SWARCO TRAFFIC SYSTEMS GMBH

SWARCO TRAFFIC SYSTEMS GMBH

International Projects Interurban / Tunnel References

SWARCO TRAFFIC SYSTEMS GMBH

Table of contents 1

THE COMPANY ....................................................................................................................... 3

2

CURRENT PROJECTS ............................................................................................................ 4

3

TUNNEL PROJECTS WORLDWIDE ........................................................................................ 8

4

INTERURBAN PROJECTS: AUSTRIA, SWITZERLAND AND WORLDWIDE ........................ 12

5

INTERURBAN PROJECTS: GERMANY ................................................................................ 16

6

SUPERORDINATE SOFTWARE............................................................................................ 27

7

DYNAMIC EVALUATION AND DISPLAY OF PARKING SPACES FOR HGV ........................ 32

8

“DRIP” PROJECTS (DYNAMIC ROUTE INFORMATION PANELS) ....................................... 34

9

PROJECT DESCRIPTIONS ................................................................................................... 36 MOTORWAY RINGROAD A99 MUNICH ............................................................................................ 37 MODULAR TRAFFIC MANAGEMENT SYSTEM FOR TEMPORARY ROAD WORKS SIGNALIZATION............... 38 TRAFFIC MANAGEMENT SYSTEM MOTORWAY A1 / A27 BREMEN ...................................................... 40 EXTENSION OF THE TRAFFIC DATA ACQUISITION IN BADEN- W UERTTEMBERG .................................. 42 TRAFFIC MANAGEMENT AND HARD SHOULDER RUNNING MOTORWAY A9 .......................................... 43 HGV PARKING MANAGEMENT SYSTEM ON MOTORWAY A5 ............................................................ 47 TRAFFIC MANAGEMENT SYSTEM OERESUND .................................................................................. 49 GOTTHARD TUNNEL MOTORWAY A2: INCREASED EFFICIENCY “EFFIGO” ......................................... 51 DYNAMIC REROUTING BAVARIA (DNET BAYERN) ............................................................................ 54 TRAFFIC MANAGEMENT IN THE CITY OF LUXEMBURG ...................................................................... 56 N2 GALLERIA MONTE CENERI (SWITZERLAND) .............................................................................. 58 OVERHEAD NOISE PROTECTION BARRIER MOTORWAY A1 COLOGNE-LOEVENICH ............................. 60 TRAFFIC MANAGEMENT WANKDORFPLATZ, CITY OF BERNE, SWITZERLAND ..................................... 62 DEVELOPMENT OF A STANDARDIZED CONTROL SOFTWARE ............................................................. 64 TRAFFIC MANAGEMENT SYSTEM MOTORWAY A14 .......................................................................... 65 EXTENSION OF THE TRAFFIC DATA ACQUISITION IN HESSE ............................................................. 66 CORRIDOR CONTROL AND HARD SHOULDER RUNNING MOTORWAY A5 ............................................. 68 NETWORK-WIDE ROUTING MOTORWAY RINGROAD MAINZ .............................................................. 69 CORRIDOR MANAGEMENT SYSTEM MOTORWAY A1 ......................................................................... 70 TELEMATIC CONTROL FOR HGV PARKING AT MOTORWAY A2 .......................................................... 71 ELECTRONIC DEER PASS WARNING SYSTEM ON FEDERAL ROAD B202 RASTORFER KREUZ ............... 73 TRAFFIC CONTROL INSTALLATION MOTORWAY A2 WUNSTORF-LUTHE ............................................. 75 CARMEL TUNNELS, HAIFA, ISRAEL ................................................................................................ 77 HGV GUIDANCE SYSTEM ON THE MOTORWAY A98 ......................................................................... 79 ROAD CONDITION AND WEATHER INFORMATION SYSTEM (RWIS) HESSE ......................................... 80 TRAFFIC MANAGEMENT SYSTEM MOTORWAY A5 / A45 FRIEDBERG - GAMBACHER KREUZ................. 81 TRAFFIC MANAGEMENT MEASURES ON MOTORWAY A5 ................................................................... 82 EXTENSION OF THE HGV GUIDANCE SYSTEM MOTORWAY A5 W EIL AM RHEIN ................................. 84 DYNAMIC ROUTING “DW ISTA” MOTORWAY A8 MUNICH – SALZBURG, JUNCTION INNTAL .................... 85 TRAFFIC GUIDANCE SYSTEM NATIONAL ROAD N2 BIASCA – VARENZO (SWITZERLAND) ................... 87 ROAD CONDITION AND W EATHER INFORMATION SYSTEM (“RWIS”) THURINGIA ............................... 88 TUNNEL AIRPORT TEGEL, BERLIN MOTORWAY A111 ...................................................................... 90 VIDEO MONITORING IN DHAHRAN, SAUDI ARABIA ........................................................................... 92 TUNNEL “TIERGARTEN SPREEBOGEN” (TTS) BERLIN HIGHWAY B96 ............................................... 93 DYNAMIC TRAFFIC GUIDANCE WITH CONGESTION INFORMATION MOTORWAYS A3 / A66 .................. 95

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 2/96

SWARCO TRAFFIC SYSTEMS GMBH

1 The Company SWARCO TRAFFIC SYSTEMS GMBH is a company of the SWARCO group, the world-leading supplier of road marking systems, signage, traffic signals and traffic management systems. From custom solutions to optimized, integrated systems, we cover a wide range of traffic management needs and offer the according service to assure maximum system availability. Our customers also benefit from the comprehensive know-how of a strong international group with every order they place with us. In order to assure the smooth flow of traffic and driving safety on the motorway, we have developed traffic management systems that stabilize traffic flow and contribute to enhanced safety and performance at high traffic volumes. Features include congestion warnings, opening or closing lanes or regulating driving speeds at intersections and junctions. Our future-proof, innovative systems and integrated solutions guide drivers all the way from their home, along the motorway and to their destination, ensuring that everyone arrives safely. SWARCO TRAFFIC SYSTEMS is your partner for INTERURBAN TRAFFIC SOLUTIONS.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 3/96

SWARCO TRAFFIC SYSTEMS GMBH

2 Current Projects Completion

Project

Volume in 1000 € 

under construction 3/2016

Motorway A45 in direction Frankfurt Renewal of sign gantry and re-integration into the corridor control system

Germany Hesse

under construction 3/2016

Motorway A448 Traffic data acquisition installations

Germany North RhineWestphalia

under construction 2/2016

Extension of the corridor control sub center Langenselbold, extention of the central system and centralization of the sub center Offenbach

Germany Hesse



under construction 1/2016

Motorway A5 renewal of the remote data transmission

Germany Hesse



under construction 1/2016

Motorway A10 Potsdam-Nuthetal, Lot 13a Traffic management system

Germany Brandenburg

722

under construction 12/2015

Tunnel Ostwestfalendamm Federal road B61 (urban motorway city of Bielefeld)

Germany North RhineWestphalia

846

under construction 11/2015

Motorway A8 Tunnel Pellinger Berg ̶ Renewal and modernization of traffic technology and sub center by order of STRABAG AG

Germany Saarland



under construction 11/2015

Rerouting system Motorway A3 junction Obertshausen

Germany Hesse

294

under construction 11/2015

Mobile LED signs motorway A66 for dynamic signposting (rerouting)

Germany Hesse

610

under construction 10/2015

Renewal of measurement points in the provisory measuring grid motorway A7

Germany North RhineWestphalia

213



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 4/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 323

under construction 10/2015

Congestion warning system motorway A1 Burscheid

Germany North RhineWestphalia

under construction 9/2015

New construction of the rerouting system on motorways A2 / A7 / A39

Germany Lower Saxony

under construction 6/2015

Motorway A7 extension Bordesholm Provisionary traffic data acquisition for the rerouting system by order of the joint venture A7 Hamburg-Bordesholm

Germany Schleswig-Holstein

under construction 4/2015

Motorway A5 New construction of a sign gantry (C2X) with connected infrastructure

Germany Hesse

under construction 3/2015

Modernization and extension of the VMS of the traffic management system motorway A3, in the course of the 8-lane extension between interchanges Heumar and Leverkusen

Germany North RhineWestphalia

under construction 3/2015

Extension motorway A13, 3rd stage junctions Radeberg to Dresden-Nord signposting for the final stage

Germany Saxony

949

under construction 3/2015

Motorway A57 traffic management system interchange Kaarst to junction Büttgen

Germany North RhineWestphalia

925

under construction 1/2015

Renewal of the communication computer remote bus for the RWIS system (road weather information system) in Schleswig-Holstein

Germany Schleswig-Holstein

under construction 1/2015

Renewal of the traffic management system motorway A61 junction Stromberg to interchange Nahetal

Germany RhinelandPalatinate

under construction 11/2014

Traffic data acquisition motorway A45 via Bluetooth sensors

Germany Hesse

5,031



313





4,354



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 5/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 402

under construction 9/2014

Network-wide rerouting Usedom Dynamic Variable Traffic Signs (dWiSta)

Germany Mecklenburg-West Pomerania

under construction 9/2014

Network-wide rerouting motorway A5 interchange Weinheimer Kreuz Dynamic Variable Traffic Signs (dWiSta)

Germany Hesse

under construction 7/2014

Connecting the “MDM“ (Mobility data market place, BASt) with the traffic center Leverkusen via DATEX II

Germany North RhineWestphalia



under construction 6/2014

Implementation of the traffic center North Rhine-Westphalia part 1: Software for the traffic center

Germany North RhineWestphalia



under construction 4/2014

Extension of the traffic data acquisition motorways A5 / A81

Germany BadenWuerttemberg

862

under construction 4/2014

Reconstruction of the corridor control system nd motorway A3 Kauppenaufstieg – 2 stage

Germany Bavaria

528

under construction 12/2013

Extension of the existing sub-center by a corridor control system with dynamic hard shoulder opening, motorway A3 Limburg

Germany Hesse



under construction 11/2013

Establishment of a traffic computer to combine all traffic-technological systems

Germany Schleswig-Holstein



under construction 11/2013

Sub-center for the corridor control system motorway A2 motorway between the border of Lower Saxony and the junction Lostau

Germany Saxony-Anhalt



under construction 8/2013

Extension / reconstruction of existing traffic control system on motorway A94 junction Parsdorf - interchange Munich East

Germany Bavaria



1,111

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 6/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

under construction 6/2013

Traffic installations for ring road “Mittlerer Ring” southwestern Munich by order of PKE

Germany Bavaria

under construction 6/2013

Traffic technological installation – Telematics motorway A1 northern part by order of Thomas Verkehrstechnik

Germany North RhineWestphalia



under construction 09/2012

Motorways A10 / A24 interchange Havelland and junction Kremmen, lot 16.4: Reconstruction of traffic management systems motorway A24

Germany Brandenburg

1,000

under construction 09/2012

Motorways A10 / A24 interchange Havelland and junction Kremmen, lot 16.1: Reconstruction of traffic management systems – dynamic signposting with congestion information

Germany Brandenburg

300

under construction 6/2011

Frame contract for the backfitting and extension of measurement points on the motorways A3 and A6

Germany Bavaria

491

under construction 06/2010

Motorway A9 direction Nuremberg – Munich: Temporary use of the hard shoulder as lane (joint offer by Siemens AG / Swarco Traffic Systems GmbH)

Germany Bavaria

12,082

Germany Bavaria

10,292

1st stage finished; 2nd stage partly finished

under construction 03/2010

Motorway A9 direction Munich– Nuremberg: Temporary use of the hard shoulder as lane (joint offer by Siemens AG / Swarco Traffic Systems GmbH) 1st stage finished; 2nd stage partly finished

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 7/96

SWARCO TRAFFIC SYSTEMS GMBH

3 Tunnel Projects Worldwide Completion

Project

Volume in 1000 € 

2015

EFFIGO-TEC Increase in efficiency of Gotthard tunnel

Switzerland Canton Uri/Ariolo

2015

Traffic management in the City of Luxemburg Implementation of three metropolitan tunnels

Luxemburg Luxemburg City



2015

Corridor control system Oeresund by order of SWARCO Sverige

Sweden



2015

Federal road B27, tunnel Schuerzeberg Renewal of traffic technology by order of Siemens

Germany Hesse



2015

Motorway A31 Emstunnel - Operational tunnel equipment, by order of the company Actemium Cegelec Dresden

Germany Lower Saxony



2015

A31 Emstunnel - Traffic computer by order of the company Actemium Cegelec Dresden

Germany Lower Saxony



2014

Federal road B294 Hugenwaldtunnel Waldkirch by order of PKE

Germany BadenWuerttemberg



2014

Motorway A44 tunnel Schulberg by order of Siemens, Dresden

Germany Hesse



2014

N2 Monte Ceneri BSA, Lotto 8410, comando traffico

Switzerland Canton Ticino

2014

N2 Monte Ceneri BSA, Lotto 8420, traffic segnaletica

Switzerland Canton Bellinzona

404

1,070

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 8/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2013

Half open tunnel Lenzburg - Birrfeld Signaling and cross-section control

Switzerland Canton Aargau

2013

Renewal of the traffic technology tunnel Heslach

Germany BadenWuerttemberg

2013

Preservation project system technology construction site signaling / provisional solution / half open tunnel Lenzburg - Birrfeld

Switzerland Canton Aargau



2013

Noise protection motorway A1 Cologne/Loevenich in joint-venture with company Duerr

Germany North RhineWestphalia



2012

Tunnel N2 19 Melide – Grancia automatic tunnel closure in case of congestion

Switzerland Canton Ticino

152

2012

Traffic installations Piottino Adaptation of traffic control by order of Cablex

Switzerland Canton Ticino



2011

Adaptation of HGV stopping, Stalvedro tunnel

Switzerland Canton Ticino

43

2010

Carmel Tunnels, Haifa Tunnel traffic management installation and sub center

Israel Haifa



2010

Gotthard Tunnel, Release 2

Switzerland Cantons Uri and Ticino



2009

National road N2 Biasca - Varenzo Traffic guidance system with installation for tunnel closure (4 tunnels)

Switzerland Canton Ticino

1,558

2,800

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 9/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2009

Motorway A8 tunnel "Pellinger Berg", by order of the company Cegelec

Germany Saarland

2009

Motorway A113 Berlin, Tunnel “Rudower Hoehe” (TRH) and “Altglienicke” (TAG) in cooperation with the company Siemens

Germany Berlin



2009

Motorway A7, tunnel Fuessen / tunnel Reinertshof VMS, radar sensors, LIFE flat signal heads by order of the company QSG Verkehrstechnik GmbH

Germany Southern Bavaria



2009

Renovation tunnel Hohentwiel, motorway A 81 by order of the company Siemens Tunnel control, outstations, VMS

Germany BadenWuerttemberg



2009

Tunnel Leutenbach B14 Traffic signs (emergency call / escape road / lay-by), by order of the company Duerr GmbH

Germany BadenWuerttemberg



2008

Tunnel B14 Leutenbach, by order of the company Duerr

Germany BadenWuerttemberg



2008

Tunnel Airport Berlin Tegel "TFT"

Germany Berlin

2,373

2008

Tunnel Behringen by order of the company Duerr traffic signs, escape route and emergency call signs

Germany Thuringia



2008

“Saukopftunnel” by order of the company Duerr traffic signs, escape road information, lay-by signs

Germany Hesse / BadenWuerttemberg



2008

Tunnel Rastatt by order of the company Duerr Tunnel control, outstations, VMS, tunnel portal signal heads, traffic signs/ escape road information

Germany BadenWuerttemberg



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 10/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2008

“Lehrertaltunnel” by order of the company Duerr Tunnel control, outstations, VMS, tunnel portal signal heads, escape road information

Germany BadenWuerttemberg

2008

Tunnel “Miltenberg Nord” VMS, tunnel portal signal head by order of the company Siemens

