About the Company Masstrans Pte Ltd was incorporated in August 2002 as a response to growing needs for streamlined solutions in heavy lift and haulage projects. From providing engineering solutions and diversified technical support, our services grew to encompass the whole life cycle of a project – from feasibility to coordination to execution.
TABLE OF CONTENTS 02
About Masstrans Pte Ltd
03
Engineering & Design
04
Other Services
05
Project Diagram
06
Project Workflow process
07 - 18 Projects – Engineering 19 - 22 Projects – Structural Design and Naval Architecture 23
Contact Details
Annex 1 Track Record for Load-out, Transportation & Installation
Masstrans’ client-list includes oil and gas companies, port operators, EPC contractors, logistics contractors, equipment providers, fabrication/ship yards, stevedores and marine/ offshore consultants. The range of clients, typically manifested in the process chain within the project hierarchy, has enabled Masstrans to acquire a unique, broadminded insight into the complexities of interdisciplinary arrangements and levels of involvement within a project. Masstrans is ISO 9001:2008 certified. The business is running on Enterprise Resource Planning (ERP) system, for better efficiency.
Overview of Services In a typical project involving the consolidation and integration of multiple modules and structures from various locations, Masstrans is keen to provide project support from Feasibility to Installation, where Masstrans’ support commences with output to module / structural designers in consideration of designated facilities, available transportation equipment and installation parameters. Feasibility Study is done by allencompassing qualified oversight that leads to effective optimisation of available resources, of which, a substantial amount is due to equipment and materials. Major resources, i.e., equipment and materials, are expertly analysed and optimised, thereby efficiently managing costs as a result.
Annex 2 Track Record for Fabrication and Construction
Engineering beyond hook and hull 2
OUR CORE BUSINESS - ENGINEERING 1. Structural Engineering
Structural design Fabrication drawings Lifting analysis & rigging design Set-down analysis 3rd party verification & review
2. Naval Architecture
Motion analysis Stability Mooring analysis Vessel design for modification/conversion Vessel plan 3rd party verification & review 3. Loadout, Transportation & Installation Design / verification of skidding systems Trailer / SPMT stability & strength analysis Lifting / rigging design & analysis Module / equipment structural integrity check RORO ramp design & analysis Ballasting calculation Stability calculation, longitudinal strength during crossover Mooring calculation Loadout manual Vessel acceleration calculations & motion analysis Seafastening & grillage design Intact & damage stability calculation Bollard pull calculation Towing manual Jacket launching analysis
Engineering & Design Services From drafting to analysis and design, Masstrans considers every job or project to be crucial in maintaining quality and supporting the objectives of our clients in the project hierarchy and phases within. Masstrans is equipped with computer software, as follows: i.
Computer Aided Drafting (CAD)
ii.
Structural engineering analyses / F.E.M. and design
iii.
Hydrostatic, Stability analyses / calculations and hull design Information on crane lifting parameters for major cranes in the region Rigging calculations Mooring Analyses & Design Motion Analysis
iv.
v. vi. vii. viii. Multipoint-multi layer running cable lifting equilibrium/rigging analysis ix. Sea fastening Analyses/design x. Module Sit-down analysis with support reaction and cable tension curve xi Towing manual, Required Bollard Pull analysis / Towline Catenary Calculation xii Land Transport / Ground Bearing Pressure Calculation
Engineering beyond hook and hull 3
- AutoCad / Inventor/ ZWCAD - StaadPro / Fusion with NEi Nastran / FEMAP with Nx Nastran - Hydromax / Maxsurf - Inhouse -
Inhouse Optimoor / Inhouse MOSES / Seakeeper Inhouse
- Inhouse - Inhouse + FEA software - Inhouse - Inhouse
BENEFITS, IN SUMMARY, WITH MASSTRANS
Other Services i.
Project Management & Execution
1.
Communication interfaces are reduced as we offer a complete package of engineering, planning, coordination and supervisory assistance through one focal point, a.k.a., one Project Manager.
2.
Overall man-hours are reduced through familiarity with the transportation process and relevant resources.
3.
Project costs are efficiently managed as we optimise major resources, i.e., equipment and materials.
In addition to engineering and design, or as a stand-alone requirement, Masstrans personnel are also mobile and versatile in representation, and thus can effectively manage and execute your loadout, transportation and installation activities through every stage – from feasibility to planning to execution to delivery – whether onshore or offshore. We can also provide turn-key subcontracting and procure the optimum resources available that will suit your requirements, while keeping your best interests in mind. Whatever the size of the project you hire us for, you can be certain that you will get the full worth of our over-10 years of experience in the business.
ii.
Marine Warranty Backed by our expertise in execution of land and marine transportation operations, Masstrans is highly capable of supervising and assessing operational hazards involved in such operations and ensuring that all necessary precautions are taken to mitigate risks or avoid losses. We place high value on each project that we take as we represent insurance underwriters and/or project owners and work in compliance with applicable maritime standards, and we also apply practical knowledge gained through our extensive experience.
iii.
Inspection, Survey & Certification All marine transportation projects require that each operation is done with safety and due diligence by everybody involved and by the vessel hired. Aside from reviewing all plans pertinent to the voyage, Masstrans also offers to carry out vessel inspections, on-hire and offhire vessel condition surveys and suitability surveys.
Engineering beyond hook and hull 4
Project diagram
Masstrans Pte Ltd
Scope
Project Management
Sub-Scope
Analyses / Design / Planning
Turnkey Contracting
Supervision / Coordination
Outsourcing / Procurement
Category Equipment
Lifting
Shifting
Voyage
Engineering beyond hook and hull 5
Load Testing
Salvage
Decommission / Removals
Project
1 Concept
Workflow process
3Calculation
4Drafting 7Operation
2 Programming 5 Modeling
6Analysis Engineering beyond hook and hull 6
Project 0180.01 - FDPSO Azurite Client – Prosafe Production Year – 2008 Workscope – Loadout to installation of top side facilities
Engineering beyond hook and hull 7
Project 0180.02 - FDPSO Azurite Client – Murphy West Africa Year – 2008 Workscope – Loadout to installation of drilling modules and derrick
Engineering beyond hook and hull 8
Project 0138.00 – FPSO Stybarrow Venture MV16 Client – MODEC, Inc Year – 2007 Workscope – Heavylift installation of topside modules and structures, including design of spreader bar
Engineering beyond hook and hull 9
Project 0482.01 – FPSO Kikeh Client – Single Buoy Moorings, Inc Year – 2012-2013 Workscope – Loadout to offshore Installation of 4 new modules
Engineering beyond hook and hull 10
(Above and Left) Project 0145.01 – Jack-up Drilling Rig “Petrojack 1” Client – Pacific Workboats Year – 2006 Workscope – Installation of Cantilever and Derrick
(Right) Project 0112.01 – Jack-up Drilling Rig “P2007” Client – Pacific Workboats Year – 2006 Workscope – Installation of Derrick
Engineering beyond hook and hull 11
(Above and Below) Project 0151.01 & 0152.01 – FPSO Polvo and Umuroa Client – Prosafe Production Services Year – 2007 Workscope – Loadout, transportation & installation
Engineering beyond hook and hull 12
(Above) Project 0094.01 – FPSO P50 Client – Jurong Shipyard Year – 2003 Workscope – Installation, by lifting, of deck crane column at Maua Jurong yard, Brazil
(Right) Project 0150.01 – FPSO P54 Client – Jurong Shipyard Year – 2004 Workscope – Installation by lifting of topside modules at Maua Jurong yard, Brazil
Engineering beyond hook and hull 13
Project 0308.01 - Gajah Baru CPP Client – PT SOME Year – 2010 Workscope – Lifting and Structural Analysis for 16-point lift of top side pancake
Engineering beyond hook and hull 14
Project 0107.01 – Semi-Submersible Gas Production Platform “Independence Hub” Client – Pacific Workboats Year – 2006 Workscope – Lifting, Uprighting and Installation of columns
Engineering beyond hook and hull 15
Project 0132.01 – PTP IMPSA CQC Client – IMPSA (Malaysia) Year – 2007 Workscope – Transportation of 3 full CQC Lower Frame Components / Sections and CQC Upper Frame
Project 0077.01 & 0089.01 – Westport CQC Client – Portek Systems & Equipment Pte Ltd Year – 2004 Workscope – Lifting and Transportation of CQC boom
Engineering beyond hook and hull 16
(Left and below drawings) Project 0254.01 – Neste Oil Plant, Singapore Client – Bok Seng Logistics Year – 2009 Workscope – Transportation of Hydro Treating Reactor
(Right) Project 0051.01 – BASF-YPC Integrated Petrochem Complex Client – FE Hardcastle & Co, Pvt Ltd (India) Year – 2003 Workscope – Loadout and transportation
Engineering beyond hook and hull 17
Project 0344.00 – Gorgon LNG Client – Schenker Australia Pty Ltd Year – 2010-2012 Workscope – Transportation of Xblocs and pipes
Engineering beyond hook and hull 18
(Above) Project 0122 – Steel Marker Buoy diameter 2.2m Client – SH Engineering Pte Ltd Year – 2005 Workscope – Design of marker buoys
(Right) Project 0253 – Seacor Penrith Client – Hallin Marine Pte Ltd Year – 2009 Workscope – Design of Mezzanine deck
Engineering beyond hook and hull 19
Project 0162 – Acergy Toisa Proteus Client – Acergy Singapore Pte Ltd Year – 2007 Workscope – Design of new moon pool hatch
Engineering beyond hook and hull 20
Client 0404 – Alnmaritec Ltd Year – 2011 Workscope – Design of Transport cradle of Pilot boat
Engineering beyond hook and hull 21
Project 0442 – “Lady Christine” Client – Asian Geos Year – 2012-2014 Workscope – Design for modification and conversion of vessel (inc. new derrick foundation, new moonpool and moonpool doors, structural/deck strength check, recalculation of stability booklet
Engineering beyond hook and hull 22
Engineering beyond hook and hull In support of Heavy Lift Loadout-TransportationInstallation Projects encompassing Land and Marine Operation requirements, Masstrans provides Engineering, Co-ordination/Supervision and Project Management with a holistic approach to project requirements, backed by qualification and experience gained from a track record of assurance, oversight, solutions and delivery. Masstrans’ interest and approach to project requirements is all encompassing, extending from unit detail to feasibility in multi modular/modal consolidation and integration, where commercial and technical capabilities set Masstrans apart in providing value to a project. Please feel free to contact us for any requirement.
MASSTRANS PTE LTD
MPL MASSTRANS (M) SDN BHD
3 International Business Park Nordic European Centre #04-06 Singapore 609927
D4-U5-09, Block D4, Solaris Dutamas, No. 1, Jalan Dutamas 1, 50480 Kuala Lumpur, Malaysia
Tel: +65 6567 9776 Fax: +65 6567 0786
Tel: +603 6419 0776 Fax: +603 6419 0786
[email protected]
www.masstrans.com 23
International partner: Indonesia PT. SARDUS ENERGI SOLUSI Multika Bldg 4F Suite 408 Jl Mampang Prapatan Raya 71-73 Jakarta 12790 Tel: +62 21 797 5182
Annex 1 Track Record Load-out, Transportation & Installation
24
25
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
Qty.
