Table of Content I. Main contracting, construction...................................................................................................................2 II. Reconstruction works................................................................................................................................2 III. Repairs, maintenance, execution, operation ............................................................................................2 IV. Expert consultancy, technical diagnostic survey, requirement-systems, design ....................................5 V. Development of quality assurance system and company images management consultancy .................7 VI. Engine diagnostic, vibration diagnostic ..................................................................................................8 VII. Operating and start up of plants .............................................................................................................9 VIII. Repair of concrete constructions...........................................................................................................9 IX. Tank examinations and reconstructions ................................................................................................10 X. Commercial and representative activities ...............................................................................................11 XI. Commercialism......................................................................................................................................11

I. Main contracting, construction COLUMBIAN TISZAI KOROMGYÁRTÓ Kft. 2007-2008 Planning, building and operation of a 10 MW capacity tail gas fired power plant as a main contracting. NITROGÉNMŰVEK ZRt. 2006-2009 New acid plant investment • Building, gearing of three pcs. of 2000 m3 acid bins; configuration of the new pipeline system (consortional partner: Vegyépszer ZRt.)

• Complete overhaul of warehouse, installation of matterial mover conveyor for loose fertiliser. TVK NyRt. 2007-2008



Complete reconstruction of a tubular bridge pipe network (4th. stage of the reconstruction).

II. Reconstruction works BANDAR IMAM PETROCHEMICAL CO., Iran 1992-1994 Post-war reconstruction works (technical diagnostic survey and construction): • 100 kt/y LDPE plant of very high (3000 bar) operating pressure • 50 kt/y HDPE plant • 50 kt/y polypropylene plant. Partners: Tecnimont S.p.A. Milano and Belleli S.p.A Mantova, Italy NATIONAL PETROCHEMICAL PUBLIC CO. LTD., Thailand 1993 • Technical consultancy on the reconstruction of steam cracker furnaces. MOL Nyrt. (Hungarian Oil and Gas Co.) Exploration & Production Division / Szeged Plant 1996-2000 • Upgrade and reconstruction along with foundation repair of nine pcs. reciprocating compressor aggregates. Partner: Alphatec Mérnökiroda Kft. (Alphatec Engineering Bureau Ltd.) • MARKER, Storage and Transportation Unit, Dabas Plans for the revamp of metering and calibration station. • Technical consultancy provided for the reconstruction project of unit "D-E". • Rewamp of tubular furnaces IV-P-1/E and IV-P-2/E in gas preparation unit “E”. TVK Nyrt. (Tisza Chemical Combine Co.) 2000-2008 • Engineering examination of tubular bridge pipe network system, making an expert opinion and suggestion, complete the first item of reconstruction. (Data: total pipe network system: 7,7 km; total length of pipe: 229 km; No. of pipe supports: 33800 pcs; No. of valves: 1600 pcs.) • Water Plant reconstuction of C-851 and E-901 cooling towers.

III. Repairs, maintenance, execution, operation NITROGÉNMŰVEK ZRT. (NITROGEN WORKS CO., PÉT) 1995-2008 • Ammonia Plant: Replacement of primary cracking furnace’s tubing and reconstruction of walling (supported by computer based network management). • Acid Plant: Replacement of refractory internal lining of hot-gas duct between reactor and turbine at four units. • Dilute Acid Plant / Quench Boilers Position 7.: Design, approval of workshop design by the authorities and construction of 2 pcs. boilers. • Ammonia Plant: Modification and construction of alkali distributing system of towers 102 E A/B. • Overhaul of turbine compressor and generator units. • Full-scale overhaul of recirculatory cooling water tower typ. CT-I. • Ammonium plant overhaul of 2 pcs. turbine compressors and 2 pcs. SIEMENS steam turbines.

TLW Ltd. Main References / May 18, 2009

2/9.

