National (primary) Energy Mix of 2006 (1 million BOE) Hydro Power, 3.11% Geothermal, 1.32%
Natural Gas, 28.57% Oil
Target in 2025 1. Less than 1 for energy elasticity 2. Optimized primary energy mix``
51.66% Coal, 15.34%
National (Primary) Energy Mix of 2025 (Presidential Decree No. 5/2006) (3 million BOE)
National (Primary) Energy Mix of 2025 (BaU Scenario) (5 million BOE) Power Plant, 1.9% Mini/micro Hydro Power Plant, 0.1% Geothermal, 1.1%
Oil, 20%
Gas, 20.6%
OPTIMIZING ENERGY MANAGEMENT
Oil, 41.7%
Gas, 30% NRE,17%
Coal , 33% Coal 34.6%
2
BIOFUELS, 5% Geothermal, 5% Biomass, Nuclear, Hydro Solar Energy, Wind Power, 5% Coal Liquefaction 2%
Source : Presidential Decree No.5/2006 2
in GWh No.
Energy Sources
2006
2007
2008
2009
2010
1
Oil
28,009
9,104
5,978
4,350
4,950
2
Gas
27,063
47,293
55,827
63,577
65,912
3
Coal
54,659
60,091
65,836
72,173
81,341
4
Geothermal
6,539
10,030
10,426
11,666
13,154
5
Hydro
12,153
12,224
12,379
12,504
12,526
128,423
138,742
150,446
164,270
177,883
Total
Source : The Electrical Power Supply Business Plan (RUPTL), PT PLN, 2006
3
3
Indonesia’s Geothermal Fields
Wayang Windu
Field
27.000 MWe of high temperature
systems
1,182 MWe installed capacity
4
Geothermal Road Map
2004
2008
807 MW
2016
2012
2000 MW
3442 MW
2020
4600 MW
2025
6000 MW
9500 MW
(Productions)
(Target)
1193 MW
1442 MW
Existing WKP
Existing WKP
1158 MW Existing WKP + New WKP
1400 MW
3500 MW
New WKP
New WKP
GSDM, 2006
5
I. II. III.
Law No. 27/2003 on Geothermal Government Regulation No. 59/2007 on Geothermal Enterprise Ministerial Regulations Ministry Regulation No. 02/2009 The Guidelines for Geothermal Preliminary Survey Assignment Ministry Regulation No. 11/2008 Mechanism for Determining of Geothermal Working Area Ministry Regulation No. 05/2009 Guideline for Electricity Pricing
6
6
CHALLENGES & OPPORTUNITIES
HOW TO GET THERE – 4700 MW BY 2014 > At least 1000 MW / year, Green field (US$ 2.5 – 3.0 M / MW) > How fast tender process can be performed, Readiness of Local Govt > How to attract the investors, not many players > Will need at least 20 units of Turbine / year, with capacity range from 10 up to 100 MW > Will need million feet of casing & tubing, 100 of wellheads (all long lead lead items) > Drilling rigs availability > Human Resources
ON THE OTHER HAND – It can bee seen as opportunity.. > Opportunity for investment > Player from abroad to participate > Turbine manufacturers get orders > The same for Casings, Tubing, Well head etc > Job opening
DO WE HAVE THE ANSWER ON THE ABOVE EXPECTATION IN THIS CURRENT ECONOMIC ENVIRONMENT
7
star energy
STAR ENERGY Profile
8
COMPANY VISION TO BECOME : THE MOST RESPECTED, FASTEST GROWING ENERGY PRODUCER IN INDONESIA BY CREATING COMPETITIVE AND BALANCED VALUE FOR OUR INVESTORS, OUR EMPLOYEES,THE COUNTRY AND THE COMMUNITY
9
COMPANY MISSION
THE ROAD TO SUCCESS LIES IN GAININGTHE RESPECT OF, AND BEING THE PARTNERS OF CHOICE FOR, ALL OF OUR STAKEHOLDERS.WE WILL WORK DILIGENTLY TO GAIN THE RESPECT OF OUR INVESTORS, OUR EMPLOYEES, OUR PARTNERS, THE COUNTRY AND THE COMMUNITY BY BEING THE BEST AT WHAT WE DO
10
BRIGHT STAR BALANCE VALUE FOR STAKE HOLDER RESPECT PEOPLE
INNOVATIVE AND ENTREPRENUERIAL GO EXTRA MILES HONESTY AND INTEGRITY TEACH YOUR SELF DAILY SAFETY, HEALTH AND ENVIRONMENT TEAM WORK AWARNESS OF COST RELATIONSHIPS ARE IMPORTANT 11
Star Energy Profile STAR ENERGY established in April 2003. On 18 September 2003, Star Energy purchased of 31.25 %