0001.01
Noble Denton Singapore Pte Ltd
FPSO Eagle
2
0004.01
Noble Denton Singapore Pte Ltd
FPSO Eagle
0005.01
JPL Services Pte Ltd
FPSO P43
Lifting of Module 15 & Rigid Arm onto FPSO Eagle - Warranty M15 (180T), Rigid Arm (664T) Survey / Approval Lifting of piperack sections 1, 2 onto FPSO Eagle - Warranty Survey Piperack Sections 1, 2 / Approval Lifting of 2 Flare Seats onto FPSO P43, utilizing crane barge POE Flare Seats x 2 (35T) Giant 6 - Engineering, Supervision and Subcontracting
0006.01
JPL Services Pte Ltd
FPSO P43
Lifting of 2 flare seats onto FPSO P43, utilizing crane barge POE Giant 6 - Engineering, Supervision and Subcontracting
0007.01
Noble Denton Singapore Pte Ltd
FPSO Eagle
0008.01
S.M.O.E. Pte Ltd
ERHA FPSO
0010.01
JPL Services Pte Ltd
0012.01
Total Completed Ton. 844 16-Sep-02
2
21-Nov-02
2
70 21-Nov-02
Flare Seats x 2 (80T)
2
160 12-Sep-02
Lifting of turntable onto FPSO Eagle - Warranty Survey / Approval
SBM FPSO Eagle Turntable
1
12-Nov-02
7 modules, 1 flare tower (total 14,500T)
8
14,500 22-Jan-03
FSO Kome-Kribi 1
Installation, by lifting, of 7 topside facility modules and flare tower onto ERHA FPSO - Engineering Feasibility Lifting of helideck from JSPL East Quay to FSO Kome-Kribi (Ex Companion) utilizing crane barge POE Giant 6 - Engineering, Supervision and Subcontracting
Helideck (140T)
1
140 21-Dec-02
Noble Denton Singapore Pte Ltd
FPSO Eagle
Lifting of Module 13 onto FPSO Eagle - Warranty Survey / Approval Module 13
1
17-Dec-02
0013.01
Noble Denton Singapore Pte Ltd
FPSO Eagle
Upper Manifold Deck, Turret Lower Gantry
2
1-Feb-03
0014.01
Noble Denton Singapore Pte Ltd
FPSO Eagle
Lifting of upper manifold deck & turret lower gantry structure onto FPSO Eagle - Warranty Survey / Approval Transportation, by barge, of Bailey crane from Tg Pagar Container Terminal to FPSO Eagle at Keppel Shipyard - Warranty Survey / Approval
Bailey Crane
1
1-May-03
0015.01
Jurong Shipyard Pte Ltd
FPSO P48
Lifting of 1 Module, 1 Skid and 1 Dome by crane barge POE Giant 6 - Module (23T), Skid (17T), Dome (500KG) Engineering, Supervision and Subcontracting
0016.01
Jurong Shipyard Pte Ltd
FPSO P50
Lifting of 12 items of machinery onto FPSO P50 by crane barge POE Giant 6 - Engineering, Supervision and Subcontracting
Machinery x 12 (400T)
0017.01
Noble Denton Singapore Pte Ltd
FPSO Eagle
Warranty survey / approval for SBM Inc FPSO Eagle - Loadout to Installation of M9, M10, M11, M13, M14, M15, M16
M9, M10, M11, M13, M14, M15, M16
0020.01
Jurong Shipyard Pte Ltd
CSX Pacific
Lifting from wharf to MV CSX Pacific of 18 hatches using crane barge POE CB1 - Engineering, Supervision and Subcontracting
0023.01
Noble Denton Singapore Pte Ltd
BSP Egret Phase 1
0045.01
Modec International LLC
FPSO Baobab Ivoirean MV 10
0050.01
Jurong Shipyard Pte Ltd
0051.01
0052.01
3
40 14-Feb-03
12
400 14-Feb-03
7
15-Jan-03
Hatch Covers x 18 (30T)
18
540 16-Mar-03
Loadout, by skidding, of BSP Egret Phase 1 gas field jacket Warranty Survey / Approval Loadout to Installation of 15 Facility Modules, 11 Piperacks, 1 Laydown Area - Engineering (incl load spreader design), Planning and Supervision
Gas Field Jacket (750T)
1
750 4-Oct-03
27
10,000 9-Jul-04
FPSO P50
Uprighting and lifting of FPSO P50 piperack utilizing crane barge POE Giant 6 - Engineering, Supervision and Subcontracting
Piperack (120T)
1
120 29-Sep-03
F.E. Hardcastle & Co. Pvt Ltd (India)
BASF-YPC Integrated Petrochem Complex, Nanjing PRC
Loadout by roll onto barge, lift onto MV Jumbo Vision, tpt from Hazira to Shanghai of 2 BASF YPC ethylene oxide reactors - Risk Management
BASF-YPC Ethylene Oxide Reactors x 2 (450T)
2
900 26-Dec-03
Jurong Shipyard Pte Ltd
FPSO P50
Lifting & transportation from KYC Yard to Jurong Shipyard of 2 Piperacks and 7 Misc lifts using crane barge POE Giant 6 Engineering, Supervision and Subcontracting
Piperacks x 2 (100T) & (90T), Misc Lifts x 7 (15T, 16T 17T, 14T, 15T, 16T, 17T)
9
300 22-Dec-04
Modules x 15, Piperacks x 11, Laydown Area (total 10,000T)
page 1 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
0054.01
Jurong Shipyard Pte Ltd
Global Development Driller I
Lifting of BOP elevator & Hydralift Counterweights on skid from Jurong Shipyard quayside onto Global Development Driller I, using crane barge POE Giant 6 - Engineering, Supervision and Subcontracting
BOP Elevator (118T), Hydralift Counterweights on skid (170T)
0056.01
Jurong Shipyard Pte Ltd
FPSO Baobab Ivoirean MV10
0057.01
Jurong Shipyard Pte Ltd
2
Total Completed Ton. 288 20-Jan-04
Lifting of 2 bow sections onto FPSO Baobab Ivoirean utilizing POE Bow sections x 2 (65T) crane barge CB2 and JSPL Quay Crane - Engineering, Supervision and Subcontracting
2
130 29-Feb-04
FPSO P50
Lifting and tpt - from KYC Yard, pipe rack upper section to P Samulunn East Quay, pipe rack lower section to FPSO P50. Thereafter, lifting of one ME drum (spool) from Tg Kling Quay S to FPSO P50 - Engineering, Supervision and Subcontracting
3
230 16-Mar-04
0058.01
Jurong Shipyard Pte Ltd
FPSO P50
Lifting of windlass, HPU from Tanjung Kling Quay South onto FPSO Windlass (32T), HPU x 2 (45T) P50 - Engineering, Supervision and Subcontracting
3
122 29-Apr-04
0060.01
Technics Offshore Engineering Pte Ltd
FPSO Baobab Ivoirean MV10
FPSO Baobab Ivoirean MV10 topside facilities; Loadout, Transportation by sea; Barge 1 - Process Cooling Medium, Heat Medium System, Nitrogen Air Receiver, Instrument Receiver; Barge 2 - Flare Scrubber Skid; Stowage Plans (barge layout), Sea Fastening Design & Calculations - Engineering
Process Cooling Medium (29.5T), Heat Medium System (40.8T), Nitrogen Air Receiver (2.9T), Instrument Receiver (19.5T), Flare Scrubber Skid (38.1T)
5
131 13-Jul-04
0064.01
Jurong Shipyard Pte Ltd
FPSO Baobab Ivoirean MV10
Lifting of Module 28 (pipe rack) from Jurong Shipyard dry dock 5 and topside blocks from quayside to FPSO Baobab Ivoirean Engineering, Supervision and Subcontracting
Module 28 (Pipe Rack 60T), Topside Blocks x 3 (65T), (25T), (45T)
4
195 30-Apr-04
0066.01
Jurong Shipyard Pte Ltd
Global Development Driller II
i. Lifting of 4 Winches onto Semi-Sub Rig Global Development Driller II, using POE G6 - Engineering, Supervision and Subcontracting
Winches x 4 (114T)
4
456 25-May-04
0067.01
Jurong Shipyard Pte Ltd
FPSO P50
4
360 25-May-04
0067.02
Jurong Shipyard Pte Ltd
FPSO P50
ii. Lifting of 4 Block Structures onto FPSO P50, utilizing POE G6 Block Structures x 4 (90T) Engineering, Supervision and Subcontracting Lifting of Flare Boom onto FPSO P50 - Engineering and Supervision Flare Boom (length 104m) (300T)
1
300 8-Feb-04
0068.01
Jurong Shipyard Pte Ltd
FPSO Baobab Ivoirean MV10
Lifting of Modules 31, 32, 33, (TSS blocks P & S, TSS blocks 4/5) onto FPSO Baobab Ivoirien MV10 - Engineering, Supervision and Subcontracting
M31, 32, 33: TSS Block P (60T), TSS Block S (60T), TSS Block 4/5 (600T)
3
720 22-Sep-04
0069.03
Jurong Shipyard Pte Ltd
FPSO P50
Lifting of 6 Block Structures from quayside to POE G6 deck to FPSO P50 - Engineering, Supervision and Subcontracting
6 Block Structures: (46T), (65T), (80T), (68T), (77T), (56T)
6
392 25-Jun-04
0071.01
Jurong Shipyard Pte Ltd
Global Development Driller I
Crane King Post (length 20.6m) (71T)
1
71 25-Jun-04
0072.01
Jurong Shipyard Pte Ltd
FPSO P50
Lifting of Crane King Post onto Global Development Driller I Engineering, Supervision and Subcontracting Lifting of Platform, Module Base, Vent Post Portside, S/Structure & Fire Pump onto FPSO P50 - Engineering, Supervision and Subcontracting
Platform (15T), Module Base (25T), Vent Post Portside (22T), S/Structure (55T), Fire Pump (55T)
5
172 15-Jul-04
0075.01
MODEC, Inc.
