Transportation. Engineers. and. Project Managers

Heavy Lift / Transportation Engineers and Project Managers Masstrans Pte Ltd [email protected] | www.masstrans.com Ver.May2014 Certificate No: ...
55 downloads 2 Views 5MB Size
Heavy Lift / Transportation Engineers and Project Managers

Masstrans Pte Ltd [email protected] | www.masstrans.com

Ver.May2014

Certificate No: SNG 0160392

1

About the Company Masstrans Pte Ltd was incorporated in August 2002 as a response to growing needs for streamlined solutions in heavy lift and haulage projects. From providing engineering solutions and diversified technical support, our services grew to encompass the whole life cycle of a project – from feasibility to coordination to execution.

TABLE OF CONTENTS 02

About Masstrans Pte Ltd

03

Engineering & Design

04

Other Services

05

Project Diagram

06

Project Workflow process

07 - 18 Projects – Engineering 19 - 22 Projects – Structural Design and Naval Architecture 23

Contact Details

Annex 1 Track Record for Load-out, Transportation & Installation

Masstrans’ client-list includes oil and gas companies, port operators, EPC contractors, logistics contractors, equipment providers, fabrication/ship yards, stevedores and marine/ offshore consultants. The range of clients, typically manifested in the process chain within the project hierarchy, has enabled Masstrans to acquire a unique, broadminded insight into the complexities of interdisciplinary arrangements and levels of involvement within a project. Masstrans is ISO 9001:2008 certified. The business is running on Enterprise Resource Planning (ERP) system, for better efficiency.

Overview of Services In a typical project involving the consolidation and integration of multiple modules and structures from various locations, Masstrans is keen to provide project support from Feasibility to Installation, where Masstrans’ support commences with output to module / structural designers in consideration of designated facilities, available transportation equipment and installation parameters. Feasibility Study is done by allencompassing qualified oversight that leads to effective optimisation of available resources, of which, a substantial amount is due to equipment and materials. Major resources, i.e., equipment and materials, are expertly analysed and optimised, thereby efficiently managing costs as a result.

Annex 2 Track Record for Fabrication and Construction

Engineering beyond hook and hull 2

OUR CORE BUSINESS - ENGINEERING 1. Structural Engineering     

Structural design Fabrication drawings Lifting analysis & rigging design Set-down analysis 3rd party verification & review

2. Naval Architecture    

Motion analysis Stability Mooring analysis Vessel design for modification/conversion  Vessel plan  3rd party verification & review 3. Loadout, Transportation & Installation  Design / verification of skidding systems  Trailer / SPMT stability & strength analysis  Lifting / rigging design & analysis  Module / equipment structural integrity check  RORO ramp design & analysis  Ballasting calculation  Stability calculation, longitudinal strength during crossover  Mooring calculation  Loadout manual  Vessel acceleration calculations & motion analysis  Seafastening & grillage design  Intact & damage stability calculation  Bollard pull calculation  Towing manual  Jacket launching analysis

Engineering & Design Services From drafting to analysis and design, Masstrans considers every job or project to be crucial in maintaining quality and supporting the objectives of our clients in the project hierarchy and phases within. Masstrans is equipped with computer software, as follows: i.

Computer Aided Drafting (CAD)

ii.

Structural engineering analyses / F.E.M. and design

iii.

Hydrostatic, Stability analyses / calculations and hull design Information on crane lifting parameters for major cranes in the region Rigging calculations Mooring Analyses & Design Motion Analysis

iv.

v. vi. vii. viii. Multipoint-multi layer running cable lifting equilibrium/rigging analysis ix. Sea fastening Analyses/design x. Module Sit-down analysis with support reaction and cable tension curve xi Towing manual, Required Bollard Pull analysis / Towline Catenary Calculation xii Land Transport / Ground Bearing Pressure Calculation

Engineering beyond hook and hull 3

- AutoCad / Inventor/ ZWCAD - StaadPro / Fusion with NEi Nastran / FEMAP with Nx Nastran - Hydromax / Maxsurf - Inhouse -

Inhouse Optimoor / Inhouse MOSES / Seakeeper Inhouse

- Inhouse - Inhouse + FEA software - Inhouse - Inhouse

BENEFITS, IN SUMMARY, WITH MASSTRANS

Other Services i.

Project Management & Execution

1.

Communication interfaces are reduced as we offer a complete package of engineering, planning, coordination and supervisory assistance through one focal point, a.k.a., one Project Manager.

2.

Overall man-hours are reduced through familiarity with the transportation process and relevant resources.

3.

Project costs are efficiently managed as we optimise major resources, i.e., equipment and materials.

In addition to engineering and design, or as a stand-alone requirement, Masstrans personnel are also mobile and versatile in representation, and thus can effectively manage and execute your loadout, transportation and installation activities through every stage – from feasibility to planning to execution to delivery – whether onshore or offshore. We can also provide turn-key subcontracting and procure the optimum resources available that will suit your requirements, while keeping your best interests in mind. Whatever the size of the project you hire us for, you can be certain that you will get the full worth of our over-10 years of experience in the business.

ii.

Marine Warranty Backed by our expertise in execution of land and marine transportation operations, Masstrans is highly capable of supervising and assessing operational hazards involved in such operations and ensuring that all necessary precautions are taken to mitigate risks or avoid losses. We place high value on each project that we take as we represent insurance underwriters and/or project owners and work in compliance with applicable maritime standards, and we also apply practical knowledge gained through our extensive experience.

iii.

Inspection, Survey & Certification All marine transportation projects require that each operation is done with safety and due diligence by everybody involved and by the vessel hired. Aside from reviewing all plans pertinent to the voyage, Masstrans also offers to carry out vessel inspections, on-hire and offhire vessel condition surveys and suitability surveys.

Engineering beyond hook and hull 4

Project diagram

Masstrans Pte Ltd

Scope

Project Management

Sub-Scope

Analyses / Design / Planning

Turnkey Contracting

Supervision / Coordination

Outsourcing / Procurement

Category Equipment

Lifting

Shifting

Voyage

Engineering beyond hook and hull 5

Load Testing

Salvage

Decommission / Removals

Project

1 Concept

Workflow process

3Calculation

4Drafting 7Operation

2 Programming 5 Modeling

6Analysis Engineering beyond hook and hull 6

Project 0180.01 - FDPSO Azurite Client – Prosafe Production Year – 2008 Workscope – Loadout to installation of top side facilities

Engineering beyond hook and hull 7

Project 0180.02 - FDPSO Azurite Client – Murphy West Africa Year – 2008 Workscope – Loadout to installation of drilling modules and derrick

Engineering beyond hook and hull 8

Project 0138.00 – FPSO Stybarrow Venture MV16 Client – MODEC, Inc Year – 2007 Workscope – Heavylift installation of topside modules and structures, including design of spreader bar

Engineering beyond hook and hull 9

Project 0482.01 – FPSO Kikeh Client – Single Buoy Moorings, Inc Year – 2012-2013 Workscope – Loadout to offshore Installation of 4 new modules

Engineering beyond hook and hull 10

(Above and Left) Project 0145.01 – Jack-up Drilling Rig “Petrojack 1” Client – Pacific Workboats Year – 2006 Workscope – Installation of Cantilever and Derrick

(Right) Project 0112.01 – Jack-up Drilling Rig “P2007” Client – Pacific Workboats Year – 2006 Workscope – Installation of Derrick

Engineering beyond hook and hull 11

(Above and Below) Project 0151.01 & 0152.01 – FPSO Polvo and Umuroa Client – Prosafe Production Services Year – 2007 Workscope – Loadout, transportation & installation

Engineering beyond hook and hull 12

(Above) Project 0094.01 – FPSO P50 Client – Jurong Shipyard Year – 2003 Workscope – Installation, by lifting, of deck crane column at Maua Jurong yard, Brazil

(Right) Project 0150.01 – FPSO P54 Client – Jurong Shipyard Year – 2004 Workscope – Installation by lifting of topside modules at Maua Jurong yard, Brazil

Engineering beyond hook and hull 13

Project 0308.01 - Gajah Baru CPP Client – PT SOME Year – 2010 Workscope – Lifting and Structural Analysis for 16-point lift of top side pancake

Engineering beyond hook and hull 14

Project 0107.01 – Semi-Submersible Gas Production Platform “Independence Hub” Client – Pacific Workboats Year – 2006 Workscope – Lifting, Uprighting and Installation of columns

Engineering beyond hook and hull 15

Project 0132.01 – PTP IMPSA CQC Client – IMPSA (Malaysia) Year – 2007 Workscope – Transportation of 3 full CQC Lower Frame Components / Sections and CQC Upper Frame

Project 0077.01 & 0089.01 – Westport CQC Client – Portek Systems & Equipment Pte Ltd Year – 2004 Workscope – Lifting and Transportation of CQC boom

Engineering beyond hook and hull 16

(Left and below drawings) Project 0254.01 – Neste Oil Plant, Singapore Client – Bok Seng Logistics Year – 2009 Workscope – Transportation of Hydro Treating Reactor

(Right) Project 0051.01 – BASF-YPC Integrated Petrochem Complex Client – FE Hardcastle & Co, Pvt Ltd (India) Year – 2003 Workscope – Loadout and transportation

Engineering beyond hook and hull 17

Project 0344.00 – Gorgon LNG Client – Schenker Australia Pty Ltd Year – 2010-2012 Workscope – Transportation of Xblocs and pipes

Engineering beyond hook and hull 18

(Above) Project 0122 – Steel Marker Buoy diameter 2.2m Client – SH Engineering Pte Ltd Year – 2005 Workscope – Design of marker buoys

(Right) Project 0253 – Seacor Penrith Client – Hallin Marine Pte Ltd Year – 2009 Workscope – Design of Mezzanine deck

Engineering beyond hook and hull 19

Project 0162 – Acergy Toisa Proteus Client – Acergy Singapore Pte Ltd Year – 2007 Workscope – Design of new moon pool hatch

Engineering beyond hook and hull 20

Client 0404 – Alnmaritec Ltd Year – 2011 Workscope – Design of Transport cradle of Pilot boat

Engineering beyond hook and hull 21

Project 0442 – “Lady Christine” Client – Asian Geos Year – 2012-2014 Workscope – Design for modification and conversion of vessel (inc. new derrick foundation, new moonpool and moonpool doors, structural/deck strength check, recalculation of stability booklet

Engineering beyond hook and hull 22

Engineering beyond hook and hull In support of Heavy Lift Loadout-TransportationInstallation Projects encompassing Land and Marine Operation requirements, Masstrans provides Engineering, Co-ordination/Supervision and Project Management with a holistic approach to project requirements, backed by qualification and experience gained from a track record of assurance, oversight, solutions and delivery. Masstrans’ interest and approach to project requirements is all encompassing, extending from unit detail to feasibility in multi modular/modal consolidation and integration, where commercial and technical capabilities set Masstrans apart in providing value to a project. Please feel free to contact us for any requirement.

