TAMILNADU WATER INVESTMENT COMPANY LIMITED (TWIC) BUSINESS EXCELLENCE

TWIC Business Brochure TAMILNADU WATER INVESTMENT COMPANY LIMITED (TWIC) – BUSINESS EXCELLENCE Brief Description of the Organization: TWIC is a pione...
Author: Edwin Black
3 downloads 0 Views 1MB Size
TWIC Business Brochure

TAMILNADU WATER INVESTMENT COMPANY LIMITED (TWIC) – BUSINESS EXCELLENCE Brief Description of the Organization: TWIC is a pioneering developer of water projects in India promoted by Infrastructure Leasing and Financial Services Limited (IL&FS), 54 % and Government of Tamil Nadu (GoTN), 46%. TWIC was formed to promote the first PPP in water Sector, namely the

New Tirupur Water Project (185 MLD, 1023 Crores).

TWIC has been actively involved in developing and implementing projects across several sectors. Our expertise ranges from urban water and sewerage systems, desalination, industrial effluent management, and recycling. Our role in all these areas would be to provide our clients with end-to-end solutions through a comprehensive understanding of the problem, selection of appropriate technology solutions, design development, arranging finance, procurement of contractors, supervision of implementation and Operation & Maintenance. We help our clients in developing projects from concepts to implementation through a model aimed at reducing life cycle costs within a sustainable delivery framework.

Infrastructure Leasing & Financial Services Limited (IL&FS) is one of India's leading infrastructure development and finance companies promoted by the Central Bank of India (CBI), Housing Development Finance Corporation Limited (HDFC), and Unit Trust of India (UTI). Over the years, IL&FS has broad-based its shareholding and inducted Institutional shareholders including State Bank of India, Life Insurance Corporation of India, ORIX Corporation - Japan and Abu Dhabi Investment Authority. The organization is focused on the commercialization and development of infrastructure projects and creation of value added financial services. The following are group companies of IL&FS, which are in the water business across India:

a. Tamilnadu Water Investment Company Limited (TWIC) b. IL&FS Water Limited (IWL), and c. New Tirupur Area Development Corporation Limited (NTADCL).

Aug’15

Page 1 of 26

TWIC Business Brochure

We will examine and implement public private partnership / community & Industries participation models that promote sustainable development, in all our projects. Our Business Areas:

A. Project Implementation & Management Consultancy services TWIC undertakes preparation of detailed project reports, selection of technology and project specification, design engineering, procurement of contractor, arranging finance for the project and implementation supervision. TWIC has employed key professionals with expertise and experience of working in multiple sectors including Textile, Tannery, Sewage, Water, Paper & Pulp, and Membrane based Processes. Moreover, we can source right people for\ any kind of system in our business, which we undertake.

B. O&M services TWIC undertakes services as Operator for turnkey Operations & Maintenance in Water Treatment plant, Industrial effluent treatment and recycling plant, Sewage treatment plant, Industrial water supply and distribution system and Waste management system. We have manpower strength of around 120 people as multidisciplinary and strong team with Managers, Process Engineers, Chemists, Maintenance Engineers, Engineering staffs (Electrical/Mechanical/Instrumentation), and chemist, etc.

C. O&M inputs during EPC TWIC complements with EPC in Industrial water supply / wastewater treatment, urban water supply/ sewerage works, brackish/ seawater desalination, Water, and waste recycling projects for advice on operability, review of design /construction documents, assistance in commissioning works and comprehensive solutions for operations and maintenance. TWIC has experience in following the areas in any plant: 

Zero Liquid Discharge Based Effluent Treatment Plants

 Activated Sludge Process Plants 

Membrane Bio-Reactor

 Reverse Osmosis Technology  Mechanical Evaporator

Aug’15

Page 2 of 26

TWIC Business Brochure

Unique Capabilities of TWIC:

In line with its philosophy of offering service at the highest level of professional excellence, the following qualities makes TWIC different from others: 

Emphasis on Life Cycle Costs and Benefits (Technology / O&M)



Ability to commercialise projects, thereby leveraging Government funds



Demonstration of Pilot before large scale Implementation

TWIC has been following established policies as outlined below:

a. Introduction of New Technologies: 

TWIC has been successful in introducing new technologies in the field of water & wastewater projects



Technology improvements have been carried out in the field of Industrial Wastewater treatment, which relate to Implementation support for “Zero Liquid Discharge” facilities consisting of host of “State of Art” systems & processes such as Activated Sludge Process, Membrane Bio Reactors, ultra-Filtration, Reverse Osmosis, Mechanical Vapour Recompression Type Evaporators, Crystallizers and Adiabatic Chillers etc. in very highly polluting industries such as Textile Dyeing, Tanneries and Pulp & Paper.