FPSO MODEC Venture 11
Lifting of Modules A, B, C, Water Injection Structures onto FPSO for Modules A (601T), B (562T), C (119T), FPSO Modec Venture 11 (MODEC Santos Mutineer / Exeter Water Injection (585T) project) - Engineering and Supervision
4
1,867 28-Sep-04
0077.01
Portek Systems & Equipment Pte Ltd
West Port CQC 8
Lifting and transportation of CQC boom from West Port CQC no 8 to CQC Boom (55 x 8 x 2 meters) (150T) POE Yard - Engineering, Supervision and Subcontracting
2
150 9-Jun-04
Piperack upper section (90T), piperack lower section (100T), spool (140T)
Qty.
page 2 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
0079.01
Jurong Shipyard Pte Ltd
FPSO Sendje Berge
Lifting of 2 Modules from barge to FPSO Sendje Berge (Okwori Field) - Engineering, Supervision and Subcontracting
Modules (128T) & (95T)
1
Total Completed Ton. 223 17-Sep-04
0081.01
Jurong Shipyard Pte Ltd
FPSO MODEC Venture 11
Design and coordination / supervision for lifting of generator E House onto FPSO MODEC Venture 11 (Santos FPSO) Engineering, Supervision and Subcontracting
E-House (300T)
1
300 17-Sep-04
0083.01
Pacific Workboats Pte Ltd
FPSO P54
Design and coordination / supervision for lifting of 2 Blocks from FPSO P54 to quayside - Engineering, Supervision
Block Structures (610T), (1100T)
2
1,710 10-Jan-04
0084.01
Pacific Workboats Pte Ltd
FPSO MODEC Venture 11
SAS Structure (105)
1
105 27-Sep-04
0086.01
Pacific Workboats Pte Ltd
FPSO P54
Uprighting, lift and go of SAS Structure from PPL Yard to Jurong Shipyard - Engineering, Supervision Removal from Vessel to Yard of Machinery Casing and Accommodation Block - Engineering, Supervision Installation by Lifting of BOP Elevator, Loading Beam and BOP Components - Engineering, Supervision Lifting of 2 Gas Compressor Modules, Piperack onto FPSO Sendje Berge - Engineering, Supervision Lifting of UTM and SAS onto FPSO MODEC Venture 11 (Santos FPSO) - Engineering, Supervision Lifting and transportation of CQC boom, from POE Yard to West Port CQC no 8 - Engineering, Supervision and Subcontracting
Machinery Casing (600T), Accommodation Block (1100T) BOP Elevator (118T) and BOP Loading Beam (210T), BOP Components (110T) Gas Compressor Modules x 2 (360T), Piperack (50 T) UTM (175T), SAS (110T)
2
1,700 29-Oct-04
4
438 22-Nov-04
3
770 19-Oct-04
2
285 11-Aug-04
CQC Boom (55 x 8 x 2m) (150T)
1
150 11-Oct-04
Lifting & installation of FPSO Santos Flare Boom - Engineering, Supervision Lifting of modules P01A, P012A, P03A, P04A, P05A, P06, P07 & Flare Boom for installation onto FPSO P50 at Maua Jurong Yard, Rio de Janeiro, Brazil - Engineering, Supervision
Flare Boom (70T)
1
70 11-Aug-04
P01A, P012A, P03A, P04A, P05A, P06, P07 & Flare Boom
8
10,000 31-Dec-04
Global Development Driller II
Qty.
0087.01
Pacific Workboats Pte Ltd
FPSO Sendje Berge
0088.01
Pacific Workboats Pte Ltd
FPSO MODEC Venture 11
0089.01
Portek Systems & Equipment Pte Ltd
West Port CQC 8
0093.01
Pacific Workboats Pte Ltd
FPSO MODEC Venture 11
0094.01
Jurong Shipyard Pte Ltd
FPSO P50
0095.01
Pacific Workboats Pte Ltd
PSA MHI CQC 65, 65
Lifting CQC 64 and CQC 65 from Keppel Terminal to Brani Terminal CQC 64 (520T), CQC 65 (520T) - Engineering, Supervision
2
1,040 17-Jan-05
0101.01
Pacific Workboats Pte Ltd
JSPL Hull 11-1067
Accommodation Block (500T)
1
500 28-Mar-05
0105.01
Pacific Workboats Pte Ltd
Semi- Sub Drilling Rig Transocean Legend
Lifting design for JSPL Hull 11-1067 Accommodation Block Engineering, Supervision Semi-Sub Drilling Rig Transocean Legend - Lifting of Accommodation Block - Rigging Plan - Engineering, Supervision
Accommodation Block (100T)
1
100 27-May-05
0106.01
Pacific Workboats Pte Ltd
JSPL Hull 1068
i. JSPL Hull 1068 Accommodation Installation - Engineering, Supervision ii. FPSO P54 Pipe Rack Areas 2, 3, 4, 5 - Uprighting and Installation - Engineering, Supervision Semi-Submersible Gas Production Platform Independence Hub Pontoons x 4 - Lifting from Jurong Shipyard to water - Columns x 4 Uprighting and Installation onto Pontoons in dry dock - Engineering, Supervision
Accommodation Block (500T)
1
500 30-Jun-05
Pipe Rack Areas 2 (190T), 3 (265T), 4 (190T) , 5 (190T) Pontoons X 4 (1400T), Columns X 4 (1400T)
4
835 30-Jun-05
8
11,200 27-Feb-06
FPSO P54 0107.01
Pacific Workboats Pte Ltd
Independence Hub
0108.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2006
PPL Jack Up Drilling Rig P2006 Derrick Sections, Upper and Lower Derrick Sections, Upper (77T), Lower from SSI Yard to PPL Yard - Lifting - Engineering, Supervision (199T)
2
0109.01
Pacific Workboats Pte Ltd
FPSO P54
FPSO P54 - Lifting of Piperack Areas 1 and 6 - Engineering, Supervision
2
Piperack Areas 1 & 6
276 4-Aug-05
20-Sep-05
page 3 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
0111.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2007
Cantilever (750T)
1
0112.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2007
Derrick (228T)
1
228 23-Jan-06
0115.01
Pacific Workboats Pte Ltd
FPSO P54
Crane Column (170T)
1
170 17-Aug-05
0116.01
Pacific Workboats Pte Ltd
Jack Up Drilling Rig P2006
Jackup Leg X 4 (180T)
4
720 2-Sep-05
0118.01
Pacific Workboats Pte Ltd
Jack Up Drilling Rig P2006
Helideck (70T)
1
70 15-Sep-05
0123.01
Pacific Workboats Pte Ltd
JSPL Hull 1069
Accommodation Block (500T)
1
500 17-Oct-05
0128.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2007
Installation, by lifting of Jack Up Drilling Rig P2007 Cantilever Engineering, Supervision Installation, by lifting, of Jack Up Drilling Rig P2007 Derrick Engineering, Supervision Installation, by lifting, of FPSO P54 Deck Crane Column Engineering, Supervision Installation, by lifting, of Jack Up Drilling Rig P2006 Jackup Legs Engineering, Supervision Installation, by lifting, of Jack Up Drilling Rig P2006 Helideck Engineering, Supervision Installation, by lifting, of JSPL Hull 1069 Accommodation Block Engineering, Supervision 3 Living Quarters - Engineering, Supervision
Total Completed Ton. 750 23-Jan-06
Living Quarters x 3 (140T), (140T), (160T)
3
440 21-Oct-05
0129.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2007
Derrick Lifting Clamp - Design
1
300 25-Oct-05
0132.01
IMPSA (Malaysia) Sdn Bhd
PTP IMPSA CQC 1, 2, 3
Transportation of 3 full CQC Lower Frame Components / Sections and CQC Upper Frame from Lumut to PTP - Engineering, Supervision
Pacific Class Jackup Drilling Rigs Series Derrick (300T) CQC x 3 (1700T)
3
5,100 22-Jan-07
0135.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2008
7 Main Hull Block Structures - Discharge at PPL Yard - Planning & Supervision
Main Hull Block Structures x 7 (260.4T), (229.2T), (137.8T), (123.7T), (59.7T), (76.7T), (61.2T)
7
949 2-Feb-06
0137.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2005
Spud Can Port, Spud Can Stbd, Center Block, Wing Blocks Loadout at POE Yard and Discharge at PPL Yard - Engineering, Supervision
Spud Can Port (410T), Spud Can Stbd (410T), Center Block (180T), Wing Blocks x 3 (40T)
7
1,120 16-Feb-06
0138.01
MODEC, Inc.
FPSO Stybarrow Venture MV 16
Installation, by lifting, of Topside Modules / Structures Modules A, B, Modules A, B, C, D (totalling 4500T) C, D, E - Engineering (including load spreader design) , Supervision
4
4,500 9-Mar-07
0138.02
MODEC, Inc.
FPSO Stybarrow Venture MV 16
Loadout & Transportation of Upper Turret, Turret Shaft and Swivel Upper Turret (500T), Turret Shaft (400T), Access from MMHE Yard (Malaysia) to Jurong Shipyard (Singapore) Swivel Access (230T) - Engineering, Supervision, Contracting
3
1,130 8-May-07
0140.01
Pacific Workboats Pte Ltd
BW Offshore FPSO YÙUM Lifting of KMZ Mating Cone and Dummy Buoy Top at Batam, from K’AK’ NÁAB (KMZ STP Project) Profab to Utraco Yard - Engineering, Supervision
Mating Cone (370T), Dummy Buoy Top (46T)
2
0141.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2005
Leg Wells x 3 (450T)
3
0143.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2008
Spud Can (410T), Leg Well (450T) and Accommodation Blocks 6 units
8
860 31-May-06
0144.01
Pacific Workboats Pte Ltd
JSPL Hull 1070
1
500 25-Apr-06
0145.01
Pacific Workboats Pte Ltd
2
1,050 10-Oct-06
0146.01
Kensteel Engineering Pte Ltd
1
422 17-May-06
Jack Up Drilling Rig P2005 - 3 Leg Wells - Lifting - Engineering, Supervision Jack Up Drilling Rig P2008 Spud Can, Leg Well and 6 Accommodation Blocks- Lifting - Engineering and Supervision
JSPL Hull 1070 Accommodation Block - Lifting at Jurong Shipyard - Accommodation Block (500T) Engineering, Supervision Jackup Drilling Rig Petrojack 1 Jack Up Drilling Rig Petrojack 1 - Installation of Cantilever & Derrick - Cantilever (750T), Derrick (300T) Engineering and Supervision FPSO Cidade do Rio de Janeiro MODEC FPSO-RJS 409 (Cidade do Rio de Janeiro MV14) Siemens E House (422T) MV14 E–House - Transportation - Cargo Barge Mooring Pattern & Calculations - Engineering, Supervision
Qty.
416 27-Mar-06
1,350 1-Jun-06
page 4 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
0148.01
Pacific Workboats Pte Ltd
FPSO Cidade do Rio de Janeiro MODEC FPSO-RJS 409 Siemens E-House - Lift & Go from MV14 Kensteel Engineering Yard to FPSO Cidade do Rio de Janeiro MV14 (Espadarte Field) - Engineering, Supervision
0150.01
Jurong Shipyard Inc.
