SWARCO TRAFFIC SYSTEMS GMBH
SWARCO TRAFFIC SYSTEMS GMBH
International Projects Interurban / Tunnel References
SWARCO TRAFFIC SYSTEMS GMBH
Table of contents 1
THE COMPANY ....................................................................................................................... 3
2
CURRENT PROJECTS ............................................................................................................ 4
3
TUNNEL PROJECTS WORLDWIDE ........................................................................................ 8
4
INTERURBAN PROJECTS: AUSTRIA, SWITZERLAND AND WORLDWIDE ........................ 12
5
INTERURBAN PROJECTS: GERMANY ................................................................................ 16
6
SUPERORDINATE SOFTWARE............................................................................................ 27
7
DYNAMIC EVALUATION AND DISPLAY OF PARKING SPACES FOR HGV ........................ 32
8
“DRIP” PROJECTS (DYNAMIC ROUTE INFORMATION PANELS) ....................................... 34
9
PROJECT DESCRIPTIONS ................................................................................................... 36 MOTORWAY RINGROAD A99 MUNICH ............................................................................................ 37 MODULAR TRAFFIC MANAGEMENT SYSTEM FOR TEMPORARY ROAD WORKS SIGNALIZATION............... 38 TRAFFIC MANAGEMENT SYSTEM MOTORWAY A1 / A27 BREMEN ...................................................... 40 EXTENSION OF THE TRAFFIC DATA ACQUISITION IN BADEN- W UERTTEMBERG .................................. 42 TRAFFIC MANAGEMENT AND HARD SHOULDER RUNNING MOTORWAY A9 .......................................... 43 HGV PARKING MANAGEMENT SYSTEM ON MOTORWAY A5 ............................................................ 47 TRAFFIC MANAGEMENT SYSTEM OERESUND .................................................................................. 49 GOTTHARD TUNNEL MOTORWAY A2: INCREASED EFFICIENCY “EFFIGO” ......................................... 51 DYNAMIC REROUTING BAVARIA (DNET BAYERN) ............................................................................ 54 TRAFFIC MANAGEMENT IN THE CITY OF LUXEMBURG ...................................................................... 56 N2 GALLERIA MONTE CENERI (SWITZERLAND) .............................................................................. 58 OVERHEAD NOISE PROTECTION BARRIER MOTORWAY A1 COLOGNE-LOEVENICH ............................. 60 TRAFFIC MANAGEMENT WANKDORFPLATZ, CITY OF BERNE, SWITZERLAND ..................................... 62 DEVELOPMENT OF A STANDARDIZED CONTROL SOFTWARE ............................................................. 64 TRAFFIC MANAGEMENT SYSTEM MOTORWAY A14 .......................................................................... 65 EXTENSION OF THE TRAFFIC DATA ACQUISITION IN HESSE ............................................................. 66 CORRIDOR CONTROL AND HARD SHOULDER RUNNING MOTORWAY A5 ............................................. 68 NETWORK-WIDE ROUTING MOTORWAY RINGROAD MAINZ .............................................................. 69 CORRIDOR MANAGEMENT SYSTEM MOTORWAY A1 ......................................................................... 70 TELEMATIC CONTROL FOR HGV PARKING AT MOTORWAY A2 .......................................................... 71 ELECTRONIC DEER PASS WARNING SYSTEM ON FEDERAL ROAD B202 RASTORFER KREUZ ............... 73 TRAFFIC CONTROL INSTALLATION MOTORWAY A2 WUNSTORF-LUTHE ............................................. 75 CARMEL TUNNELS, HAIFA, ISRAEL ................................................................................................ 77 HGV GUIDANCE SYSTEM ON THE MOTORWAY A98 ......................................................................... 79 ROAD CONDITION AND WEATHER INFORMATION SYSTEM (RWIS) HESSE ......................................... 80 TRAFFIC MANAGEMENT SYSTEM MOTORWAY A5 / A45 FRIEDBERG - GAMBACHER KREUZ................. 81 TRAFFIC MANAGEMENT MEASURES ON MOTORWAY A5 ................................................................... 82 EXTENSION OF THE HGV GUIDANCE SYSTEM MOTORWAY A5 W EIL AM RHEIN ................................. 84 DYNAMIC ROUTING “DW ISTA” MOTORWAY A8 MUNICH – SALZBURG, JUNCTION INNTAL .................... 85 TRAFFIC GUIDANCE SYSTEM NATIONAL ROAD N2 BIASCA – VARENZO (SWITZERLAND) ................... 87 ROAD CONDITION AND W EATHER INFORMATION SYSTEM (“RWIS”) THURINGIA ............................... 88 TUNNEL AIRPORT TEGEL, BERLIN MOTORWAY A111 ...................................................................... 90 VIDEO MONITORING IN DHAHRAN, SAUDI ARABIA ........................................................................... 92 TUNNEL “TIERGARTEN SPREEBOGEN” (TTS) BERLIN HIGHWAY B96 ............................................... 93 DYNAMIC TRAFFIC GUIDANCE WITH CONGESTION INFORMATION MOTORWAYS A3 / A66 .................. 95
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 2/96
SWARCO TRAFFIC SYSTEMS GMBH
1 The Company SWARCO TRAFFIC SYSTEMS GMBH is a company of the SWARCO group, the world-leading supplier of road marking systems, signage, traffic signals and traffic management systems. From custom solutions to optimized, integrated systems, we cover a wide range of traffic management needs and offer the according service to assure maximum system availability. Our customers also benefit from the comprehensive know-how of a strong international group with every order they place with us. In order to assure the smooth flow of traffic and driving safety on the motorway, we have developed traffic management systems that stabilize traffic flow and contribute to enhanced safety and performance at high traffic volumes. Features include congestion warnings, opening or closing lanes or regulating driving speeds at intersections and junctions. Our future-proof, innovative systems and integrated solutions guide drivers all the way from their home, along the motorway and to their destination, ensuring that everyone arrives safely. SWARCO TRAFFIC SYSTEMS is your partner for INTERURBAN TRAFFIC SOLUTIONS.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 3/96
SWARCO TRAFFIC SYSTEMS GMBH
2 Current Projects Completion
Project
Volume in 1000 €
under construction 3/2016
Motorway A45 in direction Frankfurt Renewal of sign gantry and re-integration into the corridor control system
Germany Hesse
under construction 3/2016
Motorway A448 Traffic data acquisition installations
Germany North RhineWestphalia
under construction 2/2016
Extension of the corridor control sub center Langenselbold, extention of the central system and centralization of the sub center Offenbach
Germany Hesse
under construction 1/2016
Motorway A5 renewal of the remote data transmission
Germany Hesse
under construction 1/2016
Motorway A10 Potsdam-Nuthetal, Lot 13a Traffic management system
Germany Brandenburg
722
under construction 12/2015
Tunnel Ostwestfalendamm Federal road B61 (urban motorway city of Bielefeld)
Germany North RhineWestphalia
846
under construction 11/2015
Motorway A8 Tunnel Pellinger Berg ̶ Renewal and modernization of traffic technology and sub center by order of STRABAG AG
Germany Saarland
under construction 11/2015
Rerouting system Motorway A3 junction Obertshausen
Germany Hesse
294
under construction 11/2015
Mobile LED signs motorway A66 for dynamic signposting (rerouting)
Germany Hesse
610
under construction 10/2015
Renewal of measurement points in the provisory measuring grid motorway A7
Germany North RhineWestphalia
213
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 4/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 € 323
under construction 10/2015
Congestion warning system motorway A1 Burscheid
Germany North RhineWestphalia
under construction 9/2015
New construction of the rerouting system on motorways A2 / A7 / A39
Germany Lower Saxony
under construction 6/2015
Motorway A7 extension Bordesholm Provisionary traffic data acquisition for the rerouting system by order of the joint venture A7 Hamburg-Bordesholm
Germany Schleswig-Holstein
under construction 4/2015
Motorway A5 New construction of a sign gantry (C2X) with connected infrastructure
Germany Hesse
under construction 3/2015
Modernization and extension of the VMS of the traffic management system motorway A3, in the course of the 8-lane extension between interchanges Heumar and Leverkusen
Germany North RhineWestphalia
under construction 3/2015
Extension motorway A13, 3rd stage junctions Radeberg to Dresden-Nord signposting for the final stage
Germany Saxony
949
under construction 3/2015
Motorway A57 traffic management system interchange Kaarst to junction Büttgen
Germany North RhineWestphalia
925
under construction 1/2015
Renewal of the communication computer remote bus for the RWIS system (road weather information system) in Schleswig-Holstein
Germany Schleswig-Holstein
under construction 1/2015
Renewal of the traffic management system motorway A61 junction Stromberg to interchange Nahetal
Germany RhinelandPalatinate
under construction 11/2014
Traffic data acquisition motorway A45 via Bluetooth sensors
Germany Hesse
5,031
313
4,354
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 5/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 € 402
under construction 9/2014
Network-wide rerouting Usedom Dynamic Variable Traffic Signs (dWiSta)
Germany Mecklenburg-West Pomerania
under construction 9/2014
Network-wide rerouting motorway A5 interchange Weinheimer Kreuz Dynamic Variable Traffic Signs (dWiSta)
Germany Hesse
under construction 7/2014
Connecting the “MDM“ (Mobility data market place, BASt) with the traffic center Leverkusen via DATEX II
Germany North RhineWestphalia
under construction 6/2014
Implementation of the traffic center North Rhine-Westphalia part 1: Software for the traffic center
Germany North RhineWestphalia
under construction 4/2014
Extension of the traffic data acquisition motorways A5 / A81
Germany BadenWuerttemberg
862
under construction 4/2014
Reconstruction of the corridor control system nd motorway A3 Kauppenaufstieg – 2 stage
Germany Bavaria
528
under construction 12/2013
Extension of the existing sub-center by a corridor control system with dynamic hard shoulder opening, motorway A3 Limburg
Germany Hesse
under construction 11/2013
Establishment of a traffic computer to combine all traffic-technological systems
Germany Schleswig-Holstein
under construction 11/2013
Sub-center for the corridor control system motorway A2 motorway between the border of Lower Saxony and the junction Lostau
Germany Saxony-Anhalt
under construction 8/2013
Extension / reconstruction of existing traffic control system on motorway A94 junction Parsdorf - interchange Munich East
Germany Bavaria
1,111
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 6/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
under construction 6/2013
Traffic installations for ring road “Mittlerer Ring” southwestern Munich by order of PKE
Germany Bavaria
under construction 6/2013
Traffic technological installation – Telematics motorway A1 northern part by order of Thomas Verkehrstechnik
Germany North RhineWestphalia
under construction 09/2012
Motorways A10 / A24 interchange Havelland and junction Kremmen, lot 16.4: Reconstruction of traffic management systems motorway A24
Germany Brandenburg
1,000
under construction 09/2012
Motorways A10 / A24 interchange Havelland and junction Kremmen, lot 16.1: Reconstruction of traffic management systems – dynamic signposting with congestion information
Germany Brandenburg
300
under construction 6/2011
Frame contract for the backfitting and extension of measurement points on the motorways A3 and A6
Germany Bavaria
491
under construction 06/2010
Motorway A9 direction Nuremberg – Munich: Temporary use of the hard shoulder as lane (joint offer by Siemens AG / Swarco Traffic Systems GmbH)
Germany Bavaria
12,082
Germany Bavaria
10,292
1st stage finished; 2nd stage partly finished
under construction 03/2010
Motorway A9 direction Munich– Nuremberg: Temporary use of the hard shoulder as lane (joint offer by Siemens AG / Swarco Traffic Systems GmbH) 1st stage finished; 2nd stage partly finished
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 7/96
SWARCO TRAFFIC SYSTEMS GMBH
3 Tunnel Projects Worldwide Completion
Project
Volume in 1000 €
2015
EFFIGO-TEC Increase in efficiency of Gotthard tunnel
Switzerland Canton Uri/Ariolo
2015
Traffic management in the City of Luxemburg Implementation of three metropolitan tunnels
Luxemburg Luxemburg City
2015
Corridor control system Oeresund by order of SWARCO Sverige
Sweden
2015
Federal road B27, tunnel Schuerzeberg Renewal of traffic technology by order of Siemens
Germany Hesse
2015
Motorway A31 Emstunnel - Operational tunnel equipment, by order of the company Actemium Cegelec Dresden
Germany Lower Saxony
2015
A31 Emstunnel - Traffic computer by order of the company Actemium Cegelec Dresden
Germany Lower Saxony
2014
Federal road B294 Hugenwaldtunnel Waldkirch by order of PKE
Germany BadenWuerttemberg
2014
Motorway A44 tunnel Schulberg by order of Siemens, Dresden
Germany Hesse
2014
N2 Monte Ceneri BSA, Lotto 8410, comando traffico
Switzerland Canton Ticino
2014
N2 Monte Ceneri BSA, Lotto 8420, traffic segnaletica
Switzerland Canton Bellinzona
404
1,070
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 8/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2013
Half open tunnel Lenzburg - Birrfeld Signaling and cross-section control
Switzerland Canton Aargau
2013
Renewal of the traffic technology tunnel Heslach
Germany BadenWuerttemberg
2013
Preservation project system technology construction site signaling / provisional solution / half open tunnel Lenzburg - Birrfeld
Switzerland Canton Aargau
2013
Noise protection motorway A1 Cologne/Loevenich in joint-venture with company Duerr
Germany North RhineWestphalia
2012
Tunnel N2 19 Melide – Grancia automatic tunnel closure in case of congestion
Switzerland Canton Ticino
152
2012
Traffic installations Piottino Adaptation of traffic control by order of Cablex
Switzerland Canton Ticino
2011
Adaptation of HGV stopping, Stalvedro tunnel
Switzerland Canton Ticino
43
2010
Carmel Tunnels, Haifa Tunnel traffic management installation and sub center
Israel Haifa
2010
Gotthard Tunnel, Release 2
Switzerland Cantons Uri and Ticino
2009
National road N2 Biasca - Varenzo Traffic guidance system with installation for tunnel closure (4 tunnels)
Switzerland Canton Ticino
1,558
2,800
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 9/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2009
Motorway A8 tunnel "Pellinger Berg", by order of the company Cegelec
Germany Saarland
2009
Motorway A113 Berlin, Tunnel “Rudower Hoehe” (TRH) and “Altglienicke” (TAG) in cooperation with the company Siemens
Germany Berlin
2009
Motorway A7, tunnel Fuessen / tunnel Reinertshof VMS, radar sensors, LIFE flat signal heads by order of the company QSG Verkehrstechnik GmbH
Germany Southern Bavaria
2009
Renovation tunnel Hohentwiel, motorway A 81 by order of the company Siemens Tunnel control, outstations, VMS
Germany BadenWuerttemberg
2009
Tunnel Leutenbach B14 Traffic signs (emergency call / escape road / lay-by), by order of the company Duerr GmbH
Germany BadenWuerttemberg
2008
Tunnel B14 Leutenbach, by order of the company Duerr
Germany BadenWuerttemberg
2008
Tunnel Airport Berlin Tegel "TFT"
Germany Berlin
2,373
2008
Tunnel Behringen by order of the company Duerr traffic signs, escape route and emergency call signs
Germany Thuringia
2008
“Saukopftunnel” by order of the company Duerr traffic signs, escape road information, lay-by signs
Germany Hesse / BadenWuerttemberg
2008
Tunnel Rastatt by order of the company Duerr Tunnel control, outstations, VMS, tunnel portal signal heads, traffic signs/ escape road information
Germany BadenWuerttemberg
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 10/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2008
“Lehrertaltunnel” by order of the company Duerr Tunnel control, outstations, VMS, tunnel portal signal heads, escape road information
Germany BadenWuerttemberg
2008
Tunnel “Miltenberg Nord” VMS, tunnel portal signal head by order of the company Siemens
Germany Bavaria
2007
Bypass Gevelsberg Tunnel “Engelbert” VMS, variable routing, partly with radio control
Germany North RhineWestphalia
2007
“Brettfalltunnel” Variable routing
Austria
2007
“Ostwestfalentunnel” Bielefeld Tunnel control, communication processor interfaces (KRI), outstations, VMS, traffic heads
Germany North RhineWestphalia
2006
A31 "Emstunnel" Sub center and traffic management by order of the company Cegelec Dresden
Germany Lower Saxony
2006
"Tiergarten" tunnel national highway B96 traffic management system with traffic data acquisition, VMS, LED LIFE signs
Germany Berlin
2006
A2 "Seelisbergtunnel" 320 LED LIFE signs
Switzerland Cantons Nidwalden / Uri
4,330
930
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 11/96
SWARCO TRAFFIC SYSTEMS GMBH
4 Interurban Projects: Austria, Switzerland and worldwide Completion
Project
Volume in 1000 €
2015
Traffic management in the City of Luxemburg Implementation of three metropolitan tunnels
Luxemburg Luxemburg City
2015
National road N2 Bellinzona TLSoverIP connection Display of variable messages (company Walter) Lot 8410 by order of Swarco Traffic Switzerland GmbH
Switzerland Canton Ticino
2015
Traffic calmed area Basel: First stage by order of Swarco Traffic Switzerland GmbH
Switzerland Canton Basel
2013
Adaptation of the traffic routing intersection Rotsee, Lucerne, by order of Steria Schweiz AG
Switzerland Canton Lucerne
2013
Swiss road traffic counting (“Schweizerische Strassenverkehrszählung SSVZ“) Counting stations for traffic data acquisition
Switzerland
2013
Western bypass Zurich in cooperation with mit Alpine Energietechnik Switzerland
Switzerland Canton Zurich
2013
N1 BAU Morges - Ecublens / Villars-Ste-Croix Oulens in cooperation with Cablex Variable signaling use of hard shoulder
Switzerland Canton Vaud
2012
City of Berne, traffic control Wankdorfplatz
Switzerland Canton Berne
2012
Road stations for traffic control system Timisoara-Lugoj
Romania
2012
Alp transit, A2 Camorino dismantling of signaling system
Switzerland Canton Ticino
389
1,131
304
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 12/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2012
Lottigna-Torre flood protection program with solar-operated prism openers by order of Cablex AG
Switzerland Canton Ticino
2009
Conversion of hard shoulder Emmen by order of the company Steria
Switzerland Canton Lucerne
2008
Half open tunnel at Zofingen, national road N2/01 Rothrist-Brittnau, traffic management system incl. control module
Switzerland Canton Aargau
232
2008