Germany Bavaria



2007

Bypass Gevelsberg Tunnel “Engelbert” VMS, variable routing, partly with radio control

Germany North RhineWestphalia



2007

“Brettfalltunnel” Variable routing

Austria



2007

“Ostwestfalentunnel” Bielefeld Tunnel control, communication processor interfaces (KRI), outstations, VMS, traffic heads

Germany North RhineWestphalia



2006

A31 "Emstunnel" Sub center and traffic management by order of the company Cegelec Dresden

Germany Lower Saxony



2006

"Tiergarten" tunnel national highway B96 traffic management system with traffic data acquisition, VMS, LED LIFE signs

Germany Berlin

2006

A2 "Seelisbergtunnel" 320 LED LIFE signs

Switzerland Cantons Nidwalden / Uri

4,330

930

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 11/96

SWARCO TRAFFIC SYSTEMS GMBH

4 Interurban Projects: Austria, Switzerland and worldwide Completion

Project

Volume in 1000 € 

2015

Traffic management in the City of Luxemburg Implementation of three metropolitan tunnels

Luxemburg Luxemburg City

2015

National road N2 Bellinzona TLSoverIP connection Display of variable messages (company Walter) Lot 8410 by order of Swarco Traffic Switzerland GmbH

Switzerland Canton Ticino



2015

Traffic calmed area Basel: First stage by order of Swarco Traffic Switzerland GmbH

Switzerland Canton Basel



2013

Adaptation of the traffic routing intersection Rotsee, Lucerne, by order of Steria Schweiz AG

Switzerland Canton Lucerne



2013

Swiss road traffic counting (“Schweizerische Strassenverkehrszählung SSVZ“) Counting stations for traffic data acquisition

Switzerland

2013

Western bypass Zurich in cooperation with mit Alpine Energietechnik Switzerland

Switzerland Canton Zurich



2013

N1 BAU Morges - Ecublens / Villars-Ste-Croix Oulens in cooperation with Cablex Variable signaling use of hard shoulder

Switzerland Canton Vaud



2012

City of Berne, traffic control Wankdorfplatz

Switzerland Canton Berne

2012

Road stations for traffic control system Timisoara-Lugoj

Romania

2012

Alp transit, A2 Camorino dismantling of signaling system

Switzerland Canton Ticino

389

1,131



304

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 12/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2012

Lottigna-Torre flood protection program with solar-operated prism openers by order of Cablex AG

Switzerland Canton Ticino

2009

Conversion of hard shoulder Emmen by order of the company Steria

Switzerland Canton Lucerne

2008

Half open tunnel at Zofingen, national road N2/01 Rothrist-Brittnau, traffic management system incl. control module

Switzerland Canton Aargau

232

2008

N1/04 variable direction sign intersection Birrfeld 22 VMS (large prism technology), 12 cross section control computer

Switzerland Canton Aargau

560

2006/2008

Western bypass Zurich 136 VMS (LED technology), 770 LED lane control signs

Switzerland Canton Zurich

2007

Extension and renewal of the variable routing, national road A1, junction Haerkingen

Switzerland Canton Solothurn

300

2007

N1/05 restoration Limmattal 34 VMS (LED technology), 7 cross section control computer

Switzerland Canton Aargau

340

2006

N3 Northern junction Basel 53 VMS (LED string technology), 20 VMS (prism technology)

Switzerland Canton Basel

480

2005 / 2006

National roads N2 / N14 modification and extension of the traffic control center Lucerne

Switzerland Canton Lucerne

2005

A8 “Innkreis” motorway Outstations and communication processor interfaces (KRI)

Austria



3,100



230

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 13/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

2004 / 2005

Traffic management and information system Tyrol, delivery of acquisition systems for traffic data and environmental data, by order of Siemens

Austria

Volume in 1000 € 326

2004 / 2005

Lorry Toll System Austria, Lot 2 – Advance signaling: lane control (LED), VMS (prism technology)

Austria

1,600

2004 / 2005

VMIS Tirol – WZG A13 “Brenner” motorway 174 VMS (LED), 76 VMS (prism technology)

Austria

1,500

2004

N1 Bruettisellen – Toess VMS (LED string technology)

Switzerland Canton Zurich

2009

Planning of traffic management system Tripolis International Airport Road by order of Janke & Partner GmbH

Libya

2008

New Jersey Turnpike Variable message signs (closed prism technology)

USA

2008

Road 222 Stockholm Variable message signs (prism technology)

Sweden

2008

Kent County Council – LED information signs variable message signs, control system

Great Britain

900

2008

Department of Transport – Strategic re-routing system combined variable message signs, control system

Great Britain

1,670

2005 / 2008

Speed enforcement system „Tutor“, Autostrade

Italy

450

 t 190

30



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 14/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

2000 / 2008

Pennsylvania Turnpike Variable message signs (closed prism technology)

USA

Volume in 1000 € 3,500

2007

MTA Bridges New York – “Queens Midtown” Tunnel and “Brooklyn Battery” Tunnel VMS

USA

340

2002 / 2006

New York Airports JFK, LaGuardia, Newark Variable message signs (closed prism technology)

USA

500

2005

Video monitoring on the premises of “Saudi Aramco” in Dhahran, Saudi Arabia

Saudi Arabia Dhahran



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 15/96

SWARCO TRAFFIC SYSTEMS GMBH

5 Interurban Projects: Germany Completion

Project

Volume in 1000 € 3,045

2016

Motorway A99 replacement of the junction Aschheim

Germany Bavaria

2015

Renewal of the corridor control system motorway A44 between junction Soest and interchange Dortmund / Unna

Germany North RhineWestphalia

833

2015

Construction of further traffic data acquisition installations acc. to TLS 2012 on the motorways A4 / A38 / A71

Germany Thuringia

506

2015

Construction of warning and information signs improving the road safety on the motorway A38

Germany Saxony-Anhalt

647

2015

Traffic light assistant Berlin Audi A1 e-tron by order of Audi AG

Germany Berlin



2015

Motorway A3 interchange Heumar Replacing signs in fiber-optic with signs in LED-technology

Germany North RhineWestphalia



2015

Motorway A8 Hohenstadt-Riedheim Central software for the fog warning system

Germany BadenWuerttemberg



2015

Replacement of fiber optical VMS for VMS in LED technology

Germany Bremen

823

2015

Traffic management system motorways A1 / A27 Adaptation of the existing sub center

Germany Bremen



2015

Construction and extension of the traffic control installations on motorways A1 and A27

Germany Bremen

4,762

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 16/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2015

Extension of parking space monitoring Motorway A4 rest area “Aachener Land“

Germany North RhineWestphalia

2015

Installation of traffic data acquisition stations motorway A59 Duisburg between junction Duissern and Hochfeld

Germany North RhineWestphalia

355

2015

Lane allocation Hienberg and Schiefe Ebene Lot 2 Traffic technology

Germany Bavaria

685

2014

Dynamic display of parking spaces for HGV Motorway A5 Hartheim - Weil am Rhein System Software

Germany BadenWuerttemberg



2014

Federal road B185 Ballenstedt Renewal of the speed warning installation with permanent counting station

Germany Saxony-Anhalt

62

2014

Dynamic information signs on federal road B10 Karlsruhe by order of Siemens

Germany BadenWuerttemberg



2014

Motorway A4n six-lane extension and replacement between junctions Düren and Kerpen - traffic management system by order of Thomas Verkehrstechnik

Germany North RhineWestphalia



2014

Motorway A5 - VMS for the new junction Niederrad,

Germany Hesse

622

2014

“dNet Bayern” 1 stage of construction motorways A3, A6, A7 – dynamic variable routing and display cross sections

Germany Bavaria

3,000

2014

Black ice warning installations (PPP project) Extension motorway A8 Ulm - Augsburg by order of GA Netztechnik GmbH

Germany Bavaria



st

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 17/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2014

Software adaptation of sub-center Bremen

Germany Bremen

2014

Refitting of corridor control system motorway A3 Wuerzburg tunnel ramp Hösbach

Germany Bavaria

2014

Weigh in Motion installation (WIM) motorway A9 Dessau / Süd – Bitterfeld / Wolfen

Germany Saxony-Anhalt

2013

Network-wide rerouting motorway ring Mainz

Germany Hesse

2013

Motorways A19 / A20 Permanent counting stations

Germany MecklenburgVorpommern

247

2013

Project “Baustelle im 21. Jahrhundert” (field equipment)

Germany Hesse

318

2013

Delivery of prismatic signs for motorways A7, A44, A45 and A480 by order of Greenway Systems

Germany Hesse



2013

Pilot installation for detection of wrong way drivers acc. to TLS 2012, motorway A66 interchange Wiesbaden and juction Eschborn

Germany Hesse



2013

Extension and improvement of 33 permanent counting stations on federal roads

Germany Saxony-Anhalt



2013

Delivery of variable message signs for tunnel Fahrlach city of Mannheim by order of Siemens Erlangen

Germany BadenWuerttemberg



1,840

537

1,792

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 18/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2013

Centralization of sub centers for traffic management installations in Hesse

Germany Hesse

2013

Network-wide routing on motorways A3, A5, A7 and A45 Rhine-Main-East

Germany Hesse

5,427

2013

WIM III – Weigh in Motion installation motorway A93, LOT 2

Germany Bavaria



2013

Corridor control system motorway A9 Bindlacher Berg

Germany BadenWuerttemberg

623

2013

Signposting B273 Potsdam North, 2nd phase

Germany Brandenburg

120

2013

Corridor control system motorway A5 Reiskirchen - junction Homberg (Ohm)

Germany Hesse

2013

Motorway A3, extension and supplementation of variable message signs

Germany North RhineWestphalia

2013

Reconstruction and renewal of camera installations on motorways A5, A66 and A3

Germany Hesse

1,190

2013

Installation and supplementation of the traffic management system on the motorways A9, A92 interchange Neufahrn

Germany Bavaria

2,053

2013

Traffic management system motorway A57, junctions Neuss-Norf and Neuss-Sued extension to 6 lanes, traffic management installation

Germany North RhineWestphalia

3,478



604

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 19/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 4,479

2012

Extension of the traffic data acquisition on motorways in Hesse (104 count stations)

Germany Hesse

2012

Refitting of count station for traffic data acquisition

Germany Saarland

2012

Permanent counting stations / speed warning system Mühlanger L187, VMS in LED-technology

Germany Saxony -Anhalt



2012

skylink - The Squaire Parkin - Airrail Frankfurt Refitting of outstations by order of Adam Hörnig GmbH & Co.KG

Germany Hesse



2012

Corridor control system motorway A5 Interchange Darmstädter Kreuz Seeheim-Jugenheim

Germany Hesse

4,695

2012

Upgrade and backfitting of automatic long-term count stations at federal roads

Germany Saxony -Anhalt

2012

Temporary hard shoulder running, motorway Germany A63 junction Nieder-Olm – interchange MainzRhinelandSüd and traffic management system ring road Palatinate “Mainzer Ring” (Swarco Traffic Systems GmbH in cooper. with Alpine Energie Österreich GmbH)

2012

Installation of roadside communication units (ITS-Roadside-Stations)

Germany Hesse

423

2012

Federal road B224 Schermbeck Installation of an electronic deer warning system

Germany North RhineWestphalia

289

2012

Corridor control system motorway A1 interchange Kamener Kreuz - Dortmund/Unna

Germany North RhineWestphalia

156



7,297

1,464

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 20/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 239

2012

Restoration of sign gantries motorway A4 Dresden-Chemnitz

Germany Saxony

2012

Development of a standardized control software for a traffic management system on the example of the A8 between AD Leonberg and AS Wendlingen (SSW - SBA -A8)

Germany BadenWuerttemberg



2011

Line control installation motorway A14 project part Central Software

Germany Saxony-Anhalt



2011

Delivery and installation of measurement devices for Germany the extension of a speed measurement network on North Rhinemotorways in North Rhine-Westphalia Westphalia

2011

Dynamic display of parking spaces for HGV, Motorway A5 Hartheim - Weil am Rhein Field installations

Germany BadenWuerttemberg



2011

Extension of corridor control system Weil am Rhein - display points and traffic data acquisition

Germany BadenWuerttemberg



2011

Line control motorway A2 Wunstorf-Luthe

Germany Lower Saxony

2011

simTD extension of the telecommunications network Germany on federal motorways in Hesse, IRS locations on the Hesse motorways A661, B3, A5

280

2011

Federal road B202 Rastorfer Kreuz: Installation of an electronic deer warning system

Germany Schleswig-Holstein

624

2011

Rollwegbrücken Ost Temporary use of hard shoulder / prism openers by order of Fraport AG

Germany Hesse

485

6,000



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 21/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2011

Motorway A81 Extension of traffic funnel at Hohentwieltunnel by order of Siemens

Germany BadenWuerttemberg

2011

Renewal, supplementation and cross-linking of permanent count stations on motorways in Saxony

Germany Saxony

349

2011

iRoute Extension of count stations to optimize the traffic control "

Germany Bavaria



2011

Ramp metering motorway A46 Barmen and Wichlinghausen

Germany North RhineWestphalia

238

2011

Counting and black ice warning installations motorway A8 Augsburg - Munich by order of Metz Anlagentechnik GmbH, Berlin

Germany South Bavaria



2011

New permanent count stations on federal highways in the federal state of Saxony-Anhalt

Germany Saxony-Anhalt

176

2011

Traffic control center Baden-Wuerttemberg - Configuration assistant

Germany BadenWuerttemberg



2011

Refitting of permanent counting stations to 8+1 vehicle classes on motorways in Brandenburg

Germany Brandenburg

96

2011

New installation of permanent count stations on the motorways A9, A14 und A38

Germany Saxony-Anhalt

2011

Motorway A94, expansion of the interchange Munich East, direction Munich

Germany Bavaria

216

1,781

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 22/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 88

2011

Installation of communication roadside units – Research project AKTIV

Germany Hesse

2011

Installation of communication roadside units

Germany Hesse

129

2011

Line control motorway A6 Schwabach new installation of the dynamic routing junction Roth

Germany Bavaria

819

2011

Motorway A57, extension to 6 lanes, Lot 2

Germany North RhineWestphalia



2011

Traffic management system motorway A1 interchange “Bremer Kreuz”, partly dismantling of the VMS followed by an extension of the measurement points

Germany Bremen



2011

Traffic data acquisition on the motorway A3 for the variable routing system Oberhausen-Arnheim

Germany North RhineWestphalia

762

2011

Motorway A10 / A115 Nuthetal dismounting and new Germany installation of the traffic management system Brandenburg

292

2010

WIM on motorways, 3 stage of completion: Installation of 4 weighing systems in Bavaria and one each in the federal countries of Lower-Saxony, North Rhine-Westphalia and Schleswig-Holstein

Germany different federal states

2010

Renewal of the federal permanent count stations in the federal state of Berlin

Germany Berlin

2010

Motorway A98 / A861 Traffic guidance system Rheinfelden Rearrangement of the congestion space

Germany BadenWuerttemberg

rd

1,709

437



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 23/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 218

2010

Renewal of the SWIS central in Hesse (road weather information system)

Germany Hesse

2010

Virtual traffic management system

Germany Hesse

81

2010

Traffic management system motorways A5 / A45, junction Friedberg to interchange Gambacher Kreuz

Germany Hesse

6,848

2010

Line control with display points and measurement points, motorway A4, junctions Eschweiler Weisweiler

Germany North RhineWestphalia

706

2010

Extension of the traffic data acquisition on motorways in Hesse for model system DIVA (14 count stations)

Germany Hesse

653

2010

Implementation of a redundant system in the sub center of the line control installation on motorway A3

Germany Hesse



2010

Extension motorway A9 Muenchberger Senke

Germany Bavaria

91

2010

Refitting of the measurement network on motorways in Bavaria

Germany Bavaria

196

2010

Increase of density of the RDS outstations (Radio Data System) on motorways A2 and A4