FPSO P54
0151.01
Prosafe Production Services Pte Ltd Polvo FPSO
0152.01
Pacific Workboats Pte Ltd
Modules / Structures Siemens E House (422T)
Qty. 1
Total Completed Ton. 422 31-May-06
Maua Jurong Yard, Brazil - FPSO P54 Topside Installations – Engineering, Planning, Co-Ordination & Supervision - 14 Modules, Flare Boom, 2 Deck Cranes - Engineering, Supervision
Modules 14, Flare Boom, Deck Cranes 2
FPSO Polvo, Modules 1, 2, 3, 4, E House (2905t), Boilers x 3 (771tons) and - Topside Modules / Structures - Loadout, Transportation and Installation - Engineering, Supervision
Modules 1, 2, 3, 4, E House (2905t), Boilers x 3 (771tons)
8
3,696 26-Feb-07
Spud Can Port, Spud Can Stbd, Center Block - Loadout at POE Yard and Discharge at PPL Yard - Engrg & Supervision Prosafe Production Services Pte Ltd Umuroa FPSO Umuroa FPSO Modules 1, 2, 3, 4, 5, 6A, 6B, Boiler P, Boiler S Engineering, Supervision, Subcontracting Pacific Workboats Pte Ltd BW Offshore FPSO YÙUM APL STP Compartment Cylinder - Loadout by PWL L1501 from K’AK’ NÁAB (KMZ STP Project) Profab Yard to Barge, Batam - Engineering, Supervision
Spud Can Port (410T), Spud Can Stbd (410), Center Block (180T) Modules 1, 2, 3, 4, 5, 6A, 6B, Boiler P, Boiler S (2504.09T) STP Compartment Cylinder (390T)
3
1,000 8-Feb-07
9
2,504 26-Feb-07
1
390 27-Jun-06
0155.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2005
Cantilever, Derrick - Loadout & Installation - Engineering, Supervision
Cantilever (750T), Derrick (300T)
2
1,050 11-Oct-06
0158.01
SDV Logistics (Singapore) Pte Ltd
Polvo FPSO
FPSO Topside Facilities; MV Azul to Jurong Port - Vacuum Condenser, Kuantan Port to Keppel Shipyard - Inlet Separator A, Inlet Separator B, Electrostatic Coalester A, Electrostatic Coalester B, Produced Water Degasser, Flare Gas Scrubber, Stabilization Separator A, Stabilization Separator B - Engineering, Supervision
Vacuum Condenser (34T), Inlet Separator A (50T), Inlet Separator B (50T), Electrostatic Coalester A (48T), Electrostatic Coalester B (48T), Produced Water Degasser (35T), Flare Gas Scrubber (49T), Stabilization Separator A (24T), Stabilization Separator B (24T)
9
362 30-Sep-06
0158.01
SDV Logistics (Singapore) Pte Ltd
Polvo FPSO
Anchor Chain (114mm x 6 lengths) (1245T), (105mm x 6 lengths) (72T)
2
1317 30-Sep-06
0158.01
SDV Logistics (Singapore) Pte Ltd
Umuroa FPSO
Lifting from MV Green Spring to Barge of 2 Anchor Chains lengths Lifting from M.V. Green Spring to Deck Cargo Barge GM 34 Provision and Supervision of Cranebarge / Lifting Operations Engineering, Transfer fromSupervision, MV Bao Da Subcontracting Shan to MV Protesilaus by lifting, of 2 sets of 12 Anchor Chain lengths x 280 t, 12 lengths x 25 t Provision and Supervision of Cranebarge / Lifting Operations Engineering, Supervision, Subcontracting
24
3,360 15-Dec-06
0158.01
SDV Logistics (Singapore) Pte Ltd
Umuroa FPSO
Loadout by lifting and transportation by barge of Umuroa FPSO Module 4 from West Port to Keppel Shipyard - Engineering, Supervision
Module 4 (120T)
1
120 15-Jan-07
0160.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2011
1,079 17-Nov-06
Acergy Singapore Pte Ltd
DSV Toisa Proteus
Hull Sections HD1 (324.5), HD2 (354T), HD5 (200T), HD7 (200T) Dive Module (285T)
4
0162.01
1
285 16-Jul-07
0163.01
J. Martens (Asia Pacific) Pte Ltd
APL Mating Cone
Mating Cone (420T)
1
420 9-Mar-07
0163.03
J. Martens (Asia Pacific) Pte Ltd
FPSO Aker Smart 1
0164.01
Pacific Workboats Pte Ltd
Jackup Drilling Rig P2010
Jack-up Drilling Rig P2011 - Installation of Hull Sections HD1, HD2, HD5, HD7 - Engineering, Supervision DSV Toisa Proteus - Removal, by lifting, and transportation, by barge, of Dive Module - Engineering and Supervision Loadout and Transportation from Lumut Port to Keppel Shipyard, by barge, of APL Mating Cone - Engineering Design of Load Spreader (SWL470MT) for FPSO Aker Smart 1 Module lifts - Engineering Jack-up Drilling Rig P2010 - Installation, by lifting, of Hull Blocks HD1/3, HD 2, HD5, HD7 - Engineering, Supervision
0152.01 0154.01
Jackup Drilling Rig P2009
Anchor Chain lengths x 12 (280T), Anchor Chain lengths x 12 (25T)
17
N.A. Hull Blocks HD1/3 (325T), HD 2 (354T), HD5 (200T), HD7 (200T)
15,000 12-Jul-07
18-Jan-08 4
1,079 9-Mar-07
page 5 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
Qty.
0172.01
Altus Logistics Pte Ltd
FPSO Wenchang, FPSO Xijiang
Transportation, from Profab Yard to South China, by barge, of FPSO FPSO Wenchang STP Buoy (358T), FPSO Wenchang STP Buoy, FPSO Xijiang STP Buoy - Engineering Xijiang STP Buoy (253T)
2
Total Completed Ton. 611 8-May-07
0172.02 0172.03
Altus Logistics Pte Ltd Altus Logistics Pte Ltd
1 1
200 11-Oct-07 500 13-Feb-08
Pacific Workboats Pte Ltd
Transportation, by barge, of APL Mating Cone - Engineering Transportation, by barge, of STP System - Batam to S'pore Engineering Lifting 3 Spud Cans from POE Yard to PPL Yard - Engineering
APL Mating Cone (200T) STP System (500T)
0174.01
FPSO Aker Smart 1 Montara Field Development FPSO Jackup Drilling Rig P2010
Spud Cans x 3 (410T)
3
1,230 16-Apr-07
0180.01
Prosafe Production Services Pte Ltd Azurite FDPSO
Loadout-Transportation-Installation of FDPSO Process Modules M71, M72, M73, M74, M75, M76, M10, M45, M51, M52, M01, M02, M12, M30, M31, M03, M41, F92, F95, F96, F75, F74 - Engineering and Supervision
M71(73.47t),M72(126.6t),M73(89.3t),M74(8 1.27t),M75(94.78t),M76(51.23t),M10(80t),M 45(417t),M51(240.47t),M52(240.47t),M01(1 107.11t),M02(904.2t),M12(101t),M30(244.4t ),M31(217.5t),M03(169.4t),M41(306t),F92(3 05.4t),F95(157.2t),F96(219.7t),F75(234.6t), F74(276.5t)
22
5,738 7-Aug-08
0180.02
Murphy West Africa Ltd
Azurite FDPSO
Loadout-Transportation-Installation of FDPSO Drilling Modules F91, F94, F84, F81, F82, F83, F93, F74, F72, VFD Building, F76, F75, Lay down panel, Acuu. basket, Drill basket, Draw work, HPU basket, Choke basket, Drill cabin, Bop/Sid Rail & Track, Tensioner x 4) - Engineering, Supervision, Contracting of loadout, transportation, installation equipment
F91(115t),F94(227t),F84(125t),F81(382t),F 82(201t),F83(257t),F93(176t),F74(413t),F7 2(61t),VFD Building(60t),F76(248t),F75(326t),Lay down panel(4t),Acuu. basket(17t),Dril basket(26t),Draw work(54t),HPU basket(21t),Choke basket (21t),Drill cabin(19t),Bop/Sid Rail & Track(9.34t),Tensionerx4 (225.2t)
21
2,985 31-Oct-08
0187.01
DHL Global Forwarding (Malaysia) Sdn Bhd
Talisman Malaysia Ltd Northern Field Bunga Orkid Development
HP Gas Separator - Jacking, Loadout (by roll on), Sea Transport from Kuantan Port to Sime Darby Yard - Engineering and Supervision
HP Gas Separator (200T)
1
200 5-Oct-07
0189.01
Deugro (Singapore) Pte Ltd
Su Tu Vang Central Processing Transportation, by Barge, of Switch Gear/ CCR Building & Misc Platform Items from Kensteel Yard to McDermott Yard, Batam - Engineering
Switch Gear/ CCR Building (600T), Misc Items (30T)
2
630 31-Aug-07
0189.03
Deugro (Singapore) Pte Ltd
1
680 27-May-08
Deugro (Singapore) Pte Ltd
MEG Module (232T) & Fuel Gas Skid (40T)
2
272 21-Apr-08
0189.05
Deugro (Singapore) Pte Ltd
Transportation, by barge, of FPSO E-house from Tianjin to Cosco Shipyard, Dalian - Engineering Transportation, by Barge, of MEG Module & Fuel Gas Skid from Tianjin to Quingdao - Engineering Transportation, by barge, of Booster Compressor skid, Sea Water Treatment Skid, Winch, other items from Tianjin to Qingdao Port to Qingdao COOEC Jetty - Engineering
E House (680T)
0189.04
Petrobras FPSO Cidade De Niteroi MV18 Petrobras FPSO Cidade De Niteroi MV18 Petrobras FPSO Cidade De Niteroi MV18
Booster Compressor skid (75T), Sea Water Treatment Skid (275T), Winch (85T), Other Items (133.5T)
4
569 24-Mar-08
0189.06
Deugro (Singapore) Pte Ltd
Su Tu Vang FPSO
Transportation, by Barge, of Turret, 9 Anchor Piles, PLEM, 2 PLEM Turret (550T), Anchor Piles x 9 (250T), Piles from MMHE Yard to Jurong Shipyard - Engineering - Intact and PLEM (25T), PLEM Piles x 2 (16T) Damage Stability
4
841 25-Mar-08
0191.01 0196.01
MOCEAN Shipping Pte Ltd Pacific Workboats Pte Ltd
MV Territory Trader Jackup Drilling Rig P2011
Spreader beam (1 x 8m) (70T) Derrick (300T)
1 1
70T 9-Oct-07 300 15-Aug-07
0197.01
Bechtel Corporation
FPSO Aker Smart 1
Design of a 70MT SWL Spreader Lift & Go of Derrick from SSI Yard, Benoi, to PPL Yard - Engineering and Supervision Reliance Industries Ltd - FPSO Aker Smart 1 Topside Facilities Loadout to Installation - P10, U10, U11, U20, U70 - Company Representation / Monitoring, Review and Reporting
P10 (602.43T), U10(181.2T), U11(294.5T), U20(440T),U70(289T)
5
1,807 17-Dec-07
page 6 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
0215.01
