materials & Construction

20

2015 WASHTO Subcommittee on Materials & Construction

21

2015 WASHTO Subcommittee on Materials & Construction

22

Design-Build Quality Assurance Program Implementation Guide

2015 WASHTO Subcommittee on Materials & Construction

23

QAP Implementation Process

2015 WASHTO Subcommittee on Materials & Construction

24

2015 WASHTO Subcommittee on Materials & Construction

25

2015 WASHTO Subcommittee on Materials & Construction

26

2015 WASHTO Subcommittee on Materials & Construction

27

2015 WASHTO Subcommittee on Materials & Construction

28

2015 WASHTO Subcommittee on Materials & Construction

29

Questions?