DEBRECENI VÍZMŰ ZRT. 1995-2008 • Continuous service of turbo blowers and centrifuges. MISKOLCI VÍZMŰ ZRT. 1995-2008 • Continuous service of turbo blowers and centrifuges. • Repair of HV turbo compressor and motor MOL Nyrt. (Hungarian Oil and Gas Co.) 1996-2008 • Exploration & Production Division / Szeged Plant: Complete renewal of water distribution system and knock-out drums at evaporation condensers. • Gas Preparation Unit “EE”: Renewal of tubular furnaces IV-P-1/EE and IV-P-2/EE. • Turbocharger repair for Waukesha 7042 GL type gas turbines on an ongoing basis. Repair of main collector’s heat exchanger tube bundles. • Water Feedback System: Repair of pumps N° 9 and 10 (type CNSZ 180-1900), and pre-operational revision, commissioning and modification of a CNSZ 18-950 type pump previously stored in warehouse. • Renewal with guaranty of sliding bearings. • Repair of 1000 m3 tank N° 2900-3 at the main collector. • Production of reciprocating compressors’ spray catcher. • “NF” Plant: Modification of gas engine’s (typ. Waukesha 7042 GL) cooling water system of compressors K-724, K-726, K-728 • Boiler room “C”- Expert examination (age limit determination) and preparation for authorithy structure examination of typ. 3HO 10/12 (3 pcs) and type GIB 20/12 (2 pcs) steam boilers. LINDE GÁZ MAGYARORSZÁG Zrt. (Linde Gas Hungary Co. / Kazincbarcika) 2001-2008 • Supervision and repairing of acetylene reciprocating compressors (2 pcs). • Revision of DEMAG Oxigen and Nitrogen compressors. • Overhaul of TA-18 and TA-28 JOY air compressors. • Revision of DEMAG Oxygen and Nitrogen compressors. • Resetting a PM 1371 B and a P1474 BA charging pump. • Implementation of the Free Floating Piston Technology (FFPTM) into C-1408 NEA CO2 reciprocating compressor. • Dnepropetrovsk, vibration diagnostics, intallation of shaft movement sensor, taking part at the overhaul. • Repair of acethilen reactor • HYCO-1 plant pipe system scheduled supervision • Construction and diagnostics examination at HYCO-2 plant during shut-down. • Repair or H2 and Acetilen compressors • Jerez de la Frontera, Spain„ A complete overhauling of the two JOY TA-18 compressors HOUSE OF PARLIAMENT (Budapest) 1996 • Boiler Plant: Overhaul and reconstruction of 40,2 m tall brickset chimney. Partner: VEGYÉPSZER Co. EVONIK-AGROFERM Co. / Kaba 2001-2008 • Improvement of UNOZAWA blower type 317 B. • Improvement of compressor techn. mark 501 A type 3GR 250/430, and its parts epicyclic train and electromotor. • Preparation of a lid of a 501B turbo-compressor circulating gear box. • Repair of 230 A-1 and 230 B-1 CICLO gear • Repair the load control system of the 501/B turbo-compressor • Complete overhaul of the 501/B turbo-compressor BORSODCHEM ZRT. / KAZINCBARCIKA: 1998-2008 • Modification of PVC-reactors. • Adjustment of two pcs. of PGW compressors at the Chlor Plant TVK Nyrt. (Tisza Chemical Combine Co.) 2000-2008 • Compensation of acetylene charger reciprocating compressor No. V. • Mechanical renovation of a HTV-700 recirculational cooling tower. GE Hungary Co./ Hajdúböszörmény 2001-2008 • Reparation of different types of pumps and fans, and vibration diagnostical examinations. TLW Ltd. Main References / May 18, 2009

3/9.

HOLCIM HUNGÁRIA RT./Kalcinátor Kft./CARMEUSE HUNGÁRIA Kft. / Hejőcsaba Calcicplant 2001-2008 • Production and location of a roller crusher + jig-shaken tray with a capacity of 50 t/hour, Beremend • Repair of various rotating machines. • Blower installation. • Continuous repair and maintenance of compressors, dust collectors, blowers, generators, engines. FCI Connectors Hungary Ltd./ Tatabánya 2001-2002 • Complex control, operate and maintenance of service systems and equipment in the workshop hall & office complex of FCI. • Local maintenance of power-current electric equipment in the workshop hall. MIFROVIT Miskolci Hűtőipari Co. / Miskolc 2001 • Supervision and repairing of screw compressor. ICN Magyarország Rt. 2001 • Chemical Plant I. Renewal of crude morphine production line during the yearly overhaul. TAGHLEEF INDUSTRIES KFT. (previously RADICIFILM Hungary Kft. 2002-2008 • Daily mechanical maintenance of the biafol film production lines in the scope of service-contract. COLUMBIAN TISZAI KOROMGYÁRTÓ KFT. (Columbian Tiszai Soot Manufacturing Ltd.) 2002-2009 • Construction of a 10MW Tail-gas fired power plant as a turn-key project. • Daily maintenance of rotating machines in the scope of service-contract. • Overhaul of 2 pieces Rotary-dryer unit. • Purging and technical survey of 3000 m3 quenchoil tank. • Replace the bottom-sheet of a 3000 m3 quenchoil tank. CHINOIN Co. 2002 •