Yew Choon Pte Ltd
FPSO Cidade de Sao Mateo
Transportation, by Barge, of M23 & M26A from Laem Chabang to Singapore - Sea Fastening, Mooring, Bollard Pull & Ballasting Engineering
M23 (262T) & M26A (797T)
0215.02
Yew Choon Pte Ltd
FPSO Cidade de Sao Mateo
0217.01
Hako Logistics Pte Ltd
0220.01
2
Total Completed Ton. 1,059 30-Jun-08
Transportation, by Barge, of M55, M34 & M26B from Laem Chabang M55 (266T), M34 (237T) & M26B (876T) to Singapore- Sea Fastening, Mooring, Bollard Pull & Ballasting Calculations - Engineering
3
1,379 25-Aug-08
MAN Diesel Generators
Transportation of MAN Diesel Generators, from PT Global Yard, Batam to Keppel Singmarine Yard, Singapore - Engineering
Generators x 6 (90T)
6
540 5-Aug-08
Hallin Marine Pte Ltd
FSO Rang Dong MV 17
PLEM (24T), Concrete Blocks x 2 (35T)
3
94 31-Oct-08
0222.01
Coli Shipping (S) Pte Ltd
27
4,968 24-Oct-08
0227.01
Wasco Technologies Pte Ltd
National Oilwell Varco - Gold Star Project FPSO Armada Perdana
Siemens E House (411T)
1
411 14-Nov-08
0234.01
deugro (Singapore) Pte Ltd
National Oilwell Varco - QGP Gold Star
Subsea Installation of PLEM, 2 Concrete Blocks by DSV Sanko Angel - Lifting Capacity Analyses Stowage Plan for Shipment 1; 27Pyrenees Cable Reels on MV Diana / sister vessel Lifting of Siemens E House onto FPSO Armada Perdana at Keppel Shipyard - Analysis / Review Transport of Vertical Riser Handling Gantry Crane (QGP Gold Star) and Miscellaneous Items from Keppel Terminal to Jurong Port Deck Strength, Seafastening and Intact & Damage Stability Calculations - Engineering
Riser Gantry Crane (46.5T) & misc items (10T)
9
57 16-Jan-09
0236.01
deugro (Singapore) Pte Ltd
Koniambo Nickel
27 Piles Sea Transport by Barge - Deck Strength, Intact & Damage Stability, Seafastening and Stowage Plan (Revised barge)
Piles x 8 (11.1T), Piles x 2 (10.3T), Piles x 5 (7.3T), Piles x 12 (7.9.T)
27
241 16-Jan-09
0236.02
deugro (Singapore) Pte Ltd
Koniambo Nickel
38 Piles Sea Transport by Barge - Deck Strength, Intact & Damage Stability, Seafastening and Stowage Plan (Revised barge)
Piles x 38 (7.9T)
38
300 16-Jan-09
0236.03
deugro (Singapore) Pte Ltd
Koniambo Nickel
38 Piles Sea Transport by Barge - Deck Strength, Intact & Damage Stability, Seafastening and Stowage Plan (Revised barge)
Piles x 38 (7.9T)
38
300 16-Jan-09
0238.01
Technics Offshore Engineering Pte Ltd
FPSO BW Pioneer
Sea Transport of 3 modules - FPSO 'CASCADE CHINOOK' - TOE to Keppel - Engineering and subcontracting of floating crane and trailer
M60A (455T), M60B (455T), M61 (250T)
3
1,160 31-Jul-09
0243.01
Altus Logistics Pte Ltd
Peregrino FPSO
Cylinder (285T)
1
285 3-Mar-09
0243.02
Altus Logistics Pte Ltd
Peregrino FPSO
Cylinder (285T)
1
285 19-May-09
0245.01
deugro (Singapore) Pte Ltd
Coal Fired Power Station
475 3-Mar-09
deugro (Singapore) Pte Ltd
Solar Turbines
Power Station Bin 1 (155T), Bin 2 (134T), Coal Silo (186T) Solar Turbines x 4 (60T)
3
0251.01
Transportation Engineering for Cylinder from Sumuranja, Indonesia to Keppel Shipyard - Engineering Transportation Engineering for Cylinder from Sumuranja, Indonesia to Keppel Shipyard - Engineering Transportation of Power Station Bin 1, Bin 2 and Coal Silo - Saddle Strength Checks Transportation by Cargo Barge Bayswater 118 of 4 Solar Turbines from Port of Tanjung Pelepas to PT McDermott Yard, Batam Engineering Design
4
240 24-Apr-09
0254.01
Bok Seng Logistics Pte Ltd
Neste Oil Plant, Singapore
Transportation of Neste Plant Hydrotreating Reactor - Loading stability / ballasting, mooring plan, towing resistance and site supervision / liason with MWS
Hydrotreating Reactor (49.38 x 6.29 x 6.78 m) (722T)
1
722 5-Jul-09
0257.01
Petroserv S.A.
FDPSO Dynamic Producer
Sea Transport of 5 modules by one barges from Dyna-Mac to Sembawang
TG Aft (302.7T), TG Fwd (180.2T), DG (727T), E-house (P) (162.8T), E-house (S) (180.6T)
5
1,553 31-Jul-09
0266.01
Altus Logistics Pte Ltd
Peregrino FPSO
Seafastening Engineering for Trolley Tower - From Profab, Batam, Indonesia to Keppel Benoi, Singapore
Trolley Tower (65T)
1
Pyrenees Cable Reels x 27 (184T)
Qty.
65 1-Jul-09
page 7 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
Qty.
0268.01
Hoy San Stevedoring Pte Ltd
MMWU
59 Loose Items (390T)
59
0269.01 0275.01
Altus Logistics Pte Ltd Hoy San Stevedoring Pte Ltd
Peregrino FPSO (Lifting Beam Design)
MMWU - Stowage Plan & Intact and Damage Calculations for 59 Loose Items Utility Container Transportation - Batam to Singapore 2 Spread beam designs with PE endorsements
Total Completed Ton. 390 17-Jun-09
1 2
109 30-Jun-09 140 31-Jul-09
0276.01
109 20-Jul-09
1
113 20-Jul-09
0284.01
Bok Seng Logistics Pte Ltd
1
625 23-Sep-09
0297.01
Titan Project Services (S) Pte Ltd
Loadout & Sea transportation of Utility Container Transportation Ballasting, bollard pull & IDS calc Pedestal Crane Transport - I&D Stability (list and trim), lashing Pedestal Crane (113T) padeye capacity & deck strength Module loadout & sea transport - Ballast calculation and attendance, E-house Module (625T) sea transport engineering Stability Calculation for Barge BS 23 Module (312T)
1
0277.01
Al Jaber Heavy Lift & Transport Pte Peregrino FPSO STP Ltd Winstar Shipping Pte Ltd Pluto LNG Development
1
312 11-Sep-09
0305.01
MSV Maverick
Knuckle Boom Crane - S'pore & Lumut - Loading Survey
Knuckle Boom Crane (150T)
1
150 18-Dec-09
0306.01
Rubicon Offshore International Pte Ltd Winstar Shipping Pte Ltd
North Rankin Re-Development
Seafastening, deck strength & 10 tons padeye calculation for 10 items - Tuas to Jurong Port
Fuel Gas KO Drum x 2 (11T), LP Flare KO Drum (5.21T), HP Flare KO Drum (106.65T), Closed Drain Drum (7.8T), Temp Water Expansion (9.3T), Inst. Air Receiver (7.55T), NO2Receiver (7.1T), Inst, Air Vessel 2nos x 2 (2.2T)
10
170 13-Nov-09
0308.01
SMOE Pte Ltd
Gajah Baru CPP
CPP topside maindeck pancake (930T)
0309.01
Schenker Australia Pty Ltd
Gorgon LNG
Lifting and structural analysis for 16 point lift for Gajah Baru project top side pancake Transportation options by barge 330 ft or landing craft 99 m of concrete caissons 70 to 120 tons from Muhibbah Yard to Barrow Island - Site Attendance and Engineering Design - Lifting and Rigging Arrangement and Plan, Deck Strength, Stowage Plans, Seafastening, Stability
0318.01
Agility Shipping Pte Ltd
Peregrino FPSO
Barge Strength and Stability Calculations for the transportation of Custody Transfer Metering Module (M40) and Desander Module C (M10C) from JRM Batam fabrication yard to the FPSO topsides assembly facility in Singapore using barge 'Crest 256'
Custody Transfer Metering Module (M40) (324.79T)and the Desander Module C (M10C) (367.64T)
0324.00
JGC-PT. KBRI Joint Operation
Tangguh LNG
0328.01
Agility Shipping Pte Ltd
0329.01 & 0329.03 0329.02
Jubilee Field FPSO
Utility Container (109T) Spreader beam (2 x 9m) (70T), Spreader beam (2 x 12m) (70T) Utility Container (109T)
1
Concrete Caissons 70 to 120 ton
930 9-Feb-10 25-Jan-11
2
692 20-Jan-10
LNG Assist Tugs M264 (Tangguh Pauru), M265 (Tangguh Ewako) – Assist Tugs M264 (550t), M265 (505t) Jacking, Cradle and On Dock lift conditions – Support Structure FEM, Site Attendance at PT Pal Yard, Surabaya
2
1,055 24-Feb-10
Peregrino FPSO
Roll on operation and Sea Transportation of 1 Module onto 330' barge 'Cruise 332' - Deck Strength and Intact and Damage Stability Calculation
Module (1500T)
1
1,500 17-Feb-10
COLI Shipping (S) Pte Ltd
Gorgon LNG
Transportation of 2 shipments of Gorgon LNG accommodation camp units (54 & 108) from Sri Racha to Fremantle on MV Beluga Elegance - Stowage Plan and Site Supervision
54 accommodation camp units, 108 accommodation camp units
162
213 16-Aug-10
COLI Shipping (S) Pte Ltd
Gorgon LNG
Transportation of HDD Pipes from Kuantan & Singapore to Australia HDD pipes 9.625" x 12.87m, 13.375" x on MV Clipper Mariner - Stowage Plan & Site Attendance 12.1m, 9.625" x 12.1, 7" x 12.1m, 9.625" x 12.7m, 20" x 11.58m
2225
2,129 17-Jun-10
page 8 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
0330.01
Agility Shipping Pte Ltd
Peregrino FPSO
transportation of modules M10A & M11A (From Batam to Keppel Shipyard) - barge deck strength and intact and damage stability calculation for roll on operation
M10A (Separation Module A) - 1418t M11A Coalescer Module A - 1198t
0332.01
MODEC Offshore Production Systems (Spore) Pte Ltd
BP Angola FPSO
Transportation of Piperacks, Helideck, Stair Tower, Metering Skid Frame, Flare Tower from Nippon Steel yard, Batam to Jurong Shipyard
Total of 12 modules consisting of 6 piperacks, flare tower (2 sections), embarkation tower, helideck support, pancake deck and metering skid foundation.
