Bid Tabulation
Technical Specifications Part One Glass by Unit Cost Most commonly used Company: Moderno Glass & Mirror LLC THICKNESS INCHES(DBL INSUL...
Technical Specifications Part One Glass by Unit Cost Most commonly used Company: Moderno Glass & Mirror LLC THICKNESS INCHES(DBL INSULATED)
TYPE
1. 19 ¼ x 33 ¾
9/16
2. 19 ¼ x 33
9/16
SIZE (INCHES)
LOCATION
Material
Hourly
Cleveland and Piedmont
Cost
Labor Cost
CLEAR
UNITS
$44.84
$79.00
CLEAR
OFFICE BLD CLEVELAND ONLY
$44.87
$79.00
3. 19 ¼ x 25 ¼
9/16
CLEAR
UNITS
$34.31
$79.00
4. 11 ¼ x 33 ¾
9/16
CLEAR & OSB FROSTED
UNIT KITCHEN
$55.00
$79.00
CLEVELAND ONLY
5. 11 ¼ x 13 ¾
9/16
OSB FROSTED
UNIT BATH
$55.00
$79.00
6. 8 1/8 x 16 ¼
9/16
OSB FROSTED
UNITS CLEVELAND ONLY
$55.00
$79.00
7. 19 ¼ x 25 ¼
9/16
CLEAR
UNITS
$34.31
$79.00
$55.00
$79.00
PIEDMONT ONLY
8. 8 1/8 X 13 5/8
9/16
OSB FROSTED
UNITS PIEDMONT ONLY
Part Two Glass Per: Square Foot 1. 3/8” Thick Insulated Material Cost $ 9.50
Hourly Labor Cost $8.00 to $79.00
SERVICE CHARGE AFTER THAT IS $29.00 2. 7/16” Thick Insulated Material Cost $9.50 3. 1/2” Thick Insulated Material Cost $9.50 4. 5/8” Thick insulated Material Cost $9.50 5. 7/8” Thick insulated Material Cost $$9.50
Thick mirror Material Cost $7.00 Labor Cost $Service charge
$8.00 to $79.00 after that $29.00 hourly
2.
1/8”
Thick mirror Material Cost $4.00 Labor Cost $0.00
Part Four Miscellaneous Window Parts 1. Window Balance # 2020-21 (Large) Material Cost $7.50 Labor Cost $79.00 service charge after that $29.00 an hour
2. Window Balance #1220-12 (Medium) Material Cost $7.00 Labor Cost $79.00 service charge after that $29.00 an hour
3. Top Sash Guide – White Material Cost $2.50 Labor Cost $79.00 service charge after that $29.00 an hour
4. Vent Lock – White Material Cost $1.50 Labor Cost $79.00 service charge after that $29.00 an hour
5. Take Out Clip Material Cost $0.25 Labor Cost $79.00 service charge after that $29.00 an hour
6. Make New Window Screens to Measurement (Max Per Sq. Ft.) Material Cost $1.50 Labor Cost $0.00 7. Rescreen a Frame (Max 16 Sq. Ft.) Repair Any Size. Material Cost $8.00 Labor Cost $__________
Part Five Storm/Security Door Parts Brand: Larson Only SLIDING GLASS FRAME PARTS
1. Left latch zinc lock
Material Cost $0.99
2. Right latch zinc lock
Material Cost $0.99
3. Key replacement kit
Material Cost $3.26
4. Latch spring
Material Cost $0.22
Hourly Labor Cost $8.00 at the shop Hourly Labor Cost $8.00 at the shop Hourly Labor Cost $8.00 at the shop Hourly Labor Cost $8.00 at the shop
STORM/SECURITY DOOR LOCK Brand: LARSON ONLY MODEL #221-SC
5. Mortise Security lock with key, brushed nickel, 20239417 Material Cost $45.00
Hourly Labor Cost $79.00
6. REPLACEMENT GLASS Material Cost $48.00
7.
