Session 2913
Shure’s PLM Journey – Phase 2 Sara Surya – Shure Incorporated Rob Feiss – Shure Incorporated
[email protected] [email protected]
LEARNING POINTS Hear about Shure’s integrated SAP PLM solution
Enable New Product Development Streamline Engineering to Manufacturing transition Optimize the Engineering Change process Ensure visibility across the organization
Understand the seamless information flow across technologies
SAP PLM 7.01 Microsoft Sharepoint cenitCONNECT (process and workflow management) ECTR - Engineering Control Center (CAD integration for NX)
Learn about next steps in the PLM Roadmap
Shure Incorporated
Professional Audio Products Legendary Microphones Revolutionary Wireless Systems Premium Earphones and Headphones
Product Lifecycle Management Buy / Make
Design / Develop
Build / Buy
360 Degree PEOPLE Visibility PROCESS TECHNOLOGY
Discontinue / Dispose Safety regulations Communication
Maintain / Manage Change Management Product Record
Product ideation thru retirement…. People, Process and Technology
PLM Phase I - Recap Goals - PLM foundation SAP PLM 7.01 Engineering Portal based on Microsoft SharePoint cenitCONNECT for workflow and process management
Key Achievements
Retired and replaced Eigner PLM One stop shop for engineers Single sign on Product Record Part Request -> SAP Material Master (Basic View) Leverage technology – SAP, Sharepoint Implemented 2 key engineering processes Engineering Change Product deviation
Go-live was in Dec 2011, on time and on budget
Building the Foundation
• Single, shared product record within the company • Eliminate data redundancy
• Supports version management • Early build of the product record directly in SAP Single Product
Business Process & System Integration
• Improve Engineering to Manufacturing Process Integration • Consolidated, Improved CAD Tools • Company wide accessibility to CAD Drawings
Record • Eliminates duplicate data entry
• Controlled Change Process • Workflow Enabled • Real time visibility and transparency • Simplified ease of use • Historical tracking Digitized Change Management
CAD Environment
CAD
MCAD I-DEAS
NX
Team Center
ECAD PADS
Board Station
Dx Expedition
ECM
60+ CAD Tools
OTHERS PORTAL ERP PM DMS
Consolidate before Integration
EIGNER STELLENT Shared Drives, Local Hard Disk PLANVIEW SAP
Sharepoint
Access / SQL Databases / Network Drive
o I-DEAS -> NX o PADS, BOARDSTATION -> Dx Expedition
Level of Integration
PLM Phase II Goals NX Integration with SAP Locations: Suzhou (China), Niles (USA) Enable consistent First Production / Development across different functional areas eg: Software, ATE, AE, EE, etc Improve Change Management and Deviation
Key Achievements Retired/Replaced TeamCenter with SAP Implemented ECTR, migrated legacy data Extended Engineering Portal Standardized and digitized first Production / Development Release
Go-Live in Dec 2012, on time and on budget
Project Details Project Team Project Manager SAP Functional Analyst Development – Sharepoint, ABAP Process Owners Subject Matter Expert (all functional areas) Consultants (Vendor) Project Duration : 5 months Roadblock Data quality in Legacy environment 9
BEST PRACTICE
Keep it simple – clear and limited project scope Project Methodology Standards - ASAP ‘Train the Trainer’ approach Mind sharing session, site visit
HIGHLIGHTS / KEY LEARNINGS Introduced Certification o 2 level – Super user, End user o Training needs o Change Management
Expose users to standard functionality prior to requirement gathering, blueprint o 1 week of user training in new tool o 1 week to practice in sandbox
Clearly established super-user group
Choose the right PLM partner Communication, Communication, Communication….
RETURN ON INVESTMENT • Business Process Optimization
• Operational Efficiency
• Hardware & Software Savings
• Improve Time to Market
RETURN ON INVESTMENT
Process Efficiency
Business Process Optimization
• Workflow enabled for traceability and execution
• Consolidated and integrated CAD
2007
2012
Open ECRs
200
38
Average Age
136
30
• Established metrics with a focus on High Priority changes
• Established owners and permission restrictions to address data integrity • Automated Change Management Process • Do more with less
RETURN ON INVESTMENT
Hardware and Software Savings • Reduced Hardware farm – Heating, Cooling – Administrative support – Backup • Software Maintenance
Improve Time to Market • BOM and Material setup directly in SAP • Streamlined and digitized release process • 360 Degree Visibility • Ease of use
Consolidate and Integrate CAD
I-DEAS
NX
MCAD Team Center
CAD
CAD
MCAD ECAD PADS
Board Station
Dx Expedition
SAP
Sharepoint
Access / SQL Databases / Network Drive
ERP, Doc.Mgt, TREX Search, Change Mgt
PLANVIEW
A F T E R
OTHERS PORTAL
ECM OTHERS PORTAL ERP PM DMS
60+ CAD Tools
EIGNER STELLENT Shared Drives, Local Hard Disk
ECAD Dx Expedition
60+ CAD Tools
B E F O R E
NX
SAP
Sharepoint Access / SQL Databases / Network Drive
Expanding the Foundation
Product Record Improvements
• • • •
Product Variants Material Classification Discontinued Product (DPN) Process ECAD Integration
BRT Improvements
• • • •
ISR Process FG Release Extended BOM & Costing New Product Introduction (NPI)
System & Process Improvements
• • • •
Supplier Collaboration Serialization & Labels Purchasing process for tooling, prototyping CAD capability
Our Partners
APPENDIX Sample Certification
System landscape Single sign-on
Single Sign on
SAP System Landscape
Suzhou, China
Niles, IL, USA
TREX
Content Server
SAP ERP SAP PLM
Content Server
THANK YOU FOR PARTICIPATING Please provide feedback on this session by completing a short survey via the event mobile application. SESSION CODE: 2913 For ongoing education on this area of focus, visit www.ASUG.com