0334.01
Riser Handling Gantry Crane
0339.01
Rubicon Offshore International Pte Ltd Leighton Offshore Pte Ltd
0340.01
SapuraAcergy Sdn Bhd
0344.00
Schenker Australia Pty Ltd
0345.01
Yang Kee Logistics Pte Ltd
Nicol Highway MRT
Survey of offloading of the cargo from MV Eastern Jade at Jurong PortTunnel Boring Machine Parts
0352.01
ASC Liner Services Pte Ltd
Gorgon LNG
0354.01
Alan Paddy's (S) Pte Ltd
Gorgon LNG
Transportation of HDD pipes from Kuantan to Australia by MV Thor Pioneer - Engineering - Analyses, Design - Deck Strength, Stowage and Seafastening Onshore pipeline - transportation of pipes from Kuantan to Henderson - Pipe lifting frame 20 x 8 x 4 ft, swl 30 t - Engineering Design
HDD pipes, various length meters 11.940 to 12.465, diameter 34" (885.00mm OD x 42.50mm WT) N.A.
0365.04
Engineering Review of Grillage details on "Hanjin Pioneer" vessel
0369.01
Allianz Global Corporate & Specialty Gladstone LNG AG Allianz Global Corporate & Specialty Gladstone LNG AG Altus Oil & Gas Services Belanak LPG FSO
0383.01
PT Offshore Services Indonesia
Kangean Field Development
0384.01
TGT FPSO
0391.01
Armada TGT Limited (Bumi Armada) PT Bangun Adyabahan Perkasa (Utraco) deugro (Singapore) Pte Ltd
0396.01
Infiniti Marine Pte Ltd
Koniambo Nickel, New Caledonia TGT FPSO
0402.01
Stanford Marine Asia Pte Ltd
Gorgon LNG
0404.02
Alnmaritec Ltd
Switzer Kissama, Switzer Kumbira
Transportation of Pilot Boats each 25 t - Switzer Kissama, Switzer Kumbira - Design of Transport cradle for sea transportation
0407.01
Teras Offshore Pte Ltd
Transport Cradle Design Check Preliminary Stowage for Transportation of Modules from Thailand, Indonesia and Fremantle to Darwin (70 shipments)
0365.05
0385.01
Riser Handling Gantry Crane - 5 cylinders and 1 main winch Loading / Offloading Survey Leighton Mynx (Accommodation Installation of accommodation block - engineering review Barge) DP Heavy Lift And Pipelay J-Lay Tower - Assembly - Engineering - Lifting Plan Sapura 3000 Gorgon LNG Loadout-Transportation-Installation, 80 barge shipments of Concrete X Blocks from Cikading to Barrow Island - Engineering and loadout supervision
Kangean Field Development
Qty. 2
Total Completed Ton. 2,616 23-Feb-10
12
427 28-Dec-10
5 Cylinders , 1 main winch
6
105 1-Mar-10
Accommodation Block 600 t
1
600 14-Jun-10
JLTS - 404t, Skidradoil - 300t, Mast #3 17t, PES - 140t Concrete X blocks
4
861 30-Apr-10 240,000 8-Aug-12
665 18-May-10 55
619 4-Aug-10
N.A.
N.A. 26-Aug-10
GLNG Plant module (3301NB)
1
1,287 11-Dec-13
Engineering Review - Transportation of module
GLNG Plant module (3301JA)
1
1,925 12-Feb-14
Seafastening Calculation and Design of 4 Skids from Singapore to Batam Sea Transport and Lifting of 6 Subsea Christmas Trees from Lamongang Marine Base to Jack Up Rig TGT FPSO - topside module installation - engineering - lifting review
C1A (59mt), C1B (32.4t), C3A (53t), C3B (27t) 6 units Christmas Tree at 46.3t each
4
171 29-Oct-10
6
278 31-Jul-11
6
6,224 16-Apr-11
M40 - 415t, TSS - 1100t, TH - 1450t, M30 1117t, M70 - 592t, M80 - 1550t Installation of module onto Jack up drilling rig Klei - Design of Clevis N.A. pad eyes (50 t each) for Klei Rig Sea transportation engineering and mooring plan for modules / 2 Units Mini Modules (475t each), 2 units items from shore (Qingdao, Shanghai & Dalian) to Jumbo vessel at DOS Cylinder (330t each), 2 units Dos anchorage (193t each) Loadout and Sea Transport of 2 Skids from Awal Idaman Jetty, Port Cone NG Package (10t) , WT Package (73.6t) Klang to Dynamac Yard, Singapore AHTS MV Stanford Alpha - Towing of barges from Cikading to N.A. Barrow Island - Catenary Calculation for Tow Line
30-Oct-10 6
1,996 28-Jan-11
2
84 23-Feb-11
N.A.
N.A. 12-Apr-11
Pilot Boats Switzer Conda,Switzer Kissama, Switzer Kumbira
3
75 13-May-11
Piperacks, Jetty, Electrical Room, Manifolds
165
39,509 24-Jun-11
page 9 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
0409.01
Asia Management Group Shipping Pte Ltd COLI Shipping (S) Pte Ltd
Bourbon Offshore - Knuckle Boom Crane Cossack Wanea Lambert
Lifting and Seafastening Procedure & Site Supervision
Knuckle Boom Crane (380t)
1
Total Completed Ton. 380 30-Jun-11
Stowage plan - M/V 'Hamra' - Subsea 7 equipment
Gorgon LNG
0420.01
Koleth (S) Pte Ltd (Miclyn Express Offshore) Tropical Shipping and Trading Company Pte Ltd Offshore Marine Services Alliance Pty Ltd RK Offshore Management Pte Ltd (Harrier Maritime Pte Ltd) Petrofac International Limited
AHT Miclyn Victory -Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line AHT Ewan Adventure - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line Deck Strength Calculation, Ballast sequence, Ramp design and arrangement for Semi Submersible Barge Teras 002 AHTS Jul Sofus K - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow LineCatenary Lifting review, "sit down" procedure, engineering and project management/site attendance
Container, Compressors, Generators, Winches, Reels N.A.
63
724 14-Jun-11
N.A.
N.A. 26-Jun-11
N.A.
N.A.
N.A. 18-Jul-11
N.A.
N.A.
N.A. 13-Jun-12
N.A.
N.A.
N.A. 26-Jun-11
N.A.
N.A.
N.A. 22-Feb-12
0424.01
Miclyn Express Offshore Pte Ltd
Gorgon LNG
Barge Miclyn 258 - Bollard Pull Calculation to suit 40T Smit Brackets N.A. and analysis for underdeck capacity calculation
N.A.
N.A. 17-Aug-11
0425.01
MODEC Offshore Production Systems (Singapore) Pte Ltd
BP Angola Block 31 PSVM FPSO
Sea fastening of loose items on the FPSO sailing out of Singapore to Angola
N.A.
N.A. 3-Jan-12
0428.01
Deugro (Singapore) Pte Ltd
382.5 MW Unosugen CCPP
1
136 8-Sep-11
0429.00
Altus Logistics Pte Ltd
TSB FBSO - BWO
14
107 8-Dec-11
0430.01
Deugro (Deutschland) GmbH
382.5 MW Unosugen CCPP
Cargo Vessel M.V PAC ATHENA - Lifting and lashing drawings of Siemens Steam Shell - Upper (67t) and cargo (Upper Steam Shell Part & Lower Steam Shell Part), lashing Lower Part (69t) calculation, lifting calculation & stowage plan Seafastening design and calculation, deck strength check of Anchor Chains, piles, reels and containers Piles, chains, reels & containers from Profab Yard, Batam to Loyang Offshore Supply-Base, Singapore Land Transport Lashing, Arrangement, Stability Siemens Steam Shell - Lower Part (69t)
0430.02
Deugro (Deutschland) GmbH
382.5 MW Unosugen CCPP
0430.03
Deugro (Deutschland) GmbH
0432.01
0410.01 0412.01 0413.01 0417.01 0419.01
Gorgon LNG Gorgon LNG Gorgon LNG Berantai FPSO
N.A.
Qty.
1
69 26-Sep-11
Land Transport Engineering - Trailer Stability Calculation, Trailer Siemens Gas Turbine (310ton) , Steam Lashing Calculation, Trailer Lashing Plan & Land Transport Solution Turbine (172ton), Generator (343ton ), Transformer (255ton ) & HP Turbine (58ton).
5
1138 14-Oct-11
382.5 MW Unosugen CCPP
Transformer Installation - review of installation procedure of transformer onto the foundation and to issue method statement for skidding of transformer.
Siemens Transformer (255ton)
1
255 18-Nov-11
Miclyn Express Offshore Pte Ltd
Gorgon LNG
N.A.
N.A.
N.A. 25-Oct-11
0433.01
Intone Pte Ltd / Drydocks World SEA
Gorgon LNG
AHTS Miclyn Magellan 2 - Feasibility Study - GORGON suitability/Powering, bollard pull & catenary calculation AHTS Ocean Unite - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line
N.A.
N.A.
N.A. 7-Oct-11
0433.02
Gorgon LNG
N.A.
N.A. 7-Oct-11
N.A.
N.A.
N.A. 7-Oct-11
0444.01
BBC Chartering Singapore Pte Ltd
2,674
6,612 11-Jan-12
0445.01
Teras Offshore Pte Ltd
Gorgon Upstream DOMGAS onshore project Teras 375ft Ballastable Barge
AHTS Ocean Unity - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line AHTS Samson VI - Towing of barges from Cikading to Barrow Island - Catenary Calculation for Tow Line Linepipe strength and tier limit calculations for 3 nominated pipe types to be stowed on MV BBC Campana Feasibility Study of 375ft Barge for Trailer Loadout
N.A.
0434.01
Intone Pte Ltd / Drydocks World SEA Samson Express Offshore Pty Ltd
NA
NA 15-Feb-12
0451.01
Bumi Armada Berhad
ONGC - FPSO D1
FPSO D1 - Topside module installation - engineering - lifting review M30 - 1094.23, M70 - 837.68
2
1,932 27-Aug-12
Gorgon LNG
Linepipes for DOMGAS onshore pipeline NA
page 10 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
Qty.