Aug’15

Page 3 of 26

TWIC Business Brochure



Most of the facilities created have high level of online instrumentation, metering and Automation. It is pertinent to mention that such ZLD facilities created are one of the first of its kind in the world.



TWIC has also introduced technologies such as Brine reuse technology for Textile dyeing and ZLD technology for Paper & Pulp mills. These developments have already started to have a positive impact on the environment.



TWIC focus on not just recovery of Water & salt, but also recovery of byproducts from Wastewater, such as Chemicals / Energy etc.

b. Sustainable Operation & Maintenance: 

While developing projects, TWIC works on the premise that project interventions should have lasting benefits and also would need to be operated and maintained on a sustainable basis.



TWIC has put in place effective O&M teams for asset management and sustainable operations.



TWIC has in-house expertise in various fields relating to water supply and wastewater management and also has the flexibility to recruit engineers/ operators etc., who are experienced in the similar field within a short time.

Government Recognition  Government of Tamilnadu:

1. GoTN has vide GO.NO. 132 dated 31.12.2012, nominated TWIC as the Project Management Agency (PMA) for implementing on behalf of the government for the following:  Dedicated agency for development and O&M of CETPs of Government of Tamilnadu.  Industrial water supply through Reuse of Sewage Water and Desalination.

Aug’15

Page 4 of 26

TWIC Business Brochure

2. G.O.116 dated: 24.10.2011 received from Handloom & Textiles, GoTN.

3. Environment and Forest (EC.1), GoTN has nominated TWIC for carrying out the diagnostic study, preparation of Detailed Project Report, facilitating financial closure and advisory on Project Management Consultancy (PMC) / O&M for Micro, Small, Medium Bleaching and Dyeing units in the districts of Namakkal, Erode, Salem & Karur vide G.O.NO. 48 dated: 31.03.2015.

 Government of India: 1. TWIC’s technology for ZLD has been recognized by the Ministry of Textiles and has been evaluated and accepted by the Department of Science and Technology (DST).

2. TWIC has been the knowledge partner and Empanelled Project Management Consultant to the Ministry of Textiles, GoI, under the 12th Plan, for the Integrated Processing Development Scheme (IPDS).

 Experience with Government Grants / subsidies: TWIC has been involved and assisted the Government in most of the Central and State Government Schemes namely, ASIDE / DIPP /ILPD/ IIUS / Central Subsidy / Interest Free loan etc .

Aug’15

Page 5 of 26

TWIC Business Brochure

PROJECT SHOWCASE

I.

Tirupur Textile Effluent Management Project, Tirupur Client: Tirupur Textile Dyeing Industries Implementation Phase TWIC assisted nine Common Effluent Treatment Plants in development of zero discharge solution for the bleaching and dying units in Tirupur. The total effluent treatment capacity of these nine CETPs is 53,000 cum per day, forming the majority of the effluents generated in Tirupur. The cost of this project was Rs. 4200 millions.

The scope of work undertaken by TWIC was preparation of detailed project reports, selection of technology and project specification, design engineering, procurement of contractor, arranging finance for the project and implementation supervision. The components of the ZLD CETP are Pipeline for effluent conveyance, Pre-treatment works, Reverse Osmosis plant, Evaporator plant, and Recovered water distribution system. TWIC has also developed an alternate technology called “Treated Brine Reuse Technology” which substantially reduces the dependence on evaporator. This has been successfully demonstrated at Arulpuram CETP and is now being implement in the remaining TWIC developed CETPs. Application for grant of patent rights for this technology has been filed with the patent office and the same is under process.

O&M phase O&M services for Zero Liquid Discharge (ZLD) based Seven Common Effluent treatment plants with capacities ranging from 3 MLD to 11 MLD in Tirupur textile cluster. The effluent from various industries collected, metered, and conveyed to the Common Effluent Treatment Plant (CETP) for treatment and recovered water distributed back to the industries for processing. These CETPs are equipped with Pre-treatment system (Biological Oxidation system based on

Aug’15

Page 6 of 26

TWIC Business Brochure

Activated Sludge Process), Reverse Osmosis system and Mechanical Evaporator for RO reject handling. TWIC has well qualified and experienced team of Managers, Engineers, Chemists, Operators and Technicians who man the CETPs round the clock.

