Summer 2015 

FMS Project  Completion Report    August 20, 2015     

This report is intended to provide an overview of the campus wide maintenance, construction, and renovation  projects that were performed and/or managed by CSU Chico Facilities Management and Services (FMS) during  the 2015 Summer Break (May 18 – August 24, 2015).    PROJECTS  Acker and Shurmer Gym floors /Yolo  Dance Floor Refinish  Campus Data Center UPS in Butte 401 ‐  Installation/Upgrade  Farm Modular Classrooms Installation  Glenn Hall Space Alterations (Phase1)   Holt Hall 171, 175, 187, 189, 257 Smart  Classrooms Refresh  Installation of Interior 3 in 1 Recycling  Bins ‐ Campus wide  Meriam Library 045 ‐ 2 Way Video  Classroom  Performing Arts Center 144 Lights  Upgrade  Performing Arts Center Band Room  Refresh  Physical Sciences 322 NMR  Spectrometer Installation  Yolo Hall 217, 218, 234 & 258   Alterations  MAINTENANCE PROJECTS  Butte Hall Elevator Modifications  Classroom Painting  Floor Maintenance and Waxing ‐  Campus wide  Holt Hall Classrooms Ceiling Tile  Removal  Holt Hall East Entrance Drainage  Installation  Holt Hall Exterior Water Intrusion  Repairs  Physical Sciences Roof Repair  Student Services Center Men's Restroom  Waterless Urinals Replacement  Wi‐Fi Clocks ‐ Campus wide Installations  Window Washing ‐ Campus wide  1   

   

Acker and Shurmer Gym floors /Yolo Dance Floor Refinish Project  Description 

Project manager     

Performed maintenance and refinished wooden floors in Acker Gym, Shurmer Gym,  and Yolo Dance Studio 

D. Sprague     

                            2   

  Campus Data Center UPS Installation/Upgrade 

 

Project  Description  Project manager 

Installed new redundant Uninterruptible Power Supply (UPS) systems in Campus  Data Center and upgraded electrical distribution components to improve Data  Center reliability  B. Coakley 

     

 

3   

  Farm Modular Classrooms Installation 

 

 

Project  Description  Project manager 

Installed a new 48x40 modular building that the University Farm can use for  conferences as an improved option other than the Pavilion. The new space can be  divided into two (2) additional classrooms that will alleviate Farm class scheduling  challenges.  B. Coakley 

   

4   

  Glenn Hall Space Alterations to Faculty Offices, Business Sales  Center, and Student Success Center (Phase1)     Project  Description  Project  coordinator 

Converted underutilized lounge, kitchen & conference room spaces to 5 private  faculty offices. 202/204 areas were renovated to create larger Student Success  Center with break‐out study rooms. Old Student Success Center converted to  College of Business Sales Center.  K. Gilmet 

 

 

              5   

  Holt Hall 171, 175, 187, 189, 257 Smart Classrooms Refresh    Project  Description  Project  coordinator 

Removed falling ceiling tiles, installed new drop ceilings, window shades, Smart  Classroom equipment, white boards, and new floor covering; improved HVAC  distribution; and repaired and painted walls in five (5) classrooms in Holt Hall.  S.  Lingsch 

 

    6   

   

Installation of Interior 3 in 1 Recycling Bins ‐ Campus wide    Project  Description  Project lead 

Placement of 20 new recycling bins approved by Campus Conservation Committee  and funded by VPBF into Phase I buildings: Acker Gym, Butte Hall, Holt Hall, Kendall  Hall, Modoc Hall, O’Connell Tech Center, Performing Arts Center, Physical Science  Building, Tehama Hall, Yolo Hall.  FMS Custodial, Warehouse, and  Moving Services 

 

 

 

7   

Meriam Library 045 ‐ 2 Way Video Classroom    Project  Description  Project  coordinator 

MLIB 045 was remodeled with new lighting, paint, wall coverings, and floor  coverings. Relocated and installed equipment to create a state of the art video  (distance learning) classroom   S. Lingsch 

   

8   

Performing Arts Center 144 Lights Upgrade    Project  Description  Project  coordinator 

All Harlen Adams Theater lighting and related controls were replaced with LED  lighting and DMX control system for energy efficiency and improved control  technology.  K. Gilmet 

     

 

9   

Performing Arts Center Band Room Refresh    Project  Description  Project manager 