MASSTRANS PTE LTD

MPL MASSTRANS (M) SDN BHD

3 International Business Park Nordic European Centre #04-06 Singapore 609927

D4-U5-09, Block D4, Solaris Dutamas, No. 1, Jalan Dutamas 1, 50480 Kuala Lumpur, Malaysia

Tel: +65 6567 9776 Fax: +65 6567 0786

Tel: +603 6419 0776 Fax: +603 6419 0786

[email protected]

www.masstrans.com 23

International partner: Indonesia PT. SARDUS ENERGI SOLUSI Multika Bldg 4F Suite 408 Jl Mampang Prapatan Raya 71-73 Jakarta 12790 Tel: +62 21 797 5182

Annex 1 Track Record Load-out, Transportation & Installation

24

25

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

Qty.

0001.01

Noble Denton Singapore Pte Ltd

FPSO Eagle

2

0004.01

Noble Denton Singapore Pte Ltd

FPSO Eagle

0005.01

JPL Services Pte Ltd

FPSO P43

Lifting of Module 15 & Rigid Arm onto FPSO Eagle - Warranty M15 (180T), Rigid Arm (664T) Survey / Approval Lifting of piperack sections 1, 2 onto FPSO Eagle - Warranty Survey Piperack Sections 1, 2 / Approval Lifting of 2 Flare Seats onto FPSO P43, utilizing crane barge POE Flare Seats x 2 (35T) Giant 6 - Engineering, Supervision and Subcontracting

0006.01

JPL Services Pte Ltd

FPSO P43

Lifting of 2 flare seats onto FPSO P43, utilizing crane barge POE Giant 6 - Engineering, Supervision and Subcontracting

0007.01

Noble Denton Singapore Pte Ltd

FPSO Eagle

0008.01

S.M.O.E. Pte Ltd

ERHA FPSO

0010.01

JPL Services Pte Ltd

0012.01

Total Completed Ton. 844 16-Sep-02

2

21-Nov-02

2

70 21-Nov-02

Flare Seats x 2 (80T)

2

160 12-Sep-02

Lifting of turntable onto FPSO Eagle - Warranty Survey / Approval

SBM FPSO Eagle Turntable

1

12-Nov-02

7 modules, 1 flare tower (total 14,500T)

8

14,500 22-Jan-03

FSO Kome-Kribi 1

Installation, by lifting, of 7 topside facility modules and flare tower onto ERHA FPSO - Engineering Feasibility Lifting of helideck from JSPL East Quay to FSO Kome-Kribi (Ex Companion) utilizing crane barge POE Giant 6 - Engineering, Supervision and Subcontracting

Helideck (140T)

1

140 21-Dec-02

Noble Denton Singapore Pte Ltd

FPSO Eagle

Lifting of Module 13 onto FPSO Eagle - Warranty Survey / Approval Module 13

1

17-Dec-02

0013.01

Noble Denton Singapore Pte Ltd

FPSO Eagle

Upper Manifold Deck, Turret Lower Gantry

2

1-Feb-03

0014.01

Noble Denton Singapore Pte Ltd

FPSO Eagle

Lifting of upper manifold deck & turret lower gantry structure onto FPSO Eagle - Warranty Survey / Approval Transportation, by barge, of Bailey crane from Tg Pagar Container Terminal to FPSO Eagle at Keppel Shipyard - Warranty Survey / Approval

Bailey Crane

1

1-May-03

0015.01

Jurong Shipyard Pte Ltd

FPSO P48

Lifting of 1 Module, 1 Skid and 1 Dome by crane barge POE Giant 6 - Module (23T), Skid (17T), Dome (500KG) Engineering, Supervision and Subcontracting

0016.01

Jurong Shipyard Pte Ltd

FPSO P50

Lifting of 12 items of machinery onto FPSO P50 by crane barge POE Giant 6 - Engineering, Supervision and Subcontracting

Machinery x 12 (400T)

0017.01

Noble Denton Singapore Pte Ltd

FPSO Eagle

Warranty survey / approval for SBM Inc FPSO Eagle - Loadout to Installation of M9, M10, M11, M13, M14, M15, M16

M9, M10, M11, M13, M14, M15, M16

0020.01

Jurong Shipyard Pte Ltd

CSX Pacific

Lifting from wharf to MV CSX Pacific of 18 hatches using crane barge POE CB1 - Engineering, Supervision and Subcontracting

0023.01

Noble Denton Singapore Pte Ltd

BSP Egret Phase 1

0045.01

Modec International LLC

FPSO Baobab Ivoirean MV 10

0050.01

Jurong Shipyard Pte Ltd

0051.01

0052.01

3

40 14-Feb-03

12

400 14-Feb-03

7

15-Jan-03

Hatch Covers x 18 (30T)

18

540 16-Mar-03

Loadout, by skidding, of BSP Egret Phase 1 gas field jacket Warranty Survey / Approval Loadout to Installation of 15 Facility Modules, 11 Piperacks, 1 Laydown Area - Engineering (incl load spreader design), Planning and Supervision

Gas Field Jacket (750T)

1

750 4-Oct-03

27

10,000 9-Jul-04

FPSO P50

Uprighting and lifting of FPSO P50 piperack utilizing crane barge POE Giant 6 - Engineering, Supervision and Subcontracting

Piperack (120T)

1

120 29-Sep-03

F.E. Hardcastle & Co. Pvt Ltd (India)

BASF-YPC Integrated Petrochem Complex, Nanjing PRC

Loadout by roll onto barge, lift onto MV Jumbo Vision, tpt from Hazira to Shanghai of 2 BASF YPC ethylene oxide reactors - Risk Management

BASF-YPC Ethylene Oxide Reactors x 2 (450T)

2

900 26-Dec-03

Jurong Shipyard Pte Ltd

FPSO P50

Lifting & transportation from KYC Yard to Jurong Shipyard of 2 Piperacks and 7 Misc lifts using crane barge POE Giant 6 Engineering, Supervision and Subcontracting

Piperacks x 2 (100T) & (90T), Misc Lifts x 7 (15T, 16T 17T, 14T, 15T, 16T, 17T)

9

300 22-Dec-04

Modules x 15, Piperacks x 11, Laydown Area (total 10,000T)

page 1 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

0054.01

Jurong Shipyard Pte Ltd

Global Development Driller I

Lifting of BOP elevator & Hydralift Counterweights on skid from Jurong Shipyard quayside onto Global Development Driller I, using crane barge POE Giant 6 - Engineering, Supervision and Subcontracting

BOP Elevator (118T), Hydralift Counterweights on skid (170T)

0056.01

Jurong Shipyard Pte Ltd

FPSO Baobab Ivoirean MV10

0057.01

Jurong Shipyard Pte Ltd

2

Total Completed Ton. 288 20-Jan-04

Lifting of 2 bow sections onto FPSO Baobab Ivoirean utilizing POE Bow sections x 2 (65T) crane barge CB2 and JSPL Quay Crane - Engineering, Supervision and Subcontracting

2

130 29-Feb-04

FPSO P50

Lifting and tpt - from KYC Yard, pipe rack upper section to P Samulunn East Quay, pipe rack lower section to FPSO P50. Thereafter, lifting of one ME drum (spool) from Tg Kling Quay S to FPSO P50 - Engineering, Supervision and Subcontracting

3

230 16-Mar-04

0058.01

Jurong Shipyard Pte Ltd

FPSO P50

Lifting of windlass, HPU from Tanjung Kling Quay South onto FPSO Windlass (32T), HPU x 2 (45T) P50 - Engineering, Supervision and Subcontracting

3

122 29-Apr-04

0060.01

Technics Offshore Engineering Pte Ltd

FPSO Baobab Ivoirean MV10

FPSO Baobab Ivoirean MV10 topside facilities; Loadout, Transportation by sea; Barge 1 - Process Cooling Medium, Heat Medium System, Nitrogen Air Receiver, Instrument Receiver; Barge 2 - Flare Scrubber Skid; Stowage Plans (barge layout), Sea Fastening Design & Calculations - Engineering

Process Cooling Medium (29.5T), Heat Medium System (40.8T), Nitrogen Air Receiver (2.9T), Instrument Receiver (19.5T), Flare Scrubber Skid (38.1T)

5

131 13-Jul-04

0064.01

Jurong Shipyard Pte Ltd

FPSO Baobab Ivoirean MV10

Lifting of Module 28 (pipe rack) from Jurong Shipyard dry dock 5 and topside blocks from quayside to FPSO Baobab Ivoirean Engineering, Supervision and Subcontracting

Module 28 (Pipe Rack 60T), Topside Blocks x 3 (65T), (25T), (45T)

4

195 30-Apr-04

0066.01

Jurong Shipyard Pte Ltd

Global Development Driller II

i. Lifting of 4 Winches onto Semi-Sub Rig Global Development Driller II, using POE G6 - Engineering, Supervision and Subcontracting

Winches x 4 (114T)

4

456 25-May-04

0067.01

Jurong Shipyard Pte Ltd

FPSO P50

4

360 25-May-04

0067.02

Jurong Shipyard Pte Ltd

FPSO P50

ii. Lifting of 4 Block Structures onto FPSO P50, utilizing POE G6 Block Structures x 4 (90T) Engineering, Supervision and Subcontracting Lifting of Flare Boom onto FPSO P50 - Engineering and Supervision Flare Boom (length 104m) (300T)

1

300 8-Feb-04

0068.01

Jurong Shipyard Pte Ltd

FPSO Baobab Ivoirean MV10

Lifting of Modules 31, 32, 33, (TSS blocks P & S, TSS blocks 4/5) onto FPSO Baobab Ivoirien MV10 - Engineering, Supervision and Subcontracting

M31, 32, 33: TSS Block P (60T), TSS Block S (60T), TSS Block 4/5 (600T)

3

720 22-Sep-04

0069.03

Jurong Shipyard Pte Ltd

FPSO P50

Lifting of 6 Block Structures from quayside to POE G6 deck to FPSO P50 - Engineering, Supervision and Subcontracting

6 Block Structures: (46T), (65T), (80T), (68T), (77T), (56T)

6

392 25-Jun-04

0071.01

Jurong Shipyard Pte Ltd

Global Development Driller I

Crane King Post (length 20.6m) (71T)

1

71 25-Jun-04

0072.01

Jurong Shipyard Pte Ltd

FPSO P50

Lifting of Crane King Post onto Global Development Driller I Engineering, Supervision and Subcontracting Lifting of Platform, Module Base, Vent Post Portside, S/Structure & Fire Pump onto FPSO P50 - Engineering, Supervision and Subcontracting

Platform (15T), Module Base (25T), Vent Post Portside (22T), S/Structure (55T), Fire Pump (55T)

5

172 15-Jul-04

0075.01

MODEC, Inc.