N1/04 variable direction sign intersection Birrfeld 22 VMS (large prism technology), 12 cross section control computer
Switzerland Canton Aargau
560
2006/2008
Western bypass Zurich 136 VMS (LED technology), 770 LED lane control signs
Switzerland Canton Zurich
2007
Extension and renewal of the variable routing, national road A1, junction Haerkingen
Switzerland Canton Solothurn
300
2007
N1/05 restoration Limmattal 34 VMS (LED technology), 7 cross section control computer
Switzerland Canton Aargau
340
2006
N3 Northern junction Basel 53 VMS (LED string technology), 20 VMS (prism technology)
Switzerland Canton Basel
480
2005 / 2006
National roads N2 / N14 modification and extension of the traffic control center Lucerne
Switzerland Canton Lucerne
2005
A8 “Innkreis” motorway Outstations and communication processor interfaces (KRI)
Austria
3,100
230
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 13/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
2004 / 2005
Traffic management and information system Tyrol, delivery of acquisition systems for traffic data and environmental data, by order of Siemens
Austria
Volume in 1000 € 326
2004 / 2005
Lorry Toll System Austria, Lot 2 – Advance signaling: lane control (LED), VMS (prism technology)
Austria
1,600
2004 / 2005
VMIS Tirol – WZG A13 “Brenner” motorway 174 VMS (LED), 76 VMS (prism technology)
Austria
1,500
2004
N1 Bruettisellen – Toess VMS (LED string technology)
Switzerland Canton Zurich
2009
Planning of traffic management system Tripolis International Airport Road by order of Janke & Partner GmbH
Libya
2008
New Jersey Turnpike Variable message signs (closed prism technology)
USA
2008
Road 222 Stockholm Variable message signs (prism technology)
Sweden
2008
Kent County Council – LED information signs variable message signs, control system
Great Britain
900
2008
Department of Transport – Strategic re-routing system combined variable message signs, control system
Great Britain
1,670
2005 / 2008
Speed enforcement system „Tutor“, Autostrade
Italy
450
t 190
30
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 14/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
2000 / 2008
Pennsylvania Turnpike Variable message signs (closed prism technology)
USA
Volume in 1000 € 3,500
2007
MTA Bridges New York – “Queens Midtown” Tunnel and “Brooklyn Battery” Tunnel VMS
USA
340
2002 / 2006
New York Airports JFK, LaGuardia, Newark Variable message signs (closed prism technology)
USA
500
2005
Video monitoring on the premises of “Saudi Aramco” in Dhahran, Saudi Arabia
Saudi Arabia Dhahran
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 15/96
SWARCO TRAFFIC SYSTEMS GMBH
5 Interurban Projects: Germany Completion
Project
Volume in 1000 € 3,045
2016
Motorway A99 replacement of the junction Aschheim
Germany Bavaria
2015
Renewal of the corridor control system motorway A44 between junction Soest and interchange Dortmund / Unna
Germany North RhineWestphalia
833
2015
Construction of further traffic data acquisition installations acc. to TLS 2012 on the motorways A4 / A38 / A71
Germany Thuringia
506
2015
Construction of warning and information signs improving the road safety on the motorway A38
Germany Saxony-Anhalt
647
2015
Traffic light assistant Berlin Audi A1 e-tron by order of Audi AG
Germany Berlin
2015
Motorway A3 interchange Heumar Replacing signs in fiber-optic with signs in LED-technology
Germany North RhineWestphalia
2015
Motorway A8 Hohenstadt-Riedheim Central software for the fog warning system
Germany BadenWuerttemberg
2015
Replacement of fiber optical VMS for VMS in LED technology
Germany Bremen
823
2015
Traffic management system motorways A1 / A27 Adaptation of the existing sub center
Germany Bremen
2015
Construction and extension of the traffic control installations on motorways A1 and A27
Germany Bremen
4,762
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 16/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2015
Extension of parking space monitoring Motorway A4 rest area “Aachener Land“
Germany North RhineWestphalia
2015
Installation of traffic data acquisition stations motorway A59 Duisburg between junction Duissern and Hochfeld
Germany North RhineWestphalia
355
2015
Lane allocation Hienberg and Schiefe Ebene Lot 2 Traffic technology
Germany Bavaria
685
2014
Dynamic display of parking spaces for HGV Motorway A5 Hartheim - Weil am Rhein System Software
Germany BadenWuerttemberg
2014
Federal road B185 Ballenstedt Renewal of the speed warning installation with permanent counting station
Germany Saxony-Anhalt
62
2014
Dynamic information signs on federal road B10 Karlsruhe by order of Siemens
Germany BadenWuerttemberg
2014
Motorway A4n six-lane extension and replacement between junctions Düren and Kerpen - traffic management system by order of Thomas Verkehrstechnik
Germany North RhineWestphalia
2014
Motorway A5 - VMS for the new junction Niederrad,
Germany Hesse
622
2014
“dNet Bayern” 1 stage of construction motorways A3, A6, A7 – dynamic variable routing and display cross sections
Germany Bavaria
3,000
2014
Black ice warning installations (PPP project) Extension motorway A8 Ulm - Augsburg by order of GA Netztechnik GmbH
Germany Bavaria
st
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 17/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2014
Software adaptation of sub-center Bremen
Germany Bremen
2014
Refitting of corridor control system motorway A3 Wuerzburg tunnel ramp Hösbach
Germany Bavaria
2014
Weigh in Motion installation (WIM) motorway A9 Dessau / Süd – Bitterfeld / Wolfen
Germany Saxony-Anhalt
2013
Network-wide rerouting motorway ring Mainz
Germany Hesse
2013
Motorways A19 / A20 Permanent counting stations
Germany MecklenburgVorpommern
247
2013
Project “Baustelle im 21. Jahrhundert” (field equipment)
Germany Hesse
318
2013
Delivery of prismatic signs for motorways A7, A44, A45 and A480 by order of Greenway Systems
Germany Hesse
2013
Pilot installation for detection of wrong way drivers acc. to TLS 2012, motorway A66 interchange Wiesbaden and juction Eschborn
Germany Hesse
2013
Extension and improvement of 33 permanent counting stations on federal roads
Germany Saxony-Anhalt
2013
Delivery of variable message signs for tunnel Fahrlach city of Mannheim by order of Siemens Erlangen
Germany BadenWuerttemberg
1,840
537
1,792
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 18/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2013
Centralization of sub centers for traffic management installations in Hesse
Germany Hesse
2013
Network-wide routing on motorways A3, A5, A7 and A45 Rhine-Main-East
Germany Hesse
5,427
2013
WIM III – Weigh in Motion installation motorway A93, LOT 2
Germany Bavaria
2013
Corridor control system motorway A9 Bindlacher Berg
Germany BadenWuerttemberg
623
2013
Signposting B273 Potsdam North, 2nd phase
Germany Brandenburg
120
2013
Corridor control system motorway A5 Reiskirchen - junction Homberg (Ohm)
Germany Hesse
2013
Motorway A3, extension and supplementation of variable message signs
Germany North RhineWestphalia
2013
Reconstruction and renewal of camera installations on motorways A5, A66 and A3
Germany Hesse
1,190
2013
Installation and supplementation of the traffic management system on the motorways A9, A92 interchange Neufahrn
Germany Bavaria
2,053
2013
Traffic management system motorway A57, junctions Neuss-Norf and Neuss-Sued extension to 6 lanes, traffic management installation
Germany North RhineWestphalia
3,478
604
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 19/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 € 4,479
2012
Extension of the traffic data acquisition on motorways in Hesse (104 count stations)
Germany Hesse
2012
Refitting of count station for traffic data acquisition
Germany Saarland
2012
Permanent counting stations / speed warning system Mühlanger L187, VMS in LED-technology
Germany Saxony -Anhalt
2012
skylink - The Squaire Parkin - Airrail Frankfurt Refitting of outstations by order of Adam Hörnig GmbH & Co.KG
Germany Hesse
2012
Corridor control system motorway A5 Interchange Darmstädter Kreuz Seeheim-Jugenheim
Germany Hesse
4,695
2012
Upgrade and backfitting of automatic long-term count stations at federal roads
Germany Saxony -Anhalt
2012
Temporary hard shoulder running, motorway Germany A63 junction Nieder-Olm – interchange MainzRhinelandSüd and traffic management system ring road Palatinate “Mainzer Ring” (Swarco Traffic Systems GmbH in cooper. with Alpine Energie Österreich GmbH)
2012
Installation of roadside communication units (ITS-Roadside-Stations)
Germany Hesse
423
2012
Federal road B224 Schermbeck Installation of an electronic deer warning system
Germany North RhineWestphalia
289
2012
Corridor control system motorway A1 interchange Kamener Kreuz - Dortmund/Unna
Germany North RhineWestphalia
156
7,297
1,464
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 20/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 € 239
2012
Restoration of sign gantries motorway A4 Dresden-Chemnitz
Germany Saxony
2012
Development of a standardized control software for a traffic management system on the example of the A8 between AD Leonberg and AS Wendlingen (SSW - SBA -A8)
Germany BadenWuerttemberg
2011
Line control installation motorway A14 project part Central Software
Germany Saxony-Anhalt
2011
Delivery and installation of measurement devices for Germany the extension of a speed measurement network on North Rhinemotorways in North Rhine-Westphalia Westphalia
2011
Dynamic display of parking spaces for HGV, Motorway A5 Hartheim - Weil am Rhein Field installations
Germany BadenWuerttemberg
2011
Extension of corridor control system Weil am Rhein - display points and traffic data acquisition
Germany BadenWuerttemberg
2011
Line control motorway A2 Wunstorf-Luthe
Germany Lower Saxony
2011
simTD extension of the telecommunications network Germany on federal motorways in Hesse, IRS locations on the Hesse motorways A661, B3, A5
280
2011
Federal road B202 Rastorfer Kreuz: Installation of an electronic deer warning system
Germany Schleswig-Holstein
624
2011
Rollwegbrücken Ost Temporary use of hard shoulder / prism openers by order of Fraport AG
Germany Hesse
485
6,000
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 21/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2011
Motorway A81 Extension of traffic funnel at Hohentwieltunnel by order of Siemens
Germany BadenWuerttemberg
2011
Renewal, supplementation and cross-linking of permanent count stations on motorways in Saxony
Germany Saxony
349
2011
iRoute Extension of count stations to optimize the traffic control "
Germany Bavaria
2011
Ramp metering motorway A46 Barmen and Wichlinghausen
Germany North RhineWestphalia
238
2011
Counting and black ice warning installations motorway A8 Augsburg - Munich by order of Metz Anlagentechnik GmbH, Berlin
Germany South Bavaria
2011
New permanent count stations on federal highways in the federal state of Saxony-Anhalt
Germany Saxony-Anhalt
176
2011
Traffic control center Baden-Wuerttemberg - Configuration assistant
Germany BadenWuerttemberg
2011
Refitting of permanent counting stations to 8+1 vehicle classes on motorways in Brandenburg
Germany Brandenburg
96
2011
New installation of permanent count stations on the motorways A9, A14 und A38
Germany Saxony-Anhalt
2011
Motorway A94, expansion of the interchange Munich East, direction Munich
Germany Bavaria
216
1,781
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 22/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 € 88
2011
Installation of communication roadside units – Research project AKTIV
Germany Hesse
2011
Installation of communication roadside units
Germany Hesse
129
2011
Line control motorway A6 Schwabach new installation of the dynamic routing junction Roth
Germany Bavaria
819
2011
Motorway A57, extension to 6 lanes, Lot 2
Germany North RhineWestphalia
2011
Traffic management system motorway A1 interchange “Bremer Kreuz”, partly dismantling of the VMS followed by an extension of the measurement points
Germany Bremen
2011
Traffic data acquisition on the motorway A3 for the variable routing system Oberhausen-Arnheim
Germany North RhineWestphalia
762
2011
Motorway A10 / A115 Nuthetal dismounting and new Germany installation of the traffic management system Brandenburg
292
2010
WIM on motorways, 3 stage of completion: Installation of 4 weighing systems in Bavaria and one each in the federal countries of Lower-Saxony, North Rhine-Westphalia and Schleswig-Holstein
Germany different federal states
2010
Renewal of the federal permanent count stations in the federal state of Berlin
Germany Berlin
2010
Motorway A98 / A861 Traffic guidance system Rheinfelden Rearrangement of the congestion space
Germany BadenWuerttemberg
rd
1,709
437
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 23/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 € 218
2010
Renewal of the SWIS central in Hesse (road weather information system)
Germany Hesse
2010
Virtual traffic management system
Germany Hesse
81
2010
Traffic management system motorways A5 / A45, junction Friedberg to interchange Gambacher Kreuz
Germany Hesse
6,848
2010
Line control with display points and measurement points, motorway A4, junctions Eschweiler Weisweiler
Germany North RhineWestphalia
706
2010
Extension of the traffic data acquisition on motorways in Hesse for model system DIVA (14 count stations)
Germany Hesse
653
2010
Implementation of a redundant system in the sub center of the line control installation on motorway A3
Germany Hesse
2010
Extension motorway A9 Muenchberger Senke
Germany Bavaria
91
2010
Refitting of the measurement network on motorways in Bavaria
Germany Bavaria
196
2010
Increase of density of the RDS outstations (Radio Data System) on motorways A2 and A4
Germany North RhineWestphalia
106
2010
Implementation of a sub center for the line control installation on motorway A5 Darmstaedter Kreuz - Seeheim-Jugenheim
Germany Hesse
223
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 24/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 € 175
2009
Refitting of 4 traffic data acquisition systems in Northern Hesse
Germany Hesse
2009
Routing signs in Ravensburg county, Lot 2 B32
Germany BadenWuerttemberg
2009
Motorways A5 / A3 Refitting of 9 traffic data acquisition systems junction Frankfurt
Germany Hesse
240
2009
Variable routing GVZ (freight transport center) / fairgrounds at the junction Delmenhorst
Germany Bremen
158
2008
Permanent count stations on the motorways A24 and federal road B96
Germany MecklenburgVorpommern
100
2008
Renewal of the "SWIS" central (road weather information system)
Germany Thuringia
2008
Motorway A10, delivery and installation of traffic control computers
Germany Brandenburg
2008
Motorway A6 / A620 refitting of the traffic control installation
Germany Saarland
2008
Ramp metering systems, motorways A4, A40, A52, A57, A59
Germany North RhineWestphalia
939
2008
19 RDS outstations (Radio Data System), network control installation Bottrop-Lotte / Osnabrueck
Germany North RhineWestphalia
756
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 25/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 € 870
2008
A12 AS Briesen – Border crossing to Poland Traffic guidance system, temporary release of hard shoulder, sub center
Germany Brandenburg
2008
Traffic management system motorway A5 Western interchange Frankfurt – Zeppelinheim Extension of management system and temporary release of hard shoulder (part IV)
Germany Hesse
2007
Expansion of the traffic management system on the motorway A3 Stockstadt
Germany North Bavaria
495
2007
Traffic data acquisition on the motorway A3 for the variable routing system Oberhausen-Arnheim
Germany North RhineWestphalia
726
2007
Expansion of the variable direction system GVZ / Messe with a congestion warning installation in direction Cuxhaven
Germany Bremen
120
2007
Permanent counting station Seelow, B167 order of the company SAG Berlin
Germany Brandenburg
2007
Ramp metering installation motorway A52 Moenchen-Gladbach Nord
Germany North RhineWestphalia
92
2007
Traffic data acquisition on motorway A66 between junction Krifteler Dreieck and interchange Wiesbadener Kreuz
Germany Hesse
163
2007
Equipment of several measurement points with sidefire radar RD2200, motorway A96 “Fuenf Seen”
Germany Bavaria
160
2007
18 permanent counting stations on national and federal roads with GPRS data transmission and solar energy
Germany Hesse
312
5,000
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 26/96
SWARCO TRAFFIC SYSTEMS GMBH
6 Superordinate Software Sub centers / central systems Core part of a traffic management system is the superordinate central software. It is used as complex center in order to control networks, as sub center for tunnel or corridor control systems or in smaller applications for data evaluation as well as for HGV parking applications. In especially developed control models and by means of specific algorithms, the software processes the data of different sensors detecting traffic and/or environmental data. The according switchings are then forwarded to the variable message signs. Tunnel control systems and special sequences use extensive control matrices. –With these even complex control tasks can be implemented. The automation of program sequences helps harmonizing traffic flows, reducing reaction times and improves traffic safety significantly. Additionally, applying the central software reduces the operating effort and ensures that traffic standards and laws are observed. Central software systems are either planned in a completely project-specific way or, on customer request, implemented according to V-model (the official project management methodology of the German government, directly relevant to software development). In any case it is the objective to develop a customfit, turn-key solution for each requirement and problem. To do so, the technical and traffic technological challenges are considered as well as the user-specific peculiarities. ®,
Besides the product line PRIMOS our “Professional Interurban Motorway System“, SWARCO is engaged to push the development of the “open-source“ software of the NERZ (i.e. user of the standardized central software for traffic centers) in different projects. Here, a simplified and mostly automated handling / monitoring with minimized manual effort is intended. Further technological objectives are: • improved traffic control by incorporating switching recommendations of different control algorithms, including new ones • implementation and testing of algorithms for managing HGV traffic • efficient variable evaluation possibilities supporting continuously required control optimizations and maintenance services of the switching programs • as well as the support of operating surveillance of system parts (especially sensor technology) and the reduction of administration efforts.