Hourly Labor Cost $79.00 after that hourly rate $29.00
1/8” THICK ANNEALED / TEMPERED GLASS BY SQ. FT. Material Cost $5.50
Hourly Labor Cost $_0.00
Labor Hours 8. Installation of entire window: removal of old, disposal and installation of new, to include any trimmings and /or caulking. Excluding any unforeseen issues. Labor Rate 8:30 a.m. – 5:00 p.m. Friday- Thursday
$280.00 to $320.00
9. Installation of glass in existing frame. Labor Rate 8:30 a.m. – 5:00 p.m. Friday- Thursday
$79.00
10. After Hours, Emergency Hour Labor. Labor Rate Friday- Sunday
$150.00
11. Store Front Availability Glass Replacement Sq. Ft. (Tempered) $220.00 Temp Glass $320.00 Laminated or Plexy Glass Flat Rate 12. Standard Sash Size Replacement 36” x 2’6” or less (white) $80.00 Sash over/above standard Size $120.00
Bid Form
Technical Specifications Part One Glass by Unit Cost Most commonly used Company: Quality Glass Service Inc. THICKNESS INCHES(DBL INSULATED)
TYPE
1. 19 ¼ x 33 ¾
9/16
2. 19 ¼ x 33
9/16
SIZE (INCHES)
LOCATION
Material
Hourly
Cleveland and Piedmont
Cost
Labor Cost
CLEAR
UNITS
$34.23
$68.00
CLEAR
OFFICE BLD CLEVELAND ONLY
$34.23
$68.00 $68.00
3. 19 ¼ x 25 ¼
9/16
CLEAR
UNITS
$26.18
4. 11 ¼ x 33 ¾
9/16
CLEAR & OSB FROSTED
UNIT KITCHEN
$c1. $21.75 $68.00
CLEVELAND ONLY
osb $25.50
5. 11 ¼ x 13 ¾
9/16
OSB FROSTED
UNIT BATH
$25.50
$68.00
6. 8 1/8 x 16 ¼
9/16
OSB FROSTED
UNITS CLEVELAND ONLY
$25.50
$68.00
7. 19 ¼ x 25 ¼
9/16
CLEAR
UNITS
$26.18
$68.00
$25.50
$68.00
PIEDMONT ONLY
8. 8 1/8 X 13 5/8
9/16
OSB FROSTED
UNITS PIEDMONT ONLY
Part Two Glass Per: Square Foot 1. 3/8” Thick Insulated
9. ¼” Thick clear tempered glass Material Cost $5.75 Hourly Labor Cost$68.00 3sq. ft min.
10. ¼” Thick clear wire glass
Material Cost $20.00 Hourly Labor Cost $68.00
3sq. ft min.
11. 9/16 Thick Insulated 3sq. ft min.
Material Cost $7.25 Hourly Labor Cost $68.00
Part Three Mirror Glass By: Square Foot 1. ¼”
2.
1/8”
Thick mirror Material Cost $4.65 Labor Cost $68.00
Thick mirror Material Cost $4.00 Labor Cost $68.00
Part Four Miscellaneous Window Parts 1. Window Balance # 2020-21 (Large) Material Cost $_________ Labor Cost $__________ QUOTE PER JOB WILL REQUIRE ORIGINAL MANUFACTURED PARTS 2.
Window Balance #1220-12 (Medium) Material Cost $_________ Labor Cost $__________ QUOTE PER JOB WILL REQUIRE ORIGINAL MANUFACTURED PARTS
3. Top Sash Guide – White Material Cost $_________ Labor Cost $__________ QUOTE PER JOB WILL REQUIRE ORIGINAL MANUFACTURED PARTS
4. Vent Lock – White Material Cost $_________ Labor Cost $__________ QUOTE PER JOB WILL REQUIRE ORIGINAL MANUFACTURED PARTS
5. Take Out Clip Material Cost ________ Labor Cost______ QUOTE PER JOB WILL REQUIRE ORIGINAL MANUFACTURED PARTS.
6. Make New Window Screens to Measurement (Max Per Sq. Ft.) Material Cost$.28 Labor Cost $68.00 United Inch 7. Rescreen a Frame (Max 16 Sq. Ft.) Material Cost $15.00 Labor Cost $68.00
Part Five Storm/Security Door Parts Brand: Larson Only SLIDING GLASS FRAME PARTS 1
Left latch zinc lock
Material Cost $_________
Hourly Labor Cost $68.00 Quote Per
job/will require original parts
2
Right latch zinc lock
Material Cost $_________
Hourly Labor Cost $68.00 Quote Per
job/will require original parts
3
Key replacement kit
Material Cost $_________
Hourly Labor Cost $68.00 Quote Per
job/will require original parts
4
Latch spring
Material Cost $_________
Hourly Labor Cost $68.00 Quote Per
job/will require original parts
STORM/SECURITY DOOR LOCK Brand: LARSON ONLY MODEL #221-SC 5
Mortise Security lock with key, brushed nickel, 20239417 Material Cost $_________
Hourly Labor Cost $68.00 Quote Per job/will require original
parts
6
REPLACEMENT GLASS Material Cost $5.50 Hourly Labor Cost$68.00 Quote Per job/will require original parts
7
1/8” THICK ANNEALED / TEMPERED GLASS BY SQ. FT. Material Cost $5.50 Hourly Labor Cost $68.00 Quote Per job/will require original parts
Labor Hours 8.
Installation of entire window: removal of old, disposal and installation of new, to include any trimmings and /or caulking. Excluding any unforeseen issues. Labor Rate 8:30 a.m. – 5:00 p.m. Friday- Thursday
$ Quote Per Opening
9. Installation of glass in existing frame. Labor Rate 8:30 a.m. – 5:00 p.m. Friday- Thursday
$68.00
10. After Hours, Emergency Hour Labor. Labor Rate Friday- Sunday
$96.00
11. Store Front Availability Glass Replacement Sq. Ft. (Tempered)$5.75 for ¼
tempered 12. Standard Sash Size Replacement 36” x 2’6” or less (white) $____________
Sash over/above standard Size $Quote per job/Will require original manufactured parts.
IMPORTANT- THIS FORM WILL BECOME APART OF THE AWARD AND CONTRACT
NOTE- ALL TOTAL WINDOW REPLACEMENTS SHALL BE BASED ON NC ENERGY CODE FOR ZONE 4 Most Responsive Bidder