FPSO MODEC Venture 11

Lifting of Modules A, B, C, Water Injection Structures onto FPSO for Modules A (601T), B (562T), C (119T), FPSO Modec Venture 11 (MODEC Santos Mutineer / Exeter Water Injection (585T) project) - Engineering and Supervision

4

1,867 28-Sep-04

0077.01

Portek Systems & Equipment Pte Ltd

West Port CQC 8

Lifting and transportation of CQC boom from West Port CQC no 8 to CQC Boom (55 x 8 x 2 meters) (150T) POE Yard - Engineering, Supervision and Subcontracting

2

150 9-Jun-04

Piperack upper section (90T), piperack lower section (100T), spool (140T)

Qty.

page 2 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

0079.01

Jurong Shipyard Pte Ltd

FPSO Sendje Berge

Lifting of 2 Modules from barge to FPSO Sendje Berge (Okwori Field) - Engineering, Supervision and Subcontracting

Modules (128T) & (95T)

1

Total Completed Ton. 223 17-Sep-04

0081.01

Jurong Shipyard Pte Ltd

FPSO MODEC Venture 11

Design and coordination / supervision for lifting of generator E House onto FPSO MODEC Venture 11 (Santos FPSO) Engineering, Supervision and Subcontracting

E-House (300T)

1

300 17-Sep-04

0083.01

Pacific Workboats Pte Ltd

FPSO P54

Design and coordination / supervision for lifting of 2 Blocks from FPSO P54 to quayside - Engineering, Supervision

Block Structures (610T), (1100T)

2

1,710 10-Jan-04

0084.01

Pacific Workboats Pte Ltd

FPSO MODEC Venture 11

SAS Structure (105)

1

105 27-Sep-04

0086.01

Pacific Workboats Pte Ltd

FPSO P54

Uprighting, lift and go of SAS Structure from PPL Yard to Jurong Shipyard - Engineering, Supervision Removal from Vessel to Yard of Machinery Casing and Accommodation Block - Engineering, Supervision Installation by Lifting of BOP Elevator, Loading Beam and BOP Components - Engineering, Supervision Lifting of 2 Gas Compressor Modules, Piperack onto FPSO Sendje Berge - Engineering, Supervision Lifting of UTM and SAS onto FPSO MODEC Venture 11 (Santos FPSO) - Engineering, Supervision Lifting and transportation of CQC boom, from POE Yard to West Port CQC no 8 - Engineering, Supervision and Subcontracting

Machinery Casing (600T), Accommodation Block (1100T) BOP Elevator (118T) and BOP Loading Beam (210T), BOP Components (110T) Gas Compressor Modules x 2 (360T), Piperack (50 T) UTM (175T), SAS (110T)

2

1,700 29-Oct-04

4

438 22-Nov-04

3

770 19-Oct-04

2

285 11-Aug-04

CQC Boom (55 x 8 x 2m) (150T)

1

150 11-Oct-04

Lifting & installation of FPSO Santos Flare Boom - Engineering, Supervision Lifting of modules P01A, P012A, P03A, P04A, P05A, P06, P07 & Flare Boom for installation onto FPSO P50 at Maua Jurong Yard, Rio de Janeiro, Brazil - Engineering, Supervision

Flare Boom (70T)

1

70 11-Aug-04

P01A, P012A, P03A, P04A, P05A, P06, P07 & Flare Boom

8

10,000 31-Dec-04

Global Development Driller II

Qty.

0087.01

Pacific Workboats Pte Ltd

FPSO Sendje Berge

0088.01

Pacific Workboats Pte Ltd

FPSO MODEC Venture 11

0089.01

Portek Systems & Equipment Pte Ltd

West Port CQC 8

0093.01

Pacific Workboats Pte Ltd

FPSO MODEC Venture 11

0094.01

Jurong Shipyard Pte Ltd

FPSO P50

0095.01

Pacific Workboats Pte Ltd

PSA MHI CQC 65, 65

Lifting CQC 64 and CQC 65 from Keppel Terminal to Brani Terminal CQC 64 (520T), CQC 65 (520T) - Engineering, Supervision

2

1,040 17-Jan-05

0101.01

Pacific Workboats Pte Ltd

JSPL Hull 11-1067

Accommodation Block (500T)

1

500 28-Mar-05

0105.01

Pacific Workboats Pte Ltd

Semi- Sub Drilling Rig Transocean Legend

Lifting design for JSPL Hull 11-1067 Accommodation Block Engineering, Supervision Semi-Sub Drilling Rig Transocean Legend - Lifting of Accommodation Block - Rigging Plan - Engineering, Supervision

Accommodation Block (100T)

1

100 27-May-05

0106.01

Pacific Workboats Pte Ltd

JSPL Hull 1068

i. JSPL Hull 1068 Accommodation Installation - Engineering, Supervision ii. FPSO P54 Pipe Rack Areas 2, 3, 4, 5 - Uprighting and Installation - Engineering, Supervision Semi-Submersible Gas Production Platform Independence Hub Pontoons x 4 - Lifting from Jurong Shipyard to water - Columns x 4 Uprighting and Installation onto Pontoons in dry dock - Engineering, Supervision

Accommodation Block (500T)

1

500 30-Jun-05

Pipe Rack Areas 2 (190T), 3 (265T), 4 (190T) , 5 (190T) Pontoons X 4 (1400T), Columns X 4 (1400T)

4

835 30-Jun-05

8

11,200 27-Feb-06

FPSO P54 0107.01

Pacific Workboats Pte Ltd

Independence Hub

0108.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2006

PPL Jack Up Drilling Rig P2006 Derrick Sections, Upper and Lower Derrick Sections, Upper (77T), Lower from SSI Yard to PPL Yard - Lifting - Engineering, Supervision (199T)

2

0109.01

Pacific Workboats Pte Ltd

FPSO P54

FPSO P54 - Lifting of Piperack Areas 1 and 6 - Engineering, Supervision

2

Piperack Areas 1 & 6

276 4-Aug-05

20-Sep-05

page 3 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

0111.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2007

Cantilever (750T)

1

0112.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2007

Derrick (228T)

1

228 23-Jan-06

0115.01

Pacific Workboats Pte Ltd

FPSO P54

Crane Column (170T)

1

170 17-Aug-05

0116.01

Pacific Workboats Pte Ltd

Jack Up Drilling Rig P2006

Jackup Leg X 4 (180T)

4

720 2-Sep-05

0118.01

Pacific Workboats Pte Ltd

Jack Up Drilling Rig P2006

Helideck (70T)

1

70 15-Sep-05

0123.01

Pacific Workboats Pte Ltd

JSPL Hull 1069

Accommodation Block (500T)

1

500 17-Oct-05

0128.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2007

Installation, by lifting of Jack Up Drilling Rig P2007 Cantilever Engineering, Supervision Installation, by lifting, of Jack Up Drilling Rig P2007 Derrick Engineering, Supervision Installation, by lifting, of FPSO P54 Deck Crane Column Engineering, Supervision Installation, by lifting, of Jack Up Drilling Rig P2006 Jackup Legs Engineering, Supervision Installation, by lifting, of Jack Up Drilling Rig P2006 Helideck Engineering, Supervision Installation, by lifting, of JSPL Hull 1069 Accommodation Block Engineering, Supervision 3 Living Quarters - Engineering, Supervision

Total Completed Ton. 750 23-Jan-06

Living Quarters x 3 (140T), (140T), (160T)

3

440 21-Oct-05

0129.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2007

Derrick Lifting Clamp - Design

1

300 25-Oct-05

0132.01

IMPSA (Malaysia) Sdn Bhd

PTP IMPSA CQC 1, 2, 3

Transportation of 3 full CQC Lower Frame Components / Sections and CQC Upper Frame from Lumut to PTP - Engineering, Supervision

Pacific Class Jackup Drilling Rigs Series Derrick (300T) CQC x 3 (1700T)

3

5,100 22-Jan-07

0135.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2008

7 Main Hull Block Structures - Discharge at PPL Yard - Planning & Supervision

Main Hull Block Structures x 7 (260.4T), (229.2T), (137.8T), (123.7T), (59.7T), (76.7T), (61.2T)

7

949 2-Feb-06

0137.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2005

Spud Can Port, Spud Can Stbd, Center Block, Wing Blocks Loadout at POE Yard and Discharge at PPL Yard - Engineering, Supervision

Spud Can Port (410T), Spud Can Stbd (410T), Center Block (180T), Wing Blocks x 3 (40T)

7

1,120 16-Feb-06

0138.01

MODEC, Inc.

FPSO Stybarrow Venture MV 16

Installation, by lifting, of Topside Modules / Structures Modules A, B, Modules A, B, C, D (totalling 4500T) C, D, E - Engineering (including load spreader design) , Supervision

4

4,500 9-Mar-07

0138.02

MODEC, Inc.

FPSO Stybarrow Venture MV 16

Loadout & Transportation of Upper Turret, Turret Shaft and Swivel Upper Turret (500T), Turret Shaft (400T), Access from MMHE Yard (Malaysia) to Jurong Shipyard (Singapore) Swivel Access (230T) - Engineering, Supervision, Contracting

3

1,130 8-May-07

0140.01

Pacific Workboats Pte Ltd

BW Offshore FPSO YÙUM Lifting of KMZ Mating Cone and Dummy Buoy Top at Batam, from K’AK’ NÁAB (KMZ STP Project) Profab to Utraco Yard - Engineering, Supervision

Mating Cone (370T), Dummy Buoy Top (46T)

2

0141.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2005

Leg Wells x 3 (450T)

3

0143.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2008

Spud Can (410T), Leg Well (450T) and Accommodation Blocks 6 units

8

860 31-May-06

0144.01

Pacific Workboats Pte Ltd

JSPL Hull 1070

1

500 25-Apr-06

0145.01

Pacific Workboats Pte Ltd

2

1,050 10-Oct-06

0146.01

Kensteel Engineering Pte Ltd

1

422 17-May-06

Jack Up Drilling Rig P2005 - 3 Leg Wells - Lifting - Engineering, Supervision Jack Up Drilling Rig P2008 Spud Can, Leg Well and 6 Accommodation Blocks- Lifting - Engineering and Supervision

JSPL Hull 1070 Accommodation Block - Lifting at Jurong Shipyard - Accommodation Block (500T) Engineering, Supervision Jackup Drilling Rig Petrojack 1 Jack Up Drilling Rig Petrojack 1 - Installation of Cantilever & Derrick - Cantilever (750T), Derrick (300T) Engineering and Supervision FPSO Cidade do Rio de Janeiro MODEC FPSO-RJS 409 (Cidade do Rio de Janeiro MV14) Siemens E House (422T) MV14 E–House - Transportation - Cargo Barge Mooring Pattern & Calculations - Engineering, Supervision

Qty.

416 27-Mar-06

1,350 1-Jun-06

page 4 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

0148.01

Pacific Workboats Pte Ltd

FPSO Cidade do Rio de Janeiro MODEC FPSO-RJS 409 Siemens E-House - Lift & Go from MV14 Kensteel Engineering Yard to FPSO Cidade do Rio de Janeiro MV14 (Espadarte Field) - Engineering, Supervision

0150.01

Jurong Shipyard Inc.