Germany North RhineWestphalia

106

2010

Implementation of a sub center for the line control installation on motorway A5 Darmstaedter Kreuz - Seeheim-Jugenheim

Germany Hesse

223

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 24/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 175

2009

Refitting of 4 traffic data acquisition systems in Northern Hesse

Germany Hesse

2009

Routing signs in Ravensburg county, Lot 2 B32

Germany BadenWuerttemberg

2009

Motorways A5 / A3 Refitting of 9 traffic data acquisition systems junction Frankfurt

Germany Hesse

240

2009

Variable routing GVZ (freight transport center) / fairgrounds at the junction Delmenhorst

Germany Bremen

158

2008

Permanent count stations on the motorways A24 and federal road B96

Germany MecklenburgVorpommern

100

2008

Renewal of the "SWIS" central (road weather information system)

Germany Thuringia



2008

Motorway A10, delivery and installation of traffic control computers

Germany Brandenburg



2008

Motorway A6 / A620 refitting of the traffic control installation

Germany Saarland



2008

Ramp metering systems, motorways A4, A40, A52, A57, A59

Germany North RhineWestphalia

939

2008

19 RDS outstations (Radio Data System), network control installation Bottrop-Lotte / Osnabrueck

Germany North RhineWestphalia

756



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 25/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 870

2008

A12 AS Briesen – Border crossing to Poland Traffic guidance system, temporary release of hard shoulder, sub center

Germany Brandenburg

2008

Traffic management system motorway A5 Western interchange Frankfurt – Zeppelinheim Extension of management system and temporary release of hard shoulder (part IV)

Germany Hesse

2007

Expansion of the traffic management system on the motorway A3 Stockstadt

Germany North Bavaria

495

2007

Traffic data acquisition on the motorway A3 for the variable routing system Oberhausen-Arnheim

Germany North RhineWestphalia

726

2007

Expansion of the variable direction system GVZ / Messe with a congestion warning installation in direction Cuxhaven

Germany Bremen

120

2007

Permanent counting station Seelow, B167 order of the company SAG Berlin

Germany Brandenburg



2007

Ramp metering installation motorway A52 Moenchen-Gladbach Nord

Germany North RhineWestphalia

92

2007

Traffic data acquisition on motorway A66 between junction Krifteler Dreieck and interchange Wiesbadener Kreuz

Germany Hesse

163

2007

Equipment of several measurement points with sidefire radar RD2200, motorway A96 “Fuenf Seen”

Germany Bavaria

160

2007

18 permanent counting stations on national and federal roads with GPRS data transmission and solar energy

Germany Hesse

312

5,000

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 26/96

SWARCO TRAFFIC SYSTEMS GMBH

6 Superordinate Software Sub centers / central systems Core part of a traffic management system is the superordinate central software. It is used as complex center in order to control networks, as sub center for tunnel or corridor control systems or in smaller applications for data evaluation as well as for HGV parking applications. In especially developed control models and by means of specific algorithms, the software processes the data of different sensors detecting traffic and/or environmental data. The according switchings are then forwarded to the variable message signs. Tunnel control systems and special sequences use extensive control matrices. –With these even complex control tasks can be implemented. The automation of program sequences helps harmonizing traffic flows, reducing reaction times and improves traffic safety significantly. Additionally, applying the central software reduces the operating effort and ensures that traffic standards and laws are observed. Central software systems are either planned in a completely project-specific way or, on customer request, implemented according to V-model (the official project management methodology of the German government, directly relevant to software development). In any case it is the objective to develop a customfit, turn-key solution for each requirement and problem. To do so, the technical and traffic technological challenges are considered as well as the user-specific peculiarities. ®,

Besides the product line PRIMOS our “Professional Interurban Motorway System“, SWARCO is engaged to push the development of the “open-source“ software of the NERZ (i.e. user of the standardized central software for traffic centers) in different projects. Here, a simplified and mostly automated handling / monitoring with minimized manual effort is intended. Further technological objectives are: • improved traffic control by incorporating switching recommendations of different control algorithms, including new ones • implementation and testing of algorithms for managing HGV traffic • efficient variable evaluation possibilities supporting continuously required control optimizations and maintenance services of the switching programs • as well as the support of operating surveillance of system parts (especially sensor technology) and the reduction of administration efforts.

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 27/96

SWARCO TRAFFIC SYSTEMS GMBH

Completion

Project

Volume in 1000 € 

under construction 2/2016

Extension of the corridor control sub center Langenselbold, extension of the central system and centralization of the sub center Offenbach

Germany Hesse

under construction 1/2015

Motorway A61 AS Stromberg - AD Nahetal Renewal of the central software for the corridor control system

Germany Rhineland-Palatinate

under construction 6/2014

Implementation of the traffic center North Rhine-Westphalia part 1: Software for the traffic center

Germany North RhineWestphalia

under construction 12/2013

Extension of the existing sub-center by a corridor control system with dynamic hard shoulder opening, motorway A3 Limburg

Germany Hesse



under construction 11/2013

Establishment of a traffic computer to combine all traffic-technological systems

Germany Schleswig-Holstein



under construction 11/2013

Sub-center for the corridor control system motorway A2 motorway between the border of Lower Saxony and the junction Lostau

Germany Saxony-Anhalt



2015

EFFIGO-TEC Increase in efficiency of Gotthard tunnel

Switzerland Canton Uri/Ariolo



2015

Traffic management system motorways A1 / A27 Germany Adaptation of the existing sub center Bremen



2015

Federal road B27, tunnel Schuerzeberg Renewal of traffic technology by order of Siemens

Germany Hesse



2015

Motorway A8 Hohenstadt-Riedheim Central software for the fog warning system

Germany BadenWuerttemberg





161

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 28/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2014

Network-wide rerouting Cologne - Koblenz Sub center software BLAK

Germany RhinelandPalatinate

2014

Software adaptation of sub-center Bremen

Germany Bremen



2014

Dynamic display of parking spaces for HGV Motorway A5 Hartheim - Weil am Rhein System Software

Germany BadenWuerttemberg



2013

BLAK software for sub center motorway A1 Cologne/Loevenich

Germany North RhineWestphalia



2013

Network wide rerouting ring road “Mainzer Ring” with sub center acc. to MARZ based on BLAK-SW

Germany Hesse



2013

Centralization of sub centers for traffic management installations in Hesse

Germany Hesse



2011

Development of a standardized control software for a corridor control system – exemplary on motorway A8 between interchange Leonberg and junction Wendlingen (SSW-SBA-A8)

Germany BadenWuerttemberg



2011

Corridor control installation motorway A14 project part Central Software

Germany Saxony-Anhalt



2011

Traffic control center Baden-Wuerttemberg Configuration assistant

Germany BadenWuerttemberg



2010

Carmel Tunnels, Haifa Tunnel traffic management installation and sub center

Israel Haifa



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 29/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2010

Implementation of a redundant system in the sub center of the line control installation on motorway A3

Germany Hesse

2010

Virtual traffic management system

Germany Hesse



2010

Implementation of a sub center for the corridor control on motorway A5 interchange Darmstaedter Kreuz - Seeheim-Jugenheim

Germany Hesse



2009

Traffic center Baden-Wuerttemberg Lot C3

Germany BadenWuerttemberg



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 30/96

SWARCO TRAFFIC SYSTEMS GMBH

RWIS Systems Road weather information systems provide the basis for an optimized winter road service adapted to the current weather conditions. In parts, the winter road service without RWIS support is only possible on large scale, whereas the RWIS support allows a winter road service which is optimally adapted to the current weather situation, time and location. Here, measurement stations detect a multitude of values such as road surface temperature, residual salt, precipitation. The collected data are automatically forwarded to the German Meteorological Service (Deutscher Wetterdienst). There, the data is linked to the general weather data and then processed. The data is combined with weather data from the German National Meteorological Service (Deutscher Wetterdienst) and evaluated to provide reliable local information for. In the RWIS computer center those measurement values, data and weather information are combined. The thus gathered information about the weather and road conditions is evaluated and visualized in a graphical user interface, differentiated for time and place. This is used to provide reliable road weather forecasts several times a day.

Completion

Project

Volume in 1000 € 

under construction 1/2015

Renewal of the Communication processor for the RWIS system Schleswig-Holstein

Germany Schleswig-Holstein

2010

Renewal of the RWIS center in Hesse (Road weather information system)

Germany Hesse

218

2008

Renewal of the RWIS central system (Road weather information system)

Germany Thuringia



 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 31/96

SWARCO TRAFFIC SYSTEMS GMBH

7 Dynamic evaluation and display of parking spaces for HGV According to the German Federal Ministry of Transport and Digital Infrastructure goods traffic is expected to increase by another 34% until 2020, which will largely take place on the federal motorway network. Together with long-distance goods transports grows the demand for an intelligent management of heavy goods vehicles (HGV) on motorways and at service stations at motorways. In the period of 2015 to 2020 another 8,000 spaces will therefore be necessary. In addition to the already existing 28,500 parking spaces at motorway service stations and just under 19,000 spaces at off-motorway rest areas, approx. 10,0000 new spaces for heavy goods vehicles were already installed. But there is still a deficit of nearly 14,000 regular parking spaces. (Source: Strassenverkehrstechnik, 7/2015)

Accident statistics show that this often has fatal consequences. A significant number of accidents on motorways are caused by overtired truck drivers and accidents at service stations due to blocked access roads increase. Existing parking space for HGV must be managed in such way that it can be efficiently utilized. At the same time, the drivers must be able to plan their compulsory breaks and to find parking space without tedious searching. Creating, controlling and displaying HGV parking space is an investment in the safety of all road users. With competitive concepts, SWARCO TRAFFIC SYSTEMS makes its contribution to implement the future technology of HGV management. In order to successfully develop new and advanced products and concepts, extensive test series are conducted in close cooperation with the Business Unit Detection – the SWARCO competence center for detection technology and its team of developers with longtime experience based on the Weiss-Electronic know-how.

Images of a test series with articulated lorry and bus on the SWARCO TRAFFIC SYSTEMS parking ground in Trier

 : not specified Projects with detailed project description are marked in bold. Multiple entries possible.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 32/96

SWARCO TRAFFIC SYSTEMS GMBH In the field of dynamic detection, evaluation and display of parking spaces for heavy goods vehicles at rest and service areas, SWARCO TRAFFIC SYSTEMS has participated in the following projects: Completion

Project

Volume in 1000 € 

2014

Dynamic display of parking spaces for HGV Motorway A5 Hartheim - Weil am Rhein System Software

Germany BadenWuerttemberg

2013

Motorway A1 service area Buddikate West dynamic display of free HGV parking spaces

Germany Schleswig-Holstein

688

2012

Motorway A2 rest area Kraehenberge HGV parking with video detection

Germany Saxony -Anhalt

184

2012

Motorway A2 service area Boerde Autom. telematic control for HGV parking incl. detection of occupancy of the parking spaces via inductive loops

Germany Saxony -Anhalt

392

2012

Dynamic display of parking spaces for HGV, Motorway A5 Hartheim - Weil am Rhein Field installations

Germany BadenWuerttemberg



2008

Service area motorway A61 Brohltal

Germany RhinelandPalatinate



2007

Display of HGV parking spaces motorway A8 service area Aichen

Germany BadenWuerttemberg

2005

HGV group parking, motorway A3 Montabaur

Germany RhinelandPalatinate

2004

“Tank und Rast” – Traffic data acquisition for service stations on federal motorways; monitoring of operation and evaluation

Germany Tank & Rast GmbH & Co KG

160



226

 : not specified Projects with detailed project description are marked in bold

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: August 2015 33/96

SWARCO TRAFFIC SYSTEMS GMBH

8 “DRIP” Projects (Dynamic Route Information Panels) Dynamic Variable Traffic Sign System with integrated Congestion Display Completion

Project

Volume in 1000 € 300

under construction 09/2012

Motorways A10 / A24 interchange Havelland and junction Kremmen, lot 16.1: Dynamic VMS with congestion information

Germany Brandenburg

2015

Network-wide rerouting Usedom Dynamic Variable Traffic Signs

Germany Mecklenburg-West Pomerania

2015

Network-wide rerouting motorway A5 interchange Weinheimer Kreuz Dynamic Variable Traffic Signs

Germany Hesse

2014

Dynamic information signs on federal road B10 Karlsruhe by order of Siemens

Germany BadenWuerttemberg

2014

“dNet Bayern” 1 stage of construction motorways A3, A6, A7 – dynamic variable routing and display cross sections

Germany Bavaria

3,000

2012

Variable routing Channel tunnel Rendsburg / Hochbrücke A7

Germany Schleswig-Holstein

1,090

2011

Motorway A5, interchange Darmstaedter Kreuz, Northern access

Germany Hesse

943

2010

Motorway A8 East, junction Inntal, direction south 3 display points, 3 outstations

Germany Bavaria

1,040

2007

Network wide rerouting Cologne-Eindhoven Motorway A4/A61 interchange Kerpen 4 display points, 4 outstations

Germany North RhineWestphalia



2006

Network wide rerouting Baden-Wuerttemberg Motorway A8 interchange Leonberger Kreuz, A5/A6 interchange Walldorfer Kreuz 7 display points, 7 outstations, sub center

Germany BadenWuerttemberg



st

402

1,111



 : not specified Projects with detailed project description are marked in bold

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: August 2015 34/96

SWARCO TRAFFIC SYSTEMS GMBH Completion

Project

Volume in 1000 € 

2005/2006

Network wide rerouting motorways A1, A7, A21 and federal road B205 - 6 display points, 6 outstations, sub center

Germany Schleswig-Holstein

2006

Dynamic traffic guidance motorway A7 junctions Hamburg Stellingen and Hamburg Bahrenfeld 2 display points and 2 outstations Dynamic traffic guidance motorways A10, A13 and A24, 6 display points, 6 outstations

Germany Hamburg



Germany Brandenburg



2006

Network wide rerouting Stuttgart area Motorway 81 , federal roads B10 / B295 4 display points, 4 outstations

Germany BadenWuerttemberg



2006

Network wide rerouting Rhine-Main West, part 2 Motorways A3 / A60 / A66 / A67 (interchanges Wiesbaden / Moenchshof / Ruesselsheim) 9 display points with 9 outstations

Germany Hesse



2005

Network wide rerouting Rhine-Main West, part 1 Motorways A3 / A66 4 display points with 4 outstations

Germany Hesse



2005

Dynamic traffic guidance motorways A3 / A66 interchange Wiesbadener Kreuz

Germany Hesse



2006

 : not specified Projects with detailed project description are marked in bold

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: August 2015 35/96

SWARCO TRAFFIC SYSTEMS GMBH

9 Project descriptions

The following descriptions represent only a small selection of projects.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 36/96

SWARCO TRAFFIC SYSTEMS GMBH

Motorway ringroad A99 Munich Relocation of the junction Aschheim / Ismaning

The pronounced goals were to prepare and reuse existing system parts as far as possible and to keep operating the hard shoulder running in the section

of

construction

works

and

system

modification.

Project content •

Dismantling, new installation and where possible reusing, preparing and reconstruction at the new location of:

Due to the extension of the junction Aschheim /

-

10 New VMS gantries

Ismaning on the motorway A99 near Munich, it

-

2 Cantilevers with overtaking

was necessary to adapt the according signposts,

-

5 Variable routing and direction signs with overtaking

display points with hard shoulder running as well as the corresponding video components. The

-

1 New variable routing sign

concerned section of the traffic management

-

28 New VMS in LED technology

system includes three lanes each in both driving

-

4 Rerouting displays in prism and LED

directions

plus

hard

shoulder,

which

technology

was -

supposed to be used as temporary additional lane even during the construction works.

