B 9004 E E DET NORSKE VERITAS MANAGEMENT SYSTEM CERTIFICATE
DET NORSKE VERITAS MANAGEMENT SYSTEM CERTIFICATE
ISO 9001
ISO14001
Pumps for Power Plant
OHSAS 18001
www.hsgoodsprings.com
Springs of Living Water
HEAD OFFICE (04144) 6F, HYOSUNG Bldg., 119 Mapo-daero, Mapo-gu, Seoul, Korea TEL : 82-2-707-7000 CHANGWON PLANT / R&D CENTER (51559) 303 Gongdan-ro, Seongsan-gu, Changwon-si, Gyeongnam, Korea TEL : 82-55-279-7861 GIMHAE PLANT (50969) 158-20 Golden root-ro, Juchon-myeon, Gimhae-si, Gyeongnam, Korea TEL : 82-55-340-4407
DIRECT CONTACT Pumps for Petrochemical, Refinery Plant
TEL : +82-2-3279-8221
E-mail :
[email protected]
Pumps for Power Generation, Desalination Plant
TEL : +82-2-3279-8280
E-mail :
[email protected]
This brochure does not contain all informations and any warranty or guarantee of any kind. Also, all informations herein is subject to change without notice.
About HYOSUNG
01 Our Business Brief Introduction of Hyosung Goodsprings
Hyosung Power & Industrial Systems PG is a division under Hyosung which consists of seven performance groups(PGs). In addition to establishing itself as a world-class manufacturer of electrical equipments, green technology and industrial machineries, Hyosung is also the largest producer of tire cords and spandex in the global market and the second largest supplier of ATMs in the USA.
Hyosung Goodsprings (HGS) has contributed to the development and economic growth of Korean pumps and water industries, based on its outstanding technology through continued research & development activities. Hyosung Goodsprings is the largest Korean company specialized in manufacturing pumps and supplying facilities for water treatments including desalination plants. By acquiring the KEPIC certificate, which enables to produce safety related pumps for nuclear power plants, Hyosung Goodsprings is currently engaged in conducting a number of national policy tasks, well recognized for our superior technologies, which includes nuclear power pumps and the localization of equipment for desalination plants. Hyosung Goodsprings is presently producing high quality products for various usages, from pumps for power plants to those for petrochemicals, building/housing, industrial, desalination plant, and marine/offshore. Hyosung Goodsprings has outstanding performances in the field of desalination plant sector. Hyosung Goodsprings also known as an import-substituting company thanks to its continuous development of new technology, is now accelerating to open up local markets as well as foreign markets. Hyosung Goodsprings provides the best solutions that customers can depend and fulfill their needs in the entire process from the receipt of orders to planning, manufacturing, and after-sales services which is all enabled by R&D activities and quality management. Hyosung Goodsprings will grow up to become a company specialized in producing pumps and water processing and rank along with the world’s top corporations, through continuous innovation and customer satisfaction efforts.
Meaning of ‘Goodsprings’ Our corporate name purports to represent “Good & Great Spring”, which symbolizes the origin of all life, wisdom and abundance. It also signifies Hyosung Goodsprings, core value of “positive contribution toward abundance and happiness of humanity” by providing abundant water, the origin of life. We pledge with our valued customers that we will provide better and more innovative products and services, as well as to leap together in order to become a world class company with global competitiveness.
Pumps for Power Plant CONTENTS 3 Our Business 4 Pumps for Power Plant 6 Thermal/Combined Cycle Power Plant 8 Nuclear Power Plant 10 R&D 12 Quality Assurance 14 Global Network
02 Pumps for Power Plant - Thermal / Combined Cycle Power Plant - Nuclear Power Plant
This is Youngheung power plant.
Thermal/Combined Cycle Power Plant
Pumps for Power Plant
Boiler Feedwater Pump Feature Technology-intensive pump which enables ultra high-pressure (up to 350bar) and high-temperature liquids (up to 200°C). Applicable for all kinds of power plants.
Capacity As required for any service
Circulating Water Pump Feature Large-capacity vertical type pump to which pull-out type structure can be applied. Duplex stainless steel applicable.