FPSO P54

0151.01

Prosafe Production Services Pte Ltd Polvo FPSO

0152.01

Pacific Workboats Pte Ltd

Modules / Structures Siemens E House (422T)

Qty. 1

Total Completed Ton. 422 31-May-06

Maua Jurong Yard, Brazil - FPSO P54 Topside Installations – Engineering, Planning, Co-Ordination & Supervision - 14 Modules, Flare Boom, 2 Deck Cranes - Engineering, Supervision

Modules 14, Flare Boom, Deck Cranes 2

FPSO Polvo, Modules 1, 2, 3, 4, E House (2905t), Boilers x 3 (771tons) and - Topside Modules / Structures - Loadout, Transportation and Installation - Engineering, Supervision

Modules 1, 2, 3, 4, E House (2905t), Boilers x 3 (771tons)

8

3,696 26-Feb-07

Spud Can Port, Spud Can Stbd, Center Block - Loadout at POE Yard and Discharge at PPL Yard - Engrg & Supervision Prosafe Production Services Pte Ltd Umuroa FPSO Umuroa FPSO Modules 1, 2, 3, 4, 5, 6A, 6B, Boiler P, Boiler S Engineering, Supervision, Subcontracting Pacific Workboats Pte Ltd BW Offshore FPSO YÙUM APL STP Compartment Cylinder - Loadout by PWL L1501 from K’AK’ NÁAB (KMZ STP Project) Profab Yard to Barge, Batam - Engineering, Supervision

Spud Can Port (410T), Spud Can Stbd (410), Center Block (180T) Modules 1, 2, 3, 4, 5, 6A, 6B, Boiler P, Boiler S (2504.09T) STP Compartment Cylinder (390T)

3

1,000 8-Feb-07

9

2,504 26-Feb-07

1

390 27-Jun-06

0155.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2005

Cantilever, Derrick - Loadout & Installation - Engineering, Supervision

Cantilever (750T), Derrick (300T)

2

1,050 11-Oct-06

0158.01

SDV Logistics (Singapore) Pte Ltd

Polvo FPSO

FPSO Topside Facilities; MV Azul to Jurong Port - Vacuum Condenser, Kuantan Port to Keppel Shipyard - Inlet Separator A, Inlet Separator B, Electrostatic Coalester A, Electrostatic Coalester B, Produced Water Degasser, Flare Gas Scrubber, Stabilization Separator A, Stabilization Separator B - Engineering, Supervision

Vacuum Condenser (34T), Inlet Separator A (50T), Inlet Separator B (50T), Electrostatic Coalester A (48T), Electrostatic Coalester B (48T), Produced Water Degasser (35T), Flare Gas Scrubber (49T), Stabilization Separator A (24T), Stabilization Separator B (24T)

9

362 30-Sep-06

0158.01

SDV Logistics (Singapore) Pte Ltd

Polvo FPSO

Anchor Chain (114mm x 6 lengths) (1245T), (105mm x 6 lengths) (72T)

2

1317 30-Sep-06

0158.01

SDV Logistics (Singapore) Pte Ltd

Umuroa FPSO

Lifting from MV Green Spring to Barge of 2 Anchor Chains lengths Lifting from M.V. Green Spring to Deck Cargo Barge GM 34 Provision and Supervision of Cranebarge / Lifting Operations Engineering, Transfer fromSupervision, MV Bao Da Subcontracting Shan to MV Protesilaus by lifting, of 2 sets of 12 Anchor Chain lengths x 280 t, 12 lengths x 25 t Provision and Supervision of Cranebarge / Lifting Operations Engineering, Supervision, Subcontracting

24

3,360 15-Dec-06

0158.01

SDV Logistics (Singapore) Pte Ltd

Umuroa FPSO

Loadout by lifting and transportation by barge of Umuroa FPSO Module 4 from West Port to Keppel Shipyard - Engineering, Supervision

Module 4 (120T)

1

120 15-Jan-07

0160.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2011

1,079 17-Nov-06

Acergy Singapore Pte Ltd

DSV Toisa Proteus

Hull Sections HD1 (324.5), HD2 (354T), HD5 (200T), HD7 (200T) Dive Module (285T)

4

0162.01

1

285 16-Jul-07

0163.01

J. Martens (Asia Pacific) Pte Ltd

APL Mating Cone

Mating Cone (420T)

1

420 9-Mar-07

0163.03

J. Martens (Asia Pacific) Pte Ltd

FPSO Aker Smart 1

0164.01

Pacific Workboats Pte Ltd

Jackup Drilling Rig P2010

Jack-up Drilling Rig P2011 - Installation of Hull Sections HD1, HD2, HD5, HD7 - Engineering, Supervision DSV Toisa Proteus - Removal, by lifting, and transportation, by barge, of Dive Module - Engineering and Supervision Loadout and Transportation from Lumut Port to Keppel Shipyard, by barge, of APL Mating Cone - Engineering Design of Load Spreader (SWL470MT) for FPSO Aker Smart 1 Module lifts - Engineering Jack-up Drilling Rig P2010 - Installation, by lifting, of Hull Blocks HD1/3, HD 2, HD5, HD7 - Engineering, Supervision

0152.01 0154.01

Jackup Drilling Rig P2009

Anchor Chain lengths x 12 (280T), Anchor Chain lengths x 12 (25T)

17

N.A. Hull Blocks HD1/3 (325T), HD 2 (354T), HD5 (200T), HD7 (200T)

15,000 12-Jul-07

18-Jan-08 4

1,079 9-Mar-07

page 5 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

Qty.

0172.01

Altus Logistics Pte Ltd

FPSO Wenchang, FPSO Xijiang

Transportation, from Profab Yard to South China, by barge, of FPSO FPSO Wenchang STP Buoy (358T), FPSO Wenchang STP Buoy, FPSO Xijiang STP Buoy - Engineering Xijiang STP Buoy (253T)

2

Total Completed Ton. 611 8-May-07

0172.02 0172.03

Altus Logistics Pte Ltd Altus Logistics Pte Ltd

1 1

200 11-Oct-07 500 13-Feb-08

Pacific Workboats Pte Ltd

Transportation, by barge, of APL Mating Cone - Engineering Transportation, by barge, of STP System - Batam to S'pore Engineering Lifting 3 Spud Cans from POE Yard to PPL Yard - Engineering

APL Mating Cone (200T) STP System (500T)

0174.01

FPSO Aker Smart 1 Montara Field Development FPSO Jackup Drilling Rig P2010

Spud Cans x 3 (410T)

3

1,230 16-Apr-07

0180.01

Prosafe Production Services Pte Ltd Azurite FDPSO

Loadout-Transportation-Installation of FDPSO Process Modules M71, M72, M73, M74, M75, M76, M10, M45, M51, M52, M01, M02, M12, M30, M31, M03, M41, F92, F95, F96, F75, F74 - Engineering and Supervision

M71(73.47t),M72(126.6t),M73(89.3t),M74(8 1.27t),M75(94.78t),M76(51.23t),M10(80t),M 45(417t),M51(240.47t),M52(240.47t),M01(1 107.11t),M02(904.2t),M12(101t),M30(244.4t ),M31(217.5t),M03(169.4t),M41(306t),F92(3 05.4t),F95(157.2t),F96(219.7t),F75(234.6t), F74(276.5t)

22

5,738 7-Aug-08

0180.02

Murphy West Africa Ltd

Azurite FDPSO

Loadout-Transportation-Installation of FDPSO Drilling Modules F91, F94, F84, F81, F82, F83, F93, F74, F72, VFD Building, F76, F75, Lay down panel, Acuu. basket, Drill basket, Draw work, HPU basket, Choke basket, Drill cabin, Bop/Sid Rail & Track, Tensioner x 4) - Engineering, Supervision, Contracting of loadout, transportation, installation equipment

F91(115t),F94(227t),F84(125t),F81(382t),F 82(201t),F83(257t),F93(176t),F74(413t),F7 2(61t),VFD Building(60t),F76(248t),F75(326t),Lay down panel(4t),Acuu. basket(17t),Dril basket(26t),Draw work(54t),HPU basket(21t),Choke basket (21t),Drill cabin(19t),Bop/Sid Rail & Track(9.34t),Tensionerx4 (225.2t)

21

2,985 31-Oct-08

0187.01

DHL Global Forwarding (Malaysia) Sdn Bhd

Talisman Malaysia Ltd Northern Field Bunga Orkid Development

HP Gas Separator - Jacking, Loadout (by roll on), Sea Transport from Kuantan Port to Sime Darby Yard - Engineering and Supervision

HP Gas Separator (200T)

1

200 5-Oct-07

0189.01

Deugro (Singapore) Pte Ltd

Su Tu Vang Central Processing Transportation, by Barge, of Switch Gear/ CCR Building & Misc Platform Items from Kensteel Yard to McDermott Yard, Batam - Engineering

Switch Gear/ CCR Building (600T), Misc Items (30T)

2

630 31-Aug-07

0189.03

Deugro (Singapore) Pte Ltd

1

680 27-May-08

Deugro (Singapore) Pte Ltd

MEG Module (232T) & Fuel Gas Skid (40T)

2

272 21-Apr-08

0189.05

Deugro (Singapore) Pte Ltd

Transportation, by barge, of FPSO E-house from Tianjin to Cosco Shipyard, Dalian - Engineering Transportation, by Barge, of MEG Module & Fuel Gas Skid from Tianjin to Quingdao - Engineering Transportation, by barge, of Booster Compressor skid, Sea Water Treatment Skid, Winch, other items from Tianjin to Qingdao Port to Qingdao COOEC Jetty - Engineering

E House (680T)

0189.04

Petrobras FPSO Cidade De Niteroi MV18 Petrobras FPSO Cidade De Niteroi MV18 Petrobras FPSO Cidade De Niteroi MV18

Booster Compressor skid (75T), Sea Water Treatment Skid (275T), Winch (85T), Other Items (133.5T)

4

569 24-Mar-08

0189.06

Deugro (Singapore) Pte Ltd

Su Tu Vang FPSO

Transportation, by Barge, of Turret, 9 Anchor Piles, PLEM, 2 PLEM Turret (550T), Anchor Piles x 9 (250T), Piles from MMHE Yard to Jurong Shipyard - Engineering - Intact and PLEM (25T), PLEM Piles x 2 (16T) Damage Stability

4

841 25-Mar-08

0191.01 0196.01

MOCEAN Shipping Pte Ltd Pacific Workboats Pte Ltd

MV Territory Trader Jackup Drilling Rig P2011

Spreader beam (1 x 8m) (70T) Derrick (300T)

1 1

70T 9-Oct-07 300 15-Aug-07

0197.01

Bechtel Corporation

FPSO Aker Smart 1

Design of a 70MT SWL Spreader Lift & Go of Derrick from SSI Yard, Benoi, to PPL Yard - Engineering and Supervision Reliance Industries Ltd - FPSO Aker Smart 1 Topside Facilities Loadout to Installation - P10, U10, U11, U20, U70 - Company Representation / Monitoring, Review and Reporting

P10 (602.43T), U10(181.2T), U11(294.5T), U20(440T),U70(289T)

5

1,807 17-Dec-07

page 6 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

0215.01

Yew Choon Pte Ltd

FPSO Cidade de Sao Mateo

Transportation, by Barge, of M23 & M26A from Laem Chabang to Singapore - Sea Fastening, Mooring, Bollard Pull & Ballasting Engineering