Project conception





8 Video cameras (adjustment)

Delivery and installation of: -

11 New outstations

-

11 Control cabinets

Installation of the mounting equipment

In the course of the project, the signposts of the junction Aschheim / Ismaning were dismantled and newly installed at the relocated position. The display points of the corridor control system were adapted to the changed requirements. Thus, in cooperation with the traffic management center, also the release sequences for the hard shoulder running system had to be adapted accordingly. Additionally, the video points had to be adjusted to the new locations and visibility conditions.

Realization Construction works: May 2014 – June 2016 Project volume: approx. € 3 Mio

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 37/96

SWARCO TRAFFIC SYSTEMS GMBH

Modular traffic management system for temporary road works signalization by order of ASS Verkehrsservice GmbH in Nuernberg

System features •

Low energy consumption due to energy efficient components



Intuitive user interface



Modular system configuration



Operating status monitoring with automatic error message



Controlling and monitoring from anywhere



GPRS communication



Data security via VPN communication



High quality standard due to LED-VMS acc. to EN 12966

Project conception The road works management system is used for the

temporary

installation

of

road

works



Controller and communication inside VMS housing

signalization. The modular system set-up allows an easy and quick installation and bringing into service, the traffic safety is thus increased. The energy efficient

LED-technology

and

the

control

integrated in the VMS-housing by Swarco Traffic Systems

minimize

investment

costs,

reduce

maintenance costs and stretch operation periods. The communication between the central and the signalization is done via GPRS. The system is operated by means of an intuitive user interface. The system provides a multitude of extension possibilities such as traffic data acquisition for displaying congestion warnings, the integration of programmable LED-VMS or the integration of several road works sections.

System architecture

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 38/96

SWARCO TRAFFIC SYSTEMS GMBH

Project contents

Realization



1 Central control

Completion period:



12 display points with each

June 2015 – August 2015

- VMS-control in LED-technology - GPRS-communication to central - Solar energy supply with battery backup - Tubular lattice towers and baseplates

Central computer

Road works signaling

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 39/96

SWARCO TRAFFIC SYSTEMS GMBH

Traffic management system motorway A1 / A27 Bremen Dismantling, rebuilding and new installation

SWARCO TRAFFIC SYSTEMS implemented in this project both the dismantling and rebuilding of the traffic management on motorway A1 as well as the new corridor control system on motorway A27. The VMS were exchanged by night without disrupting the operation of the traffic management system. The installations were brought to service in several steps: •

Start of operation on motorway A1 in January 2015;



Start of operation on A27 first part in April, second part in September 2015.

Project conception During the 6-lane extension of the motorway A1

In September 2015 the traffic management

near Bremen, Germany, in 2009 the existing

system on the motorway A27 between the

traffic technology was dismantled and the VMS,

junctions Achim-Nord and Bremen-Nord was

outstations and weather stations were temporarily

officially opened.

stored. Whereas the traffic technology on motorway A1 was upgraded and rebuilt, for the new traffic management installation on motorway A27 the stored equipment was reused. The two and three-lane corridor control system on the A27 includes 15 bridges and 4 weather stations. Out of a total of 21 VMS, 10 were reused from the A1 equipment. Two-lane display point A27

The existing congestion warning system at the junction Bremen-Überseestadt was integrated into the traffic management system, the extension on motorway A1 and the complete section of the A27 was incorporated in the PRIMOS® Central Software.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 40/96

SWARCO TRAFFIC SYSTEMS GMBH

Project content

Realization

A1 / A27 total:

Start of construction: April 2014



6 Weather stations

Start of operation: September 2015



54 Overhead radar detectors

Project volume: approx. € 5 Mio.



10 Measurement points with loops



7 Measurement points with sidefire radar



21 Bridges with: - 6 Display points on motorway A1 - 15 Display points on motorway A27



6 Roadside traffic signs



PRIMOS® Central software

®

PRIMOS Central software: Overview map A1

®

PRIMOS Central software: Overview map A27

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 41/96

SWARCO TRAFFIC SYSTEMS GMBH

Extension of the traffic data acquisition in BadenWuerttemberg on motorways A5 / A81

The detection cross sections are located on the motorways: •

A5



A 81



A 864



A 81/B33

Project Content •

19 outstations



71 classification detectors with (2) vehicle classes acc. to TLS



6 solar powered stations



Acquisition of operating data

Project Conception In the course of the extension on motorways in Baden-Wuerttemberg,

the

traffic

acquisition

network was extended with a total of 19 detection cross sections acc. to TLS. The project includes the set-up and installation of inductive loops and

Realization

outstations as well as data and communication connections.

Start of constructions: in progress 4/2014 Project volume: approx. € 862 thousands.

A total of 6 stations are powered by solarpanels directly integrated into the cabinet.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 42/96

SWARCO TRAFFIC SYSTEMS GMBH

Traffic management and hard shoulder running motorway A9 Holledau – Neufahrn (1st & 2nd stage)

Project summary In the area between the interchanges Holledau and Neufahrn in driving direction Munich the existing corridor control installation was renewed and extended. In direction Nuremberg a new corridor control system was installed. The information is displayed by means of display cross-sections with VMS in LED-technology, installed at sign gantries made of spun concrete or mounted at poles beside the road. The traffic data acquisition is mainly done via overhead detectors mounted at the sign gantries.

Project Conception

These detectors use a combination of Doppler radar, ultrasonic and passive infrared technology

Being one of the most important traffic arteries in

for an exact data acquisition. They evaluate the

Bavaria, the motorway A 9 is of great significance.

traffic volumes per lane and minute for heavy

Although the traffic situation could be improved

goods vehicles and cars as well as their average

between the interchanges Neufahrn and Munich-

speeds. Inductive double loops are used where a

Nord after the eight-lane extension in 2005 and

higher number of vehicle classes and a better

the existing traffic management installations, north

accuracy is needed in the permanent counting

of Neufahrn the situation got worse due to

stations.

increased traffic loads. This frequently causes

Environmental data is detected by means of

traffic disturbances and congestions, especially in

visibility sensors (scatter measurement) and

rush hour and holiday traffic.

precipitation sensors (volume and type of

In order to better use the existing infrastructure, a

precipitation with Doppler radar measurement)

traffic management system was installed and the

evaluating the quantity of water on the road. At

existing corridor control installation in direction

some locations, additional sensors in the road

Munich was renewed and extended. Additionally,

evaluate data such as water film heights, freezing

a system for the temporary opening of the hard

temperature and road surface temperature for

shoulder was installed which allows using the

road service means.

hard shoulder as additional lane during peak

The display points as well as the detectors for

times.

traffic acquisition and environmental data are connected to the outstations which carry out the communication with the traffic computer.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 43/96

SWARCO TRAFFIC SYSTEMS GMBH The data transmission between the outstations



Signs for permanent use of hard shoulder

and the controlling traffic computer of the sub

(opening / closing / end of the hard shoulder

center located in the traffic and operation center

running) on the right hand lane together with

(Verkehrsrechner- und Betriebszentrale) for

permanent light signals (green arrow, red X,

southern Bavaria in Munich-Freimann is done via

yellow blinking arrow) in LED-technology

high-performance fiber optic network.

mounted overhead,

Also in the traffic and operation center the system



Fourth lane indicated within the variable routing by means of prism openers,

is operated and visualized. •

Pan-tilt-zoom

video

cameras

on

poles,

cantilevers and gantries to monitor the hard shoulder (free of obstacles) and •

Video network via fiber optic cable with video center in the cable house Holledau.

Additionally, for the temporary use of the hard shoulder, every 500 m to 1,000 m lay-bys and acceleration / deceleration lanes are implemented Variable routing with hard shoulder running

at service areas and nodes. In some parts the

The temporary opening of the hard shoulder

hard shoulder was enforced.

was integrated in the traffic management system

The fourth lane is indicated within the variable

in driving direction Nuernberg from the inter-

routing by means of prism openers. Pan-tilt-zoom

change Neufahrn to the interchange Holledau and

video cameras on poles, cantilevers and gantries

in driving direction Munich from the parking and

observe and monitor the hard shoulder from the

rest area Holledau to the junction Allershausen.

video center in the traffic and operation center.

To do so, the following system parts were added: •

Variable message signs analog to the corridor control system between the right hand lane and the hard shoulder as well as above the hard shoulder,



Traffic

data

acquisition

with

overhead

detectors for the hard shoulder,

Cantilever with permanent light, video camera and display for closing of hard shoulder running

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 44/96

SWARCO TRAFFIC SYSTEMS GMBH

Opening of hard shoulder

Project Content (dir. M. / dir. N.)

In peak traffic times at the motorway A 9, the



Length corridor control

traffic controller recommends the temporary



Length hard shoulder run. 26.3 km / 29.5 km

opening of the hard shoulder.



Display cross-sections with VMS / permanent

35.6 km / 34.1 km

Before the operator releases the hard shoulder,

light signals

the video cameras of the intelligent video center

- Gentries

scan the relevant section and check whether it is

- Cantilevers

6 pcs. / 7 pcs.

free from obstacles and ready to be used.

- Poles

3 pcs. / 0 pcs.

Additionally, in the future the operator will be



sections already checked and released for traffic.

Display cross-sections with signposting

supported by an automatic detection in the •

8 pcs. / 7 pcs.

Display cross-sections with static signposting



21 pcs. / 21 pcs.

4 pcs. / 4 pcs.

Display cross-sections with signs for hard shoulder running



28 pcs. / 27 pcs.

Traffic data - Overhead detectors

91 pcs. / 75 pcs.

- Induction loops

23 pcs. / 15 pcs.



Visibility

37 pcs. / 7 pcs.

Operator work station for automatic image evaluation system



Humidity

15 pcs. / 8 pcs.



Ground sensors

18 pcs. / 18 pcs.

After the hard shoulder was opened, the system



Video locations

73 pcs. / 81 pcs.

can also be used to analyze and monitor the



Outstations

traffic and to detect congestions, stopped

- new

vehicles, obstacles, wrong way drivers or

- refitted

occupied lay-bys and to report it to the operator.



31 pcs. / 35 pcs. 15 pcs. / 2 pcs.

Length new cable

Once the traffic volume decreases or in case of

- Data cable (fiber optics)

72 km / 54 km

incidents (e.g. accident, stopped vehicle, vehicle

- Energy cable

26 km / 33 km

in lay-by) the hard shoulder will be closed. After a period of transition the normal state of operation with a regular three-lane road is valid.



Energy - Connection locations

9 pcs. / 3 pcs.

- Distribution locations

34 pcs. / 15 pcs.

The hard shoulder resumes its original function as emergency lane.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 45/96

SWARCO TRAFFIC SYSTEMS GMBH The first stage of construction stretches from the

In this extremely accident-sensitive stretch, the

junction Allershausen to the interchange Neufahrn

measure improves greatly the traffic flow and

in both driving directions. The partly finished

traffic safety, traffic is harmonized and stabilized

second stage extends the installation from the

so that the number of congestions will be reduced

interchange Holledau to the junction Allershausen

in peak times.

in driving direction Nuernberg and allows for a hard shoulder running in the section between the interchanges Neufahrn and Holledau.

Realization

The corridor control installation between

Joint venture SIEMENS AG /

interchange Holledau and junction Allershausen in

SWARCO TRAFFIC SYSTEMS GmbH

direction Munich was finished in July 2015. The

Contract award dir. Nuernberg: February 2010

hard shoulder running in between the service and

Contract award dir. Munich: June 2010

rest area Holledau and the junction Allershausen in direction Munich will only be possible after

st

Start of operation 1 stage: December 2012 nd

certain road adaptations. These constructions are

Start of operation 2

to be implemented in 2016 so that by the end of

- Dir. Nuernberg (SBA+TSF): March 2015

2016 / in the beginning of 2017 the hard shoulder

- Dir. Munich (SBA): July 2015

running will be stretch from the service and rest

- Dir. Munich (TSF):

area Holledau to the interchange Neufahrn.

stage:

End of 2016 / beginning of 2017 Project volume (total): € 39.5 Mio

Overview map motorway A 9

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 46/96

SWARCO TRAFFIC SYSTEMS GMBH

HGV Parking Management System on Motorway A5 between Freiburg and Basel

Optimum utilization of parking spaces With the objective of optimally using all existing parking spaces up to the very last one, even parking spaces for passenger cars, which can be used at night without any safety hazard, are taken into consideration. Optimum detection and display The truck parking management system uses magnetic field sensors and radar detectors and identifies vehicles by their space needs. The system guides motorists who search a parking space by a three-fold classification (passenger

Project concept

car, long truck, and short truck) and balances the different parking space types (mixed parking

With the new HGV parking management system SWARCO TRAFFIC SYSTEMS has implemented a pilot project on the motorway A5 between Freiburg and Basel.

space, spaces marked for trucks and spaces marked for passenger cars). Additionally, spaces for cars and "tolerated" space uses at night are also considered. The communication between

An intelligent traffic control system leads the truck

parking area and sub center occurs via GPRS.

drivers in this section directly to free parking

The system works with automated corrections

spaces and thus helps to optimally use existing

which can also be implemented manually by SMS

parking capacities. On the motorway stretch

on site.

towards the customs at Basel / Weil am Rhein the system now controls the truck parking space numbers for five parking areas. The parking areas along the 24 km long stretch heading south largely differ in terms of size and equipment.

For the display of the parking spaces, SWARCO TRAFFIC SYSTEMS takes a new innovative approach, to boost the acceptance of the truck drivers. Not the calculated number of spaces is displayed but a parking space number based on

Therefore, the challenge was to assess the

fixed parameters. This means in case of a large

different preconditions such as infrastructures,

number of free spaces the display is adjusted in

their detailing degree, and the combination of

steps of 5 vehicles.

existing parking areas.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 47/96

SWARCO TRAFFIC SYSTEMS GMBH The display of "1" means that all regular parking spaces are occupied, but there might still be some "tolerated" spaces available. "0" is displayed to clearly indicate, that there are absolutely no parking spaces to be found and the truck drivers should refrain from entering the parking area at all.

Project content 5 parking areas on the motorway A5: Central software and field equipment •

5 Dynamic parking space displays in LED technology



1 Dynamic parking space display in prism technology

Free capacities viewable via internet and



7 Control cabinets

mobile devices



6 Cameras with pan-tilt-technology and

A SWARCO web service permits to retrieve

connection via fiber-optic cabling •

10 Overhead radar detectors

projected full occupancy for the current calendar



16 Magnetic field sensors

day on the internet or via smartphones. The



10 Access points

website follows the design of Baden-



1 Central Server

Württemberg's road traffic center in Stuttgart



Central Software based on BLAK

(SVZ) and can be accessed via the link www.svz-



1 Operating computer in the motorway

information both on free parking spaces and the

maintenance center

bw.de/ lkw_parken.html. •

1 i-Phone for manually correcting the number of parking spaces via SMS



GPRS communication between the central server and the control cabinets

The pilot project is part of the EU project "Easy Way – Harmonising European ITS Services and Actions" in which SWARCO TRAFFIC SYSTEMS cooperates with the federal state of BadenWürttemberg, the "Landesstelle für Straßentechnik" and the Regional Administrative Authority in Freiburg.