Capacity As required for any service
Major References for Thermal Power Plant Boiler Feed Water Pump Delivery
Project
Site
Enduser
EPC
Item & Specification
~2016
Thermogas Machala CCPP
Ecuador
Thermogas Machala
JSC Machine
6sets (128m3/h, 1,297m, 650kW)
2015
Rabigh II IPP
Saudi Arabia
SEC
SAMSUNG C&T
9sets (380m3/h, 1,649m, 2,050kW)
2015
PP14
Saudi Arabia
SEC
WorleyParsons(SEC)
24sets (360m3/h, 1,724m, 2,200kW)
2015
PP 13
Saudi Arabia
SEC
WorleyParsons(SEC)
24sets (360m3/h, 1,724m, 2,200kW)
2015
Bandirma II CCPP
Turkey
Enerjisa
SIEMENS
2sets (553m3/h, 2,156m, 3,700kW)
2015
Khabat TPP Unit # 1&2
Iraq
GAMA Power systems
POSCO E&C
6sets (334m3/h, 2,250m, 2,600kW)
2014
Prai CCGT PJT
Malaysia
TNB
SAMSUNG C&T
6sets (365m3/h, 2,155m, 2,200kW)
2014
Azito Phase 3 CCPP
Cote d'lvoire
Azito
HYUNDAI E&C
3sets (285m3/h, 1,135m , 1,250kW)
2014
Ain Arnat CCPP
Algeria
SPE
HYUNDAI E&C
6sets (438m3/h, 1,460m, 2,000kW)
2012
Tufanbeyli TPP
Turkey
Enerjisa
KEPCO E&C
9sets (308m3/h, 2,260m, 2,500kW)
2012
UCH II Expansion CCPP
Pakistan
URS Infrastructured & Environment UK Limited
HYUNDAI Eng.
3sets (300m3/h, 1,350m, 1,400kW)
2012
SHUWEIHAT S3 IPP
UAE
SAPCO
DAEWOO E&C
6sets (811m3/h, 1,052m, 2,800kW)
2012
NORTE II CCGT POWER PJT
Mexico
GE
SAMSUNG Eng.
4sets (290m3/h, 1,630m, 1,700kW)
2012
Sohar II & Barka III CCPP
Oman
Al Batinah Power Company
GS E&C
6sets (623.6m3/h, 1,588m, 2,800kW)
2011
Marafiq 5&6 CCPP
Saudi Arabia
Marafiq
HANWHA E&C
1sets (584m3/h, 2,200m, 5,000kW)
2010
Shuweihat S2
UAE
Ruwais Power Company
SAMSUNG C&T
6sets (609m3/h, 1,200m, 2,600kW)
2010
Nhon Trach 2 CCPP
Vietnam
Petrovietnam
SIEMENS
3sets (423.2m3/h, 1,444.5m, 2,200kW)
2009
Severn CCPP
UK
Public Utilities Board
SIEMENS
4sets (278.6m3/h, 1,542.3m, 2,700kW)
2009
Seraya CCPP
Singapore
Public Utilities Board
SIEMENS
4sets (565.2m3/h, 1,610.5m, 3,100kW)
2009
Yoengwol CCPP
Korea
KOSPO
DOOSAN
6sets (184.4m3/h, 1,702m, 1,200kW)
2008
Jebel Ali M project
UAE
DEWA
DOOSAN
4sets (525m3/h, 1,356m, 2,650kW)
2008
Ambatovy CCPP
Madagascar
Keangnam
KEONGNAM
9sets (250m3/h, 1,190m, 1,180kW)
2008
Qatalum CCPP
Qatar
Qatalum
DOOSAN
12sets (505.4m3/h, 1,468m)
2008
Gunsan CCPP
Korea
KOWEPO
S&TC
6sets (184.4m3/h, 1,702m, 1,200kW)
Circulating Water Pump Delivery
Project
Site
Enduser
EPC
Item & Specification
2014
Prai CCGT PJT
Malaysia
TNB
SAMSUNG C&T
3sets (46,050m3/h, 16m, 2,700kW)
2014
PACO Power Plant
Panama
Minera Panama S.A
SK E&C
4sets (13,200m3/h, 35m, 1,770kW)
2013
Takoradi T2 CCPP
Ghana
TICO
KEPCO E&C
2sets (26,000m3/h, 22.3m, 2,100kW)
2013
Qurayyah IPP
Saudi Arabia
SEC
SAMSUNG C&T
12sets (29,600m3/h, 16.63m, 2,250kW)
2013
SHOAIBA II CCPP
Saudi Arabia
SEC
DAELIM IND.