Production of a 3,15m3 acid-resistant extractor and it’s local settlement, and renewing the driver and stuffing box locking fluid system.

DEBRECENI ERŐMŰ CO. (Power Plant of Debrecen) 2002-2003 • Yearly revision of a 7,1 MW performance steam-generator machine group. KARPATNEFOTOHIM, KALUSH – Ukraine 2004-2008 • Rotary part changed overhaul of T5806, T5807 and T5808 SIEMENS produced steam turbines at plant shutdowns; vibration diagnostics measurements. AES-II TISZAI ERŐMŰ LTD. (AES-II Tiszai Power Plant Ltd.) 2002 • Reparation and enlarging of the instrument air system. MÁTRAI ERŐMŰ CO. ( Mátra Power Plant Co.) 2002 • Reparation of NA 1000 and NA 250 plumbings (accessories). EASTERN Sugar Co./Kaba 2002-2005 • Renovation and reparation of DRESSER and GROH Type blowers. • Technical survey and rotor overhaul of No. 29. and No. 30 steam turbines. NYÍREGYHÁZI ERŐMŰ CO. (Power Plant Nyíregyháza Co.) 2002-2003 • Reparation of a 11,2 MW performance steam-turbine/generator unit. SZELENCE LTD. 2003 • Reparation of EVM 200/540-II type vacuum pump.

TLW Ltd. Main References / May 18, 2009

4/9.

PAKSI ATOMERŐMŰ ZRT. (Nuclear Power Station Co. / Paks) 2003-2009 • Reparation of filter fillings of generator’s bearing oil. • Designing, manufacturing repairing of filter fillings of generator’s bearing oil. MONDI BP Zrt. (previously NEUSIDLER ZRt.) 2001-2007 • Reparation of pump Nr. DC 200/400 M. • Technical survey and overhaul of 5,2 MW steamturbine-generator unit. • Vibration diagnostics and regulator cleaning of an 5,2 MW stematurbine. • Preparation of a PM 8 type paper production line. • Preparation of 21 pump, fitting duocone seals. MÁTRA POWER PLANT ZRT. 2002-2008 • Repair of NA 1000-1200 closing valves, repair of NA 250 equipments. • Maintenance of 2 items of NA 1600 slam type lock (U 128, U 129) at the 3rd block. SYNERGY KFT. 2007 • Pumps repairs.