Realization Construction -

Field equipment: Sept. 2010 – Nov. 2011

-

Central software: Feb. 2011 – Aug. 2014 incl. bringing the system into service

Official opening and activation of the online information: Feb. 2015

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 48/96

SWARCO TRAFFIC SYSTEMS GMBH

Traffic management system Oeresund by order of SWARCO Sverige

Project content •

Integral part system with bidirectional data exchange to the superordinate SCADA system



Integration of several peripheral systems via different interfaces (OPC, WAN-Com, proprietary RS232)



Integration of the SWARCO Nordic outstation via TLS Over IP

Project conception



Extensive user management



Log files of essential operating and switching processes

The Oeresund Bridge connects via European route E20 the Danish capital city of Copenhagen and the major Swedish city of Malmö leading across the Oeresund strait. The connection consists of a nearly 8 kilometer

Citect SCADA Client

Citect SCADA Server

SCADA

bridge from the Swedish coast to the artificial island of Peberholm, which lies in the middle of the strait. It is then followed by a 4 km underwater

PRIMOS Traffic Client

External systems PLC-based

PRIMOS Traffic Server

tunnel, called the Drogden Tunnel, from Peberholm to the Danish island of Amager. (Source: Wikipedia)

The SWARCO TRAFFIC SYSTEMS project

provided by SWARCO

Outstations

Traffic management Oeresund (by order of SWARCO Sverige) consists of a traffic management system with corridor control and an extensive tunnel management.

VMS Signs

Barriers

Weather Stations

Video System

Peripheral systems

System overview (simplified depiction)

The traffic management in the tunnel uses the Central Software PRIMOS Control.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 49/96

SWARCO TRAFFIC SYSTEMS GMBH

Features PRIMOS Control •

Create sign contents



Configure and administer programs



Set Parameters e.g. wind limits, visibility, brightness, forewarnings…



View overviews and meteorological data



View protocols of switchings, switching states, user actions



Traffic infrastructure map

View statistics of lamp burning times and VMS switchings



User and group administration



Switch language

Realization Construction: October 2012 – January 2015.

Section overview in PRIMOS Traffic and zoomed detail

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 50/96

SWARCO TRAFFIC SYSTEMS GMBH

Gotthard Tunnel Motorway A2: Increased efficiency “EffiGo” incl. Integration into the BLE* and new operating concept

The tunnel is controlled both by Airolo (Ticino) and Goeschenen (Uri) with responsibilities alternating every two weeks. The northern ramp is so far exclusively operated by Goeschenen, the southern one exclusively by Airolo. In the course of several system extensions such as the so-called Release 2 in 2008, the traffic control was already prepared to be integrated into the operational control level (BLE TINWUR) of the cantons Ticino (TI), Nidwalden (NW) and Uri (UR). All computers in the area XI were thus already integrated into the BLE.

Increased efficiency 2014/15: Ongoing project

Initial position The Gotthard Tunnel in the Swiss Alps is considered to be one of the narrowest bottle-necks on the transit road between Northern and Southern

Goals are: •

software architecture

Europe and with 17 kilometers one of the longest •

two-way tunnels in the world. The traffic control of the Gotthard Tunnel was completely rebuilt in the period from 2003 to 2005 by SWARCO TRAFFIC SYSTEMS (then

Adapting and simplifying the complete

Adapting the operation to other BLE systems. To do so, the operating surface will be completely redesigned in order to have a “Look&Feel” similar to the other systems of the BLE

Weiss-Electronic GmbH). Here, all roadside stations and the group level with

10

redundant

group

computers

were

established, as well as the process level with one redundant head computer for the tunnel and one head computer each for the northern and the southern ramp. Since the tunnel is located in both, the German speaking canton Uri and the Italian speaking canton Ticino, from the very beginning the graphical user interface was designed with the possibility to switch to the according language.

*BLE: operational control level (Betriebsleitebene) SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 51/96

SWARCO TRAFFIC SYSTEMS GMBH •

Abolishing the separation of the northern

Project Content

ramp with which the separate head computer



Central control software

can be omitted. The head computers of the



2 Superordinate processor systems with

tunnel will take over their functionality which

web-server

will lead to the desired redundancy •



2 Auxiliary processor systems as emergency

Exchanging the outdated hardware and

control with web-server

changing over the complete group level to



10 Group processors with 20 servers

redundant communication processors KRI2B



83 Sub-stations for the control of approx. 500 signals and traffic lights



Since the operating authorities are very content

50 Measurement points for the detection

with the function and reliability of the of the traffic

with induction loops and radar detectors •

management system, the system’s core part itself

7 Overheight control installations

is not to be changed. The original operating surface had been developed using Java applets which is no longer desired due to possible

Realization

incompatibilities of different versions. Because of



Start of constructions: January 2003.

that, a completely new MMI (Man Machine



Begin of operation: September 2005.

Interface) will be developed, based solely on



Extension: June 2008 – July 2010.

HTML and Java Script.



Increased efficiency: 2014 – 2015



Total project volume: approx. € 4.3 millions

HMI-Architektur mit Java (aktueller Stand)



HMI-Architektur ohne Java HMI-Architektur

„

HMI (Server)

Datenhaltung

Anwendungslogik

HMI (Server) HMI (Server)

n

DatenhaltungDatenhaltung AnwendungslogikAnwendungslogik

Kommunikation

Webadapter (Java-Applikation) Java Virtual Machine HMI (Webadapter) Datenspeicher

Kommunikation JavaScript-Generator

IIOP

n

n

WBA

‚

†

Webserver

Server

n

WBA

Dateizugriff

HTTP

WBA #n

#0 #1 ... Webserver (extern)

Kommunikation Steuerung/Datenhaltung Kommunikation (HTML/JavaScript-Generator)

n

Kommunikation a Webserver (intern)

Protokoll X

nb

HTML/JavaScript-Generator

Anwendungsserver/ Webserver HTTP

IIOP

Server Server

HTTP/HTTPS

WAN/LAN Client

Client Client

ƒ

Webbrowser Webseite (HTML) Java-Applet Java Virtual Machine HMI (Client) Kommunikation Steuerung/Datenhaltung Präsentation

HTTP/HTTPS

‡

Webbrowser

Webbrowser

Webseite (HTML) JavaScript-Engine

Webseite (HTML) JavaScript-Umgebung Kommunikation

Steuerung/Datenhaltung

Fassade Präsentation

Steuerung, Datenhaltung und Präsentation (JavaScript-Framework)

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 52/96

SWARCO TRAFFIC SYSTEMS GMBH

Original project conception: Gotthard Tunnel Motorway A2 Substitution of the traffic control installation 2003 Lot A: Traffic controller & Computer Lot B: Traffic data acquisition

Extension 2008 / 2010 Besides the implementation of further operating modes,

additional

metering

functions

were

installed on behalf of ASTRA, the Swiss Federal Roads Office. They are activated in the case of tailbacks on the accessing roads at Naxberg-

In order to ensure higher security for the traffic

tunnel and Galleria Stalvedro.

flows, a new evolutionary road control installation allocates the vehicles to the appropriate lanes of the tunnel’s gateway. This gateway can be closed e.g. when the passage of the tunnel is impossible because of an accident.

The special method of metering automatically adapts to the vehicle volumes inside the Gotthard tunnel. It is used to avoid tailbacks in the areas of those tunnels in front while at the same time keeping enough vehicles in the system so that the

The systematic metering of vehicles permits only

maximum capacity of the Gotthard tunnel can be

a safe number of vehicles in the tunnel at the

used, if needed. Furthermore, this measure keeps

same time.

clear the escape routes for emergency vehicles.

By means of a so-called drop control, heavy

During the extension also the so-called emer-

goods vehicles (HGV) are singularized so that

gency control was fundamentally renewed. This

they will not enter the tunnel in large groups.

allows switching the signal heads (traffic lights)

This is especially important in case of fire in order

even if the complete network structure fails.

to prevent the spreading of the flames. The ne-

The simple pressing of the “immediately“ button

cessary signal switchings will be started auto-

allows a quick reaction in stressful emergency

matically if there is a fire, if the permitted CO2-

situations.

concentration is exceeded or if stopped vehicles are detected. As all the communication facilities have a redundant structure, the system can still be controlled in the event of a defective cable or devices failure.

Goals are: •

Establishing of homogeneous traffic flow



Warning of tailbacks, fire and dangerous traffic conditions



Better security management of the traffic flows and fast closure of the tunnel



Capacity management / traffic metering



Exact information about the number of vehicles in the according tunnel section

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 53/96

SWARCO TRAFFIC SYSTEMS GMBH

Dynamic rerouting Bavaria (dNet Bayern) 1. Stage - Lot Telematics / traffic sign gantries

Project conception The project as described here comprises the first stage of constructions in the area of the interchanges Biebelried / Feuchtwangen/Crailsheim with the lot Telematics/traffic sign gantries. One location includes 2 dynamic VMS – one at about 1500 m in between the advance announcest

ment (2000 m) and the 1 signposting (1000 m), st

the other at about 750 m between the 1 (1000 m) and the 2

nd

signposting (500 m). On the motorway

A3 in front of the double junction Rottendorf / interchange Biebelried there is an additional location at the parallel lane in between the junction and the interchange. LED-matrix for three lanes

Defined sign contents The planned traffic management system called “Dynamic network-wide rerouting Bavaria (dNet Bayern)” is located on the motorways A3 direction Nuernberg, A7 direction Ulm and A6 direction Heilbronn.

Standard sign three lanes

It comprises 4 variable rerouting systems with congestion information with a total of 9 cross sections with dynamic VMS. Their freely programmable matrix displays in LEDtechnology show alternative routing recommen-

Standard sign two lanes

dations for different destinations and traffic information. They include weather conditions and traffic loads as well as disturbances and incidents in Bavaria and the neighboring federal states. The traffic is guided according to the current situation disturbances are displayed for each direction.

Location A3

The system is controlled by the sub center in the

These measures add considerably to the safety of

traffic and operation center Northern Bavaria

the whole traffic network.

(Verkehrs- und Betriebszentrale Nordbayern) in Nuernberg-Fischbach.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 54/96

SWARCO TRAFFIC SYSTEMS GMBH

Project Content

Realization



Controlled areas:

Start of construction: May 2013



Motorway A3 direction Nuernberg

Start of operation: November 2014

(ramp junction Rottendorf /

Project volume: approx. € 3 millions.

interchange Biebelried), −

Motorway A7 direction Ulm (ramp interchange Biebelried),



Motorway A7 direction Ulm (ramp interch. Feuchtwangen/Crailsheim)



Motorway A6 direction Heilbronn (ramp interch. Feuchtwangen/Crailsheim)



4 dynamic routing VMS systems (dWiSta)



A total of 9 dynamic VMS display cross sections (dWiSta)

LED-Matrix two lanes

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 55/96

SWARCO TRAFFIC SYSTEMS GMBH

Traffic management in the City of Luxemburg Implementation of three metropolitan tunnels

Additionally, two more tunnels in the city area Pénétrante Sued and Desserte Schuman have been equipped, modernized and extended with traffic technology by STS over the years.

Project conception In the current project all three tunnels as well as the traffic authority (Service de la circulation) were integrated into the control center of the tunnel René Konen. From there, they are directly linked to the new Luxembourgish Police center. The data is transmitted via fiber optics. Images, Starting in 2004 SWARCO TRAFFIC SYSTEMS (then as Weiss-Electronic, in cooperation with a

sound as well as keyboard and mouse signals are transmitted via KVM-over-IP technology.

partner from Luxembourg), began to renew the

Instead of using individual operator computers,

tunnel control of the tunnel René Konen, which

the data is switched to a video wall at the police

runs underneath the city center and pedestrian

center when triggered by an event. From there,

zone in Luxemburg City.

the tunnels can be controlled by means of the

Since then, the traffic management and the tunnel

individual STS central software systems.

technology has been further optimized and

Desserte Schuman is integrated into the

updated. Thus, e.g. the height control has partly

visualization of the René Konen central software

been changed over to laser technology, central

whereas Pénétrante Sued has its own

computers have been modernized and several

visualization and control system.

test fields have been installed.

Combined central software visualization for the tunnels René Konen and Desserte Schuman

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 56/96

SWARCO TRAFFIC SYSTEMS GMBH

Project content

Realization



8 LED-VMS

Start of constructions: September 2004.



10 Continuous lights

First operation: Since June 2005.



2 Portal traffic lights

Since 2012 continuous optimizations and



1 Barrier

extensions



8 Double loops



2 Radar detectors

KVM over IP (KVMoIP) means the



4 Prism openers

remote control of keyboard, video and



3 Outstations



4 Height controls, partly as laser

clients and servers from everywhere.



1 Tunnel sub center compputer

For the KVM-connection, Internet or



4 Operator stations

mouse via IP-protocol. The administrator can use and administer the

other networks working with TCP/IP can be used.

System architecture of the traffic management system in the City of Luxemburg (simplified)

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 57/96

SWARCO TRAFFIC SYSTEMS GMBH

N2 Galleria Monte Ceneri (Switzerland) Control and Signalization

The lot control included the delivery, installation, cabling and bringing into service of 19 outstations and the implementation of a central software (sub center), which is connected to the superordinate control system. Besides incident detection with detection of wrong way drivers, fire and CO2 contamination, the control also allows an bilateral traffic flow. This means that if one tunnel tube is closed, the other tube can be used in two-way traffic. To do so, special interlocking and monitoring mechanisms were implemented in the control system.

Project Conception

The connection to the SCADA system allows the

Monte Ceneri in the Swiss canton Ticino forms a

interaction with the lots ventilation, tunnel lighting,

natural barrier, dividing the northern and the

fire alarm system and emergency system. In case

southern parts of the canton. Therefore,

of an incident a quick tunnel closure is carried out.

concerning traffic, the mountain is of great

In the lot signalling the according variable

importance and the tunnels of the Gotthard

message signs (VMS) including brackets and

railway, the national road N2 and the motorway

cabling were delivered, installed and brought into

A2 cross below it.

service.

In order to increase tunnel safety, by order of

An integration test in several levels was

ASTRA (the federal roads office) the motorway

performed across all lots and made sure that the

tunnel was equipped with an on-site control

system is functioning and operates properly.

system within the tunnel as well as in front of the tunnel.

At the 40 portals a total of approx. 240 VMS in LED and prim technology, traffic lights, blinking lights and approx. 30 static signals were installed. Additionally, traffic flow is detected and classified via induction loops at 8 detection points. The special challenge was to implement the whole installation and bringing into service of the control system and signaling incl. cabling in each driving direction within only two weeks.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 58/96

SWARCO TRAFFIC SYSTEMS GMBH

Project content

Realization



Approx. 240 VMS in LED and prim technology

Construction: August 2012 – September 2014.



Approx. 30 static signals

Project volume: approx. €. 1.5 Mio.



Traffic lights, blinking lights



8 Detection points with induction loops



1 Central software, connected to the superordinate control system

Monte Ceneri control system northern portal Monte Ceneri control system southern portal

Monte Ceneri tunnel control system

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 59/96

SWARCO TRAFFIC SYSTEMS GMBH

Overhead noise protection barrier motorway A1 CologneLoevenich

Project concept The tunnel control center monitors continuously the noise protection via video and can close it at once if necessary. Concerning the control, the noise protection is integrated in the processes of •

the junction control of the interchange Cologne-West,



the congestion warning system from direction Dortmund



and in the system with dynamic routing VMS (dWiSta).

The region around the city of Cologne has one of the highest traffic loads of Germany. The overhead noise protection Loevenich now provides an intelligent and efficient solution for the traffic management system on the ring road around Cologne (Koelner Ring). Started in 2007, the two kilometer stretch on the motorway A1 in the west of the city was extended to six lanes. In order to protect the urban districts close to the

VMS gantry

motorway A1, the specific section of the motorway was enclosed by an overhead noise protection barrier. The tunnel-like construction across the motorway is made of reinforced concrete walls beside the motorway and in the medial strip, which are covered by an arched glass structure. Integrated in the noise protection is the junction Cologne-Loevenich as well as five bridges. The speed limit within the installation is reduced to

Roadside station

80 km/h.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 60/96

SWARCO TRAFFIC SYSTEMS GMBH

Project content field installations •

212 dynamic display systems in LEDtechnology at 47 display cross sections (of which 13 within the tunnel)

Dismantling of the existing systems with traffic signs, dynamic VMS, roadside stations and

74 roadside stations with 1000 V transformer for power supply





steel bridges •

Length of noise protection barrier: approx. 1500 m, 1 tube per driving direction



Clearance within the tubes: approx. 4.7 m (at some points 4.5 m)



37 prism openers at 27 display cross sections



12 variable routing systems



4 VMS in LED- technology (dWiSta) within

The roadside stations on the sign gantries are

the noise protection

also accessible within the tunnel via the service



29 static signs and signposts

paths on the roof, without having to close the



Permanent lane signals, blinkers



13 measurement cross sections in inductive

By using double IOC it is possible to control the

loop technology

traffic management both by the sub center and in



24 data acquisition units for double loops

case of an incident by the tunnel operating center



34 combined overhead detectors



46 brightness sensors (inside and outside)



2 measurement station for humidity incl.