Aug’15

Page 7 of 26

TWIC Business Brochure

Process Scheme:

Global Water Intelligence Award 2014: TWIC‘s Tirupur CETP ZLD project recognised by the prestigious Global Water Awards 2014 by Global Water intelligence (GWI) as “Highly Commended” under the Industrial Water Project of the year category and has also called it as a “phoenix rising from the ashes of an environmental catastrophe”. 2014 WateReuse Industrial Project of the Year: Tirupur ZLD Project was chosen as Water Reuse Industrial Project for the Year 2014 by the Water Reuse Association, USA. The WateReuse Project of the Year Award recognizes projects whose significance and contributions to the community continue to advance the water reuse industry. Tirupur ZLD Project has demonstrated continued dedication to the water reuse community. 2030 WRG Corporate Water Stewardship Award: The 2030 WRG Corporate water Stewardship award for the year 2015 awarded to TWIC at Athens by GWI, UK

Aug’15

Page 8 of 26

TWIC Business Brochure

II.

Implementation of Zero Liquid Effluent Treatment Project for tannery cluster Client: Ambur Economic Development Organization Limited

Project Management services for Zero Liquid Discharge (ZLD) based 3 Common Effluent treatment plants with capacities ranging from 1 MLD to 4 MLD (combined capacities of 7.2 MLD) in Ambur and Vaniyambadi Tannery cluster. These CETPs have Membrane Bio-Reactor as pre-treatment for RO systems and Evaporator for RO reject management.

The Project would enable the tannery sector at Ambur and Vaniyambadi in meeting environmental norms specified by the Tamilnadu Pollution Control Board. The project has been completed and commissioned.

Aug’15

Page 9 of 26

TWIC Business Brochure

III.

Consultancy services for Implementation of the integrated wastewater management (ZLD) for tannery CETP Client: Pallavaram Tanners Industrial Effluent Treatment Company Ltd

Owners Consultation Engineer for implementation of the integrated wastewater management project consists of development of appropriate solutions to meet the Zero Liquid Discharge requirements for the Common Tannery Effluent Treatment plant of capacity 3 MLD. TWIC has evaluated design and construction engineering documents and monitoring the project implementation works. This is to ensure the adequacy of treatment plant to treat maximum 3 MLD Tannery effluents. TWIC was also engaged by the CETP for providing “monitoring & feedback services” during the O&M of the plant by the EPC contractor.

Aug’15

View of Pallavaram CETP

Equalization Tank

Clarifier

Aeration Tank

Page 10 of 26

TWIC Business Brochure

IV.

Technical and Commercial Feasibility for Development, Financing, Implementation and Operation of Zero Liquid Discharge Effluent Project for paper and Pulp effluent Client: Tamilnadu Newsprint and Papers Limited, Karur

TWIC had entered in to an agreement for Preparation of Technical and Commercial Feasibility report as a precursor for Development, Financing, Implementation and Operation of Zero Liquid Discharge Effluent Project for paper and Pulp effluent including Design, Implementation and Operation and Maintenance of a Pilot plant.

120 m3/d pilot plant was commissioned and trials were carried out for over an 8 months period and the same has now been completed successfully. The pilot plant was used to process Hardwood from bleaching effluent from the pulp mill. TWIC has now prepared a Detailed Project Report for implementation of a full scale Zero Liquid Discharge Project .The project developed is under joint patenting between TNPL & TWIC.

Aug’15

Aeration Tank

Ultra filtration Unit

RO unit

Reactor Clarifier

Page 11 of 26

TWIC Business Brochure

Simple Schematic of process

Raw Effluent Collection Tank

Preliminary Treatment

Primary Treatment

Pulp Sludge

Secondary Treatment

Bio Sludge

Tertiary Treatment

Chemical Sludge for Cement Industry

Quaternary Treatment

Sulphate Stream for SRP Section

Reverse Osmosis

R.O Permeate (Water for Reuse)

Brine for Dyeing Units

Aug’15

Evaporator Crystallizer

Page 12 of 26

TWIC Business Brochure

V.