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 27/96
SWARCO TRAFFIC SYSTEMS GMBH
Completion
Project
Volume in 1000 €
under construction 2/2016
Extension of the corridor control sub center Langenselbold, extension of the central system and centralization of the sub center Offenbach
Germany Hesse
under construction 1/2015
Motorway A61 AS Stromberg - AD Nahetal Renewal of the central software for the corridor control system
Germany Rhineland-Palatinate
under construction 6/2014
Implementation of the traffic center North Rhine-Westphalia part 1: Software for the traffic center
Germany North RhineWestphalia
under construction 12/2013
Extension of the existing sub-center by a corridor control system with dynamic hard shoulder opening, motorway A3 Limburg
Germany Hesse
under construction 11/2013
Establishment of a traffic computer to combine all traffic-technological systems
Germany Schleswig-Holstein
under construction 11/2013
Sub-center for the corridor control system motorway A2 motorway between the border of Lower Saxony and the junction Lostau
Germany Saxony-Anhalt
2015
EFFIGO-TEC Increase in efficiency of Gotthard tunnel
Switzerland Canton Uri/Ariolo
2015
Traffic management system motorways A1 / A27 Germany Adaptation of the existing sub center Bremen
2015
Federal road B27, tunnel Schuerzeberg Renewal of traffic technology by order of Siemens
Germany Hesse
2015
Motorway A8 Hohenstadt-Riedheim Central software for the fog warning system
Germany BadenWuerttemberg
161
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 28/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2014
Network-wide rerouting Cologne - Koblenz Sub center software BLAK
Germany RhinelandPalatinate
2014
Software adaptation of sub-center Bremen
Germany Bremen
2014
Dynamic display of parking spaces for HGV Motorway A5 Hartheim - Weil am Rhein System Software
Germany BadenWuerttemberg
2013
BLAK software for sub center motorway A1 Cologne/Loevenich
Germany North RhineWestphalia
2013
Network wide rerouting ring road “Mainzer Ring” with sub center acc. to MARZ based on BLAK-SW
Germany Hesse
2013
Centralization of sub centers for traffic management installations in Hesse
Germany Hesse
2011
Development of a standardized control software for a corridor control system – exemplary on motorway A8 between interchange Leonberg and junction Wendlingen (SSW-SBA-A8)
Germany BadenWuerttemberg
2011
Corridor control installation motorway A14 project part Central Software
Germany Saxony-Anhalt
2011
Traffic control center Baden-Wuerttemberg Configuration assistant
Germany BadenWuerttemberg
2010
Carmel Tunnels, Haifa Tunnel traffic management installation and sub center
Israel Haifa
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 29/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2010
Implementation of a redundant system in the sub center of the line control installation on motorway A3
Germany Hesse
2010
Virtual traffic management system
Germany Hesse
2010
Implementation of a sub center for the corridor control on motorway A5 interchange Darmstaedter Kreuz - Seeheim-Jugenheim
Germany Hesse
2009
Traffic center Baden-Wuerttemberg Lot C3
Germany BadenWuerttemberg
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 30/96
SWARCO TRAFFIC SYSTEMS GMBH
RWIS Systems Road weather information systems provide the basis for an optimized winter road service adapted to the current weather conditions. In parts, the winter road service without RWIS support is only possible on large scale, whereas the RWIS support allows a winter road service which is optimally adapted to the current weather situation, time and location. Here, measurement stations detect a multitude of values such as road surface temperature, residual salt, precipitation. The collected data are automatically forwarded to the German Meteorological Service (Deutscher Wetterdienst). There, the data is linked to the general weather data and then processed. The data is combined with weather data from the German National Meteorological Service (Deutscher Wetterdienst) and evaluated to provide reliable local information for. In the RWIS computer center those measurement values, data and weather information are combined. The thus gathered information about the weather and road conditions is evaluated and visualized in a graphical user interface, differentiated for time and place. This is used to provide reliable road weather forecasts several times a day.
Completion
Project
Volume in 1000 €
under construction 1/2015
Renewal of the Communication processor for the RWIS system Schleswig-Holstein
Germany Schleswig-Holstein
2010
Renewal of the RWIS center in Hesse (Road weather information system)
Germany Hesse
218
2008
Renewal of the RWIS central system (Road weather information system)
Germany Thuringia
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 31/96
SWARCO TRAFFIC SYSTEMS GMBH
7 Dynamic evaluation and display of parking spaces for HGV According to the German Federal Ministry of Transport and Digital Infrastructure goods traffic is expected to increase by another 34% until 2020, which will largely take place on the federal motorway network. Together with long-distance goods transports grows the demand for an intelligent management of heavy goods vehicles (HGV) on motorways and at service stations at motorways. In the period of 2015 to 2020 another 8,000 spaces will therefore be necessary. In addition to the already existing 28,500 parking spaces at motorway service stations and just under 19,000 spaces at off-motorway rest areas, approx. 10,0000 new spaces for heavy goods vehicles were already installed. But there is still a deficit of nearly 14,000 regular parking spaces. (Source: Strassenverkehrstechnik, 7/2015)
Accident statistics show that this often has fatal consequences. A significant number of accidents on motorways are caused by overtired truck drivers and accidents at service stations due to blocked access roads increase. Existing parking space for HGV must be managed in such way that it can be efficiently utilized. At the same time, the drivers must be able to plan their compulsory breaks and to find parking space without tedious searching. Creating, controlling and displaying HGV parking space is an investment in the safety of all road users. With competitive concepts, SWARCO TRAFFIC SYSTEMS makes its contribution to implement the future technology of HGV management. In order to successfully develop new and advanced products and concepts, extensive test series are conducted in close cooperation with the Business Unit Detection – the SWARCO competence center for detection technology and its team of developers with longtime experience based on the Weiss-Electronic know-how.
Images of a test series with articulated lorry and bus on the SWARCO TRAFFIC SYSTEMS parking ground in Trier
: not specified Projects with detailed project description are marked in bold. Multiple entries possible.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 32/96
SWARCO TRAFFIC SYSTEMS GMBH In the field of dynamic detection, evaluation and display of parking spaces for heavy goods vehicles at rest and service areas, SWARCO TRAFFIC SYSTEMS has participated in the following projects: Completion
Project
Volume in 1000 €
2014
Dynamic display of parking spaces for HGV Motorway A5 Hartheim - Weil am Rhein System Software
Germany BadenWuerttemberg
2013
Motorway A1 service area Buddikate West dynamic display of free HGV parking spaces
Germany Schleswig-Holstein
688
2012
Motorway A2 rest area Kraehenberge HGV parking with video detection
Germany Saxony -Anhalt
184
2012
Motorway A2 service area Boerde Autom. telematic control for HGV parking incl. detection of occupancy of the parking spaces via inductive loops
Germany Saxony -Anhalt
392
2012
Dynamic display of parking spaces for HGV, Motorway A5 Hartheim - Weil am Rhein Field installations
Germany BadenWuerttemberg
2008
Service area motorway A61 Brohltal
Germany RhinelandPalatinate
2007
Display of HGV parking spaces motorway A8 service area Aichen
Germany BadenWuerttemberg
2005
HGV group parking, motorway A3 Montabaur
Germany RhinelandPalatinate
2004
“Tank und Rast” – Traffic data acquisition for service stations on federal motorways; monitoring of operation and evaluation
Germany Tank & Rast GmbH & Co KG
160
226
: not specified Projects with detailed project description are marked in bold
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: August 2015 33/96
SWARCO TRAFFIC SYSTEMS GMBH
8 “DRIP” Projects (Dynamic Route Information Panels) Dynamic Variable Traffic Sign System with integrated Congestion Display Completion
Project
Volume in 1000 € 300
under construction 09/2012
Motorways A10 / A24 interchange Havelland and junction Kremmen, lot 16.1: Dynamic VMS with congestion information
Germany Brandenburg
2015
Network-wide rerouting Usedom Dynamic Variable Traffic Signs
Germany Mecklenburg-West Pomerania
2015
Network-wide rerouting motorway A5 interchange Weinheimer Kreuz Dynamic Variable Traffic Signs
Germany Hesse
2014
Dynamic information signs on federal road B10 Karlsruhe by order of Siemens
Germany BadenWuerttemberg
2014
“dNet Bayern” 1 stage of construction motorways A3, A6, A7 – dynamic variable routing and display cross sections
Germany Bavaria
3,000
2012
Variable routing Channel tunnel Rendsburg / Hochbrücke A7
Germany Schleswig-Holstein
1,090
2011
Motorway A5, interchange Darmstaedter Kreuz, Northern access
Germany Hesse
943
2010
Motorway A8 East, junction Inntal, direction south 3 display points, 3 outstations
Germany Bavaria
1,040
2007
Network wide rerouting Cologne-Eindhoven Motorway A4/A61 interchange Kerpen 4 display points, 4 outstations
Germany North RhineWestphalia
2006
Network wide rerouting Baden-Wuerttemberg Motorway A8 interchange Leonberger Kreuz, A5/A6 interchange Walldorfer Kreuz 7 display points, 7 outstations, sub center
Germany BadenWuerttemberg
st
402
1,111
: not specified Projects with detailed project description are marked in bold
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: August 2015 34/96
SWARCO TRAFFIC SYSTEMS GMBH Completion
Project
Volume in 1000 €
2005/2006
Network wide rerouting motorways A1, A7, A21 and federal road B205 - 6 display points, 6 outstations, sub center
Germany Schleswig-Holstein
2006
Dynamic traffic guidance motorway A7 junctions Hamburg Stellingen and Hamburg Bahrenfeld 2 display points and 2 outstations Dynamic traffic guidance motorways A10, A13 and A24, 6 display points, 6 outstations
Germany Hamburg
Germany Brandenburg
2006
Network wide rerouting Stuttgart area Motorway 81 , federal roads B10 / B295 4 display points, 4 outstations
Germany BadenWuerttemberg
2006
Network wide rerouting Rhine-Main West, part 2 Motorways A3 / A60 / A66 / A67 (interchanges Wiesbaden / Moenchshof / Ruesselsheim) 9 display points with 9 outstations
Germany Hesse
2005
Network wide rerouting Rhine-Main West, part 1 Motorways A3 / A66 4 display points with 4 outstations
Germany Hesse
2005
Dynamic traffic guidance motorways A3 / A66 interchange Wiesbadener Kreuz
Germany Hesse
2006
: not specified Projects with detailed project description are marked in bold
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: August 2015 35/96
SWARCO TRAFFIC SYSTEMS GMBH
9 Project descriptions
The following descriptions represent only a small selection of projects.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 36/96
SWARCO TRAFFIC SYSTEMS GMBH
Motorway ringroad A99 Munich Relocation of the junction Aschheim / Ismaning
The pronounced goals were to prepare and reuse existing system parts as far as possible and to keep operating the hard shoulder running in the section
of
construction
works
and
system
modification.
Project content •
Dismantling, new installation and where possible reusing, preparing and reconstruction at the new location of:
Due to the extension of the junction Aschheim /
-
10 New VMS gantries
Ismaning on the motorway A99 near Munich, it
-
2 Cantilevers with overtaking
was necessary to adapt the according signposts,
-
5 Variable routing and direction signs with overtaking
display points with hard shoulder running as well as the corresponding video components. The
-
1 New variable routing sign
concerned section of the traffic management
-
28 New VMS in LED technology
system includes three lanes each in both driving
-
4 Rerouting displays in prism and LED
directions
plus
hard
shoulder,
which
technology
was -
supposed to be used as temporary additional lane even during the construction works.
Project conception
•
•
8 Video cameras (adjustment)
Delivery and installation of: -
11 New outstations
-
11 Control cabinets
Installation of the mounting equipment
In the course of the project, the signposts of the junction Aschheim / Ismaning were dismantled and newly installed at the relocated position. The display points of the corridor control system were adapted to the changed requirements. Thus, in cooperation with the traffic management center, also the release sequences for the hard shoulder running system had to be adapted accordingly. Additionally, the video points had to be adjusted to the new locations and visibility conditions.