4sets (28,640m3/h, 16.08m, 2,200kW)
2012
HGP #5~8 CCPP
Korea
Hyundai Green Power
HYUNDAI E&C
4sets (19,150m3/h, 22.5m, 1,700kW)
2012
Shuweihat S3 IPP
UAE
SAPCO
DAEWOO E&C
4sets (42,200m3/h, 22.4m, 3,400kW)
2012
Shuweihat S3 IPP
UAE
SAPCO
DAEWOO E&C
2sets (34,500m3/h, 15.6m, 2,000kW)
2011
Sohar II IPP
Oman
Al Batinah Power Company
GS E&C
4sets (14,500m3/h, 23m, 1,250kW)
2011
Barka III IPP
Oman
Al Batinah Power Company
GS E&C
3sets (21,700m3/h, 23m, 1,850kW)
2010
Shuweihat S2
UAE
Ruwais Power Company
DOOSAN
4sets (27,700m3/h, 27m, 2,600kW)
2010
Bekirli
Turkey
ICDAS
PROKON
4sets (31,500m3/h, 30m, 3,500kW)
2009
Ras Laffan C IWPP
Qatar
RGPC
HYUNDAI E&C
9sets (23,600m3/h, 28m, 2,400kW) 2sets (30,000m3/h, 27m, 2,800kW)
2009
Aravali STPP
India
NTPC
NTPC
2009
Farakka STPP
India
NTPC
NTPC
5sets (44,500m3/h, 7m, 1,100kW)
2004~2009
Boryeong TPP Unit 7,8
Korea
KOMIPO
KOMIPO
18sets (34,820m3/h, 14.5m, 2,100kW)
2008
Qatalum CCPP
Qatar
Qatalum
DOOSAN
6sets (23,300m3/h, 26m)
Condensate Extraction Pump
Condensate Extraction Pump
Delivery
Project
Site
Enduser
EPC
Item & Specification
2015
Rabigh II IPP
Saudi Arabia
SEC
SAMSUNG C&T
6sets (1,080m3/h, 235m, 980kW)
2015
Panda Stonewall
USA
Panda Energy
SIEMENS
3sets (456m3/h, 269m, 480kW)
2015
Khabat TPP Unit # 1&2
Iraq
GAMA Power systems
POSCO E&C
6sets (470m3/h, 260m, 490kW)
2015
Fast Track 3A PJT
Malaysia
TNB
DAELIM IND.
3sets (1,080m3/h, 130m, 490kW)
Vertical barrel casing structure enables to apply in the severe suction condition.
2014
Prai CCGT PJT
Malaysia
TNB
SAMSUNG C&T
6sets (370m3/h, 230m, 315kW)
2014
Bandirma II CCPP
Turkey
Enerjisa
SIEMENS
2sets (539m3/h, 272m, 600kW)
Capacity
2014
Azito Phase 3 CCPP
Cote d'lvoire
Azito
HYUNDAI E&C
2sets (780m3/h, 130m, 400kW)
Feature CWP SLP BFP
Circulating Water Pump Seawater Lift Pump
Up To 5,500m3/h (24,200GPM)
CBP
Boiler Feedwater Pump Condensate Extraction Pump Condensate Booster Pump
NOTE : For more detailed information on these products, please contact our sales representative. I
6 7 Pumps for Power Plant
Eletro Amazonas Maua III
Brazil
Eletrobras
SIEMENS
3sets (390m3/h, 258m, 400kW)
2014
ENARSA Brigadier Lopez
Argentina
Enarsa
SIEMENS
2sets (577m3/h, 243m, 560kW)
Argentina
Enarsa
SIEMENS
3sets (577m3/h, 243m, 560kW)
USA
Panda Energy
SIEMENS
3sets (456m3/h, 269m, 480kW) 3sets (456m3/h, 269m, 480kW)
2014 ENARSA Ensenada de Barragan
BFBP Boiler Feedwater Booster Pump CEP
2014
2014
Panda Energy Temple II CCPP
2013
Panda Energy Temple I CCPP
USA
Panda Energy
SIEMENS
2013
Panda Sherman I
USA
Panda Energy
SIEMENS
3sets (456m3/h, 269m, 480kW)
2013
SHOAIBA II CCPP
Saudi Arabia
SEC
DAELIM IND.
6sets (412m3/h, 125m, 210kW)
2013
Qurayyah IPP
Saudi Arabia
SEC
SAMSUNG C&T
12sets (1,010m3/h, 330.4m, 1,290kW)
2012
UCH II Expansion CCPP
Pakistan
URS Infrastructured & Environment UK Limited
HYUNDAI Eng.