Tirupur Water Supply and Sewerage Project Client: Tirupur Municipal Corporation & Government of Tamilnadu

New Tirupur Area Development Corporation Limited (NTADCL) has been established as a special purpose vehicle for development and implementation of the Tirupur Water Supply and Sewerage Project. NTADCL was promoted by TWIC along with the Tirupur Exporters Association, to implement the first water sector related project under the public-private partnership framework in the country. It is the first water supply project in India to be financed commercially on a limited recourse basis.

Project scope Facilities have been constructed to extract, treat and supply 185 MLD (expandable to 250 MLD) from the river Cauvery. Water is being supplied to the dyeing and bleaching industries and domestic consumers in Tirupur and Domestic consumers of Tirupur Municipality, fifteen villages panchayat with a total population of 8,00,000 are being supplied with water. A Sewage Treatment Plant along with the sewerage network based on Activated Sludge Process (ASP) of capacity 15 MLD (expandable to 30 MLD) has been implemented for Tirupur Town.

The project cost of Rs 1023 Crores was financed through a mixture of commercial loans (60%), equity (30%) and sub debt (10%).

TWIC is the promoter of the New Tirupur Area Development Corporation Limited project with associated promoter responsibility, covering a) BOT responsibilities under the concession agreement b) Arranging of finance c) Supervision of contractor performance

The Project is under operation since 2005 and supplying water to Tirupur municipalities, Industries located in the region and specified enroute villages.

Aug’15

Page 13 of 26

TWIC Business Brochure

Aug’15

1. Raw Water Pumping Station

2. Water Treatment Plant

3. Filter House at Night

4. Sludge Thickener

Page 14 of 26

TWIC Business Brochure

VI.

Consultancy Services to Conduct Prefeasibility and Planning Studies for 100 MLD Desalination Plant in Ramanadhapuram & Thoothukudi Districts Client: Tamilnadu Water Supply and Drainage Board

Proposed Project: The project involves catering drinking water to the water stressed public and Industries in coastal area of Ramanathapuram District and Thoothukudi District separately by setting up of either 1 No of 100 MLD or more than 1 plant of various capacities totaling 100 MLD Sea Water Reverse Osmosis Desalination Plants (SWRO).

Project Scope: The scope of the work is to assess the number and sizing of desalination plants at select candidate sites in Ramanathapuram District and Thoothukudi District separately for setting up of either 1 No of 100 MLD or more than 1 plant of various capacities totaling 100 MLD Sea Water Reverse Osmosis Desalination Plants (SWRO) by conducting the following Planning Study and Preparation of Pre-feasibility report including,

1. Gathering data on existing population, water supply details, infrastructures and then estimation of future growth and water demand and distribution of water to the demand centers. 2. Capital and Operating costs together with a preliminary environmental assessment, financial viability with basic designs and details of the identified risks associated.

Further, each site is to be evaluated for,  Access to good quality sea water  Brine disposal and dispersion  Physical suitability for construction of desalination plant, e.g. soils and flooding  Acceptability from an environmental point of view and  Access to electrical power. Aug’15

Page 15 of 26

TWIC Business Brochure

The report has been submitted and TN Government has approved 2 Nos 60 MLD Desalination Plants at Alanthalai Thoothukudi and Kuthrimozhi Ramanadapuram at a project cost of Rs 1350 Cr for Implementation. TWIC is also nominated as the Bid management consultants and Owner Engineer for 3 years .

Aug’15

Page 16 of 26

TWIC Business Brochure

Workshop conducted by TWIC on behalf of government of Tamilnadu on UGSS:

TWIC has successfully conducted a two day National Workshop on underground Sewerage System for Government of Tamilnadu (Commissionerate of Municipal Administration Department) on 22.07.2013 and 23.07.2013

The Work shop included presentations from various states and countries with a round table discussion on reviewing the existing arrangements, problems, issues and to find out sustainable solutions with the available modern technologies and arrive at various implementation strategies on Piping, Manholes, Pumps, STPs, Water reuse and Power Generation. The Workshop was presided by the Hon’ble Minister for Municipal Administration, Rural Development, Law, Courts & Prisons and the dignitaries & over 100 Engineering staff from various State government departments participated.

Majority of the participants have appreciated the arrangements and the way the topics were structured covering all the areas relevant to overall objective of the workshop and expressed that the sessions were very educative, interesting and useful for the existing ongoing schemes and for implementation of proposed future schemes.