Project content sub center

data acquisition units and IOC

The control software is based on the standardized

15 height control installations with photo

“BLAK” software (www.nerz-ev.de).



evidence •

VMS with shutter as emergency signalization (fail-save)

• •

tunnel.

Besides the standard operating elements (e.g. show current conditions, switching VMS, requesting protocols and statistics) also the ramp meter-

Lane lights as support for the overhead

ing system must be parameterized or the closing

signalization to divert vehicles

barrier systems must be operated.

3 ramp metering systems are integrated into the tunnel control for tunnel closure

Realization Start of construction: 2007 Start of operation: 2013

Ramp metering with closing barrier

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 61/96

SWARCO TRAFFIC SYSTEMS GMBH

Traffic management Wankdorfplatz, City of Berne, Switzerland

constructed. The traffic now flows on two levels: Traffic going straight on stays above the ground, traffic turning left or right uses the underground traffic circle. Static and variable message signs are used for signposting. The traffic is managed via traffic signal installations, metering systems and congestion monitoring already in the periphery of the Wankdorfplatz.

Project Conception Wankdorf in the northern part of the city of Berne is both residential area for approx. 20,000 people and industrial area with soccer stadium,

shopping

mall,

BERNEXPO,

BernArena, Klee-Center and much more. With 65,000 trips daily the Wankdorfplatz is

The local operation by the police is done via

said to be a major hub, and the trend in the

the

future is increasing. As the central hub in the

management system by means of the PRIMOS

Canton and as heart of the development of the

MOTION central software and an intuitive user

territory the Wankdorfplatz has reached its

interface.

touchpanel

of

the

Wankdorf

traffic

capacity limits - without the development of local infrastructure the total traffic could no longer be managed in a compatible manner. The share of public transport is expected to increase significantly in the area of ESP Wankdorf. The aim is to primarily cover the increasing traffic that occurs from the new uses of ESP, by public transport and provide attractive as well as safe conditions for bicyclist

User interface of the traffic management system Wankdorf

and pedestrians. To do so, the Wankdorfplatz was completely rebuilt and an underground traffic circle was

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 62/96

SWARCO TRAFFIC SYSTEMS GMBH Goals are: •

To create the necessary capacity for trouble-free tram and bus operation.



Improve traffic flow on the peripheral roads



Protect the residential streets from deviating and increased traffic



Increase the attractiveness for

Realization Building owner canton of Bern in collaboration with the ASTRA. Start of construction: June 2012 Start of operation: December 2012 Project volume total: approx. € 1.13 millions

pedestrians, cyclists and for public transport

Project Content •

Traffic management computer



Section control unit



Manual control unit



Dynamic and static signposts



Internal proprietary connection between

Outdoor touchpanel operation unit

- Traffic management computer and section control unit - Section control unit and manual control unit (serial) - Manual control unit and dynamic signposts (I/O contacts) •

Connection of traffic management computer and traffic management manual control per fiber optic cable via INFRA3

Signposting in prism technology

Manual control unit

interface •

Connection of traffic management computer and VSR Berne per 2-wire SHDSL section via OCIT-I PD interface



Connection of PRIMOS MOTION central software of the visualization server with the webvisualisation clients via Internet per HTTPS protocol

Signposting and metering

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 63/96

SWARCO TRAFFIC SYSTEMS GMBH

Development of a standardized control software for a traffic management system using the example of the A8 between junctions Leonberg and Wendlingen (SSW - SBA -A8)

The aim was to create transferrable sub-center software. Within this project the software of the traffic management system was tested in parallel mode against the existing control system of the B27. After this test in reality it is for the first time used at the newly built corridor control system A8 between the motorway intersection Leonberg and the junction Wendlingen. The project was carried out according to the V -

model.

Thereby

the

"

Object-oriented

development using finished products " (in Part 3 "Handbook collections, scenarios " of the V model) was predetermined. The developed software units have been

Project design

implemented to be integrated into the existing traffic control system VRZ3 and the basis

The motorway A8 in the south of the city of Stuttgart has a particularly high traffic load of nearly 150,000 veh. / 24 hours on working days. The effects are especially noticeable in the

section

between

Wendlingen

and

Leonberg, in which the recorded number of accidents is above average.

traffic jams and disturbances. The newly corridor

management

The decisive achievement within this project was also the integration services and the testing of software units for the Basis software developed for the German market and the VRZ3. All this secures the reliability in operation of the corridor control software.

Especially in the peak times there are regularly

installed

software developed for the German market.

system

Project Content

is

Creating a sub-center according to MARZ, on

supposed to improve traffic flow and to

the basis of the data distributor of the

decisively increase road safety. It is supple-

Federation (BLAK software).

mented by the temporary use of the hard shoulder as an additional lane between the interchange Stuttgart and junction Moehringen. Purpose of the project was to develop a standardized control software (sub center) for

The following components were prepared in accordance with the terms of reference •

SBA – algorithms



Plug-ins

corridor management systems by using the

Realization

example of the A8 south of Stuttgart (SSW -

Project start: September 2009

SBA- A8).

Commissioning October 2011

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 64/96

SWARCO TRAFFIC SYSTEMS GMBH •

Traffic management system motorway A14 Project Central Technology

support of operational monitoring of system components (especially of sensors)



Reduction of administrative overhead

Project Content The IT system (lower panel) should be transferred to other stations; within this project it is used in the Traffic management system of A14 between the AS Schoenebeck

and

junction Wanzleben near Magdeburg. Software units of basic software of the traffic control

Project Conception

centre-based With the sub-center of the traffic management system

the

increased

A14

by

road

effectively

safety has

been

situation-specific

system

and

other

finalised

products are integrated so that the overall reliable operation of the traffic management system is guaranteed.

displays and optimized control. V-model specifications and system features In addition, the following technical objectives: •



were implemented. The aim was to comply

Reusability of the standard solution in

with the defined interface standards and

principle, all traffic management systems

predefined interfaces. The overall system is

Independence of company-specific solutions

characterized by high operational availability, reliability,

reusability,

efficiency and

easy

maintenance. The extensibility of the system •

Simplified and highly automated handling /

and its components for different applications

monitoring with minimal manual effort

and systems is guaranteed.

thereby improving access opportunities administrators and operators •

Improved traffic management taking into account various switching and recommendations new control algorithms

Realization Construction

period

for

the

entire

implementation of the traffic management system A14 sub-center and outdoor plant as well as trial operation stage September 2010 -



Implementation and testing of algorithms

December 2011.

for the influence of truck traffic •

High performance evaluation capabilities in support of ongoing improvements necessary control and maintenance of the switching programs

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 65/96

SWARCO TRAFFIC SYSTEMS GMBH

Project Content Extension of the Traffic Data Acquisition in Hesse



104 outstations connected to several sub centers



310 classification detectors with (8+1) vehicle classes acc. to TLS



44 solar powered stations



Acquisition of operating data

Project Conception In the course of the extension on motorways in Hesse, the traffic acquisition network was extended with a total of 104 detection cross sections acc. to TLS. The project includes the set-up and installation of inductive loops and outstations as well as data and communication connections. A total of 44 locations were operated by means of solar power. The detection cross sections are located on the motorways:

Realization



A3



A 4 ( Hesse and Thuringia)



A5



A7



A 44 / A49

This project extends and continues the traffic



A 45 (Hesse and Bavaria)

data acquisition installations on motorways in



A 66

Hesse which were realized throughout the past



A 659

years.



A 661

Start of constructions: 2009. Start of operation: 2012. Project volume: approx. € 4.5 millions.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 66/96

SWARCO TRAFFIC SYSTEMS GMBH

Project contents of earlier of traffic data acquisition measures Extension of the traffic data acquisition in the subordinated road network for the model system DIVA (dynamic integrated traffic situation on secondary roads) •

Renewal of 14 outstations



24 classification detectors with (8+1) vehicle classes acc. to TLS



1 solar powered location



Acquisition of operating data

Realization Construction: Nov. 2009 – Oct. 2010 Project volume: € 653 thousands

Refitting of 4 traffic data acquisition locations in Northern Hesse •

Renewal of 4 outstations



18 classification detectors with (8+1) vehicle classes acc. to TLS



Realization Construction: May 2009 – Nov. 2009 Project volume: € 175 thousands

Acquisition of operating data

Refitting of 9 traffic data acquisition locations at the interchange Frankfurt •

Renewal of 9 outstations



43 classification detectors with (8+1) vehicle classes acc. to TLS



Realization Construction: Feb. 2009 – July 2009 Project volume: € 240 thousands

Acquisition of operating data

Extension of the traffic data acquisition network in Hesse •

Renewal of 18 outstations



23 classification detectors with (8+1) vehicle classes acc. to TLS



18 solar powered locations



Acquisition of operating data

Realization Construction: Nov. 2006 – June 2007 Project volume: € 312 thousands

Installation for the traffic data acquisition on motorways in Hesse •

141 outstations connected to 10 sub centers



More than 600 classification detectors with (8+1) vehicle classes acc. to TLS



13 solar powered locations



Acquisition of operating data

Realization Construction: Nov. 2003 – May 2006 Project volume: € 5.887 millions

The project was implemented in cooperation with partners from the field of civil engineering.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 67/96

SWARCO TRAFFIC SYSTEMS GMBH

Corridor control and hard shoulder running motorway A5 interchange Darmstadt – Seeheim-Jugenheim

Additionally, the temporary release of the hard shoulder in the section between the interchange Darmstadt and Darmstadt-Eberstadt is used to increase the road capacity during peak periods. Before the hard shoulder is opened for traffic it is controlled by 19 video cameras. The system is controlled by the traffic center Hesse (VZH).

Project Content

Project Conception



21 sign gantries incl. VMS



12 cantilever beams



13 prism openers



22 measurement points for traffic data acquisition

The motorway A5 is one of the most important north-south connections in Germany. Because of



its location and function within the traffic network,

6 measurement points for environmental data acquisition

the section between the interchange Darmstadt



41 outstations

and the junction Seeheim-Jugenheim must cope



1 communication computer

with particularly high traffic loads.



2 user stations

The corridor management system was set up to



19 video cameras

harmonize the traffic flows and warn the road users of congestions, dangers and other disturbances. To do so, radar, ultrasonic and infrared sensors are used to detect the traffic at 22

Realization

measurement points. From this data, the sub

Project start: December 2009

center evaluates the according measures and

Start of operation: August 2012

displays them at the variable message signs

Project volume: approx. € 4.7 millions

installed at 21 sign Gantries.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 68/96

SWARCO TRAFFIC SYSTEMS GMBH

Network-wide routing Motorway ringroad Mainz with dynamic variable signposting system and hard shoulder running motorway A63

Additionally, the dynamic signs of the rerouting system will be used to warn of congestion and incidents and give route recommendations for the area.

Project Content •

8 SWARCO FUTURIT dynamic rerouting signs (dWiSta)



18 Outstations with control module CCM2200+



37 Variable message signs / rerouting signs in prism technology

Project Conception



32 Cameras with automatic lane scanning



“BSURZ“ Central technology for hard shoulder opening

The forecast of more than 100,000 vehicles per day on the motorway A60 in the year 2025 made the 6-lane expansion of the motorway ring around the city of Mainz (Rhineland-Palatinate) to an



Implementation of network-wide rerouting system motorway ring Mainz into the existing traffic management system Cologne – Koblenz

important measure to ensure smooth traffic flow and to increase the capacity and safety. With the installation of a network wide rerouting system

including

dynamic

signposting

and

temporary opening of the hard shoulder on the motorway A63 between the junction Nieder-Olm and the interchange Mainz Süd in both directions, SWARCO TRAFFIC SYSTEMS GMBH INTERURBAN makes an important contribution to this project. Depending

on

the

traffic

Realization

situation, the hard shoulder on

Start of construction: February 2011

the A63, which at the moment

Start of operation: April 2012

is permanently open, will be

Currently, the start of the automatic lane scanning

used as

is postponed.

third

emergency lane.

lane or

as

Project volume: approx. € 7.3 millions

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 69/96

SWARCO TRAFFIC SYSTEMS GMBH Additionally, a VMS located in the opposite driving

Corridor management system motorway A1 Dortmund-Unna – interchange Kamen

direction gives information about the traffic situation at the interchange Dortmund-Unna, whereas a roadside traffic sign with two VMS located at the ramp Kamen Zentrum (driving direction Bremen) is used to inform the accessing traffic. The huge sign gantries reaching across six lanes, which were installed in a record time between August 2011 and January 2012. The project, with Business Unit Interurban as main contractor, spanned the whole project management scope of work

including

planning,

construction

of

foundations, steel constructions, mounting and bringing into operation as well as the necessary

Project Conception

traffic safeguarding.

The section of the motorway A1 between Dortmund-Unna and the interchange Kamen is infamous

for

its

high

traffic

volumes

and

Project Content

congestions.



6 outstations in PRIMOS traffic technology

In northward direction, on a length of approx.



5 sign gantries across six lanes

seven kilometers, a traffic management system



25 variable message signs in LED-technology

with a total of 25 VMS in LED-technology and 15

®

one further VMS in the opposite direction

radar detectors was implemented on the six-lane



15 radar detectors

motorway.



1 side installation with 2 VMS

At each of the five newly installed sign gantries five VMS and three radar sensors detect the traffic



1 weather station

on the lanes and forward the data to an outstation ©

in PRIMOS traffic technology. This data, together

Realization

with weather data from a weather station, is then The corridor management system was opened for

used to determine the current traffic situation.

traffic in April 2012 after only nine months and The

sub

center

evaluates

the

data

and

successfully accepted and approved in July 2012.

accordingly displays the necessary speed limits and warning signs such as fog, congestion, road

Project volume: approx. € 1.5 millions

words at the VMS.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 70/96

SWARCO TRAFFIC SYSTEMS GMBH

Telematic control for HGV parking at motorway A2 in Saxony-Anhalt

Objective is to reliably determine the actual occupancy of the parking spaces (total error rate < 10%, error rate per detection point < 5%) and to neglect those vehicles leaving the parking area without actually parking.

Project Content The project consists mainly of the detection, evaluation and transmission of traffic data with: •

adding up the number of HGVs in the parking

In these pilot projects, on motorway A2 in Saxony-

spaces (no monitoring of individual parking

Anhalt, telematic control for HGV parking at service and rest areas with different detection methods, will be tested.

9 Double inductive loops for detecting and

spots) •

2 Video cameras used for traffic monitoring, for supporting the winter service, for supporting the police fighting crime as well as

Occupancy of HGV parking spaces via inductive loops at service area Boerde

for monitoring the system functions and accuracy of the display •

One LED-sign displaying the number of free parking spaces

Nine detection points with inductive loops in the lanes determine the occupancy rate of the parking spaces. The passing curves are evaluated by means of a special algorithm. With this, the

Project Conception

entering and leaving vehicles can be compared and matched.