Realization Construction works: May 2014 – June 2016 Project volume: approx. € 3 Mio
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 37/96
SWARCO TRAFFIC SYSTEMS GMBH
Modular traffic management system for temporary road works signalization by order of ASS Verkehrsservice GmbH in Nuernberg
System features •
Low energy consumption due to energy efficient components
•
Intuitive user interface
•
Modular system configuration
•
Operating status monitoring with automatic error message
•
Controlling and monitoring from anywhere
•
GPRS communication
•
Data security via VPN communication
•
High quality standard due to LED-VMS acc. to EN 12966
Project conception The road works management system is used for the
temporary
installation
of
road
works
•
Controller and communication inside VMS housing
signalization. The modular system set-up allows an easy and quick installation and bringing into service, the traffic safety is thus increased. The energy efficient
LED-technology
and
the
control
integrated in the VMS-housing by Swarco Traffic Systems
minimize
investment
costs,
reduce
maintenance costs and stretch operation periods. The communication between the central and the signalization is done via GPRS. The system is operated by means of an intuitive user interface. The system provides a multitude of extension possibilities such as traffic data acquisition for displaying congestion warnings, the integration of programmable LED-VMS or the integration of several road works sections.
System architecture
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 38/96
SWARCO TRAFFIC SYSTEMS GMBH
Project contents
Realization
•
1 Central control
Completion period:
•
12 display points with each
June 2015 – August 2015
- VMS-control in LED-technology - GPRS-communication to central - Solar energy supply with battery backup - Tubular lattice towers and baseplates
Central computer
Road works signaling
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 39/96
SWARCO TRAFFIC SYSTEMS GMBH
Traffic management system motorway A1 / A27 Bremen Dismantling, rebuilding and new installation
SWARCO TRAFFIC SYSTEMS implemented in this project both the dismantling and rebuilding of the traffic management on motorway A1 as well as the new corridor control system on motorway A27. The VMS were exchanged by night without disrupting the operation of the traffic management system. The installations were brought to service in several steps: •
Start of operation on motorway A1 in January 2015;
•
Start of operation on A27 first part in April, second part in September 2015.
Project conception During the 6-lane extension of the motorway A1
In September 2015 the traffic management
near Bremen, Germany, in 2009 the existing
system on the motorway A27 between the
traffic technology was dismantled and the VMS,
junctions Achim-Nord and Bremen-Nord was
outstations and weather stations were temporarily
officially opened.
stored. Whereas the traffic technology on motorway A1 was upgraded and rebuilt, for the new traffic management installation on motorway A27 the stored equipment was reused. The two and three-lane corridor control system on the A27 includes 15 bridges and 4 weather stations. Out of a total of 21 VMS, 10 were reused from the A1 equipment. Two-lane display point A27
The existing congestion warning system at the junction Bremen-Überseestadt was integrated into the traffic management system, the extension on motorway A1 and the complete section of the A27 was incorporated in the PRIMOS® Central Software.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 40/96
SWARCO TRAFFIC SYSTEMS GMBH
Project content
Realization
A1 / A27 total:
Start of construction: April 2014
•
6 Weather stations
Start of operation: September 2015
•
54 Overhead radar detectors
Project volume: approx. € 5 Mio.
•
10 Measurement points with loops
•
7 Measurement points with sidefire radar
•
21 Bridges with: - 6 Display points on motorway A1 - 15 Display points on motorway A27
•
6 Roadside traffic signs
•
PRIMOS® Central software
®
PRIMOS Central software: Overview map A1
®
PRIMOS Central software: Overview map A27
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 41/96
SWARCO TRAFFIC SYSTEMS GMBH
Extension of the traffic data acquisition in BadenWuerttemberg on motorways A5 / A81
The detection cross sections are located on the motorways: •
A5
•
A 81
•
A 864
•
A 81/B33
Project Content •
19 outstations
•
71 classification detectors with (2) vehicle classes acc. to TLS
•
6 solar powered stations
•
Acquisition of operating data
Project Conception In the course of the extension on motorways in Baden-Wuerttemberg,
the
traffic
acquisition
network was extended with a total of 19 detection cross sections acc. to TLS. The project includes the set-up and installation of inductive loops and
Realization
outstations as well as data and communication connections.
Start of constructions: in progress 4/2014 Project volume: approx. € 862 thousands.
A total of 6 stations are powered by solarpanels directly integrated into the cabinet.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 42/96
SWARCO TRAFFIC SYSTEMS GMBH
Traffic management and hard shoulder running motorway A9 Holledau – Neufahrn (1st & 2nd stage)
Project summary In the area between the interchanges Holledau and Neufahrn in driving direction Munich the existing corridor control installation was renewed and extended. In direction Nuremberg a new corridor control system was installed. The information is displayed by means of display cross-sections with VMS in LED-technology, installed at sign gantries made of spun concrete or mounted at poles beside the road. The traffic data acquisition is mainly done via overhead detectors mounted at the sign gantries.
Project Conception
These detectors use a combination of Doppler radar, ultrasonic and passive infrared technology
Being one of the most important traffic arteries in
for an exact data acquisition. They evaluate the
Bavaria, the motorway A 9 is of great significance.
traffic volumes per lane and minute for heavy
Although the traffic situation could be improved
goods vehicles and cars as well as their average
between the interchanges Neufahrn and Munich-
speeds. Inductive double loops are used where a
Nord after the eight-lane extension in 2005 and
higher number of vehicle classes and a better
the existing traffic management installations, north
accuracy is needed in the permanent counting
of Neufahrn the situation got worse due to
stations.
increased traffic loads. This frequently causes
Environmental data is detected by means of
traffic disturbances and congestions, especially in
visibility sensors (scatter measurement) and
rush hour and holiday traffic.
precipitation sensors (volume and type of
In order to better use the existing infrastructure, a
precipitation with Doppler radar measurement)
traffic management system was installed and the
evaluating the quantity of water on the road. At
existing corridor control installation in direction
some locations, additional sensors in the road
Munich was renewed and extended. Additionally,
evaluate data such as water film heights, freezing
a system for the temporary opening of the hard
temperature and road surface temperature for
shoulder was installed which allows using the
road service means.
hard shoulder as additional lane during peak
The display points as well as the detectors for
times.
traffic acquisition and environmental data are connected to the outstations which carry out the communication with the traffic computer.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 43/96
SWARCO TRAFFIC SYSTEMS GMBH The data transmission between the outstations
•
Signs for permanent use of hard shoulder
and the controlling traffic computer of the sub
(opening / closing / end of the hard shoulder
center located in the traffic and operation center
running) on the right hand lane together with
(Verkehrsrechner- und Betriebszentrale) for
permanent light signals (green arrow, red X,
southern Bavaria in Munich-Freimann is done via
yellow blinking arrow) in LED-technology
high-performance fiber optic network.
mounted overhead,
Also in the traffic and operation center the system
•
Fourth lane indicated within the variable routing by means of prism openers,
is operated and visualized. •
Pan-tilt-zoom
video
cameras
on
poles,
cantilevers and gantries to monitor the hard shoulder (free of obstacles) and •
Video network via fiber optic cable with video center in the cable house Holledau.
Additionally, for the temporary use of the hard shoulder, every 500 m to 1,000 m lay-bys and acceleration / deceleration lanes are implemented Variable routing with hard shoulder running
at service areas and nodes. In some parts the
The temporary opening of the hard shoulder
hard shoulder was enforced.
was integrated in the traffic management system
The fourth lane is indicated within the variable
in driving direction Nuernberg from the inter-
routing by means of prism openers. Pan-tilt-zoom
change Neufahrn to the interchange Holledau and
video cameras on poles, cantilevers and gantries
in driving direction Munich from the parking and
observe and monitor the hard shoulder from the
rest area Holledau to the junction Allershausen.
video center in the traffic and operation center.
To do so, the following system parts were added: •
Variable message signs analog to the corridor control system between the right hand lane and the hard shoulder as well as above the hard shoulder,
•
Traffic
data
acquisition
with
overhead
detectors for the hard shoulder,
Cantilever with permanent light, video camera and display for closing of hard shoulder running
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 44/96
SWARCO TRAFFIC SYSTEMS GMBH
Opening of hard shoulder
Project Content (dir. M. / dir. N.)
In peak traffic times at the motorway A 9, the
•
Length corridor control
traffic controller recommends the temporary
•
Length hard shoulder run. 26.3 km / 29.5 km
opening of the hard shoulder.
•
Display cross-sections with VMS / permanent
35.6 km / 34.1 km
Before the operator releases the hard shoulder,
light signals
the video cameras of the intelligent video center
- Gentries
scan the relevant section and check whether it is
- Cantilevers
6 pcs. / 7 pcs.
free from obstacles and ready to be used.
- Poles
3 pcs. / 0 pcs.
Additionally, in the future the operator will be
•
sections already checked and released for traffic.
Display cross-sections with signposting
supported by an automatic detection in the •
8 pcs. / 7 pcs.
Display cross-sections with static signposting
•
21 pcs. / 21 pcs.
4 pcs. / 4 pcs.
Display cross-sections with signs for hard shoulder running
•
28 pcs. / 27 pcs.
Traffic data - Overhead detectors
91 pcs. / 75 pcs.
- Induction loops
23 pcs. / 15 pcs.
•
Visibility
37 pcs. / 7 pcs.
Operator work station for automatic image evaluation system
•
Humidity
15 pcs. / 8 pcs.
•
Ground sensors
18 pcs. / 18 pcs.
After the hard shoulder was opened, the system
•
Video locations
73 pcs. / 81 pcs.
can also be used to analyze and monitor the
•
Outstations
traffic and to detect congestions, stopped
- new
vehicles, obstacles, wrong way drivers or
- refitted
occupied lay-bys and to report it to the operator.
•
31 pcs. / 35 pcs. 15 pcs. / 2 pcs.
Length new cable
Once the traffic volume decreases or in case of
- Data cable (fiber optics)
72 km / 54 km
incidents (e.g. accident, stopped vehicle, vehicle
- Energy cable
26 km / 33 km
in lay-by) the hard shoulder will be closed. After a period of transition the normal state of operation with a regular three-lane road is valid.
•
Energy - Connection locations
9 pcs. / 3 pcs.
- Distribution locations
34 pcs. / 15 pcs.
The hard shoulder resumes its original function as emergency lane.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 45/96
SWARCO TRAFFIC SYSTEMS GMBH The first stage of construction stretches from the
In this extremely accident-sensitive stretch, the
junction Allershausen to the interchange Neufahrn
measure improves greatly the traffic flow and
in both driving directions. The partly finished
traffic safety, traffic is harmonized and stabilized
second stage extends the installation from the
so that the number of congestions will be reduced
interchange Holledau to the junction Allershausen
in peak times.
in driving direction Nuernberg and allows for a hard shoulder running in the section between the interchanges Neufahrn and Holledau.
Realization
The corridor control installation between
Joint venture SIEMENS AG /
interchange Holledau and junction Allershausen in
SWARCO TRAFFIC SYSTEMS GmbH
direction Munich was finished in July 2015. The
Contract award dir. Nuernberg: February 2010
hard shoulder running in between the service and
Contract award dir. Munich: June 2010
rest area Holledau and the junction Allershausen in direction Munich will only be possible after
st
Start of operation 1 stage: December 2012 nd
certain road adaptations. These constructions are
Start of operation 2
to be implemented in 2016 so that by the end of
- Dir. Nuernberg (SBA+TSF): March 2015
2016 / in the beginning of 2017 the hard shoulder
- Dir. Munich (SBA): July 2015
running will be stretch from the service and rest
- Dir. Munich (TSF):
area Holledau to the interchange Neufahrn.
stage:
End of 2016 / beginning of 2017 Project volume (total): € 39.5 Mio
Overview map motorway A 9
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 46/96
SWARCO TRAFFIC SYSTEMS GMBH
HGV Parking Management System on Motorway A5 between Freiburg and Basel
Optimum utilization of parking spaces With the objective of optimally using all existing parking spaces up to the very last one, even parking spaces for passenger cars, which can be used at night without any safety hazard, are taken into consideration. Optimum detection and display The truck parking management system uses magnetic field sensors and radar detectors and identifies vehicles by their space needs. The system guides motorists who search a parking space by a three-fold classification (passenger
Project concept
car, long truck, and short truck) and balances the different parking space types (mixed parking
With the new HGV parking management system SWARCO TRAFFIC SYSTEMS has implemented a pilot project on the motorway A5 between Freiburg and Basel.
space, spaces marked for trucks and spaces marked for passenger cars). Additionally, spaces for cars and "tolerated" space uses at night are also considered. The communication between
An intelligent traffic control system leads the truck
parking area and sub center occurs via GPRS.
drivers in this section directly to free parking
The system works with automated corrections
spaces and thus helps to optimally use existing
which can also be implemented manually by SMS
parking capacities. On the motorway stretch
on site.
towards the customs at Basel / Weil am Rhein the system now controls the truck parking space numbers for five parking areas. The parking areas along the 24 km long stretch heading south largely differ in terms of size and equipment.
For the display of the parking spaces, SWARCO TRAFFIC SYSTEMS takes a new innovative approach, to boost the acceptance of the truck drivers. Not the calculated number of spaces is displayed but a parking space number based on
Therefore, the challenge was to assess the
fixed parameters. This means in case of a large
different preconditions such as infrastructures,
number of free spaces the display is adjusted in
their detailing degree, and the combination of
steps of 5 vehicles.
existing parking areas.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 47/96
SWARCO TRAFFIC SYSTEMS GMBH The display of "1" means that all regular parking spaces are occupied, but there might still be some "tolerated" spaces available. "0" is displayed to clearly indicate, that there are absolutely no parking spaces to be found and the truck drivers should refrain from entering the parking area at all.
Project content 5 parking areas on the motorway A5: Central software and field equipment •
5 Dynamic parking space displays in LED technology
•
1 Dynamic parking space display in prism technology
Free capacities viewable via internet and
•
7 Control cabinets
mobile devices
•
6 Cameras with pan-tilt-technology and
A SWARCO web service permits to retrieve
connection via fiber-optic cabling •
10 Overhead radar detectors
projected full occupancy for the current calendar
•
16 Magnetic field sensors
day on the internet or via smartphones. The
•
10 Access points
website follows the design of Baden-
•
1 Central Server
Württemberg's road traffic center in Stuttgart
•
Central Software based on BLAK
(SVZ) and can be accessed via the link www.svz-
•
1 Operating computer in the motorway
information both on free parking spaces and the
maintenance center
bw.de/ lkw_parken.html. •
1 i-Phone for manually correcting the number of parking spaces via SMS
•
GPRS communication between the central server and the control cabinets
The pilot project is part of the EU project "Easy Way – Harmonising European ITS Services and Actions" in which SWARCO TRAFFIC SYSTEMS cooperates with the federal state of BadenWürttemberg, the "Landesstelle für Straßentechnik" and the Regional Administrative Authority in Freiburg.
Realization Construction -
Field equipment: Sept. 2010 – Nov. 2011
-
Central software: Feb. 2011 – Aug. 2014 incl. bringing the system into service
Official opening and activation of the online information: Feb. 2015
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 48/96
SWARCO TRAFFIC SYSTEMS GMBH
Traffic management system Oeresund by order of SWARCO Sverige
Project content •
Integral part system with bidirectional data exchange to the superordinate SCADA system
•
Integration of several peripheral systems via different interfaces (OPC, WAN-Com, proprietary RS232)
•
Integration of the SWARCO Nordic outstation via TLS Over IP
Project conception
•
Extensive user management
•
Log files of essential operating and switching processes
The Oeresund Bridge connects via European route E20 the Danish capital city of Copenhagen and the major Swedish city of Malmö leading across the Oeresund strait. The connection consists of a nearly 8 kilometer
Citect SCADA Client
Citect SCADA Server
SCADA
bridge from the Swedish coast to the artificial island of Peberholm, which lies in the middle of the strait. It is then followed by a 4 km underwater
PRIMOS Traffic Client
External systems PLC-based
PRIMOS Traffic Server
tunnel, called the Drogden Tunnel, from Peberholm to the Danish island of Amager. (Source: Wikipedia)
The SWARCO TRAFFIC SYSTEMS project
provided by SWARCO
Outstations
Traffic management Oeresund (by order of SWARCO Sverige) consists of a traffic management system with corridor control and an extensive tunnel management.