2sets (655m3/h, 155m, 400kW)
2012
SHUWEIHAT S3 IPP
UAE
SAPCO
DAEWOO E&C
6sets (582m3/h, 275m, 720kW)
2012
New HariPure CCPP
Bangladesh
EGCB
HYUNDAI E&C
2sets (620m3/h, 220m, 550kW)
2011
Sohar II & Barka III CCPP
Oman
Al Batinah Power Company
GS E&C
6sets (618m3/h, 248.5m, 630kW)
2009
Shuweihat S2
UAE
Ruwais Power Company
SAMSUNG C&T
6sets (498m3/h, 208m, 405kW)
2009
Severn CCPP
UK
Welsh Power
SIEMENS
4sets (596.8m3/h, 244.8m, 600kW)
2009
Seraya CCPP
Singapore
Public Utilities Board
SIEMENS
4sets (495.9m3/h, 253m, 581kW)
Nuclear Power Plant
Pumps for Power Plant
Safety Injection Pump & Containment Spray Pump
Major References for Nuclear Power Plant
Feature
Korea
ASME Sec, Division - class – component Thermal transient qualification – actual test Dynamic qualification against seismic load Environment qualification against hash zone Fatigue analysis for equipment design life 40 years guarantee
Delivery
2013 ~ 2015
Project
Shin-Ul-Chin #1, #2 (1,400MW)
Capacity As required for any service
2009 ~ 2011
2008 ~ 2010
Shin-Ko-Ri #3, #4 (1,400MW)
Shin-Wol-Sung #1, #2 (1,000MW)
Circulating Water Pump Feature Large-capacity vertical type pump to which pull-out type structure can be applied duplex stainless steel applicable.
2008 ~ 2010
Shin-Ko-Ri #1, #2 (1,000MW)
Capacity As required for any service
2001 ~ 2002
Ul-Chin NPP #5, #6 (1,000MW)
Service
Quantity
Boric Acid Makeup Pump
4
Item & Specification 4x3 HCN-4/5
Shutdown Cooling Pump
4
12x16x24 VCN
Safety Injection Pump
8
6x11-7stg.-HDBN
Containment Spray Pump
4
12x16x24 VCN
Deisel Fuel Oil Transfer Pump
8
3x2HCN-8.5
Circulating Water Pump
12
VMF2100-1840 VCP600-575-4Stg.
Condensate Pump
6
Feedwater Booster Pump
6
16x24x34L DSJH
Main Feedwater Pump
6
14x14x17B DVSR
Start-Up Feedwater Pump
2
250x200SBRD4M
Boric Acid Makeup Pump
4
4x3 HCN-1
Shutdown Cooling Pump
4
12x16x24 VCN 6x11-7stg.-HDN
Safety Injection Pump
4
Containment Spray Pump
4
12x16x24 VCN
Circulating Water Pump
12
VMF2100-1830
Low Pressure Safety Injection Pump
4
8x14x24 DFSS
High Pressure Safety Injection Pump
4
6x10-1/4-9stg.-HDB
Containment Spray Pump
2
8x14x24 VCN
Boric Acid Makeup Pump
4
3x1 1/2 HCN-1 2 1/2x2 HCN-8 1/2
Deisel Fuel Oil Transfer Pump
8
Containment Cooling Water Pump
8
24x24 HDN-24
Circulating Water Pump
8
VMF1950-1690
Condensate Pump
6
30KxG4VMT
Feedwater Booster Pump
6
16x20x34 LDSJH
Low Pressure Safety Injection Pump
4
8x14x24 DFSS
High Pressure Safety Injection Pump
4
6x10-1/4-9stg.-HDB
Containment Spray Pump
2
8x14x24 VCN
Boric Acid Makeup Pump
4
3x1 1/2 HCN-1
Deisel Fuel Oil Transfer Pump
8
2 1/2x2 HCN-8 1/2
Condensate Pump
6
30KKxH4 VMT
Feedwater Booster Pump
6
10x20x34 LDSJH
Low Pressure Safety Injection Pump
4
8x14x24 DFSS
High Pressure Safety Injection Pump
4
6x10-1/4-9stg.-HDB
Boric Acid Makeup Pump
4
80x40 UCN-25
Holdup Pump
4
80x40 UCN-20
Item & Specification
Recent Records Delivery
2013 ~ 2017
CEP
Condensate Extraction Pump
Condensate Pump & Feedwater Booster Pump
CCP
Centrifugal Charging Pump
Feature
HPSIP
High Pressure Safety Injection Pump
Technology – intensive structure enables to apply in severe suction condition
LPSIP
Low Pressure Safety Injection Pump
Capacity
CSP
Containment Spray Pump
As required for any service
CVCSP Chemical Volume Control System Pump ESWP
Essential Service Water Pump
SRCP
Safety Related Centrifugal Pump
I
8 9 Pumps for Power Plant
Note : For more detailed information on these products, please contact our sales representative.