In the pilot project at the service area Boerde in driving direction Berlin, the occupancy of HGV parking spaces will be determined by means of intelligent loops.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 71/96

SWARCO TRAFFIC SYSTEMS GMBH By means of the protocol TLS-over-IP, the vehicle characteristics determined by the algorithm are forwarded

as

unique

IDs

to

the

parking

HGV parking with video detection at motorway A2, rest area Krähenberge

management center. There, the free spaces are evaluated by calculating the entering and leaving vehicles, not tracking individual vehicles but counting similar vehicle patterns. The number of spaces is then forwarded to the display sign in LED technology. No individual vehicles are tracked but similar

Project Conception

vehicle-patterns are counted. The system uses a

In another project, the rest area Krähenberge will

detector newly developed for this application with

be equipped with a system based on video

special software.

technology. The system consists of eight video

A particular challenge in this project is - in contrast

cameras, each one determining the occupancy of

to applications on motorways and interurban

five HGV parking spaces by means of single

roads - that all kinds of traffic conditions such as

vehicle detection. The results are combined and

sudden speed changes, stop and go traffic,

the number of free parking spaces is then

maneuvering and reversing vehicles must be

displayed

considered.

motorway. A video camera with pan-tilt-zoom

via

LED-sign

located

beside

the

function is used to monitor the occupancy and to visually correct the numbers, if necessary.

Realization

The system will be integrated into an existing

The system is in test operation mode since the

video System, video and TLS data will be

end of 2011.

forwarded to the traffic management center at Halle/Peißen via fiber optic cable.

Project Content •

8 camera systems determining the occupancy



1 PTZ-camera (Pan-Tilt-Zoom)



1 outstation



1 LED display

Realization The system was implemented in 2011.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 72/96

SWARCO TRAFFIC SYSTEMS GMBH

Electronic deer pass warning system on federal road B202 Rastorfer Kreuz

Project Content •

PRIMOS MOTION Central Software



2 Outstations



16 Variable message signs



2 Traffic data acquisition systems



4 Detection fields

®

Project Conception With approx. 30 accidents caused by deer, the federal road B202 near Kiel in Schleswig-Holstein is a well-known accident black spot. Goals are to reduce the number of accidents caused by wild animals and, at the same time, to preserve a north-south passing-strip where the wild animals can cross. To do so, two safety fences of four kilometers length were installed to

The detectors are deliberately adjusted in such way that only larger animals are detected and small ones are ignored. This is done in order to avoid that the attention of the road users wears off because the situation is considered to be nonhazardous.

secure the area at the side of the road and to

The display of the VMS in LED-technology can

force the animals to only cross the road at two

optionally be adjusted to be static or blinking.

defined spots. ®

At these spots, detection areas at the side of the road were established to detect the animals when they approach. They consist of six sensors each at both sides of the road. Once animals are detected, warning signs placed in sufficient distance beside the road start blinking and show the warning “deer pass” and a speed reduction of 70 km/h (50 km/h). The road user has enough time to slow down and to avoid the collision, if

Central Software PRIMOS MOTION The complete system is parameterized and visualized via the PRIMOS® MOTION central software by means of a local operating station in the operating center at Neumuenster. Here, the software not only processes the animal detection as such but also the measurement data from the inductive loops detecting traffic data such as number of vehicles and vehicle classes.

necessary.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 73/96

SWARCO TRAFFIC SYSTEMS GMBH The traffic data, e.g. traffic volumes, is evaluated and

used

for

statistical

means.

Also,

the

brightness and function of the signs can be adjusted. Additionally, the software includes a

Realization

complete user administration as well as the

The planned test operation phase of twelve-weeks

logging of wild animal detections and their

will be used to fine-tune the installation, e.g.

resulting switchings.

adjusting the detectors, adapting the trigger times.

Outlook: Deer pass systems do not only raise road safety but also actively make a contribution to protect nature. Habitats fragmented by roads are reunited and the genetic exchange of the wildlife is assured.

The deer pass system installed by SWARCO TRAFFIC SYSTEMS INTERURBAN was officially taken into operation by Dr. Tamara Zieschang, state

secretary

Transport,

of

Building

the and

Federal

Ministry

of

Affairs

on

Urban

12 September 2011.

A good example for the success of these installations is the deer pass warning system at the country road L172 near Halle in SaxonyAnhalt (Ziegelrodaer Forst). At this location, the number of accidents caused by deer pass was reduced by nearly 100%.

®

Schematic representation of the deer pass warning system in the PRIMOS MOTION Software visualization

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 74/96

SWARCO TRAFFIC SYSTEMS GMBH In this project the existing traffic control installation

Traffic control installation motorway A2 Wunstorf-Luthe in Lower Saxony

on motorway A2 west of Hanover was extended in the following sections: •

From junction Wunstorf-Luthe to border to North Rhine-Westphalia in driving direction Dortmund



From border North Rhine-Westphalia to junction Rehren in driving direction Berlin

First, all display points in driving direction Dortmund

where

set-up.

Afterwards,

the

measurement points in both driving directions and Innovative solutions with intelligent and telematic approach to control the traffic are good traffic management

instruments,

especially

for

a

territorial state such as Lower Saxony, which

outstations were installed. After this, in one section after another, the existing measurement locations were retrofitted, tested and brought back into operation.

needs a functional infrastructure. The use of

With this procedure, the periods during which the

telematics brings safety, effectivity and comfort.

according displays per location were out of operation could be minimized.

Project Conception In order to raise traffic safety and improve traffic flow, alongside of the 6-lane motorway A2 between the borders to North Rhine-Westphalia and Saxony-Anhalt, traffic control installations were set up in several sections during the last three years. The new installation allows a continuous traffic control by management systems on the LowerSaxony part of the motorway A2.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 75/96

SWARCO TRAFFIC SYSTEMS GMBH

Project Content •







35 Additional display points with LED-VMS (A,



B and C) (27 in direction Dortmund, 8 in

incl. buried cable works on a length of

direction Berlin)

approx. 15 km

Exchange of 18 existing fiber optic VMS type





existing corridor control installation at 15

technology at 7 display points

existing outstations

18 Measurement points (8 in direction



Fiber-optic cable on a length of approx. 50 km

Dortmund, 10 in direction Berlin) in induction

and set-up of an Ethernet network in

loop technology

redundant ring structure

Refitting of 12 existing measurement points

Integration of 22 existing measurement points



Communication between outstation and existing sub center via TLS over IP



Set-up, maintenance and removal of a

in induction loop technology in new

temporarily stationary signage (speed limit /

outstations

ban on passing) during the refitting phase of

2 Environmental data stations for SWIS and

the existing display points and outstations

corridor management, 2 additional visibility



Extension of supply lines in the area of the

A and 13 VMS type B / C for VMS in LED-

from radar to induction loop technology •

Meter connection columns, supply lines



Removal of the existing stationary signage

sensors at the locations of existing black ice

(speed limit / ban on passing) in direction

warning installations

Dortmund and Hannover after the corridor

Set-up of 19 new outstations (10 in direction

control installation started operating

Dortmund and 9 in direction Berlin) •

Exchange of 19 existing outstations for new ones according to TLS 2002

Realization Start of construction: 2009 Start of operation: 2011 Project volume: approx. € 6 millions

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 76/96

SWARCO TRAFFIC SYSTEMS GMBH Using the tunnels, which require paying a toll, cuts

Carmel Tunnels, Haifa, Israel Tunnel management system

the current travel time from the Haifa South interchange in the west to the Checkpoint interchange in the east from 30 -50 minutes down to 6 minutes. Driving all the way through the tunnels will cost 11.40 Shekels (approx. 2.35 €).

Project Conception The

project

includes

the

complete

tunnel

management system with central software and 27 outstations. To a larger part, SWARCO TRAFFIC SYSTEMS Interurban acts, together with our

Project Content

partner Menorah Izu Aharon in Israel, as system



Central control software

integrator and coordinator.



27 Outstations



4 Internal variable message signs (LED)



73 Lane control signs



4 Prism openers for variable routing



46 Double induction loops



84 Traffic detection cameras



8 PTZ cameras



18 Corridor motion detection cameras



9 Routing and blocking barriers



2 Overheight controls



144 Emergency roadside telephones

The old part of Haifa with port and major business districts is located on a narrow coastal strip beneath 550m high Mount Carmel. To relieve traffic-congested downtown Haifa and to provide an alternative to driving up and across Mount Carmel the Carmel Tunnels Project was started. The project consists of two sets of twin tunnels, the 3.5 km long western set and the 1.6 km long eastern set, with two lanes of traffic in each tunnel and four portals. The entire project is 6.5 km long and includes 5

Goals are:

conventional bridges, 6 segmental bridges and 11



Reduce road congestion in the Haifa area

kilometers of roads.



Provide alternate route



Cut travel time

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 77/96

SWARCO TRAFFIC SYSTEMS GMBH System description

Realization

The central software allows controlling all tunnel systems by means of a visualization screen. All information is available all the time in one

Project start: April 2009 Project start-up and opening: November 2010.

overview. The tunnels are monitored from the International User Interface

tunnel control center in Krayot. The

system

management

is

connected

system

with

(FMS)

the

facility

including

fire

detection, electrical control, light control and ventilation control. In case of an alarm e.g. fire alarm, it reacts with predefined measures such as tunnel closure.

In the webvisualization of the central control software you can switch within seconds to and from different languages, countries and/or time zones during operation. The GUI adjusts e.g. text orientation, operating elements, date formats etc. according to the selected language.

External communication with •

Haifa Municipality - Center-to-center (C2C)



Traffic light controller (C2F)



Toll Plaza Hof Carmel and Krayot



Radio station Haifa



Emergency service via external workstation

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 78/96

SWARCO TRAFFIC SYSTEMS GMBH After a construction phase of only 7 months,

HGV guidance system on the motorway A98 Customs facilities Rheinfelden

including

planning

and

construction,

the

congestion management system for the motorway A 98 was introduced.

Project Content The project includes the delivery, mounting and bringing into operation of •

7 New sign gantries



7 Variable routing installations in prism technology



2 Prism openers



15 LED variable message signs



1 Video camera connected with the existing video center

Project Conception In spite of a length of only 29 km, the motorway A 98, the so-called “Hochrheinautobahn”, is an

By means of the link road A 861 it leads directly to highly

frequented

customs

facilities

4 Measurement points



5 Roadside units

As well as the backfitting of existing roadside

extremely important and busy traffic connection.

the



at

units, the extension of the sub center and further adaptations of the traffic technology.

Rheinfelden and is thus the direct connection to Switzerland.

Realization

Especially the high numbers of lorries which build

In operation since October 2010, the southern

tailbacks from the Swiss border to the motorway

lane and traffic system was opened with a ribbon-

at peak times, pose a big challenge for the traffic

cutting ceremony on 09 December 2010.

safety on the motorway. In case of such tailbacks, in front of the junction “Hochrhein” (Tunnel Nollinger Berg) the right lane of the motorway is reserved for the waiting Lorries, while the car drivers are able to use the left lane. This is made possible by a sophisticated system of modern traffic technology, offering the highest degree of information and safety for all people involved and helping to keep the traffic moving.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 79/96

SWARCO TRAFFIC SYSTEMS GMBH

Road condition and weather information system (RWIS) Hesse

The data is combined with weather data from the German

National

(Deutscher

Meteorological

Wetterdienst)

and

Service

evaluated

to

provide reliable local information for a winter road service which is optimally adapted to the current weather situation.

Project Content •

76 Measurement stations



80 User stations



1170 Sensors



Results are clearly arranged and displayed in a map



Project Conception

Import of weather reports from the National Meteorological Service

After the successful implementation of a sub center for the road condition and weather



Export of weather data to the National Meteorological Service

information service in Thuringia in 2009, a similar system was launched in Hesse in November 2010. A total of 76 measurement stations all over Hesse collect a variety of measurement values such as road

surface

temperature,

residual

Realization Start of constructions: April 2010. Begin of operations: November 2010.

salt,

precipitation.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 80/96

SWARCO TRAFFIC SYSTEMS GMBH The extension of the traffic control system, which

Traffic management system motorway A5 / A45 Friedberg Gambacher Kreuz

has proven of value, is another decisive step in the

project

Congestion

free

Hesse

2015

(Staufreies Hessen 2015).

Goals are: •

Harmonizing the traffic flow by means of dynamic speed limits



Warning of traffic and weather related dangers such as accidents and fog



Lane closure in case of disturbances

Project Conception

Project Content

The motorway A5 is not only one of the most



important motorway connections for long distance

Control software sub center (separate extension of existing sub center)

traffic (Hamburg – Frankfurt – Basel) but has also



46 Roadside units

a huge regional importance and thus the highest



39 Sign gantries with 105 variable message

traffic load in the Rheine-Main area (up to 144,000

signs type A and 66 variable message signs

veh/24h).

type B

The new traffic control system spans the sections



24 Measurement points for traffic data

of the A 5 between the junction Gambacher Kreuz

acquisition (74 double induction loops and

and the service area Wetterau as well as the A45

105 overhead detectors)

between

the

junctions

Gießen

Sued

and

Gambacher Kreuz. Especially on these sections the daily traffic load is very high: Between Gambacher Kreuz and junction Friedberg up to 100.000 veh/24h and between Gießen and Gambacher Kreuz up to



11 Environmental stations



Laying of approx. 58 km fiber optical cable and energy cable



Traffic management on a section of 8 km on the motorway A45 and 20 km on the motorway A5 in both driving directions

72.000 veh/24 h. Due

to

this,

the

motorway

is

frequently

Realization

overloaded, even smallest disturbances have

Contract and start of construction: June 2009

negative effects on the traffic flow and accidents

Start of operation: October 2010

cause enormous congestions.

Project volume: € 6.8 millions

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 81/96

SWARCO TRAFFIC SYSTEMS GMBH

Traffic management measures on motorway A5

Because of higher traffic loads and the success of the temporary automatic release of the hard shoulder in the corridor control installation on the motorway

A3

between

Frankfurt-Sued

and

Seligenstadt, in a third step the corridor control system on motorway A5 was equipped in both directions with such a hard shoulder release system

between

the

northern

interchange

Frankfurt and the junction Friedberg. At the same time, the existing installation was extended and important elements were modernized.