IV. Expert consultancy, technical diagnostic survey, requirement-systems, design MOL Rt. (Hungarian Oil and Gas Co.) 1994-2001 • Exploration & Production Division / Szeged Plant / Gas Preparation Unit “E”: Technical diagnostic survey of mechanical equipment (pressure vessels, rotating machines, pipelines, safety valves, ferro-concrete foundations, hightemperature insulations, steel constructions). All data were captured, processed and presented in a computer based data processing system (GRAFOSZ 1.0). Project preparation and implementation were supported by computer based network management and resource. • Exploration & Production Division / Szeged Plant: Working out of requirement-system for contracts concerning construction and servicing. Elaboration of “Technical Requirements” for contracts regarding construction and service suppliers. • Exploration & Production Division / Gas and Oil Transport Department: Review of Maintenance Technology Approach and Maintenance Technology Instructions. • Exploration & Production Division / Szeged Plant / Gas Preparation Unit: Technical diagnostic survey of 4 tubular furnaces. • Exploration & Production Division / Szeged Plant/ Gas Preparation Unit: Design activity: • Detailed design of amendments required by trial run of H2S removal facility. • Detailed design of modified piping between facilities H2S removal and KÖGÜ, enabling further coupling of there facilities. • Detailed design for erection of the main pumps "MOYNO 9H065G1 SSO-XDBB" of the H2S removal facility. • Exploration & Production Division / Szeged Plant / Hydrogen Sulphide Removal Facility LO-CAT II: Technical inspection and qualification. Partner: Tecnimont S.p.A Milano, Italy • Exploration & Production Division / Szeged Plant: Technical requirements' system relating to perforation prevention in carbon steel underground pipes transporting hydrocarbon. Technical requirements' system relating to perforation prevention in synthetic pipes transporting water. • Szeged Plant / Storage Tank Farm F-10: Technical survey of AUDCO ROCKWELL armatures, specification of repair technology, cost estimation and finally performing domestic overhaul of the armatures (100 pcs). • Exploration & Production Division / Kiskunhalas Plant / Engineering Co-ordination: Development and continuous operating of Computer Aided Maintenance System • Exploration & Production Division / Szeged Plant: Technical evaluation of the wellhead armature’s failure at the gas well ALG 1001. • Exploration & Production Division / Szeged Plant: Survey of 21 well pipehead armatures. • Exploration & Production Division / Szeged Plant/ Gas Preparation Unit: Detailed design of exchanger’s header II-T-1. • Exploration & Production Division / Szeged Plant: Expert's opinion relating to supplement of missing quality assurance documents for appliances. Elaboration of expert’s report for replacement of armatures’ quality statement documents. • Exploration & Production Division / Szeged Plant: Elaboration of expert’s report to solve operational problems of heat exchangers H09 and H12 of main collector. • Exploration & Production Division / Szeged Plant/ StorageTank Farm E-10: Development of painting technology and related economical analysis for spherical product containers. • Exploration & Production Division / Szeged Plant: Examination of technical problems of reciprocating gas compressor. • Exploration & Production Division / Szeged Plant: Examination of performance reciprocating compressor driven by gas engine. TLW Ltd. Main References / May 18, 2009

5/9.

• • • • • • • • •

Expert examination of dewaxing lubricator pipes, substitution of the missing documentation, complete of the necessary repairs. Exploration & Production Division / Szeged Plant / Pressure Booster Plant: Definition of pressure pulsation in the pipeline system of compressor K-711. Exploration & Production Division / Szeged Plant: Study about the modification of K-701 gas engine pipeline. Exploration & Production Division / Szeged Plant / “NF” Plant: Study about modernisation of ignition system of Ganz gas engines (14 pcs) type 18PA4V185GE-C. Exploration & Production Division / Szeged Plant: Register and structural examination of atmospheric storage tanks of inflammable fluids, fusions and intoxicants, substitution of the essential documentation. Exploration & Production Division / Szeged Plant: Expert opinion about T-9 oil line’s failure of oil well Sze 28. Szeged Plant : “15 years expert opinion” of tank park 400 m3 ball tank No. „E-10” marked 401. Overhaul of DRESSER-CLARK compressor gas-engine units type HMB10, emission reduction of gas engine. Refining, Supervision of stoker for safe operating, Százhalombatta.

