REJECT

SUPPLIER Inspection Checklist for Suppliers, Source and Receiving Inspection QUALITY REQUIREMENTS CUSTOMER DRAWING NO. AQL: LOT SIZE: REV. ARROWH...
Author: Ellen Ford
8 downloads 0 Views 358KB Size
SUPPLIER Inspection Checklist for Suppliers, Source and Receiving Inspection QUALITY REQUIREMENTS

CUSTOMER DRAWING NO.

AQL:

LOT SIZE:

REV.

ARROWHEAD DRAWING NO.

SUPPLIER NAME

MATERIAL

HEAT LOT

SPEC NO.

ITEM

REQUIRED (*) Dims in inches

ZONE

ACTUAL (RANGE)

SUPPLIER

REV.

SAMPLE SIZE: P.O. NO.

CUSTOMER

QUANTITY

SUPPLIER W.O. SOURCE

ACCEPT/REJECT ACCEPT/REJECT

page 1 of 5

DATE

MEASURING EQUIPMENT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ARPRO 1135 Rev NC 1/22/14 (*) Unless otherwise noted above, tolerances are as follows: angles +/- 30', .X +/- .1, .XX +/- .03, .XXX +/- .010 Revised to add column for Measuring Equipment. 6/24/08 G.G.

REMARKS

SUPPLIER Inspection Checklist for Suppliers, Source and Receiving Inspection QUALITY REQUIREMENTS

CUSTOMER DRAWING NO.

AQL:

LOT SIZE:

REV.

ARROWHEAD DRAWING NO.

SUPPLIER NAME

MATERIAL

HEAT LOT

SPEC NO.

ITEM

REQUIRED (*) Dims in inches

ZONE

ACTUAL (RANGE)

SUPPLIER

REV.

SAMPLE SIZE P.O. NO.

CUSTOMER

QUANTITY

SUPPLIER W.O. SOURCE

ACCEPT/REJECT ACCEPT/REJECT

page 2 of 5

DATE

MEASURING EQUIPMENT

21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 ARPRO 1135 Rev NC 1/22/14 (*) Unless otherwise noted above, tolerances are as follows: angles +/- 30', .X +/- .1, .XX +/- .03, .XXX +/- .010 Revised to add column for Measuring Equipment. 6/24/08 G.G.

REMARKS

SUPPLIER Inspection Checklist for Suppliers, Source and Receiving Inspection QUALITY REQUIREMENTS

CUSTOMER DRAWING NO.

AQL:

LOT SIZE:

REV.

ARROWHEAD DRAWING NO.

SUPPLIER NAME

MATERIAL

HEAT LOT

SPEC NO.

ITEM

REQUIRED (*) Dims in inches

ZONE

ACTUAL (RANGE)

SUPPLIER

REV.

SAMPLE SIZE: P.O. NO.

CUSTOMER

QUANTITY

SUPPLIER W.O. SOURCE

ACCEPT/REJECT ACCEPT/REJECT

page 3 of 5

DATE

MEASURING EQUIPMENT

41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 ARPRO 1135 Rev NC 1/22/14 (*) Unless otherwise noted above, tolerances are as follows: angles +/- 30', .X +/- .1, .XX +/- .03, .XXX +/- .010 Revised to add column for Measuring Equipment. 6/24/08 G.G.

REMARKS

SUPPLIER Inspection Checklist for Suppliers, Source and Receiving Inspection QUALITY REQUIREMENTS

CUSTOMER DRAWING NO. MATERIAL

HEAT LOT

ITEM

REQUIRED (*) Dims in inches

61 62

SPEC NO.

SUPPLIER NAME

REV.

P.O. NO.

CUSTOMER

QUANTITY

SUPPLIER W.O.

ARPRO 967

Part number and Revision

Quantity

66 Heat Lots 67 C of C Documentation

69 Verify Material

71

ARROWHEAD DRAWING

Quality Clauses

65

70

REV.

SAMPLE SIZE:

FAIR

Identification

68

LOT SIZE:

MEASURING EQUIPMENT ARPRO 967/Visual

63

64

AQL:

Heat Treat Ultrasonic Inspect Forging

72 Sealing Surface 73 Damage 75 Cleanliness

SUPPLIER

SOURCE

ACCEPT/REJECT

ACCEPT/REJECT

DATE

REMARKS Check if req and/or on file. Verify each clause is met,

Verify part number, Revision, heat number, PO number, ARPRO 967 manufacture date, etc. Verify correct part Documentation number and revision is received per drawing /Visual and receiver ticket Verify quantity shipped meets quantity received. Visual Multiple heat lots are permissible, provided segregation is Documentation maintained up to and /Visual thru time of shipment and paperwork. Verify C of C is received from all Visual processors. Verify all documents received cross Documentation reference to each other /Visual on C of C Verify material received/used is per drawing/ and check chemical and physical AMS XXXX test reports. Documentation Documentation

if applicable

if applicable scratches, gouges, cracks, and tool marks Visual allowed. scratches, gouges, cracks, tool marks, and Visual contamination. Visual inspect for cleanliness and APPS-3-M-100 documented. Verify Lot is 100% Sampling is not inspected and applicable documented.

Critical Characteristic ARPRO 1135 Rev NC 1/22/14 (*) Unless otherwise noted above, tolerances are as follows: angles +/- 30', .X +/- .1, .XX +/- .03, .XXX +/- .010 Revised to add column for Measuring Equipment. 6/24/08 G.G. 76

page 4 of 5

ARROWHEAD RECEIVING Inspection Checklist for Suppliers, Source and Receiving Inspection QUALITY REQUIREMENTS

CUSTOMER DRAWING NO. MATERIAL

HEAT LOT

ITEM

REQUIRED (*) Dims in inches

AQL:

LOT SIZE:

REV.

ARROWHEAD DRAWING

SPEC NO.

SUPPLIER NAME

RECEIVING INSPECTOR ACCEPT/REJECT

DATE

REV.

SAMPLE SIZE: P.O. NO.

CUSTOMER

QUANTITY

SUPPLIER W.O. Comments

77

MEASURING EQUIPMENT

REMARKS

AP Intranet

Verify vendor is approved for special process AP/Customer

ASL 78

DFAR Compliant

79

Receiver Ticket Notes

page 5 of 5

Verify material received/used is DFAR compliant if required. Verify that items received meets all the Receiver Ticket notes. Verify part number, Revision, heat number, PO number, manufacture date. ARPRO 967 Multiple heat lots are permissible, provided segregation is Documentation maintained up to and /Visual thru time of shipment and paperwork. scratches, gouges, cracks, tool marks, and contamination. Visual Verify C of C is received from all Visual processors. AP Intranet

80 Identification

81 Heat Lots 82 Damage 83

C of C ARPRO 1135 Rev NC 1/22/14 (*) Unless otherwise noted above, tolerances are as follows: angles +/- 30', .X +/- .1, .XX +/- .03, .XXX +/- .010 Revised to add column for Measuring Equipment. 6/24/08 G.G.

SUPPLIER PRINT NAME: __________________________

SOURCE PRINT NAME: __________________________

SIGN/STAMP:________________________

SIGN/STAMP:_______________________ LOT ACCEPTED:______

DATE:________

DATE:________

ARROWHEAD RECEIVING INSPECTOR PRINT NAME: __________________________

SIGN/STAMP:________________________

DATE:________

Suggest Documents