The Role of PLN in Promoting Solar PV in Indonesia

The Role of PLN in Promoting Solar PV in Indonesia Workshop of Renewable Energy Project Development Programme Southeast Asia Organised by The Deutsch...
Author: Belinda Lloyd
2 downloads 3 Views 500KB Size
The Role of PLN in Promoting Solar PV in Indonesia Workshop of Renewable Energy Project Development Programme Southeast Asia Organised by

The Deutsche Gasellschaft fuer Internationale Zusammenarbeit (GIZ) and the German Chamber of Commerce in Indoensia (EKONID) March 2012

Background of Solar PV Utilisation in PLN • • • • • • •

Accelerate electrification ratio for remote area. Reducing oil dependency. Security supply of fuel. Reducing oil cost. Reducing and decelerate environmental impact. Community education in energy consumption Generate and Stimulate Local Economic Activity

Road Map of Solar PV Programme in PLN Capacity, MWp

90 80

70

70

2015

2016

75

75

2017

2018

80

80

2019

2020

70 60 60 50 50 40 30 30 20 10 2 0 2011

2012

2013

2014

Year

What is in the past, current and future of PLN’s Solar PV projects? Solar PV Development: 1. Solar PV Development Program in 6 tourist destinations islands : Operation 2. Solar PV Development Program in 9 remote isles: 5 locations operation, 4 locations COD May 2012 3. Solar PV Development Program in 100 Locations in Eastern Indonesia Region: 36 locations in construction (COD June 2012). 78 locations in tender preparation. 4. Solar PV Development Program in 1000 locations: Planning Finalisation (2013 - 2016)

Capacity, kWp

Realisation and Target Capacity of PV Solar in PLN Year 2010 to 2013 60,000

50,000

50,000

40,000

30,000

20,000

10,545 10,000

920

1,820

2010

2011

2012

Year

2013

Identified Locations of Solar PV Development (Potential Solar PV Market) BUSINESS REGION

NUMBER OF LOCATION

TOTAL CAPACITY (kWp)

Western Indonesia

366

62,13%

63,450

61%

Java Bali

21

3,57%

7,500

7%

Eastern Indonesia

202

34,30%

32,500

32%

Sum

589

103,450

Number and Percentage of Proposed PV-PP by Type (Potential Solar PV Market)

222 locations, 38%

322 locations, 55%

OFF GRID

45 locations, 7%

ON GRID HIBRID

Number of Location

Identified Capacity of Solar PV Development (Potential Solar PV Market) 250

200

150

100

50

0 50

100

150

200

250

300

350

400

450

Capacity of PV-PP HIBRID

ON GRID

OFF GRID

500

550

750

1000

Identified Potential Existing Grid System To Be Connected Large Scale PV System For IPP (Potential Solar PV Market) 1. 2. 3. 4.

Planned Scheme Number Location Estimated PV Capacity Location - Kalimantan Selatan - Kalimantan Tengah - Kalimantan Timur - Kalimantan Utara - Sulawesi Utara - Sulawesi Tengah

: IPP (Independent Power Producer). : 71 Sub Systems. : 306. 500 MWp : - Sulawesi Tenggara - Maluku - Maluku Utara - Papua - Papua Barat - Tenggara Barat - Nusa Tenggara Timur

PV AND WIND POWER PLANT PROJECTS OF PLN INDONESIA -Average Solar Irradiation between 4 – 6 kW/m2 . Most higher radiation is in Eastern of Indonesia - Estimating, the radiation can generate energy about 3.7 kWh/day.

EAST KALIMANTAN

EAST KALIMANTAN

Location: SEBATIK SEBATIK Island Capacity : 300 kWp Status : Construction

Location: DERAWAN Island Capacity : 170 kWp + Battery Status : Operation on March 2011

RIAU&KEPRI

EAST KALIMANTAN

NORTH MALUKU

NORTH SULAWESI

Location: MORO. KARIMUN Island Capacity: 200 kWp Status : Construction

Location: BUNYU BUNYU Island Capacity : 150 kWp Status : On Tender

Location : MOROTAI Island Capacity : 600 kWp Status: Operation on April 2012

Location : MARAMPIT Island Capacity : 50 kWp Status : Construction

RIAU&KEPRI Location: TAREMPA ANAMBAS Island Capacity: 200 kWp Status : Construction

NORTH SULAWESI Location : MIANGAS Island Capacity : 30 kWp Status : Operation on Oct 2011

NORTH SULAWESI Location : BUNAKEN Island Capacity : 335 kWp + Battery Status : Operation on Feb. 2011

WEST SUMATERA Location: SIMALEPET SIPORA Island Capacity: 40 kWp Status : Construction

WEST NUSA TENGGARA

SOUTH SULAWESI

Location : GILI TRAWANGAN Capacity : 200 kWp Status : Operation on Feb 2011

Location: TOMIA Island Capacity : 75 kWp Status : Operation on May 2011

PAPUA Location: SAONEK RAJA AMPAT Islands Capacity : 40 kWp Status : Operation on Dec. 2010

MALUKU WEST SUMATERA

Location: BANDA NAIRA Capacity : 100 kWp Status : Operation on Dec. 2010

Location: TUA PEJAT SIPORA Island Capacity: 150 kWp Status : Construction

: Wind Turbine Projects : Photovoltaic Projects

BALI

EAST NUSATENGGARA

Location : NUSA PENIDA Capacity : 3x85 kW Status : Existing owned by PLN

Location: LEMBATA Capacity : 200 kWp Status : Operation on Sept 2011