VMS Signs
Barriers
Weather Stations
Video System
Peripheral systems
System overview (simplified depiction)
The traffic management in the tunnel uses the Central Software PRIMOS Control.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 49/96
SWARCO TRAFFIC SYSTEMS GMBH
Features PRIMOS Control •
Create sign contents
•
Configure and administer programs
•
Set Parameters e.g. wind limits, visibility, brightness, forewarnings…
•
View overviews and meteorological data
•
View protocols of switchings, switching states, user actions
•
Traffic infrastructure map
View statistics of lamp burning times and VMS switchings
•
User and group administration
•
Switch language
Realization Construction: October 2012 – January 2015.
Section overview in PRIMOS Traffic and zoomed detail
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 50/96
SWARCO TRAFFIC SYSTEMS GMBH
Gotthard Tunnel Motorway A2: Increased efficiency “EffiGo” incl. Integration into the BLE* and new operating concept
The tunnel is controlled both by Airolo (Ticino) and Goeschenen (Uri) with responsibilities alternating every two weeks. The northern ramp is so far exclusively operated by Goeschenen, the southern one exclusively by Airolo. In the course of several system extensions such as the so-called Release 2 in 2008, the traffic control was already prepared to be integrated into the operational control level (BLE TINWUR) of the cantons Ticino (TI), Nidwalden (NW) and Uri (UR). All computers in the area XI were thus already integrated into the BLE.
Increased efficiency 2014/15: Ongoing project
Initial position The Gotthard Tunnel in the Swiss Alps is considered to be one of the narrowest bottle-necks on the transit road between Northern and Southern
Goals are: •
software architecture
Europe and with 17 kilometers one of the longest •
two-way tunnels in the world. The traffic control of the Gotthard Tunnel was completely rebuilt in the period from 2003 to 2005 by SWARCO TRAFFIC SYSTEMS (then
Adapting and simplifying the complete
Adapting the operation to other BLE systems. To do so, the operating surface will be completely redesigned in order to have a “Look&Feel” similar to the other systems of the BLE
Weiss-Electronic GmbH). Here, all roadside stations and the group level with
10
redundant
group
computers
were
established, as well as the process level with one redundant head computer for the tunnel and one head computer each for the northern and the southern ramp. Since the tunnel is located in both, the German speaking canton Uri and the Italian speaking canton Ticino, from the very beginning the graphical user interface was designed with the possibility to switch to the according language.
*BLE: operational control level (Betriebsleitebene) SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 51/96
SWARCO TRAFFIC SYSTEMS GMBH •
Abolishing the separation of the northern
Project Content
ramp with which the separate head computer
•
Central control software
can be omitted. The head computers of the
•
2 Superordinate processor systems with
tunnel will take over their functionality which
web-server
will lead to the desired redundancy •
•
2 Auxiliary processor systems as emergency
Exchanging the outdated hardware and
control with web-server
changing over the complete group level to
•
10 Group processors with 20 servers
redundant communication processors KRI2B
•
83 Sub-stations for the control of approx. 500 signals and traffic lights
•
Since the operating authorities are very content
50 Measurement points for the detection
with the function and reliability of the of the traffic
with induction loops and radar detectors •
management system, the system’s core part itself
7 Overheight control installations
is not to be changed. The original operating surface had been developed using Java applets which is no longer desired due to possible
Realization
incompatibilities of different versions. Because of
•
Start of constructions: January 2003.
that, a completely new MMI (Man Machine
•
Begin of operation: September 2005.
Interface) will be developed, based solely on
•
Extension: June 2008 – July 2010.
HTML and Java Script.
•
Increased efficiency: 2014 – 2015
•
Total project volume: approx. € 4.3 millions
HMI-Architektur mit Java (aktueller Stand)
HMI-Architektur ohne Java HMI-Architektur
HMI (Server)
Datenhaltung
Anwendungslogik
HMI (Server) HMI (Server)
n
DatenhaltungDatenhaltung AnwendungslogikAnwendungslogik
Kommunikation
Webadapter (Java-Applikation) Java Virtual Machine HMI (Webadapter) Datenspeicher
Kommunikation JavaScript-Generator
IIOP
n
n
WBA
Webserver
Server
n
WBA
Dateizugriff
HTTP
WBA #n
#0 #1 ... Webserver (extern)
Kommunikation Steuerung/Datenhaltung Kommunikation (HTML/JavaScript-Generator)
n
Kommunikation a Webserver (intern)
Protokoll X
nb
HTML/JavaScript-Generator
Anwendungsserver/ Webserver HTTP
IIOP
Server Server
HTTP/HTTPS
WAN/LAN Client
Client Client
Webbrowser Webseite (HTML) Java-Applet Java Virtual Machine HMI (Client) Kommunikation Steuerung/Datenhaltung Präsentation
HTTP/HTTPS
Webbrowser
Webbrowser
Webseite (HTML) JavaScript-Engine
Webseite (HTML) JavaScript-Umgebung Kommunikation
Steuerung/Datenhaltung
Fassade Präsentation
Steuerung, Datenhaltung und Präsentation (JavaScript-Framework)
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 52/96
SWARCO TRAFFIC SYSTEMS GMBH
Original project conception: Gotthard Tunnel Motorway A2 Substitution of the traffic control installation 2003 Lot A: Traffic controller & Computer Lot B: Traffic data acquisition
Extension 2008 / 2010 Besides the implementation of further operating modes,
additional
metering
functions
were
installed on behalf of ASTRA, the Swiss Federal Roads Office. They are activated in the case of tailbacks on the accessing roads at Naxberg-
In order to ensure higher security for the traffic
tunnel and Galleria Stalvedro.
flows, a new evolutionary road control installation allocates the vehicles to the appropriate lanes of the tunnel’s gateway. This gateway can be closed e.g. when the passage of the tunnel is impossible because of an accident.
The special method of metering automatically adapts to the vehicle volumes inside the Gotthard tunnel. It is used to avoid tailbacks in the areas of those tunnels in front while at the same time keeping enough vehicles in the system so that the
The systematic metering of vehicles permits only
maximum capacity of the Gotthard tunnel can be
a safe number of vehicles in the tunnel at the
used, if needed. Furthermore, this measure keeps
same time.
clear the escape routes for emergency vehicles.
By means of a so-called drop control, heavy
During the extension also the so-called emer-
goods vehicles (HGV) are singularized so that
gency control was fundamentally renewed. This
they will not enter the tunnel in large groups.
allows switching the signal heads (traffic lights)
This is especially important in case of fire in order
even if the complete network structure fails.
to prevent the spreading of the flames. The ne-
The simple pressing of the “immediately“ button
cessary signal switchings will be started auto-
allows a quick reaction in stressful emergency
matically if there is a fire, if the permitted CO2-
situations.
concentration is exceeded or if stopped vehicles are detected. As all the communication facilities have a redundant structure, the system can still be controlled in the event of a defective cable or devices failure.
Goals are: •
Establishing of homogeneous traffic flow
•
Warning of tailbacks, fire and dangerous traffic conditions
•
Better security management of the traffic flows and fast closure of the tunnel
•
Capacity management / traffic metering
•
Exact information about the number of vehicles in the according tunnel section
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 53/96
SWARCO TRAFFIC SYSTEMS GMBH
Dynamic rerouting Bavaria (dNet Bayern) 1. Stage - Lot Telematics / traffic sign gantries
Project conception The project as described here comprises the first stage of constructions in the area of the interchanges Biebelried / Feuchtwangen/Crailsheim with the lot Telematics/traffic sign gantries. One location includes 2 dynamic VMS – one at about 1500 m in between the advance announcest
ment (2000 m) and the 1 signposting (1000 m), st
the other at about 750 m between the 1 (1000 m) and the 2
nd
signposting (500 m). On the motorway
A3 in front of the double junction Rottendorf / interchange Biebelried there is an additional location at the parallel lane in between the junction and the interchange. LED-matrix for three lanes
Defined sign contents The planned traffic management system called “Dynamic network-wide rerouting Bavaria (dNet Bayern)” is located on the motorways A3 direction Nuernberg, A7 direction Ulm and A6 direction Heilbronn.
Standard sign three lanes
It comprises 4 variable rerouting systems with congestion information with a total of 9 cross sections with dynamic VMS. Their freely programmable matrix displays in LEDtechnology show alternative routing recommen-
Standard sign two lanes
dations for different destinations and traffic information. They include weather conditions and traffic loads as well as disturbances and incidents in Bavaria and the neighboring federal states. The traffic is guided according to the current situation disturbances are displayed for each direction.
Location A3
The system is controlled by the sub center in the
These measures add considerably to the safety of
traffic and operation center Northern Bavaria
the whole traffic network.
(Verkehrs- und Betriebszentrale Nordbayern) in Nuernberg-Fischbach.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 54/96
SWARCO TRAFFIC SYSTEMS GMBH
Project Content
Realization
•
Controlled areas:
Start of construction: May 2013
−
Motorway A3 direction Nuernberg
Start of operation: November 2014
(ramp junction Rottendorf /
Project volume: approx. € 3 millions.
interchange Biebelried), −
Motorway A7 direction Ulm (ramp interchange Biebelried),
−
Motorway A7 direction Ulm (ramp interch. Feuchtwangen/Crailsheim)
−
Motorway A6 direction Heilbronn (ramp interch. Feuchtwangen/Crailsheim)
•
4 dynamic routing VMS systems (dWiSta)
•
A total of 9 dynamic VMS display cross sections (dWiSta)
LED-Matrix two lanes
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 55/96
SWARCO TRAFFIC SYSTEMS GMBH
Traffic management in the City of Luxemburg Implementation of three metropolitan tunnels
Additionally, two more tunnels in the city area Pénétrante Sued and Desserte Schuman have been equipped, modernized and extended with traffic technology by STS over the years.
Project conception In the current project all three tunnels as well as the traffic authority (Service de la circulation) were integrated into the control center of the tunnel René Konen. From there, they are directly linked to the new Luxembourgish Police center. The data is transmitted via fiber optics. Images, Starting in 2004 SWARCO TRAFFIC SYSTEMS (then as Weiss-Electronic, in cooperation with a
sound as well as keyboard and mouse signals are transmitted via KVM-over-IP technology.
partner from Luxembourg), began to renew the
Instead of using individual operator computers,
tunnel control of the tunnel René Konen, which
the data is switched to a video wall at the police
runs underneath the city center and pedestrian
center when triggered by an event. From there,
zone in Luxemburg City.
the tunnels can be controlled by means of the
Since then, the traffic management and the tunnel
individual STS central software systems.
technology has been further optimized and
Desserte Schuman is integrated into the
updated. Thus, e.g. the height control has partly
visualization of the René Konen central software
been changed over to laser technology, central
whereas Pénétrante Sued has its own
computers have been modernized and several
visualization and control system.
test fields have been installed.
Combined central software visualization for the tunnels René Konen and Desserte Schuman
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 56/96
SWARCO TRAFFIC SYSTEMS GMBH
Project content
Realization
•
8 LED-VMS
Start of constructions: September 2004.
•
10 Continuous lights
First operation: Since June 2005.
•
2 Portal traffic lights
Since 2012 continuous optimizations and
•
1 Barrier
extensions
•
8 Double loops
•
2 Radar detectors
KVM over IP (KVMoIP) means the
•
4 Prism openers
remote control of keyboard, video and
•
3 Outstations
•
4 Height controls, partly as laser
clients and servers from everywhere.
•
1 Tunnel sub center compputer
For the KVM-connection, Internet or
•
4 Operator stations
mouse via IP-protocol. The administrator can use and administer the
other networks working with TCP/IP can be used.
System architecture of the traffic management system in the City of Luxemburg (simplified)
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 57/96
SWARCO TRAFFIC SYSTEMS GMBH
N2 Galleria Monte Ceneri (Switzerland) Control and Signalization
The lot control included the delivery, installation, cabling and bringing into service of 19 outstations and the implementation of a central software (sub center), which is connected to the superordinate control system. Besides incident detection with detection of wrong way drivers, fire and CO2 contamination, the control also allows an bilateral traffic flow. This means that if one tunnel tube is closed, the other tube can be used in two-way traffic. To do so, special interlocking and monitoring mechanisms were implemented in the control system.
Project Conception
The connection to the SCADA system allows the
Monte Ceneri in the Swiss canton Ticino forms a
interaction with the lots ventilation, tunnel lighting,
natural barrier, dividing the northern and the
fire alarm system and emergency system. In case
southern parts of the canton. Therefore,
of an incident a quick tunnel closure is carried out.
concerning traffic, the mountain is of great
In the lot signalling the according variable
importance and the tunnels of the Gotthard
message signs (VMS) including brackets and
railway, the national road N2 and the motorway
cabling were delivered, installed and brought into
A2 cross below it.
service.
In order to increase tunnel safety, by order of
An integration test in several levels was
ASTRA (the federal roads office) the motorway
performed across all lots and made sure that the
tunnel was equipped with an on-site control
system is functioning and operates properly.
system within the tunnel as well as in front of the tunnel.
At the 40 portals a total of approx. 240 VMS in LED and prim technology, traffic lights, blinking lights and approx. 30 static signals were installed. Additionally, traffic flow is detected and classified via induction loops at 8 detection points. The special challenge was to implement the whole installation and bringing into service of the control system and signaling incl. cabling in each driving direction within only two weeks.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 58/96
SWARCO TRAFFIC SYSTEMS GMBH
Project content
Realization
•
Approx. 240 VMS in LED and prim technology
Construction: August 2012 – September 2014.
•
Approx. 30 static signals
Project volume: approx. €. 1.5 Mio.
•
Traffic lights, blinking lights
•
8 Detection points with induction loops
•
1 Central software, connected to the superordinate control system
Monte Ceneri control system northern portal Monte Ceneri control system southern portal
Monte Ceneri tunnel control system
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 59/96
SWARCO TRAFFIC SYSTEMS GMBH
Overhead noise protection barrier motorway A1 CologneLoevenich
Project concept The tunnel control center monitors continuously the noise protection via video and can close it at once if necessary. Concerning the control, the noise protection is integrated in the processes of •
the junction control of the interchange Cologne-West,
•
the congestion warning system from direction Dortmund
•
and in the system with dynamic routing VMS (dWiSta).
The region around the city of Cologne has one of the highest traffic loads of Germany. The overhead noise protection Loevenich now provides an intelligent and efficient solution for the traffic management system on the ring road around Cologne (Koelner Ring). Started in 2007, the two kilometer stretch on the motorway A1 in the west of the city was extended to six lanes. In order to protect the urban districts close to the
VMS gantry
motorway A1, the specific section of the motorway was enclosed by an overhead noise protection barrier. The tunnel-like construction across the motorway is made of reinforced concrete walls beside the motorway and in the medial strip, which are covered by an arched glass structure. Integrated in the noise protection is the junction Cologne-Loevenich as well as five bridges. The speed limit within the installation is reduced to
Roadside station
80 km/h.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 60/96
SWARCO TRAFFIC SYSTEMS GMBH
Project content field installations •
212 dynamic display systems in LEDtechnology at 47 display cross sections (of which 13 within the tunnel)
Dismantling of the existing systems with traffic signs, dynamic VMS, roadside stations and
74 roadside stations with 1000 V transformer for power supply
•
•
steel bridges •
Length of noise protection barrier: approx. 1500 m, 1 tube per driving direction
•
Clearance within the tubes: approx. 4.7 m (at some points 4.5 m)
•
37 prism openers at 27 display cross sections
•
12 variable routing systems
•
4 VMS in LED- technology (dWiSta) within
The roadside stations on the sign gantries are
the noise protection
also accessible within the tunnel via the service
•
29 static signs and signposts
paths on the roof, without having to close the
•
Permanent lane signals, blinkers
•
13 measurement cross sections in inductive
By using double IOC it is possible to control the
loop technology
traffic management both by the sub center and in
•
24 data acquisition units for double loops
case of an incident by the tunnel operating center
•
34 combined overhead detectors
•
46 brightness sensors (inside and outside)
•
2 measurement station for humidity incl.