M23 (262T) & M26A (797T)

0215.02

Yew Choon Pte Ltd

FPSO Cidade de Sao Mateo

0217.01

Hako Logistics Pte Ltd

0220.01

2

Total Completed Ton. 1,059 30-Jun-08

Transportation, by Barge, of M55, M34 & M26B from Laem Chabang M55 (266T), M34 (237T) & M26B (876T) to Singapore- Sea Fastening, Mooring, Bollard Pull & Ballasting Calculations - Engineering

3

1,379 25-Aug-08

MAN Diesel Generators

Transportation of MAN Diesel Generators, from PT Global Yard, Batam to Keppel Singmarine Yard, Singapore - Engineering

Generators x 6 (90T)

6

540 5-Aug-08

Hallin Marine Pte Ltd

FSO Rang Dong MV 17

PLEM (24T), Concrete Blocks x 2 (35T)

3

94 31-Oct-08

0222.01

Coli Shipping (S) Pte Ltd

27

4,968 24-Oct-08

0227.01

Wasco Technologies Pte Ltd

National Oilwell Varco - Gold Star Project FPSO Armada Perdana

Siemens E House (411T)

1

411 14-Nov-08

0234.01

deugro (Singapore) Pte Ltd

National Oilwell Varco - QGP Gold Star

Subsea Installation of PLEM, 2 Concrete Blocks by DSV Sanko Angel - Lifting Capacity Analyses Stowage Plan for Shipment 1; 27Pyrenees Cable Reels on MV Diana / sister vessel Lifting of Siemens E House onto FPSO Armada Perdana at Keppel Shipyard - Analysis / Review Transport of Vertical Riser Handling Gantry Crane (QGP Gold Star) and Miscellaneous Items from Keppel Terminal to Jurong Port Deck Strength, Seafastening and Intact & Damage Stability Calculations - Engineering

Riser Gantry Crane (46.5T) & misc items (10T)

9

57 16-Jan-09

0236.01

deugro (Singapore) Pte Ltd

Koniambo Nickel

27 Piles Sea Transport by Barge - Deck Strength, Intact & Damage Stability, Seafastening and Stowage Plan (Revised barge)

Piles x 8 (11.1T), Piles x 2 (10.3T), Piles x 5 (7.3T), Piles x 12 (7.9.T)

27

241 16-Jan-09

0236.02

deugro (Singapore) Pte Ltd

Koniambo Nickel

38 Piles Sea Transport by Barge - Deck Strength, Intact & Damage Stability, Seafastening and Stowage Plan (Revised barge)

Piles x 38 (7.9T)

38

300 16-Jan-09

0236.03

deugro (Singapore) Pte Ltd

Koniambo Nickel

38 Piles Sea Transport by Barge - Deck Strength, Intact & Damage Stability, Seafastening and Stowage Plan (Revised barge)

Piles x 38 (7.9T)

38

300 16-Jan-09

0238.01

Technics Offshore Engineering Pte Ltd

FPSO BW Pioneer

Sea Transport of 3 modules - FPSO 'CASCADE CHINOOK' - TOE to Keppel - Engineering and subcontracting of floating crane and trailer

M60A (455T), M60B (455T), M61 (250T)

3

1,160 31-Jul-09

0243.01

Altus Logistics Pte Ltd

Peregrino FPSO

Cylinder (285T)

1

285 3-Mar-09

0243.02

Altus Logistics Pte Ltd

Peregrino FPSO

Cylinder (285T)

1

285 19-May-09

0245.01

deugro (Singapore) Pte Ltd

Coal Fired Power Station

475 3-Mar-09

deugro (Singapore) Pte Ltd

Solar Turbines

Power Station Bin 1 (155T), Bin 2 (134T), Coal Silo (186T) Solar Turbines x 4 (60T)

3

0251.01

Transportation Engineering for Cylinder from Sumuranja, Indonesia to Keppel Shipyard - Engineering Transportation Engineering for Cylinder from Sumuranja, Indonesia to Keppel Shipyard - Engineering Transportation of Power Station Bin 1, Bin 2 and Coal Silo - Saddle Strength Checks Transportation by Cargo Barge Bayswater 118 of 4 Solar Turbines from Port of Tanjung Pelepas to PT McDermott Yard, Batam Engineering Design

4

240 24-Apr-09

0254.01

Bok Seng Logistics Pte Ltd

Neste Oil Plant, Singapore

Transportation of Neste Plant Hydrotreating Reactor - Loading stability / ballasting, mooring plan, towing resistance and site supervision / liason with MWS

Hydrotreating Reactor (49.38 x 6.29 x 6.78 m) (722T)

1

722 5-Jul-09

0257.01

Petroserv S.A.

FDPSO Dynamic Producer

Sea Transport of 5 modules by one barges from Dyna-Mac to Sembawang

TG Aft (302.7T), TG Fwd (180.2T), DG (727T), E-house (P) (162.8T), E-house (S) (180.6T)

5

1,553 31-Jul-09

0266.01

Altus Logistics Pte Ltd

Peregrino FPSO

Seafastening Engineering for Trolley Tower - From Profab, Batam, Indonesia to Keppel Benoi, Singapore

Trolley Tower (65T)

1

Pyrenees Cable Reels x 27 (184T)

Qty.

65 1-Jul-09

page 7 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

Qty.

0268.01

Hoy San Stevedoring Pte Ltd

MMWU

59 Loose Items (390T)

59

0269.01 0275.01

Altus Logistics Pte Ltd Hoy San Stevedoring Pte Ltd

Peregrino FPSO (Lifting Beam Design)

MMWU - Stowage Plan & Intact and Damage Calculations for 59 Loose Items Utility Container Transportation - Batam to Singapore 2 Spread beam designs with PE endorsements

Total Completed Ton. 390 17-Jun-09

1 2

109 30-Jun-09 140 31-Jul-09

0276.01

109 20-Jul-09

1

113 20-Jul-09

0284.01

Bok Seng Logistics Pte Ltd

1

625 23-Sep-09

0297.01

Titan Project Services (S) Pte Ltd

Loadout & Sea transportation of Utility Container Transportation Ballasting, bollard pull & IDS calc Pedestal Crane Transport - I&D Stability (list and trim), lashing Pedestal Crane (113T) padeye capacity & deck strength Module loadout & sea transport - Ballast calculation and attendance, E-house Module (625T) sea transport engineering Stability Calculation for Barge BS 23 Module (312T)

1

0277.01

Al Jaber Heavy Lift & Transport Pte Peregrino FPSO STP Ltd Winstar Shipping Pte Ltd Pluto LNG Development

1

312 11-Sep-09

0305.01

MSV Maverick

Knuckle Boom Crane - S'pore & Lumut - Loading Survey

Knuckle Boom Crane (150T)

1

150 18-Dec-09

0306.01

Rubicon Offshore International Pte Ltd Winstar Shipping Pte Ltd

North Rankin Re-Development

Seafastening, deck strength & 10 tons padeye calculation for 10 items - Tuas to Jurong Port

Fuel Gas KO Drum x 2 (11T), LP Flare KO Drum (5.21T), HP Flare KO Drum (106.65T), Closed Drain Drum (7.8T), Temp Water Expansion (9.3T), Inst. Air Receiver (7.55T), NO2Receiver (7.1T), Inst, Air Vessel 2nos x 2 (2.2T)

10

170 13-Nov-09

0308.01

SMOE Pte Ltd

Gajah Baru CPP

CPP topside maindeck pancake (930T)

0309.01

Schenker Australia Pty Ltd

Gorgon LNG

Lifting and structural analysis for 16 point lift for Gajah Baru project top side pancake Transportation options by barge 330 ft or landing craft 99 m of concrete caissons 70 to 120 tons from Muhibbah Yard to Barrow Island - Site Attendance and Engineering Design - Lifting and Rigging Arrangement and Plan, Deck Strength, Stowage Plans, Seafastening, Stability

0318.01

Agility Shipping Pte Ltd

Peregrino FPSO

Barge Strength and Stability Calculations for the transportation of Custody Transfer Metering Module (M40) and Desander Module C (M10C) from JRM Batam fabrication yard to the FPSO topsides assembly facility in Singapore using barge 'Crest 256'

Custody Transfer Metering Module (M40) (324.79T)and the Desander Module C (M10C) (367.64T)

0324.00

JGC-PT. KBRI Joint Operation

Tangguh LNG

0328.01

Agility Shipping Pte Ltd

0329.01 & 0329.03 0329.02

Jubilee Field FPSO

Utility Container (109T) Spreader beam (2 x 9m) (70T), Spreader beam (2 x 12m) (70T) Utility Container (109T)

1

Concrete Caissons 70 to 120 ton

930 9-Feb-10 25-Jan-11

2

692 20-Jan-10

LNG Assist Tugs M264 (Tangguh Pauru), M265 (Tangguh Ewako) – Assist Tugs M264 (550t), M265 (505t) Jacking, Cradle and On Dock lift conditions – Support Structure FEM, Site Attendance at PT Pal Yard, Surabaya

2

1,055 24-Feb-10

Peregrino FPSO

Roll on operation and Sea Transportation of 1 Module onto 330' barge 'Cruise 332' - Deck Strength and Intact and Damage Stability Calculation

Module (1500T)

1

1,500 17-Feb-10

COLI Shipping (S) Pte Ltd

Gorgon LNG

Transportation of 2 shipments of Gorgon LNG accommodation camp units (54 & 108) from Sri Racha to Fremantle on MV Beluga Elegance - Stowage Plan and Site Supervision

54 accommodation camp units, 108 accommodation camp units

162

213 16-Aug-10

COLI Shipping (S) Pte Ltd

Gorgon LNG

Transportation of HDD Pipes from Kuantan & Singapore to Australia HDD pipes 9.625" x 12.87m, 13.375" x on MV Clipper Mariner - Stowage Plan & Site Attendance 12.1m, 9.625" x 12.1, 7" x 12.1m, 9.625" x 12.7m, 20" x 11.58m

2225

2,129 17-Jun-10

page 8 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

0330.01

Agility Shipping Pte Ltd

Peregrino FPSO

transportation of modules M10A & M11A (From Batam to Keppel Shipyard) - barge deck strength and intact and damage stability calculation for roll on operation

M10A (Separation Module A) - 1418t M11A Coalescer Module A - 1198t

0332.01

MODEC Offshore Production Systems (Spore) Pte Ltd

BP Angola FPSO

Transportation of Piperacks, Helideck, Stair Tower, Metering Skid Frame, Flare Tower from Nippon Steel yard, Batam to Jurong Shipyard

Total of 12 modules consisting of 6 piperacks, flare tower (2 sections), embarkation tower, helideck support, pancake deck and metering skid foundation.

