Session 2913 Shure s PLM Journey Phase 2

Session 2913 Shure’s PLM Journey – Phase 2 Sara Surya – Shure Incorporated Rob Feiss – Shure Incorporated [email protected] [email protected]...
Author: Hector Simpson
13 downloads 0 Views 2MB Size
Session 2913

Shure’s PLM Journey – Phase 2 Sara Surya – Shure Incorporated Rob Feiss – Shure Incorporated [email protected] [email protected]

LEARNING POINTS  Hear about Shure’s integrated SAP PLM solution    

Enable New Product Development Streamline Engineering to Manufacturing transition Optimize the Engineering Change process Ensure visibility across the organization

 Understand the seamless information flow across technologies    

SAP PLM 7.01 Microsoft Sharepoint cenitCONNECT (process and workflow management) ECTR - Engineering Control Center (CAD integration for NX)

 Learn about next steps in the PLM Roadmap

Shure Incorporated

Professional Audio Products  Legendary Microphones  Revolutionary Wireless Systems  Premium Earphones and Headphones

Product Lifecycle Management Buy / Make

Design / Develop

Build / Buy

360 Degree PEOPLE Visibility PROCESS TECHNOLOGY

Discontinue / Dispose  Safety regulations  Communication

Maintain / Manage  Change Management  Product Record

Product ideation thru retirement…. People, Process and Technology

PLM Phase I - Recap  Goals - PLM foundation  SAP PLM 7.01  Engineering Portal based on Microsoft SharePoint  cenitCONNECT for workflow and process management

 Key Achievements       

Retired and replaced Eigner PLM One stop shop for engineers Single sign on Product Record Part Request -> SAP Material Master (Basic View) Leverage technology – SAP, Sharepoint Implemented 2 key engineering processes  Engineering Change  Product deviation

 Go-live was in Dec 2011, on time and on budget

Building the Foundation

• Single, shared product record within the company • Eliminate data redundancy

• Supports version management • Early build of the product record directly in SAP Single Product

Business Process & System Integration

• Improve Engineering to Manufacturing Process Integration • Consolidated, Improved CAD Tools • Company wide accessibility to CAD Drawings

Record • Eliminates duplicate data entry

• Controlled Change Process • Workflow Enabled • Real time visibility and transparency • Simplified ease of use • Historical tracking Digitized Change Management

CAD Environment

CAD

MCAD I-DEAS

NX

Team Center

ECAD PADS

Board Station

Dx Expedition

ECM

60+ CAD Tools

OTHERS PORTAL ERP PM DMS

 Consolidate before Integration

EIGNER STELLENT Shared Drives, Local Hard Disk PLANVIEW SAP

Sharepoint

Access / SQL Databases / Network Drive

o I-DEAS -> NX o PADS, BOARDSTATION -> Dx Expedition

 Level of Integration

PLM Phase II  Goals  NX Integration with SAP Locations: Suzhou (China), Niles (USA)  Enable consistent First Production / Development across different functional areas eg: Software, ATE, AE, EE, etc  Improve Change Management and Deviation

 Key Achievements  Retired/Replaced TeamCenter with SAP Implemented ECTR, migrated legacy data  Extended Engineering Portal  Standardized and digitized first Production / Development Release

 Go-Live in Dec 2012, on time and on budget

Project Details  Project Team  Project Manager  SAP Functional Analyst  Development – Sharepoint, ABAP  Process Owners  Subject Matter Expert (all functional areas)  Consultants (Vendor)  Project  Duration : 5 months  Roadblock  Data quality in Legacy environment 9

BEST PRACTICE

 Keep it simple – clear and limited project scope  Project Methodology Standards - ASAP  ‘Train the Trainer’ approach  Mind sharing session, site visit

HIGHLIGHTS / KEY LEARNINGS  Introduced Certification o 2 level – Super user, End user o Training needs o Change Management

 Expose users to standard functionality prior to requirement gathering, blueprint o 1 week of user training in new tool o 1 week to practice in sandbox

 Clearly established super-user group

 Choose the right PLM partner  Communication, Communication, Communication….

RETURN ON INVESTMENT • Business Process Optimization

• Operational Efficiency

• Hardware & Software Savings

• Improve Time to Market

RETURN ON INVESTMENT

Process Efficiency

Business Process Optimization

• Workflow enabled for traceability and execution

• Consolidated and integrated CAD

2007

2012

Open ECRs

200

38

Average Age

136

30

• Established metrics with a focus on High Priority changes

• Established owners and permission restrictions to address data integrity • Automated Change Management Process • Do more with less

RETURN ON INVESTMENT

Hardware and Software Savings • Reduced Hardware farm – Heating, Cooling – Administrative support – Backup • Software Maintenance

Improve Time to Market • BOM and Material setup directly in SAP • Streamlined and digitized release process • 360 Degree Visibility • Ease of use

Consolidate and Integrate CAD

I-DEAS

NX

MCAD Team Center

CAD

CAD

MCAD ECAD PADS

Board Station

Dx Expedition

SAP

Sharepoint

Access / SQL Databases / Network Drive

ERP, Doc.Mgt, TREX Search, Change Mgt

PLANVIEW

A F T E R

OTHERS PORTAL

ECM OTHERS PORTAL ERP PM DMS

60+ CAD Tools

EIGNER STELLENT Shared Drives, Local Hard Disk

ECAD Dx Expedition

60+ CAD Tools

B E F O R E

NX

SAP

Sharepoint Access / SQL Databases / Network Drive

Expanding the Foundation

Product Record Improvements

• • • •

Product Variants Material Classification Discontinued Product (DPN) Process ECAD Integration

BRT Improvements

• • • •

ISR Process FG Release Extended BOM & Costing New Product Introduction (NPI)

System & Process Improvements

• • • •

Supplier Collaboration Serialization & Labels Purchasing process for tooling, prototyping CAD capability

Our Partners

APPENDIX  Sample Certification

 System landscape  Single sign-on

Single Sign on

SAP System Landscape

Suzhou, China

Niles, IL, USA

TREX

Content Server

SAP ERP SAP PLM

Content Server

THANK YOU FOR PARTICIPATING Please provide feedback on this session by completing a short survey via the event mobile application. SESSION CODE: 2913 For ongoing education on this area of focus, visit www.ASUG.com

Suggest Documents