Flooring deficiencies were corrected by removing old vinyl tile flooring, infilling  former tiered floor and installing improved vinyl flooring.  At the same time this  Band Room was refreshed with new lighting, new paint, acoustical treatments, and  recording infrastructure installed  P. Strawn 

     

10   

Physical Sciences 322 NMR Spectrometer Installation    Project  Description  Project manager 

Installed new nuclear magnetic resonance (NMR) spectrometer in PHSC 322.   Upgraded electrical and HVAC, and installed safety controls  D. Sprague 

     

 

11   

Yolo Hall 217, 218, 234, and 258 Alterations    Project  Description 

Project  coordinator 

Converted 2 outdated computer labs into 1 large classroom (Yolo 234) with large  touch‐screens and teaching technology similar to THMA 116.  Converted 2  classrooms and auxiliary spaces into 2 smart classrooms (Yolo 217/218). Converted  1 space into 2 large faculty offices (Yolo 258 & 258A.)  Upgraded ADA access and  installed water efficient fixtures in second floor restrooms.  Installed ADA‐compliant  Hi/Lo drinking fountain with hydration station  K. Gilmet 

       

 

12   

          MAINTENANCE     PROJECTS   

 

13   

Butte Hall Elevator Modifications    Project  Description  Project manager 

Retained elevator consultant to make recommendations for improvements to  elevator reliability.  Installed modified mechanical guides to improve elevator  reliability.  D. Sprague 

 

 

 

 

14   

Classroom Painting    Project  Description  Project lead 

 

FMS Carpenters and Painters installed chair rails and painted 54 classrooms per  revitalized annual classroom paint plan in following buildings:  Butte Hall – 23  classrooms; Tehama Hall – 19 classrooms; Yolo Hall – 12 classrooms (paint only)  D. Sprague/FMS Paint Shop 

 

15   

  Floor Maintenance and Waxing ‐ Campus wide   

Project  Description  Project lead 

Annual floor maintenance that included stripping and waxing of building classrooms  and corridors floor surfaces.  FMS Custodial 

   

 

16   

Holt Hall Classrooms Ceiling Tile Removal    Project  Description  Project lead 

Removed loose and falling ceiling tiles in 21 Holt Hall classrooms.  Ceilings will be  repainted during the upcoming term as scheduling permits.  S. Taylor, FMS Maintenance 

     

 

17   

Holt Hall East Entrance Drainage Installation    Project  Description  Project lead 

New drains and concrete flatwork were installed at the east entrance to Holt Hall to  correct longstanding drainage and flooding problems at this entrance.  P. Strawn, FMS Maintenance 

 

 

 

18   

Holt Hall Exterior Water Intrusion Repairs    Project  Description  Project leads 

Northeast side of Holt Hall was excavated to expose below grade structure for  replacement of waterproofing membrane and installation of French Drain to correct  water intrusion into this building.  Backfilled areas were regraded with new  irrigation and retaining wall installed.  P. Strawn, D. Sprague, M. Alonzo 

 

 

       

  19   

Physical Sciences Roof Repair    Project  Description  Project lead 

Installed new roof materials and flashing on PHSY roof to correct multiple roof leaks 

S. Lingsch 

 

   

 

20   

Student Services Center Men's Restroom Waterless Urinals  Replacement    Project  Description  Project lead 

Removed and replaced all waterless urinals in SSC which created maintenance  problems and indoor air quality challenges.  New ultra low flow urinals with motion  activated controls were installed.  B. Coakley, FMS Plumber and Carpenter Shops 

     

 

21   

Wi‐Fi Clocks ‐ Campus wide Installations    Project  Description  Project lead 

Old clock systems were removed and new Wi‐Fi clocks were installed in over 60  locations. This initial phase of a VPBF‐funded project included MLIB that removed  45 outdated clocks for replacement with standalone Wi‐Fi clocks to improve time  accuracies and reduce maintenance costs  P. Strawn, FMS Design, Cale Whitehouse 

 

 

 

22   

Window Washing ‐ Campus wide    Project  Description  Project manager 

Exterior windows in following ten (10) buildings were cleaned by a commercial  vendor using low water use techniques: Butte Hall, Gateway Science Museum,  Glenn Hall, Holt Hall, Langdon Hall, O’Connell Technology Center, Physical Science,  Plumas Hall, Student Services Center, Tehama Hall  D. Sayers, R. Southall 

 

 