Project
UAE/ Brakah NPP #1~4
Service
Quantity
Safety Injection Pump
16
SBVN150/9
Shutdown Cooling Pump
8
SVSN300-765 12x16x29VCN
Containment Spray Pump
8
Main Feedwater Pump, Turbine Driven
12
FKIH42
Circulation Water Pump
24
VMF2400-2120
Diesel Fuel Oil Transfer Pump
16
HCN 3x2-1
CL Seawater Supply Pump
4
VTM100/3
Circulating Water Screen Wash Pump
6
VTM125/2
03 R&D Inspiring innovation, creation and expertise Hyosung R&D Center identifies innovation, creation, and expertise as core values, and concentrates on world class R&D activities in the 21st century with a philosophy aspiring after customer satisfaction, quality priority, and performance orientation, Hyosung pursues to be the world’s best company in the field of Industrial Pump and Desalination, Oil & Gas, and Power Plant (including nuclear).
Hydraulic Designs •Various Hydro Data •Basic Shape Design using specially designed programs •Optimal shape design through Experiments •More hydro design using Impeller 3D design programs •3D Flow simulation performance prediction
Impeller 3D design program
Streamline
Impeller design-only program
Optimal shape design of Experiments with
Vapour Volume Fraction
Pressure distribution
Structural Integrity Evaluation •Stress analysis, strength evaluation support unit •Strength test by a fluid flow using FSI (Fluid Structure Interaction)
•Dynamic Analysis of Rotor-only program •Structural Vibration, Thermal Stress Analysis
Pump Test Center HYOSUNG GOODSPRINGS Pump Test Center, one of the largest facilities in the world
Structural Vibration, Thermal Stress Analysis
Structural Strength Analysis
Electricity Test Capacity Large Size Pump Test Stand
High Pressure Pump Test Stand
Petrochemical Pump Test Stand I
10 11 Pumps for Power Plant
Feature
Capability
Max. Volt.
13,200 V
Max. Power
14,000 kW
Max. Flow
110,000 m3/h
Test Stand
7 ea.
Max. Flow
6,000 m3/h
Max. Press.
400 barG
Max. Temp.
200℃ below
Test Stand
4 ea.
Max. Flow
5,000 m3/h
Test Stand
5 ea.
Shaft Analysis Tool
Model Assembly Analysis
Sump Model Test Design of Anti-vortex Device (AVD) To ensure pump safety and customer satisfactions
Submerged vortex cavitation
Air-entrance vortex AVD for submerged vortex and removal of vortex
04 Quality Assurance
Product Development History
Hyosung strives for excellence. We believe excellence can only be achieved through absolute qualities and values for customers. In order to create quality and fine products, we believe that all of the actions of every single employee must be focused on the highest level of quality. In order to achieve those levels, we have implemented an assurance policy and programs that make our philosophy into a reality.
1962. May
·Established Hanyoung Industrial Corporation
1975.
Oct
·Merged into Hyosung Group
1977.
Sep
·Completed the Changwon Plant with Korea’s largest test facility
Our Quality Assurance Policy is based on the global standard and meets the demands of ISO 9001. As a globally active company, we are committed to comprehensive and quality management through three quality systems: quality management system, customer-focused management system, and concentration on core competencies. The comprehensive quality management system ensures that we completely comply with all compliances and applicable legislation, codes, and standards along with implementing efficient operation of our management resources in order to eliminate unnecessary wastes.
1989.
Oct
·Established Hyosung EBARA Co., Ltd.
1990.
Oct
·Newly operated pump plant
1995.
Jan
·Hyosung Heavy Industries Co., Ltd. Acquired and merged the Pump Business Division
1996.
