12300 / 12600 South Design-Build Project Draper & Riverton Cities, Utah
How teamwork, community integration, and follow-through made this project a true asset to the community.
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Overview
C S Se
• Scope: Six-Mile Long Residential and Commercial Roadway Reconstruction • Design-Build Delivery • Budget: $125,000,000 ($90,000,000 DB Cost)
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se x c h a n g e
Project Overview • Project Owner – Utah Department of Transportation
• Contractor – GRW Design-Builders • Geneva Rock Products • Ralph L. Wadsworth Construction Company • W.W. Clyde & Co.
• Design Consultant – H.W. Lochner AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Area
C S Se x c h a n g e
• Location – Draper & Riverton Cities, Utah
• Residential and Commercial Corridor – Main arterial / business corridor for the two communities – Major throughway to I-15, area schools, and the scenic Jordan River Parkway Trail
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Area
C S Se x c h a n g e
• Various Stakeholders – – – –
Residents Businesses Developers Trail / Multi-Modal Users – City / Political Officials – Agencies – Schools
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Scope
C S Se x c h a n g e
• Roadway Widening and Improvements – Widening from two to five lanes with shoulders, bike lanes, parkstrip, curb, gutter, and sidewalks – Required acquisition of 300 properties including over 60 relocations – Center medians – Utility relocations, including under-grounding power lines – Intersection improvements
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Scope Cont.
C S Se x c h a n g e
• Structural Improvements – – – –
New Single Point Urban Interchange at I-15 New rail and railroad overpass New bridge over Jordan River with trail underneath New pedestrian overpass with access to area schools
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Why Design-Build?
C S Se x c h a n g e
• Schedule Savings – Design and construction completed in 2 vs. 7 years
• One Point-of-Contact – Simplified conflict management between design and contractor teams
• Economic Stimulus • Added Value – By working together, design, construction, and public involvement teams identified various opportunities for innovation and cost savings
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
CSS Attributes
C S Se x c h a n g e
Collaborative Teamwork
Commitment to Community Integration
Follow-Through in Incorporating Context Sensitive Initiatives
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se x c h a n g e
Developing the Vision and Delivering the Vision
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
CSS Attributes
C S Se
Collaborative Teamwork
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Collaborative Teamwork
C S Se
• Multi-Disciplinary Team • Constant On-going Internal Team Communication
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Collaborative Teamwork
C S Se
•
Community Coordination Committees
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Collaborative Teamwork
C S Se
•
Neighborhood Group Meetings
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Collaborative Teamwork
C S Se
•
Coordination with Adjacent Projects
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
CSS Attributes
C S Se x c h a n g e
Commitment to Community Integration
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Community Integration
C S Se
• Identification of the different context along the corridor.
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Community Integration
C S Se
• On-Site Project Office
Project Office
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Community Integration
C S Se
• Face-to-Face Communication
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Community Integration
C S Se
• Consistent Project Identity
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Community Integration
C S Se
• Extensive, Dynamic Public Outreach and Involvement
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Community Integration
C S Se
• Access Control Modifications
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Community Integration
C S Se
• School Involvement
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
CSS Attributes
C S Se x c h a n g e
Follow-Through in Incorporating Context Sensitive Initiatives
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Follow-Through
C S Se
• Contractor Incentives
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Follow-Through
C S Se
• Right-of-Way Commitments
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Follow-Through
C S Se
• Consistent On-going Communication • Build Trust by being Open and Honest
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Follow-Through
C S Se
• Aesthetics and Landscaping
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Follow-Through
C S Se
• Aesthetics and Landscaping
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Community Integration:
C S Se
Before and After
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Community Integration:
C S Se
Before and After
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
12300 South:
C S Se
Before and After
–
Pre-Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
12300 South:
C S Se
Before and After
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
12300 South:
C S Se
Before and After
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se x c h a n g e
Influence on Current UDOT Practice • Public Information Managers on high-impact construction projects • Improved communication during construction – Regular email updates for residents, businesses and commuters – Increased media coverage of construction impacts
• Stakeholder committees during construction AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se x c h a n g e
Influence on Current UDOT Practice • Stakeholder administered contractor incentives on highimpact construction projects • Increased local government involvement during construction • Development of “Partners for the Road Ahead” business guide • Increased emphasis on aesthetics – More stakeholder input – Local themes AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Contact Information
C S Se x c h a n g e
For further Information please contact: Kim Clark, PE H.W. Lochner
[email protected] (801) 262-8700 Kris Peterson Utah Department of Transportation
[email protected] (801) AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Construction
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se
Project Construction
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Results:
C S Se
Roadway
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Results:
C S Se
I-15 Interchange and Main Line
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Results:
C S Se
Jordan River Bridge and Trail
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Results:
C S Se
Pedestrian Overpass
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Results:
C S Se
Railroad
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
Project Results:
C S Se
Landscaping and Aesthetics
x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006
C S Se x c h a n g e
AASHTO/FHWA Peer Exchange: Context Sensitive Solutions Baltimore, MD Sept. 6-8, 2006