0334.01

Riser Handling Gantry Crane

0339.01

Rubicon Offshore International Pte Ltd Leighton Offshore Pte Ltd

0340.01

SapuraAcergy Sdn Bhd

0344.00

Schenker Australia Pty Ltd

0345.01

Yang Kee Logistics Pte Ltd

Nicol Highway MRT

Survey of offloading of the cargo from MV Eastern Jade at Jurong PortTunnel Boring Machine Parts

0352.01

ASC Liner Services Pte Ltd

Gorgon LNG

0354.01

Alan Paddy's (S) Pte Ltd

Gorgon LNG

Transportation of HDD pipes from Kuantan to Australia by MV Thor Pioneer - Engineering - Analyses, Design - Deck Strength, Stowage and Seafastening Onshore pipeline - transportation of pipes from Kuantan to Henderson - Pipe lifting frame 20 x 8 x 4 ft, swl 30 t - Engineering Design

HDD pipes, various length meters 11.940 to 12.465, diameter 34" (885.00mm OD x 42.50mm WT) N.A.

0365.04

Engineering Review of Grillage details on "Hanjin Pioneer" vessel

0369.01

Allianz Global Corporate & Specialty Gladstone LNG AG Allianz Global Corporate & Specialty Gladstone LNG AG Altus Oil & Gas Services Belanak LPG FSO

0383.01

PT Offshore Services Indonesia

Kangean Field Development

0384.01

TGT FPSO

0391.01

Armada TGT Limited (Bumi Armada) PT Bangun Adyabahan Perkasa (Utraco) deugro (Singapore) Pte Ltd

0396.01

Infiniti Marine Pte Ltd

Koniambo Nickel, New Caledonia TGT FPSO

0402.01

Stanford Marine Asia Pte Ltd

Gorgon LNG

0404.02

Alnmaritec Ltd

Switzer Kissama, Switzer Kumbira

Transportation of Pilot Boats each 25 t - Switzer Kissama, Switzer Kumbira - Design of Transport cradle for sea transportation

0407.01

Teras Offshore Pte Ltd

Transport Cradle Design Check Preliminary Stowage for Transportation of Modules from Thailand, Indonesia and Fremantle to Darwin (70 shipments)

0365.05

0385.01

Riser Handling Gantry Crane - 5 cylinders and 1 main winch Loading / Offloading Survey Leighton Mynx (Accommodation Installation of accommodation block - engineering review Barge) DP Heavy Lift And Pipelay J-Lay Tower - Assembly - Engineering - Lifting Plan Sapura 3000 Gorgon LNG Loadout-Transportation-Installation, 80 barge shipments of Concrete X Blocks from Cikading to Barrow Island - Engineering and loadout supervision

Kangean Field Development

Qty. 2

Total Completed Ton. 2,616 23-Feb-10

12

427 28-Dec-10

5 Cylinders , 1 main winch

6

105 1-Mar-10

Accommodation Block 600 t

1

600 14-Jun-10

JLTS - 404t, Skidradoil - 300t, Mast #3 17t, PES - 140t Concrete X blocks

4

861 30-Apr-10 240,000 8-Aug-12

665 18-May-10 55

619 4-Aug-10

N.A.

N.A. 26-Aug-10

GLNG Plant module (3301NB)

1

1,287 11-Dec-13

Engineering Review - Transportation of module

GLNG Plant module (3301JA)

1

1,925 12-Feb-14

Seafastening Calculation and Design of 4 Skids from Singapore to Batam Sea Transport and Lifting of 6 Subsea Christmas Trees from Lamongang Marine Base to Jack Up Rig TGT FPSO - topside module installation - engineering - lifting review

C1A (59mt), C1B (32.4t), C3A (53t), C3B (27t) 6 units Christmas Tree at 46.3t each

4

171 29-Oct-10

6

278 31-Jul-11

6

6,224 16-Apr-11

M40 - 415t, TSS - 1100t, TH - 1450t, M30 1117t, M70 - 592t, M80 - 1550t Installation of module onto Jack up drilling rig Klei - Design of Clevis N.A. pad eyes (50 t each) for Klei Rig Sea transportation engineering and mooring plan for modules / 2 Units Mini Modules (475t each), 2 units items from shore (Qingdao, Shanghai & Dalian) to Jumbo vessel at DOS Cylinder (330t each), 2 units Dos anchorage (193t each) Loadout and Sea Transport of 2 Skids from Awal Idaman Jetty, Port Cone NG Package (10t) , WT Package (73.6t) Klang to Dynamac Yard, Singapore AHTS MV Stanford Alpha - Towing of barges from Cikading to N.A. Barrow Island - Catenary Calculation for Tow Line

30-Oct-10 6

1,996 28-Jan-11

2

84 23-Feb-11

N.A.

N.A. 12-Apr-11

Pilot Boats Switzer Conda,Switzer Kissama, Switzer Kumbira

3

75 13-May-11

Piperacks, Jetty, Electrical Room, Manifolds

165

39,509 24-Jun-11

page 9 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

0409.01

Asia Management Group Shipping Pte Ltd COLI Shipping (S) Pte Ltd

Bourbon Offshore - Knuckle Boom Crane Cossack Wanea Lambert

Lifting and Seafastening Procedure & Site Supervision

Knuckle Boom Crane (380t)

1

Total Completed Ton. 380 30-Jun-11

Stowage plan - M/V 'Hamra' - Subsea 7 equipment

Gorgon LNG

0420.01

Koleth (S) Pte Ltd (Miclyn Express Offshore) Tropical Shipping and Trading Company Pte Ltd Offshore Marine Services Alliance Pty Ltd RK Offshore Management Pte Ltd (Harrier Maritime Pte Ltd) Petrofac International Limited

AHT Miclyn Victory -Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line AHT Ewan Adventure - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line Deck Strength Calculation, Ballast sequence, Ramp design and arrangement for Semi Submersible Barge Teras 002 AHTS Jul Sofus K - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow LineCatenary Lifting review, "sit down" procedure, engineering and project management/site attendance

Container, Compressors, Generators, Winches, Reels N.A.

63

724 14-Jun-11

N.A.

N.A. 26-Jun-11

N.A.

N.A.

N.A. 18-Jul-11

N.A.

N.A.

N.A. 13-Jun-12

N.A.

N.A.

N.A. 26-Jun-11

N.A.

N.A.

N.A. 22-Feb-12

0424.01

Miclyn Express Offshore Pte Ltd

Gorgon LNG

Barge Miclyn 258 - Bollard Pull Calculation to suit 40T Smit Brackets N.A. and analysis for underdeck capacity calculation

N.A.

N.A. 17-Aug-11

0425.01

MODEC Offshore Production Systems (Singapore) Pte Ltd

BP Angola Block 31 PSVM FPSO

Sea fastening of loose items on the FPSO sailing out of Singapore to Angola

N.A.

N.A. 3-Jan-12

0428.01

Deugro (Singapore) Pte Ltd

382.5 MW Unosugen CCPP

1

136 8-Sep-11

0429.00

Altus Logistics Pte Ltd

TSB FBSO - BWO

14

107 8-Dec-11

0430.01

Deugro (Deutschland) GmbH

382.5 MW Unosugen CCPP

Cargo Vessel M.V PAC ATHENA - Lifting and lashing drawings of Siemens Steam Shell - Upper (67t) and cargo (Upper Steam Shell Part & Lower Steam Shell Part), lashing Lower Part (69t) calculation, lifting calculation & stowage plan Seafastening design and calculation, deck strength check of Anchor Chains, piles, reels and containers Piles, chains, reels & containers from Profab Yard, Batam to Loyang Offshore Supply-Base, Singapore Land Transport Lashing, Arrangement, Stability Siemens Steam Shell - Lower Part (69t)

0430.02

Deugro (Deutschland) GmbH

382.5 MW Unosugen CCPP

0430.03

Deugro (Deutschland) GmbH

0432.01

0410.01 0412.01 0413.01 0417.01 0419.01

Gorgon LNG Gorgon LNG Gorgon LNG Berantai FPSO

N.A.

Qty.

1

69 26-Sep-11

Land Transport Engineering - Trailer Stability Calculation, Trailer Siemens Gas Turbine (310ton) , Steam Lashing Calculation, Trailer Lashing Plan & Land Transport Solution Turbine (172ton), Generator (343ton ), Transformer (255ton ) & HP Turbine (58ton).

5

1138 14-Oct-11

382.5 MW Unosugen CCPP

Transformer Installation - review of installation procedure of transformer onto the foundation and to issue method statement for skidding of transformer.

Siemens Transformer (255ton)

1

255 18-Nov-11

Miclyn Express Offshore Pte Ltd

Gorgon LNG

N.A.

N.A.

N.A. 25-Oct-11

0433.01

Intone Pte Ltd / Drydocks World SEA

Gorgon LNG

AHTS Miclyn Magellan 2 - Feasibility Study - GORGON suitability/Powering, bollard pull & catenary calculation AHTS Ocean Unite - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line

N.A.

N.A.

N.A. 7-Oct-11

0433.02

Gorgon LNG

N.A.

N.A. 7-Oct-11

N.A.

N.A.

N.A. 7-Oct-11

0444.01

BBC Chartering Singapore Pte Ltd

2,674

6,612 11-Jan-12

0445.01

Teras Offshore Pte Ltd

Gorgon Upstream DOMGAS onshore project Teras 375ft Ballastable Barge

AHTS Ocean Unity - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line AHTS Samson VI - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line Linepipe strength and tier limit calculations for 3 nominated pipe types to be stowed on MV BBC Campana Feasibility Study of 375ft Barge for Trailer Loadout

N.A.

0434.01

Intone Pte Ltd / Drydocks World SEA Samson Express Offshore Pty Ltd

NA

NA 15-Feb-12

0451.01

Bumi Armada Berhad

ONGC - FPSO D1

FPSO D1 - Topside module installation - engineering - lifting review M30 - 1094.23, M70 - 837.68

2

1,932 27-Aug-12

Gorgon LNG

Linepipes for DOMGAS onshore pipeline NA

page 10 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

Qty.