Total Completed Ton. 20-Apr-12
0456.01
BBC Chartering Singapore Pte Ltd
Vestas Wind Systems A/S
Wind turbine towers
0457.00
HDS Project
0482.01
JGC Construction International Pte Ltd Al Jaber Heavy Lift & Transport Pte Ltd SBM Offshore
MV BBC California Deck panel strength checks for loading of wind turbine towers Review of Heavylift Procedures, spreader bar calculations, and spreader bar certification Ballast Calculation for Roll on and Roll off of 2 units Ship Unloader
NA
NA 26-Apr-13
Ship Unloaders (300t)
2
600 10-May-12
Installation Engineering and PMT works
M23, KAU, E-house, M07
4
1550 30-Sep-13
0482.03
SBM Offshore
0483.01
Leighton Engineering Sdn Bhd
SNP Kikeh FPSO
Lifeboat upgrade
lifeboat platform & davit x 2 sets
4
Gorgon LNG
Engineering Support
L1 Caissons rings
0484.01
Siemens Pte Ltd
SBM Offshore
East Power Plant (Brown Field Detailed Design) East Power Plant (Brown Field Detailed Design) BC-10 RIS Module
FGCS Skid Transportation - Seafastening, stowage plan on "Lewek FGCS Skid Martin" EDG Skid Transportation - Seafastening, stowage plan on "Dayang EDG Skid Cinta" Transportation & Installation Engineering RIS Module
0484.02
Siemens Pte Ltd
0485.01 0486.00
Agility Project Logistics
Zawtika
3059 14-Dec-12
Agility Project Logistics
Zawtika
161
3059 10-Sep-12
0489.01
Lanka Hydraulic Instutute Ltd
Concrete coated pipes of various dimensions Concrete coated pipes of various dimensions NA
161
0486.01
Transportation of 28in Concrete Coated Pipes - Seafastening Design and Rigging Arrangement, Pipe Tier Limitation Calculation, Acceleration Calculation for Clipper Galaxy Transportation of 28in Concrete Coated Pipes - Seafastening Design and Rigging Arrangement, Pipe Tier Limitation Calculation, Acceleration Calculation for Clipper Mooring Analysis for RORO vessel Galaxy
NA
NA 12-Dec-12
0489.02 0493.00 0501.01
Lanka Hydraulic Institute Ltd FH Bertling Pte Ltd deugro (Singapore) Pte Ltd
North Malay Basin FPSO
NA 10-Dec-12 1413 29-Apr-13 300 24-Dec-12
deugro (Singapore) Pte Ltd
North Malay Basin FPSO
NA Rotating deck, boom, A-frame Turret Head, Chain Table, Turret Gantry, Crane Pedestal, Platform Anchor piles and Followers for FPSO
NA 3 5
0501.04 0505.01
Altus Oil & Gas Malaysia Sdn Bhd
Mooring Analysis of Pontoon Transportation of crane parts - Seafastening Design Turret Head Structure Shipment on barge Victory Falcon - Intact & Damage Stability booklet, Seafastening details Dwgs & Local Deck strength check, Mooring Cargo Shipment on bargeCalculation Victory Falcon - Barge stowage plan, Seafastening details Dwgs & Local Deck strength check, Grillage analysis, & Damage Stability, Deck Strength, Mooring Shifting ofIntact 1 module from yard to jetty - Structural Analysis
Modular room
1
72 29-Jan-13
0506.01
Angola Block
Acceleration Report and Seafastening Dwg
Media Filter & Blower package
1
131 24-Jan-13
0510.01
Panalpina World Transport (S) Pte Ltd Bumi Armada Berhad
FPSO Armada Claire
Lifting Reviews
Skid 11 ‐ Water Injection System / Electrostatic Coalescer, Flare Tower, Skid 9 ‐ Water Injection System / Pw, Skid 1 ‐ Inj. Gas compressor / Fuel Gas, RTM
5
3124 17-Dec-12
0511.01
Consolidated Pipe Carriers Limited
Gemusut-Kakap Field
Transportation Analysis
Pipes
17-May-13
0511.02
Consolidated Pipe Carriers Limited
Gemusut-Kakap Field
Transportation Analysis
SLED and double joints
20-May-13
0527.01
Bibby Offshore Singapore Pte Ltd
Champion Waterflood
Crest Odyssey 1 Acceleration & Seafastening Calculations
Winches & related components
0532.01
Orient Project Shipping (S) Pte Ltd
0534.01
AG&P
0534.02
AG&P
0462.00
Loadout of 2 Units Ship Unloader SNP Kikeh FPSO
Texas Propane Dehydrogenation Expansion Texas Propane Dehydrogenation Expansion
various equipment and spreader bars
Pre-Stow plan for cargoes from Korea and Thailand to Manausa, Brazil Feasibility Study of loadout facilities Site Attendance for loadout of modules
Ongoing 31-Jan-13
1
40 4-Oct-12
1
35 18-Jul-13
1
1250 Ongoing
1026 16-Apr-13
11
91.7 18-Jul-13 1826 25-Jul-13
NA Piperacks
18
NA 16-Sep-13 1858 Ongoing page 11 of 12
Masstrans Track Record - LTI - 2014-03-31 - CM Job No
Client
Project
Activity / Work Scope
Modules / Structures
0538.01
Siemens Pte Ltd
Petronas FLNG-2 (Rotan)
E-house P7 & S7
0550.01
Pape Engineering
Sea transportation of E-house x 2 - Feasibility study on the vessel stability Supply of draftsperson
0559.01
Bumi Armada Berhad
FPSO C7
Lifting Reviews
Qty. 2
Total Completed Ton. 3400 20-Nov-13 28-Feb-14 Ongoing
page 12 of 12
Annex 2 Track Record Fabrication and Construction
26
Track Record - FabricationConstruction - 2014-02-28 - CM Job No
Client
Project
Activity / Work Scope
Completed
0009
Pioneer Offshore Enterprises Pte Ltd
Cranebarge POE Giant 6
Stability calculations and Clyde Crane load chart
22/1/2003
0019
Pioneer Offshore Enterprises Pte Ltd
Cranebarges CB1, CB2, CB3
Principle particulars, inclusive of profile plans and crane lifting load charts
15/9/2005
0028
Offshore Logistic Asia Pacific Pte Ltd
SAT Dive System
Design of diving bell A-Frame launching skid
0036
Harald Frigstad Engineering Pte Ltd
Semi-Submersible Rig Atwood Southern Cross
FEM analysis of diving bell skid foundation for semi-submersible rig
6/12/2003
0037
TG Marine Services Pte Ltd
Barge Antara Koh B8
25/6/2003
0038
Pioneer Offshore Enterprises Pte Ltd
Pipe Lay Barge Pek Sun 1203
0043
Pioneer Offshore Enterprises Pte Ltd
Cranebarge POE Giant 6
FEM analysis of barge strength and seafastening design for crawler crane mounted on barge Antara Koh B8 Measurement of barge "Peck Sun 1203" equipment foundations, enclosed spaces, underdeck carlings, LSA / FFA Engineering & site attendance for load test of 'POE Giant 6' crane
0048
DSV Allied Achiever Sat Dive System
Design of diving bell launch system
23/9/2003
0065
Allied Marine & Equipment Sdn Bhd (Malaysia) TG Marine Services Pte Ltd
Cranebarge Sumpile
FEM and stability calculations for Sumpile crane boom
4/6/2004
0073
POE Shipping Pte Ltd
Deck Cargo Barge 250 ft
Calculation of bollard strength
7/6/2004
0082
TG Marine Services Pte Ltd
Jack Up Barge SF-1
Stability calculations for jack up barge
30/9/2004
0085
Hiap Shing Shipping Pte Ltd
Cranebarge ET Offshore 20
Stability calculations for crane barge E.T. Offshore 20 lifting 200 tonnes
10/8/2004
0097
TG Marine Services Pte Ltd
Crane barge POE 1817
Crane barge POE 1817 stability calculations
0098
Pacific Workboats Pte Ltd
Cranebarge PW L1501
PWL 1501 Load Test Barge Design
14/1/2005
0102
POE Shipping Pte Ltd
Pipelay Barge PL1
Pipe Laying Barge 'PL 1' - Intact Stability Calculation, GA Updating
19/4/2005
0119
POE Shipping Pte Ltd
Craneship POE Ocean Lift
Crane Ship POE Ocean Lift - Crane - New Load Chart after Boom Extension
7/10/2005
0122
SH Engineering Pte Ltd
Steel Marker Buoy diameter 2.2m
Diameter 2.2m Steel Marker Buoy
0124
IMT Marine Consultants Ltd.
IMT 966 AHTS
IMT 966 - AHTS Design - Ship Construction Unit / Detailed Drawings
0124.A
IMT Marine Consultants Ltd.
IMT 966 AHTS
Attendance on sea trials on IMT behalf
11/10/2005
0126
Kim Heng Marine & Oilfield Pte Ltd
Deck Cargo Barge Kim Heng 2388
Barge Kim Heng 2388 Towing Bracket Strength Check
11/10/2005
0133
Kim Heng Marine & Oilfield Pte Ltd
Deck Cargo Barge (180 x 60 x 12) ft
22/12/2005
0139
Proceanic Engineering Services Pte Ltd Quantum Marine Works Pte Ltd
Cendor MOPU
analyses and design - longitudinal strength, tank tables, stability book, towing brackets, bollards Cendor MOPU Tow from Lumut to Cendor Field - Sea keeping Analysis
0149
Hercules Drilling Rig
5/5/2005
7/4/2003 8/12/2003
4/1/2004
12/10/2005 16/6/2006
10/3/2006
35 T Anchor / Mooring Winch Platforms (Cantilever) and Foundation Design and Structural FEM Analysis
23/8/2006
page 1 of 5
Track Record - FabricationConstruction - 2014-02-28 - CM Job No
Client
Project
Activity / Work Scope
Completed
0157
IMT Marine Consultants Ltd.