TVK Nyrt. (Tisza Chemical Combine Co.) / Tiszaújváros: 1995-2008 • Technical diagnostic survey of the idle Polypropylene Plant I.; technical and economical investigation and in-depth study on relocation of this plant to other country. Partner: Tecnimont S.p.A. Milano, Italy. • Complete mechanical planning of a tubular bridge pipe network. RICHTER GEDEON Vegyészeti Gyár Rt. (Richter Gedeon Chemical Works Co.) / Budapest 1997-1999 • Inspection and review of processing plant’s ventilator system (design). • Complete planning of technical store and fireguard basis. PAKSI ATOMERŐMŰ Zrt. (Nuclear Power Plant PAKS) 2008 • Preparing a technical expert survey about the chechking, maintaining, replacing of fire-stop valves. NITROGÉNMŰVEK ZRT. (Nitrogen Works Co., Pét) 1997 • Nitrogen Fertiliser Plant: Design activity for debottlenecking project. • Urea Plant: Design of new adsorber and modification of exiting reactor. DUNASTYR Co. / Százhalombatta 1997-2004 • Expert survey and evaluation of the possible causes leading to heavy damage of a 600 m3 pellet silo. • Storage hall capacity enlargement study. • Examination of the damage silo with special 3D laser scanning technology, making an expert proposal. GEOINFORM Co. / Szolnok 1998 • Expert’s report and structural inspection of BSB mobile measuring separator of 100 bar authorized pressure. FCI CONNECTORS HUNGARY LTD. 200-2001 • Performance of technical supervision during the construction of the new workshop hall & office complex of FCI. BESTFOODS HUNGARY LTD./UNILEVER HUNGARY Ltd. 2000-2002 • Examination of boiler typ. TP-600/12-G and AKH-2/12, prepare for the official examination. • Expert opinion of blending room’s dust collector system. • Rákospalota , Röszke Plants: Maintenance organisation. (Total Productive Maintenance, CMMS settlement) MIFROVIT Miskolci Hűtőipari Rt. (MIFROVIT Refrigerating Industry Co.)/Miskolc 2001 • Examination of cooling reciprocating compressors’ principal axis. KABAI CUKORGYÁR RT. (Sugar Mill Co) / Kaba 2001 • Noise-reducing of reciprocating compressors (2 pcs) planning and construction. EVONIK-AGROFERM Co.: 2002 • Mechanical examination and reparation of a SZ70-1 234/A sliding spin. • Nádudvar Plant: Examination of the ammonia and sulphuric acid pipes, and sulphuric acid tank. CHINOIN Co. 2002 TLW Ltd. Main References / May 18, 2009

6/9.

• •

Production planning of a 3,15 m3 large acid-resistance extractor. Planning of the No.738 tank park. ( 6 of 20m3 and 3 of 50m3 acid-resistance tanks)

LINDE Gáz Magyarország Co. ( Linde Gas Hungary Co.) 2002-2009 • Expert Report about the examination of the C1161 and C1461 compressors in Kazincbarcika. • Expert Report about the vibration and greasing diagnostical examination of the C1608 and C1408 compressors in the Dunaújváros Plant. • Supervision and technical expert of masonry of the reformer furnace. • Kazincbarcika – Classification according to PED of pressure vessels, pipes, safety valves at ASU, HYCO-1 and HYCO-2 plants. Preparing of Control plan and Computer based documentation. Developing of „0” statement. • Make HAZOP analysis at the Gas bottle loader plant. • Mechanical examination of a reciprocating compressor with a FREE Floating Piston C-1408 produced by NEA. HOLCIM Hungária Co. (Hejőcsaba Lime Plant Co. / Miskolc) 2003 • State examination of Maerz furnace’s chimney. SLOVNAFT FCC Plant 2003 • Examination report about failure of No. 13 B 101 steam turbine-air compressor unit on behalf of TÜV Rheinland InterCert. COLUMBIAN TISZAI KOROMGYÁR KFT. (Columbian Tiszai Soot Manufacturing Ltd.) 2005-2008 • Expert opinion of steam boiler technical condition, plant equipment works number: 6038. • Tail-gas plant Own frequency examination of a G71 gas turbine and related BASF generator aggregate with a final item method. • Expert opinion about the mechanical status of a 34-06-01 signed, 1000 m3 volumed storage tank. EBEPLAN Kft. Szombathely 2005 • Repair of PGW compressor and making documentation of connectig pipelines, for authorization of PED standard. TRANS-SPED LTD. Tiszaújváros, Debrecen 2007 • Implementation of CMMS system, maintenance management. TUV Rheinland InterCert Ltd. 2007-2009 • Taking part in RBI/RCM implementation project at Slovnaft, Bratislava. AKZO Nobel Coatings Zrt. 2007 • Cleaning and structural examination of T-24 etilalcohol tank.