Total Completed Ton. 20-Apr-12

0456.01

BBC Chartering Singapore Pte Ltd

Vestas Wind Systems A/S

Wind turbine towers

0457.00

HDS Project

0482.01

JGC Construction International Pte Ltd Al Jaber Heavy Lift & Transport Pte Ltd SBM Offshore

MV BBC California Deck panel strength checks for loading of wind turbine towers Review of Heavylift Procedures, spreader bar calculations, and spreader bar certification Ballast Calculation for Roll on and Roll off of 2 units Ship Unloader

NA

NA 26-Apr-13

Ship Unloaders (300t)

2

600 10-May-12

Installation Engineering and PMT works

M23, KAU, E-house, M07

4

1550 30-Sep-13

0482.03

SBM Offshore

0483.01

Leighton Engineering Sdn Bhd

SNP Kikeh FPSO

Lifeboat upgrade

lifeboat platform & davit x 2 sets

4

Gorgon LNG

Engineering Support

L1 Caissons rings

0484.01

Siemens Pte Ltd

SBM Offshore

East Power Plant (Brown Field Detailed Design) East Power Plant (Brown Field Detailed Design) BC-10 RIS Module

FGCS Skid Transportation - Seafastening, stowage plan on "Lewek FGCS Skid Martin" EDG Skid Transportation - Seafastening, stowage plan on "Dayang EDG Skid Cinta" Transportation & Installation Engineering RIS Module

0484.02

Siemens Pte Ltd

0485.01 0486.00

Agility Project Logistics

Zawtika

3059 14-Dec-12

Agility Project Logistics

Zawtika

161

3059 10-Sep-12

0489.01

Lanka Hydraulic Instutute Ltd

Concrete coated pipes of various dimensions Concrete coated pipes of various dimensions NA

161

0486.01

Transportation of 28in Concrete Coated Pipes - Seafastening Design and Rigging Arrangement, Pipe Tier Limitation Calculation, Acceleration Calculation for Clipper Galaxy Transportation of 28in Concrete Coated Pipes - Seafastening Design and Rigging Arrangement, Pipe Tier Limitation Calculation, Acceleration Calculation for Clipper Mooring Analysis for RORO vessel Galaxy

NA

NA 12-Dec-12

0489.02 0493.00 0501.01

Lanka Hydraulic Institute Ltd FH Bertling Pte Ltd deugro (Singapore) Pte Ltd

North Malay Basin FPSO

NA 10-Dec-12 1413 29-Apr-13 300 24-Dec-12

deugro (Singapore) Pte Ltd

North Malay Basin FPSO

NA Rotating deck, boom, A-frame Turret Head, Chain Table, Turret Gantry, Crane Pedestal, Platform Anchor piles and Followers for FPSO

NA 3 5

0501.04 0505.01

Altus Oil & Gas Malaysia Sdn Bhd

Mooring Analysis of Pontoon Transportation of crane parts - Seafastening Design Turret Head Structure Shipment on barge Victory Falcon - Intact & Damage Stability booklet, Seafastening details Dwgs & Local Deck strength check, Mooring Cargo Shipment on bargeCalculation Victory Falcon - Barge stowage plan, Seafastening details Dwgs & Local Deck strength check, Grillage analysis, & Damage Stability, Deck Strength, Mooring Shifting ofIntact 1 module from yard to jetty - Structural Analysis

Modular room

1

72 29-Jan-13

0506.01

Angola Block

Acceleration Report and Seafastening Dwg

Media Filter & Blower package

1

131 24-Jan-13

0510.01

Panalpina World Transport (S) Pte Ltd Bumi Armada Berhad

FPSO Armada Claire

Lifting Reviews

Skid 11 ‐ Water Injection System / Electrostatic Coalescer, Flare Tower, Skid 9 ‐ Water Injection System / Pw, Skid 1 ‐ Inj. Gas compressor / Fuel Gas, RTM

5

3124 17-Dec-12

0511.01

Consolidated Pipe Carriers Limited

Gemusut-Kakap Field

Transportation Analysis

Pipes

17-May-13

0511.02

Consolidated Pipe Carriers Limited

Gemusut-Kakap Field

Transportation Analysis

SLED and double joints

20-May-13

0527.01

Bibby Offshore Singapore Pte Ltd

Champion Waterflood

Crest Odyssey 1 Acceleration & Seafastening Calculations

Winches & related components

0532.01

Orient Project Shipping (S) Pte Ltd

0534.01

AG&P

0534.02

AG&P

0462.00

Loadout of 2 Units Ship Unloader SNP Kikeh FPSO

Texas Propane Dehydrogenation Expansion Texas Propane Dehydrogenation Expansion

various equipment and spreader bars

Pre-Stow plan for cargoes from Korea and Thailand to Manausa, Brazil Feasibility Study of loadout facilities Site Attendance for loadout of modules

Ongoing 31-Jan-13

1

40 4-Oct-12

1

35 18-Jul-13

1

1250 Ongoing

1026 16-Apr-13

11

91.7 18-Jul-13 1826 25-Jul-13

NA Piperacks

18

NA 16-Sep-13 1858 Ongoing page 11 of 12

Masstrans Track Record - LTI - 2014-03-31 - CM Job No

Client

Project

Activity / Work Scope

Modules / Structures

0538.01

Siemens Pte Ltd

Petronas FLNG-2 (Rotan)

E-house P7 & S7

0550.01

Pape Engineering

Sea transportation of E-house x 2 - Feasibility study on the vessel stability Supply of draftsperson

0559.01

Bumi Armada Berhad

FPSO C7

Lifting Reviews

Qty. 2

Total Completed Ton. 3400 20-Nov-13 28-Feb-14 Ongoing

page 12 of 12

Annex 2 Track Record Fabrication and Construction

26

Track Record - FabricationConstruction - 2014-02-28 - CM Job No

Client

Project

Activity / Work Scope

Completed

0009

Pioneer Offshore Enterprises Pte Ltd

Cranebarge POE Giant 6

Stability calculations and Clyde Crane load chart

22/1/2003

0019

Pioneer Offshore Enterprises Pte Ltd

Cranebarges CB1, CB2, CB3

Principle particulars, inclusive of profile plans and crane lifting load charts

15/9/2005

0028

Offshore Logistic Asia Pacific Pte Ltd

SAT Dive System

Design of diving bell A-Frame launching skid

0036

Harald Frigstad Engineering Pte Ltd

Semi-Submersible Rig Atwood Southern Cross

FEM analysis of diving bell skid foundation for semi-submersible rig

6/12/2003

0037

TG Marine Services Pte Ltd

Barge Antara Koh B8

25/6/2003

0038

Pioneer Offshore Enterprises Pte Ltd

Pipe Lay Barge Pek Sun 1203

0043

Pioneer Offshore Enterprises Pte Ltd

Cranebarge POE Giant 6

FEM analysis of barge strength and seafastening design for crawler crane mounted on barge Antara Koh B8 Measurement of barge "Peck Sun 1203" equipment foundations, enclosed spaces, underdeck carlings, LSA / FFA Engineering & site attendance for load test of 'POE Giant 6' crane

0048

DSV Allied Achiever Sat Dive System

Design of diving bell launch system

23/9/2003

0065

Allied Marine & Equipment Sdn Bhd (Malaysia) TG Marine Services Pte Ltd

Cranebarge Sumpile

FEM and stability calculations for Sumpile crane boom

4/6/2004

0073

POE Shipping Pte Ltd

Deck Cargo Barge 250 ft

Calculation of bollard strength

7/6/2004

0082

TG Marine Services Pte Ltd

Jack Up Barge SF-1

Stability calculations for jack up barge

30/9/2004

0085

Hiap Shing Shipping Pte Ltd

Cranebarge ET Offshore 20

Stability calculations for crane barge E.T. Offshore 20 lifting 200 tonnes

10/8/2004

0097

TG Marine Services Pte Ltd

Crane barge POE 1817

Crane barge POE 1817 stability calculations

0098

Pacific Workboats Pte Ltd

Cranebarge PW L1501

PWL 1501 Load Test Barge Design

14/1/2005

0102

POE Shipping Pte Ltd

Pipelay Barge PL1

Pipe Laying Barge 'PL 1' - Intact Stability Calculation, GA Updating

19/4/2005

0119

POE Shipping Pte Ltd

Craneship POE Ocean Lift

Crane Ship POE Ocean Lift - Crane - New Load Chart after Boom Extension

7/10/2005

0122

SH Engineering Pte Ltd

Steel Marker Buoy diameter 2.2m

Diameter 2.2m Steel Marker Buoy

0124

IMT Marine Consultants Ltd.

IMT 966 AHTS

IMT 966 - AHTS Design - Ship Construction Unit / Detailed Drawings

0124.A

IMT Marine Consultants Ltd.

IMT 966 AHTS

Attendance on sea trials on IMT behalf

11/10/2005

0126

Kim Heng Marine & Oilfield Pte Ltd

Deck Cargo Barge Kim Heng 2388

Barge Kim Heng 2388 Towing Bracket Strength Check

11/10/2005

0133

Kim Heng Marine & Oilfield Pte Ltd

Deck Cargo Barge (180 x 60 x 12) ft

22/12/2005

0139

Proceanic Engineering Services Pte Ltd Quantum Marine Works Pte Ltd

Cendor MOPU

analyses and design - longitudinal strength, tank tables, stability book, towing brackets, bollards Cendor MOPU Tow from Lumut to Cendor Field - Sea keeping Analysis

0149

Hercules Drilling Rig

5/5/2005

7/4/2003 8/12/2003

4/1/2004

12/10/2005 16/6/2006

10/3/2006

35 T Anchor / Mooring Winch Platforms (Cantilever) and Foundation Design and Structural FEM Analysis

23/8/2006

page 1 of 5

Track Record - FabricationConstruction - 2014-02-28 - CM Job No

Client

Project

Activity / Work Scope

Completed

0157

IMT Marine Consultants Ltd.

IMT 966 AHTS

Labroy T162 (IMT966 AHTS) - 167 Deck Crane Base Support Structure - FE Analysis

0162

Acergy Singapore Pte Ltd

Multi Purpose Construction Vessel Toisa Proteus

Toisa Proteus' - Dive System Removal

16/7/2007

0162.A

Acergy Singapore Pte Ltd

Multi Purpose Construction Vessel Toisa Proteus

Toisa Proteus' - Moon Pool Hatch Design

29/5/2007

0162.C

Acergy Singapore Pte Ltd

Multi Purpose Construction Vessel Toisa Proteus

Toisa Proteus' - Dive Module - Transportation Engineering

25/9/2007

0198.A

Caldive International Pte Ltd

Reliance MA-D6 Field Development

0198.B

Caldive International Pte Ltd

DSV Eclipse

Multipurpose Offshore Vessel Olympic Canyon - Installation of Penelope Dive Module Engineering DSV Eclipse - crane upgrade and anti heeling System - Engineering

0198.D

Caldive International Pte Ltd

DSV Eclipse

Bell to TUP clamp Clamp Interlock - fabrication, subcontracted

0198.E

Caldive International Pte Ltd

DSV Eclipse

C clamp Safety Device Bell side door - engineering design and fabrication, subcontracted

0198.G

Caldive International Pte Ltd

Enginering desing of Subsea Stabbing Guide Assemblies for Subsea Isolation Valve (SSIV)

2/6/2008

0198.H

Caldive International Pte Ltd

Reliance MA-D6 Field Development - Installation of Subsea Isolation Valve DSV Texas Horizon

29/12/2008

0221

Diving Bell Launch System

0226.A

M.O.S. Marine Offshore Services Pte Ltd Pelabuhan Tanjung Pelepas Sdn Bhd

Technical evaluation, including deck strength for installation of Mezzanine Deck and fitment of SAT 2 onto DSV Texas Horizon Diving Bell A-Frame, Skid Base and Trolley System, DDC Frame - Analyses and Design

Port of Tanjung Pelepas - Mitsui RTG

Mitsui RTG Cranes x 8 units - Structural analyses / review

25/2/2009

0235.A

Caldive International Pte Ltd

Hyperbaric Rescue Chamber

HRC (Hyperbaric Rescue Chamber) Support Frame - Design

30/4/2009

0250

Cal Dive International Pte Ltd

DSV Eclipse

DSV 'Eclipse' - Upgrade at Keppel (Gul Rd) Shipyard, Feb, '09 - Technical Support