IMT 966 AHTS
Labroy T162 (IMT966 AHTS) - 167 Deck Crane Base Support Structure - FE Analysis
0162
Acergy Singapore Pte Ltd
Multi Purpose Construction Vessel Toisa Proteus
Toisa Proteus' - Dive System Removal
16/7/2007
0162.A
Acergy Singapore Pte Ltd
Multi Purpose Construction Vessel Toisa Proteus
Toisa Proteus' - Moon Pool Hatch Design
29/5/2007
0162.C
Acergy Singapore Pte Ltd
Multi Purpose Construction Vessel Toisa Proteus
Toisa Proteus' - Dive Module - Transportation Engineering
25/9/2007
0198.A
Caldive International Pte Ltd
Reliance MA-D6 Field Development
0198.B
Caldive International Pte Ltd
DSV Eclipse
Multipurpose Offshore Vessel Olympic Canyon - Installation of Penelope Dive Module Engineering DSV Eclipse - crane upgrade and anti heeling System - Engineering
0198.D
Caldive International Pte Ltd
DSV Eclipse
Bell to TUP clamp Clamp Interlock - fabrication, subcontracted
0198.E
Caldive International Pte Ltd
DSV Eclipse
C clamp Safety Device Bell side door - engineering design and fabrication, subcontracted
0198.G
Caldive International Pte Ltd
Enginering desing of Subsea Stabbing Guide Assemblies for Subsea Isolation Valve (SSIV)
2/6/2008
0198.H
Caldive International Pte Ltd
Reliance MA-D6 Field Development - Installation of Subsea Isolation Valve DSV Texas Horizon
29/12/2008
0221
Diving Bell Launch System
0226.A
M.O.S. Marine Offshore Services Pte Ltd Pelabuhan Tanjung Pelepas Sdn Bhd
Technical evaluation, including deck strength for installation of Mezzanine Deck and fitment of SAT 2 onto DSV Texas Horizon Diving Bell A-Frame, Skid Base and Trolley System, DDC Frame - Analyses and Design
Port of Tanjung Pelepas - Mitsui RTG
Mitsui RTG Cranes x 8 units - Structural analyses / review
25/2/2009
0235.A
Caldive International Pte Ltd
Hyperbaric Rescue Chamber
HRC (Hyperbaric Rescue Chamber) Support Frame - Design
30/4/2009
0250
Cal Dive International Pte Ltd
DSV Eclipse
DSV 'Eclipse' - Upgrade at Keppel (Gul Rd) Shipyard, Feb, '09 - Technical Support
17/4/2009
0253
Hallin Marine Systems Ltd - Hallin Marine Pte Ltd Cal Dive Marine Construction (Mauritius) Ltd Cal Dive International Pte Ltd
AHSV Seacor Penrith
Seacor Penrith - Mezzanine deck for A Frame and ROV - Design
1/6/2009
Hyperbaric Lifeboat
Hyperbaric lifeboat support frame design
3/6/2009
Hyperbaric Lifeboat Davit Frame
Davit Frame - Strength check for load test condition
0264 0286 0292
Greatship Global Offshore Services Pte Ltd 0299 Underwater Technology Services (S) Pte Ltd 0324 BUT.KJP Corporation - PT KBR Indonesia Joint Operation 0327 Offshore Ship Designers (Singapore) Pte. Ltd. 0327.02 Offshore Ship Designers (Singapore) Pte. Ltd. 0335 Underwater Technology Services (S) Pte Ltd
Integration of Dive System
12/10/2006
24/10/2007 3/3/2009 18/1/2008 29/12/2008
30/6/2009
11/9/2009 14/10/2009
Deflection check of diving chambers skid in lifting condition
9/12/2009
Tangguh LNG - LNG Assist Tugs
Tangguh LNG Assist Tugs M264, M265 - Support Structure - FEM Analysis
24/2/2010
Acergy Borealis - DP Pipelay And Heavy Lift Construction Vessel DP Pipelay And Heavy Lift Construction Vessel Acergy Borealis
Installation of superstructure - Strength analysis for lifting off condition
30/7/2010
Installation of superstructure - Strength analysis for lifting on condition upon outfitting Continuing on job 327 SPHLB Support Structure and Jacking Beam strength check
30/7/2010 8/6/2010
page 2 of 5
Track Record - FabricationConstruction - 2014-02-28 - CM Job No
Client
0335.02 Underwater Technology Services (S) Pte Ltd 0335.03 Underwater Technology Services (S) Pte Ltd 0335.04 Underwater Technology Services (S) Pte Ltd 0335.06 Underwater Technology Services (S) Pte Ltd 0335.07 Underwater Technology Services (S) Pte Ltd 0335.08 Underwater Technology Services (S) Pte Ltd 0335.09 Underwater Technology Services (S) Pte Ltd 0335.10 Underwater Technology Services (S) Pte Ltd 0335.11 Underwater Technology Services (S) Pte Ltd 0335.12 Underwater Technology Services (S) Pte Ltd 0335.14 Underwater Technology Services (S) Pte Ltd 0335.15 Underwater Technology Services (S) Pte Ltd 0335.16 Underwater Technology Services (S) Pte Ltd 0335.18 Underwater Technology Services (S) Pte Ltd 0344.08 Schenker Australia Pty Ltd
Project
Activity / Work Scope
Completed
SPHLB Support Structure and Jacking Beam strength check
6/9/2010
SAET System
Structural check for DDC 1 Skid, DDC 2 & 3 Skid, Control Van & Machinery Van
13/1/2011
SAET System
Design of trolley (in A frame) for the diving bell of Saturation system
24/5/2011
SAET System
SDC Skid Frame FEM Analysis
13/1/2011
SAET System
Design of winch
25/2/2011
SAET System
HRC Davit - FEM Analysis
24/3/2011
SAET System
ROV Control Van-FEM Analysis
13/1/2011
SAET System
Winch Skid-FEM Analysis
13/1/2011
SAET System
Catcher Hook FEM Analysis
15/11/2010
SAT04 System
Control Van - FEM Analysis
16/11/2010
SAET System
HRC Frame - FEM Analysis
13/1/2011
SAET System
ROV Frame - FEM Analysis
13/4/2011
SAET System
Spreader Bar Design
13/1/2011
SAT04 System
Winch Skid-FEM Analysis
13/1/2011
Gorgon-Barrow Island LNG Project
Hinge design for the ramp of the stern of the barges
1/8/2011
0344.12 Schenker Australia Pty Ltd
Gorgon-Barrow Island LNG Project
Wedge modification
1/8/2011
0344.14 Schenker Australia Pty Ltd
Gorgon-Barrow Island LNG Project
22/9/2011
0345.16 Schenker Australia Pty Ltd
Gorgon-Barrow Island LNG Project
Deck Cargo Barge Giant 2 main deck and barge side cracks, portside 7, starboardside 2 reinforcement / strengthening plan and engineering Design of steel cradles for sea transportation of cable drums from Korea
0346.25 Schenker Australia Pty Ltd
Gorgon-Barrow Island LNG Project
Stanchion modification drawings
11/5/2012
0347.26 Schenker Australia Pty Ltd
Gorgon-Barrow Island LNG Project
Design of steel cradles for sea transportation of cable drums from Korea
27/9/2012
0348.01 Alan Paddy's (S) Pte Ltd
Offshore Container
Drawing modification and structural calculations
30/7/2010
0354.01 Alan Paddy's (S) Pte Ltd
Piperack 30 mt
30MT Piperack Design - Drawing and Structural Calculations
0385.01 PT Bangun Adyabahan Perkasa (Utraco)
Kangean Field Jack Up Drilling Rig Klei
Clevis Pad eye for Klei Rig
21/9/2012
16/11/2011 7/12/2010
page 3 of 5
Track Record - FabricationConstruction - 2014-02-28 - CM Job No
Client
Project
Activity / Work Scope
Completed
0401.01 Seacor Marine (Asia) Pte Ltd
Seabulk Nilar
0401.02 Seacor Marine (Asia) Pte Ltd
Seabulk Nilar
1.) Re-calculate the Stability of the Seabulk Nilar (upgrade to AHT status) as required by BV. 2.) Update the GA with the AHT, stern roller, Shark-jaw, Tow pins and the Platform for the new Davitexperiment; and Workboat. Inclining 1.) Procedure write up 2.) Attendance and report
21/9/2011
0402.01 Stanford Marine Asia Pte Ltd
Gorgon - Stanford Alpha
Catenary Calculations for Stanford Alpha Towing Lines.
25/4/2011
0404.01 Alnmaritec Ltd
Transport Cradles Design Check
Design checking of Transport cradle to confirm their adequacy for sea transportation
24/6/2011
0404.02 Alnmaritec Ltd
Transport Cradles
Design of Transport Cradle
0412.01 Koleth (S) Pte Ltd (Miclyn Express Offshore) 0413.01 Tropical Shipping and Trading Company Pte Ltd 0419.01 RK Offshore Management Pte Ltd (Harrier Maritime Pte Ltd) 0422.00 GEOQUIP Marine AG
Miclyn Victory
Catenary Calculations for Miclyn Victory Towing Lines.
30/6/2011
Gorgon - Ewan Adventure
Catenary Calculations for Ewan Adventure Towing Lines
10/8/2011
MV Jul Sofus K
Catenary Calculations for AHTS MV Jul Sofus K Towing Lines
25/8/2011
DSV Lady Christine - Conversion
derrick foundation, moonpool, existing and new moonpool bottom doors, accommodation layout update, general arrangement update, LSA/FFA and safety plan update, new accommodation construction drawings, longitudinal strength calculations, hydrostatic table and stability book update, inclining experiment procedure, ship yard sourcing - engineering analyses and design, project coordination
22/12/2011
0442.00 Gardline Marine Sciences Limited
DSV Lady Christine - Conversion
Design of new moonpool, moonpool doors design, design of derrick foundation, Container foundation design, update stability booklets, Tween deck design, Inclining Experiment procedure and Report, Design of existing moonpool closing
17/7/2012
0442.16 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Drawing of modifications on mezzanine deck
28/11/2012
0442.17 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Mezzanine deck structural analysis & drawings
28/11/2012
0442.18 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Plimsoll Mark
19/11/2012
0442.20 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Revised Stability Booklet
18/12/2012
0442.21 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Deck structural analysis
0442.22 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Underdeck Strengthening Details
0442.23 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Crew Accommodation modification
0442.24 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Inclining test and updating of stability booklet
0442.25 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Structural analysis of new A-frame
0442.26 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Seafastening design & calculation of various items
0442.27 Asia Geos (L) Ltd
MV Geoasia (ex-Lady Christine)
Drafting of Detailed Seating Plan on Main Deck
13/10/2011
8/8/2011
page 4 of 5
Track Record - FabricationConstruction - 2014-02-28 - CM Job No
Client
0445.01 Teras Offshore Pte Ltd
Project
Activity / Work Scope
Completed 20/1/2012
0447.00 Alan Paddy's (S) Pte Ltd
Construction of self ballastable deck cargo barges 375 ft x 18 Ballast system and stability for loading / offloading and voyage - Design review, feasibillity units study Research & Development of JWA water bag frame Structural Strength Analysis for water bag frame
0448.00 Global Explorer Marine Pte Ltd
Barge Labroy 156
Seafastening Design & Analysis for Crawler Crane
29/2/2012
0448.07 PT Bina Nusantara Perkasa
Barge Labroy 156
23/7/2012
0451.02 Bumi Armada Berhad
ONGC - FPSO D1
Engineering services for barge thrusters installation design, barge tank reconstruction design, barge stability booklet Design of Spreader beam
0461.00 Al Jaber Heavy Lift & Transport Pte Ltd 0464.01 LAP Projects (Asia) Pte Ltd
Saudi Aramco Mobil Refinery Company Ltd (SAMREF) Lifting and Turnaround of reactor
0473.01 Singapore Marine Logistics Pte Ltd
SMLOG 180
180' Spud Test Lift Barge Padeye Design
31/8/2012
0473.02 Swissco Offshore Pte Ltd
SMLOG 180
Global Strength Check for 2000t Test Lift
15/8/2013
0492.01 Geoquip Marine UK Ltd
GMTR 120 Series Twin Tower Derrick
Structural Analysis of Compensator Carriage
0492.02 Geoquip Marine UK Ltd
GMTR 120 Series Twin Tower Derrick
Structural Analysis of Rooster box
25/1/2013
0494.01 Seacor Marine (Asia) Pte Ltd
Seabulk Badamyar
Safety & Fire Protection
6/11/2012
0501.01 deugro (Singapore) Pte Ltd
Barge Victory Falcon
Intact & Damage Stability booklet - modification
0511.03 Consolidated Pipe Carriers Limited
Gemusut-Kakap Field
Pad-eye check
10/7/2013
0513.01 Specialist Marine Services Pte Ltd
FPSO Raroa
Technical drawings for damaged anchor wire removal procedure
17/7/2013
0516.01 Gaylin International Pte Ltd
Structural Analysis of Smith Bracket
10/5/2013
0528.01 Gaylin International Pte Ltd
Analysis of Steel Drum
23/7/2013
0549.01 Swire Salvage Pte Ltd
Designing of 12 point lifting frame & Strand Jack frame Design of Wind Turbine Towers Stacking Frame
Pacific Rover
Design of temporary platform for ROV on deck
3/8/2012
24/10/2012 28/8/2012 7/8/2012
17/12/2012
24/12/2012
6/2/2014