Project Conception

The fourth step, implemented in 2008, extended the system on motorway A5 between the western

Built in 2009, the traffic control system on the

interchange

Frankfurt

and

junction

motorways A5 / A45, junction Friedberg to

Zeppelinheim for another 10 km to the south.

interchange Gambacher Kreuz extends the

Additionally, between the interchange Frankfurter

existing traffic control system and continues the

and the junction Frankfurt-Niederrad, an auto-

traffic measures around the interchange Frankfurt.

matic system for the temporary release of the hard shoulder was installed at a length of 3 km,

Since the end of the 1980s, these measures aim to harmonize and control the traffic by means of

which substantially relieved the area of the Frankfurt interchange during the peak hours.

traffic management systems in order to cope with the continuously rising traffic loads. Starting in 1989/90 with the road section between the western interchange Frankfurt and Bad Homburg, in a second step the corridor control system was extended in 1995/96 going from Bad Homburg to the junction Friedberg.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 82/96

SWARCO TRAFFIC SYSTEMS GMBH

Project Content of earlier traffic management measures 4. Stage: Extension of the corridor control system •

22 display cross sections



Traffic control system 95 LED VMS (type A), 44 LED VMS (type B/C)



4 Display cross sections for variable routing



4 Display cross sections for release of hard shoulder



5 Monitoring cameras



34 roadway stations



Infrastructural works on a section of approx. 10 km

Realization Construction: April 2007 – June 2008. Project volume: approx. € 5 millions

3. Stage: Extension and reconstruction •

Modification and extension of the sub center



Installation of 35 display cross sections with 210 LED VMS



Extension of 11 display cross sections in fiber optic technology



37 Prism openers/shutters for temporary release of hard shoulder



Conversion of measurement cross sections to radar detectors for local traffic data acquisition



Video monitoring with 51 cameras and video center



Infrastructural works on a section of approx. 20 km

Realization Construction: July 2004 – June 2005 Project volume: approx. € 10 millions

1. and 2. Stage •

Sub center



61 Display cross sections (303 fiber optic VMS)

Realization



89 Measuring cross sections for local data acquisition

1. Stage: 1989/90.



10 Environmental data stations

2. Stage: 1995/96.



Infrastructural works on a section of approx. 30 km

Project volume: approx. € 8.6 millions

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 83/96

SWARCO TRAFFIC SYSTEMS GMBH

Extension of the HGV guidance system motorway A5 Weil am Rhein

Project Content •

Delivery and mounting of three walkable steel gantries including according base plate



Delivery

and

mounting

of

three

prism

openers as variable routing •

Delivery and mounting of two complete outstations including according cable works



Delivery and mounting of an outstation rack for an existing outstation



Planning and generating of traffic technology, program plans and configuration lists



Project Conception

Extension

of

the

sub-center

and

the

communication computer Weil am Rheine by new display points

Because of the night driving ban for heavy goods vehicles in Switzerland while not having enough space when the motorway is congested, there are regularly HGV congestions on the motorway A5 Karlsruhe – Basel in front of the customs site Weil am Rhein during the night and early in the morning. The hard shoulder and main lane are then blocked by the parking lorries. The fact that the exit and the junction “Weil am Rhein” lie within the congested area makes the situation even more problematic. In the course of the extension, the routing signs

Realization

are adapted to the switching state of the HGV

Started at the beginning of 2010, the project was

guidance system. To do so, three static displays

successfully finished in July 2010 after a test

are substituted by dynamic signs in triangular

operation of 2 weeks.

prism technology. These measures are taken to avoid that the cars are guided to the right lane where the Lorries are parked because of the existing static signs. Thus, the car traffic and the HGV traffic are separated.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 84/96

SWARCO TRAFFIC SYSTEMS GMBH

Dynamic routing “dWiSta” motorway A8 Munich – Salzburg, junction Inntal

Goals are: •

Information of disturbances on the Brenner or Tauern passage for the long-distance traffic



Display of alternative routes: -

for serious disturbances on the Brenner route via Tauern route (destination Verona)

-

for serious disturbances on the Tauern route via Brenner route (destination Triest)



Display of disturbances or obstacles on the motorways A93 south or A8 east, such as road works, accidents, congestions, HGV

Project Conception

bans in Austria or winter road conditions The passages of Brenner and Tauern are the important transit routes with an accordingly high

(without recommendation of alternative routes)

traffic load. Especially during holiday traffic, this regularly leads to congestions due to capacity

System description

overload. Road works, accidents or bad weather cause further traffic disturbances. The effects go

The dWiSta chain on the A8 east at the junction

beyond regional and national borders.

Inntal direction south was installed additionally to the already existing blue routing signs. It consists

Until

now

disturbances

and

recommended

alternative routes were only available via radio. In case of massive traffic obstructions on the Brenner route approaching the junction Inntal, mobile

warning

signs

with

the

of three sign gantries with programmable dWiSta signs in LED technology and the according outstations providing data and energy for the signs.

according The information signs are approx. 13 m wide and

information were set up.

2.8 m high. Via 432 x 88 white LEDs in a distance With the installation and integration of three large-

of 30 mm up to four text lines can be displayed.

sized dynamic routing signs with integrated congestion information (dWiSta) on the motorway

In the upper left and right corners of the display

A8 East in front of the motorway junction Inntal

additional danger signs can be displayed in color

direction

such as congestion, road works or danger

south,

extensively

be

the

road

informed

users about

can the

now

current

pictograms.

situation.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 85/96

SWARCO TRAFFIC SYSTEMS GMBH The first dWiSta display is located approx. 10 km in front of the junction Inntal, in front of the parking Eulenauer Filz. The road user has enough time to react to the displayed disturbance and alternative routing. A road user not familiar with the area can also stop at the parking and have a look at a road map for orientation.

Coordination of the system The highway police as well as the operating companies

of

the

motorways

in

Austria

(ASFINAG) and Italy (Autostrada del Brennero) inform the traffic information center in Bavaria about the traffic situation on the Tauern and Brenner route. The switching diagrams of the

The second dWiSta display is located approx.

dWiSta signs associated with the according traffic

900 m in front of the exit lane.

disturbance are coordinated and ordered by the

The third dWiSta display is located at the begin of the exit lane, about one kilometer in front of the spot where the decision must be made which route to take. The according sign gantry has already been designed for a five-lane extension of the junction Inntal in the future.

traffic authorities in Austria and Italy. The traffic information center judges the traffic situation and forwards a switching recommendation to the traffic management center in Southern Bavaria which activates the switching of the diagram. The switching diagrams are stored in the traffic management center in Southern Bavaria so that there is no need to enter the information every time.

Exemplary display for third sign

Project Content •

3 Display cross sections with dWiSta signs



3 Roadside stations



SHDSL data transfer to the roadside station via TLS-over-IP

Exemplary display for second sign

Realization Start of constructions: July 2009. Exemplary display for first sign

Example of a dWiSta chain motorway A8 east junction Inntal with alternative routing

Start of operation: June 2010. Project volume: approx. € 1.04 millions. The installation is the first part of the project

The information is displayed separately for each

“dynamic network control Bavaria” for which

direction by means of the lane signaling arrows

further dWiSta sites at crucial locations in the

underneath the programmable display.

motorway network all over Bavaria will be set up during the coming years.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 86/96

SWARCO TRAFFIC SYSTEMS GMBH

Traffic Guidance System National Road N2 Biasca – Varenzo (Switzerland)

Data Acquisition Traffic data is collected by means of induction loops at the tunnel entrances for each direction. Environmental data is collected by means of four weather stations monitoring temperature and visibility.

Sub-centers The complete system is divided into four areas allocated to the four tunnels. Each tunnel and the adjoining sections of the motorway have their own sub center which are connected via fiber optic cabling to a central control station. The central

Project Conception

station controls the complete system.

The N2 motorway (“strada nazionale”) plays a

Project Content

vital role in alpine transit. The outdated Traffic



94 Display cross sections

Guidance System between the junctions “Quinto”



Traffic guidance:

and “Faido”, including the four tunnels “Piottino”,

365 LED signs and signals,

”Pardorea”, ”Casletto” and “Piumogna”, required

63 Prismatic VMS,

replacement on a total length of 11 km.

136 Flashers, 80 Traffic lights

Traffic Guidance



40 Outstations

The system consists of 47 display cross sections



4 Sub centers



1 Central control station



11 km of civil works

in LED and prismatic sign technology as well as lane signaling and traffic lights, influencing traffic in both directions. In the case that one or more tunnels are closed, traffic can be diverted to the oncoming lane before

Realization

or between tunnels.

Construction: August 2008 – April 2009.

Outside of the tunnels the signs are mounted on

Project volume: approx. € 2.8 millions.

15 gantries; inside of the tunnels signs partly wall

.

mounted, partly installed on traverses across the lanes.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 87/96

SWARCO TRAFFIC SYSTEMS GMBH

Road Condition and Weather Information System (“RWIS”) Thuringia

This data will be edited and combined then with general weather data. Thus, several times a day reliable road weather forecasts are generated. In the computer center which is located in Legefeld, the measurement values, data and weather

information

are

then

merged.

The

resulting temporally and locally differentiated information on weather and road conditions are evaluated and visualized in a graphical user interface. They are basis for an optimized winter road service adapted to the current weather situation.

Project Conception A total of 36 measurement stations collect a variety of measurement values such as road surface temperature, residual salt, precipitation.

Project Content •

36 Measurement stations



458 Sensors



Results are clearly arranged and displayed in a map

The collected data is automatically forwarded to



the German National Meteorological Service (Deutscher Wetterdienst).

Import of weather reports and weather radar from the National Meteorological Service



Export of weather data to the National Meteorological Service

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 88/96

SWARCO TRAFFIC SYSTEMS GMBH Goals are:

Realization

Reliable forecasts for a target-oriented and

Start of constructions: June 2008.

efficient winter road service:

Begin of operation: November 2008.



Optimized basis for decision-making



Winter service when, where and how it is necessary



Reduced reaction times



Drastic reduction of accidents



Optical visualization

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 89/96

SWARCO TRAFFIC SYSTEMS GMBH

Tunnel Airport Tegel, Berlin motorway A111

The control of the traffic technology, monitoring and operation is realized with the central control software. The hardware and software is located in the operation building TFT. The system is connected via different interfaces and user stations with the existing traffic management centers in Berlin: •

“Verkehrsrechnerzentrale” at Stolpe



“Verkehrsregelungszentrale der Verkehrslenkung Berlin“ at the Airport Tempelhof



“Tunnelleitzentrale” in the TFT building

Project Conception Up to 90,000 vehicles use daily the tunnel “Flughafen Tegel” and have an according impact on the road. Opened for traffic in 1979, the approx. 1000 m long tunnel is part of the city motorway A111 in Berlin.

Goals are:

During a general renovation the tunnel was



expanded and equipped with up-to-date traffic and

Harmonizing the traffic flow in unbalanced traffic situations

safety technology.



Traffic monitoring to avoid congestions

The traffic management system contains tunnel



Early information and safe rerouting of the

control, road control and the integration of the

traffic in foreseeable situations such as

tunnel into a network control system. The tunnel

maintenance, construction

control reacts to different requirements from the



Fast reaction to unpredictable incidents:

building control systems (e.g. fire alert), traffic

-

Information

monitoring (e.g. congestions) and traffic situation

-

Safe traffic guidance

(e.g. construction sites).

-

Effective traffic flow

-

Quick tunnel closing in case of emergency

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 90/96

SWARCO TRAFFIC SYSTEMS GMBH

Project Content •

Central control software

Realization



26 outstations

Start of constructions: November 2006.



147 variable traffic sings (LED)

Opening for traffic: June 2008.



32 variable traffic sings (prism openers)

Project volume: approx. € 2.37 millions.



9 variable routing



4 prism openers for variable routing



107 radar detectors



3 double induction loops



5 routing and blocking barriers



2 rain sensors



5 height controls



32 road markers (2 chains)

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 91/96

SWARCO TRAFFIC SYSTEMS GMBH The project was realized in cooperation with our

Video monitoring in Dhahran, Saudi Arabia

project partner, the Almisehal Group from Saudi Arabia.

Project Content •

Video center



5 Secondary centers



Fiber optical network 25 km2



5 High-precision pan-tilt-camera units with - Infrared beam (500 m distance) - Extended temperature range (+70°) - Extended zoom

Project Conception

- Integrated camera washer system

Saudi Aramco, the state-owned national oil company of Saudi Arabia, located in Dhahran, is the largest oil corporation in the world. The company owns a worldwide network of refineries

Realization Start of project: July 2004. Start of operation: April 2005.

and installations for the production and processing of crude oil and gas, as well as pipelines for their transportation. The project’s objective was to observe the 25 km

2

company premises with a minimum number of cameras and to monitor all sensible and strategic focus points. From the center the cameras are parameterized and controlled. They go independently on userdefined “patrols” by panning to the learned areas and zooming into the sensible areas such as entrances, oil tanks etc.. In order to maintain a night visibility of up to 500 m, an accordingly far reaching infrared beam (infrared canon with variable focus) moves with the camera. Furthermore, the reliable and centralized control and live streaming (real time) of the cameras must be guaranteed over great distances.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 92/96

SWARCO TRAFFIC SYSTEMS GMBH

Tunnel “Tiergarten Spreebogen” (TTS) Berlin Highway B96

The main part consists of one tunnel for each driving direction with two lanes and one emergency lane. The tunnel segments joining in the north and in the south consist of one lane and emergency lane per driving direction. A road control installation was installed throughout the entire tunnel. In order to close the tunnel system and to lead the whole traffic through the existing road network, the tunnel part has been integrated into a network control system. The tunnel control system in the tunnel itself reacts to different requirements from

Project Conception



facility management systems (FMS) (e.g. fire alert),

Originally planned as interim solution, the urban



traffic monitoring (e.g. congestions) and

road B96 runs straight through Berlin’s greatest



traffic situation (e.g. construction sites).

urban public park, the “Tiergarten”. The An effective solution had to be found in order to

according

traffic

sign

displays

are

automatically activated.

manage and direct the traffic through the area of the new City Center with governmental district and the newly designed “Potsdamer Platz”.

The

core

of

the

system

is

the

so-called

“Conductor” which controls and monitors the processes. By means of a complex matrix all

The result is a tunnel with a length of 2,387 m

possible requests are linked with all traffic sign

leading from “Heidestrasse” to “Landwehrkanal”

displays that can be realized. This ensures that in

with entrance and exit ramps at “Invalidenstrasse”

the tunnel for each request there is always a

and “Kemperplatz”.

predefined, safe and automatically activated

Besides integrating the through traffic from north

reaction of the whole system. Additionally, when a

to south, also the supplier access ramps for the

situation requires the judgment of the operator, he

office and service centers of Daimler-Chrysler and

can intervene at any time and affect the reaction

Sony-Center as well as the access to the parking

of the tunnel system by means of the “Conductor”.

deck at the main station (Lehrter Bahnhof) had to be taken into consideration.

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 93/96

SWARCO TRAFFIC SYSTEMS GMBH

Goals are:

Realization



Reducing the traffic load

Start of constructions: July 2004.



Optimizing the traffic flow

Opening for traffic: March 2006.



Reducing the transit traffic passing through

Project volume: approx. € 4.33 millions.

the parliamentary and governmental district •

Restoring the natural and recreational character of the “Tiergarten”

Project Content •

Central control software



61 Outstations



258 Variable traffic signs (LED)



28 Variable routing signs



88 Prism openers for variable routing



93 Radar detectors (of which 64 in the tunnel)



8 Routing and blocking barriers

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 94/96

SWARCO TRAFFIC SYSTEMS GMBH

Dynamic Traffic Guidance with Congestion Information Motorways A3 / A66 Wiesbaden Interchange

Sign control The control of the dynamic signs is based on a road network control model integrated in the Traffic Control Center of the State of Hesse. Existing sensors on the A3 and A66 deliver the required

information,

the

outstations

work

according to TLS2002 protocol standard. The dWiSta sign A “dWiSta” sign incorporates a programmable full matrix (96x528=50.688 resp. 96x576=55.276 light points, 25 mm pixel pitch) with single lens systems. Text height is 350 mm, following the DIN 1451 Matrix Font as closely as possible.

Project Conception The A3 and A66 are among the most frequented

Both, active as well as inactive LEDs are constantly monitored.

commuting motorways in the Rhine-Main conurbation, linking the Hessian capital of Wiesbaden

Project Content

to Frankfurt/Main, where the A66 leads right into



4 Outstations

the city center. Rush hour congestions are almost



4 Twin beam gantries

inevitable.



4 “dWiSta” VMS

Now, two dynamic VMS “dWiSta” style with



Connection to sub center Diedenbergen

integrated congestion information are installed



Civil works

around the Wiesbaden interchange on both, the southbound A3, as well as on the eastbound A66. These four VMS were the first of their kind in Germany, defined by the BASt (German federal highway research institute) in August 2004. The signs deliver information about congestions, as well as automatically calculated alternative routes.

Realization Construction: December 2004 – April 2005. Project volume: approx. € 1.4 millions. The project was realized in cooperation with Sirti GmbH (civil engineering, laying of cables, installation).

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E. [email protected]

Status: April 2016 95/96

SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16 D-54294 Trier [email protected]

SWARCO TRAFFIC SYSTEMS GMBH Kelterstraße 67, D-72669 Unterensingen, T. +49-7022-6025-200, F. +49-7022-6025-199, E. [email protected]

Status: April 2016 96/96