Project content sub center
data acquisition units and IOC
The control software is based on the standardized
15 height control installations with photo
“BLAK” software (www.nerz-ev.de).
•
evidence •
VMS with shutter as emergency signalization (fail-save)
• •
tunnel.
Besides the standard operating elements (e.g. show current conditions, switching VMS, requesting protocols and statistics) also the ramp meter-
Lane lights as support for the overhead
ing system must be parameterized or the closing
signalization to divert vehicles
barrier systems must be operated.
3 ramp metering systems are integrated into the tunnel control for tunnel closure
Realization Start of construction: 2007 Start of operation: 2013
Ramp metering with closing barrier
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 61/96
SWARCO TRAFFIC SYSTEMS GMBH
Traffic management Wankdorfplatz, City of Berne, Switzerland
constructed. The traffic now flows on two levels: Traffic going straight on stays above the ground, traffic turning left or right uses the underground traffic circle. Static and variable message signs are used for signposting. The traffic is managed via traffic signal installations, metering systems and congestion monitoring already in the periphery of the Wankdorfplatz.
Project Conception Wankdorf in the northern part of the city of Berne is both residential area for approx. 20,000 people and industrial area with soccer stadium,
shopping
mall,
BERNEXPO,
BernArena, Klee-Center and much more. With 65,000 trips daily the Wankdorfplatz is
The local operation by the police is done via
said to be a major hub, and the trend in the
the
future is increasing. As the central hub in the
management system by means of the PRIMOS
Canton and as heart of the development of the
MOTION central software and an intuitive user
territory the Wankdorfplatz has reached its
interface.
touchpanel
of
the
Wankdorf
traffic
capacity limits - without the development of local infrastructure the total traffic could no longer be managed in a compatible manner. The share of public transport is expected to increase significantly in the area of ESP Wankdorf. The aim is to primarily cover the increasing traffic that occurs from the new uses of ESP, by public transport and provide attractive as well as safe conditions for bicyclist
User interface of the traffic management system Wankdorf
and pedestrians. To do so, the Wankdorfplatz was completely rebuilt and an underground traffic circle was
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 62/96
SWARCO TRAFFIC SYSTEMS GMBH Goals are: •
To create the necessary capacity for trouble-free tram and bus operation.
•
Improve traffic flow on the peripheral roads
•
Protect the residential streets from deviating and increased traffic
•
Increase the attractiveness for
Realization Building owner canton of Bern in collaboration with the ASTRA. Start of construction: June 2012 Start of operation: December 2012 Project volume total: approx. € 1.13 millions
pedestrians, cyclists and for public transport
Project Content •
Traffic management computer
•
Section control unit
•
Manual control unit
•
Dynamic and static signposts
•
Internal proprietary connection between
Outdoor touchpanel operation unit
- Traffic management computer and section control unit - Section control unit and manual control unit (serial) - Manual control unit and dynamic signposts (I/O contacts) •
Connection of traffic management computer and traffic management manual control per fiber optic cable via INFRA3
Signposting in prism technology
Manual control unit
interface •
Connection of traffic management computer and VSR Berne per 2-wire SHDSL section via OCIT-I PD interface
•
Connection of PRIMOS MOTION central software of the visualization server with the webvisualisation clients via Internet per HTTPS protocol
Signposting and metering
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 63/96
SWARCO TRAFFIC SYSTEMS GMBH
Development of a standardized control software for a traffic management system using the example of the A8 between junctions Leonberg and Wendlingen (SSW - SBA -A8)
The aim was to create transferrable sub-center software. Within this project the software of the traffic management system was tested in parallel mode against the existing control system of the B27. After this test in reality it is for the first time used at the newly built corridor control system A8 between the motorway intersection Leonberg and the junction Wendlingen. The project was carried out according to the V -
model.
Thereby
the
"
Object-oriented
development using finished products " (in Part 3 "Handbook collections, scenarios " of the V model) was predetermined. The developed software units have been
Project design
implemented to be integrated into the existing traffic control system VRZ3 and the basis
The motorway A8 in the south of the city of Stuttgart has a particularly high traffic load of nearly 150,000 veh. / 24 hours on working days. The effects are especially noticeable in the
section
between
Wendlingen
and
Leonberg, in which the recorded number of accidents is above average.
traffic jams and disturbances. The newly corridor
management
The decisive achievement within this project was also the integration services and the testing of software units for the Basis software developed for the German market and the VRZ3. All this secures the reliability in operation of the corridor control software.
Especially in the peak times there are regularly
installed
software developed for the German market.
system
Project Content
is
Creating a sub-center according to MARZ, on
supposed to improve traffic flow and to
the basis of the data distributor of the
decisively increase road safety. It is supple-
Federation (BLAK software).
mented by the temporary use of the hard shoulder as an additional lane between the interchange Stuttgart and junction Moehringen. Purpose of the project was to develop a standardized control software (sub center) for
The following components were prepared in accordance with the terms of reference •
SBA – algorithms
•
Plug-ins
corridor management systems by using the
Realization
example of the A8 south of Stuttgart (SSW -
Project start: September 2009
SBA- A8).
Commissioning October 2011
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 64/96
SWARCO TRAFFIC SYSTEMS GMBH •
Traffic management system motorway A14 Project Central Technology
support of operational monitoring of system components (especially of sensors)
•
Reduction of administrative overhead
Project Content The IT system (lower panel) should be transferred to other stations; within this project it is used in the Traffic management system of A14 between the AS Schoenebeck
and
junction Wanzleben near Magdeburg. Software units of basic software of the traffic control
Project Conception
centre-based With the sub-center of the traffic management system
the
increased
A14
by
road
effectively
safety has
been
situation-specific
system
and
other
finalised
products are integrated so that the overall reliable operation of the traffic management system is guaranteed.
displays and optimized control. V-model specifications and system features In addition, the following technical objectives: •
•
were implemented. The aim was to comply
Reusability of the standard solution in
with the defined interface standards and
principle, all traffic management systems
predefined interfaces. The overall system is
Independence of company-specific solutions
characterized by high operational availability, reliability,
reusability,
efficiency and
easy
maintenance. The extensibility of the system •
Simplified and highly automated handling /
and its components for different applications
monitoring with minimal manual effort
and systems is guaranteed.
thereby improving access opportunities administrators and operators •
Improved traffic management taking into account various switching and recommendations new control algorithms
Realization Construction
period
for
the
entire
implementation of the traffic management system A14 sub-center and outdoor plant as well as trial operation stage September 2010 -
•
Implementation and testing of algorithms
December 2011.
for the influence of truck traffic •
High performance evaluation capabilities in support of ongoing improvements necessary control and maintenance of the switching programs
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 65/96
SWARCO TRAFFIC SYSTEMS GMBH
Project Content Extension of the Traffic Data Acquisition in Hesse
•
104 outstations connected to several sub centers
•
310 classification detectors with (8+1) vehicle classes acc. to TLS
•
44 solar powered stations
•
Acquisition of operating data
Project Conception In the course of the extension on motorways in Hesse, the traffic acquisition network was extended with a total of 104 detection cross sections acc. to TLS. The project includes the set-up and installation of inductive loops and outstations as well as data and communication connections. A total of 44 locations were operated by means of solar power. The detection cross sections are located on the motorways:
Realization
•
A3
•
A 4 ( Hesse and Thuringia)
•
A5
•
A7
•
A 44 / A49
This project extends and continues the traffic
•
A 45 (Hesse and Bavaria)
data acquisition installations on motorways in
•
A 66
Hesse which were realized throughout the past
•
A 659
years.
•
A 661
Start of constructions: 2009. Start of operation: 2012. Project volume: approx. € 4.5 millions.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 66/96
SWARCO TRAFFIC SYSTEMS GMBH
Project contents of earlier of traffic data acquisition measures Extension of the traffic data acquisition in the subordinated road network for the model system DIVA (dynamic integrated traffic situation on secondary roads) •
Renewal of 14 outstations
•
24 classification detectors with (8+1) vehicle classes acc. to TLS
•
1 solar powered location
•
Acquisition of operating data
Realization Construction: Nov. 2009 – Oct. 2010 Project volume: € 653 thousands
Refitting of 4 traffic data acquisition locations in Northern Hesse •
Renewal of 4 outstations
•
18 classification detectors with (8+1) vehicle classes acc. to TLS
•
Realization Construction: May 2009 – Nov. 2009 Project volume: € 175 thousands
Acquisition of operating data
Refitting of 9 traffic data acquisition locations at the interchange Frankfurt •
Renewal of 9 outstations
•
43 classification detectors with (8+1) vehicle classes acc. to TLS
•
Realization Construction: Feb. 2009 – July 2009 Project volume: € 240 thousands
Acquisition of operating data
Extension of the traffic data acquisition network in Hesse •
Renewal of 18 outstations
•
23 classification detectors with (8+1) vehicle classes acc. to TLS
•
18 solar powered locations
•
Acquisition of operating data
Realization Construction: Nov. 2006 – June 2007 Project volume: € 312 thousands
Installation for the traffic data acquisition on motorways in Hesse •
141 outstations connected to 10 sub centers
•
More than 600 classification detectors with (8+1) vehicle classes acc. to TLS
•
13 solar powered locations
•
Acquisition of operating data
Realization Construction: Nov. 2003 – May 2006 Project volume: € 5.887 millions
The project was implemented in cooperation with partners from the field of civil engineering.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 67/96
SWARCO TRAFFIC SYSTEMS GMBH
Corridor control and hard shoulder running motorway A5 interchange Darmstadt – Seeheim-Jugenheim
Additionally, the temporary release of the hard shoulder in the section between the interchange Darmstadt and Darmstadt-Eberstadt is used to increase the road capacity during peak periods. Before the hard shoulder is opened for traffic it is controlled by 19 video cameras. The system is controlled by the traffic center Hesse (VZH).
Project Content
Project Conception
•
21 sign gantries incl. VMS
•
12 cantilever beams
•
13 prism openers
•
22 measurement points for traffic data acquisition
The motorway A5 is one of the most important north-south connections in Germany. Because of
•
its location and function within the traffic network,
6 measurement points for environmental data acquisition
the section between the interchange Darmstadt
•
41 outstations
and the junction Seeheim-Jugenheim must cope
•
1 communication computer
with particularly high traffic loads.
•
2 user stations
The corridor management system was set up to
•
19 video cameras
harmonize the traffic flows and warn the road users of congestions, dangers and other disturbances. To do so, radar, ultrasonic and infrared sensors are used to detect the traffic at 22
Realization
measurement points. From this data, the sub
Project start: December 2009
center evaluates the according measures and
Start of operation: August 2012
displays them at the variable message signs
Project volume: approx. € 4.7 millions
installed at 21 sign Gantries.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 68/96
SWARCO TRAFFIC SYSTEMS GMBH
Network-wide routing Motorway ringroad Mainz with dynamic variable signposting system and hard shoulder running motorway A63
Additionally, the dynamic signs of the rerouting system will be used to warn of congestion and incidents and give route recommendations for the area.
Project Content •
8 SWARCO FUTURIT dynamic rerouting signs (dWiSta)
•
18 Outstations with control module CCM2200+
•
37 Variable message signs / rerouting signs in prism technology
Project Conception
•
32 Cameras with automatic lane scanning
•
“BSURZ“ Central technology for hard shoulder opening
The forecast of more than 100,000 vehicles per day on the motorway A60 in the year 2025 made the 6-lane expansion of the motorway ring around the city of Mainz (Rhineland-Palatinate) to an
•
Implementation of network-wide rerouting system motorway ring Mainz into the existing traffic management system Cologne – Koblenz
important measure to ensure smooth traffic flow and to increase the capacity and safety. With the installation of a network wide rerouting system
including
dynamic
signposting
and
temporary opening of the hard shoulder on the motorway A63 between the junction Nieder-Olm and the interchange Mainz Süd in both directions, SWARCO TRAFFIC SYSTEMS GMBH INTERURBAN makes an important contribution to this project. Depending
on
the
traffic
Realization
situation, the hard shoulder on
Start of construction: February 2011
the A63, which at the moment
Start of operation: April 2012
is permanently open, will be
Currently, the start of the automatic lane scanning
used as
is postponed.
third
emergency lane.
lane or
as
Project volume: approx. € 7.3 millions
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 69/96
SWARCO TRAFFIC SYSTEMS GMBH Additionally, a VMS located in the opposite driving
Corridor management system motorway A1 Dortmund-Unna – interchange Kamen
direction gives information about the traffic situation at the interchange Dortmund-Unna, whereas a roadside traffic sign with two VMS located at the ramp Kamen Zentrum (driving direction Bremen) is used to inform the accessing traffic. The huge sign gantries reaching across six lanes, which were installed in a record time between August 2011 and January 2012. The project, with Business Unit Interurban as main contractor, spanned the whole project management scope of work
including
planning,
construction
of
foundations, steel constructions, mounting and bringing into operation as well as the necessary
Project Conception
traffic safeguarding.
The section of the motorway A1 between Dortmund-Unna and the interchange Kamen is infamous
for
its
high
traffic
volumes
and
Project Content
congestions.
•
6 outstations in PRIMOS traffic technology
In northward direction, on a length of approx.
•
5 sign gantries across six lanes
seven kilometers, a traffic management system
•
25 variable message signs in LED-technology
with a total of 25 VMS in LED-technology and 15
®
one further VMS in the opposite direction
radar detectors was implemented on the six-lane
•
15 radar detectors
motorway.
•
1 side installation with 2 VMS
At each of the five newly installed sign gantries five VMS and three radar sensors detect the traffic
•
1 weather station
on the lanes and forward the data to an outstation ©
in PRIMOS traffic technology. This data, together
Realization
with weather data from a weather station, is then The corridor management system was opened for
used to determine the current traffic situation.
traffic in April 2012 after only nine months and The
sub
center
evaluates
the
data
and
successfully accepted and approved in July 2012.
accordingly displays the necessary speed limits and warning signs such as fog, congestion, road
Project volume: approx. € 1.5 millions
words at the VMS.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 70/96
SWARCO TRAFFIC SYSTEMS GMBH
Telematic control for HGV parking at motorway A2 in Saxony-Anhalt
Objective is to reliably determine the actual occupancy of the parking spaces (total error rate < 10%, error rate per detection point < 5%) and to neglect those vehicles leaving the parking area without actually parking.
Project Content The project consists mainly of the detection, evaluation and transmission of traffic data with: •
adding up the number of HGVs in the parking
In these pilot projects, on motorway A2 in Saxony-
spaces (no monitoring of individual parking
Anhalt, telematic control for HGV parking at service and rest areas with different detection methods, will be tested.
9 Double inductive loops for detecting and
spots) •
2 Video cameras used for traffic monitoring, for supporting the winter service, for supporting the police fighting crime as well as
Occupancy of HGV parking spaces via inductive loops at service area Boerde
for monitoring the system functions and accuracy of the display •
One LED-sign displaying the number of free parking spaces
Nine detection points with inductive loops in the lanes determine the occupancy rate of the parking spaces. The passing curves are evaluated by means of a special algorithm. With this, the
Project Conception
entering and leaving vehicles can be compared and matched.