17/4/2009

0253

Hallin Marine Systems Ltd - Hallin Marine Pte Ltd Cal Dive Marine Construction (Mauritius) Ltd Cal Dive International Pte Ltd

AHSV Seacor Penrith

Seacor Penrith - Mezzanine deck for A Frame and ROV - Design

1/6/2009

Hyperbaric Lifeboat

Hyperbaric lifeboat support frame design

3/6/2009

Hyperbaric Lifeboat Davit Frame

Davit Frame - Strength check for load test condition

0264 0286 0292

Greatship Global Offshore Services Pte Ltd 0299 Underwater Technology Services (S) Pte Ltd 0324 BUT.KJP Corporation - PT KBR Indonesia Joint Operation 0327 Offshore Ship Designers (Singapore) Pte. Ltd. 0327.02 Offshore Ship Designers (Singapore) Pte. Ltd. 0335 Underwater Technology Services (S) Pte Ltd

Integration of Dive System

12/10/2006

24/10/2007 3/3/2009 18/1/2008 29/12/2008

30/6/2009

11/9/2009 14/10/2009

Deflection check of diving chambers skid in lifting condition

9/12/2009

Tangguh LNG - LNG Assist Tugs

Tangguh LNG Assist Tugs M264, M265 - Support Structure - FEM Analysis

24/2/2010

Acergy Borealis - DP Pipelay And Heavy Lift Construction Vessel DP Pipelay And Heavy Lift Construction Vessel Acergy Borealis

Installation of superstructure - Strength analysis for lifting off condition

30/7/2010

Installation of superstructure - Strength analysis for lifting on condition upon outfitting Continuing on job 327 SPHLB Support Structure and Jacking Beam strength check

30/7/2010 8/6/2010

page 2 of 5

Track Record - FabricationConstruction - 2014-02-28 - CM Job No

Client

0335.02 Underwater Technology Services (S) Pte Ltd 0335.03 Underwater Technology Services (S) Pte Ltd 0335.04 Underwater Technology Services (S) Pte Ltd 0335.06 Underwater Technology Services (S) Pte Ltd 0335.07 Underwater Technology Services (S) Pte Ltd 0335.08 Underwater Technology Services (S) Pte Ltd 0335.09 Underwater Technology Services (S) Pte Ltd 0335.10 Underwater Technology Services (S) Pte Ltd 0335.11 Underwater Technology Services (S) Pte Ltd 0335.12 Underwater Technology Services (S) Pte Ltd 0335.14 Underwater Technology Services (S) Pte Ltd 0335.15 Underwater Technology Services (S) Pte Ltd 0335.16 Underwater Technology Services (S) Pte Ltd 0335.18 Underwater Technology Services (S) Pte Ltd 0344.08 Schenker Australia Pty Ltd

Project

Activity / Work Scope

Completed

SPHLB Support Structure and Jacking Beam strength check

6/9/2010

SAET System

Structural check for DDC 1 Skid, DDC 2 & 3 Skid, Control Van & Machinery Van

13/1/2011

SAET System

Design of trolley (in A frame) for the diving bell of Saturation system

24/5/2011

SAET System

SDC Skid Frame FEM Analysis

13/1/2011

SAET System

Design of winch

25/2/2011

SAET System

HRC Davit - FEM Analysis

24/3/2011

SAET System

ROV Control Van-FEM Analysis

13/1/2011

SAET System

Winch Skid-FEM Analysis

13/1/2011

SAET System

Catcher Hook FEM Analysis

15/11/2010

SAT04 System

Control Van - FEM Analysis

16/11/2010

SAET System

HRC Frame - FEM Analysis

13/1/2011

SAET System

ROV Frame - FEM Analysis

13/4/2011

SAET System

Spreader Bar Design

13/1/2011

SAT04 System

Winch Skid-FEM Analysis

13/1/2011

Gorgon-Barrow Island LNG Project

Hinge design for the ramp of the stern of the barges

1/8/2011

0344.12 Schenker Australia Pty Ltd

Gorgon-Barrow Island LNG Project

Wedge modification

1/8/2011

0344.14 Schenker Australia Pty Ltd

Gorgon-Barrow Island LNG Project

22/9/2011

0345.16 Schenker Australia Pty Ltd

Gorgon-Barrow Island LNG Project

Deck Cargo Barge Giant 2 main deck and barge side cracks, portside 7, starboardside 2 reinforcement / strengthening plan and engineering Design of steel cradles for sea transportation of cable drums from Korea

0346.25 Schenker Australia Pty Ltd

Gorgon-Barrow Island LNG Project

Stanchion modification drawings

11/5/2012

0347.26 Schenker Australia Pty Ltd

Gorgon-Barrow Island LNG Project

Design of steel cradles for sea transportation of cable drums from Korea

27/9/2012

0348.01 Alan Paddy's (S) Pte Ltd

Offshore Container

Drawing modification and structural calculations

30/7/2010

0354.01 Alan Paddy's (S) Pte Ltd

Piperack 30 mt

30MT Piperack Design - Drawing and Structural Calculations

0385.01 PT Bangun Adyabahan Perkasa (Utraco)

Kangean Field Jack Up Drilling Rig Klei

Clevis Pad eye for Klei Rig

21/9/2012

16/11/2011 7/12/2010

page 3 of 5

Track Record - FabricationConstruction - 2014-02-28 - CM Job No

Client

Project

Activity / Work Scope

Completed

0401.01 Seacor Marine (Asia) Pte Ltd

Seabulk Nilar

0401.02 Seacor Marine (Asia) Pte Ltd

Seabulk Nilar

1.) Re-calculate the Stability of the Seabulk Nilar (upgrade to AHT status) as required by BV. 2.) Update the GA with the AHT, stern roller, Shark-jaw, Tow pins and the Platform for the new Davitexperiment; and Workboat. Inclining 1.) Procedure write up 2.) Attendance and report

21/9/2011

0402.01 Stanford Marine Asia Pte Ltd

Gorgon - Stanford Alpha

Catenary Calculations for Stanford Alpha Towing Lines.

25/4/2011

0404.01 Alnmaritec Ltd

Transport Cradles Design Check

Design checking of Transport cradle to confirm their adequacy for sea transportation

24/6/2011

0404.02 Alnmaritec Ltd

Transport Cradles

Design of Transport Cradle

0412.01 Koleth (S) Pte Ltd (Miclyn Express Offshore) 0413.01 Tropical Shipping and Trading Company Pte Ltd 0419.01 RK Offshore Management Pte Ltd (Harrier Maritime Pte Ltd) 0422.00 GEOQUIP Marine AG

Miclyn Victory

Catenary Calculations for Miclyn Victory Towing Lines.

30/6/2011

Gorgon - Ewan Adventure

Catenary Calculations for Ewan Adventure Towing Lines

10/8/2011

MV Jul Sofus K

Catenary Calculations for AHTS MV Jul Sofus K Towing Lines

25/8/2011

DSV Lady Christine - Conversion

derrick foundation, moonpool, existing and new moonpool bottom doors, accommodation layout update, general arrangement update, LSA/FFA and safety plan update, new accommodation construction drawings, longitudinal strength calculations, hydrostatic table and stability book update, inclining experiment procedure, ship yard sourcing - engineering analyses and design, project coordination

22/12/2011

0442.00 Gardline Marine Sciences Limited

DSV Lady Christine - Conversion

Design of new moonpool, moonpool doors design, design of derrick foundation, Container foundation design, update stability booklets, Tween deck design, Inclining Experiment procedure and Report, Design of existing moonpool closing

17/7/2012

0442.16 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Drawing of modifications on mezzanine deck

28/11/2012

0442.17 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Mezzanine deck structural analysis & drawings

28/11/2012

0442.18 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Plimsoll Mark

19/11/2012

0442.20 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Revised Stability Booklet

18/12/2012

0442.21 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Deck structural analysis

0442.22 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Underdeck Strengthening Details

0442.23 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Crew Accommodation modification

0442.24 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Inclining test and updating of stability booklet

0442.25 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Structural analysis of new A-frame

0442.26 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Seafastening design & calculation of various items

0442.27 Asia Geos (L) Ltd

MV Geoasia (ex-Lady Christine)

Drafting of Detailed Seating Plan on Main Deck

13/10/2011

8/8/2011

page 4 of 5

Track Record - FabricationConstruction - 2014-02-28 - CM Job No

Client

0445.01 Teras Offshore Pte Ltd

Project

Activity / Work Scope

Completed 20/1/2012

0447.00 Alan Paddy's (S) Pte Ltd

Construction of self ballastable deck cargo barges 375 ft x 18 Ballast system and stability for loading / offloading and voyage - Design review, feasibillity units study Research & Development of JWA water bag frame Structural Strength Analysis for water bag frame

0448.00 Global Explorer Marine Pte Ltd

Barge Labroy 156

Seafastening Design & Analysis for Crawler Crane

29/2/2012

0448.07 PT Bina Nusantara Perkasa

Barge Labroy 156

23/7/2012

0451.02 Bumi Armada Berhad

ONGC - FPSO D1

Engineering services for barge thrusters installation design, barge tank reconstruction design, barge stability booklet Design of Spreader beam

0461.00 Al Jaber Heavy Lift & Transport Pte Ltd 0464.01 LAP Projects (Asia) Pte Ltd

Saudi Aramco Mobil Refinery Company Ltd (SAMREF) Lifting and Turnaround of reactor

0473.01 Singapore Marine Logistics Pte Ltd

SMLOG 180

180' Spud Test Lift Barge Padeye Design

31/8/2012

0473.02 Swissco Offshore Pte Ltd

SMLOG 180

Global Strength Check for 2000t Test Lift

15/8/2013

0492.01 Geoquip Marine UK Ltd

GMTR 120 Series Twin Tower Derrick

Structural Analysis of Compensator Carriage

0492.02 Geoquip Marine UK Ltd

GMTR 120 Series Twin Tower Derrick

Structural Analysis of Rooster box

25/1/2013

0494.01 Seacor Marine (Asia) Pte Ltd

Seabulk Badamyar

Safety & Fire Protection

6/11/2012

0501.01 deugro (Singapore) Pte Ltd

Barge Victory Falcon

Intact & Damage Stability booklet - modification

0511.03 Consolidated Pipe Carriers Limited

Gemusut-Kakap Field

Pad-eye check

10/7/2013

0513.01 Specialist Marine Services Pte Ltd

FPSO Raroa

Technical drawings for damaged anchor wire removal procedure

17/7/2013

0516.01 Gaylin International Pte Ltd

Structural Analysis of Smith Bracket

10/5/2013

0528.01 Gaylin International Pte Ltd

Analysis of Steel Drum

23/7/2013

0549.01 Swire Salvage Pte Ltd

Designing of 12 point lifting frame & Strand Jack frame Design of Wind Turbine Towers Stacking Frame

Pacific Rover

Design of temporary platform for ROV on deck

3/8/2012

24/10/2012 28/8/2012 7/8/2012

17/12/2012

24/12/2012

6/2/2014

page 5 of 5