V. Development of quality assurance system and company images management consultancy PETROLSZERVÍZ Oil Industry Maintenance and Building Ltd. / Szeged 1995 • Development and introduction of quality assurance system according to ISO 9002:1994. Partner: MACRO-TQI Ltd. • Prepare of indoor standard and machine book in the field of quality development. PANNONPETROLEUM Hydrocarbon Industry Servicing Ltd. / Gellénháza 1995 • Development and introduction of quality assurance system according to ISO 9002:1994. Partner: MACRO-TQI Ltd. DIÁSZ Servicing Ltd. / Szeged 1996 • Development and introduction of quality assurance system according to ISO 9002:1994. Partner: MACRO-TQI Ltd. MOL Rt. (Hungarian Oil and Gas Co.) / Exploration & Production Division / Kiskunhalas Plant 1996 • Engineering Co-ordination: Development of quality assurance system according to ISO 9002:1994. Partner: MACROTQI Ltd. GÉPSZER-BORSOD Ltd. 1996 TLW Ltd. Main References / May 18, 2009

7/9.



Development and introduction of quality assurance system according to ISO 9002:1994., face planning.

HAJDÚ és TÁRSAI Ltd. 1996 • Development and introduction of quality assurance system according to ISO 9002:1994. TURBO TEAM Ltd. 1996-1997 • Development and introduction of quality assurance system according to ISO 9001:1994., face planning. GEOFOR Ltd. 1997 •

Development and introduction of quality assurance system according to ISO 9001:1994., face planning.

MÉRTÉK Ltd. 1997-1998 •

Development and introduction of quality assurance system according to ISO 9002:1994.

TÜV RHEINLAND INTERCERT Ltd. 2005 • Concerning at any investment working out of uniformised documentation system and “O” status recording. PAKSI ATOMERŐMŰ ZRT. (Nuclear Power Station Co. / Paks) 2006 • Adaptation of Maintenance and control system by ASME standard.

VI. Engine diagnostic, vibration diagnostic LINDE Gáz Magyarország Zrt. (LINDE Gas Hungary Co. / Kazincbarcika) 2002-2009 • Examination of No. C1107 gas stack ventilator. • Examination of DEMAG type No. C 1461 N2 circulating and No. C 1161 air compressors. • Vibration examination of No. P-1671/A-B methane pump • Diagnostical examination of No. E 1521 gas after-cooler dismounted tube nest. • Continuous vibration diagnostics of rotating machines at HYCO-1, HYCO-2, ASU plants/Kazincbarcika. GE Lighting Tungsram Co. 2003-2007 • Vibration diagnostical examination of 19 different ventilator in the Vacuum Engineering and Machine Plant. • Condition monitoring and repairing of dust vent hoods. EVONIK-AGROFERM Co. 2003-2009 • Twin balancing of Decenter in place. • Vibration diagnostical examination of rotating machines. AES-II. Tiszai Erőmű Kft. (AES-Tisza Power Plant Ltd.) 2003-2009 • Vibration test of No. 1. block’s rotating machine. • Vibration examination of No. 1-4. block’s ventilators (recirculation and pressure ventilators) balancing in place. NEUSIEDLER Co. / Szolnok 2003-2007 • Vibration test of rotating machines. EASTERN SUGAR CO. / KABA 2003-2007 • Vibration survey of turbo aggregate. MÁTRAI ERŐMŰ RT. (Mátra Power Plant Co. / Visonta) 2003-2008 • Balancing of grid blow on place.

TLW Ltd. Main References / May 18, 2009

8/9.

BUDAPESTI ERŐMŰ Zrt. 2003 • Vibration diagnostical examination of rotating machines. AJKAI ERŐMŰ Zrt. 2003-2009 • Vibration diagnostical examination of rotating machines. UNILEVER Magyarország Zrt. 2004-2006 • Vibration diagnostical examination of rotating machines. LUKOR Rt.-UKRANIE 2005-2006 • Vibration diagnostical examination of ethylene turbine. TVK POWER PLANT 2004 • Vibration diagnostical examination of cooling fan. TAGHLEEF INDUSTRIES (previously RADICIFILM Kft.) 2005-2009 • Continuous vibration diagnostical examination of rotating machines. DUNAPACK Zrt. 2005-2008 • Balancing of 10 MW generator on place. • Vibration diagnostical examination of turbo aggregate and local balancing of a turbo generator COLUMBIAN TISZAI KOROMGYÁRTÓ KFT. (Columbian Tiszai Soot Manufacturing Ltd.) 2005-2009 • Ad hoc vibration diagnostical examination and local balancing of rotating machines. • Tail-gas plant Own frequency examination of a G71 gas turbine and related BASF generator aggregate with a final item method.