stake and operating control in a producing oil and gas field, KAKAP PSC Block, in the Natuna sea. In November 2004, Star Energy took over Magma Nusantara Ltd., which operate 110 MW geothermal power plan at Wayang Windu of West Java. Just finished with installation 2nd Unit for 117 MW and fully in commercial operation in March 2009. Current capacity now become 227 MW. Effective February 24, 2009 Magma Nusantara Ltd now became Star Energy Geothermal (Wayang Windu) Limited At present, Star Energy also has 100% share in the exploration of Banyumas PSC Oil & Gas Block (Awarded in 2005), 100% share in the exploration of Sebatik PSC Oil & Gas (Awarded in 2006) Block of East Kalimantan, and 100% share in the exploration of Sekayu PSC Oil & Gas Block of South Sumatera (Awarded in 2007) February 2009, awarded another Jailolo Geothermal field at 12 Province. Halmahera Regency of Maluku
Who Are We? -Star Energy Holdings Pte Ltd Key Highlights World-Class Geothermal Assets 100% working interest and Operator since 1994 400 MW contract through 2036 Near term expansion with Unit 2 under construction and Unit 3 & 4 in development Operating Availability >98%; 24MWe steam/well
Experienced Operations Team & Market Leader in Project Delivery Consistently beat budget production/ project delivery in the past few years
Financial Strength Consistent operational profitability
SEHPL
Good liquidity ratios Strong Capital Structure
Experienced Operational and Project Management Teams
Strong financial support commitment from Shareholders
Subsurface excellence track record
Attractive Oil & Gas Portfolio With Significant Upside Operator ship in three blocks One producing block with 8.7 yr Reserve to Production ratio Three promising exploration blocks located near other producing blocks
13
Star Group – Corporate Structure
Star Energy 100%
100%
Shareholders include : Ashmore Holdings, more than US$ 50 billion in asset under management and portfolio of energy assets that include ex-Enron assets. Barito Pacific, one of the largest Indonesia conglomerates with market capitalization of Holdings Rp21 trillion
100%
75%
100%
Star Energy (Kakap) Ltd.
Magma Nusantara Ltd
Star Energy (Banyumas) Ltd.
Star Energy Sentosa (Sebatik) Ltd
Star Energy (Sekayu) Ltd
31.25% working interest in Kakap PSC
100% Wayang Windu Project
100% working interest in Banyumas PSC
100% working interest in Sebatik PSC
100% working interest in Sekayu PSC
14
Star Energy Location 100° E THAILAND
106° E
112° E
118° E
124° E
130° E
136° E
12° N
PHILIPPINES
SOUTH CHINA
KAKAP PSC. 6°N
SEA
SEBATIK PSC.
Philippines Malaysia
BRUNEI DARUSALAM
ARUN
Kinabalu
Banda Aceh
Sandakan
S A B A H
Bandar Seri Begawan
Philippines Indonesia
Pangkalanbrandan
Medan
NATUNA
Jailolo
SIMEULUE
Kuala Lumpur Toba Lake
C E L E B E S
SARAWAK
S E A
P ACI FI C
OCEAN
Manado
SINGAPORE
Kuching
BATAM BINTAN
HALMAHERA
NIAS
Pekanbaru
0°
BATU
Pontianak
SINGKEP
Padang
Samarinda
KALIMANTA N
BIAK Balikpapan
PELENG
Palu
SULA YAPEN
SIBERUT
MISOOL
Jambi Palangkaraya
PAGAI
SULAWESI Jayapura SERAM
Banjarmasin
BANGKA BELITUNG
I R I A N
BURU Ambon Kendari
J A V A
SEKAYU PSC.
S E A BUTON
Tanjungkarang Ujungpandang BAWEAN
ENGGANO
6° S
B A N D A
S E A
KAI
ARU
Jakarta
J A Y A
Indonesia Papua New Guinea
Palembang Bengkulu
KANGEAN
Bandung
Semarang
Surabaya
TANIMBAR
KOLEPOM
JAVA Yogyakarta
ARAFURA S E A
BALI LOMBOK Denpasar Mataram
I N D I A N O C E A NWAYANG WINDU
SUMBAWA
BANYUMAS PSC.
FLORES
Dili
Kupang
starenergy
Star Energy
12° S 0
Kilometers
500
MAP LOKASI Dir:\Drawings\Wayang Windu\Jailolo.dsf
15
star energy
STAR ENERGY Kakap
16
Description of Kakap PSC
17
Located in Natuna Sea, Indonesia, 486 km NE of Singapore and 1247 km North of Jakarta.
