The New Line Copenhagen – Ringsted General description of TP 50 TP 50 earth and construction work stretches from St. 31+152, with the contract boundary being at the southern abutment of S-BRA-07, OP of Lille Syd, and ends at St. 54+200 This package covers the last 23 km of the new line Copenhagen – Ringsted. It includes bridge structures, as well as roads, fauna passages, retaining walls and embankments up to and included first layer of sub ballast. Also a number of roads will have to be either, relocated or reconstructed. The earthwork at the alignment includes both local earth balances as well as total earth balance. The earth works includes the utility relocation where the contractor is to act as trench excavation contractor, as well as the removal of dead piles and cables within permanently expropriated areas. Special attentions should be paid to the crossing of M20 Vestmotorvejen and close to or across the existing main railway line Copenhagen – Ringsted, which could give rise to challenges during construction.
Design and build TP 50
Being the Employer, Banedanmark requires the Contractor to design and build the following permanent civil works. General items
St. 31+152 - 54+200 31+152 - 54+200 31+152 - 54+200
Item Description Temporary dewatering of groundwater during construction phase Preparation of spoil areas Handling of topsoil along existing roads (0-1 m from pavement) as mildly contaminated Preparation of plans for traffic diversions during construction phase Foundations for overhead catenary system (optional) Embankments and excavation for railway Sub ballast and lower layer ballast on embankment Drainage of railway embankment and cuttings including pumping stations and rainwater basins
The New Line Copenhagen – Ringsted
Structures
St.
Item description
ID No.
31+540
UP Road to rainwater basin
S-TU-13
31+689
UP Ramps for M10
S-BRA-08
31+715
OP path (Skolestien) crossing new ramps
S-TU-09
31+832
UP Lyngvej/Nordhøj
S-BRA-09
31+875
OP path (Skolestien) crossing Nordhøj
S-TU-10
32+078
UP Path (Skolestien) and faunapassage
S-TU-11
32+695
OP Ølbyvej
S-BRO-05
35+141
OP Højelsesvej
W-BRO-01
35+755
UP Tranemose bæk
W-F-04
35+976
UP Salbyvej
W-BRA-01
37+630
UP Køge å
W-BRA-02
37+998
OP Ejbyvej
W-BRO-02
40+432
Vindegårdsvandløbet, dry passage
W-BRA-03
40+986
UP Bjæverskovvej
W-BRA-04
41+296
UP Teglværksvej
W-BRA-05
42+086
UP Regnemarksværket and faunapassage
W-BRA-06
43+841
OP Vestre Ringvej
W-BRO-03
44+860
UP Slimminge å
W-BRA-07
45+948
OP Bøgedevej
W-BRO-04
46+410
UP Bøgedevandløbet
W-F-16
48+045
OP M20 Vestmotorvejen
W-BRO-05
48+351
OP Humleorevej
W-BRO-06
48+835
UP Fjællebroløbet
W-F-17
The New Line Copenhagen – Ringsted
Structures
St.
Item description
ID No.
49+604
UP Køgevej
W-BRO-09
49+692
UP Vigersdal å
W-F-19
50+419
Demolishment of OP existing Bedstedvej
50+450
New Overpass (approx. location)
52+558
Demolishment of OP existing Adamshøjvej
54+111
UP Østre Ringvej
The New Line Copenhagen – Ringsted
W-BRO-10
W-BRA-10
Roads and Paths, in addition to those crossing on / below structures St. Item description ID No. 31+330 31+540
Skolestien, permanent relocation Vej til regnvandsbassin
31+610
Vej bagom Statoil
31+860
Skolestien del 2
31+685
Road between Lyngvej and Nordhøj
32+400
Tilslutning til Ølbyvej nord
32+400
Tilslutning til Ølbyvej syd
32+700
Pilegårdsvej
33+000
Turning space Pilegårdsvej
32+400
Temporary Ølbyvej
35+150
Højelsevej, raised verticalt alignment.
35+975
Salbyvej, lower vertical alignment
35+975
Temporary Salbyvej
36+600
Salby Lokalvej, permanent relocation
38+000
Ejbyvej, raised vertical alignment
40+980
Bjæverskovvej, permanent relocation
38+690
Mellemvej, new connection to Bjæverskovvej
39+490
Access to farm, new connection to Bjæverskovvej
39+440
Spanagervej, new connection to Bjæverskovvej.
W-RO-03
40+290
Skulkerupvej, new connection to Bjæverskovvej
W-RO-04
40+420
Access to farm, new connection to Bjæverskovvej
45+940
Temporary Bøgedevej
46+000
Access road north, new access to Bøgedevej
48+000
Traffic relocation M20 Vestmotorvejen
48+600
Kongstedvej, permanent relocation
W-RO-07
48+900
Path nearby Kongstedvej, new path connecting to existing
W-RO-08
48+350
Temporary Humleorevej
52+450
Access road, new connection to Adamshøjvej (Approx. Location)
52+450
Road, Access road connecting Bedstedvej to new road across railway. (Approx. Location)
52+450
Road, New road connecting Adamshøjvej and Bedstedvej. (Approx. Location)
52+450
Road, Access road connecting Adamshøjvej to new road across railway. (Approx. Location)
54+100
Traffic relocation Østre Ringvej
The New Line Copenhagen – Ringsted
S-RO-11
W-RO-01
W-RO-02
Retaining Walls and noise screens
St.
Item description
ID No.
38+300 – 38+500
Retaining wall along ramp (left side of New Line)
W-RE-08
42+100 – 42+495
Retaining wall after Regnemarksværket (left side of New Line Retaining wall after Regnemarksværket (right side of New Line) Retaining wall before Vestre Ringvej (left side of New Line) Retaining wall at Vestmotorvejen (left side of New Line) Retaining wall at Vestmotorvejen (right side of New Line) Retaining wall before Kværkeby (left side of New Line) Noise Screen (st. are approx.)
W-RE-07a
42+240 – 42+365 43+700 – 43+825 47+920 – 47+970 48+120 – 48+158 48+930 – 48+950 49+200 – 49+700
W-RE-07b W-RE-06 W-RE-09 W-RE-10 W-RE-11 W-NS-01
Earthworks All earthworks, drainage etc. necessary for construction and functioning during operation phase of embankments and cuttings, incl. turnouts and sidings, along the alignment up to and included first layer of ballast according to BN1-6 from St. 31+152 54+200, are included in this tender package. The overall earth balance for this tender package has been designed by Banedanmark. The Contractor shall make a detailed design for the earth handling within the contract limits. Overview An overview of the contract limits associated to TP40 is presented in the drawings: TSNCX_1_030000_001, Rev. C, preliminary TSNCX_1_034000_001, Rev. C, preliminary TSNCX_1_038000_001, Rev. C, preliminary TSNCX_1_042000_001, Rev. C, preliminary TSNCX_1_046000_001, Rev. C, preliminary TSNCX_1_052000_001, Rev. C, preliminary
Forfatteren har det fulde ansvar for denne publikation. Den Europæiske Union fralægger sig ethvert ansvar for brugen af oplysningerne i publikationen.