VII. Operating and start up of plants IRAN, CHINA, RUSSIA, NIGERIA 1993-1996 • Participate in start up of polypropylene plant. Partner: Technimont Milano. TENGIZ, KAZAHSTAN 1994 • Recruit and employ qualified Hungarian technical experts, partner: Vegyépszer Rt. FCI CONNECTORS HUNGARY LTD. 2000 • Moving of FCI Co’s machineries, warehouses and offices to the new site, co-operation in re-running. AIR LIQUIDE CO.-DANMARK 2004 • Disassembling of air compressor and parts, transporting to Hungary.

VIII. Repair of concrete constructions AES TISZAI ERŐMŰ ZRT. (Tisza Power Station Co.) / Tiszaújváros: 1994 • Restoration of 250 m reinforced concrete chimney damaged by helicopter crash. Partner: Alphatec Mérnökiroda Kft. (Alphatec Engineering Bureau Ltd.)

TLW Ltd. Main References / May 18, 2009

9/9.

MOL Nyrt. (Hungarian Oil and Gas Co.) 1994-1996 • Exploration & Production Division / Szeged Plant: Repair of pump aggregate N° FO-5 foundation at the main collector. Partner: Alphatec Mérnökiroda Kft. (Alphatec Engineering Office Ltd.) • Exploration & Production Division / Szeged Plant / Water Feedback System: Repair of foundations of pumps N° 6 and 8 (type CNSZ 180-1900) and assembly of new pump-drive unit. Partner: ÚTVASÚT Ltd. NITROGÉNMŰVEK ZRT. (Nitrogen Works Co.) 1997-2005 • Hamon water-cooler towers: Repair of concrete constructions. • Grout repair of GTT-3M steam turbines ferroconcrete base at acid plant III. TVK Nyrt. (Tisza Chemical Combine Co.) 2005-2006 • Overhaul of VI.-VII. recirculatory cooling towers’ concrete structures. Romania, Marosvásárhely 2005 • Compressor base repairing with injection method at 3 pcs Thomassen piston compressors.

IX. Tank examinations and reconstructions COLUMBIAN TISZAI KOROMGYÁRTÓ Kft. (Columbian Tiszai Soot Manufacturing Ltd.) 2006•

Purging and technical survey of 3000 m3 No. 34-02-01 quenchoil tanks.

2007 2008



Expertise of a 3000 m3 No. 34-03-01 quenchoil tank ’s mechanical status



Change of a 3000 m3 No. 34-03-01 quenchoil tank’s base plate



Partial cleaning of a 3000 m3 No. 34-02-01 quenchoil tank , check and repair of its base rings and base plates with low frequency scanning



Repair of a 1000 m3 No. 2900-3 reservoir tank



Examination of a 2000 m3 2007 A reservoir tank



System conversion and tank setting in a gas motor compression unit Type Waukesha 7042 GL No. K-724, 726,728



15-year expertise of a globe tank No. 3337021



Planning of a tank park No. 738

MOL NyRt. 1997

1998 1999 2000 CHINOIN RT. 2002

TLW Ltd. Main References / May 18, 2009

10/9.

X. Commercial and representative activities THOMASSEN COMPRESSION SYSTEM B.V. 2003-2009 • Full scale Hungarian dealership and representation. PROGNOST GmbH. 2007-2009 • Full scale Hungarian, Checz and Slovak dealership and representation. COLUMBIAN TISZAI KOROMGYÁRTÓ Kft. (Columbian Tiszai Soot Manufacturing Ltd.) 2008-2009 • Continuous spare parts supply for a 10 MW tail gas fired power plant (turbine, generator, gear-box etc.). CHINOIN Co., Budapest 1994-1998 • Sale of dead stocks and retired mechanical and electrical equipment and apparatus. • Trading of technical materials and spare parts.

XI. Commercialism HAUN INDUSTRIES Distributor Company (USA) 1998-2000 • Exclusive trading representation for the territory of Hungary and Ukraine (Waukesha gas engines, Ingersoll Rand compressors etc.).

Adjusting plates From 2003



Exclusive steel-jointing adjusting plates dealership and representation.