Aug’15

Page 17 of 26

TWIC Business Brochure

Summary list of Projects completed / Ongoing: Wastewater & Recycling Projects

Sl. No

Name of the Project

Project Cost

Role of TWIC

Consultancy Services 1

Zero Liquid Discharge Project for nine Rs.420 CETPs in Tirupur Crores

2

Zero Liquid Discharge Project for Pallavaram CETP Implementation of Brine Reuse Technology at Arulpuram CETP Implementation of Brine Reuse Technology at Chinnakarai CETP Implementation of Brine Reuse Technology at Kasipalayam CETP Implementation of Brine Reuse Technology at Kunankalpalayam CETP Implementation of Brine Reuse Technology at Murugampalayam CETP Implementation of Brine Reuse Technology at Rayapuram CETP Implementation of Brine Reuse Technology for S.Periyapalayam CETP Implementation of Zero Liquid Discharge facilities for a Pulp and Paper Mill Zero Liquid Discharge project for treating leather effluent at Ambur and Vaniyambadi, Tamilnadu Marine outfall facility for treated effluent at Brandix Textile Park, Vizag, AP Preparation Detailed Project Report for the construction of Common Effluent Treatment Plants at Ludhiana, Punjab Development of Alternate Water solution for a leading Refinery

3 4 5 6 7 8 9 10

11

12

13

14

Aug’15

Rs.36 Crores Rs. 15.10 Crores Rs. 21.96 Crores Rs. 12.08 Crores Rs. 15.10 Crores Rs. 30.20 Crores Rs. 15.10 Crores Rs. 10.20 Crores Rs.3 Crores

DPR, Project Developer and Management Consultant Owners Consultant DPR and Project Management Consultant DPR and Project Management Consultant DPR and Project Management Consultant DPR and Project Management Consultant DPR and Project Management Consultant DPR and Project Management Consultant DPR and Project Management Consultant DPR Consultant & Technical evaluation study

Rs.88 Crores

Project Consultant

Management

Rs.21 Crores

DPR and Project Management Consultant

Rs. 450 Crores

DPR Consultant

Rs.400 Crores

DPR Consultant

Page 18 of 26

TWIC Business Brochure

Sl. No 15

16

Project Cost

Role of TWIC

Technical Evaluation of ETP at VTX Rs. 3.31 Textiles Ltd, SIPCOT, Perundurai Crores

Technical Evaluation Consultancy

Name of the Project

Alternate Water Supply to SIPCOT Industrial Park, at Sriperumbudur and Irungattukottai 17 Audit of the technology and proof reading of proposals submitted by various departments towards restoration & maintenance of Ooty lake 18 Consultancy Service (national consultant) for the project activity on CETP in Tamilnadu, Indo German Environment Partnership (IGEP),Deutsche Gesellschaft fur Internationale Zusammenarbiet (GIZ) GmbH 19 Developing Recycling Reuse ProjectSTP Delawas on PPP Mode Operation & Maintenance 20

21

22

23

24

25

26 Aug’15

Rs.65 Crores

DPR and Pilot Studies

Rs. 30 Crores

Audit on the technology & Proof reading of the proposals

-

Case studies on the CETPs in Textile & Tannery Sector in Tamilnadu

Rs. 213 Crores

O&M services for Implementation of Zero Liquid Discharge Facility for Arulpuram CETP for 15 years O&M services for Implementation of Zero Liquid Discharge Facility for Rayapuram CETP for 15 years O&M services for Implementation of Zero Liquid Discharge Facility for Chinnakkarai CETP for 15 years O&M services for Implementation of Zero Liquid Discharge Facility for Murugampalayam CETP for 15 years O&M services for Implementation of Zero Liquid Discharge Facility for Kasipalayam CETP for 15 years O&M services for Implementation of Zero Liquid Discharge Facility for Kunnankalpalayam CETP for 15 years Desalination Chennai Desalination Project Rs.1800

Feasibility Study

O&M Contractor

O&M Contractor

O&M Contractor

O&M Contractor

O&M Contractor

O&M Contractor

DPR Consultant for Phase I Page 19 of 26

TWIC Business Brochure

Sl. No

27 28

Name of the Project

Project Cost

Crores Development of a captive Rs.300 Desalination and Power Plant Crores Annual Contract Operation & Maintenance for Sea Water Desalination Plant

29

Operation and Maintenance of Multi Stage Flash (MSF) & Sea Water Reverse Osmosis (SWRO) Desalination plants at NDDP site Kalpakkam, Tamilnadu- I year Operations Contract 30 Operation of Water and Waste Water System (Desalination System (DS), Demineralization (DM), Waste water system (WWS) and Chlorination system (CS) on 24 hr x 365 days basis) – 3 Years Operation Contract from Power Mech for ITPCL 2x600 Mw Thermal Power Station International Experience 29