Covers 2000 square kilometers in 2 separate blocks with 9 oil and gas fields (4 platforms and 5 subsea tiebacks).
Has long-term contract with GOI until March 2028 (original contract was from 1975 until 2005 and has been recently extended)
Current PSC parties include Star Energy (31.25%), Novus/Medco (25%), Premier (18.75%), Singapore Petroleum (15%) and Pertamina (10%).
West Natuna Transportation System
CONOCOPHILLIPS INDONESIA BLOCK ‘B’ = 43.1 % PREMIER OIL – BLOCK ‘A’ = 36.9 % STAR ENERGY – BLOCK KAKAP = 20.0 % 18
Description of Kakap PSC - Location Map
All fields located in South Kakap Block
Has 9 Producing fields (4 platforms and 5 subsea tiebacks) 19
Facilities and Infrastructure - Schematic
All oil piped to FPSO for processing and storage
Gas processed at KF platform before shipping to Singapore via WNTS pipeline
Sales gas currently coming from KH and KRA fields 20
Facilities and Infrastructure – FPSO
Start up Cargo Capacity Process Capacity Current Staff Accomodation
: : : :
March 1986 650,000 Bbls 25,000 BOPD 2,250 BOPD 20,000 BWPD : 53 : 87
$16.5 mm Refurbishment 2001-2004 2003 : $3.9 mm 2004 : 2.4 mm
21
Facilities and Infrastructure - Kakap Platforms KH Platform
KG Platform
KF Platform
KRA Platform
22
star energy
STAR ENERGY Wayang Windu
23
LOCATIONS
Pangalengan - West Java ± 40 km south of Bandung ELEVATIONS
+1700 meter from sea level AREA
14,400 ha Resource area 96 ha Tea Plantation 11.2 ha Forestry area
Salak Kamojang
Wayang Windu
Wayang Windu Power Station
Patuha
Darajat 24
Karaha Bodas
Facilities – Steam Field Total Wells are 39 wells: - Reservoir temp. 260°C to 325° - Depth range 1300 m to 2500 m 14
Production Wells
Supplying steam for Unit 1
5
Injection Wells
Sufficient for Unit 1& Unit 2
5
Slim Holes
3
Abandoned Wells
6
Non-Commercial
2 temporary abandonment
6
Production wells
New wells for Unit 2
Steam Lines (17.5 km, 36”, 42”, & 48” dia.) Operating pressure 10 to 14 bar Operating temperature 190°C Injection Lines (16 km, 18”,24” & 30” dia.) Operating pressure 10 barg Operating temperature 180°C 25
Power Station Turbine manufacturer - Fuji Electric Co., Ltd output 110 MW and 117MW gross Single casing, dual flow, double exhaust Rated steam pressure 10.2 bar Rated steam temperature 180.7 °C Length of last stage blade 27 inch.
Generator Unit Manufacturer - Fuji Electric Co., Ltd Synchronous, Brush Less type output 137,500 kVA voltage 13.8 kV
26
Power Station Main Transformer 13.8 kV ~ 150 kV Capacity 92 / 134 MVA (ONAN / ONAF)
Condenser Direct contact, spray jet type Circulating water flow 16,700 3 m /hour Steam flow 718,663 kg/hour
27
Power Station
Gas Removal System 2 x 50% hybrid system type 1 x 50 % ejector type (back up) NCG flow 14,667 kg/hour
Hot Well Pump Vertical centrifugal canned type Capacity 10,200 t/h, 2 x 50%
28
Power Station Cooling Tower - fans 2 x 8 Cell
29
FACILITIES-STEAM ABOVE GROUND FACILITY SCRUBBER (Vessel) Capacity 4 x 65 MW
U-1
U-2 U-2 U-1
SEPARATOR (Vessel) Capacity 6 x 48 MW 30
2009 KEY ACTIVITIES CONTINUE UNIT 3 WAYANG WINDU PROJECT,
DESIGN FOR 120 MW SINGLE UNIT. COMPLETION TARGET BY 2012 DRILL SEBATIK PSC EXPLORATION BLOCK DRILL SEKAYU PSC EXPLORATION BLOCK GRAVITY SURVEY BANYUMAS EXPLORATION BLOCK BEGIN WITH A SURVEY AND EXPLORATION ACTIVITIES IN THE NEW JAILOLO AREA ACTIVELY PARTICIPATE IN THE COMING GEOTHERMAL TENDER BY GOVERNMENT SEEKING APPOINMENT FROM GOVERNMENT TO PERFORM A STUDY FOR A GEOTHERMAL PROSPECT IN EAST JAVA PROVINCE 31