In the pilot project at the service area Boerde in driving direction Berlin, the occupancy of HGV parking spaces will be determined by means of intelligent loops.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 71/96
SWARCO TRAFFIC SYSTEMS GMBH By means of the protocol TLS-over-IP, the vehicle characteristics determined by the algorithm are forwarded
as
unique
IDs
to
the
parking
HGV parking with video detection at motorway A2, rest area Krähenberge
management center. There, the free spaces are evaluated by calculating the entering and leaving vehicles, not tracking individual vehicles but counting similar vehicle patterns. The number of spaces is then forwarded to the display sign in LED technology. No individual vehicles are tracked but similar
Project Conception
vehicle-patterns are counted. The system uses a
In another project, the rest area Krähenberge will
detector newly developed for this application with
be equipped with a system based on video
special software.
technology. The system consists of eight video
A particular challenge in this project is - in contrast
cameras, each one determining the occupancy of
to applications on motorways and interurban
five HGV parking spaces by means of single
roads - that all kinds of traffic conditions such as
vehicle detection. The results are combined and
sudden speed changes, stop and go traffic,
the number of free parking spaces is then
maneuvering and reversing vehicles must be
displayed
considered.
motorway. A video camera with pan-tilt-zoom
via
LED-sign
located
beside
the
function is used to monitor the occupancy and to visually correct the numbers, if necessary.
Realization
The system will be integrated into an existing
The system is in test operation mode since the
video System, video and TLS data will be
end of 2011.
forwarded to the traffic management center at Halle/Peißen via fiber optic cable.
Project Content •
8 camera systems determining the occupancy
•
1 PTZ-camera (Pan-Tilt-Zoom)
•
1 outstation
•
1 LED display
Realization The system was implemented in 2011.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 72/96
SWARCO TRAFFIC SYSTEMS GMBH
Electronic deer pass warning system on federal road B202 Rastorfer Kreuz
Project Content •
PRIMOS MOTION Central Software
•
2 Outstations
•
16 Variable message signs
•
2 Traffic data acquisition systems
•
4 Detection fields
®
Project Conception With approx. 30 accidents caused by deer, the federal road B202 near Kiel in Schleswig-Holstein is a well-known accident black spot. Goals are to reduce the number of accidents caused by wild animals and, at the same time, to preserve a north-south passing-strip where the wild animals can cross. To do so, two safety fences of four kilometers length were installed to
The detectors are deliberately adjusted in such way that only larger animals are detected and small ones are ignored. This is done in order to avoid that the attention of the road users wears off because the situation is considered to be nonhazardous.
secure the area at the side of the road and to
The display of the VMS in LED-technology can
force the animals to only cross the road at two
optionally be adjusted to be static or blinking.
defined spots. ®
At these spots, detection areas at the side of the road were established to detect the animals when they approach. They consist of six sensors each at both sides of the road. Once animals are detected, warning signs placed in sufficient distance beside the road start blinking and show the warning “deer pass” and a speed reduction of 70 km/h (50 km/h). The road user has enough time to slow down and to avoid the collision, if
Central Software PRIMOS MOTION The complete system is parameterized and visualized via the PRIMOS® MOTION central software by means of a local operating station in the operating center at Neumuenster. Here, the software not only processes the animal detection as such but also the measurement data from the inductive loops detecting traffic data such as number of vehicles and vehicle classes.
necessary.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 73/96
SWARCO TRAFFIC SYSTEMS GMBH The traffic data, e.g. traffic volumes, is evaluated and
used
for
statistical
means.
Also,
the
brightness and function of the signs can be adjusted. Additionally, the software includes a
Realization
complete user administration as well as the
The planned test operation phase of twelve-weeks
logging of wild animal detections and their
will be used to fine-tune the installation, e.g.
resulting switchings.
adjusting the detectors, adapting the trigger times.
Outlook: Deer pass systems do not only raise road safety but also actively make a contribution to protect nature. Habitats fragmented by roads are reunited and the genetic exchange of the wildlife is assured.
The deer pass system installed by SWARCO TRAFFIC SYSTEMS INTERURBAN was officially taken into operation by Dr. Tamara Zieschang, state
secretary
Transport,
of
Building
the and
Federal
Ministry
of
Affairs
on
Urban
12 September 2011.
A good example for the success of these installations is the deer pass warning system at the country road L172 near Halle in SaxonyAnhalt (Ziegelrodaer Forst). At this location, the number of accidents caused by deer pass was reduced by nearly 100%.
®
Schematic representation of the deer pass warning system in the PRIMOS MOTION Software visualization
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 74/96
SWARCO TRAFFIC SYSTEMS GMBH In this project the existing traffic control installation
Traffic control installation motorway A2 Wunstorf-Luthe in Lower Saxony
on motorway A2 west of Hanover was extended in the following sections: •
From junction Wunstorf-Luthe to border to North Rhine-Westphalia in driving direction Dortmund
•
From border North Rhine-Westphalia to junction Rehren in driving direction Berlin
First, all display points in driving direction Dortmund
where
set-up.
Afterwards,
the
measurement points in both driving directions and Innovative solutions with intelligent and telematic approach to control the traffic are good traffic management
instruments,
especially
for
a
territorial state such as Lower Saxony, which
outstations were installed. After this, in one section after another, the existing measurement locations were retrofitted, tested and brought back into operation.
needs a functional infrastructure. The use of
With this procedure, the periods during which the
telematics brings safety, effectivity and comfort.
according displays per location were out of operation could be minimized.
Project Conception In order to raise traffic safety and improve traffic flow, alongside of the 6-lane motorway A2 between the borders to North Rhine-Westphalia and Saxony-Anhalt, traffic control installations were set up in several sections during the last three years. The new installation allows a continuous traffic control by management systems on the LowerSaxony part of the motorway A2.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 75/96
SWARCO TRAFFIC SYSTEMS GMBH
Project Content •
•
•
•
35 Additional display points with LED-VMS (A,
•
B and C) (27 in direction Dortmund, 8 in
incl. buried cable works on a length of
direction Berlin)
approx. 15 km
Exchange of 18 existing fiber optic VMS type
•
•
existing corridor control installation at 15
technology at 7 display points
existing outstations
18 Measurement points (8 in direction
•
Fiber-optic cable on a length of approx. 50 km
Dortmund, 10 in direction Berlin) in induction
and set-up of an Ethernet network in
loop technology
redundant ring structure
Refitting of 12 existing measurement points
Integration of 22 existing measurement points
•
Communication between outstation and existing sub center via TLS over IP
•
Set-up, maintenance and removal of a
in induction loop technology in new
temporarily stationary signage (speed limit /
outstations
ban on passing) during the refitting phase of
2 Environmental data stations for SWIS and
the existing display points and outstations
corridor management, 2 additional visibility
•
Extension of supply lines in the area of the
A and 13 VMS type B / C for VMS in LED-
from radar to induction loop technology •
Meter connection columns, supply lines
•
Removal of the existing stationary signage
sensors at the locations of existing black ice
(speed limit / ban on passing) in direction
warning installations
Dortmund and Hannover after the corridor
Set-up of 19 new outstations (10 in direction
control installation started operating
Dortmund and 9 in direction Berlin) •
Exchange of 19 existing outstations for new ones according to TLS 2002
Realization Start of construction: 2009 Start of operation: 2011 Project volume: approx. € 6 millions
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 76/96
SWARCO TRAFFIC SYSTEMS GMBH Using the tunnels, which require paying a toll, cuts
Carmel Tunnels, Haifa, Israel Tunnel management system
the current travel time from the Haifa South interchange in the west to the Checkpoint interchange in the east from 30 -50 minutes down to 6 minutes. Driving all the way through the tunnels will cost 11.40 Shekels (approx. 2.35 €).
Project Conception The
project
includes
the
complete
tunnel
management system with central software and 27 outstations. To a larger part, SWARCO TRAFFIC SYSTEMS Interurban acts, together with our
Project Content
partner Menorah Izu Aharon in Israel, as system
•
Central control software
integrator and coordinator.
•
27 Outstations
•
4 Internal variable message signs (LED)
•
73 Lane control signs
•
4 Prism openers for variable routing
•
46 Double induction loops
•
84 Traffic detection cameras
•
8 PTZ cameras
•
18 Corridor motion detection cameras
•
9 Routing and blocking barriers
•
2 Overheight controls
•
144 Emergency roadside telephones
The old part of Haifa with port and major business districts is located on a narrow coastal strip beneath 550m high Mount Carmel. To relieve traffic-congested downtown Haifa and to provide an alternative to driving up and across Mount Carmel the Carmel Tunnels Project was started. The project consists of two sets of twin tunnels, the 3.5 km long western set and the 1.6 km long eastern set, with two lanes of traffic in each tunnel and four portals. The entire project is 6.5 km long and includes 5
Goals are:
conventional bridges, 6 segmental bridges and 11
•
Reduce road congestion in the Haifa area
kilometers of roads.
•
Provide alternate route
•
Cut travel time
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 77/96
SWARCO TRAFFIC SYSTEMS GMBH System description
Realization
The central software allows controlling all tunnel systems by means of a visualization screen. All information is available all the time in one
Project start: April 2009 Project start-up and opening: November 2010.
overview. The tunnels are monitored from the International User Interface
tunnel control center in Krayot. The
system
management
is
connected
system
with
(FMS)
the
facility
including
fire
detection, electrical control, light control and ventilation control. In case of an alarm e.g. fire alarm, it reacts with predefined measures such as tunnel closure.
In the webvisualization of the central control software you can switch within seconds to and from different languages, countries and/or time zones during operation. The GUI adjusts e.g. text orientation, operating elements, date formats etc. according to the selected language.
External communication with •
Haifa Municipality - Center-to-center (C2C)
•
Traffic light controller (C2F)
•
Toll Plaza Hof Carmel and Krayot
•
Radio station Haifa
•
Emergency service via external workstation
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 78/96
SWARCO TRAFFIC SYSTEMS GMBH After a construction phase of only 7 months,
HGV guidance system on the motorway A98 Customs facilities Rheinfelden
including
planning
and
construction,
the
congestion management system for the motorway A 98 was introduced.
Project Content The project includes the delivery, mounting and bringing into operation of •
7 New sign gantries
•
7 Variable routing installations in prism technology
•
2 Prism openers
•
15 LED variable message signs
•
1 Video camera connected with the existing video center
Project Conception In spite of a length of only 29 km, the motorway A 98, the so-called “Hochrheinautobahn”, is an
By means of the link road A 861 it leads directly to highly
frequented
customs
facilities
4 Measurement points
•
5 Roadside units
As well as the backfitting of existing roadside
extremely important and busy traffic connection.
the
•
at
units, the extension of the sub center and further adaptations of the traffic technology.
Rheinfelden and is thus the direct connection to Switzerland.
Realization
Especially the high numbers of lorries which build
In operation since October 2010, the southern
tailbacks from the Swiss border to the motorway
lane and traffic system was opened with a ribbon-
at peak times, pose a big challenge for the traffic
cutting ceremony on 09 December 2010.
safety on the motorway. In case of such tailbacks, in front of the junction “Hochrhein” (Tunnel Nollinger Berg) the right lane of the motorway is reserved for the waiting Lorries, while the car drivers are able to use the left lane. This is made possible by a sophisticated system of modern traffic technology, offering the highest degree of information and safety for all people involved and helping to keep the traffic moving.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 79/96
SWARCO TRAFFIC SYSTEMS GMBH
Road condition and weather information system (RWIS) Hesse
The data is combined with weather data from the German
National
(Deutscher
Meteorological
Wetterdienst)
and
Service
evaluated
to
provide reliable local information for a winter road service which is optimally adapted to the current weather situation.
Project Content •
76 Measurement stations
•
80 User stations
•
1170 Sensors
•
Results are clearly arranged and displayed in a map
•
Project Conception
Import of weather reports from the National Meteorological Service
After the successful implementation of a sub center for the road condition and weather
•
Export of weather data to the National Meteorological Service
information service in Thuringia in 2009, a similar system was launched in Hesse in November 2010. A total of 76 measurement stations all over Hesse collect a variety of measurement values such as road
surface
temperature,
residual
Realization Start of constructions: April 2010. Begin of operations: November 2010.
salt,
precipitation.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 80/96
SWARCO TRAFFIC SYSTEMS GMBH The extension of the traffic control system, which
Traffic management system motorway A5 / A45 Friedberg Gambacher Kreuz
has proven of value, is another decisive step in the
project
Congestion
free
Hesse
2015
(Staufreies Hessen 2015).
Goals are: •
Harmonizing the traffic flow by means of dynamic speed limits
•
Warning of traffic and weather related dangers such as accidents and fog
•
Lane closure in case of disturbances
Project Conception
Project Content
The motorway A5 is not only one of the most
•
important motorway connections for long distance
Control software sub center (separate extension of existing sub center)
traffic (Hamburg – Frankfurt – Basel) but has also
•
46 Roadside units
a huge regional importance and thus the highest
•
39 Sign gantries with 105 variable message
traffic load in the Rheine-Main area (up to 144,000
signs type A and 66 variable message signs
veh/24h).
type B
The new traffic control system spans the sections
•
24 Measurement points for traffic data
of the A 5 between the junction Gambacher Kreuz
acquisition (74 double induction loops and
and the service area Wetterau as well as the A45
105 overhead detectors)
between
the
junctions
Gießen
Sued
and
Gambacher Kreuz. Especially on these sections the daily traffic load is very high: Between Gambacher Kreuz and junction Friedberg up to 100.000 veh/24h and between Gießen and Gambacher Kreuz up to
•
11 Environmental stations
•
Laying of approx. 58 km fiber optical cable and energy cable
•
Traffic management on a section of 8 km on the motorway A45 and 20 km on the motorway A5 in both driving directions
72.000 veh/24 h. Due
to
this,
the
motorway
is
frequently
Realization
overloaded, even smallest disturbances have
Contract and start of construction: June 2009
negative effects on the traffic flow and accidents
Start of operation: October 2010
cause enormous congestions.
Project volume: € 6.8 millions
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 81/96
SWARCO TRAFFIC SYSTEMS GMBH
Traffic management measures on motorway A5
Because of higher traffic loads and the success of the temporary automatic release of the hard shoulder in the corridor control installation on the motorway
A3
between
Frankfurt-Sued
and
Seligenstadt, in a third step the corridor control system on motorway A5 was equipped in both directions with such a hard shoulder release system
between
the
northern
interchange
Frankfurt and the junction Friedberg. At the same time, the existing installation was extended and important elements were modernized.