30

Aug’15

Technical services to IL&FS for an opportunity to acquire a controlling equity stake in Maynilad Water Services Inc, which operates a 2000 mld water treatment and distribution system in Manila, Philippines Technical and commercial due diligence services to SCI Asia for investment in a Chinese water Company

Role of TWIC

DPR Consultant O&M Contractor

O&M Contractor for one year

O&M Contractor for 3 years

-

Technical Consultant

-

Technical Consultant

Page 20 of 26

TWIC Business Brochure

Water & Sewage:

Sl. No

Name of the Project

Project Cost

Role of TWIC

1

Tirupur Water Supply and Sewerage Project

Rs. 1023 Crores

2

Master Plan for Provision of Storm water Drainage for the city of Pune

Rs. 499.86 Crores

3

Water Supply and Waste Water Management Project at Nanded, Maharashtra

Rs. 309 Crores

DPR Preparation, Project Management Consultant

4

Dedicated Water Supply in Coimbatore Underground Sewerage Scheme – Sewage Treatment Plant, Corporation of Madurai Underground Sewerage Scheme Collection System, Corporation of Madurai

Rs. 114 Crores Rs.360 Crores

Bid Process Management

Rs. 120 Crores

Bid Evaluation

5

6

7

Aug’15

Refurbishment of Water Treatment Rs. 30 Plant, Corporation of Madurai Crores

Promoter, Developer & Project Management for BOT DPR Preparation

Bid Evaluation

Quality Checking & Advising during construction

Page 21 of 26

TWIC Business Brochure

Sl. No 8 9

10 11

12 13 14

15

16

17

18

19

20

Aug’15

Name of the Project

Project Cost

Role of TWIC

Dedicated Water Supply Scheme to Salem Corporation Combined Water Supply Improvement Scheme to Vellore Corporation Salem Corporation Sewage Treatment Plant Water Supply Improvement Scheme to Nelliyalam, Municipality of Nelliyalam Under Ground Sewer Collection System to Alandur Municipality. Dedicated Water Supply Scheme to Erode Corporation Combined Water Supply Improvement Scheme to Melur Union - Proof Checking

Rs. 283 Crores Rs. 1295 Crores

DPR Preparation and Bid Process Management Proof Checking of DPR

Rs. 45 Crores Rs. 47.99 Crores

Evaluation of Bids

Rs. 3 Crores

Transaction advisor to select O&M Operator DPR and Bid Document Preparation Proof Checking of DPR

Combined Water Supply Improvement Scheme to Attur & Narasingapuram Union – Proof Checking Hogenekkal Water Supply and Fluorosis Mitigation Project in Dharmapuri and Krishnagiri District – Proof Checking Preparation of DPR for water Supply Improvement in distribution system for 26 Municipalities Consultancy Services for Preparation of DPR for Sewage Disposal Arrangements System in Ambattur Phase-I & II S&S Scheme at Ayyapakkam Village of Tamilnadu Housing Board Combined Water Supply Scheme to Pudukottai Package 1 & Pudukkottai Package 2 Consultancy Services for Checking and Vetting of DPR Prepared for the