Sep
·Completed Korea’s largest test facility for testing BOILER FEED PUMP for 800MW Thermal Power Station and REACTOR FEED PUMP for 1350MW Nuclear Power Station
Our customer-focused management system clarifies and simplifies our first priority which is customer satisfaction. All of our work is aimed to exceed customer needs and provide exceptional value through quality standards, flexibility, and innovation.
1997.
Aug
·Obtained “Nuclear Reactor Facility Production License” (Pumps & Valves)
1999.
Aug
·Supplied pumps for Yeongkwang Nuclear Power (1000MW,NO.5&6) CWP (Korea’s largest capacity)
2003.
Nov
·Won a Korea Energy Efficient Product Excellence Award (presented by Korea Management Association)
2006.
Apr
·Obtained high-efficiency machinery materials certifications enforced by the Korea Energy Management Corporation
2009.
Jul
·Completion ceremony held for the ‘Containerized RO’ project at Incheon Mooui Island / Obtained nuclear power-related ASME ‘N’, ‘NPT’ certifications
2010.
Sep
·Hyosung / Ebara Joint Venture Terminated and Changed name to "HYOSUNG GOODSPRINGS"
Dec
·Supplied API610 pump 32 sets (OH2) to Takreer For “Ruwais Refinery Expansion #2 , UAE”
Jan
·Supplied API610 pump 11 sets (BB2, BB3) to GASCO For “SHAH GAS DEVELOPMENT #4, UAE”
Feb
·Defining Corporate Identity & Brand Identity – “Pumps & Water”
Apr
·Supplied API610 pump 32 sets (BB1, OH2) to ARAMCO For “KAPSARC, Saudi Arabia”
Jun
·Awarded for 104 sets of Q class and Non-Q class related pumps For “BARAKAH / UAE Nuclear power plant”
Nov
·Won the Minister’s award from Ministry of Knowledge Economy by developing Safety Injection Pump for nuclear power plant for the first time in Korea
Feb
·Developed the can type diffuser for the first time in Korea
Year
Finally, we concentrate on our core competencies for strict quality control and continual improvement which provides quality products and cost-saving to our clients via advancement in technical capacity and technological innovation. We implement our policy via the Quality Management Team which manages research laboratories, including the Measurement Standard Laboratory, the Chemical Analysis Laboratory and the Material Analysis Laboratory to maintain a strict control over quality.
2011.
2013.
Mar
·Supplied CWP for Shin-Boryeong Units 1 & 2, the largest coal-fired power plant in Korea
Sep
·Supplied BFP, CEP for Taean thermal power plant Units 9 & 10
Oct
·Successful localization of the centrifugal charging pump for the first time in Korea
Nov
·Received order for Bismayah New City Project to NIC, Republic of IRAQ
Apr
·Completion of the World’s Largest Pump Test Center and Opening Ceremony held in HYOSUNG GOODSPRINGS Changwon Plant
2015.
Jun
·The opening of HYOSUNG Abu Dhabi branch office
2015.
Nov
·Technical Seminar and Improvement Completion Ceremony of BFP for 1000MW
2014.
ISO 9001
I
12 13 Pumps for Power Plant
ISO 14001
OHSAS 18001
KEPIC
CE Mark
Milestones
Global Network Ready to serve our global customer anytime, anywhere
Global Network | Aggressive Expansion of Global Customer Support Structure
Sales Network A/S Overseas Branch Domestic Plant
30 Sales Networks
23 Service Networks
6
Branch Offices
Business Networks Main Office
Seoul, Korea
Manufacturing Plant
Changwon & Gimhae, Korea
Branch Office (6)
Spain·Italy·UAE·USA·India·Iran
Sales Network (30)
USA·Netherlands·Spain·Turkey·Israel·United Kingdom·Italy UAE·Iran·Saudi Arabia·Kuwait·Jordan·Oman·Egypt·Qatar·Bahrain·Iraq Thailand·Japan·Indonesia·Singapore·Malaysia·Taiwan·Vietnam·India
A/S Network (23)
USA·Mexico·Peru·Puerto Rico·Argentina·Russia·Poland·Germany Turkey·Italy·Azerbaijan·UAE·Iran·Saudi Arabia·Singapore
I
14 15 Pumps for Power Plant
Hyosung, the star company behind Korea’s rapid economic growth over the last five decades, is now leaping forward as the top-rank global company armed with global excellence and value management.
Major Reference | Hyosung’s Worldwide References