Project Conception
The fourth step, implemented in 2008, extended the system on motorway A5 between the western
Built in 2009, the traffic control system on the
interchange
Frankfurt
and
junction
motorways A5 / A45, junction Friedberg to
Zeppelinheim for another 10 km to the south.
interchange Gambacher Kreuz extends the
Additionally, between the interchange Frankfurter
existing traffic control system and continues the
and the junction Frankfurt-Niederrad, an auto-
traffic measures around the interchange Frankfurt.
matic system for the temporary release of the hard shoulder was installed at a length of 3 km,
Since the end of the 1980s, these measures aim to harmonize and control the traffic by means of
which substantially relieved the area of the Frankfurt interchange during the peak hours.
traffic management systems in order to cope with the continuously rising traffic loads. Starting in 1989/90 with the road section between the western interchange Frankfurt and Bad Homburg, in a second step the corridor control system was extended in 1995/96 going from Bad Homburg to the junction Friedberg.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 82/96
SWARCO TRAFFIC SYSTEMS GMBH
Project Content of earlier traffic management measures 4. Stage: Extension of the corridor control system •
22 display cross sections
•
Traffic control system 95 LED VMS (type A), 44 LED VMS (type B/C)
•
4 Display cross sections for variable routing
•
4 Display cross sections for release of hard shoulder
•
5 Monitoring cameras
•
34 roadway stations
•
Infrastructural works on a section of approx. 10 km
Realization Construction: April 2007 – June 2008. Project volume: approx. € 5 millions
3. Stage: Extension and reconstruction •
Modification and extension of the sub center
•
Installation of 35 display cross sections with 210 LED VMS
•
Extension of 11 display cross sections in fiber optic technology
•
37 Prism openers/shutters for temporary release of hard shoulder
•
Conversion of measurement cross sections to radar detectors for local traffic data acquisition
•
Video monitoring with 51 cameras and video center
•
Infrastructural works on a section of approx. 20 km
Realization Construction: July 2004 – June 2005 Project volume: approx. € 10 millions
1. and 2. Stage •
Sub center
•
61 Display cross sections (303 fiber optic VMS)
Realization
•
89 Measuring cross sections for local data acquisition
1. Stage: 1989/90.
•
10 Environmental data stations
2. Stage: 1995/96.
•
Infrastructural works on a section of approx. 30 km
Project volume: approx. € 8.6 millions
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 83/96
SWARCO TRAFFIC SYSTEMS GMBH
Extension of the HGV guidance system motorway A5 Weil am Rhein
Project Content •
Delivery and mounting of three walkable steel gantries including according base plate
•
Delivery
and
mounting
of
three
prism
openers as variable routing •
Delivery and mounting of two complete outstations including according cable works
•
Delivery and mounting of an outstation rack for an existing outstation
•
Planning and generating of traffic technology, program plans and configuration lists
•
Project Conception
Extension
of
the
sub-center
and
the
communication computer Weil am Rheine by new display points
Because of the night driving ban for heavy goods vehicles in Switzerland while not having enough space when the motorway is congested, there are regularly HGV congestions on the motorway A5 Karlsruhe – Basel in front of the customs site Weil am Rhein during the night and early in the morning. The hard shoulder and main lane are then blocked by the parking lorries. The fact that the exit and the junction “Weil am Rhein” lie within the congested area makes the situation even more problematic. In the course of the extension, the routing signs
Realization
are adapted to the switching state of the HGV
Started at the beginning of 2010, the project was
guidance system. To do so, three static displays
successfully finished in July 2010 after a test
are substituted by dynamic signs in triangular
operation of 2 weeks.
prism technology. These measures are taken to avoid that the cars are guided to the right lane where the Lorries are parked because of the existing static signs. Thus, the car traffic and the HGV traffic are separated.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 84/96
SWARCO TRAFFIC SYSTEMS GMBH
Dynamic routing “dWiSta” motorway A8 Munich – Salzburg, junction Inntal
Goals are: •
Information of disturbances on the Brenner or Tauern passage for the long-distance traffic
•
Display of alternative routes: -
for serious disturbances on the Brenner route via Tauern route (destination Verona)
-
for serious disturbances on the Tauern route via Brenner route (destination Triest)
•
Display of disturbances or obstacles on the motorways A93 south or A8 east, such as road works, accidents, congestions, HGV
Project Conception
bans in Austria or winter road conditions The passages of Brenner and Tauern are the important transit routes with an accordingly high
(without recommendation of alternative routes)
traffic load. Especially during holiday traffic, this regularly leads to congestions due to capacity
System description
overload. Road works, accidents or bad weather cause further traffic disturbances. The effects go
The dWiSta chain on the A8 east at the junction
beyond regional and national borders.
Inntal direction south was installed additionally to the already existing blue routing signs. It consists
Until
now
disturbances
and
recommended
alternative routes were only available via radio. In case of massive traffic obstructions on the Brenner route approaching the junction Inntal, mobile
warning
signs
with
the
of three sign gantries with programmable dWiSta signs in LED technology and the according outstations providing data and energy for the signs.
according The information signs are approx. 13 m wide and
information were set up.
2.8 m high. Via 432 x 88 white LEDs in a distance With the installation and integration of three large-
of 30 mm up to four text lines can be displayed.
sized dynamic routing signs with integrated congestion information (dWiSta) on the motorway
In the upper left and right corners of the display
A8 East in front of the motorway junction Inntal
additional danger signs can be displayed in color
direction
such as congestion, road works or danger
south,
extensively
be
the
road
informed
users about
can the
now
current
pictograms.
situation.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 85/96
SWARCO TRAFFIC SYSTEMS GMBH The first dWiSta display is located approx. 10 km in front of the junction Inntal, in front of the parking Eulenauer Filz. The road user has enough time to react to the displayed disturbance and alternative routing. A road user not familiar with the area can also stop at the parking and have a look at a road map for orientation.
Coordination of the system The highway police as well as the operating companies
of
the
motorways
in
Austria
(ASFINAG) and Italy (Autostrada del Brennero) inform the traffic information center in Bavaria about the traffic situation on the Tauern and Brenner route. The switching diagrams of the
The second dWiSta display is located approx.
dWiSta signs associated with the according traffic
900 m in front of the exit lane.
disturbance are coordinated and ordered by the
The third dWiSta display is located at the begin of the exit lane, about one kilometer in front of the spot where the decision must be made which route to take. The according sign gantry has already been designed for a five-lane extension of the junction Inntal in the future.
traffic authorities in Austria and Italy. The traffic information center judges the traffic situation and forwards a switching recommendation to the traffic management center in Southern Bavaria which activates the switching of the diagram. The switching diagrams are stored in the traffic management center in Southern Bavaria so that there is no need to enter the information every time.
Exemplary display for third sign
Project Content •
3 Display cross sections with dWiSta signs
•
3 Roadside stations
•
SHDSL data transfer to the roadside station via TLS-over-IP
Exemplary display for second sign
Realization Start of constructions: July 2009. Exemplary display for first sign
Example of a dWiSta chain motorway A8 east junction Inntal with alternative routing
Start of operation: June 2010. Project volume: approx. € 1.04 millions. The installation is the first part of the project
The information is displayed separately for each
“dynamic network control Bavaria” for which
direction by means of the lane signaling arrows
further dWiSta sites at crucial locations in the
underneath the programmable display.
motorway network all over Bavaria will be set up during the coming years.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 86/96
SWARCO TRAFFIC SYSTEMS GMBH
Traffic Guidance System National Road N2 Biasca – Varenzo (Switzerland)
Data Acquisition Traffic data is collected by means of induction loops at the tunnel entrances for each direction. Environmental data is collected by means of four weather stations monitoring temperature and visibility.
Sub-centers The complete system is divided into four areas allocated to the four tunnels. Each tunnel and the adjoining sections of the motorway have their own sub center which are connected via fiber optic cabling to a central control station. The central
Project Conception
station controls the complete system.
The N2 motorway (“strada nazionale”) plays a
Project Content
vital role in alpine transit. The outdated Traffic
•
94 Display cross sections
Guidance System between the junctions “Quinto”
•
Traffic guidance:
and “Faido”, including the four tunnels “Piottino”,
365 LED signs and signals,
”Pardorea”, ”Casletto” and “Piumogna”, required
63 Prismatic VMS,
replacement on a total length of 11 km.
136 Flashers, 80 Traffic lights
Traffic Guidance
•
40 Outstations
The system consists of 47 display cross sections
•
4 Sub centers
•
1 Central control station
•
11 km of civil works
in LED and prismatic sign technology as well as lane signaling and traffic lights, influencing traffic in both directions. In the case that one or more tunnels are closed, traffic can be diverted to the oncoming lane before
Realization
or between tunnels.
Construction: August 2008 – April 2009.
Outside of the tunnels the signs are mounted on
Project volume: approx. € 2.8 millions.
15 gantries; inside of the tunnels signs partly wall
.
mounted, partly installed on traverses across the lanes.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 87/96
SWARCO TRAFFIC SYSTEMS GMBH
Road Condition and Weather Information System (“RWIS”) Thuringia
This data will be edited and combined then with general weather data. Thus, several times a day reliable road weather forecasts are generated. In the computer center which is located in Legefeld, the measurement values, data and weather
information
are
then
merged.
The
resulting temporally and locally differentiated information on weather and road conditions are evaluated and visualized in a graphical user interface. They are basis for an optimized winter road service adapted to the current weather situation.
Project Conception A total of 36 measurement stations collect a variety of measurement values such as road surface temperature, residual salt, precipitation.
Project Content •
36 Measurement stations
•
458 Sensors
•
Results are clearly arranged and displayed in a map
The collected data is automatically forwarded to
•
the German National Meteorological Service (Deutscher Wetterdienst).
Import of weather reports and weather radar from the National Meteorological Service
•
Export of weather data to the National Meteorological Service
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 88/96
SWARCO TRAFFIC SYSTEMS GMBH Goals are:
Realization
Reliable forecasts for a target-oriented and
Start of constructions: June 2008.
efficient winter road service:
Begin of operation: November 2008.
•
Optimized basis for decision-making
•
Winter service when, where and how it is necessary
•
Reduced reaction times
•
Drastic reduction of accidents
•
Optical visualization
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 89/96
SWARCO TRAFFIC SYSTEMS GMBH
Tunnel Airport Tegel, Berlin motorway A111
The control of the traffic technology, monitoring and operation is realized with the central control software. The hardware and software is located in the operation building TFT. The system is connected via different interfaces and user stations with the existing traffic management centers in Berlin: •
“Verkehrsrechnerzentrale” at Stolpe
•
“Verkehrsregelungszentrale der Verkehrslenkung Berlin“ at the Airport Tempelhof
•
“Tunnelleitzentrale” in the TFT building
Project Conception Up to 90,000 vehicles use daily the tunnel “Flughafen Tegel” and have an according impact on the road. Opened for traffic in 1979, the approx. 1000 m long tunnel is part of the city motorway A111 in Berlin.
Goals are:
During a general renovation the tunnel was
•
expanded and equipped with up-to-date traffic and
Harmonizing the traffic flow in unbalanced traffic situations
safety technology.
•
Traffic monitoring to avoid congestions
The traffic management system contains tunnel
•
Early information and safe rerouting of the
control, road control and the integration of the
traffic in foreseeable situations such as
tunnel into a network control system. The tunnel
maintenance, construction
control reacts to different requirements from the
•
Fast reaction to unpredictable incidents:
building control systems (e.g. fire alert), traffic
-
Information
monitoring (e.g. congestions) and traffic situation
-
Safe traffic guidance
(e.g. construction sites).
-
Effective traffic flow
-
Quick tunnel closing in case of emergency
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 90/96
SWARCO TRAFFIC SYSTEMS GMBH
Project Content •
Central control software
Realization
•
26 outstations
Start of constructions: November 2006.
•
147 variable traffic sings (LED)
Opening for traffic: June 2008.
•
32 variable traffic sings (prism openers)
Project volume: approx. € 2.37 millions.
•
9 variable routing
•
4 prism openers for variable routing
•
107 radar detectors
•
3 double induction loops
•
5 routing and blocking barriers
•
2 rain sensors
•
5 height controls
•
32 road markers (2 chains)
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 91/96
SWARCO TRAFFIC SYSTEMS GMBH The project was realized in cooperation with our
Video monitoring in Dhahran, Saudi Arabia
project partner, the Almisehal Group from Saudi Arabia.
Project Content •
Video center
•
5 Secondary centers
•
Fiber optical network 25 km2
•
5 High-precision pan-tilt-camera units with - Infrared beam (500 m distance) - Extended temperature range (+70°) - Extended zoom
Project Conception
- Integrated camera washer system
Saudi Aramco, the state-owned national oil company of Saudi Arabia, located in Dhahran, is the largest oil corporation in the world. The company owns a worldwide network of refineries
Realization Start of project: July 2004. Start of operation: April 2005.
and installations for the production and processing of crude oil and gas, as well as pipelines for their transportation. The project’s objective was to observe the 25 km
2
company premises with a minimum number of cameras and to monitor all sensible and strategic focus points. From the center the cameras are parameterized and controlled. They go independently on userdefined “patrols” by panning to the learned areas and zooming into the sensible areas such as entrances, oil tanks etc.. In order to maintain a night visibility of up to 500 m, an accordingly far reaching infrared beam (infrared canon with variable focus) moves with the camera. Furthermore, the reliable and centralized control and live streaming (real time) of the cameras must be guaranteed over great distances.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 92/96
SWARCO TRAFFIC SYSTEMS GMBH
Tunnel “Tiergarten Spreebogen” (TTS) Berlin Highway B96
The main part consists of one tunnel for each driving direction with two lanes and one emergency lane. The tunnel segments joining in the north and in the south consist of one lane and emergency lane per driving direction. A road control installation was installed throughout the entire tunnel. In order to close the tunnel system and to lead the whole traffic through the existing road network, the tunnel part has been integrated into a network control system. The tunnel control system in the tunnel itself reacts to different requirements from
Project Conception
•
facility management systems (FMS) (e.g. fire alert),
Originally planned as interim solution, the urban
•
traffic monitoring (e.g. congestions) and
road B96 runs straight through Berlin’s greatest
•
traffic situation (e.g. construction sites).
urban public park, the “Tiergarten”. The An effective solution had to be found in order to
according
traffic
sign
displays
are
automatically activated.
manage and direct the traffic through the area of the new City Center with governmental district and the newly designed “Potsdamer Platz”.
The
core
of
the
system
is
the
so-called
“Conductor” which controls and monitors the processes. By means of a complex matrix all
The result is a tunnel with a length of 2,387 m
possible requests are linked with all traffic sign
leading from “Heidestrasse” to “Landwehrkanal”
displays that can be realized. This ensures that in
with entrance and exit ramps at “Invalidenstrasse”
the tunnel for each request there is always a
and “Kemperplatz”.
predefined, safe and automatically activated
Besides integrating the through traffic from north
reaction of the whole system. Additionally, when a
to south, also the supplier access ramps for the
situation requires the judgment of the operator, he
office and service centers of Daimler-Chrysler and
can intervene at any time and affect the reaction
Sony-Center as well as the access to the parking
of the tunnel system by means of the “Conductor”.
deck at the main station (Lehrter Bahnhof) had to be taken into consideration.
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 93/96
SWARCO TRAFFIC SYSTEMS GMBH
Goals are:
Realization
•
Reducing the traffic load
Start of constructions: July 2004.
•
Optimizing the traffic flow
Opening for traffic: March 2006.
•
Reducing the transit traffic passing through
Project volume: approx. € 4.33 millions.
the parliamentary and governmental district •
Restoring the natural and recreational character of the “Tiergarten”
Project Content •
Central control software
•
61 Outstations
•
258 Variable traffic signs (LED)
•
28 Variable routing signs
•
88 Prism openers for variable routing
•
93 Radar detectors (of which 64 in the tunnel)
•
8 Routing and blocking barriers
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 94/96
SWARCO TRAFFIC SYSTEMS GMBH
Dynamic Traffic Guidance with Congestion Information Motorways A3 / A66 Wiesbaden Interchange
Sign control The control of the dynamic signs is based on a road network control model integrated in the Traffic Control Center of the State of Hesse. Existing sensors on the A3 and A66 deliver the required
information,
the
outstations
work
according to TLS2002 protocol standard. The dWiSta sign A “dWiSta” sign incorporates a programmable full matrix (96x528=50.688 resp. 96x576=55.276 light points, 25 mm pixel pitch) with single lens systems. Text height is 350 mm, following the DIN 1451 Matrix Font as closely as possible.
Project Conception The A3 and A66 are among the most frequented
Both, active as well as inactive LEDs are constantly monitored.
commuting motorways in the Rhine-Main conurbation, linking the Hessian capital of Wiesbaden
Project Content
to Frankfurt/Main, where the A66 leads right into
•
4 Outstations
the city center. Rush hour congestions are almost
•
4 Twin beam gantries
inevitable.
•
4 “dWiSta” VMS
Now, two dynamic VMS “dWiSta” style with
•
Connection to sub center Diedenbergen
integrated congestion information are installed
•
Civil works
around the Wiesbaden interchange on both, the southbound A3, as well as on the eastbound A66. These four VMS were the first of their kind in Germany, defined by the BASt (German federal highway research institute) in August 2004. The signs deliver information about congestions, as well as automatically calculated alternative routes.
Realization Construction: December 2004 – April 2005. Project volume: approx. € 1.4 millions. The project was realized in cooperation with Sirti GmbH (civil engineering, laying of cables, installation).
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16, D-54294 Trier, T. +49-651-81002-0, F. +49-651-81002-999, E.
[email protected]
Status: April 2016 95/96
SWARCO TRAFFIC SYSTEMS GMBH Business Unit Interurban Niederkircher Straße 16 D-54294 Trier
[email protected]
SWARCO TRAFFIC SYSTEMS GMBH Kelterstraße 67, D-72669 Unterensingen, T. +49-7022-6025-200, F. +49-7022-6025-199, E.
[email protected]
Status: April 2016 96/96