Rs. 240 Crores

Proof Checking of DPR

Rs. 1900 Crores

Proof Checking of DPR

Rs. 451.04 Crores

DPR Preparation

Rs. 10 Crores

DPR Preparation and Bid Processing

Rs. 600 Crores

Proof Checking of DPR

Rs, 150 Crores

Proof Checking of DPR

Rs. 391.91 Crores Rs. 780.50 Crores

DPR Preparation

Page 22 of 26

TWIC Business Brochure

Sl. No

21

22

23

24

25

26

27

Aug’15

Name of the Project work of Enlargement of Sewage pumping main, Improvements to existing sewage pumping stations, Construction of Road side pumping stations and Enlargement of Gravity sewer mains at various locations for plugging of sewage outfalls in Chennai city Consultancy services to carry out Post Audit of the UGSS in Madurai Corporation, CMA Consultancy services to carry out Post Audit of the UGSS in Mayiladuthurai Municipality, CMA Consultancy Services for Preparation of DPR for Water Management Plan in Arcot Municipality Consultancy Services for Preparation of DPR for Water Supply Distribution System (24x7) to Kavundampalyam, Vadavalli and Veerakeralam in Coimbatore Corporation GMR Krishnagiri SEZ Ltd (GKSL) Study on Water Supply to Special Investment Region (SIR) in Krishnagir District, Tamilnadu Consultancy for Proof Checking of DPR’s for Implementation of UGSS works in the 12 ULBs (Package-I Chidambaram, Thirupathur & Arakkonam) (Pakcage –II Mettur, Rasipuram & Sathyamangalam), (Package III Kodaikanal, Periyakulam, Bodinayakanur), (Package – IV Karaikudi, Rameswaram & Sattur) Consultancy for Checking and Vetting of DPR prepared for the

Project Cost

Role of TWIC

-

Audit of the UGSS Scheme

existing

-

Audit of the UGSS Scheme

existing

Rs. 27.30 Crores

DPR Preparation

Rs. 103 Crores

DPR Preparation

Rs. 50 Crores

Feasibility Preparation

Rs. 841.37 Crores

Proof Checking of DPR

Rs.163 Crores

Proof Checking of DPR

Report

Page 23 of 26

TWIC Business Brochure

Sl. No

28

29

30

31

32

33

Aug’15

Name of the Project

Project Cost

work of Plugging of sewage outfalls and diversion works in Adyar river, Buckingham Canal and Cooum river in Chennai City Water ways Consultancy work for preparation of Rs.243.40 DPR for Improvement of water Crores supply transmission main / feeder main, distribution system and water management plan in Vellore City Municipal Corporation Consultancy service for Feasibility study and preparation of Detailed Project Report to adopt Soil BioTechnology for treatment of sewage at Villivakkam STP Consulting services to conduct prefeasibility studies including financial viability, for setting up of either one number of 100MLD or more than 1 plant of various capacities, totalling 100MLD sea water Reverse Osmosis Desalination plant in Thoothukudi District. Consulting services to conduct prefeasibility studies including financial viability, for setting up of either one number of 100MLD or more than 1 plant of various capacities, totalling 100MLD sea water Reverse Osmosis Desalination plant in Ramanathapuram District. Consultancy services for preparation of DPR for Water Supply Improvement Scheme (24x7) to Kurichi & Kuniyamuthur extended area. Consultancy Services to conduct feasibility study and survey to ensure uniform and uninterrupted drinking water supply distribution

Rs.6.0

Role of TWIC

DPR Preparation

Feasibility Preparation Preparation

&

Report DPR

Rs.840.08 Crores

Prefeasibility including Viability

Study Financial

Rs.847.1 Crores

Prefeasibility including Viability

Study Financial

Rs.150.20 Crores

DPR Preparation

Rs.3024 Crores

Feasibility Study

Page 24 of 26

TWIC Business Brochure

Sl. No

34

35

36

37

38

Aug’15

Name of the Project

Project Cost

Role of TWIC

system for entire Coimbatore Corporation. CMWSSB Evaluation of Performance of AMR meters installed in Area -V,IX,X &XIII

-

Evaluation Report of AMR Water Meter

TNUIFSL -Consultancy assignment for Proof Checking of UGSS DPR’s for 6 Town Panchayats (Ponneri, Thiruporur, Ayikudi, Kanyakumari, Vallam and Manachanallur cluster with S.Kannanur Town Panchayats) Package III Coimbatore Water Supply Improvement Scheme (24x7) to 6 extended areas (Thudiyalur, Vellakinar, Kallapatti, Vilankuruchi, Saravanampatti, Chinnavedampatti) Consultancy for preparation of Detailed Project Report (DPR) for the Improvement of Water Supply distribution system (CWSS) to 8 Municipalities (Ambur, Vaniyambadi, Melvisharam, Pernampattu, Gudiyattam, Walajapet, Thirupattur, Ranipet) Preparation of detailed designs various project components like Intake, Transmission main, 24 x7 Water Supply Distribution System along with Specification, Bill of Quantities and Drawings for approval to DWSD for Chhota Govindpur and Bagbera Piped Water Supply Scheme in East Singhbhum district of Jharkhand State.

Rs.150 Crores

Rs.198.83 Crores

Proof Checking of DPR

DPR Preparation

Rs.146 Crores

DPR Preparation

Rs. 200 Crores

DPR Preparation

Page 25 of 26

TWIC Business Brochure

AWARDS RECEIVED

Aug’15

Page 26 of 26